CN206174487U - Pre -cast screw fixing device - Google Patents
Pre -cast screw fixing device Download PDFInfo
- Publication number
- CN206174487U CN206174487U CN201621221546.0U CN201621221546U CN206174487U CN 206174487 U CN206174487 U CN 206174487U CN 201621221546 U CN201621221546 U CN 201621221546U CN 206174487 U CN206174487 U CN 206174487U
- Authority
- CN
- China
- Prior art keywords
- plate
- fixing device
- positioning
- screw
- location
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Reinforcement Elements For Buildings (AREA)
Abstract
本实用新型涉及工程设备领域,尤其涉及一种紧固装置,具体提供一种预埋螺杆固定装置。一种预埋螺杆固定装置,包括螺杆、定位板和固定支架,其特征在于:所述的定位板上设有灌浆孔和螺杆定位孔,所述螺杆定位孔与螺杆配合连接;所述的固定支架包括支撑板和支撑柱,所述支撑柱安装于支撑板底面并固定连接,在支撑板上设有凹槽,固定支架和定位板通过螺杆连接并设有调节装置。所述的定位板四周中部侧向延伸设有定位块,所述定位块设有尖端用于对齐工程定位墨线。所述的调节装置包括螺母和垫圈,所述螺母安装于固定支架上方和定位板下方并在两者之间设有垫圈。所述的定位板上设有把手。
The utility model relates to the field of engineering equipment, in particular to a fastening device, in particular to a pre-embedded screw fixing device. A pre-embedded screw fixing device, comprising a screw, a positioning plate and a fixing bracket, characterized in that: the positioning plate is provided with a grouting hole and a screw positioning hole, and the screw positioning hole is connected with the screw; the fixing The bracket includes a support plate and a support column. The support column is installed on the bottom surface of the support plate and is fixedly connected. A groove is provided on the support plate. The fixed bracket and the positioning plate are connected by a screw rod and provided with an adjustment device. The central part of the positioning plate is surrounded by a positioning block extending laterally, and the positioning block is provided with a tip for aligning the engineering positioning ink line. The adjusting device includes a nut and a washer, and the nut is installed above the fixing bracket and below the positioning plate with a washer between them. The positioning plate is provided with a handle.
Description
技术领域technical field
本实用新型涉及工程设备领域,尤其涉及一种紧固装置,具体提供一种预埋螺杆固定装置。The utility model relates to the field of engineering equipment, in particular to a fastening device, in particular to a pre-embedded screw fixing device.
背景技术Background technique
水工工程施工过程中通常涉及有预埋螺杆施工,预埋螺杆定位不准,或者在浇筑混凝土过程中,预埋螺杆容易受到混凝土冲击、振捣棒碰撞、钢筋笼偏位等各种因素影响导致位置偏差,偏差过大致使上部构件无法安装。The construction process of hydraulic engineering usually involves pre-embedded screw construction, the positioning of the pre-embedded screw is not accurate, or in the process of pouring concrete, the pre-embedded screw is easily affected by various factors such as concrete impact, vibrating rod collision, steel cage deviation, etc. This leads to a positional deviation, which is so large that the upper part cannot be installed.
传统的施工方法是采用人工定位,容易造成偏差,返工处理预埋螺杆偏差过大的工作极为费工费时,偏差严重时甚至需要拆除基础重新施工。特别是在多根预埋螺杆组成一个固定单位,多个固定单元组合固定上部构件的情况下,预埋螺杆的精确定位和固定措施尤为重要,单个预埋螺杆出现偏差,会导致全部预埋螺杆返工处理的情况;同时临时安装固定装置浪费大量人力财力,因此急需一种预埋施工固定装置。The traditional construction method is to use manual positioning, which is easy to cause deviations. Rework to deal with the excessive deviation of the pre-embedded screw is extremely labor-intensive and time-consuming. When the deviation is serious, it may even be necessary to remove the foundation and re-construct. Especially when multiple embedded screws form a fixed unit, and multiple fixed units are combined to fix the upper component, the precise positioning and fixing measures of the embedded screw are particularly important. Deviation of a single embedded screw will lead to the failure of all embedded screws. The situation of rework processing; At the same time, the temporary installation of fixtures wastes a lot of manpower and financial resources, so there is an urgent need for a pre-embedded construction fixture.
发明内容Contents of the invention
针对上述现有技术不足之处,本实用新型提供一种固定效果好,同时定位精度高的预埋螺杆固定装置。Aiming at the shortcomings of the above-mentioned prior art, the utility model provides a pre-embedded screw fixing device with good fixing effect and high positioning accuracy.
为了实现上述目的,本实用新型采用如下技术方案:一种预埋螺杆固定装置,包括螺杆、定位板和固定支架,所述的定位板上设有灌浆孔和螺杆定位孔,所述螺杆定位孔与螺杆配合连接;所述的固定支架包括支撑板和支撑柱,所述支撑柱安装于支撑板底面并固定连接,在支撑板上设有凹槽,固定支架和定位板通过螺杆连接并设有调节装置。In order to achieve the above object, the utility model adopts the following technical scheme: a pre-embedded screw fixing device, including a screw, a positioning plate and a fixing bracket, the positioning plate is provided with a grouting hole and a screw positioning hole, and the screw positioning hole Cooperate and connect with the screw rod; the fixed bracket includes a support plate and a support column, the support column is installed on the bottom surface of the support plate and fixedly connected, a groove is provided on the support plate, the fixed bracket and the positioning plate are connected by a screw rod and provided with Adjustment device.
如上所述的定位板四周中部侧向延伸设有定位块,所述定位块设有尖端用于对齐工程定位墨线。The middle part of the above-mentioned positioning plate is provided with a positioning block extending laterally around the middle, and the positioning block is provided with a tip for aligning the engineering positioning ink line.
如上所述的调节装置包括螺母和垫圈,所述螺母安装于固定支架上方和定位板下方并在两者之间设有垫圈。The above-mentioned adjusting device includes a nut and a washer, and the nut is installed above the fixing bracket and below the positioning plate with a washer between them.
如上所述的凹槽宽度比螺杆直径大1mm-5mm。The groove width as mentioned above is 1mm-5mm larger than the screw diameter.
如上所述的所述的定位板上设有把手。As mentioned above, a handle is provided on the positioning plate.
如上所述的定位板整体成矩形。The positioning plate as described above has a rectangular shape as a whole.
如上所述的固定支架整体成L形。The fixing bracket as mentioned above is L-shaped as a whole.
本实用新型有益性:Beneficiality of the utility model:
本实用新型相对传统预埋螺杆固定装置,通过在定位板上设有的四个螺杆定位孔能有效提升安装效率,同时设有了固定支架,通过凹槽和定位块调整位置,实现高精度定位避免出现因固定偏差造成返工现象。Compared with the traditional pre-embedded screw fixing device, the utility model can effectively improve the installation efficiency through the four screw positioning holes provided on the positioning plate. At the same time, a fixing bracket is provided, and the position is adjusted through the groove and the positioning block to realize high-precision positioning. Avoid rework caused by fixed deviations.
附图说明Description of drawings
附图1为本实用新型一种预埋螺杆定位装置的结构示意图;Accompanying drawing 1 is the structural representation of a kind of pre-embedded screw positioning device of the present utility model;
附图2为图1从另一个方向看的结构示意图。Accompanying drawing 2 is the structural diagram of Fig. 1 viewed from another direction.
图中标识:1-定位板、2-固定支架、3-螺杆、4-调节装置、5-把手、101-定位块、102-灌浆孔、201-凹槽、202-支撑板、203-支撑柱。Marks in the picture: 1-positioning plate, 2-fixing bracket, 3-screw, 4-adjusting device, 5-handle, 101-positioning block, 102-grouting hole, 201-groove, 202-supporting plate, 203-supporting column.
具体实施方式detailed description
参考附图对本实用新型一种预埋螺杆固定装置做进一步详细描述,With reference to the accompanying drawings, a further detailed description of a pre-embedded screw fixing device of the present invention is made,
实施例1,一种预埋螺杆固定装置,包括螺杆3、定位板1和固定支架2,所述的定位板1上设有灌浆孔102和螺杆定位孔,所述螺杆定位孔设于定位板四个角落并与螺杆3配合连接;所述的固定支架2包括支撑板202和支撑柱203,所述支撑柱203安装于支撑板202底面并固定连接,在支撑板202上设有凹槽201,固定支架2和定位板1通过螺杆3连接并设有调节装置4。Embodiment 1, a pre-embedded screw fixing device, including a screw 3, a positioning plate 1 and a fixing bracket 2, the positioning plate 1 is provided with a grouting hole 102 and a screw positioning hole, and the screw positioning hole is set on the positioning plate The four corners are connected with the screw rod 3; the fixed bracket 2 includes a support plate 202 and a support column 203, the support column 203 is installed on the bottom surface of the support plate 202 and fixedly connected, and the support plate 202 is provided with a groove 201 , the fixed bracket 2 and the positioning plate 1 are connected by a screw 3 and an adjusting device 4 is provided.
定位板1四周中部侧向延伸设有定位块101,所述定位块101设有尖端用于对齐工程定位墨线。A positioning block 101 is provided laterally extending around the middle of the positioning plate 1, and the positioning block 101 is provided with a tip for aligning engineering positioning ink lines.
调节装置4包括螺母和垫圈,所述螺母安装于固定支架2上方和定位板1下方并在两者之间设有垫圈。The adjusting device 4 includes a nut and a washer, and the nut is installed above the fixing bracket 2 and below the positioning plate 1 with a washer between them.
凹槽201宽度比螺杆3直径大1mm-5mm。The width of the groove 201 is 1mm-5mm larger than the diameter of the screw rod 3 .
作为本实用新型优选方案凹槽201宽度比螺杆3直径大2mm,便于调节固定支架2与螺杆3的位置使支撑柱203贴合施工工作面。As a preferred solution of the utility model, the width of the groove 201 is 2mm larger than the diameter of the screw rod 3, which is convenient for adjusting the positions of the fixing bracket 2 and the screw rod 3 so that the support column 203 fits the construction work surface.
作为本实用新型定位板1上设有把手5。As the utility model positioning plate 1 is provided with a handle 5 .
作为本实用新型优选方案定位板1整体成矩形。As a preferred solution of the utility model, the positioning plate 1 is integrally shaped into a rectangle.
本实用新型具体使用过程:首先在每排滑触线支架两端定位排架的中点,并利用这两个点在工作面上弹出一条通长的墨线,此墨线用作定位块101的中心对准基线。将螺杆3与定位板1组装好,并旋紧下方调节装置4中设于定位板1下方的螺母,使螺杆3与定位板1不会晃动。将固定支架2上的凹槽201套在螺杆3上;将定位板1和螺杆3放置到工作面的预留孔上,将固定支架2末端的支撑柱203支撑在工作面的孔壁上,将支撑柱203调整在定位板1的对角线上,以达到更好的固定效果。调整定位板1中心线与墨线重合,旋紧固定支架2上的固定螺母。完成固定工作,施工人员要用力晃动螺杆3,测试稳固程度。完成安装全部的预埋螺杆3后,用经纬仪或者全站仪复核一遍螺杆3的位置,完成最后的位置调整后,即可浇筑混凝土,三天后旋松调节装置4使本固定装置与螺杆3脱离实现重复利用。The specific use process of the utility model: firstly, locate the midpoint of the rack at both ends of each row of trolley line brackets, and use these two points to pop up a long ink line on the working surface, and this ink line is used as the center of the positioning block 101 Align to baseline. Assemble the screw rod 3 and the positioning plate 1, and tighten the nuts located below the positioning plate 1 in the adjustment device 4 below, so that the screw rod 3 and the positioning plate 1 will not shake. Set the groove 201 on the fixed bracket 2 on the screw rod 3; place the positioning plate 1 and the screw rod 3 on the reserved hole of the working surface, and support the support column 203 at the end of the fixed bracket 2 on the hole wall of the working surface, Adjust the support column 203 on the diagonal of the positioning plate 1 to achieve a better fixing effect. Adjust the center line of the positioning plate 1 to coincide with the ink line, and tighten the fixing nut on the fixing bracket 2. After completing the fixing work, the construction personnel will shake the screw rod 3 vigorously to test the degree of stability. After installing all the pre-embedded screw rods 3, check the position of the screw rod 3 with theodolite or total station. After the final position adjustment, the concrete can be poured. After three days, loosen the adjusting device 4 to separate the fixing device from the screw rod 3. Achieve reuse.
以上内容是结合具体的优选实施方式对本发明所作的进一步详细说明,不能认定本发明的具体实施只局限于这些说明。对于本发明所属技术领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干简单推演或替换,都应当视为属于本发明的保护范围。The above content is a further detailed description of the present invention in conjunction with specific preferred embodiments, and it cannot be assumed that the specific implementation of the present invention is limited to these descriptions. For those of ordinary skill in the technical field of the present invention, without departing from the concept of the present invention, some simple deduction or replacement can be made, which should be regarded as belonging to the protection scope of the present invention.
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621221546.0U CN206174487U (en) | 2016-11-14 | 2016-11-14 | Pre -cast screw fixing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621221546.0U CN206174487U (en) | 2016-11-14 | 2016-11-14 | Pre -cast screw fixing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206174487U true CN206174487U (en) | 2017-05-17 |
Family
ID=58683618
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621221546.0U Active CN206174487U (en) | 2016-11-14 | 2016-11-14 | Pre -cast screw fixing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206174487U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111636610A (en) * | 2020-06-03 | 2020-09-08 | 王勇 | A kind of box body for self-positioning and rapid assembly of cast-in-place hollow floor slabs |
CN111636611A (en) * | 2020-06-03 | 2020-09-08 | 王勇 | Multi-pillar anti-floating box body of cast-in-place hollow floor slab |
CN111894288A (en) * | 2020-06-24 | 2020-11-06 | 上海二十冶建设有限公司 | Welding control device for positioning rib of reinforced concrete wall and column template |
CN116856735A (en) * | 2023-07-28 | 2023-10-10 | 包钢集团工业与民用建筑工程有限公司 | Positioning device for concrete embedded building member |
-
2016
- 2016-11-14 CN CN201621221546.0U patent/CN206174487U/en active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111636610A (en) * | 2020-06-03 | 2020-09-08 | 王勇 | A kind of box body for self-positioning and rapid assembly of cast-in-place hollow floor slabs |
CN111636611A (en) * | 2020-06-03 | 2020-09-08 | 王勇 | Multi-pillar anti-floating box body of cast-in-place hollow floor slab |
CN111636610B (en) * | 2020-06-03 | 2025-03-11 | 王勇 | A self-positioning and rapid assembly molding box for cast-in-place hollow-core slabs |
CN111894288A (en) * | 2020-06-24 | 2020-11-06 | 上海二十冶建设有限公司 | Welding control device for positioning rib of reinforced concrete wall and column template |
CN116856735A (en) * | 2023-07-28 | 2023-10-10 | 包钢集团工业与民用建筑工程有限公司 | Positioning device for concrete embedded building member |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206174487U (en) | Pre -cast screw fixing device | |
CN104652809A (en) | Construction method of support system for templates of concrete beams and slabs | |
JP2010043468A (en) | Anchor bolt setting apparatus and construction method of foundation | |
CN202913420U (en) | Reusable positioning device for installing foundation bolts | |
CN103835527B (en) | A kind of dismountable supporting device | |
CN104153555A (en) | Detachable cantilever steel beam pre-embedded fixing device with horizontal fixing components | |
CN104120802A (en) | Simple method for mounting and locating seismic isolation support | |
CN104499619A (en) | PC outer hanging wall bottom adjusting component | |
CN203741866U (en) | Fixing frame structure for pre-buried screws in concrete foundation | |
CN204199318U (en) | Multi-purpose Iron Tower Foundation Anchor Bolt Positioning Formwork Device | |
CN205742554U (en) | A kind of steel column and the Mixed Architecture of beams of concrete | |
CN206220117U (en) | For the positioner of column foot | |
CN204512826U (en) | A kind of height-adjustable column | |
CN104328795A (en) | Locator for tower frame connection stand bar and mounting foundation bolt and using method of locator for tower frame connection stand bars and mounting foundation bolts | |
JP2017020312A (en) | Steel column leg | |
CN204212175U (en) | A kind of positioning auxiliary device installing pre-embedded bolt | |
CN104018655A (en) | A component type single support frame | |
CN204386139U (en) | Detachable structural steel anchor device | |
CN202202409U (en) | Double-layer plate positioning bolt | |
CN104264989B (en) | A kind of fixing to the device drawing metal rod | |
CN103981893B (en) | Gas Turbine Foundation Embedded Bolt Suspension Reinforcing Device and Method | |
CN204751889U (en) | Jockey is used in concrete form hoist and mount | |
CN204551846U (en) | Profiled sheet positioner | |
CN206220118U (en) | A kind of column foot detent mechanism | |
CN205976407U (en) | Smart flat installation work rack of hanging of concrete built -in fitting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |