[go: up one dir, main page]

CN205049630U - Joint terminal box of modularization combination formula three -phase electric energy measurement - Google Patents

Joint terminal box of modularization combination formula three -phase electric energy measurement Download PDF

Info

Publication number
CN205049630U
CN205049630U CN201520721895.8U CN201520721895U CN205049630U CN 205049630 U CN205049630 U CN 205049630U CN 201520721895 U CN201520721895 U CN 201520721895U CN 205049630 U CN205049630 U CN 205049630U
Authority
CN
China
Prior art keywords
voltage
current
neutral line
wiring module
inserting column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520721895.8U
Other languages
Chinese (zh)
Inventor
尹志浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Shaoxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Shengzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Shaoxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Shengzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Zhejiang Electric Power Co Ltd, Shaoxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd, Shengzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201520721895.8U priority Critical patent/CN205049630U/en
Application granted granted Critical
Publication of CN205049630U publication Critical patent/CN205049630U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Measuring Instrument Details And Bridges, And Automatic Balancing Devices (AREA)

Abstract

本实用新型公开了一种模块化组合式三相电能计量联合接线盒,包括滑移安装于导轨上的三个电流电压接线模块、一个中性线接线模块和一对定位块,电流电压接线模块与中性线接线模块通过该对定位块固定,各电流电压接线模块具有一条电压插柱和一对电流插柱,中性线插柱、各电压插柱置于各自模块水平开设的腰形孔中,各中性线插柱上所对应的中性线接线模块顶部、各电压插柱上所对应的电流电压接线模块顶部均垂直开设的通孔供调节螺钉穿置,调节螺钉分别与中性线插柱、电压插柱螺纹连接,通过旋动调节螺钉,电压插柱和中性线插柱均可在各自的腰形孔中上、下移动,灵活调节中性线插柱、各电压插柱的高低位置,因此本实用新型与所有三相电能表能顺利插接。

The utility model discloses a modular combined three-phase electric energy metering joint junction box, which comprises three current and voltage connection modules, a neutral wire connection module and a pair of positioning blocks, which are slidably installed on the guide rail, and the current and voltage connection module The neutral wire connection module is fixed by the pair of positioning blocks. Each current and voltage connection module has a voltage plug and a pair of current plugs. The neutral wire plug and each voltage plug are placed in the waist-shaped holes opened horizontally by the respective modules. In the middle, the top of the neutral line wiring module corresponding to each neutral line insertion post and the top of the current and voltage connection module corresponding to each voltage insertion post have vertical through holes for the adjustment screw to pass through, and the adjustment screw is respectively connected to the neutral line. The line inserts and voltage inserts are threaded. By turning the adjustment screw, the voltage inserts and the neutral line inserts can move up and down in their respective waist-shaped holes, and the neutral line inserts and the voltage inserts can be flexibly adjusted. Therefore, the utility model can be plugged smoothly with all three-phase electric energy meters.

Description

模块化组合式三相电能计量联合接线盒Modular combined three-phase electric energy metering combined junction box

【技术领域】【Technical field】

本实用新型涉及一种三相电能计量联合接线盒,具体是指模块化组合式三相电能计量联合接线盒。The utility model relates to a three-phase electric energy metering combined junction box, in particular to a modular combined three-phase electric energy metering combined junction box.

【背景技术】【Background technique】

现有三相电能计量联合接线盒带有3个电压插柱、3对6个电流插柱,均装于一个盒体中,由于不同厂家、不同型号的带电流互感器的三相电能表其电压插孔和中性线插孔存在高低位置略有不同的问题,而整体式三相电能计量联合接线盒中的电压插柱、中性线插柱的高低位置是固定一致的,无法调节高低,因此现有三相电能计量联合接线盒存在与三相电能表适配性差,无法与所有三相电能表实现对孔连接。The existing three-phase electric energy metering combined junction box has 3 voltage inserts and 3 pairs of 6 current inserts, all of which are installed in one box body. Because the voltage inserts of three-phase electric energy meters with current transformers of different manufacturers and models There is a problem that the height and position of the hole and the neutral line jack are slightly different, but the height and position of the voltage post and the neutral line post in the integrated three-phase electric energy metering combined junction box are fixed and consistent, and the height cannot be adjusted. The existing combined junction box for three-phase electric energy metering has poor adaptability to three-phase electric energy meters, and cannot realize hole-to-hole connection with all three-phase electric energy meters.

有鉴于此,现有一体式三相电能计量联合接线盒存在改进必要。In view of this, it is necessary to improve the existing integrated three-phase electric energy metering joint junction box.

【实用新型内容】【Content of utility model】

本实用新型的目的在于提供一种模块化组合式三相电能计量联合接线盒,它可以灵活地调节中性线插柱、各电压插柱的高低位置。The purpose of the utility model is to provide a modular combined three-phase electric energy metering joint junction box, which can flexibly adjust the height of the neutral wire inserting post and each voltage inserting post.

为达成上述目的,本实用新型提供如下解决方案:In order to achieve the above object, the utility model provides the following solutions:

一种模块化组合式三相电能计量联合接线盒,包括三个电流电压接线模块、一个中性线接线模块、一对定位块和一条导轨,所述电流电压接线模块、中性线接线模块可滑移地安装于导轨上,并通过该对定位块加以固定,各电流电压接线模块具有一条电压插柱和一对高低位置固定的电流插柱,其改进点在于:各电压插柱置于各电流电压接线模块水平开设的腰形孔中,各电压插柱上对应此电流电压接线模块顶部垂直开设的通孔供调节螺钉穿置,此调节螺钉与电压插柱螺纹连接;中性线插柱置于中性线接线模块水平开设的腰形孔中,中性线插柱上对应此中性线接线模块顶部垂直开设的通孔供调节螺钉穿置,该调节螺钉与中性线插柱螺纹连接。A modular combined three-phase electric energy metering joint junction box, comprising three current and voltage connection modules, a neutral wire connection module, a pair of positioning blocks and a guide rail, the current and voltage connection modules and the neutral wire connection module can be It is slidably installed on the guide rail and fixed by the pair of positioning blocks. Each current and voltage wiring module has a voltage plug and a pair of current plugs with fixed heights. The improvement is that each voltage plug is placed on each In the waist-shaped hole opened horizontally on the current and voltage wiring module, each voltage plug corresponds to the through hole vertically opened on the top of the current and voltage wiring module for the adjustment screw to pass through. The adjustment screw is threaded with the voltage plug; the neutral wire plug Placed in the waist-shaped hole opened horizontally on the neutral line terminal module, the neutral line post corresponds to the through hole vertically opened on the top of the neutral line terminal module for the adjustment screw to pass through, and the adjustment screw is threaded with the neutral line post connect.

本实用新型模块化组合式三相电能计量联合接线盒还包括三条滑移式电流短接片,各滑移式电流短接片安装于各电流电压接线模块上,带电换表作业时,三条滑移式电流短接片均与相对应的电流电压接线模块的一对电流插柱连接。The utility model's modular combined three-phase electric energy metering junction box also includes three sliding current shorting pieces, and each sliding current shorting piece is installed on each current and voltage wiring module. The movable current shorting pieces are all connected with a pair of current insertion posts of the corresponding current and voltage wiring modules.

采用上述技术方案后,本实用新型具有如下优点和有益效果:After adopting the above technical scheme, the utility model has the following advantages and beneficial effects:

通过旋动调节螺钉,电压插柱和中性线插柱均可在各自的腰形孔中上、下移动。调节螺钉向下旋动时,电压插柱、中性线插柱向上移动,而当调节螺钉向上旋动时,电压插柱、中性线插柱向下移动,由此起到灵活地调节中性线插柱、各电压插柱的高低位置的目的,由于电压插柱、中性线插柱均为高低位置可调式,因此本实用新型与所有三相电能表的适配性强,三条电压插柱和一条中性线插柱均能与三相电能表的插孔实现顺利插接。By turning the adjusting screw, the voltage post and the neutral line post can move up and down in their respective waist-shaped holes. When the adjustment screw is turned downward, the voltage post and the neutral line post move upward, and when the adjustment screw is turned upward, the voltage post and the neutral line post move downward, thereby flexibly adjusting the neutral line. The purpose of the high and low positions of the neutral line post and each voltage post, because the voltage post and the neutral line post are all adjustable in height, so the utility model has strong adaptability to all three-phase electric energy meters, and the three voltage Both the post and a neutral line post can be smoothly plugged into the socket of the three-phase electric energy meter.

【附图说明】【Description of drawings】

图1是本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;

图2是本实用新型的电流电压接线模块立体图;Fig. 2 is a perspective view of the current and voltage wiring module of the present invention;

图3是本实用新型的中性线接线模块立体图;Fig. 3 is a three-dimensional view of the neutral wiring module of the present invention;

图4是本实用新型的导轨立体图;Fig. 4 is a three-dimensional view of the guide rail of the present utility model;

图5是本实用新型组装结构示意图。Fig. 5 is a schematic diagram of the assembly structure of the utility model.

【具体实施方式】【detailed description】

请参阅图1、2、3、4、5所示,是实用新型的较佳实施例。See also shown in Fig. 1,2,3,4,5, be the preferred embodiment of utility model.

一种模块化组合式三相电能计量联合接线盒,包括三个电流电压接线模块1、一个中性线接线模块2、一对定位块3和一条导轨4,所述电流电压接线模块1、中性线接线模块2可滑移地安装于导轨4上,并通过该对定位块3加以固定,各电流电压接线模块1具有一条电压插柱11和一对高低位置固定的电流插柱12,其改进点在于:各电压插柱11置于各电流电压接线模块1水平开设的腰形孔10中,各电压插柱11上对应此电流电压接线模块1顶部垂直开设的通孔供调节螺钉S1穿置,此调节螺钉S1与电压插柱11螺纹连接;中性线插柱21置于中性线接线模块2水平开设的腰形孔20中,中性线插柱21上对应此中性线接线模块2顶部垂直开设的通孔供调节螺钉S2穿置,该调节螺钉S2与中性线插柱螺纹连接。A modular combined three-phase electric energy metering joint junction box, including three current and voltage connection modules 1, a neutral line connection module 2, a pair of positioning blocks 3 and a guide rail 4, the current and voltage connection module 1, the middle The linear wiring module 2 is slidably installed on the guide rail 4, and is fixed by the pair of positioning blocks 3. Each current and voltage wiring module 1 has a voltage post 11 and a pair of current post 12 with fixed heights. The improvement is that each voltage post 11 is placed in the waist-shaped hole 10 opened horizontally in each current and voltage connection module 1, and the through hole vertically opened on the top of each voltage post 11 corresponding to the current and voltage connection module 1 is used for the adjustment screw S1 to pass through. The adjustment screw S1 is threadedly connected with the voltage post 11; the neutral line post 21 is placed in the waist-shaped hole 20 opened horizontally in the neutral line connection module 2, and the neutral line post 21 corresponds to the neutral line connection The through hole vertically opened on the top of the module 2 is used for passing the adjusting screw S2, and the adjusting screw S2 is threadedly connected with the neutral line post.

定位块3固定到导轨4上时,通过装于定位块3上的一对紧固螺钉31顶实导轨4即可。When the positioning block 3 is fixed on the guide rail 4, the guide rail 4 can be pushed firmly by a pair of fastening screws 31 mounted on the positioning block 3 .

每个电流电压接线模块1的一个电压插柱11的端头、每个电流电压接线模块1的一对电流插柱12的端头用于插入三相电能表的插孔中,然后用螺钉拧紧(未图示)。The end of a voltage post 11 of each current and voltage terminal module 1, the terminal of a pair of current post 12 of each current and voltage terminal module 1 are used to insert into the jack of the three-phase electric energy meter, and then tightened with screws (not shown).

中性线接线模块2的中性线插柱21其端头用于插入三相电能表的插孔中,然后用螺钉拧紧(未图示)。The end of the neutral line post 21 of the neutral line connection module 2 is used to be inserted into the jack of the three-phase electric energy meter, and then tightened with screws (not shown).

本实用新型模块化组合式三相电能计量联合接线盒还包括三条滑移式电流短接片5,各滑移式电流短接片5安装于各电流电压接线模块1上,带电换表作业时,三条滑移式电流短接片5均与相对应的电流电压接线模块1的一对电流插柱12连接。The utility model's modular combined three-phase electric energy metering joint junction box also includes three sliding current shorting pieces 5, each sliding current shorting piece 5 is installed on each current and voltage wiring module 1, and when the meter is switched with electricity , the three sliding current shorting pieces 5 are all connected to a pair of current plug posts 12 of the corresponding current and voltage connection module 1 .

三片可滑移式电流短接片5经短接后,方可进行装拆更换三相电能表操作。After the three slidable current short-connectors 5 are short-circuited, the three-phase watt-hour meter can be assembled, disassembled and replaced.

Claims (2)

1. a modularized combination type three-phase electric energy metering combined connection box, comprise three current/voltage Wiring modules, a neutral line Wiring module, a pair locating piece and a guide rail, described current/voltage Wiring module, neutral line Wiring module is installed on guide rail slippingly, and by this, locating piece is fixed, each current/voltage Wiring module has a voltage inserting column and the fixing electric current inserting column of a pair high and low position, it is characterized in that: each voltage inserting column is placed in the mounting hole that each current/voltage Wiring module level is offered, the through hole that on each voltage inserting column, this current/voltage Wiring module plan vertical corresponding is offered places for set screw, this set screw is threaded with voltage inserting column, neutral line inserting column is placed in the mounting hole that neutral line Wiring module level is offered, and the through hole that on neutral line inserting column, this neutral line Wiring module plan vertical corresponding is offered places for set screw, and this set screw is threaded with neutral line inserting column.
2. modularized combination type three-phase electric energy metering combined connection box according to claim 1, it is characterized in that: also comprise three sliding electric current short circuit sheets, each sliding electric current short circuit sheet is installed on each current/voltage Wiring module, charged change table operation time, three sliding electric current short circuit sheets all connect with a pair electric current inserting column of corresponding current/voltage Wiring module.
CN201520721895.8U 2015-09-17 2015-09-17 Joint terminal box of modularization combination formula three -phase electric energy measurement Expired - Fee Related CN205049630U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520721895.8U CN205049630U (en) 2015-09-17 2015-09-17 Joint terminal box of modularization combination formula three -phase electric energy measurement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520721895.8U CN205049630U (en) 2015-09-17 2015-09-17 Joint terminal box of modularization combination formula three -phase electric energy measurement

Publications (1)

Publication Number Publication Date
CN205049630U true CN205049630U (en) 2016-02-24

Family

ID=55343199

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520721895.8U Expired - Fee Related CN205049630U (en) 2015-09-17 2015-09-17 Joint terminal box of modularization combination formula three -phase electric energy measurement

Country Status (1)

Country Link
CN (1) CN205049630U (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106229731A (en) * 2016-08-25 2016-12-14 国网河南省电力公司南阳供电公司 Assembled electric current short-circuit connector
CN109001506A (en) * 2018-05-07 2018-12-14 海盐通用电气有限公司 Electric energy metering combined wiring box
CN109085396A (en) * 2018-08-30 2018-12-25 中国电力科学研究院有限公司 With the multifunctional combined terminal box of electrical energy measurement for changing table tooling
CN109085398A (en) * 2018-08-30 2018-12-25 中国电力科学研究院有限公司 With the multifunctional combined terminal box of electrical energy measurement for changing table tooling
CN109085401A (en) * 2018-08-30 2018-12-25 中国电力科学研究院有限公司 The multifunctional combined terminal box of electrical energy measurement with test fixture
CN109085402A (en) * 2018-08-30 2018-12-25 中国电力科学研究院有限公司 The multifunctional combined terminal box of electrical energy measurement
CN109085400A (en) * 2018-08-30 2018-12-25 中国电力科学研究院有限公司 The multifunctional combined junction box stream detection switch structure of electrical energy measurement
CN109085397A (en) * 2018-08-30 2018-12-25 中国电力科学研究院有限公司 Electrical energy measurement multifunctional combined terminal box test fixture structure
CN109085399A (en) * 2018-08-30 2018-12-25 中国电力科学研究院有限公司 Electrical energy measurement presses detection switch structure with multifunctional combined junction box
CN109188337A (en) * 2018-08-30 2019-01-11 中国电力科学研究院有限公司 The multifunctional combined terminal box voltage detection switch structure of field-checking equipment
CN109188336A (en) * 2018-08-30 2019-01-11 中国电力科学研究院有限公司 The multifunctional combined terminal box current detection switch structure of field-checking equipment
CN110244098A (en) * 2019-07-25 2019-09-17 广东电网有限责任公司 Two-in two-out combined junction box

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106229731A (en) * 2016-08-25 2016-12-14 国网河南省电力公司南阳供电公司 Assembled electric current short-circuit connector
CN109001506A (en) * 2018-05-07 2018-12-14 海盐通用电气有限公司 Electric energy metering combined wiring box
CN109001506B (en) * 2018-05-07 2024-02-20 海盐通用电气有限公司 Electric energy metering joint junction box
CN109188336A (en) * 2018-08-30 2019-01-11 中国电力科学研究院有限公司 The multifunctional combined terminal box current detection switch structure of field-checking equipment
CN109085401B (en) * 2018-08-30 2021-08-03 中国电力科学研究院有限公司 Multifunctional combined junction box for energy metering with test fixture
CN109085402A (en) * 2018-08-30 2018-12-25 中国电力科学研究院有限公司 The multifunctional combined terminal box of electrical energy measurement
CN109085400A (en) * 2018-08-30 2018-12-25 中国电力科学研究院有限公司 The multifunctional combined junction box stream detection switch structure of electrical energy measurement
CN109085397A (en) * 2018-08-30 2018-12-25 中国电力科学研究院有限公司 Electrical energy measurement multifunctional combined terminal box test fixture structure
CN109085399A (en) * 2018-08-30 2018-12-25 中国电力科学研究院有限公司 Electrical energy measurement presses detection switch structure with multifunctional combined junction box
CN109188337A (en) * 2018-08-30 2019-01-11 中国电力科学研究院有限公司 The multifunctional combined terminal box voltage detection switch structure of field-checking equipment
CN109085398A (en) * 2018-08-30 2018-12-25 中国电力科学研究院有限公司 With the multifunctional combined terminal box of electrical energy measurement for changing table tooling
CN109085396A (en) * 2018-08-30 2018-12-25 中国电力科学研究院有限公司 With the multifunctional combined terminal box of electrical energy measurement for changing table tooling
CN109085401A (en) * 2018-08-30 2018-12-25 中国电力科学研究院有限公司 The multifunctional combined terminal box of electrical energy measurement with test fixture
CN109188336B (en) * 2018-08-30 2021-08-03 中国电力科学研究院有限公司 Structure of current detection switch for multifunctional combined junction box for field calibration equipment
CN109085398B (en) * 2018-08-30 2021-08-03 中国电力科学研究院有限公司 Multifunctional combined junction box for electric energy measurement with meter changing tool
CN109085402B (en) * 2018-08-30 2021-08-06 中国电力科学研究院有限公司 Multifunctional combined junction box for electric energy measurement
CN109085397B (en) * 2018-08-30 2021-08-06 中国电力科学研究院有限公司 Test fixture structure for multifunctional combined junction box for electric energy measurement
CN109085396B (en) * 2018-08-30 2021-09-17 中国电力科学研究院有限公司 Multifunctional combined junction box with meter replacing tool for electric energy metering
CN109085400B (en) * 2018-08-30 2021-09-28 中国电力科学研究院有限公司 Current detection switch structure for multifunctional combined junction box for electric energy metering
CN109085399B (en) * 2018-08-30 2021-09-28 中国电力科学研究院有限公司 Voltage detection switch structure for multifunctional combined junction box for electric energy metering
CN109188337B (en) * 2018-08-30 2022-03-04 中国电力科学研究院有限公司 Multifunctional joint junction box voltage detection switch structure for field calibration equipment
CN110244098A (en) * 2019-07-25 2019-09-17 广东电网有限责任公司 Two-in two-out combined junction box

Similar Documents

Publication Publication Date Title
CN205049630U (en) Joint terminal box of modularization combination formula three -phase electric energy measurement
CN204649803U (en) A kind of three-phase electric energy metering combined connection box
CN103698733B (en) A kind of test connection terminal assemblies for electric energy metrical
CN104793125B (en) A kind of test device of photovoltaic combiner box current divider measurement plate
CN203165309U (en) Experimental device for measuring capacitance and air dielectric constant
CN105425000A (en) Electric energy meter hanging support with plugging type conjunction box
CN202257990U (en) Combined table for transformer verification simulation training
CN204462216U (en) A kind of three-phase many rates guide rail meter
CN202854320U (en) Full compatible type function and error detecting unit
CN204613391U (en) A dual-purpose fast wiring test meter stand for three-phase electric energy meters
CN208142617U (en) Fitting depth bracket and distribution box is adjusted in distribution box
CN205305274U (en) Guide tracked atmospheric control ware
CN208209283U (en) A kind of microcomputer protective relay cabinet convenient for connecing electricity installation
CN203984002U (en) A kind of reactive power automatic compensation controller
CN206076734U (en) A distribution bus system
CN216123125U (en) Novel wardrobe and cabinet split control power supply
CN110966903B (en) A box transformer copper bar measurement tool
CN203746311U (en) Electrical control practical training cabinet
CN203813299U (en) MNS intelligent low voltage withdrawable switch cabinet
CN202757962U (en) Ampere meter seat compatible with state grid and southern power grid
CN104218462A (en) Position-adjustable teaching power cabinet
CN203586974U (en) Detection tool for stand column
CN202042097U (en) Electronic experiment box
CN203149112U (en) Hand-operated tool for calibrating electric energy meter
CN207817056U (en) A kind of distribution products micro energy lose great current tester

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160224

Termination date: 20200917