CN103925172B - Integral mounting method for tension leg type offshore floating wind turbine - Google Patents
Integral mounting method for tension leg type offshore floating wind turbine Download PDFInfo
- Publication number
- CN103925172B CN103925172B CN201410138023.9A CN201410138023A CN103925172B CN 103925172 B CN103925172 B CN 103925172B CN 201410138023 A CN201410138023 A CN 201410138023A CN 103925172 B CN103925172 B CN 103925172B
- Authority
- CN
- China
- Prior art keywords
- offshore floating
- tension leg
- wind turbine
- column
- auxiliary
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000007667 floating Methods 0.000 title claims abstract description 99
- 238000000034 method Methods 0.000 title claims abstract description 15
- 238000009434 installation Methods 0.000 claims abstract description 56
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 11
- 239000010959 steel Substances 0.000 claims abstract description 11
- 238000010276 construction Methods 0.000 claims abstract description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 10
- 230000005611 electricity Effects 0.000 claims description 4
- 241000288140 Gruiformes Species 0.000 description 3
- 238000013461 design Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 230000005484 gravity Effects 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 2
- 238000011160 research Methods 0.000 description 2
- TVEXGJYMHHTVKP-UHFFFAOYSA-N 6-oxabicyclo[3.2.1]oct-3-en-7-one Chemical compound C1C2C(=O)OC1C=CC2 TVEXGJYMHHTVKP-UHFFFAOYSA-N 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000013332 literature search Methods 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/727—Offshore wind turbines
Landscapes
- Wind Motors (AREA)
Abstract
一种张力腿式海上浮动式风力机整体安装的辅助装置及方法,该辅助装置包括辅助模块、眼板、止动销、油缸、定位绞车和钢丝绳,其中,辅助模块安装在风力机的多立柱张力腿式海上浮动式基础的外侧,眼板可拆卸地连接在多立柱张力腿式海上浮动式基础的周向立柱上,多个油缸布置于辅助模块的侧面和底面,油缸的缸体固定在辅助模块上,止动销与油缸的缸杆相铰接并且受油缸的驱动插入眼板的孔中,定位绞车固定在辅助模块的顶部,钢丝绳一端与定位绞车相连,另一端与预抛在海底的定位锚相连。本发明能够为张力腿式海上浮动式风力机的安装提供足够的稳性和浮力以及辅助定位,从而大幅节省海上作业时间,降低安装成本,适合于大规模海上浮动式风力发电场的建设。
An auxiliary device and method for the overall installation of a tension leg type offshore floating wind turbine, the auxiliary device includes an auxiliary module, an eye plate, a stop pin, an oil cylinder, a positioning winch and a steel wire rope, wherein the auxiliary module is installed on the multi-column tension of the wind turbine. On the outside of the leg-type offshore floating foundation, the eye plate is detachably connected to the circumferential columns of the multi-column tension-legged offshore floating foundation. Multiple oil cylinders are arranged on the side and bottom of the auxiliary module, and the cylinder body of the oil cylinder is fixed on the auxiliary module. On the module, the stop pin is hinged with the cylinder rod of the oil cylinder and inserted into the hole of the eye plate driven by the oil cylinder. The positioning winch is fixed on the top of the auxiliary module. One end of the wire rope is connected with the positioning winch, and the other end is connected with the positioning anchor pre-thrown on the seabed. connected. The invention can provide sufficient stability, buoyancy and auxiliary positioning for the installation of the tension leg type offshore floating wind turbine, thereby greatly saving offshore operation time and reducing installation costs, and is suitable for the construction of large-scale offshore floating wind farms.
Description
技术领域technical field
本发明涉及海上浮动式风力机的整体安装技术,具体涉及一种张力腿式海上浮动式风力机整体安装辅助装置及安装方法,属于海洋工程技术领域,The invention relates to the overall installation technology of an offshore floating wind turbine, in particular to a tension leg type offshore floating wind turbine integral installation auxiliary device and an installation method, belonging to the technical field of marine engineering.
背景技术Background technique
风能是目前发展最迅速、最具潜力的可再生能源,全球可利用的风能资源非常丰富,风能总量比地球上可开发利用的水能总量大10倍以上,其中大部分高品质的风能资源集中在海上深水区域。海上风能大国如:美国、中国、日本、挪威等的风能资源都集中在水深超过30m的非浅水区域。深水浮动式风力机作为一种替代传统固定式风机的新装备具有广阔的应用前景,已成为国外海上风能研究的热点领域。美国、欧洲和日本等对此进行了比较广泛的研究,纷纷提出了新型的浮式风机概念,目前处于不同的设计和验证阶段。Wind energy is currently the fastest growing renewable energy with the greatest potential. The world’s available wind energy resources are very abundant. Resources are concentrated in deep water areas offshore. The wind energy resources of major offshore wind energy countries such as the United States, China, Japan, and Norway are all concentrated in non-shallow water areas with a water depth of more than 30m. As a new equipment to replace traditional fixed wind turbines, deep-water floating wind turbines have broad application prospects and have become a hot field of offshore wind energy research abroad. The United States, Europe and Japan have conducted extensive research on this, and have proposed new concepts of floating wind turbines, which are currently in different stages of design and verification.
浮动式风力机主要由三部分组成,即位于顶部的风力发电机组、底部的浮式基础和用以连接二者的塔筒结构。底部的浮式基础与海洋石油平台下浮体相似,可划分为三种主要类型:单柱式平台,半潜式平台和张力腿式平台。单柱式平台通过压载使重心高度远低于浮心高度以获得稳性和优良的垂荡性能。半潜式平台通过合理布置水线面以取得较大的水线面惯性矩,从而获得稳性和较好的运动性能。张力腿式平台通过设置张力腿预张力以获得稳性和优良的运动性能。The floating wind turbine is mainly composed of three parts, namely the wind turbine at the top, the floating foundation at the bottom, and the tower structure used to connect the two. The floating foundation at the bottom is similar to the floating body under the offshore oil platform, and can be divided into three main types: single column platform, semi-submersible platform and tension leg platform. The height of the center of gravity of the single-column platform is much lower than the height of the buoyancy center through ballasting to obtain stability and excellent heave performance. The semi-submersible platform obtains a larger moment of inertia on the water plane by rationally arranging the water plane, so as to obtain stability and better motion performance. The tension leg platform obtains stability and excellent motion performance by setting the tension leg pretension.
目前,海上浮动式风力机的安装方式主要分为多体式安装、两体式安装和整体式安装。分体式是指依次安装机舱、轮毂、叶片、塔筒和浮动式基础等,其安装过程比较复杂,每次安装需要海上吊装的次数较多,需要较长的海上作业时间,因此对安装船的要求高,安装费用也较高。两体式安装是指在陆地上把顶部的风力发电机组(包括机舱、轮毂和叶片等)和塔筒安装好,再利用安装船吊运至预先安装好的海上浮动式基础上。整体式安装是利用现有技术和装备在陆地上完成海上浮动式风力机所有部件的安装,再利用安装船整体运输至预定安装海域,最后再安装系泊系统。At present, the installation methods of offshore floating wind turbines are mainly divided into multi-body installation, two-body installation and integral installation. The split type refers to the installation of the engine room, hub, blade, tower and floating foundation in sequence. The installation process is more complicated, and each installation requires more sea hoisting and longer sea operation time. Therefore, the installation ship The requirements are high and the installation cost is also high. The two-piece installation refers to the installation of the top wind turbine (including the nacelle, hub and blades, etc.) and the tower on land, and then use the installation ship to lift it to the pre-installed offshore floating foundation. Integral installation is to use the existing technology and equipment to complete the installation of all components of the offshore floating wind turbine on land, and then use the installation ship to transport the whole part to the intended installation sea area, and finally install the mooring system.
经对现有技术的文献检索发现,上海交通大学船建学院于2012年公布一种新型的多立柱张力腿式海上5MW浮动式风力机(Energies 2012,5,3874-3891;doi:10.3390/en5103874),其浮动基础主体型深21.5m,中心立柱直径6m,周向立柱截面尺寸长4.8m,宽4.8m,排水体积4170m3,平台重量包括固定压载约为2375t,浮心位置位于水面下约12m处,重心位置位于水面下约9.85m处。由于该5MW海上张力腿式海上浮动式风力机浮心位于重心位置以下,在未安装张力系泊腿之前,整体稳性不足,因此安装时不宜采用整体式安装,只适合采用分体式安装或两体式安装,因而安装成本较高。A literature search of existing technologies found that Shanghai Jiao Tong University School of Shipbuilding announced a new multi-column tension leg offshore 5MW floating wind turbine in 2012 (Energies 2012,5,3874-3891; doi:10.3390/en5103874 ), the main body of the floating foundation is 21.5m deep, the diameter of the central column is 6m, the section size of the circumferential column is 4.8m long, 4.8m wide, and the drainage volume is 4170m 3 . At about 12m, the center of gravity is located at about 9.85m below the water surface. Since the buoyancy center of the 5MW offshore tension leg type offshore floating wind turbine is below the center of gravity, the overall stability is insufficient before the tension mooring legs are installed. One-piece installation, so the installation cost is higher.
发明内容Contents of the invention
本发明的目的在于克服现有张力腿式海上浮动式风力机安装方式的上述不足和缺陷,提供一种张力腿式海上浮动式风力机的整体安装方法,其既可以为张力腿式海上浮动式风力机的安装提供足够的稳性和浮力,又可以为张力腿式海上浮动式风力机的安装提供辅助定位,从而大幅节省海上作业时间,降低安装成本。The purpose of the present invention is to overcome the above-mentioned deficiencies and defects of the existing tension leg type offshore floating wind turbine installation method, and provide an overall installation method of the tension leg type offshore floating wind turbine, which can be a tension leg type offshore floating wind turbine. The installation of the wind turbine provides sufficient stability and buoyancy, and can also provide auxiliary positioning for the installation of the tension leg offshore floating wind turbine, thereby greatly saving offshore operation time and reducing installation costs.
本发明解决其技术问题的技术方案是:The technical scheme that the present invention solves its technical problem is:
一种张力腿式海上浮动式风力机的整体安装方法,该张力腿式海上浮动式风力机包括具有周向立柱的多立柱张力腿式海上浮动式基础,其特征在于:采用辅助装置进行安装;所述辅助装置包括辅助模块、眼板、止动销、油缸、定位绞车和钢丝绳,所述辅助模块内部设有压载舱、动力舱、压载泵舱和液压泵站舱,安装在所述多立柱张力腿式海上浮动式基础的外侧,所述眼板可拆卸地连接在所述多立柱张力腿式海上浮动式基础的周向立柱上,多个所述油缸布置于所述辅助模块的侧面和底面,该油缸的缸体固定在所述辅助模块上,所述止动销与所述油缸的缸杆相铰接,并且该止动销受该油缸的驱动插入所述眼板的孔中,所述定位绞车固定在所述辅助模块的顶部,所述钢丝绳一端与该定位绞车相连,另一端与预抛在海底的定位锚相连,所述的辅助装置数量共三组;An overall installation method of a tension leg offshore floating wind turbine, the tension leg offshore floating wind turbine includes a multi-column tension leg offshore floating foundation with circumferential columns, and is characterized in that an auxiliary device is used for installation; The auxiliary device includes an auxiliary module, an eye plate, a stop pin, an oil cylinder, a positioning winch and a wire rope. The auxiliary module is provided with a ballast tank, a power cabin, a ballast pump cabin and a hydraulic pump station cabin inside, and is installed in the multiple The outer side of the column tension leg type offshore floating foundation, the eye plate is detachably connected to the circumferential column of the multi-column tension leg type offshore floating foundation, and a plurality of the oil cylinders are arranged on the side of the auxiliary module and the bottom surface, the cylinder body of the oil cylinder is fixed on the auxiliary module, the stop pin is hinged with the cylinder rod of the oil cylinder, and driven by the oil cylinder, the stop pin is inserted into the hole of the eye plate, the The positioning winch is fixed on the top of the auxiliary module, one end of the steel wire rope is connected with the positioning winch, and the other end is connected with the positioning anchor pre-thrown on the seabed, and the number of the auxiliary devices is three groups;
所述整体安装方法包括如下具体步骤:The overall installation method includes the following specific steps:
1)在船厂完成包括有多立柱张力腿式海上浮动式基础的张力腿式海上浮动式风力机的建造和安装;1) Complete the construction and installation of the tension leg offshore floating wind turbine including the multi-column tension leg offshore floating foundation at the shipyard;
2)将所述眼板连接在所述多立柱张力腿式海上浮动式基础的周向立柱上,利用陆上的吊机将3组已安装止动销、油缸、定位绞车和钢丝绳的辅助模块安装在所述多立柱张力腿式海上浮动式基础上;2) Connect the eye plate to the circumferential column of the multi-column tension leg type offshore floating foundation, and use a crane on land to install 3 sets of auxiliary modules that have installed stop pins, oil cylinders, positioning winches and wire ropes On the multi-column tension leg offshore floating foundation;
3)驱动所述辅助模块上的油缸,使止动销插入所述多立柱张力腿式海上浮动式基础上眼板的孔中,将该辅助模块与所述多立柱张力腿式海上浮动式基础的周向立柱相连接进行临时固定;3) Drive the oil cylinder on the auxiliary module to insert the stop pin into the hole of the eye plate on the multi-column tension leg type offshore floating foundation, and connect the auxiliary module with the multi-column tension leg type offshore floating foundation. The circumferential columns are connected for temporary fixation;
4)将组装完毕的张力腿式海上浮动式风力机和辅助装置整体吊装至船坞里,通过所述辅助模块中的压载泵进行压载,直至水线面到达预定吃水;4) hoisting the assembled tension leg offshore floating wind turbine and auxiliary devices into the dock as a whole, and ballasting through the ballast pump in the auxiliary module until the water plane reaches the predetermined draft;
5)利用拖船将组装后的张力腿式海上浮动式风力机和辅助装置整体拖航至预定安装海域;5) Use a tugboat to tow the assembled tension leg offshore floating wind turbine and auxiliary devices to the intended installation sea area;
6)将钢丝绳与预抛在海底的定位锚相连接,然后驱动定位绞车通过钢丝绳定位所述张力腿式海上浮动式风力机;6) Connect the steel wire rope with the positioning anchor pre-thrown on the seabed, and then drive the positioning winch to locate the tension leg type offshore floating wind turbine through the steel wire rope;
7)将系泊系统与所述张力腿式海上浮动式风力机的多立柱张力腿式海上浮动式基础连接;7) connecting the mooring system with the multi-column tension leg floating offshore foundation of the tension leg floating offshore wind turbine;
8)驱动所述辅助模块上的油缸,使止动销由所述多立柱张力腿式海上浮动式基础上的眼板的孔中退出,将所述辅助装置与多立柱张力腿式海上浮动式基础相脱离;8) Drive the oil cylinder on the auxiliary module so that the stop pin exits from the hole of the eye plate on the multi-column tension-leg type offshore floating foundation, and connect the auxiliary device with the multi-column tension-leg type offshore floating foundation separate from each other;
9)由所述多立柱张力腿式海上浮动式基础的周向立柱上拆除所述眼板,将所述钢丝绳与海底的定位锚相脱离,利用拖船将所述辅助装置拖离安装海域,完成张力腿式海上浮动式风力机的整体安装。9) Remove the eye plate from the circumferential column of the multi-column tension leg type offshore floating foundation, separate the steel wire rope from the positioning anchor on the seabed, use a tugboat to drag the auxiliary device away from the installation sea area, and complete Overall installation of a tension leg offshore floating wind turbine.
进一步地,所述的定位绞车采用电力驱动或者液压驱动。Further, the positioning winch is driven by electricity or hydraulic pressure.
进一步地,所述的油缸采用电力驱动或者液压驱动。Further, the oil cylinder is driven by electricity or hydraulic pressure.
与现有技术相比,本发明的有益效果是:Compared with prior art, the beneficial effect of the present invention is:
在张力腿式海上浮动式风力机安装时,所述辅助模块既能够提供足够的稳性和浮力,又能够提供辅助定位,从而大幅节省了海上作业时间,降低了安装成本,适合大规模海上浮动式风力发电场的建设。When the tension leg type offshore floating wind turbine is installed, the auxiliary module can not only provide sufficient stability and buoyancy, but also provide auxiliary positioning, thereby greatly saving offshore operation time and reducing installation costs, and is suitable for large-scale offshore floating construction of wind farms.
附图说明Description of drawings
图1是本发明的主视图。Fig. 1 is a front view of the present invention.
图2是本发明的侧视图。Figure 2 is a side view of the present invention.
图3是图2中的A—A剖视图。Fig. 3 is a cross-sectional view along line A-A in Fig. 2 .
图4本发明的俯视图。Figure 4 is a top view of the present invention.
图5本发明的立体图。Figure 5 is a perspective view of the present invention.
图中,1—风轮,2—机舱,3—塔筒,4—多立柱张力腿式海上浮动式基础,5—辅助模块,6—定位绞车,7—钢丝绳,8—眼板,9—止动销,10—油缸。In the figure, 1—wind wheel, 2—engine room, 3—tower, 4—multi-column tension leg offshore floating foundation, 5—auxiliary module, 6—positioning winch, 7—wire rope, 8—eye plate, 9— Stop pin, 10—oil cylinder.
具体实施方式detailed description
以下结合附图和实施例对本发明作进一步描述,本实施例以本发明的技术方案为前提,给出了详细的实施方式和具体的操作过程,但本发明的保护范围不限于下述的实施例。The present invention will be further described below in conjunction with accompanying drawing and embodiment, present embodiment is based on the premise of technical solution of the present invention, has provided detailed implementation and specific operation process, but protection scope of the present invention is not limited to following implementation example.
如图1、图2、图3和图5所示,本实施例所述的辅助装置用于对张力腿式海上浮动式风力机的整体安装,该张力腿式海上浮动式风力机包括风轮1、机舱2、塔筒3和多立柱张力腿式海上浮动式基础4,其中,风轮1和机舱2通过法兰安装在塔筒3的上部,塔筒3的下部安装在多立柱张力腿式海上浮动式基础4的中央立柱上,该多立柱张力腿式海上浮动式基础4具有多个周向立柱。As shown in Fig. 1, Fig. 2, Fig. 3 and Fig. 5, the auxiliary device described in this embodiment is used for the overall installation of the tension leg type offshore floating wind turbine, and the tension leg type offshore floating wind turbine includes a wind wheel 1. The nacelle 2, the tower 3 and the multi-column tension leg offshore floating foundation 4, wherein the wind wheel 1 and the nacelle 2 are installed on the upper part of the tower 3 through flanges, and the lower part of the tower 3 is installed on the multi-column tension leg On the central column of the floating offshore foundation 4, the multi-column tension leg floating offshore foundation 4 has a plurality of circumferential columns.
所述的风轮1包含3组叶片和轮毂,其中叶片直径为126m,叶片安装在轮毂上。The wind wheel 1 includes 3 sets of blades and a hub, wherein the diameter of the blades is 126m, and the blades are installed on the hub.
所述的机舱2内布置一组5MW风力发电机组及传动系统,风轮1与该5MW风力发电机组通过传动系统相连。A group of 5MW wind power generators and a transmission system are arranged in the nacelle 2, and the wind wheel 1 is connected with the 5MW wind power generators through the transmission system.
所述的塔筒3为圆锥形壳体式结构,底部直径6m,顶部直径4m,塔筒3的顶部与机舱2通过法兰相连。The tower 3 is a conical shell structure with a bottom diameter of 6m and a top diameter of 4m. The top of the tower 3 is connected to the engine room 2 through a flange.
本实施例所述张力腿式海上浮动式风力机整体安装的辅助装置的数量共三组,所述辅助装置包括辅助模块5、眼板8、止动销9、油缸10、定位绞车6和钢丝绳7,它们之间的连接关系为:三个辅助模块5均匀地安装在多立柱张力腿式海上浮动式基础4的周围外侧;眼板8可拆卸地临时连接在所述多立柱张力腿式海上浮动式基础4的周向立柱上;多个油缸10布置于所述辅助模块5的侧面和底面,请结合参阅图4,该油缸10的缸体固定在辅助模块5上,油缸10的缸杆与所述止动销9相铰接,并且该止动销9受油缸10的驱动能够插入所述眼板8的孔中;三个定位绞车6分别固定安装在三个辅助模块5的顶部,所述钢丝绳7的一端与定位绞车6的卷筒相连,另一端与预抛在海底的定位锚相连。The total number of auxiliary devices installed in the tension leg type offshore floating wind turbine in this embodiment is three groups, and the auxiliary devices include auxiliary modules 5, eye plates 8, stop pins 9, oil cylinders 10, positioning winches 6 and wire ropes 7 , the connection relationship between them is: three auxiliary modules 5 are evenly installed on the outside of the multi-column tension leg type offshore floating foundation 4; A plurality of oil cylinders 10 are arranged on the side and bottom surface of the auxiliary module 5, please refer to Fig. 4, the cylinder body of the oil cylinder 10 is fixed on the auxiliary module 5, and the cylinder rod of the oil cylinder 10 is connected with the auxiliary module 5. The stop pin 9 is hinged, and the stop pin 9 is driven by the oil cylinder 10 and can be inserted into the hole of the eye plate 8; the three positioning winches 6 are respectively fixedly installed on the top of the three auxiliary modules 5, and the steel wire rope 7 One end of it is connected with the reel of positioning winch 6, and the other end is connected with the positioning anchor pre-thrown on the seabed.
所述的辅助模块5为壳状钢构件,其内部设有压载舱、动力舱、压载泵舱和液压泵站舱;该辅助模块5的尺寸为宽度4.5m,长度10m,高度20m,设计吃水6m,设计排水体积2700m3。The auxiliary module 5 is a shell-shaped steel member, and its interior is provided with a ballast tank, a power cabin, a ballast pump cabin and a hydraulic pump station cabin; the size of the auxiliary module 5 is 4.5m in width, 10m in length, and 20m in height. The design draft is 6m, and the design drainage volume is 2700m 3 .
所述的定位绞车6采用电力驱动或者液压驱动,其额定拉力750kN,额定速度0-20m/min。当张力腿式海上浮动式风力机拖航至预定安装海域后,定位绞车6通过钢丝绳7对张力腿式海上浮动式风力机进行定位。The positioning winch 6 is electrically driven or hydraulically driven, with a rated pulling force of 750kN and a rated speed of 0-20m/min. After the tension leg offshore floating wind turbine is towed to the intended installation sea area, the positioning winch 6 positions the tension leg offshore floating wind turbine through the wire rope 7 .
所述的油缸10采用电力驱动或者液压驱动,其额定推力100kN,额定速度0-10m/min。The oil cylinder 10 is driven by electricity or hydraulic pressure, its rated thrust is 100kN, and its rated speed is 0-10m/min.
所述的眼板8上设有能够插入止动销9的孔。The eye plate 8 is provided with a hole capable of inserting the stop pin 9 .
所述的止动销9在辅助模块5侧面共布置12组,在辅助模块5底部共布置6组;止动销9经油缸10驱动后能够插入眼板8的孔中,为辅助模块5进行临时固定。The stop pins 9 are arranged in 12 groups on the side of the auxiliary module 5, and 6 groups are arranged on the bottom of the auxiliary module 5; the stop pins 9 can be inserted into the holes of the eye plate 8 after being driven by the oil cylinder 10, and temporarily fix the auxiliary module 5 .
采用所述辅助装置的张力腿式海上浮动式风力机的整体安装方法包括如下具体步骤:The overall installation method of the tension leg type offshore floating wind turbine using the auxiliary device includes the following specific steps:
1)多立柱张力腿式海上浮动式基础4在船厂建造完毕后,通过陆上吊机分别将风轮1、机舱2、塔筒3安装在该多立柱张力腿式海上浮动式基础4上。1) After the multi-column tension-leg offshore floating foundation 4 is built in the shipyard, the wind turbine 1, the nacelle 2, and the tower 3 are respectively installed on the multi-column tension-leg offshore floating foundation 4 by a land crane.
2)将眼板8连接在所述多立柱张力腿式海上浮动式基础4的周向立柱上,将止动销9、油缸10、定位绞车6和钢丝绳7安装在辅助模块5上,组装成所述辅助装置,利用陆上的吊机将三组辅助装置分别安装在多立柱张力腿式海上浮动式基础4上。2) Connect the eye plate 8 to the circumferential column of the multi-column tension leg type offshore floating foundation 4, install the stop pin 9, the oil cylinder 10, the positioning winch 6 and the wire rope 7 on the auxiliary module 5, and assemble it into the The above-mentioned auxiliary devices, three groups of auxiliary devices are respectively installed on the multi-column tension leg type offshore floating foundation 4 by using a crane on land.
3)驱动辅助模块5上的油缸10,使止动销9插入多立柱张力腿式海上浮动式基础4上的眼板8的孔中,将该辅助模块5与多立柱张力腿式海上浮动式基础4的周向立柱相连接进行临时固定。3) Drive the oil cylinder 10 on the auxiliary module 5 to insert the stop pin 9 into the hole of the eye plate 8 on the multi-column tension-leg offshore floating foundation 4, and connect the auxiliary module 5 with the multi-column tension-leg offshore floating foundation 4's circumferential columns are connected for temporary fixation.
4)将组装完毕的张力腿式海上浮动式风力机和辅助装置整体吊装至船坞里,通过辅助模块5中的压载泵进行压载,直至水线面MSL到达预定吃水。4) Hoist the assembled tension leg offshore floating wind turbine and auxiliary devices into the dock as a whole, and perform ballasting through the ballast pump in the auxiliary module 5 until the water surface MSL reaches the predetermined draft.
5)利用拖船将组装后的张力腿式海上浮动式风力机和辅助装置整体拖航至预定安装海域。5) Use the tugboat to tow the assembled tension leg offshore floating wind turbine and auxiliary devices to the intended installation sea area.
6)将钢丝绳7与预抛在海底的定位锚相连接,然后驱动定位绞车6通过钢丝绳7定位所述张力腿式海上浮动式风力机。6) Connect the wire rope 7 to the positioning anchor pre-thrown on the seabed, and then drive the positioning winch 6 to position the tension-leg offshore floating wind turbine through the wire rope 7 .
7)将系泊系统与所述张力腿式海上浮动式风力机的多立柱张力腿式海上浮动式基础4连接。7) Connect the mooring system with the multi-column tension leg floating offshore foundation 4 of the tension leg floating offshore wind turbine.
8)驱动辅助模块5上的油缸10,使止动销9由多立柱张力腿式海上浮动式基础4上的眼板8的孔中退出,将所述辅助装置与多立柱张力腿式海上浮动式基础4的周向立柱相脱离。8) Drive the oil cylinder 10 on the auxiliary module 5, so that the stop pin 9 is withdrawn from the hole of the eye plate 8 on the multi-column tension-leg type offshore floating foundation 4, and connect the auxiliary device with the multi-column tension-leg type offshore floating type. The circumferential columns of the foundation 4 are separated from each other.
9)由所述多立柱张力腿式海上浮动式基础的周向立柱上拆除所述眼板8,完成张力腿式海上浮动式风力机的整体安装,将所述钢丝绳7与海底的定位锚相脱离,利用拖船将所述辅助装置拖离安装海域,为下一次安装进行准备。9) The eye plate 8 is removed from the circumferential column of the multi-column tension leg type offshore floating foundation to complete the overall installation of the tension leg type offshore floating wind turbine, and the steel wire rope 7 is connected to the positioning anchor on the seabed. Detachment, use the tugboat to tow the auxiliary device away from the installation sea area, and prepare for the next installation.
本实施例所提供的3组张力腿式海上5MW浮动式风力机整体安装辅助装置,能总计提供5100m3排水体积和92535m4水线面惯性矩,因而该辅助装置可以为张力腿式海上浮动式风力机的安装提供足够的稳性和浮力;三台定位绞车6可以为张力腿式海上浮动式风力机的安装提供辅助定位,从而可以大幅节省海上作业时间,降低安装成本,适合于建设大规模海上浮动式风力发电场。The 3 groups of tension leg type offshore 5MW floating wind turbine overall installation auxiliary devices provided in this embodiment can provide a total of 5100m3 drainage volume and 92535m4 waterline surface inertia moment, so the auxiliary device can be tension leg type offshore floating type The installation of the wind turbine provides sufficient stability and buoyancy; the three positioning winches 6 can provide auxiliary positioning for the installation of the tension leg type offshore floating wind turbine, which can greatly save offshore operation time and reduce installation costs, and is suitable for large-scale construction Offshore floating wind farms.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410138023.9A CN103925172B (en) | 2014-04-08 | 2014-04-08 | Integral mounting method for tension leg type offshore floating wind turbine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410138023.9A CN103925172B (en) | 2014-04-08 | 2014-04-08 | Integral mounting method for tension leg type offshore floating wind turbine |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103925172A CN103925172A (en) | 2014-07-16 |
CN103925172B true CN103925172B (en) | 2017-05-17 |
Family
ID=51143513
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410138023.9A Expired - Fee Related CN103925172B (en) | 2014-04-08 | 2014-04-08 | Integral mounting method for tension leg type offshore floating wind turbine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103925172B (en) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017157399A1 (en) | 2016-03-15 | 2017-09-21 | Stiesdal A/S | A floating wind turbine and a method for the installation of such floating wind turbine |
ES2642177B1 (en) * | 2016-05-13 | 2018-08-29 | Esteyco Sap | AUXILIARY FLOATING SYSTEM FOR THE INSTALLATION AND / OR TRANSPORTATION OF MARINE STRUCTURES AND PROCEDURE THAT INCLUDES SUCH SYSTEM. |
CN107021190A (en) * | 2017-03-30 | 2017-08-08 | 中国海洋石油总公司 | Can be from the floating tension leg type offshore floating wind turbine foundation installed and its installation method |
CN110356521B (en) * | 2019-07-25 | 2020-10-23 | 上海电气风电集团股份有限公司 | Floating drum flexible connection type semi-submersible floating fan structure |
CN110758663B (en) * | 2019-12-04 | 2023-06-16 | 海南大学 | Tension leg platform-wind turbine double-body modularized floating integrated system and application method thereof |
CN111894812B (en) * | 2020-07-17 | 2021-11-23 | 上海电气风电集团股份有限公司 | Installation method and installation device of offshore wind turbine |
BR112023022321A2 (en) | 2021-04-29 | 2024-01-16 | Seatrium Sg Pte Ltd | FLOATING STRUCTURE FOR OFFSHORE DEPLOYMENT |
WO2022231511A1 (en) * | 2021-04-29 | 2022-11-03 | Sembcorp Marine Integrated Yard Pte. Ltd. | A buoyant structure for receiving a tower of a wind turbine in offshore deployment |
NL2033898B1 (en) | 2022-02-18 | 2023-12-12 | Heerema Marine Contractors Nl | A method and system of installing a floating foundation, assembly of floating foundation and ballasting frame, and ballasting frame |
WO2023156474A1 (en) | 2022-02-18 | 2023-08-24 | Heerema Marine Contractors Nederland Se | A method and system of installing a floating foundation, assembly of floating foundation and ballasting frame, and ballasting frame |
NL2031010B1 (en) | 2022-02-18 | 2023-09-05 | Heerema Marine Contractors Nl | A method and system of installing a floating foundation, assembly of floating foundation and ballasting frame, and ballasting frame |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0335218A3 (en) * | 1988-03-28 | 1990-03-07 | Alcatel Stk A/S | Submarine catenary offshore cable |
CN1437541A (en) * | 2000-05-12 | 2003-08-20 | Abb拉默斯环球公司 | Temporary floatation stabilization device and method |
CN201633883U (en) * | 2010-02-21 | 2010-11-17 | 宁波市远东水下工程有限公司 | Shiftable pile positioning device of engineering ship |
CN201816728U (en) * | 2010-09-27 | 2011-05-04 | 上海利策科技有限公司 | Floater system used for being connected with floating production storage and offloading (FPSO) hull |
US8087849B2 (en) * | 2006-02-28 | 2012-01-03 | Seahorse Equipment Corporation | Battered column tension leg platform |
CN102417013A (en) * | 2010-09-27 | 2012-04-18 | 上海利策科技有限公司 | Connecting and releasing structure of FPSO mooring floater and ship body |
-
2014
- 2014-04-08 CN CN201410138023.9A patent/CN103925172B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0335218A3 (en) * | 1988-03-28 | 1990-03-07 | Alcatel Stk A/S | Submarine catenary offshore cable |
CN1437541A (en) * | 2000-05-12 | 2003-08-20 | Abb拉默斯环球公司 | Temporary floatation stabilization device and method |
US8087849B2 (en) * | 2006-02-28 | 2012-01-03 | Seahorse Equipment Corporation | Battered column tension leg platform |
CN201633883U (en) * | 2010-02-21 | 2010-11-17 | 宁波市远东水下工程有限公司 | Shiftable pile positioning device of engineering ship |
CN201816728U (en) * | 2010-09-27 | 2011-05-04 | 上海利策科技有限公司 | Floater system used for being connected with floating production storage and offloading (FPSO) hull |
CN102417013A (en) * | 2010-09-27 | 2012-04-18 | 上海利策科技有限公司 | Connecting and releasing structure of FPSO mooring floater and ship body |
Also Published As
Publication number | Publication date |
---|---|
CN103925172A (en) | 2014-07-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103925172B (en) | Integral mounting method for tension leg type offshore floating wind turbine | |
CA2777282C (en) | Vessel and method for transporting and hoisting the offshore wind turbine generator system | |
CN202295230U (en) | Floating-type offshore wind power foundation | |
CN112523969B (en) | Truss inhaul cable type floating offshore wind turbine structure | |
CN103818523A (en) | Floating fan base with flare type tension legs, marine wind-driven generator and construction method | |
CN102152841A (en) | Vertically installed Spar-type floater for offshore wind generator and construction methods | |
CN106014874B (en) | How to install offshore wind turbines | |
CN108951593B (en) | Marine fan installation system and installation method based on four-barrel jacket composite foundation | |
CN215553999U (en) | Semi-submersible floating type fan system capable of reducing load | |
CN111891299A (en) | Offshore wind turbine integral transportation and installation ship and offshore wind turbine integral transportation and installation method | |
CN103979081B (en) | The marine buoyant wind machine integral installation workboat of deep drinking water | |
CN104816797A (en) | Offshore wind driven generator set and mounting method thereof | |
CN114670976B (en) | Back pressure type offshore wind power complete machine transportation and installation ship and method | |
CN110712721A (en) | Offshore wind farm fan installation operation engineering ship and operation method thereof | |
CN208085949U (en) | A kind of floating wind turbine and TLP platforms transport installation integrated ship | |
US9457873B2 (en) | On-site fabricated fiber-composite floating platforms for offshore applications | |
CN114179983A (en) | A kind of floating fan platform installation method | |
CN103661827A (en) | Installation system and construction method of wind turbine assembly in sea intertidal zone | |
CN203767042U (en) | Outward floating type tension leg floating wind turbine foundation and offshore wind turbine | |
CN104554639A (en) | Installation equipment for large offshore wind power equipment | |
CN111075659A (en) | Offshore wind turbine floating foundation suitable for deep water area and construction method | |
CN212580095U (en) | Integral transportation and installation ship for offshore wind turbine | |
KR20130137382A (en) | Wind turbine installation ship | |
CN204642060U (en) | A kind of large-scale coastal waters wind power equipment installs equipment | |
CN110775215B (en) | Semi-submersible-wind turbine double-body modularized floating integrated system and application method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170517 Termination date: 20200408 |
|
CF01 | Termination of patent right due to non-payment of annual fee |