CN203798982U - Switch electric life test loop for extra-high voltage substation reactive compensation - Google Patents

Switch electric life test loop for extra-high voltage substation reactive compensation Download PDF

Info

Publication number
CN203798982U
CN203798982U CN201420155832.6U CN201420155832U CN203798982U CN 203798982 U CN203798982 U CN 203798982U CN 201420155832 U CN201420155832 U CN 201420155832U CN 203798982 U CN203798982 U CN 203798982U
Authority
CN
China
Prior art keywords
switch
transformer
secondary side
test
voltage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420155832.6U
Other languages
Chinese (zh)
Inventor
张振乾
孔祥军
李向阳
李庆余
田阳
杨海芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI filed Critical State Grid Corp of China SGCC
Priority to CN201420155832.6U priority Critical patent/CN203798982U/en
Application granted granted Critical
Publication of CN203798982U publication Critical patent/CN203798982U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

The utility model provides a switch electric life test loop for extra-high voltage substation reactive compensation. The secondary side high voltage terminal of a first transformer is connected with a protection circuit breaker, a first electric reactor, a closing switch, a first auxiliary switch, an operation switch, a first capacitor, a resistor, the secondary side of a second transformer and the secondary side low voltage terminal of the first transformer in series in sequence to form a loop. The common node of the protection circuit breaker and the first electric reactor is connected with the primary side low voltage terminal of the second transformer. The secondary side low voltage terminal of the first transformer is connected with the primary side high voltage terminal of the second transformer and a grounding point. A switch to be tested is bridged between the grounding point and the common node of the first auxiliary switch and the operation switch. The high voltage terminal of the switch to be tested is connected with a second auxiliary switch, a second electric reactor, a second capacitor and the grounding point in series in sequence to form a loop. The test loop can save test capacity; the closing-separating operation of the switch can be carried out in one test without switching the test loop frequently; and thus the test efficiency is improved.

Description

用于特高压变电站无功补偿的开关电寿命试验回路Life test circuit of switching power for reactive power compensation in UHV substation

技术领域technical field

本实用新型属于高压开关大功率试验领域,特别是涉及一种用于特高压变电站无功补偿的开关电寿命试验回路。The utility model belongs to the high-power test field of a high-voltage switch, in particular to a switch electrical life test circuit for reactive power compensation of an ultra-high voltage substation.

背景技术Background technique

特高压交流输电系统中的无功盈亏有较大幅度的变化,其中投切主变三次侧的电容器组是无功调节的重要手段。目前,特高压工程中电容器组额定电压达到110kV,单组电容器容量达到210Mvar甚至更高,无功补偿专用开关也首次使用了126kV开关设备,电容器组额定电压高、容量大,专用开关需要频繁操作,运行工况严酷。The reactive power profit and loss in the UHV AC transmission system has relatively large changes, and switching the capacitor bank on the tertiary side of the main transformer is an important means of reactive power regulation. At present, the rated voltage of the capacitor bank in the UHV project reaches 110kV, and the capacity of a single capacitor reaches 210Mvar or even higher. The special switch for reactive power compensation also uses 126kV switchgear for the first time. The rated voltage of the capacitor bank is high and the capacity is large, and the dedicated switch needs to be frequently operated. , the operating conditions are severe.

增大的开断电流、关合过程预击穿烧蚀、频繁的操作等因素使得专用断路器运行工况非常严酷,一旦超出寿命范围使用,极易发生重击穿,将直接威胁电容器组的绝缘性能,给特高压电网的安全运行造成隐患。因此,进行专用开关投切电容器组的电寿命试验尤为迫切,而现行的国家标准没有该试验项目,并且在实验室容量有限的条件下,难以开展此项试验,即便开展要实现“合-分”操作则需要频繁倒换试验回路,试验效率低下。Increased breaking current, pre-breakdown and ablation during closing process, frequent operation and other factors make the operating conditions of special circuit breakers very harsh. Insulation performance has caused hidden dangers to the safe operation of UHV power grids. Therefore, it is particularly urgent to carry out the electrical life test of the special switching capacitor bank, but the current national standard does not have this test item, and under the condition of limited laboratory capacity, it is difficult to carry out this test, even if it is carried out to achieve "close-open "The operation requires frequent switching of the test circuit, and the test efficiency is low.

实用新型内容Utility model content

针对现有技术的缺陷,本实用新型的目的在于提出一种无需频繁倒换试验回路,以提高试验效率的进行专用开关投切电容器组的电寿命试验回路。Aiming at the defects of the prior art, the purpose of this utility model is to propose an electrical life test circuit for switching capacitor banks with special switches without frequent switching of the test circuit to improve test efficiency.

为了解决以上技术问题,本实用新型采用如下技术方案实现。In order to solve the above technical problems, the utility model adopts the following technical solutions to realize.

一种用于特高压变电站无功补偿的开关电寿命试验回路,包括:网络电源,第一变压器,第一、第二、第三电压传感器以及第一、第二、第三电流传感器,A switching electrical life test circuit for reactive power compensation in UHV substations, comprising: a network power supply, a first transformer, first, second, and third voltage sensors, and first, second, and third current sensors,

所述第一变压器二次侧高压端依次与保护断路器、第一电抗器、合闸开关、第一辅助开关、操作开关、第一电容器、电阻器、第二变压器二次侧和第一变压器二次侧低压端相串联形成回路;The high voltage terminal on the secondary side of the first transformer is sequentially connected with the protective circuit breaker, the first reactor, the closing switch, the first auxiliary switch, the operating switch, the first capacitor, the resistor, the secondary side of the second transformer and the first transformer The low-voltage side of the secondary side is connected in series to form a loop;

所述保护断路器与第一电抗器的公共节点接第二变压器一次侧低压端;The common node between the protective circuit breaker and the first reactor is connected to the primary side low-voltage end of the second transformer;

所述第一变压器二次侧低压端分别与第二变压器一次侧高压端和接地点相连;The secondary side low-voltage end of the first transformer is respectively connected to the second transformer primary-side high-voltage end and a grounding point;

所述待试开关跨接在接地点与第一辅助开关和操作开关的公共节点之间;所述待试开关高压端依次与第二辅助开关、第二电抗器、第二电容器和接地点相串联形成回路;The switch to be tested is connected between the grounding point and the common node of the first auxiliary switch and the operating switch; form a loop in series;

所述第一电压传感器设置在第一辅助开关和操作开关的公共节点,第二电压传感器设置在第二变压器二次侧高压端,第三电压传感器设置在第一电抗器和合闸开关的公共节点;The first voltage sensor is set at the common node of the first auxiliary switch and the operating switch, the second voltage sensor is set at the high voltage end of the secondary side of the second transformer, and the third voltage sensor is set at the common node of the first reactor and the closing switch ;

所述第一电流传感器检测通过第一辅助开关的电流,第二电流传感器检测通过待试开关的电流,第三电流传感器检测第二变压器输出电流。The first current sensor detects the current passing through the first auxiliary switch, the second current sensor detects the current passing through the switch to be tested, and the third current sensor detects the output current of the second transformer.

进一步地,所述第二变压器二次侧并联有第一避雷器。Further, the secondary side of the second transformer is connected in parallel with a first lightning arrester.

进一步地,所述第一电容器两端并联有第二避雷器,第一电容器两端并联有放电电阻器。Further, a second lightning arrester is connected in parallel at both ends of the first capacitor, and a discharge resistor is connected in parallel at both ends of the first capacitor.

进一步地,所述合闸开关和第一辅助开关公共节点与接地点之间并联有保护间隙。Further, a protective gap is connected in parallel between the common node of the closing switch and the first auxiliary switch and the grounding point.

与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:

本实用新型用第二电容器、第二电抗器、第二辅助开关、待试开关组成的回路进行关合试验;利用第一变压器提供大部分的开断试验电流,第二变压器提供小部分开断电流和全部恢复电压;可利用容量有限的试验电源进行专用开关投切电容器组试验,节约了试验容量;并且专用开关的“合-分”操作可在一次试验中进行,无需频繁倒换试验回路,提高了试验的效率。The utility model uses the circuit composed of the second capacitor, the second reactor, the second auxiliary switch and the switch to be tested to carry out the closing test; the first transformer is used to provide most of the breaking test current, and the second transformer provides a small part of the breaking test current. Current and full recovery voltage; the test power supply with limited capacity can be used to conduct the special switch switching capacitor bank test, which saves the test capacity; and the "on-off" operation of the special switch can be carried out in one test without frequent switching of the test circuit. Improve the efficiency of the test.

附图说明Description of drawings

图1为本实用新型进行专用开关投切电容器组电寿命试验原理图;Fig. 1 is that the utility model carries out the schematic diagram of the electrical life test of the special switch switching capacitor group;

图中:S-网络电源;T1-第一变压器;BD-保护断路器;Lc-第一电抗器;HK-合闸开关;FK1-第一辅助开关;CD-操作开关;Cv-第一电容器;Rv-电阻器;Rf-放电电阻器;P2-第二避雷器;P1-第一避雷器;T2-第二变压器;SP-待试开关;FK2-第二辅助开关;Lh-第二电抗器;Ch-第二电容器;BQ-保护间隙;V1-第一电压传感器;V2-第二电压传感器;V3-第三电压传感器;A1-第一电流传感器;A2-第二电流传感器;A3-第三电流传感器。In the figure: S-network power supply; T1-first transformer; BD-protective circuit breaker; Lc-first reactor; HK-closing switch; FK1-first auxiliary switch; CD-operation switch; Cv-first capacitor ; Rv-resistor; Rf-discharge resistor; P2-second arrester; P1-first arrester; T2-second transformer; Ch-second capacitor; BQ-guard gap; V1-first voltage sensor; V2-second voltage sensor; V3-third voltage sensor; A1-first current sensor; A2-second current sensor; A3-third current sensor.

具体实施方式Detailed ways

参照图1,第二电容器Ch和第二电抗器Lh,试验前事先给第二电容器Ch充电,两者组合作为关合试验时的电源,S是网络电源,第一变压器T1一次侧与电源S并联,第一变压器T1二次侧高压端串联保护开关BD,第二变压器T2一次侧通过保护开关BD与第一变压器T1二次侧反并联,第一变压器T1二次侧低压端接地,第一变压器T1二次侧两个引出线,作为开断试验时电流源输出端,第二变压器T2二次侧两个引出线,作为开断试验时电压源输出端。Referring to Figure 1, the second capacitor Ch and the second reactor Lh are charged to the second capacitor Ch before the test, and the combination of the two is used as the power supply during the closing test, S is the network power supply, and the primary side of the first transformer T1 is connected to the power supply S Parallel connection, the secondary side high voltage end of the first transformer T1 is connected in series with the protective switch BD, the primary side of the second transformer T2 is anti-parallel connected with the secondary side of the first transformer T1 through the protective switch BD, the secondary side low voltage end of the first transformer T1 is grounded, the first The two lead-out lines on the secondary side of the transformer T1 are used as the output terminals of the current source during the breaking test, and the two lead-out lines on the secondary side of the second transformer T2 are used as the output terminals of the voltage source during the breaking test.

关合试验电源输出端依次串联第二辅助开关FK2、待试开关SP,构成回路,提供关合时的高频涌流,开断试验电流源输出端依次串联保护开关BD、第一电抗器Lc、合闸开关HK、第一辅助开关FK、待试开关SP、第一变压器T1二次侧低压端构成回路,提供开断试验的大部分试验电流,开断试验电压源输出端依次串联电阻器Rv、第一电容器Cv、操作开关CD、待试开关SP、第二变压器T2二次侧低压端构成回路,提供开断试验部分试验电流和全部恢复电压。The output terminal of the closing test power supply is sequentially connected in series with the second auxiliary switch FK2 and the switch to be tested SP to form a loop to provide high-frequency inrush current during closing and closing. The closing switch HK, the first auxiliary switch FK, the switch to be tested SP, and the secondary side low-voltage end of the first transformer T1 form a loop, which provides most of the test current for the breaking test, and the output terminal of the breaking test voltage source is connected in series with the resistor Rv , the first capacitor Cv, the operating switch CD, the switch to be tested SP, and the secondary side low-voltage end of the second transformer T2 form a loop to provide part of the test current and the full recovery voltage for the breaking test.

第二变压器T2二次侧并联的第一避雷器P1,用于限制第二变压器T2二次侧过电压;第一电容器Cv两端并联的第二避雷器P2,用于限制第一电容器Cv两端过电压;合闸开关HK和第一辅助开关FK的公共节点与接地点之间并联有保护间隙BQ,用于限制第一变压器T1二次侧的过电压。The first lightning arrester P1 connected in parallel to the secondary side of the second transformer T2 is used to limit the overvoltage on the secondary side of the second transformer T2; the second lightning arrester P2 connected in parallel to both ends of the first capacitor Cv is used to limit the overvoltage across the first capacitor Cv Voltage; a protective gap BQ is connected in parallel between the common node of the closing switch HK and the first auxiliary switch FK and the grounding point, which is used to limit the overvoltage on the secondary side of the first transformer T1.

第一电压传感器V1设置在第一辅助开关FK1和操作开关CD公共节点,第二电压传感器V2设置在第二变压器T2二次侧高压端,第三电压传感器V3设置在第一电抗器Lc与合闸开关HK公共节点;所述第一电流传感器A1检测通过第一辅助开关FK1的电流,第二电流传感器A2检测通过待试开关SP的电流,第三电流传感器A3检测第二变压器T2输出电流。The first voltage sensor V1 is set at the common node of the first auxiliary switch FK1 and the operation switch CD, the second voltage sensor V2 is set at the high voltage end of the secondary side of the second transformer T2, and the third voltage sensor V3 is set at the first reactor Lc and the closing Gate switch HK common node; the first current sensor A1 detects the current passing through the first auxiliary switch FK1, the second current sensor A2 detects the current passing through the switch SP to be tested, and the third current sensor A3 detects the output current of the second transformer T2.

进行试验时,先给第二电容器Ch充电至额定关合试验电压,此时合闸开关HK、第一辅助开关FK1、待试开关SP、第二辅助开关FK2、操作开关CD均处在分闸状态,按试验程序先合第二辅助开关FK2,后合待试开关SP,待试开关SP关合满足既定峰值和频率要求的涌流,0.1秒后第二辅助开关FK2和待试开关SP先后分闸。按照试验程序,依次将保护开关BD、第一辅助开关FK1、待试开关SP合闸,然后关合合闸开关HK,待试开关SP为空载合闸;待试开关SP分闸前,适时关合操作开关CD,待试开关SP通过第一变压器T2和第二变压器T2共同提供的电流,此电流为额定开断电流,0.1秒后,第一辅助开关FK1和待试开关SP分闸,此时待试开关SP开断了额定电流,待试开关SP两端承受标准要求的恢复电压。待试开关SP开断后0.3秒,操作开关CD、合闸开关HK、保护开关BD分闸,本次试验结束,所有设备恢复初始状态,为下次试验做准备。When conducting the test, first charge the second capacitor Ch to the rated closing test voltage. At this time, the closing switch HK, the first auxiliary switch FK1, the switch to be tested SP, the second auxiliary switch FK2, and the operating switch CD are all in the opening state. According to the test procedure, close the second auxiliary switch FK2 first, and then close the switch SP to be tested. The switch SP to be tested is closed to meet the inrush current of the predetermined peak value and frequency requirements. After 0.1 seconds, the second auxiliary switch FK2 and the switch SP to be tested are separated brake. According to the test procedure, close the protection switch BD, the first auxiliary switch FK1, and the switch SP to be tested in sequence, and then close the closing switch HK, and the switch SP to be tested is closed with no load; Close the operation switch CD, the current provided by the switch SP to be tested through the first transformer T2 and the second transformer T2, this current is the rated breaking current, after 0.1 second, the first auxiliary switch FK1 and the switch SP to be tested are opened, At this time, the switch SP to be tested breaks the rated current, and both ends of the switch SP to be tested bear the recovery voltage required by the standard. 0.3 seconds after the switch SP to be tested is turned off, the operation switch CD, the closing switch HK, and the protection switch BD are opened. This test is over, and all equipment returns to the initial state to prepare for the next test.

最后应该说明的是:以上实施例仅用以说明本实用新型的技术方案而非对其限制,结合上述实施例对本实用新型进行了详细说明,所属领域的普通技术人员应当理解到:本领域技术人员依然可以对本实用新型的具体实施方式进行修改或者等同替换,但这些修改或变更均在申请待批的权利要求保护范围之中。Finally, it should be noted that: the above embodiments are only used to illustrate the technical solutions of the present utility model and not to limit them. The utility model has been described in detail in conjunction with the above embodiments, and those of ordinary skill in the art should understand that: those skilled in the art Personnel can still modify or equivalently replace the specific implementation of the present utility model, but these modifications or changes are all within the protection scope of the pending claims.

Claims (4)

1.一种用于特高压变电站无功补偿的开关电寿命试验回路,其特征在于,该试验回路包括:网络电源,第一变压器,第一、第二、第三电压传感器以及第一、第二、第三电流传感器,1. A switching power life test circuit for reactive power compensation in UHV substations, characterized in that the test circuit includes: network power supply, first transformer, first, second, third voltage sensors and first, second 2. The third current sensor, 所述第一变压器二次侧高压端依次与保护断路器、第一电抗器、合闸开关、第一辅助开关、操作开关、第一电容器、电阻器、第二变压器二次侧和第一变压器二次侧低压端相串联形成回路;The high voltage terminal on the secondary side of the first transformer is sequentially connected with the protective circuit breaker, the first reactor, the closing switch, the first auxiliary switch, the operating switch, the first capacitor, the resistor, the secondary side of the second transformer and the first transformer The low-voltage side of the secondary side is connected in series to form a loop; 所述保护断路器与第一电抗器的公共节点接第二变压器一次侧低压端;The common node between the protective circuit breaker and the first reactor is connected to the primary side low-voltage end of the second transformer; 所述第一变压器二次侧低压端分别与第二变压器一次侧高压端和接地点相连;The secondary side low-voltage end of the first transformer is respectively connected to the second transformer primary-side high-voltage end and a grounding point; 所述待试开关跨接在接地点与第一辅助开关和操作开关的公共节点之间;所述待试开关高压端依次与第二辅助开关、第二电抗器、第二电容器和接地点相串联形成回路;The switch to be tested is connected between the grounding point and the common node of the first auxiliary switch and the operating switch; form a loop in series; 所述第一电压传感器设置在第一辅助开关和操作开关的公共节点,第二电压传感器设置在第二变压器二次侧高压端,第三电压传感器设置在第一电抗器和合闸开关的公共节点;The first voltage sensor is set at the common node of the first auxiliary switch and the operating switch, the second voltage sensor is set at the high voltage end of the secondary side of the second transformer, and the third voltage sensor is set at the common node of the first reactor and the closing switch ; 所述第一电流传感器检测通过第一辅助开关的电流,第二电流传感器检测通过待试开关的电流,第三电流传感器检测第二变压器输出电流。The first current sensor detects the current passing through the first auxiliary switch, the second current sensor detects the current passing through the switch to be tested, and the third current sensor detects the output current of the second transformer. 2.根据权利要求1所述的试验回路,其特征在于,所述第二变压器二次侧并联有第一避雷器。2. The test circuit according to claim 1, characterized in that, the secondary side of the second transformer is connected in parallel with a first lightning arrester. 3.根据权利要求1所述的试验回路,其特征在于,所述第一电容器两端并联有第二避雷器和放电电阻器。3. The test circuit according to claim 1, characterized in that a second lightning arrester and a discharge resistor are connected in parallel at both ends of the first capacitor. 4.根据权利要求1所述的试验回路,其特征在于,所述合闸开关和第一辅助开关的公共节点与接地点之间并联有保护间隙。4. The test circuit according to claim 1, characterized in that a protective gap is connected in parallel between the common node of the closing switch and the first auxiliary switch and the grounding point.
CN201420155832.6U 2014-04-02 2014-04-02 Switch electric life test loop for extra-high voltage substation reactive compensation Expired - Lifetime CN203798982U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420155832.6U CN203798982U (en) 2014-04-02 2014-04-02 Switch electric life test loop for extra-high voltage substation reactive compensation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420155832.6U CN203798982U (en) 2014-04-02 2014-04-02 Switch electric life test loop for extra-high voltage substation reactive compensation

Publications (1)

Publication Number Publication Date
CN203798982U true CN203798982U (en) 2014-08-27

Family

ID=51381186

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420155832.6U Expired - Lifetime CN203798982U (en) 2014-04-02 2014-04-02 Switch electric life test loop for extra-high voltage substation reactive compensation

Country Status (1)

Country Link
CN (1) CN203798982U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110376515A (en) * 2019-07-10 2019-10-25 中国南方电网有限责任公司超高压输电公司检修试验中心 A kind of DC high-speed switch direct current sky fills current breaking test method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110376515A (en) * 2019-07-10 2019-10-25 中国南方电网有限责任公司超高压输电公司检修试验中心 A kind of DC high-speed switch direct current sky fills current breaking test method
CN110376515B (en) * 2019-07-10 2021-11-23 中国南方电网有限责任公司超高压输电公司检修试验中心 DC high-speed switch DC air charging current on-off test method

Similar Documents

Publication Publication Date Title
CN106646206B (en) High-voltage and high-current composite injection DC circuit breaker synthetic test circuit and method
CN102967826B (en) Test method for electric endurance of switching capacitor set beaker of extra-high voltage project
CN103928913B (en) A kind of high voltage DC breaker based on rapid repulsion mechanism and insulating transformer
CN203151088U (en) A single-phase ground fault isolation device
CN102222893B (en) A kind of fast failure demand limiter based on current-carrying isolator
CN101702517B (en) Energy-saving outdoor grid current limiting device
CN105226657B (en) A kind of series-parallel comprehensive compensation device administered for power distribution network low-voltage
CN103337852A (en) Direct-current power grid opening and closing device
CN203800578U (en) High-voltage direct-current circuit breaker
CN101640424B (en) On-off system of 1000kV AC ultrahigh-voltage transmission line
CN202275787U (en) Three-fracture series type high voltage DC breaker
CN203261040U (en) Low-voltage dynamic reactive power compensation device
CN201994679U (en) High-voltage reactive power automatic compensation device
Hu et al. Analysis on the necessity of high-voltage shunt reactors in power grid
CN203798982U (en) Switch electric life test loop for extra-high voltage substation reactive compensation
CN207459723U (en) Spare phase transformer quickly puts into arrangement
CN202042813U (en) Switch type 10 kV temporary box type power transformation device
CN201733065U (en) Low-voltage single-phase power source overvoltage protective device
CN203813447U (en) Substation High Voltage Reactive Power Automatic Compensation Device
CN204290066U (en) Low-voltage comprehensive distribution box wiring system
CN202840464U (en) High-voltage reactive power compensation device
CN209571763U (en) A kind of gas insulated combined electrical equipment of band isolation on-load switch
CN201716400U (en) Test loop for being tangent to high-voltage circuit breaker of back to back capacitor unit
CN101986500A (en) Flexible adjustment device for 10KV capacitor
CN106921149A (en) A kind of FSR high capacity and high speed switchgearses

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140827