hull
wind power
bow
leg
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420821401.9U
Other languages
Chinese (zh)
Inventor
赵志坚
张利军
陈鸽
刘仁昌
邢永强
王永刚
李连亮
王晓光
葛文华
王思铭
陈应战
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHONGYUAN SHIPPING ENGINEERING GROUP Co Ltd
Original Assignee
ZHONGYUAN SHIPPING ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGYUAN SHIPPING ENGINEERING GROUP Co Ltd filed Critical ZHONGYUAN SHIPPING ENGINEERING GROUP Co Ltd
Priority to CN201420821401.9U priority Critical patent/CN204642060U/en
Application granted granted Critical
Publication of CN204642060U publication Critical patent/CN204642060U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Wind Motors (AREA)

Abstract

本实用新型公开了一种大型近海风电设备安装装备,属于风电安装技术领域。本实用新型包括船体、三个艏侧推、全回转推进器、主机、主起重机、桩腿、桩靴、生活区及直升机平台;船体首部具有超U型水线形状,船体尾部安装有全回转推进器,船体的首部具有三个艏侧推,船体的底部舱室具有若干个主机,船体上具有若干个带有等距插销孔的桩腿,每个桩腿的下部与桩靴相连接,生活区安置于主甲板上,船首设有直升机甲台,主起重机在一个桩腿的上部,每个桩腿上具有液压升降装置,甲板上配置有若干台辅助用折臂吊。

The utility model discloses a large offshore wind power equipment installation equipment, which belongs to the technical field of wind power installation. The utility model includes a hull, three bow thrusters, a full-turn thruster, a main engine, a main crane, spud legs, spud boots, a living area and a helicopter platform; the bow of the hull has a super U-shaped waterline shape, and a full-turn The propeller, the bow of the hull has three bow thrusters, the bottom cabin of the hull has several main engines, and the hull has several spud legs with equidistant pin holes, and the lower part of each spud leg is connected with the spud can. The area is placed on the main deck, the bow is equipped with a helicopter deck, the main crane is on the upper part of a leg, each leg has a hydraulic lifting device, and there are several auxiliary folding arm cranes on the deck.

Description

一种大型近海风电设备安装装备A large offshore wind power equipment installation equipment

技术领域 technical field

本实用新型涉及一种大型近海风电设备安装装备,属于风电安装技术领域。 The utility model relates to a large offshore wind power equipment installation equipment, which belongs to the technical field of wind power installation.

背景技术 Background technique

随着以煤炭和石油为代表的化石类能源的日益枯竭以及世界人口数量的持续增加、地球环境的日趋恶化,开发利用清洁、可再生的新型替代能源成为了全世界关注的焦点。 With the depletion of fossil energy represented by coal and oil, the continuous increase of the world's population, and the deterioration of the earth's environment, the development and utilization of clean and renewable new alternative energy has become the focus of attention all over the world.

风能作为新型替代能源的代表,在过去30余年内不断取得突破,规模化经济效益日渐明显。目前,全世界的大型风场正呈现出从陆地向海上发展的趋势。这是因为海洋上风资源丰富,风电场开发的利益相关方少,受环境制约少,且海上风速高,湍流强度小,风能利用较陆上更为充分,其能量收益比较陆地风机高20%-60%。在这种大环境下我国在加大对近海风电场的开发力度。针对这种情况,需要一种能适应近海海域的大型综合化绿色风电安装装备。 As a representative of new alternative energy sources, wind energy has continuously made breakthroughs in the past 30 years, and the economic benefits of scale have become increasingly obvious. At present, large-scale wind farms around the world are showing a trend of developing from land to sea. This is because offshore wind resources are abundant, wind farm development has fewer stakeholders, less environmental constraints, and offshore wind speeds are high and turbulence intensity is low. Wind energy utilization is more adequate than that on land, and its energy income is 20% higher than that of land wind turbines- 60%. In this environment, my country is increasing its efforts to develop offshore wind farms. In response to this situation, a large-scale integrated green wind power installation equipment that can adapt to offshore waters is needed.

发明内容 Contents of the invention

为了满足海上风电开发需要,本实用新型提供一种大型近海风电设备安装装备。 In order to meet the needs of offshore wind power development, the utility model provides a large-scale offshore wind power equipment installation equipment.

本实用新型采取的技术方案如下: The technical scheme that the utility model takes is as follows:

一种大型近海风电设备安装装备,包括船体、三个艏侧推、全回转推进器、主机、主起重机、四个桩腿、桩靴、生活区及直升机平台;船体首部具有超U型水线形状,船体尾部安装有全回转推进器,船体的首部具有三个艏侧推,船体的底部舱室具有若干个主机,船体上具有若干个带有等距插销孔的桩腿,每个桩腿的下部与桩靴相连接,生活区安置于主甲板上,船首设有直升机甲台,主起重机在一个桩腿的上部,每个桩腿上具有液压升降装置,甲板上配置有若干台辅助用折臂吊。 A large-scale offshore wind power equipment installation equipment, including a hull, three bow thrusters, an azimuth thruster, a main engine, a main crane, four spud legs, spud boots, a living area and a helicopter platform; the bow of the hull has a super U-shaped waterline shape, the tail of the hull is equipped with an azimuth thruster, the bow of the hull has three bow thrusters, the bottom cabin of the hull has several main engines, and the hull has several legs with equidistant pin holes, each leg The lower part is connected with the spud boots, the living area is placed on the main deck, the bow is equipped with a helicopter platform, the main crane is on the upper part of a spud leg, each leg has a hydraulic lifting device, and several auxiliary folding units are equipped on the deck. jib crane.

船体可为单甲板,双层底;船底、主甲板、舷侧、纵舱壁及甲板室均采用纵骨架式。 The hull can be single-deck, double-bottom; the bottom, main deck, side, longitudinal bulkhead and deckhouse are all longitudinal framed.

船体设八道全通水密横舱壁和三道贯通首尾的纵舱壁以及左右舷两道纵向外板。 The hull is equipped with eight fully watertight transverse bulkheads, three longitudinal bulkheads passing through the fore and aft, and two longitudinal shells on the starboard and starboard sides.

主机的数量为六个。 The number of hosts is six.

桩腿直径4.7米,桩腿及桩靴全长81米,采用水密桩靴。 The diameter of the pile leg is 4.7 meters, the total length of the pile leg and the pile shoe is 81 meters, and the watertight pile shoe is used.

辅助用折臂吊数量为三个。 The number of auxiliary knuckle-arm cranes is three.

本实用新型的有益效果:液压升降系统进行船体提升工作;上升提升速度21米/小时,下降速度24米/小时;液压升降系统由一套液压系统、四个桩腿的液压升降装置以及相应的控制系统组成;每个桩腿的液压升降装置包括四个铰接梁和八个液压千斤顶、一个导向装置、及若干销轴组成,每个铰接梁由一个桩腿插销和两个对称的液压千斤顶插销组成,并通过对 称的液压千斤顶插销与液压千斤顶相连;升降动作通过液压千斤顶带动四个铰接梁来实现,常规升降运动时,始终有三个铰接梁处于受力状态,一个铰接梁处于回缩状态,这样做螺旋升降运动从而实现平台的连续上升或下降;在预压载工况时八个液压千斤顶同时做升降运动来实现预压载工况平台的升降调整。将主起重机布置在某一根桩腿之上,大幅增大了甲板有效使用面积,实现了甲板的科学化布置。液压升降装置与桩腿,插销孔配合,具备了连续升降,任意高度锁紧的能力,均衡桩腿受力改善疲劳寿命的同时,大大提高了风电设备安装的灵活性。首部三个艏侧推与尾部全回转推进器组合,具备了卓越的DP定位能力,同时也提高了经济性。尾部全回转推进器,艏侧推,主起重机与桩腿,桩靴组合可在水深15-40米的近海海域完成了航行,运输,安装,维护等一条龙的近海风电安装作业。 The beneficial effect of the utility model: the hydraulic lifting system carries out the lifting work of the hull; the lifting speed is 21 meters/hour, and the falling speed is 24 meters/hour; the hydraulic lifting system consists of a set of hydraulic system, hydraulic lifting devices of four pile legs and corresponding Control system; the hydraulic lifting device of each leg includes four articulated beams, eight hydraulic jacks, a guide device, and several pins, and each articulated beam consists of a leg pin and two symmetrical hydraulic jack pins Composed, and connected with the hydraulic jack through the symmetrical hydraulic jack pin; the lifting action is realized by driving the four hinged beams through the hydraulic jack. During the conventional lifting movement, there are always three hinged beams in a stressed state, and one hinged beam is in a retracted state. In this way, the helical lifting movement can be used to realize the continuous rise or fall of the platform; in the pre-ballast working condition, eight hydraulic jacks perform lifting movements at the same time to realize the lifting adjustment of the platform in the pre-ballast working condition. Arranging the main crane on a certain pile leg greatly increases the effective use area of the deck and realizes the scientific layout of the deck. The hydraulic lifting device cooperates with the pile leg and the pin hole, and has the ability of continuous lifting and locking at any height. While balancing the force of the pile leg and improving the fatigue life, it greatly improves the flexibility of wind power equipment installation. The combination of the first three bow thrusters and the tail azimuth thruster has excellent DP positioning capability and also improves the economy. Tail azimuth thruster, bow thruster, main crane, spud legs, and spud shoes can complete the one-stop offshore wind power installation operation such as navigation, transportation, installation, and maintenance in offshore waters with a water depth of 15-40 meters.

采用以上技术方案,使此近海风电设备安装装备同时兼具了运输船、自升式平台、重吊船及工程安装船的功能于一体,与现有技术相比,可在近海海域完成从运输到定位,吊装,维护等一条龙的风电设备安装工作。 With the above technical solutions, the offshore wind power equipment installation equipment has the functions of a transport ship, a jack-up platform, a heavy lift ship and an engineering installation ship. Compared with the existing technology, it can complete the transportation from offshore From positioning, hoisting, maintenance and other one-stop wind power equipment installation work.

附图说明 Description of drawings

图1是本实用新型专利一实施例(航行工况)的近海风电安装装备的主视图。 Fig. 1 is a front view of offshore wind power installation equipment of an embodiment of the utility model patent (navigation working condition).

图2是本实用新型专利二实施例(作业工况)的近海风电安装装备的主视图。 Fig. 2 is a front view of the offshore wind power installation equipment of the second embodiment of the utility model patent (working condition).

图3是本实用新型专利二实施例(作业工况)的近海风电安装装备的俯视图。 Fig. 3 is a top view of the offshore wind power installation equipment of the second embodiment of the utility model patent (working condition).

图4是本实用新型专利的船体型线横剖面图。 Fig. 4 is the cross-sectional view of the hull molding line of the utility model patent.

图中:2.船体,3.主起重机,4.辅助用折臂吊,5.主机,6.桩腿,7.桩靴,8.艏侧推,9.全回转推进器,10.液压升降装置,11.生活区,12.直升机平台,13.主甲板。 In the figure: 2. Hull, 3. Main crane, 4. Auxiliary knuckle-arm crane, 5. Main engine, 6. Spud leg, 7. Spud shoe, 8. Bow thruster, 9. Azimuth thruster, 10. Hydraulic pressure Lifting gear, 11. Living area, 12. Helicopter platform, 13. Main deck.

具体实施方式 Detailed ways

下面结合附图对本实用新型做进一步说明: Below in conjunction with accompanying drawing, the utility model is further described:

图1是本实用新型一实施例(航行工况)的风电安装装备主视图。图2和图3分别是本实用新型专利二实施例(作业工况)等主视图和俯视图。图4是本实用新型专利的型线图。 Fig. 1 is a front view of the wind power installation equipment of an embodiment of the utility model (navigation working condition). Fig. 2 and Fig. 3 are respectively the front view and the top view of the second embodiment of the utility model patent (operating conditions). Fig. 4 is the profile diagram of the utility model patent.

图1-3所示,大型近海风电设备安装装备,包括船体、三个艏侧推、全回转推进器、主机、主起重机、四个桩腿、桩靴、生活区及直升机平台;船体首部具有超U型水线形状,船体尾部安装有全回转推进器,船体的首部具有三个艏侧推,船体的底部舱室具有若干个主机,船体上具有若干个带有等距插销孔的桩腿,每个桩腿的下部与桩靴相连接,生活区安置于主甲板上,船首设有直升机甲板,主起重机在一个桩腿的上部,每个桩腿上具有液压升降装置,甲板上配置有若干台辅助用折臂吊。 As shown in Figure 1-3, the installation equipment for large-scale offshore wind power equipment includes the hull, three bow thrusters, azimuth thrusters, main engine, main crane, four spud legs, spud shoes, living quarters and a helicopter platform; the bow of the hull has Super U-shaped waterline shape, a full-turn propeller is installed at the tail of the hull, three bow thrusters are installed at the bow of the hull, several main engines are installed in the bottom cabin of the hull, and several pile legs with equidistant pin holes are installed on the hull. The lower part of each leg is connected with the spud shoe, the living area is placed on the main deck, the bow is equipped with a helicopter deck, the main crane is on the upper part of a leg, each leg has a hydraulic lifting device, and the deck is equipped with several Auxiliary folding arm crane.

本装备呈船型,其俯视图如图3所示,船体可为单甲板,双层底;船底、主甲板、舷侧、纵舱壁及甲板室均采用纵骨架式。船体2的示例性参数如下:船长133.1米,型宽39.2米, 型深9.8米。船体可为单甲板,双层底,船底、主甲板、舷侧、纵舱壁及甲板室均采用纵骨架式。船体设八道全通水密横舱壁和三道贯通首尾的纵舱壁以及左右舷两道纵向外板。 The equipment is in the shape of a ship, and its top view is shown in Figure 3. The hull can be single-deck and double-bottom; the bottom, main deck, sides, longitudinal bulkheads and deckhouses all adopt the longitudinal frame type. Exemplary parameters of the hull 2 are as follows: length 133.1 meters, molded beam 39.2 meters, molded depth 9.8 meters. The hull can be single deck, double bottom, bottom, main deck, side, longitudinal bulkhead and deckhouse all adopt longitudinal frame type. The hull is equipped with eight fully watertight transverse bulkheads, three longitudinal bulkheads passing through the fore and aft, and two longitudinal shells on the starboard and starboard sides.

本实用新型的一个特点是,该近海风电设备安装装备具有自航及动力定位能力。如图1所示,船尾部安装有全回转推进器,可提供12.5Kn设计航速的同时配合首部的艏侧推能够经济,可靠地提供动力定位能力。实现了对风电设备的运输,安装定位能力。同时首部型线使用超U型水线设计,大幅减小了碎波现象,提高了快速性,降低了船舶能耗。 A feature of the utility model is that the offshore wind power equipment installation equipment has self-navigation and dynamic positioning capabilities. As shown in Figure 1, an azimuth thruster is installed at the stern of the ship, which can provide a design speed of 12.5Kn and cooperate with the bow thruster at the bow to provide economical and reliable dynamic positioning capabilities. The ability to transport, install and locate wind power equipment has been realized. At the same time, the super U-shaped waterline design is used for the first section line, which greatly reduces the breaking wave phenomenon, improves the rapidity, and reduces the energy consumption of the ship.

本实用新型的另一个特点是,该近海风电设备安装装备具有插桩固定和起重吊装的能力。如图2所示,桩腿可向下插伸,通过重力将桩靴插入海底,为风电设备安装提供固定的作用。之后,利用液压升降装置将装备船体2逐渐抬高,到达安装高度后,使用主起重机进行吊装作业。结合自航及定位能力,达到了目前国际最先进的第三代海上风电设备安装装备的标准,实现了从运输到定位、安装、维护一条龙的风电安装模式。 Another feature of the utility model is that the offshore wind power equipment installation equipment has the ability to insert piles for fixing and hoisting. As shown in Figure 2, the spud legs can be inserted downwards, and the spud cans are inserted into the seabed by gravity to provide fixation for the installation of wind power equipment. After that, the equipment hull 2 is gradually raised by using the hydraulic lifting device, and after reaching the installation height, the main crane is used for hoisting operation. Combined with self-propelled and positioning capabilities, it has reached the current international most advanced third-generation offshore wind power equipment installation equipment standards, and realized a one-stop wind power installation mode from transportation to positioning, installation and maintenance.

安装装备船体2的首部采用超U型水线设计,各个工况下水线面面积系数为0.62-0.7;半入水角为80°-90°。船体2上同时建有生活区和直升机甲板。 The bow of the installation equipment hull 2 adopts a super U-shaped waterline design, and the area coefficient of the waterplane surface under each working condition is 0.62-0.7; the semi-water entry angle is 80°-90°. Both the living quarters and the helideck are built on the hull 2.

主起重机3安装在桩腿上部,作为举例而非限制,实施例中将主起重机安装在装备左舷靠后方位置桩腿提升装置房间上部。在实施例中主起重机主勾的最大起重量为900吨,工作半径15.2米~95.4米,可360°回转工作。辅钩最大起重重量80吨,工作半径19.2米到102.2米。最大起吊高度距主甲板109.6米。 The main crane 3 is installed on the top of the leg. As an example without limitation, in the embodiment, the main crane is installed on the upper part of the room where the port side is equipped with the rear position of the leg lifting device. In the embodiment, the maximum lifting capacity of the main hook of the main crane is 900 tons, the working radius is 15.2 meters to 95.4 meters, and it can rotate 360°. The maximum lifting weight of the auxiliary hook is 80 tons, and the working radius is 19.2 meters to 102.2 meters. The maximum lifting height is 109.6 meters from the main deck.

实施例中甲板上配置有三台辅助用折臂吊4,每台功率60吨*米,最大工作半径25米。 In the embodiment, three auxiliary knuckle-arm cranes 4 are configured on the deck, each with a power of 60 tons*m and a maximum working radius of 25 meters.

实施例中装备配有六台主机5,每台功率2800KW,额定转速720转,使用轻质柴油MGO以符合CLEAN-DESIGN要求。 In the embodiment, it is equipped with six main engines 5, each with a power of 2800KW and a rated speed of 720 revolutions, and light diesel MGO is used to meet the requirements of CLEAN-DESIGN.

作为举例而非限制,本实用新型专利采用四根桩腿的形式。实施例中装备左右舷侧各有两根桩腿6和桩靴7。桩腿6直径4.7米,桩腿6及桩靴7全长81米,采用水密桩靴。 As an example and not a limitation, the utility model patent adopts the form of four legs. In the embodiment, two spud legs 6 and spud shoes 7 are respectively arranged on the left and right sides of the equipment. The diameter of pile leg 6 is 4.7 meters, the total length of pile leg 6 and pile shoe 7 is 81 meters, and watertight pile shoes are used.

作为举例而非限制,本实用新型专利首部采用三台管隧式推进器8,尾部采用三台全回转推进器9。实施例中艏侧推每台功率1500KW,尾部全回转推进器每台3250KW。 As an example and not limitation, the utility model patent adopts three tunnel propellers 8 at the head, and three full-turn propellers 9 at the tail. In the embodiment, each bow thruster has a power of 1500KW, and each tail full-turn thruster has a power of 3250KW.

作为举例而非限制,本实用新型采用液压升降装置10进行船体2升降作业。提升速度21米/小时,下降速度24米/小时。由一套液压系统、四个桩腿、以及液压升降装置10和相应的控制系统组成;桩腿的液压升降装置采用的是南通迪施有限公司申报专利的“安装船平台连续升降装置”。 As an example and not a limitation, the utility model adopts a hydraulic lifting device 10 to carry out the lifting operation of the hull 2 . The lifting speed is 21 meters per hour, and the descending speed is 24 meters per hour. It consists of a set of hydraulic system, four legs, hydraulic lifting device 10 and corresponding control system; the hydraulic lifting device of the legs adopts the "continuous lifting device for installation ship platform" patented by Nantong Disch Co., Ltd.

本实施例的安装装备1的其他参数举例如下:作业水深15米-40米,定位能力DP2,甲板可变载荷5000吨。 Other parameters of the installation equipment 1 in this embodiment are as follows: the working water depth is 15 meters to 40 meters, the positioning capability is DP2, and the deck variable load is 5000 tons.

本实用新型实施例的风电设备安装装备,可在15米-40米水深的近海海域范围内进行运 输、定位、下桩、吊装、维护等综合性工程作业。这一风电设备安装装备的功能不局限风电设备安装,一般的海洋工程作业也可以胜任。 The installation equipment for wind power equipment in the embodiment of the utility model can carry out comprehensive engineering operations such as transportation, positioning, piling, hoisting, and maintenance in the offshore sea area with a water depth of 15 meters to 40 meters. The function of this wind power equipment installation equipment is not limited to the installation of wind power equipment, and it can also be competent for general marine engineering operations.

使用本实用新型实施例的风电安装装备在近海海域实施海上风机施工作业主要有以下几个阶段:风电设备运输作业;动力定位作业;桩腿安装作业;风电设备安装作业;桩腿回收作业以及后续安装作业。 Using the wind power installation equipment of the embodiment of the utility model to implement offshore wind turbine construction operations in offshore waters mainly includes the following stages: wind power equipment transportation operation; dynamic positioning operation; pile leg installation operation; wind power equipment installation operation; pile leg recovery operation and follow-up Installation work.

安装过程: Installation process:

第一阶段,本专利装备将风电设备运输至风电场后,进行动力定位,将装备定位至风电设备安装位置附近合适的距离处。 In the first stage, after the patented equipment transports the wind power equipment to the wind farm, dynamic positioning is performed to locate the equipment at a suitable distance near the installation position of the wind power equipment.

第二阶段,开始本专利装备安装作业:首先进行桩腿下放和插桩,并将装备船体2顶升至预压载高度,进行预压载后,将装备船体2顶升至作业高度。 In the second stage, the installation operation of the patented equipment is started: first, the legs are lowered and the piles are inserted, and the equipment hull 2 is jacked up to the pre-ballasting height. After the pre-ballasting, the equipment hull 2 is jacked up to the working height.

第三阶段,对风车基座进行吊装及打桩作业,完成风车基座的安装。 In the third stage, hoisting and piling operations are carried out on the windmill base to complete the installation of the windmill base.

第四阶段,依次对塔筒,风车电机,风车叶片进行吊装作业并依次完成对此三部分风机部件的安装,从而完成此位置单个风机的整机安装工作。 In the fourth stage, the tower, windmill motor, and windmill blades are hoisted in sequence and the installation of these three parts of the fan components is completed in turn, so as to complete the installation of a single fan at this position.

第五阶段,在一个位置完成一台风车整机安装后,本专利装备航行至风电场其他地点,依次进行所运载风车部件的安装工作,直至运载的所有风电设备安装完成。 In the fifth stage, after the complete installation of a windmill is completed at one location, the patented equipment sails to other locations of the wind farm, where the installed windmill components are carried out sequentially until all the installed wind power equipment is completed.

本实用新型实施例的风电设备安装装备具有以下优点: The wind power equipment installation equipment in the embodiment of the utility model has the following advantages:

1.采用液压升降顶升装置,具备连续提升能力,保证装备船体2可停在任意高度,均衡桩腿受力改善疲劳寿命的同时,大大提高了风电设备安装的灵活性。 1. The hydraulic lifting and jacking device is adopted, which has continuous lifting capacity, ensures that the equipped hull 2 can stop at any height, balances the force on the legs and improves the fatigue life, and greatly improves the flexibility of wind power equipment installation.

2.作业水深15米-40米,适合中国近海、欧洲北海的近海等多种近海海域进行风电安装作业。 2. The operating water depth is 15m-40m, which is suitable for wind power installation operations in various offshore waters such as China's offshore and the offshore of the North Sea in Europe.

3.首部采用超U型水线设计,大大提高了装备的快速性能。 3. The first part adopts a super U-shaped waterline design, which greatly improves the rapid performance of the equipment.

4.世界最先进的第三代海上风电安装装备,可完成7MW风机的运输及安装作业。 4. The world's most advanced third-generation offshore wind power installation equipment can complete the transportation and installation of 7MW wind turbines.

5.运载能力强,甲板可变载荷超过5000吨。 5. The carrying capacity is strong, and the variable load on the deck exceeds 5000 tons.

6.独特的甲板布置,将主起重机跟其中一根桩腿布置在同一位置上,大幅增大了甲板营运面积。 6. Unique deck layout, the main crane and one of the legs are arranged at the same position, which greatly increases the deck operating area.

7.卓越的定位能力,保证了作业的安全性和高效的安装效率。 7. Excellent positioning ability ensures the safety of operation and high installation efficiency.

在本专利的一实施例中,所述船体首部采用了超U型水线设计。 In an embodiment of this patent, the bow of the hull adopts a super U-shaped waterline design.

在本专利的一实施例中,所述船尾全回转推进器提供船舶前进航行的动力。 In an embodiment of this patent, the stern azimuth thruster provides the power for the forward sailing of the ship.

在本专利的一实施例中,所述艏侧推与所述船尾全回转推进器可共同提供动力定位能力。 In an embodiment of this patent, the bow thruster and the stern azimuth thruster can jointly provide dynamic positioning capability.

在本专利的一实施例中,所述起重机为全回转起重机。 In one embodiment of this patent, the crane is an all-slewing crane.

在本专利的一实施例中,所述船体可用于我国沿海和欧洲北海进行运输作业。 In an embodiment of this patent, the hull can be used for transportation operations along the coast of my country and in the North Sea of Europe.

在本专利的一实施例中,所述船体的最大甲板可变载荷可达到5000吨以上。 In an embodiment of this patent, the maximum deck variable load of the hull can reach more than 5000 tons.

在本专利的二实施例中,所述桩靴插入海底,所述桩腿将所述船体抬离海面。 In the second embodiment of this patent, the spud can is inserted into the seabed, and the spud legs lift the hull from the sea surface.

在本专利的二实施例中,所述桩腿共4根,每根最大提升能力为5500吨,最大自持能力达到9500吨。 In the second embodiment of this patent, there are 4 legs in total, each with a maximum lifting capacity of 5,500 tons, and a maximum self-sustaining capacity of 9,500 tons.

在本专利的二实施例中,所述起重机为全回转起重机。 In the second embodiment of this patent, the crane is an all-slewing crane.

在本专利的二实施例中,所述桩腿上装有液压升降装置。 In the second embodiment of this patent, hydraulic lifting devices are installed on the legs.

在本专利的二实施例中,液压升降装置具有连续提升能力,可使所述船体维持在任意高度位置。 In the second embodiment of this patent, the hydraulic lifting device has a continuous lifting capability, which can maintain the hull at any height.

在本专利的二实施例中,近海风电设备安装装备还包括三个折臂吊,用于进行辅助安装作业。 In the second embodiment of this patent, the offshore wind power equipment installation equipment also includes three knuckle-arm cranes for auxiliary installation work.

在本专利的二实施例中,所述桩腿的最小作业水深为15米,最大作业水深为40米。 In the second embodiment of this patent, the minimum operating water depth of the pile legs is 15 meters, and the maximum operating water depth is 40 meters.

在本专利的二实施例中,所述起重机最大可完成7MW风机的吊装工作。 In the second embodiment of this patent, the crane can complete the hoisting work of a 7MW wind turbine at most.

图4所示:首部采用超U型水线设计:吃水水线面面积系数为0.62-0.7;半入水角为80°-90°。平行中体长度为全船总长的63%;尾部采用方尾。 As shown in Figure 4: the head adopts a super U-shaped waterline design: the area coefficient of the waterline surface is 0.62-0.7; the half-water entry angle is 80°-90°. The length of the parallel center body is 63% of the total length of the whole ship; the tail adopts a square tail.

虽然本实用新型已以较佳实施例揭示如上,然其并非用以限定本实用新型,任何本技术领域技术人员,在不脱离本实用新型的精神和范围内,当可作些许的修改和完善,因此本实用新型的保护范围当以权力要求书所界定的为准。 Although the utility model has been disclosed above with preferred embodiments, it is not intended to limit the utility model, and any person skilled in the art may make some modifications and improvements without departing from the spirit and scope of the utility model , so the scope of protection of the present utility model should be defined by the claims.

Claims (6)

1.一种大型近海风电设备安装装备,其特征在于:包括船体(2)、三个艏侧推(8)、全回转推进器(9)、主机(5)、主起重机(3)、四个桩腿(6)、桩靴(7)、生活区(11)及直升机平台(12);船体(2)首部具有超U型水线形状,船体(2)尾部安装有全回转推进器(9),船体(2)的首部具有三个艏侧推(8),船体(2)的底部舱室具有若干个主机(5),船体(2)上具有若干个带有等距插销孔(14)的桩腿(6),每个桩腿(6)的下部与桩靴(7)相连接,生活区(11)安置于主甲板(13)上,船首设有直升机平台(12),主起重机(3)在一个桩腿(6)的上部,每个桩腿(6)上具有液压升降装置(10),甲板上配置有若干台辅助用折臂吊(4)。 1. A large-scale offshore wind power equipment installation equipment, characterized in that it includes a hull (2), three bow thrusters (8), an azimuth thruster (9), a main engine (5), a main crane (3), four A spud leg (6), a spud shoe (7), a living area (11) and a helicopter platform (12); the bow of the hull (2) has a super U-shaped waterline shape, and the tail of the hull (2) is equipped with an azimuth propeller ( 9), the bow of the hull (2) has three bow thrusters (8), the bottom compartment of the hull (2) has several main engines (5), and the hull (2) has several equidistant pin holes (14 ), the lower part of each leg (6) is connected with the spud shoe (7), the living area (11) is placed on the main deck (13), and the bow is provided with a helicopter platform (12), the main The crane (3) is on the top of a leg (6), each leg (6) has a hydraulic lifting device (10), and several auxiliary folding arm cranes (4) are arranged on the deck. 2.根据权利要求1所述的一种大型近海风电设备安装装备,其特征在于:船体(2)为单甲板,双层底;船底、主甲板、舷侧、纵舱壁及甲板室均采用纵骨架式。 2. A large-scale offshore wind power equipment installation equipment according to claim 1, characterized in that: the hull (2) is a single deck, double bottom; the bottom, main deck, side, longitudinal bulkhead and deckhouse all adopt Longitudinal frame. 3.根据权利要求1所述的一种大型近海风电设备安装装备,其特征在于:船体(2)设八道全通水密横舱壁和三道贯通首尾的纵舱壁以及左右舷两道纵向外板。 3. A large-scale offshore wind power equipment installation equipment according to claim 1, characterized in that: the hull (2) is provided with eight fully-through watertight transverse bulkheads, three longitudinal bulkheads penetrating the fore and aft, and two longitudinal outer bulkheads on the starboard and starboard sides. plate. 4.根据权利要求1所述的一种大型近海风电设备安装装备,其特征在于:主机(5)的数量为六个。 4. A large-scale offshore wind power equipment installation equipment according to claim 1, characterized in that: the number of hosts (5) is six. 5.根据权利要求1所述的一种大型近海风电设备安装装备,其特征在于:桩腿(6)直径4.7米,桩腿(6)及桩靴(7)全长81米,采用水密桩靴。 5. A large-scale offshore wind power equipment installation equipment according to claim 1, characterized in that: the diameter of the pile leg (6) is 4.7 meters, the total length of the pile leg (6) and the pile shoe (7) is 81 meters, and watertight piles are used boots. 6.根据权利要求1所述的一种大型近海风电设备安装装备,其特征在于:辅助用折臂吊(4)数量为三个。 6. The installation equipment for large-scale offshore wind power equipment according to claim 1, characterized in that the number of auxiliary knuckle-arm cranes (4) is three.
CN201420821401.9U 2014-12-19 2014-12-19 A kind of large-scale coastal waters wind power equipment installs equipment Expired - Fee Related CN204642060U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420821401.9U CN204642060U (en) 2014-12-19 2014-12-19 A kind of large-scale coastal waters wind power equipment installs equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420821401.9U CN204642060U (en) 2014-12-19 2014-12-19 A kind of large-scale coastal waters wind power equipment installs equipment

Publications (1)

Publication Number Publication Date
CN204642060U true CN204642060U (en) 2015-09-16

Family

ID=54094826

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420821401.9U Expired - Fee Related CN204642060U (en) 2014-12-19 2014-12-19 A kind of large-scale coastal waters wind power equipment installs equipment

Country Status (1)

Country Link
CN (1) CN204642060U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105711766A (en) * 2016-04-03 2016-06-29 大连理工大学 Self-elevating submersible underwater work platform and method of use thereof
CN106089597A (en) * 2016-07-28 2016-11-09 太重(天津)滨海重型机械有限公司 Offshore wind farm unit transport mounting platform
CN108674597A (en) * 2018-06-04 2018-10-19 中天科技集团海洋工程有限公司 A kind of jack up wind-powered electricity generation mounting platform

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105711766A (en) * 2016-04-03 2016-06-29 大连理工大学 Self-elevating submersible underwater work platform and method of use thereof
WO2017173934A1 (en) * 2016-04-03 2017-10-12 大连理工大学 Self-elevating submersible underwater working platform and usage thereof
CN106089597A (en) * 2016-07-28 2016-11-09 太重(天津)滨海重型机械有限公司 Offshore wind farm unit transport mounting platform
CN106089597B (en) * 2016-07-28 2018-11-23 太重(天津)滨海重型机械有限公司 Offshore wind farm unit transport mounting platform
CN108674597A (en) * 2018-06-04 2018-10-19 中天科技集团海洋工程有限公司 A kind of jack up wind-powered electricity generation mounting platform

Similar Documents

Publication Publication Date Title
CN104192272B (en) Installation method from boat jack up wind-powered electricity generation transport installation ship and Wind turbines
CN103925172B (en) Integral mounting method for tension leg type offshore floating wind turbine
CN112523969B (en) Truss inhaul cable type floating offshore wind turbine structure
CN110712721B (en) An offshore wind farm wind turbine installation operation engineering vessel and operation method thereof
CN103452742B (en) A kind of Semi-submersible type multi-floater wave energy conversion device
CN111891299A (en) Offshore wind turbine integral transportation and installation ship and offshore wind turbine integral transportation and installation method
CN106965906B (en) A kind of marine three basic formula wind-powered electricity generation complete machine installation ships and its single step construction method
CN102001431B (en) Three-blade propulsion and power generation two-purpose wind surf
CN105752282A (en) Self-elevating wind power generation work boat
CN102704452A (en) Ultra-large self-elevating wind turbine installation vessel with multi-type pile legs and design method thereof
CN107571975A (en) A kind of offshore wind farm mounting platform
CN204642060U (en) A kind of large-scale coastal waters wind power equipment installs equipment
CN106828812A (en) Semi-submersible type deep-sea wind-powered electricity generation mounting platform and its wind power generating set integral installation method
CN103979081B (en) The marine buoyant wind machine integral installation workboat of deep drinking water
CN104554639A (en) Installation equipment for large offshore wind power equipment
CN103661827A (en) Installation system and construction method of wind turbine assembly in sea intertidal zone
CN209660183U (en) Deep Sea Floating Fishing and Animal Husbandry-Wind Power Combined Platform System
CN205469697U (en) High loading capacity, multi-working conditions, environment-friendly wind power installation ship
CN212556704U (en) Multifunctional wind power supporting ship
CN212580095U (en) Integral transportation and installation ship for offshore wind turbine
CN108674597A (en) A kind of jack up wind-powered electricity generation mounting platform
CN210101938U (en) Self-elevating wind power installation platform
CN205150152U (en) Be suitable for rotatory buoy tender that hangs of coastal energy -concerving and environment -protective type 10t in guangdong
CN218662313U (en) 3500-ton hoisting deep-water large-scale offshore wind power installation platform
CN105667726B (en) High loading capacity, multi-working conditions, environment-friendly wind power installation ship and its working method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150916