CN204282349U - A kind of bamboo reinforced cement soil agitation pile - Google Patents

A kind of bamboo reinforced cement soil agitation pile Download PDF

Info

Publication number
CN204282349U
CN204282349U CN201420614713.2U CN201420614713U CN204282349U CN 204282349 U CN204282349 U CN 204282349U CN 201420614713 U CN201420614713 U CN 201420614713U CN 204282349 U CN204282349 U CN 204282349U
Authority
CN
China
Prior art keywords
pile
bamboo
moso
several
cement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420614713.2U
Other languages
Chinese (zh)
Inventor
胡俊
佳琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hainan University
Original Assignee
Hainan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hainan University filed Critical Hainan University
Priority to CN201420614713.2U priority Critical patent/CN204282349U/en
Application granted granted Critical
Publication of CN204282349U publication Critical patent/CN204282349U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本实用新型公开了一种竹筋水泥土搅拌桩,是在桩体中插设有数根毛竹,数根毛竹分为两部分设置,其中第一部分的毛竹为一根或数根,插设在桩体的中心部位设置,第二部分的毛竹为数根,绕设在桩体中心部位的周圈设置,毛竹的直径为Ф50-100mm,毛竹的底部位于桩体底部上方1-2m,本实用新型的有益效果:在水泥土搅拌桩中插入毛竹,形成竹筋水泥土搅拌桩,既可以承受一定的竖向承载力,又可以承受横向剪力。可以广泛地应用于基坑工程的围护结构,盾构进出洞端头的土体加固,以及地基处理工程中,具有易挖除性、经济性、临时性。

The utility model discloses a bamboo-reinforced cement-soil mixing pile, in which several moso bamboos are inserted in the pile body, and the several moso bamboos are divided into two parts, wherein one or several moso bamboos in the first part are inserted in the pile The central part of the body is set, and the moso bamboo in the second part is several, which are arranged around the circumference of the center of the pile body. The diameter of the moso bamboo is Ф50-100mm, and the bottom of the moso bamboo is located 1-2m above the bottom of the pile body. The utility model Beneficial effects: the moso bamboo is inserted into the cement-soil mixing pile to form a bamboo-reinforced cement-soil mixing pile, which can not only bear a certain vertical bearing capacity, but also bear lateral shearing force. It can be widely used in the enclosure structure of the foundation pit project, the soil reinforcement at the end of the shield tunnel entry and exit, and the foundation treatment project. It is easy to excavate, economical and temporary.

Description

一种竹筋水泥土搅拌桩A kind of bamboo-reinforced cement-soil mixing pile

技术领域technical field

本实用新型涉及一种水泥土搅拌桩,特别涉及一种竹筋水泥土搅拌桩。The utility model relates to a cement-soil mixing pile, in particular to a bamboo-reinforced cement-soil mixing pile.

背景技术Background technique

目前,水泥土搅拌桩被广泛地应用在地基处理工程中,水泥土搅拌桩的止水能力较好,但是普遍存在着抗剪能力和抗弯能力不足的问题。At present, cement-soil mixing piles are widely used in foundation treatment projects. The cement-soil mixing piles have good water-stopping ability, but there are generally problems of insufficient shear resistance and bending resistance.

发明内容Contents of the invention

本实用新型的目的为了解决现有的水泥土搅拌桩存在的抗剪能力和抗弯能力不足的问题而提供的一种竹筋水泥土搅拌桩。The purpose of the utility model is to provide a bamboo-reinforced cement-soil mixing pile in order to solve the problem of insufficient shear resistance and bending resistance existing in the existing cement-soil mixing pile.

本实用新型提供的竹筋水泥土搅拌桩是在桩体中插设有数根毛竹,数根毛竹分为两部分设置,其中第一部分的毛竹为一根或数根,插设在桩体的中心部位设置,第二部分的毛竹为数根,绕设在桩体中心部位的周圈设置。The bamboo-reinforced cement-soil mixing pile provided by the utility model is that several moso bamboos are inserted in the pile body, and the several moso bamboos are divided into two parts, wherein the first part is one or several moso bamboos, which are inserted in the center of the pile body The position is set, the moso bamboo in the second part is several, and is set around the circumference of the central part of the pile body.

毛竹的直径为Ф50-100mm。The diameter of moso bamboo is Ф50-100mm.

毛竹的底部位于桩体底部上方1-2m。The bottom of the moso bamboo is located 1-2m above the bottom of the pile body.

本实用新型的施工原理:Construction principle of the utility model:

每根水泥土搅拌桩施工完毕,随即进行插设毛竹的施工,毛竹的直径在50mm~100mm之间,根据水泥土搅拌桩直径来选择。毛竹必须在搅拌桩水泥土硬化前插入。选用的毛竹必须通直光滑,先采用人工往桩中心压入一部分毛竹,再利用桩机将毛竹剩余部分全部压入水泥土中,压的时候应注意将毛竹粗段朝上,细段朝下。加筋水泥搅拌桩施工完毕,挖除桩头松散破碎的部分,露出20cm~30cm毛竹头,沿桩顶将毛竹头用钢筋网连接,并用C20混凝土浇筑成镇口板,毛竹必须在搅拌桩机钻杆提出后立即插入,以保证在水泥土未凝结之前完成。After the construction of each cement-soil mixing pile, the construction of moso bamboo is inserted immediately. The diameter of the moso bamboo is between 50mm and 100mm, which is selected according to the diameter of the cement-soil mixing pile. Moso bamboo must be inserted before the cement soil of the mixing pile hardens. The selected moso bamboo must be straight and smooth. First, manually press a part of the moso bamboo into the center of the pile, and then use the pile driver to press all the moso bamboo into the cement soil. When pressing, the thick section of the moso bamboo should be facing upwards, and the thin section should be facing down. . After the construction of the reinforced cement mixing pile is completed, the loose and broken part of the pile head is excavated to expose the 20cm~30cm moso bamboo head. Insert the drill pipe immediately after it is raised to ensure that it is completed before the cement soil is set.

本实用新型的有益效果:The beneficial effects of the utility model:

在水泥土搅拌桩中插入毛竹,形成竹筋水泥土搅拌桩,既可以承受一定的竖向承载力,又可以承受横向剪力。可以广泛地应用于基坑工程的围护结构,盾构进出洞端头的土体加固,以及地基处理工程中。具有易挖除性、经济性、临时性。Moso bamboo is inserted into the cement-soil mixing pile to form a bamboo-reinforced cement-soil mixing pile, which can not only bear a certain vertical bearing capacity, but also bear horizontal shear force. It can be widely used in the enclosure structure of the foundation pit project, the soil reinforcement at the end of the shield tunnel entry and exit, and the foundation treatment project. It is easy to dig out, economical and temporary.

附图说明Description of drawings

图1为本实用新型断面结构示意图。Fig. 1 is the schematic diagram of the section structure of the utility model.

1、桩体  2、毛竹。1. Pile body 2. Moso bamboo.

具体实施方式Detailed ways

请参阅图1所示:Please refer to Figure 1:

本实用新型提供的竹筋水泥土搅拌桩是在桩体1中插设有数根毛竹2,数根毛竹2分为两部分设置,其中第一部分的毛竹2为一根或数根,插设在桩体1的中心部位设置,第二部分的毛竹2为数根,绕设在桩体1中心部位的周圈设置。The bamboo-reinforced cement-soil mixing pile provided by the utility model is that several moso bamboos 2 are inserted in the pile body 1, and the several moso bamboos 2 are divided into two parts and arranged, wherein the moso bamboo 2 of the first part is one or several, and is inserted in the The central part of the pile body 1 is arranged, and the moso bamboo 2 of the second part is several, and is arranged around the circumference of the central part of the pile body 1.

毛竹2的直径为Ф50-100mm。The diameter of moso bamboo 2 is Ф50-100mm.

毛竹2的底部位于桩体1底部上方1-2m。The bottom of moso bamboo 2 is positioned at 1-2m above the bottom of pile body 1.

本实用新型的施工原理:Construction principle of the utility model:

每根水泥土搅拌桩施工完毕,随即进行插设毛竹2的施工,毛竹2的直径在50mm~100mm之间,根据水泥土搅拌桩直径来选择。毛竹2必须在搅拌桩水泥土硬化前插入。选用的毛竹2必须通直光滑,先采用人工往桩中心压入一部分毛竹2,再利用桩机将毛竹2剩余部分全部压入水泥土中,压的时候应注意将毛竹2粗段朝上,细段朝下。加筋水泥搅拌桩施工完毕,挖除桩头松散破碎的部分,露出20cm~30cm毛竹2的头部,沿桩顶将毛竹2的头部用钢筋网连接,并用C20混凝土浇筑成镇口板,毛竹2必须在搅拌桩机钻杆提出后立即插入,以保证在水泥土未凝结之前完成。After the construction of each cement-soil mixing pile, the construction of inserting the moso bamboo 2 is carried out immediately. The diameter of the moso bamboo 2 is between 50 mm and 100 mm, which is selected according to the diameter of the cement-soil mixing pile. Moso bamboo 2 must be inserted before the cement soil of the mixing pile is hardened. The selected moso bamboo 2 must be straight and smooth. First, manually press a part of the moso bamboo 2 into the center of the pile, and then use the pile machine to press the remaining part of the moso bamboo 2 into the cement soil. When pressing, the thick section of the moso bamboo 2 should face upward. Thin section down. After the construction of the reinforced cement mixing pile is completed, the loose and broken part of the pile head is excavated to expose the head of the 20cm-30cm moso bamboo 2, and the head of the moso bamboo 2 is connected along the top of the pile with a steel mesh, and the township board is poured with C20 concrete. Moso bamboo 2 must be inserted immediately after the drill rod of the mixing pile driver is put forward, so as to ensure that it is completed before the cement soil is not set.

Claims (1)

1. a bamboo reinforced cement soil agitation pile, it is characterized in that: be in pile body, be inserted with several mao bamboon, several mao bamboon is divided into two parts to arrange, wherein the mao bamboon of Part I is one or several, the centre being plugged in pile body is arranged, and the mao bamboon of Part II is several, and winding is arranged in the border in pile body centre, the diameter of mao bamboon is Ф 50mm, and the bottom of mao bamboon is positioned at top 1-2m bottom pile body.
CN201420614713.2U 2014-10-23 2014-10-23 A kind of bamboo reinforced cement soil agitation pile Expired - Fee Related CN204282349U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420614713.2U CN204282349U (en) 2014-10-23 2014-10-23 A kind of bamboo reinforced cement soil agitation pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420614713.2U CN204282349U (en) 2014-10-23 2014-10-23 A kind of bamboo reinforced cement soil agitation pile

Publications (1)

Publication Number Publication Date
CN204282349U true CN204282349U (en) 2015-04-22

Family

ID=52865529

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420614713.2U Expired - Fee Related CN204282349U (en) 2014-10-23 2014-10-23 A kind of bamboo reinforced cement soil agitation pile

Country Status (1)

Country Link
CN (1) CN204282349U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105839620A (en) * 2016-03-29 2016-08-10 中铁时代建筑设计院有限公司 Plastic-sleeve bamboo-reinforcement cemented soil pile and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105839620A (en) * 2016-03-29 2016-08-10 中铁时代建筑设计院有限公司 Plastic-sleeve bamboo-reinforcement cemented soil pile and construction method thereof

Similar Documents

Publication Publication Date Title
CN204326567U (en) A kind of reinforced concrete wall runs through large fracture preparing structure
CN207700185U (en) A kind of retaining wall device for manual hole digging pile
CN204326094U (en) The polygon steel pile foundation of transmission of electricity steel pipe pole
CN205296170U (en) Combined type campshed underground structure
CN204282349U (en) A kind of bamboo reinforced cement soil agitation pile
CN202139604U (en) Cast-in-situ abnormal reinforced concrete pile core cement soil underground continuous wall for retaining and protection for foundation excavation
CN207959202U (en) A kind of CFG bracing means
CN102677679A (en) Cement-soil diaphragm wall with cast-in-situ special-shaped reinforced concrete pile cores for construction of foundation pits
CN206308687U (en) A kind of precast pile
CN104452755A (en) Honeycomb type thin-wall steel pipe and micro pile construction method adopting same
CN205999887U (en) Boring steel reinforcement cage hoop slip casting broken stone pile
CN205617365U (en) Novel stake of reinforced concrete spiral
CN204343327U (en) A kind of construction equipment of retaining wall
CN202755360U (en) Front stiffening pile of anchoring part
CN204475320U (en) A kind of screw pile
CN104234076B (en) Concrete guide wall structure
CN104032732B (en) Cast-type pre-stressed steel plate concrete-pile and construction method thereof and supporting piling wall
CN205591244U (en) Deep weak soil branch stake foundation stabilization structure
CN203866823U (en) Compound pile core for civil engineering
CN203855955U (en) Cast-in-place pre-stress steel plate concrete pile and support pile wall
CN203905025U (en) Foundation pit supporting wall with special-shaped reinforced concrete and cement soil separately arranged
CN103835290A (en) Pile foundation structure suitable for marine soft soil and design method thereof
CN104563121A (en) Retaining wall construction device based on multilayer template
CN204356764U (en) A kind of tower crane without pile foundation
CN204343268U (en) Stilling pool structure with bottom plate in smooth transition

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150422

Termination date: 20151023

EXPY Termination of patent right or utility model