CN204676551U - 后插式钢筋笼灌注桩的振捣装置 - Google Patents
后插式钢筋笼灌注桩的振捣装置 Download PDFInfo
- Publication number
- CN204676551U CN204676551U CN201520188989.3U CN201520188989U CN204676551U CN 204676551 U CN204676551 U CN 204676551U CN 201520188989 U CN201520188989 U CN 201520188989U CN 204676551 U CN204676551 U CN 204676551U
- Authority
- CN
- China
- Prior art keywords
- reinforcing cage
- shaking platform
- pile
- vibrating arm
- reinforcing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
本实用新型公开了一种后插式钢筋笼灌注桩的振捣装置,解决了现有的混凝土钢筋笼灌注桩密实度差的技术问题。包括灌在灌注桩桩孔(1)正上方设置有振动平台吊钩(9)和振动平台(5),在振动平台(5)上设置有振动锤(7),在振动平台(5)和细石混凝土(2)之间设置有钢筋笼(3),在钢筋笼(3)中设置有振动杆(4),振动杆(4)的底端与钢筋笼(3)的底端活动插接在一起,振动杆(4)的顶端与振动锤(7)连接在一起,在钢筋笼(3)底端设置有锥形帽(8),加固架沿着振动上下方向每间隔3米设置一个活动支撑的环形加固架。提高了桥梁灌注桩的整体密实性,有效保证了桩体施工质量。
Description
技术领域
本发明涉及一种灌注桩的振捣装置,特别涉及一种后插式钢筋笼灌注桩的振捣装置。
背景技术
钢筋混凝土桥梁灌注桩的施工工艺是先用钻机成孔,然后在成孔中放入加工好的钢筋笼,之后在孔内下导管进行混凝土灌注,浇筑是通过提升导管分段进行灌注使混凝土密实及达到设计要求。在整个成桩过程中由于一次性导管提升不及时及不到位,使混凝土成桩后的密实度达不到要求,特别是在距桩顶3米范围内容易形成断桩,造成桩长达不到设计要求,只能采取二次接桩,存在工期延长,成桩质量差及桩体承载力无法满足设计要求的问题。
发明内容
本发明提供了一种后插式钢筋笼灌注桩的振捣装置,解决了现有的混凝土钢筋笼灌注桩密实度差的技术问题。
一种后插式钢筋笼灌注桩的振捣装置,包括灌注桩桩孔,在灌注桩桩孔中灌注有细石混凝土,在灌注桩桩孔正上方设置有振动平台吊钩,在振动平台吊钩上掉接有振动平台,在振动平台上设置有振动锤,在振动平台和细石混凝土之间设置有钢筋笼,在钢筋笼中设置有振动杆,振动杆的底端与钢筋笼的底端活动插接在一起,振动杆的顶端与 振动锤连接在一起,在钢筋笼底端设置有锥形帽,在钢筋笼内侧主筋与振动杆之间设置有环形加固架,加固架沿着振动上下方向每间隔3米设置一个活动支撑的环形加固架,在振动平台与钢筋笼之间设置有挂笼绳。
一种后插式钢筋笼灌注桩的振捣方法,包括以下步骤:
第一步、用桥梁钻机钻出灌注桩桩孔,使桩孔达到设计深度;
第二步、在钢筋笼的底部焊接锥形帽,将振动杆放入钢筋笼中,将钢筋笼锥形帽与振动杆的底端活动插接在一起,沿振动杆每隔3米在振动杆与钢筋主筋之间活动支撑一个环形支撑架;
第三步、将振动锤安装到振动平台上,用挂笼绳将振动平台与钢筋笼的顶端连接在一起;
第四步、用吊车的吊钩将振动平台下方的钢筋笼悬吊到灌注桩桩孔正上方;
第五步、向灌注桩孔内一次性连续泵送细石混凝土,是细石混凝土的顶端达到设计桩顶标高;
第六步、待细石混凝土灌注完成后的五分钟内,通过调节挂笼绳将钢筋笼的底端落到细石混凝土的顶端,开动振动锤,以钢筋笼1.2-1.5米/分钟的速度沉入到细石混凝土中,直到钢筋笼沉入到桩底标高位置,在钢筋笼沉入过程中通过人工调节挂笼绳使钢筋笼沉入过程中保持垂直状态;
第七步、待钢筋笼沉入到桩底标高位置3分钟后,将振动平台吊钩向上提升3米,再开动振动锤振动5分钟,关闭振动锤在将振动平 台吊钩向上提升3米,再一次开动振动锤振动5分钟,依次循环直至将振动杆从细石混凝土中拔出为止。
本发明采用了先灌注桩体混凝土后插入钢筋笼的施工工艺,使桩底到桩顶灌注的混凝土得到有效振捣,提高了桥梁灌注桩的整体密实性,有效保证了桩体施工质量。
附图说明
图1是本发明的结构示意图。
具体实施方式
一种后插式钢筋笼灌注桩的振捣装置,包括灌注桩桩孔1,在灌注桩桩孔1中灌注有细石混凝土2,在灌注桩桩孔1正上方设置有振动平台吊钩9,在振动平台吊钩9上掉接有振动平台5,在振动平台5上设置有振动锤7,在振动平台5和细石混凝土2之间设置有钢筋笼3,在钢筋笼3中设置有振动杆4,振动杆4的底端与钢筋笼3的底端活动插接在一起,振动杆4的顶端与振动锤7连接在一起,在钢筋笼3底端设置有锥形帽8,在钢筋笼3内侧主筋与振动杆之间设置有环形加固架,加固架沿着振动上下方向每间隔3米设置一个活动支撑的环形加固架,在振动平台5与钢筋笼3之间设置有挂笼绳6。
一种后插式钢筋笼灌注桩的振捣方法,包括以下步骤:
第一步、用桥梁钻机钻出灌注桩桩孔,使桩孔达到设计深度;
第二步、在钢筋笼3的底部焊接锥形帽8,将振动杆4放入钢筋笼3中,将钢筋笼锥形帽8与振动杆4的底端活动插接在一起,沿振动杆每隔3米在振动杆与钢筋主筋之间活动支撑一个环形支撑架;
第三步、将振动锤7安装到振动平台5上,用挂笼绳6将振动平台5与钢筋笼3的顶端连接在一起;
第四步、用吊车的吊钩9将振动平台5下方的钢筋笼3悬吊到灌注桩桩孔正上方;
第五步、向灌注桩孔1内一次性连续泵送细石混凝土2,是细石混凝土2的顶端达到设计桩顶标高;
第六步、待细石混凝土2灌注完成后的五分钟内,通过调节挂笼绳6将钢筋笼3的底端落到细石混凝土2的顶端,开动振动锤7,钢筋笼以31.2-1.5米/分钟的速度沉入到细石混凝土2中,直到钢筋笼3沉入到桩底标高位置,在钢筋笼3沉入过程中通过人工调节挂笼绳6使钢筋笼3沉入过程中保持垂直状态;
第七步、待钢筋笼3沉入到桩底标高位置3分钟后,将振动平台吊钩9向上提升3米,再开动振动锤7振动5分钟,关闭振动锤7在将振动平台吊钩9向上提升3米,再一次开动振动锤7振动5分钟,依次循环直至将振动杆4从细石混凝土3中拔出为止。
Claims (1)
1.一种后插式钢筋笼灌注桩的振捣装置,包括灌注桩桩孔(1),在灌注桩桩孔(1)中灌注有细石混凝土(2),其特征在于,在灌注桩桩孔(1)正上方设置有振动平台吊钩(9),在振动平台吊钩(9)上掉接有振动平台(5),在振动平台(5)上设置有振动锤(7),在振动平台(5)和细石混凝土(2)之间设置有钢筋笼(3),在钢筋笼(3)中设置有振动杆(4),振动杆(4)的底端与钢筋笼(3)的底端活动插接在一起,振动杆(4)的顶端与振动锤(7)连接在一起,在钢筋笼(3)底端设置有锥形帽(8),在钢筋笼(3)内侧主筋与振动杆之间设置有环形加固架,加固架沿着振动上下方向每间隔3米设置一个活动支撑的环形加固架,在振动平台(5)与钢筋笼(3)之间设置有挂笼绳(6)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520188989.3U CN204676551U (zh) | 2015-03-31 | 2015-03-31 | 后插式钢筋笼灌注桩的振捣装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520188989.3U CN204676551U (zh) | 2015-03-31 | 2015-03-31 | 后插式钢筋笼灌注桩的振捣装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204676551U true CN204676551U (zh) | 2015-09-30 |
Family
ID=54176256
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520188989.3U Expired - Fee Related CN204676551U (zh) | 2015-03-31 | 2015-03-31 | 后插式钢筋笼灌注桩的振捣装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204676551U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104846828A (zh) * | 2015-03-31 | 2015-08-19 | 中铁十九局集团第三工程有限公司 | 后插式钢筋笼灌注桩的振捣装置及其振捣方法 |
CN108442361A (zh) * | 2018-04-28 | 2018-08-24 | 山西建筑工程有限公司 | 一种混凝土灌注桩钢筋笼倒钩式防上浮装置及使用方法 |
CN113699995A (zh) * | 2021-07-26 | 2021-11-26 | 甘肃旭盛显示科技有限公司 | 振动杆和钢筋笼匹配吊装的施工方法 |
-
2015
- 2015-03-31 CN CN201520188989.3U patent/CN204676551U/zh not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104846828A (zh) * | 2015-03-31 | 2015-08-19 | 中铁十九局集团第三工程有限公司 | 后插式钢筋笼灌注桩的振捣装置及其振捣方法 |
CN108442361A (zh) * | 2018-04-28 | 2018-08-24 | 山西建筑工程有限公司 | 一种混凝土灌注桩钢筋笼倒钩式防上浮装置及使用方法 |
CN108442361B (zh) * | 2018-04-28 | 2024-05-10 | 山西建筑工程集团有限公司 | 一种混凝土灌注桩钢筋笼倒钩式防上浮装置及使用方法 |
CN113699995A (zh) * | 2021-07-26 | 2021-11-26 | 甘肃旭盛显示科技有限公司 | 振动杆和钢筋笼匹配吊装的施工方法 |
CN113699995B (zh) * | 2021-07-26 | 2022-07-22 | 甘肃旭盛显示科技有限公司 | 振动杆和钢筋笼匹配吊装的施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103835283A (zh) | 全湿接头预制预应力地下连续墙及其施工方法 | |
CN103912009B (zh) | 流砂地质的高层住宅基础集水坑施工方法 | |
CN102720186B (zh) | 变截面钻孔灌注桩水下一次成型浇筑法 | |
CN104846828A (zh) | 后插式钢筋笼灌注桩的振捣装置及其振捣方法 | |
CN204676551U (zh) | 后插式钢筋笼灌注桩的振捣装置 | |
CN103541352B (zh) | 一种在砂土地层大直径高承台桩地下地上连续施工方法 | |
CN104153295A (zh) | 一种用于钢管拱桥自密实混凝土顶升灌注施工方法 | |
CN106930277A (zh) | 一种人工挖孔灌注桩施工方法 | |
CN102230313A (zh) | 桥梁薄壁空心墩手拉葫芦提升作业平台及其施工方法 | |
CN105133575B (zh) | 在地下连续墙体表面浇筑内衬的吊模支护装置和施工方法 | |
CN103266602A (zh) | 一种人工挖孔扩径桩及其施工方法 | |
CN104153403B (zh) | 逆作法灌注桩静载试桩的施工方法 | |
CN101858090B (zh) | 地下连续墙刚性接头软连接的施工方法 | |
CN109518706A (zh) | 一种成井过程中无需泥浆的降水井施工方法 | |
CN201972095U (zh) | 桥梁薄壁空心墩手拉葫芦提升作业平台 | |
CN205063056U (zh) | 装配式建筑外墙干挂节点的防腐结构 | |
CN107237322B (zh) | 一种长螺旋钻孔后插笼灌注桩高效插入振动管的方法 | |
CN206379110U (zh) | 一种灌注桩施工模拟装置 | |
CN103628684B (zh) | 一种同时浇筑楼板和剪力墙的施工方法 | |
CN205934931U (zh) | 一种盖顺挖作法施工的基坑结构 | |
CN202787267U (zh) | 自动排气料斗装置 | |
CN110549480A (zh) | 一种蒸压加气混凝土砌块浆料加注装置 | |
CN201459734U (zh) | 一种干性钻孔桩捣固器 | |
CN104131562A (zh) | 一种用于复合地基桩的成桩施工设备 | |
CN108457275A (zh) | 灌注桩混凝土振捣装置及其施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150930 |
|
CF01 | Termination of patent right due to non-payment of annual fee |