CN205785736U - A test steel pipe fixing device - Google Patents
A test steel pipe fixing device Download PDFInfo
- Publication number
- CN205785736U CN205785736U CN201620433609.2U CN201620433609U CN205785736U CN 205785736 U CN205785736 U CN 205785736U CN 201620433609 U CN201620433609 U CN 201620433609U CN 205785736 U CN205785736 U CN 205785736U
- Authority
- CN
- China
- Prior art keywords
- steel
- section
- test
- fixture
- steel pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 186
- 239000010959 steel Substances 0.000 title claims abstract description 186
- 238000009434 installation Methods 0.000 claims description 3
- 239000011148 porous material Substances 0.000 claims 4
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims 3
- 238000003556 assay Methods 0.000 claims 1
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 6
- 238000009863 impact test Methods 0.000 description 6
- 230000007423 decrease Effects 0.000 description 4
- 238000002474 experimental method Methods 0.000 description 2
- 210000003813 thumb Anatomy 0.000 description 2
- 238000011900 installation process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Landscapes
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
本实用新型公开了一种试验钢管固定装置,包括基座、夹具和定位机构,所述基座的顶部固定有夹具,夹具内安装所述试验钢管,试验钢管位于夹具两端的部分安装有限制试验钢管轴向和径向移动的定位机构;夹具包括下夹具和上夹具,下夹具安装在基座的顶部,下夹具的上部开设有截面为半圆形的下通槽,下通槽内配置有上钢段下夹具的上部安设上夹具,上夹具的下部开设有截面为半圆形的上通槽,上通槽内配置有下钢段,所述下钢段与上钢段对应拼接成管孔,管孔内可安装试验钢管。本实用新型的有益效果为:可限制试验钢管的径向和轴向移动,实现试验钢管两端刚性定位,提高了试验的准确度;夹具包括多个不同尺寸的钢段,可用于不同尺寸的试验钢管,通用性强。
The utility model discloses a test steel pipe fixing device, which comprises a base, a clamp and a positioning mechanism. A clamp is fixed on the top of the base, and the test steel tube is installed in the clamp. The positioning mechanism for axial and radial movement of the steel pipe; the fixture includes a lower fixture and an upper fixture. The lower fixture is installed on the top of the base. The upper part of the lower fixture of the upper steel section is equipped with an upper fixture, and the lower part of the upper fixture is provided with an upper channel with a semicircular cross section, and a lower steel section is arranged in the upper channel, and the lower steel section and the upper steel section are correspondingly spliced into a Tube hole, test steel pipe can be installed in the tube hole. The beneficial effects of the utility model are: it can limit the radial and axial movement of the test steel pipe, realize the rigid positioning of both ends of the test steel pipe, and improve the accuracy of the test; the fixture includes a plurality of steel sections of different sizes, which can be used for Test steel pipe, strong versatility.
Description
技术领域 technical field
本实用新型涉及试验设备技术领域,具体涉及限制钢管轴向和径向移动的试验钢管固定装置。 The utility model relates to the technical field of test equipment, in particular to a test steel pipe fixing device which limits the axial and radial movement of the steel pipe.
背景技术 Background technique
钢管是石油化工管网及海洋平台支架等重要工程结构中广泛使用的基本构件,在其工作过程中不可避免地会遭受意外的撞击。为了研究钢管的变形机理和失效模态,进行钢管的侧向冲击试验时,往往采用系列跨距外径比、径厚比的钢管来进行实验。在多工况实验需求下,标准的试验设备及配套的试验夹具往往不具有一般的通用性,对不同的实验钢管两端进行刚性固定往往很难完全达到固支要求,更换不同管径的钢管试验时耗费大量的人力物力;并且,在钢管的冲击试验中,难以控制钢管的变形位置。因此,有必要对现有技术进行改进。 Steel pipes are widely used basic components in important engineering structures such as petrochemical pipe networks and offshore platform supports, and they will inevitably suffer accidental impacts during their work. In order to study the deformation mechanism and failure mode of steel pipes, when conducting lateral impact tests of steel pipes, a series of steel pipes with span outer diameter ratio and diameter to thickness ratio are often used for experiments. Under the requirements of multi-working conditions experiments, standard test equipment and supporting test fixtures often do not have general versatility. Rigid fixing of both ends of different experimental steel pipes is often difficult to fully meet the fixing requirements. Replacement of steel pipes with different diameters The test consumes a lot of manpower and material resources; and, in the impact test of the steel pipe, it is difficult to control the deformation position of the steel pipe. Therefore, it is necessary to improve the prior art.
发明内容 Contents of the invention
本实用新型的目的在于,针对现有技术的不足,提供一种结构简单、适应范围广、限制钢管轴向和径向移动的试验钢管固定装置。 The purpose of the utility model is to provide a test steel pipe fixing device with a simple structure, a wide range of application, and a limit to the axial and radial movement of the steel pipe.
本实用新型采用的技术方案是:一种试验钢管固定装置,包括基座、夹具和定位机构,所述基座的顶部固定有夹具,夹具内安装所述试验钢管,试验钢管位于夹具两端的部分安装有限制试验钢管轴向和径向移动的定位机构。 The technical solution adopted by the utility model is: a test steel pipe fixing device, including a base, a clamp and a positioning mechanism, the top of the base is fixed with a clamp, the test steel tube is installed in the clamp, and the test steel tube is located at the two ends of the clamp A positioning mechanism is installed to limit the axial and radial movement of the test steel pipe.
按上述方案,所述夹具包括下夹具和、上夹具和定位机构,所述下夹具安装在基座的顶部安装下夹具,下夹具的上部开设有截面为半圆形的下通槽,下通槽内配置有上钢段,上钢段的截面为半圆形;所述下夹具的上部安设上夹具,上夹具的下部开设有截面为半圆形的上通槽,上通槽与下通槽正对布置;上通槽内配置有下钢段,下钢段的截面为半圆形;所述下钢段与上钢段对应拼接成管孔,管孔内可安装试验钢管,试验钢管的两端伸出管孔;所述定位机构安装在试验钢管的两端。 According to the above scheme, the clamp includes a lower clamp, an upper clamp and a positioning mechanism. The lower clamp is installed on the top of the base to install the lower clamp. The upper steel section is arranged in the groove, and the section of the upper steel section is semicircular; the upper fixture is installed on the upper part of the lower fixture, and the lower part of the upper fixture is provided with an upper channel with a semicircular section. The through slots are arranged facing each other; the lower steel section is arranged in the upper through slot, and the cross section of the lower steel section is semicircular; the lower steel section and the upper steel section are correspondingly spliced into pipe holes, and test steel pipes can be installed in the pipe holes. Both ends of the steel pipe protrude from the pipe hole; the positioning mechanism is installed at both ends of the test steel pipe.
按上述方案,所述定位机构包括横穿试验钢管的插销,以及两个大头螺栓,所述插销的两端各插入一个大头螺栓的头部,大头螺栓的栓本体与螺母配合,螺母的外侧端面可与上夹具和/或下夹具的侧壁贴紧;所述插销与大头螺栓的栓本体相垂直。 According to the above scheme, the positioning mechanism includes a pin that crosses the test steel pipe, and two big head bolts. The two ends of the bolt are respectively inserted into the head of a big head bolt. The bolt body of the big head bolt cooperates with the nut, and the outer end surface of the nut It can be close to the side wall of the upper fixture and/or the lower fixture; the bolt is perpendicular to the bolt body of the big head bolt.
按上述方案,所述定位机构包括钢塞和T型的钢塞拔,钢塞拔的大头端尺寸大于试验钢管的尺寸,钢塞拔的大头端位于试验钢管的外部,钢塞拔的另一端与钢塞固连,钢塞安装在试验钢管的内部。 According to the above scheme, the positioning mechanism includes a steel plug and a T-shaped steel plug puller, the size of the big end of the steel plug puller is larger than the size of the test steel pipe, the big end of the steel plug puller is located outside the test steel pipe, and the other end of the steel plug puller is It is fixedly connected with the steel plug, and the steel plug is installed inside the test steel pipe.
按上述方案,所述下通槽内沿下通槽的径向依次配置有多个上钢段,相邻两个上钢段紧贴;上钢段的截面为半圆形,各上钢段的截面半径自下而上逐渐减小;所述上通槽内沿上通槽的径向依次配置有多个下钢段,相邻两个下钢段紧贴;下钢段的截面为半圆形,各下钢段的截面半径自上而下逐渐减小;每个下钢段可与其中一个上钢段对应拼接成管孔。 According to the above scheme, a plurality of upper steel sections are sequentially arranged along the radial direction of the lower passage in the lower passage, and two adjacent upper steel sections are close to each other; the cross section of the upper steel section is semicircular, and each upper steel section The radius of the section decreases gradually from bottom to top; inside the upper channel, there are a plurality of lower steel sections sequentially arranged along the radial direction of the upper channel, and two adjacent lower steel sections are close to each other; the section of the lower steel section is half Circular, the section radius of each lower steel section gradually decreases from top to bottom; each lower steel section can be spliced with one of the upper steel sections to form a pipe hole.
按上述方案,所述上夹具与下夹具通过连接螺栓连接。 According to the above scheme, the upper clamp and the lower clamp are connected by connecting bolts.
与现有技术相比,本实用新型的有益效果为:1、本实用新型采用夹具和定位机构,可限制试验钢管的径向和轴向移动,实现试验钢管两端刚性固定,提高了试验的准确度;夹具包括多个不同尺寸的钢段,可用于不同尺寸的试验钢管,通用性强;2、在试验钢管的冲击试验中,钢塞可减小试验钢管在夹持端的变形,且钢塞和钢塞拔可多次利用,节约成本;3、插销和大头螺栓拆装方便;4、通过调整基座和夹具的位置,可满足任意跨距外径比钢管的试验;5、本实用新结构设计合理,使用方便,通用性强。 Compared with the prior art, the beneficial effects of the utility model are as follows: 1. The utility model adopts a clamp and a positioning mechanism, which can limit the radial and axial movement of the test steel pipe, realize the rigid fixation of both ends of the test steel pipe, and improve the test efficiency. Accuracy; the fixture includes multiple steel sections of different sizes, which can be used for test steel pipes of different sizes, and has strong versatility; 2. In the impact test of the test steel pipe, the steel plug can reduce the deformation of the test steel pipe at the clamping end, and the steel The plug and steel plug can be used for many times, saving cost; 3. The plug pin and the big head bolt are easy to disassemble; 4. By adjusting the position of the base and the fixture, it can meet the test of steel pipes with any span and outer diameter ratio; 5. This practical The new structure is reasonable in design, easy to use and strong in versatility.
附图说明 Description of drawings
图1为本实用新型一个具体实施例的结构示意图。 Fig. 1 is a structural schematic diagram of a specific embodiment of the present invention.
图2为本实施例中试验钢管的安装示意图。 Fig. 2 is a schematic diagram of the installation of the test steel pipe in this embodiment.
图3为本实施例中钢塞与下夹具的位置示意图。 Fig. 3 is a schematic diagram of the position of the steel plug and the lower clamp in this embodiment.
图4为本实施例中上夹具和下夹具的连接示意图。 Fig. 4 is a schematic diagram of the connection of the upper clamp and the lower clamp in this embodiment.
图5为本实施例中钢塞与钢塞拔的连接示意图。 Fig. 5 is a schematic diagram of the connection between the steel plug and the steel plug in this embodiment.
图6为图5的主视图。 Fig. 6 is a front view of Fig. 5 .
图7为本实施例中插销与大头螺栓的连接示意图。 Fig. 7 is a schematic diagram of the connection between the bolt and the big head bolt in this embodiment.
图8为图7的主视图。 Fig. 8 is a front view of Fig. 7 .
其中:1、基座;2、上夹具;3、插销;4、钢塞;5、大头螺栓;6、上钢段;7、钢塞拔;8、连接螺栓;9、下夹具;10、下钢段;11、试验钢管;12、螺母。 Among them: 1. Base; 2. Upper clamp; 3. Latch; 4. Steel plug; 5. Thumb bolt; 6. Upper steel section; 7. Steel plug pull; 8. Connecting bolt; 9. Lower clamp; Lower steel section; 11, test steel pipe; 12, nut.
具体实施方式 detailed description
为了更好地理解本实用新型,下面结合附图和具体实施例对本实用新型作进一步地描述。 In order to better understand the utility model, the utility model will be further described below in conjunction with the accompanying drawings and specific embodiments.
如图1所述的一种试验钢管固定装置,包括基座1、夹具和定位机构,基座1的顶部固装夹具,所述试验钢管11安装在夹具内,所述定位机构安装在夹具两端的试验钢管11上。 A kind of test steel pipe fixing device as described in Figure 1, comprises base 1, clamp and positioning mechanism, and the top of base 1 is fixed fixture, and described test steel pipe 11 is installed in the clamp, and described positioning mechanism is installed on both sides of clamp. On the end of the test steel pipe 11.
本实施例中,如图4所示,夹具包括下夹具9和上夹具2,下夹具9固定在基座1的顶部,下夹具9的上部开设有截面为半圆形的下通槽,下通槽内沿下通槽的径向依次配置有多个上钢段6,相邻两个上钢段6紧贴;上钢段6的截面为半圆形,各上钢段6同心,且截面半径自下而上逐渐减小。下夹具9的上部安设有上夹具2(通过四个连接螺栓8固定),上夹具2的下部开设有截面为半圆形的上通槽,上通槽与下通槽正对布置;上通槽内沿上通槽的径向依次配置有多个下钢段10,相邻两个下钢段10紧贴;下钢段10的截面为半圆形,各下钢段10同心,且截面半径自上而下逐渐减小,如图2-4所示。每个下钢段10可与其中一个上钢段6对应拼接成管孔,管孔内可安装试验钢管11,如图2-3所示;上钢段6和下钢段10的尺寸根据试验钢管11的尺寸设计。上钢段6和下钢段10可构成多种规格的管孔,以适应不同管径的试验钢管11。试验钢管11的两端伸出管孔;所述定位机构安装在试验钢管11的两端。 In this embodiment, as shown in Figure 4, the fixture includes a lower fixture 9 and an upper fixture 2, the lower fixture 9 is fixed on the top of the base 1, and the upper part of the lower fixture 9 is provided with a lower through groove with a semicircular cross section. A plurality of upper steel sections 6 are sequentially arranged in the through groove along the radial direction of the lower through groove, and two adjacent upper steel sections 6 are close to each other; the cross section of the upper steel sections 6 is semicircular, and each upper steel section 6 is concentric, and The section radius decreases gradually from bottom to top. The upper part of the lower fixture 9 is equipped with an upper fixture 2 (fixed by four connecting bolts 8), and the lower part of the upper fixture 2 is provided with an upper channel with a semicircular cross-section, and the upper channel is arranged opposite to the lower channel; A plurality of lower steel sections 10 are sequentially arranged in the through groove along the radial direction of the upper through groove, and two adjacent lower steel sections 10 are close to each other; the cross section of the lower steel sections 10 is semicircular, and each lower steel section 10 is concentric, and The section radius gradually decreases from top to bottom, as shown in Figure 2-4. Each lower steel section 10 can be spliced with one of the upper steel sections 6 to form a pipe hole, and a test steel pipe 11 can be installed in the pipe hole, as shown in Figure 2-3; the size of the upper steel section 6 and the lower steel section 10 is based on the test The dimension design of steel pipe 11. The upper steel section 6 and the lower steel section 10 can form pipe holes of various specifications, so as to adapt to test steel pipes 11 of different pipe diameters. Both ends of the test steel pipe 11 protrude from the pipe hole; the positioning mechanism is installed at both ends of the test steel pipe 11 .
本实施例中,如图7和图8所示,定位机构包括横穿试验钢管11的插销3(试验钢管11上开设有与插销3配合的通孔),以及两个大头螺栓5,插销3的两端各插入一个大头螺栓5的头部,大头螺栓5的栓本体与螺母12配合,螺母12的外端面可与上夹具2和/或下夹具9的侧壁贴紧;所述插销3与大头螺栓5的栓本体相垂直。调节螺母12在大头螺栓5的栓本体的位置,可控制试验钢管11的轴向移动:若试验钢管11两端的螺母12均与上夹具2和/或下夹具9的侧壁贴紧时,试验钢管11的轴向定位;若试验钢管11两端的螺母12未与上夹具2和/或下夹具9的侧壁贴紧,即存在间隙时,试验钢管11可轴向移动。 In this embodiment, as shown in Figures 7 and 8, the positioning mechanism includes a bolt 3 that traverses the test steel pipe 11 (the test steel pipe 11 is provided with a through hole that matches the bolt 3), and two stud bolts 5, the bolt 3 The two ends of each insert the head of a big head bolt 5, and the bolt body of big head bolt 5 cooperates with nut 12, and the outer end surface of nut 12 can be close to the side wall of upper fixture 2 and/or lower fixture 9; Said latch 3 Perpendicular to the bolt body of the tack bolt 5. Adjusting the position of the nut 12 on the bolt body of the big head bolt 5 can control the axial movement of the test steel pipe 11: if the nuts 12 at both ends of the test steel pipe 11 are in close contact with the side walls of the upper fixture 2 and/or the lower fixture 9, the test Axial positioning of the steel pipe 11; if the nuts 12 at both ends of the test steel pipe 11 are not in close contact with the side walls of the upper fixture 2 and/or the lower fixture 9, that is, when there is a gap, the test steel pipe 11 can move axially.
试验钢管11在两端进行冲击试验时,为了避免试验钢管11在夹持端发生变形或者尽可能地减小变形度,通常在钢管内安装钢塞4。如图5和图6所示,所述固定装置还包括钢塞4和T型的钢塞拔7,钢塞拔7的大头端尺寸超过试验钢管11的尺寸,钢塞拔7的大头端位于试验钢管11的端面外部,钢塞拔7的另一端与钢塞4固连,钢塞4伸入在试验钢管11的内部,钢塞4在试验钢管11内的具体位置根据实际试验要求确定。 When the test steel pipe 11 is subjected to an impact test at both ends, in order to avoid deformation of the test steel pipe 11 at the clamping end or reduce the degree of deformation as much as possible, a steel plug 4 is usually installed in the steel pipe. As shown in Figures 5 and 6, the fixing device also includes a steel plug 4 and a T-shaped steel plug 7, the size of the large end of the steel plug 7 exceeds the size of the test steel pipe 11, and the large end of the steel plug 7 is located at Outside the end face of the test steel pipe 11, the other end of the steel plug 7 is fixedly connected with the steel plug 4, and the steel plug 4 extends into the inside of the test steel pipe 11. The specific position of the steel plug 4 in the test steel pipe 11 is determined according to the actual test requirements.
如图1所示,本实施例中包括两组所述固定装置,两组所述固定装置安装按实际试验要求而定(如通过移动两组基座和夹具的位置,可满足任意跨距外径比钢管试验);所述试验钢管11安装在两个所述固定装置上。本实施例以试验钢管的端部冲击试验为例,具体安装过程为: As shown in Figure 1, two sets of fixtures are included in this embodiment, and the installation of the two sets of fixtures depends on the actual test requirements (such as by moving the positions of the two sets of bases and fixtures, it can meet the requirements of any span. Diameter ratio steel pipe test); the test steel pipe 11 is installed on the two fixing devices. This embodiment takes the end impact test of the test steel pipe as an example, and the specific installation process is as follows:
1、根据试验要求间隔安设两组基座1,将下夹具9安装在基座1顶部的对应位置。 1. Install two sets of bases 1 at intervals according to the test requirements, and install the lower fixture 9 at the corresponding position on the top of the base 1 .
2、根据试验钢管11的外径,选择合适尺寸的上钢段6和下钢段10,使试验钢管11可安置在上钢段6和下钢段10形成的管孔内;并将选好的上钢段6安装在上夹具2内,选好的下钢段10安装在下夹具9内。 2. According to the outer diameter of the test steel pipe 11, select the upper steel section 6 and the lower steel section 10 of appropriate size, so that the test steel pipe 11 can be placed in the pipe hole formed by the upper steel section 6 and the lower steel section 10; The upper steel segment 6 is installed in the upper clamp 2, and the selected lower steel segment 10 is installed in the lower clamp 9.
3、将试验钢管11的两端分别安装在两个下钢段10上,并通过连接螺栓8将上夹具2安装在下夹具9上。 3. Install the two ends of the test steel pipe 11 on the two lower steel sections 10 respectively, and install the upper fixture 2 on the lower fixture 9 through the connecting bolt 8 .
4、将钢塞4伸入试验钢管11的内部,并使钢塞4接近夹具内侧的位置;钢塞拔7靠近试验钢管11的底部内壁。 4. Insert the steel plug 4 into the inside of the test steel pipe 11, and make the steel plug 4 close to the position inside the fixture; the steel plug puller 7 is close to the bottom inner wall of the test steel tube 11.
5、将插销3穿过试验钢管11的通孔,插销3的两端装配大头螺栓5,并调节螺母12对试验钢管11定位,限制试验钢管11的轴向移动。 5. Pass the bolt 3 through the through hole of the test steel pipe 11, assemble the two ends of the bolt 3 with the thumb bolts 5, and adjust the nut 12 to position the test steel pipe 11 to limit the axial movement of the test steel pipe 11.
6、开始试验钢管11端部冲击试验。 6. Start the impact test on the end of steel pipe 11.
尽管上面结合附图对本实用新型的优选实施例进行了详细描述,但本实用新型并不局限于上述的具体实施方式,上述的具体实施方式仅仅是示意性的,而不是限制性的。如:改变夹具的半环形钢段的厚度,改变钢塞长度和拔塞方式,改变大头螺钉的形式等。本领域的普通技术人员来在本实用新型启示下,在不脱离本实用新型宗旨和权利要求所保护的范围的实施方案均在本实用新型的保护范围之内。 Although the preferred embodiments of the present invention have been described in detail above with reference to the accompanying drawings, the present invention is not limited to the above-mentioned specific embodiments, which are only illustrative and not restrictive. Such as: change the thickness of the semi-circular steel section of the fixture, change the length of the steel plug and the way of plugging, change the form of the big head screw, etc. Those of ordinary skill in the art come under the inspiration of the utility model, and implementations that do not depart from the gist of the utility model and the scope of protection of the claims are all within the protection scope of the utility model.
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620433609.2U CN205785736U (en) | 2016-05-12 | 2016-05-12 | A test steel pipe fixing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620433609.2U CN205785736U (en) | 2016-05-12 | 2016-05-12 | A test steel pipe fixing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205785736U true CN205785736U (en) | 2016-12-07 |
Family
ID=57409451
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620433609.2U Expired - Fee Related CN205785736U (en) | 2016-05-12 | 2016-05-12 | A test steel pipe fixing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205785736U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107192530A (en) * | 2017-05-27 | 2017-09-22 | 福州市星旺成信息科技有限公司 | A kind of product quality detection device |
CN107345844A (en) * | 2017-08-07 | 2017-11-14 | 北京工业大学 | A kind of round cross-section rod vibration experiment clamping device |
CN108627392A (en) * | 2018-07-05 | 2018-10-09 | 新兴铸管股份有限公司 | Finish rolling deformed bar stretches clamping device |
CN112611530A (en) * | 2020-11-27 | 2021-04-06 | 中国科学院地质与地球物理研究所 | Base for vibration test tool of intelligent guide drilling downhole tool |
-
2016
- 2016-05-12 CN CN201620433609.2U patent/CN205785736U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107192530A (en) * | 2017-05-27 | 2017-09-22 | 福州市星旺成信息科技有限公司 | A kind of product quality detection device |
CN107345844A (en) * | 2017-08-07 | 2017-11-14 | 北京工业大学 | A kind of round cross-section rod vibration experiment clamping device |
CN108627392A (en) * | 2018-07-05 | 2018-10-09 | 新兴铸管股份有限公司 | Finish rolling deformed bar stretches clamping device |
CN112611530A (en) * | 2020-11-27 | 2021-04-06 | 中国科学院地质与地球物理研究所 | Base for vibration test tool of intelligent guide drilling downhole tool |
CN112611530B (en) * | 2020-11-27 | 2021-10-26 | 中国科学院地质与地球物理研究所 | Base for vibration test tool of intelligent guide drilling downhole tool |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205785736U (en) | A test steel pipe fixing device | |
CN202894421U (en) | Tube wall drill fixture | |
CN204361637U (en) | Fault indicator for overhead lines fixture | |
CN204649057U (en) | A kind of pipe distribution system of plastic heat exchanger | |
CN203880273U (en) | Split type flange | |
CN104339120B (en) | The self-tightening type line-up clamp of rapid-cooling heat exchanger pipe splicing | |
CN102773652A (en) | Automatic centering fixing device for welding of long round pipe | |
CN104242214B (en) | Electric cable with large cross-section lays the general fixing device that wish-bone arm type is installed | |
CN106247881B (en) | A kind of localization method and positioning device of converter station valve hall shielding ball position of opening | |
CN203626057U (en) | Novel butt-joint device for thin-wall steel tubes for building construction | |
CN205673812U (en) | The blade assembly welding tooling of CAP1400 initial separator | |
CN204524687U (en) | A kind of PE winding pipe weldering enlarging fixture | |
CN104326359A (en) | Clamper for clamping I-steel | |
CN205246439U (en) | Tired anchor clamps of four -point bending of two spans | |
CN201002223Y (en) | Flange cushion mounting locator | |
CN211395632U (en) | Jacket positioning device and jacket | |
CN204308247U (en) | A kind of magnetic drill base | |
CN203509542U (en) | Flange aligning device | |
CN205049063U (en) | Shielding ball holing position's positioner | |
CN218817422U (en) | Fixing sleeve of metal support | |
CN202752793U (en) | Automatic centering fixing device for welding long round pipes | |
CN205928488U (en) | Flexible rubber joint mounting adjustment instrument | |
CN104400454B (en) | Shielding ball clamping tooling | |
CN205673814U (en) | Drain pipe welding tooling in sleeve | |
CN216819288U (en) | A kind of surrounding sealing device for electrical pipeline |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161207 Termination date: 20170512 |
|
CF01 | Termination of patent right due to non-payment of annual fee |