CN203255095U - Cabin front coaming and thermal-insulation pad installing assembly and automobile - Google Patents
Cabin front coaming and thermal-insulation pad installing assembly and automobile Download PDFInfo
- Publication number
- CN203255095U CN203255095U CN201320214072.7U CN201320214072U CN203255095U CN 203255095 U CN203255095 U CN 203255095U CN 201320214072 U CN201320214072 U CN 201320214072U CN 203255095 U CN203255095 U CN 203255095U
- Authority
- CN
- China
- Prior art keywords
- insulation pad
- heat insulation
- engine room
- installation
- dash panel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T10/00—Road transport of goods or passengers
- Y02T10/10—Internal combustion engine [ICE] based vehicles
- Y02T10/40—Engine management systems
Landscapes
- Vehicle Interior And Exterior Ornaments, Soundproofing, And Insulation (AREA)
Abstract
本实用新型提供了一种机舱前围板隔热垫安装总成及汽车,属于汽车技术领域。该机舱前围板隔热垫安装总成包括前围板及固定于所述前围板的隔热垫;所述前围板上设有至少一个焊接螺栓;所述隔热垫上设有至少一个与所述焊接螺栓对应的安装孔,且所述焊接螺栓过盈安装于对应的安装孔;每一安装孔在第一方向的小于所述焊接螺栓的直径,每一安装孔在与第一方向垂直的第二方向的长度大于所述焊接螺栓的直径。本实用新型的机舱前围板隔热垫安装总成及汽车通过隔热垫的安装孔与前围板的焊接螺栓的过盈配合,而将隔热垫预安装并固定于前围板,无需再另外使用别的固定件对隔热垫进行固定,减少了装配程序,提高装配效率,且减少零件种类和数量,降低了成本。
The utility model provides an installation assembly of a heat-insulation pad for a front panel of an engine room and an automobile, belonging to the technical field of automobiles. The engine room cowl heat insulation pad installation assembly includes a front wall and a heat insulation pad fixed on the front wall; the front wall is provided with at least one welding bolt; the heat insulation pad is provided with at least one The mounting holes corresponding to the welding bolts, and the welding bolts are interference-fitted in the corresponding mounting holes; the diameter of each mounting hole in the first direction is smaller than the diameter of the welding bolts, and each mounting hole is in the first direction The length in the vertical second direction is greater than the diameter of the welding bolt. The installation assembly of the engine room cowl heat insulation pad of the utility model and the interference fit between the installation hole of the heat insulation pad and the welding bolts of the front wall of the automobile pre-install and fix the heat insulation pad on the front wall without the need In addition, other fixing parts are used to fix the heat insulation pad, which reduces assembly procedures, improves assembly efficiency, reduces types and quantities of parts, and reduces costs.
Description
技术领域technical field
本实用新型涉及汽车技术领域,特别涉及一种机舱前围板隔热垫安装总成及汽车。The utility model relates to the technical field of automobiles, in particular to an installation assembly of a heat-insulation pad for a front panel of a nacelle and an automobile.
背景技术Background technique
机舱前围板隔热垫在现代汽车NVH(Noise、Vibration、Harshness,即是:噪声、振动与舒适性的英文缩写)及热学性能要求不断提高的前提下已成为一般汽车所必须的功能部件。Under the premise of the continuous improvement of NVH (Noise, Vibration, Harshness, English abbreviation for noise, vibration and comfort) and thermal performance requirements of modern automobiles, the front wall insulation pad has become a necessary functional part of general automobiles.
在机舱前围板隔热垫的安装过程中,通常要设计4个左右的安装点,先将其固定在前围板上。而后再进行机舱管路及线束铺设安装等工作。在前围板上其他部件组装完毕之后,最后再通过各个线束及管路卡夹将机舱前围板隔热垫牢牢的固定在前围板上。During the installation process of the engine room cowl heat insulation pad, it is usually necessary to design about 4 installation points and fix it on the cowl panel first. Then carry out the work of laying and installing the pipelines and wiring harnesses in the engine room. After the other components on the dash panel are assembled, the engine room dash panel heat insulation pad is firmly fixed on the dash panel through various wiring harnesses and pipeline clips.
然而,当机舱前围板隔热垫安装完成后,专门为安装定位的安装点大多成为一种冗余设计,造成了浪费,提高了成本。However, after the engine room cowl insulation pad is installed, most of the installation points specially positioned for installation become a redundant design, which causes waste and increases the cost.
实用新型内容Utility model content
有鉴于此,有必要提供一种降低成本的机舱前围板隔热垫安装总成及汽车。In view of this, it is necessary to provide a cost-reduced engine room dash panel heat insulation pad installation assembly and an automobile.
为了解决上述问题,根据本实用新型的第一方面,提供了一种机舱前围板隔热垫安装总成,其包括前围板及固定于所述前围板的隔热垫;所述前围板上设有至少一个焊接螺栓;所述隔热垫上设有至少一个与所述焊接螺栓对应的安装孔,且所述焊接螺栓过盈安装于对应的所述安装孔;每一所述安装孔在第一方向的长度小于所述焊接螺栓的直径,每一所述安装孔的在与所述第一方向垂直的第二方向的长度大于所述焊接螺栓的直径。In order to solve the above problems, according to the first aspect of the present utility model, there is provided an engine room dash panel heat insulation pad installation assembly, which includes a dash panel and a heat insulation pad fixed to the dash panel; There is at least one welding bolt on the coaming plate; at least one installation hole corresponding to the welding bolt is arranged on the heat insulation pad, and the welding bolt is interference installed in the corresponding installation hole; each of the installation The length of the hole in the first direction is smaller than the diameter of the welding bolt, and the length of each mounting hole in the second direction perpendicular to the first direction is larger than the diameter of the welding bolt.
进一步地,所述隔热垫上包括至少一个压薄凹陷区,且所述安装孔设置在对应的所述压薄凹陷区的底壁。Further, the heat insulation pad includes at least one thinned depression area, and the installation holes are arranged on the bottom wall of the corresponding thinned depression area.
进一步地,每一压薄凹陷区的底壁的厚度为1-3mm。Further, the thickness of the bottom wall of each thinned depression area is 1-3mm.
进一步地,所述焊接螺栓穿过所述对应安装孔后收容在对应的所述压薄凹陷区内。Further, the welding bolts pass through the corresponding mounting holes and are accommodated in the corresponding thinning depressions.
进一步地,所述隔热垫为热塑性纤维隔热垫。Further, the heat insulation pad is a thermoplastic fiber heat insulation pad.
另一方面,本实用新型还提供了一种汽车,该汽车包括车身,该车身包括上述机舱前围板隔热垫安装总成。On the other hand, the utility model also provides an automobile, which includes a vehicle body, and the vehicle body includes the above-mentioned installation assembly for the heat insulation pad of the dash panel of the cabin.
本实用新型的有益效果:The beneficial effects of the utility model:
本实用新型的机舱前围板隔热垫安装总成及汽车通过隔热垫的安装孔与前围板的焊接螺栓的过盈配合,而将隔热垫预安装并固定于前围板,无需再另外使用别的固定件对隔热垫进行固定,减少了装配程序,提高装配效率,且减少零件种类和数量,降低了成本。The installation assembly of the engine room cowl heat insulation pad of the utility model and the interference fit between the installation hole of the heat insulation pad and the welding bolt of the front wall of the automobile pre-install and fix the heat insulation pad on the front wall without the need In addition, other fixing parts are used to fix the heat insulation pad, which reduces assembly procedures, improves assembly efficiency, reduces types and quantities of parts, and reduces costs.
附图说明Description of drawings
图1表示本实用新型机舱前围板隔热垫安装总成的结构示意图,该机舱前围板隔热垫安装总成包括机舱前围板隔热垫;Fig. 1 shows the structural representation of the engine room cowl heat insulation pad installation assembly of the utility model, and the engine room cowl heat insulation pad installation assembly includes the engine room cowl heat insulation pad;
图2表示图1中机舱前围板隔热垫的局部放大图;Figure 2 shows a partial enlarged view of the heat insulation pad of the front wall of the engine room in Figure 1;
图3表示图1中沿着线A-A的截面示意图。Fig. 3 shows a schematic cross-sectional view along line A-A in Fig. 1 .
具体实施方式Detailed ways
下面结合附图对本实用新型作进一步详细的说明。Below in conjunction with accompanying drawing, the utility model is described in further detail.
请结合参照图1,本实用新型提供了一种汽车,其包括车身。该车身包括机舱前围板隔热垫安装总成1。Please refer to FIG. 1 , the utility model provides an automobile, which includes a vehicle body. The vehicle body includes an installation assembly 1 for the insulation pad of the front wall of the engine room.
请结合参照图2和图3,机舱前围板隔热垫安装总成1包括前围板11及安装在前围板11上的隔热垫13。前围板11上设有至少一个焊接螺栓111。Please refer to FIG. 2 and FIG. 3 , the installation assembly 1 of the engine room dash panel heat insulation pad includes a
隔热垫13上包括至少一个压薄凹陷区131,优选地,每一压薄凹陷区131通过热压成型形成,且每一压薄凹陷区131的底壁的厚度为1-3mm。每一压薄凹陷区131的底壁上设有一个贯穿隔热垫13的安装孔133。安装孔133在第一方向的长度小于焊接螺栓111的直径,且安装孔133在与第一方向垂直的第二方向的长度大于焊接螺栓111的直径;其中,安装孔133的第一方向是指安装孔133与焊接螺栓111的周缘卡接的接触点之间的距离。The
隔热垫13采用传统的热塑性纤维等材料,当隔热垫13上进行压薄以形成压薄凹陷区131时,使得压薄凹陷区131具有一定的硬度。这样,因为133周边的压薄凹陷区131具有一定的硬度,使得焊接螺栓111与133配合时候不会轻易松动。The
优选地,本实施例中,安装孔133呈长方形,安装孔133在第一方向的长度(即长方形的宽)小于焊接螺栓111的直径,且安装孔133在与所述第一方向垂直的第二方向的长度(即长方形的长)大于焊接螺栓111的直径。Preferably, in this embodiment, the
应当指出的是,安装孔133的形状并不限于长方形,也可以是椭圆形等,只要可以实现安装孔133在第一方向的长度小于焊接螺栓111的直径,且安装孔133在与所述第一方向垂直的第二方向的长度大于焊接螺栓111的直径,以使得通过隔热垫13的安装孔133与前围板11的焊接螺栓111的过盈配合,而将隔热垫13预安装并固定于前围板11。It should be noted that the shape of the
进行机舱前围板隔热垫的装配过程中,先将隔热垫13的安装孔133套接在前围板11的焊接螺栓111上,且焊接螺栓111穿过安装孔133后收容在对应的压薄凹陷区131内。此时,安装孔133与焊接螺栓111通过过盈配合连接,从而使得隔热垫13安装在前围板11上,对隔热垫13起到预安装固定的作用,并且,由于隔热垫13一般重量较轻,通过安装孔133和焊接螺栓111的固定配合即可达到安装固定的目的。因此,在对机舱前围板隔热垫的管路、线束及其它部件组装完毕后,无需再另外使用别的固定件对隔热垫13进行固定,减少了装配程序,提高装配效率,且减少零件种类和数量,降低了成本。During the assembly process of the engine room cowl heat insulation pad, the
由上述可知:本实用新型的机舱前围板隔热垫安装总成及汽车通过隔热垫13的安装孔133与前围板11的焊接螺栓111的过盈配合,而将隔热垫13预安装并固定于前围板11,无需再另外使用别的固定件对隔热垫13进行固定,减少了装配程序,提高装配效率,且减少零件种类和数量,降低了成本。From the above, it can be known that the installation assembly of the engine room cowl heat insulation pad of the utility model and the automobile pass the interference fit between the
以上所述的仅是本实用新型的一个实施方式。对于本领域的普通技术人员来说,在不脱离本实用新型创造构思的前提下,还可以做出若干变形和改进,这些都属于本实用新型的保护范围。What has been described above is only an embodiment of the present utility model. For those skilled in the art, without departing from the inventive concept of the present utility model, some modifications and improvements can be made, and these all belong to the protection scope of the present utility model.
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320214072.7U CN203255095U (en) | 2013-04-24 | 2013-04-24 | Cabin front coaming and thermal-insulation pad installing assembly and automobile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201320214072.7U CN203255095U (en) | 2013-04-24 | 2013-04-24 | Cabin front coaming and thermal-insulation pad installing assembly and automobile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203255095U true CN203255095U (en) | 2013-10-30 |
Family
ID=49467692
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201320214072.7U Expired - Fee Related CN203255095U (en) | 2013-04-24 | 2013-04-24 | Cabin front coaming and thermal-insulation pad installing assembly and automobile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203255095U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2545212A (en) * | 2015-12-09 | 2017-06-14 | Jaguar Land Rover Ltd | Thermally insulating panel for a vehicle |
-
2013
- 2013-04-24 CN CN201320214072.7U patent/CN203255095U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2545212A (en) * | 2015-12-09 | 2017-06-14 | Jaguar Land Rover Ltd | Thermally insulating panel for a vehicle |
GB2545212B (en) * | 2015-12-09 | 2018-08-15 | Jaguar Land Rover Ltd | Powertrain system having thermally insulating panel for a vehicle |
US10829061B2 (en) | 2015-12-09 | 2020-11-10 | Jaguar Land Rover Limited | Thermally insulating panel for a vehicle |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203641685U (en) | Damping pipe clamp for automobile air conditioner | |
JP2011084096A (en) | Vehicle body front structure | |
CN203255095U (en) | Cabin front coaming and thermal-insulation pad installing assembly and automobile | |
CN205344524U (en) | Automobile pedal mounting structure | |
CN201273208Y (en) | Heat-insulating structure of engine exhaustion system | |
CN201574813U (en) | Combined exhaust pipe heat insulation sleeve | |
CN203431309U (en) | Oil pipe fixing clamp | |
CN201989723U (en) | Mounting bracket for automobile control unit | |
CN216043984U (en) | Silencer heat shield tool for automobile | |
CN201149325Y (en) | Fixed component for connection of intumescence tank | |
CN205591996U (en) | Vehicle vent -pipe way separates heat exchanger and car | |
CN208241887U (en) | A kind of fixed bracket of induction noise test microphone and noise testing equipment | |
CN204481599U (en) | A kind of electric machine support and there is electric machine assembly and the indoor set of this electric machine support | |
CN209126795U (en) | Steering gear input shaft sealing device and steering gear assembly | |
CN205113197U (en) | Enclose acoustic pad before car | |
CN109185355B (en) | Clutch housing for automobile | |
CN202868113U (en) | Oil pipe and car | |
CN107323254B (en) | A kind of automobile power assembly and automobile | |
CN201932105U (en) | Plate embedding component | |
CN203358492U (en) | Sound insulation pad for automobile engine hood | |
CN221562788U (en) | Expansion water bottle installation structure | |
CN205652215U (en) | Car vacuum sensor fixed support | |
CN204004788U (en) | A kind of pipe clamp mounting frame | |
CN217396438U (en) | Preceding wall heat insulating mattress and vehicle that has it | |
CN206290831U (en) | A kind of support for fixed car flexible pipe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
ASS | Succession or assignment of patent right |
Owner name: BEIJING AUTOMOBILE RESEARCH GENERAL INSTITUTE CO., Free format text: FORMER OWNER: BAIC MOTOR CO., LTD. Effective date: 20131205 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20131205 Address after: 101300 Beijing, Shunyi District Shun Road, No. 25, room 5, 106 Patentee after: Beijing Automobile Research General Institute Co., Ltd. Address before: 101300 Beijing City Renhe Town Shunyi District Shuanghe Street No. 99 Patentee before: Beijing Automibile Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20131030 Termination date: 20200424 |
|
CF01 | Termination of patent right due to non-payment of annual fee |