CN204552145U - The house that wall body structure is integrated with agent structure after-pouring - Google Patents

The house that wall body structure is integrated with agent structure after-pouring Download PDF

Info

Publication number
CN204552145U
CN204552145U CN201520030034.5U CN201520030034U CN204552145U CN 204552145 U CN204552145 U CN 204552145U CN 201520030034 U CN201520030034 U CN 201520030034U CN 204552145 U CN204552145 U CN 204552145U
Authority
CN
China
Prior art keywords
wall body
body structure
agent structure
agent
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520030034.5U
Other languages
Chinese (zh)
Inventor
黄鹏
王爱志
许雷
王军
张玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Constar Construction & Engineering Co Ltd
Original Assignee
Guangdong Constar Construction & Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Constar Construction & Engineering Co Ltd filed Critical Guangdong Constar Construction & Engineering Co Ltd
Priority to CN201520030034.5U priority Critical patent/CN204552145U/en
Application granted granted Critical
Publication of CN204552145U publication Critical patent/CN204552145U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model relates to a kind of wall body structure house integrated with agent structure after-pouring, include agent structure and wall body structure, be equipped with one group of " L " type between the wall column of described agent structure and the side of wall body structure, between described agent structure and the upper end of wall body structure and cushion connector, often group " L " type buffering connector has two, and be symmetrical set, and build integrated with agent structure and wall body structure.Construction process simplifies, the duration is short, reaches energy-saving and cost-reducing object, and the disposable discharge completing building waste of engineering section face amount is simultaneously few, and on-the-spot civilized construction degree is high, also eliminates follow-up construction and the operation handing-over defect of later stage floor multiple working procedure; And the wall body structure that novel light anti-crack concrete is built, light weight, environmental protection and energy saving, compressive strength are high, good heat insulating, forming, surperficial verticality, planeness are easy to control, and eliminate plastering process, avoid the hollowing of plastering and producing, the common quality defect such as crack, seepage.

Description

The house that wall body structure is integrated with agent structure after-pouring
Technical field
The utility model belongs to building construction technology field, the house that particularly wall body structure is integrated with agent structure after-pouring.
Background technology
In order to the call of " about safe promotion Healthy Development of Urbanization, carrying forward vigorously Ecological Civilization Construction " that active response party eighteen major report proposes; and implement comprehensively the Ministry of Construction promulgate promote novel building engineering " industrialization " develop every will be then; according to economizing on resources and protection of the environment fundamental state policy; greatly develop low-carbon (LC), energy-saving and environmental protection building, change traditional brick, watt, ash, sand, stone extensive style, labour-intensive production model.
At present, the home building industry degree of advanced country is up to more than 70%, the industrialized level of China is less than 10%, particularly building body construction aspect, industrialization level is less than 5%, so far still to rest in mode that multiple tracks working procedure sequentially constructs with manual form that (i.e. the agent structure of existing conventional house construction work and the equal construction by stages of wall body structure, especially wall body structure needs by manually carrying out successively building by laying bricks or stones, plastering, batch to scrape.), not only of poor quality, long in time limit, efficiency is low, and waste of raw materials and environment pollution very serious.How to make building operation simplify, rapid, progressively mention agenda, housing construction industrialization has been main trend.
Utility model content
In order to solve the above-mentioned technical problem existed in prior art, it is integrated with agent structure after-pouring that the utility model provides a kind of wall body structure, forming, construction simplifies, the duration is short, the discharge of effective minimizing building waste, improve on-the-spot civilized construction degree, avoid the common quality defect such as hollowing, crack, seepage of plastering and producing, the house that the resistance to overturning of wall body structure is good.
For solving the problems of the technologies described above, the utility model adopts following technical scheme:
The house that a kind of wall body structure is integrated with agent structure after-pouring, include agent structure and wall body structure, be equipped with one group of " L " type between the wall column of described agent structure and the side of wall body structure, between described agent structure and the upper end of wall body structure and cushion connector, described often group " L " type buffering connector has two, and be symmetrical set, and build integrated with agent structure and wall body structure.
Further, described agent structure and wall body structure adopt normal conventional concrete and novel light anti-crack concrete to build respectively and form, and wherein said novel light anti-crack concrete is prepared from by following composition and percentage by weight.
Further, soft cushion coat is provided with between described " L " type buffering connector and agent structure, wall column.
Further, described " L " type buffering connector is " L " shape steel plate, and described soft cushion coat is the soft glue-line of coating.
Further, described soft cushion coat is the thickness of the soft glue-line of coating is 5mm.
Further, the whole surface of described " L " type buffering connector is provided with and builds through hole, builds through hole described in the concrete of described wall body structure passes.
The beneficial effects of the utility model are:
The utility model passes through technique scheme, construction process simplifies, the duration is short, reach energy-saving and cost-reducing object, engineering section face amount is disposable simultaneously completes the discharge decreasing building waste, improve on-the-spot civilized construction degree, also eliminate follow-up construction and the operation handing-over defect of later stage floor multiple working procedure; And wall body structure adopts novel light anti-crack concrete to build, forming, surface verticality, planeness are easy to control, and light weight, environmental protection and energy saving, compressive strength are high, good heat insulating, meet clear-water concrete standard thus eliminate inner, external wall and the operation such as to plaster, avoid the hollowing of plastering and producing, the common quality defect such as crack, seepage.
In addition, by arranging " L " type buffering connector between agent structure and wall body structure, and build integration, displacement distortion and the antidetonation of operative constraint wall body structure are destroyed, and ensure that the resistance to overturning of wall body structure.
Accompanying drawing explanation
Below in conjunction with accompanying drawing and specific embodiment, the utility model is described in further detail:
Fig. 1 is the construction party ratio juris schematic flow diagram in the wall body structure described in the utility model house integrated with agent structure after-pouring;
Fig. 2 is the partial structurtes schematic diagram of the wall body structure described in the utility model house embodiment integrated with agent structure after-pouring;
Fig. 3 is that in the wall body structure described in the utility model house embodiment integrated with agent structure after-pouring, " L " type cushions the integrated partial structurtes schematic diagram of connector and agent structure, wall body structure;
Fig. 4 is the partial structurtes schematic diagram that in the wall body structure described in the utility model house embodiment integrated with agent structure after-pouring, " L " type cushions connector.
Detailed description of the invention
In order to make the purpose of this utility model, technical scheme and advantage clearly understand, below in conjunction with drawings and Examples, the utility model is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the utility model, and be not used in restriction the utility model.
As shown in Figure 1, the construction method in the house that wall body structure is integrated with agent structure after-pouring described in the utility model embodiment, first agent structure is built, then after the concrete of agent structure reaches design strength and discharges corresponding stress, install wall body structure template and water power pipeline, wall body structure built by last pumping of concrete.Specifically can include following steps:
Steps A. build agent structure, its pouring construction is built identical with existing agent structure, does not repeat them here.
Step B., after the concrete of agent structure reaches design strength and discharges corresponding stress, arranges at the vertical of agent structure and level the pull-up structure reinforcing bar be connected with wall body structure to interval, while at lintel hole top, some reinforcing bars are set.
Step C. is connected " L " type buffering connector at the vertical of agent structure and level to interval setting with wall body structure;
Step D. installs one-sided (aluminium alloys) template of wall body structure.
Step e. the water power pipeline in pre-buried wall body structure and colligation structure muscle.
Step F. opposite side (aluminium alloys) template of wall body structure is installed.
Step G. builds wall body structure, simultaneously colligation beam reinforced steel bar and installation form plate upper thread pipe.
Step H. after the concrete final set of wall body structure, stripping.
Wherein, described wall body structure adopts novel light anti-crack concrete to build, and described agent structure adopts normal conventional concrete to build; Described novel light anti-crack concrete is prepared from by following composition and percentage by weight: cement 22.51%, pottery sand 42.997%, flyash 16.43%, durafiber 0.097%, blowing agent 0.083%, water reducing agent 0.26%, air entraining agent 0.056% and water 17.567%; Described cement is P.032.5 class g cement, and the specification of described pottery sand is 2 ~ 5mm, and described flyash is II grade of fine-ground fly-ash, and the length of described durafiber is 19mm, and described water reducing agent is high-efficiency water-reducing agent of poly-carboxylic acid.
Described " building wall body structure ", specifically comprise the following steps: before building, first clear water in storage bin hopper is pumped from pipeline, reach moistening and object that is cleanser conduit, then add identical with concrete mix in hopper or coordinate cement mortar for 1:2, pumping of concrete after lubrication piping, can be started; Build pumping when starting, rate of pumping should slow down, and oil pressure change should within the scope of permissible value, to be pumped smooth time, ability normal speed carries out pumping; Build pump period, the amount of concrete in hopper should keep being not less than on cylinder barrel mouth is advisable between 150mm under 10mm to hopper port, avoids suction efficiency low, easily sucks air and causes plug pipe, and can overflow and strengthen shaft load during too many then back suction.And cement mortar before building, should be adopted to carry out connecing slurry process in the bottom surface of wall body structure, the thickness of described cement mortar is that 30mm is thick, and its match ratio is identical with novel light anti-crack concrete.
When the opposite side template of wall body structure is installed, arranging a longitudinal cross-section in the upper end of at least a certain template is leg-of-muttonly build mouth, simultaneously offer pouring hole building floor plates directly over mouth, in pouring hole, mouth is built in concrete input and complete for pump line is inserted and build; After building, use custom made forms capping.Before installation " L " type buffering connector, first soft cushion coat is set in the position of agent structure installation " L " type buffering connector.
In addition, when building wall body structure, concrete pumping is first far away rear near, pipe is torn open gradually in building, concrete pumping should be worked continuously simultaneously, and interval time should more than 2 hours, and building for every layer is highly 1/2 of body of wall clear height, when backstage is supplied not in time, need rate of pumping be reduced, during pumping brief interruption, stir and should not stop; When blade is stuck, queuing of need reversing, then rotate forward, reverse certain hour, can continue pumping after rotating forward smoothly.If pumping midway is more than 20 minutes idle hours, when pipeline is longer again, should every 5 minutes turn on pumps once, pumping is concrete in a small amount, when pipeline is shorter, can adopt every rotating in 5 minutes 2-3 strokes, pipe inner concrete is wriggled, prevent bleeding from emanating, temperature be high in long-time termination of pumping (more than 45 minutes), concrete slump hour may cause plug pipe, concrete should be removed from pump and carrier pipe.
The construction method in the house that wall body structure described in the utility model is integrated with agent structure after-pouring has the following advantages:
(1) under the prerequisite not changing former design thickness of wall body and functional performance, wall body structure and agent structure integral construction is adopted to build, instead of and build by laying bricks or stones separately, compensate for blockwork complex procedures, the drawbacks such as rehandling is many, for building construction integral construction is laid a solid foundation, significantly save artificial, material, machinery and consume; Comprehensively, the overall section face of construction is taken full advantage of, complete two partitioned projects in a time period simultaneously, simplify construction process, substantially reducing the duration (can shorten the construction period 1/3, bring considerable economic benefit), and engineering section face amount disposablely completes the discharge decreasing building waste, improves on-the-spot civilized construction degree, also eliminate follow-up construction and the operation handing-over defect of later stage floor multiple working procedure.
(2) because wall body structure is integrated with agent structure monobloc cast, forming, surperficial verticality, planeness are easy to control, and rear surface planeness of construct, perpendicularity deviation be equal≤5mm, reach clear-water concrete standard; Reach clear-water concrete requirement simultaneously, thus eliminate inner, external wall and the operation such as to plaster, direct Puttying is fitted up, and avoids the common quality defect such as hollowing, crack, seepage of plastering and producing; Shorten the duration, reach energy-saving and cost-reducing object, for the green construction of engineering and the normal use in house, there is profound significance, form " industrialization " preliminary thinking, also bring considerable economic benefit.
(3) novel light anti-crack concrete is adopted to build wall body structure, light weight, environmental protection and energy saving, compressive strength are high, compressive strength high (>=8MPa) and resistance to overturning are all better than block structure body of wall, its heat-insulating property is good, coefficient of thermal conductivity≤0.27W/M*K meets standard-required, interior admixture special cracking resistant material and multiple Admixture, reasonable mixture ratio, effectively reduces the be full of cracks of concrete autogenous shrinkage.
(4) " L " type buffering connector is set between agent structure and wall body structure, eliminates structural stress change and destroy and crack etc., effectively ensure that meeting the requirements of structure both shrinks STRESS VARIATION when building; Displacement distortion and the antidetonation of simultaneously operative constraint wall body structure are destroyed, and ensure that the resistance to overturning of wall body structure.
(5) high in conjunction with aluminum alloy mould plate planeness, rigidity is strong, apparent bright and clean good feature, by to the becoming more meticulous of aluminum alloy mould plate, Modular design, allow the template of wall body structure and agent structure integraty support install, the two is integrated, all make use of active section face from spatially scientific and reasonable, building construction integral is constructed and may become.
Effect and quality is built in order to improve, the construction method in the house that wall body structure described in the utility model is integrated with agent structure after-pouring also comprises: should carry out " surveying setting-out " before described " arranging at the vertical of agent structure and level the pull-up structure reinforcing bar be connected with wall body structure to interval; arrange some reinforcing bars at lintel hole top " simultaneously, all carry out " examination " after described " the opposite side template of wall body structure is installed " and " building wall body structure, simultaneously colligation beam reinforced steel bar and installation form plate upper thread pipe " simultaneously.
As shown in Fig. 2 to Fig. 4, the utility model embodiment still provides a kind of wall body structure house integrated with agent structure after-pouring, include agent structure 1 and wall body structure 2, be equipped with one group of " L " type between the wall column 11 of described agent structure 1 and the side of wall body structure 2, between described agent structure 1 and the upper end of wall body structure 2 and cushion connector 3, described often group " L " type buffering connector 3 has two, and be symmetrical set, and build integrated with agent structure 1 and wall body structure 2.
Concrete structure can be: described agent structure 1 and wall body structure 2 adopt normal conventional concrete and novel light anti-crack concrete to build respectively and form, and wherein said novel light anti-crack concrete is prepared from by following composition and percentage by weight: cement 22.51%, pottery sand 42.997%, flyash 16.43%, durafiber 0.097%, blowing agent 0.083%, water reducing agent 0.26%, air entraining agent 0.056% and water 17.567%; The specification of described pottery sand is 2 ~ 5mm, and described flyash is II grade of fine-ground fly-ash, and the length of described durafiber is 19mm, and described water reducing agent is high-efficiency water-reducing agent of poly-carboxylic acid.Described " L " type buffering connector 3 is " L " shape steel plates, and it is fixed on agent structure 1(wall column 11 by screw 32) on, and agent structure 1 is built integrated with wall body structure 2 in the lump; Described " L " type buffering connector 3 and agent structure 1, be provided with soft cushion coat 4 between wall column 11; Described soft cushion coat 4 is soft glue-lines (founding to obtain soft glue as strong) of coating, and its thickness is 5mm.
Like this, house described in the utility model, by arranging " L " type buffering connector between agent structure and wall body structure, and builds integration, and displacement distortion and the antidetonation of operative constraint wall body structure are destroyed, ensure that the resistance to overturning of wall body structure, construction process simplifies, the duration is short; And wall body structure adopts novel light anti-crack concrete to build, forming, surface verticality, planeness are easy to control, and light weight, environmental protection and energy saving, compressive strength are high, good heat insulating, meet clear-water concrete standard thus eliminate inner, external wall and the operation such as to plaster, avoid the hollowing of plastering and producing, the common quality defect such as crack, seepage.
Certainly, the whole surface of described " L " type buffering connector 3 is provided with and builds through hole 31, builds through hole 31 described in the concrete of described wall body structure 2 passes.Can increase like this concrete that wall body structure builds and " L " type cushion between connector 3 in conjunction with fixed effect, improve the stability of wall body structure further.
In sum, wall body structure described in the utility model is integrated with agent structure after-pouring, and active response country calls, and uses energy-conserving and environment-protective material, and Creating Green is constructed; Replace traditional extensive style to build by laying bricks or stones, save a large amount of manpower; Wall body structure pouring construction makes the duration greatly shift to an earlier date, and has significantly saved the consumption of labour, constructional materials and machinery equipment, exempts later stage operation handing-over defect.
The above is preferred embodiment of the present utility model; it should be pointed out that for those skilled in the art, under the prerequisite not departing from the utility model principle; can also make some improvements and modifications, these improvements and modifications are also considered as protection domain of the present utility model.

Claims (6)

1. the house that a wall body structure is integrated with agent structure after-pouring, include agent structure and wall body structure, it is characterized in that, be equipped with one group of " L " type between the wall column of described agent structure and the side of wall body structure, between described agent structure and the upper end of wall body structure and cushion connector, described often group " L " type buffering connector has two, and be symmetrical set, and build integrated with agent structure and wall body structure.
2. house according to claim 1, it is characterized in that, described agent structure and wall body structure adopt normal conventional concrete and novel light anti-crack concrete to build respectively and form.
3. house according to claim 1 or 2, is characterized in that, described " L " type buffering connector and agent structure, is provided with soft cushion coat between wall column.
4. house according to claim 3, is characterized in that, described " L " type buffering connector is " L " shape steel plate, and described soft cushion coat is the soft glue-line of coating.
5. house according to claim 3, is characterized in that, described soft cushion coat is the thickness of the soft glue-line of coating is 5mm.
6. house according to claim 1 or 2 or 4 or 5, is characterized in that, the whole surface of described " L " type buffering connector is provided with and builds through hole, builds through hole described in the concrete of described wall body structure passes.
CN201520030034.5U 2015-01-16 2015-01-16 The house that wall body structure is integrated with agent structure after-pouring Expired - Fee Related CN204552145U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520030034.5U CN204552145U (en) 2015-01-16 2015-01-16 The house that wall body structure is integrated with agent structure after-pouring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520030034.5U CN204552145U (en) 2015-01-16 2015-01-16 The house that wall body structure is integrated with agent structure after-pouring

Publications (1)

Publication Number Publication Date
CN204552145U true CN204552145U (en) 2015-08-12

Family

ID=53827274

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520030034.5U Expired - Fee Related CN204552145U (en) 2015-01-16 2015-01-16 The house that wall body structure is integrated with agent structure after-pouring

Country Status (1)

Country Link
CN (1) CN204552145U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106245833A (en) * 2016-08-24 2016-12-21 河南省华亿绿色建材有限公司 Concrete heat-insulating curtain wall lamination transition construction method
CN109057101A (en) * 2018-08-17 2018-12-21 罗守训 The method of construction and exterior wall of support construction and exterior wall
CN110563414A (en) * 2019-10-28 2019-12-13 中国十七冶集团有限公司 Preparation and construction method of separated concrete for CCW heat-preservation curtain wall

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106245833A (en) * 2016-08-24 2016-12-21 河南省华亿绿色建材有限公司 Concrete heat-insulating curtain wall lamination transition construction method
CN109057101A (en) * 2018-08-17 2018-12-21 罗守训 The method of construction and exterior wall of support construction and exterior wall
CN110563414A (en) * 2019-10-28 2019-12-13 中国十七冶集团有限公司 Preparation and construction method of separated concrete for CCW heat-preservation curtain wall

Similar Documents

Publication Publication Date Title
CN101456707B (en) Fiber reinforcement fine aggregate glued stone concrete light partition board and method for producing the same
CN104563282B (en) Integral constructing method of house body structure and wall structure and house
CN104529335B (en) Discarded fired brick regeneration C35 steel fiber reinforced concrete and preparation method thereof
CN105236869A (en) Special high strength grouting material for connecting reinforcement sleeve
CN107060340A (en) A kind of construction technology of Machine-made Sand clear-water concrete
CN107313531A (en) A kind of assembled integral shear wall connecting node and its system and its construction technology
CN204552145U (en) The house that wall body structure is integrated with agent structure after-pouring
CN104594630B (en) House wall structure and agent structure after-pouring integral construction method and house
CN104230237A (en) Ceramic tile ready-mixed mortar and production method thereof
CN110078453A (en) A kind of lightweight concrete and its preparation method and application
CN104211342B (en) Colored ready-mixed mortar and production method thereof
WO2007143885A1 (en) An insulated and soundproof block and a masonry method thereof
CN101698587A (en) Exterior wall plastering mortar and construction method thereof
CN104908157A (en) Super-high performance concrete compound pipeline preparation method
CN204551727U (en) A kind of agent structure house of building integrated with wall body structure
CN104557124B (en) Lightweight anti-crack concrete and preparation method thereof
CN105155780B (en) Thin-walled cold-bent pipe regenerated aggregate concrete Special-Shaped Column
CN207194226U (en) A kind of assembled integral shear wall connecting node
CN102535847B (en) Construction method of gypsum self-insulation external wall block masonry
CN204551765U (en) Buffer isolator between building structure
CN203373872U (en) Cast-in-place concrete self-warm-keeping wall with dismounting-free outer formworks
CN209812704U (en) Equipment for processing wall pieces using blocks
CN107246106A (en) A kind of surface cuts shaping haydite concrete prefabricated panel
CN113700156A (en) Cement cone plugging construction process for shear wall screw hole
CN112851281A (en) Method for preparing polymer quick-drying early-strength anti-corrosion mortar

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150812

Termination date: 20210116

CF01 Termination of patent right due to non-payment of annual fee