[go: up one dir, main page]

CN203032416U - A star-connection resistor set damping-type switch auto-switching phase break passing device for an electric railway - Google Patents

A star-connection resistor set damping-type switch auto-switching phase break passing device for an electric railway Download PDF

Info

Publication number
CN203032416U
CN203032416U CN 201220666752 CN201220666752U CN203032416U CN 203032416 U CN203032416 U CN 203032416U CN 201220666752 CN201220666752 CN 201220666752 CN 201220666752 U CN201220666752 U CN 201220666752U CN 203032416 U CN203032416 U CN 203032416U
Authority
CN
China
Prior art keywords
train
switch
star
neutral section
switches
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220666752
Other languages
Chinese (zh)
Inventor
李子晗
李群湛
易东
赵元哲
吴积钦
李亚楠
周福林
解绍锋
陈民武
刘炜
南晓强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Jiaotong University
Original Assignee
Southwest Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Jiaotong University filed Critical Southwest Jiaotong University
Priority to CN 201220666752 priority Critical patent/CN203032416U/en
Application granted granted Critical
Publication of CN203032416U publication Critical patent/CN203032416U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Electric Propulsion And Braking For Vehicles (AREA)

Abstract

本实用新型公开了一种电气化铁道星形阻尼式开关自动切换过分相装置,将电分段S1、S2、S3分别接于第一接触网1和第一中性段1、第二接触网2和第二中性段2、第一中性段1和第二中性段2之间,列车驶过时,受电弓将电分段S1、S2、S3两端的导线瞬时接通;开关K1、K2和K3分别跨接于电分段S1、S2和S3上,星形电阻器组R两端跨接于电分段S3上,另一端接地;通常情况下开关K1、K2处于接通状态,开关3处于断开状态。根据列车在电分相的位置和取流状况以及列车通过电分相的时间因素(大于列车通过电分相的时间,小于最小行车间隔),控制开关K1、K2和K3的接通和断开以实现列车通过电分相中性段的自动切换。该装置结构简单,投资较小,便于实施。

Figure 201220666752

The utility model discloses an electrified railway star-shaped damping switch automatic switching over-phase splitting device, which connects electric segments S1, S2, and S3 to the first catenary 1, the first neutral section 1, and the second catenary 2 respectively. Between the second neutral section 2, the first neutral section 1 and the second neutral section 2, when the train passes by, the pantograph connects the wires at both ends of the electric sections S1, S2, and S3 instantaneously; switches K1, K2 and K3 are respectively connected across the electrical segments S1, S2 and S3, the two ends of the star-shaped resistor group R are connected across the electrical segment S3, and the other end is grounded; usually the switches K1 and K2 are in the on state, Switch 3 is off. According to the position of the train in the electrical separation phase and the current situation and the time factor of the train passing through the electrical separation phase (greater than the time for the train to pass through the electrical separation phase, less than the minimum driving interval), control the on and off of the switches K1, K2 and K3 In order to realize the automatic switching of the train through the neutral section of the electric split phase. The device has the advantages of simple structure, small investment and convenient implementation.

Figure 201220666752

Description

一种电气化铁道星形阻尼式开关自动切换过分相装置An electrified railway star-shaped damping switch automatic switching over-phase splitting device

技术领域technical field

本实用新型涉及一种电气化铁道星形阻尼式开关自动切换过分相装置。The utility model relates to an electrified railway star-shaped damping switch automatic switching over-phase splitting device.

背景技术Background technique

我国电气化铁道普遍采用单相工频交流制,为使电力系统三相负荷尽可能平衡,电气化铁道往往采用轮换相序、分相分区供电的方案。分相分区处的相邻供电区间用空气或绝缘子分割,形成绝缘电分相,简称电分相或分相。my country's electrified railway generally adopts single-phase power frequency AC system. In order to make the three-phase load of the power system as balanced as possible, the electrified railway often adopts the scheme of alternating phase sequence and phase-separated partition power supply. The adjacent power supply intervals at the phase-separation partition are divided by air or insulators to form insulating electrical phase separation, referred to as electrical phase separation or phase separation.

为防止电力机车带电通过分相因燃弧而烧坏接触网悬挂部件,甚至导致相间短路等,列车过分相时,司机需手动进行退级、关辅助机组、断主断路器,靠列车惯性驶过分相区,再合主断路器,合辅助机组,进级恢复功率,完成过分相过程,俗称降弓过分相。随着列车速度的提升,过分相频繁,高速下由司机手动已无法完成,必须采用自动过分相技术。现阶段主要的自动过分相有地面开关自动切换过分相和地面过分相之分。In order to prevent electric locomotives from burning catenary suspension components due to phase splitting due to arcing, or even causing phase-to-phase short circuit, etc., when the train is over-phase splitting, the driver needs to manually degrade, turn off the auxiliary unit, and turn off the main circuit breaker, and drive by train inertia Over-phase separation, then close the main circuit breaker, close the auxiliary unit, upgrade and restore power, and complete the over-phase separation process, commonly known as lowering the bow over-phase. With the increase of train speed, over-phase separation is frequent, and it is impossible for the driver to do it manually at high speed. Automatic over-phase separation technology must be adopted. At this stage, the main automatic transition phases are divided into ground switch automatic switching transition phase and ground transition phase.

地面开关自动切换过分相,是通过地面开关设备与列车位置信号配合,通过开关把电分相两端的供电臂电压依次切换到中性段上,列车不需要做切换动作,仅由地面开关完成,其间需要断电,但断电时间为两组开关切换时间间隔,对列车速度影响较小。但开关切换过程中易产生较大过电压,造成牵引网与车载设备烧损,影响机车安全运行;地面感应装置的技术复杂,对其灵敏性要求较高,感应失效或被人为破坏则会造成恶劣影响。The ground switch automatically switches the over-split phase, through the cooperation of the ground switch equipment and the train position signal, through the switch, the voltage of the power supply arm at both ends of the electric split phase is switched to the neutral section in turn, and the train does not need to do the switching action, it is only completed by the ground switch. In the meantime, a power outage is required, but the power outage time is the switching time interval of two groups of switches, which has little influence on the train speed. However, a large overvoltage is likely to be generated during the switching process, causing the traction network and on-board equipment to burn, affecting the safe operation of the locomotive; the technology of the ground sensing device is complex, and its sensitivity is high, and the sensing failure or artificial damage will cause Bad influence.

车载自动过分相是通过列车与地面信号的配合,在列车上通过列车控制系统模拟司机手动过分相,即自动断辅助电路、断主断路器、合主断路器、合辅助电路等一系列操作过程。但列车过分相过程,列车失电时间长,速度损失大,制约列车速度的提升;存在供电死区,列车在长大坡道路段有停在中性段的风险;由于中性段分布电容与感应电压的存在,列车空载进入中性段时有可能造成过电压,影响自动过分相的可靠性。The on-board automatic phase separation is through the cooperation of the train and the ground signal, and the train control system simulates the driver's manual phase separation on the train, that is, a series of operation processes such as automatically breaking the auxiliary circuit, breaking the main circuit breaker, closing the main circuit breaker, and closing the auxiliary circuit. . However, due to the phase separation process of the train, the train loses power for a long time and the speed loss is large, which restricts the increase of the train speed; there is a power supply dead zone, and the train has the risk of stopping at the neutral section on the long slope road section; due to the distributed capacitance of the neutral section and the The existence of induced voltage may cause overvoltage when the train enters the neutral section with no load, which will affect the reliability of automatic phase separation.

不论车载还是地面自动过分相,都存在高压开关切换和通过中性段的暂态电气过程,甚至造成牵引供电系统的过电压和过电流,影响设备安全运行。由于既有的过分相装置存在的种种问题,推广使用都受到一定制约。因此,研究安全、可靠、快速、稳定的过分相方案,是铁路安全运行的需要,也是高速铁路发展的迫切要求。Regardless of the vehicle-mounted or ground automatic over-phase separation, there are high-voltage switch switching and transient electrical processes passing through the neutral section, which may even cause overvoltage and overcurrent in the traction power supply system, affecting the safe operation of equipment. Due to the various problems existing in the existing excessive phase separation device, the popularization and use are all subject to certain restrictions. Therefore, research on safe, reliable, fast and stable over-phase separation schemes is a need for safe railway operation and an urgent requirement for the development of high-speed railways.

与发明人曾发明了的“一种电气化铁道阻尼式自动切换过分相装置”(201210277013.4)相比,采用星形电阻器组R,可以在正常情况下像原来一样起到对第一接触网1与第二接触网2的隔离作用,同时增加对地支路,可保证在列车驶过第一中性段1和第二中性段2并在开关切换时一直发挥对暂态过电压、过电流的阻尼抑制作用,并可以减少列车通过电分相的失电时间。Compared with the "A damping type automatic switching over-phase splitting device for electrified railway" (201210277013.4) invented by the inventor, the use of the star-shaped resistor group R can play the role of the first catenary 1 under normal circumstances as before. The isolation function with the second catenary 2, while adding the ground branch, can ensure that the train passes through the first neutral section 1 and the second neutral section 2 and always exerts protection against transient overvoltage and overcurrent when the switch is switched. The damping inhibition effect, and can reduce the power loss time of the train passing through the electric split phase.

实用新型内容Utility model content

本实用新型的目的就是提供一种电气化铁道星形阻尼式开关自动切换过分相装置,采用开关和星形电阻器组连接方案,利用星形电阻器组的隔离与阻尼特性,避免开关频繁切换可能造成的暂态过电压和过电流,实现列车安全可靠地自动过分相,并节约运行成本和维护费用。The purpose of this utility model is to provide an electrified railway star-shaped damping switch automatic switching over-phase splitting device, which adopts the connection scheme of the switch and the star-shaped resistor group, and utilizes the isolation and damping characteristics of the star-shaped resistor group to avoid the possibility of frequent switching of the switch The transient overvoltage and overcurrent caused by the train can realize the safe and reliable automatic phase separation of the train, and save the operation cost and maintenance cost.

本实用新型解决其技术问题,所采用的技术方案为:将电分段S1、S2、S3分别接于第一接触网1和第一中性段1、第二接触网2和第二中性段2、第一中性段1和第二中性段2之间,列车驶过时,受电弓将电分段S1、S2、S3两端的导线瞬时接通;开关K1、K2和K3分别跨接于电分段S1、S2和S3上,星形电阻器组R两端跨接于电分段S3上,另一端接地;开关K1、K2和K3与测控单元构成自动切换系统。The utility model solves the technical problem. The adopted technical scheme is: connect the electrical segments S1, S2, and S3 to the first catenary 1 and the first neutral section 1, the second catenary 2 and the second neutral section respectively. Section 2, between the first neutral section 1 and the second neutral section 2, when the train passes by, the pantograph connects the conductors at both ends of the electric sections S1, S2, and S3 instantaneously; the switches K1, K2, and K3 respectively cross Connected to the electrical segments S1, S2 and S3, the two ends of the star-shaped resistor group R are connected to the electrical segment S3, and the other end is grounded; the switches K1, K2 and K3 form an automatic switching system with the measurement and control unit.

本实用新型的工作原理是:通常开关K1、K2处于接通状态,开关3处于断开状态,通过开关K1和K2的电流之差为零;若列车从第一接触网1方向到来驶过电分段S1并使得通过开关K1和K2的电流之差非零(即通过开关K1的电流大于通过开关K2的电流)时,开关K1断开,然后立刻接通开关K3,列车转由第二接触网2供电;列车驶过电分段S3进入第二中性段2后,若通过开关K2和K3的电流之差非零(即通过开关K2的电流大于通过开关K3的电流)时,断开开关K3,再接通开关K1,否则,经过一段的时间(大于列车通过电分相的时间,但小于最小行车间隔)延迟后,断开开关K3,接通开关K1。同理,列车从第二接触网2方向到来,则按相同规则依次断开K2,接通K3,列车驶过后,再断开K3,接通K2,而开关K1保持接通。The working principle of the utility model is: usually the switches K1 and K2 are in the on state, the switch 3 is in the off state, and the difference between the currents passing through the switches K1 and K2 is zero; When segmenting S1 and making the difference between the currents passing through switches K1 and K2 non-zero (that is, the current passing through switch K1 is greater than the current passing through switch K2), switch K1 is turned off, and then switch K3 is turned on immediately, and the train turns to the second contact Power supply from network 2; after the train passes through the electric segment S3 and enters the second neutral segment 2, if the difference between the currents passing through the switches K2 and K3 is non-zero (that is, the current passing through the switch K2 is greater than the current passing through the switch K3), disconnect Switch K3, then turn on switch K1, otherwise, after a period of time (greater than the time when the train passes through the electrical phase separation, but less than the minimum running interval) delay, turn off switch K3, and turn on switch K1. In the same way, when the train arrives from the direction of the second catenary 2, K2 is turned off sequentially according to the same rules, and K3 is turned on. After the train passes by, K3 is turned off again, and K2 is turned on, while the switch K1 remains on.

与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:

一、本实用新型利用星形电阻器组的阻尼特性,抑制开关切换可能产生的暂态过电压和过电流及其对牵引供电系统电气设备和车载设备造成的不利影响,提高供电可靠性和安全性。1. The utility model utilizes the damping characteristics of the star-shaped resistor group to suppress the transient overvoltage and overcurrent that may be caused by switch switching and its adverse effects on the electrical equipment and vehicle-mounted equipment of the traction power supply system, and improve the reliability and safety of power supply sex.

二、本实用新型取消地面传感装置,可以避免地面人员干扰,提高可靠性。2. The utility model cancels the ground sensing device, which can avoid the interference of ground personnel and improve reliability.

三、与发明人曾发明了的“一种电气化铁道阻尼式自动切换过分相装置”(201210277013.4)相比,本实用新型可以减少列车通过电分相的失电时间。3. Compared with "A damping type automatic switching over-phase-splitting device for electrified railway" (201210277013.4) invented by the inventor, the utility model can reduce the power-off time of the train passing through the electric phase-splitting.

四、该装置结构简单,操作方便,投资较少,便于实施。Four, the device is simple in structure, easy to operate, less investment, and easy to implement.

开关K1、K2、K3和星形电阻器组R的额定电压为27.5kV;开关K1、K2和K3的额定电流=列车额定电流;星形电阻器组R中每个电阻的阻值由其阻尼作用和最小损耗取得,如选取对应电压下小于1安培电流的阻值。The rated voltage of switches K1, K2, K3 and star resistor group R is 27.5kV; the rated current of switches K1, K2 and K3 = train rated current; the resistance value of each resistor in star resistor group R is damped by it The effect and the minimum loss are obtained, such as selecting a resistance value less than 1 ampere current under the corresponding voltage.

开关可以是真空开关,亦可为电力电子开关,应经过技术经济比较后确定。The switch can be a vacuum switch or a power electronic switch, which should be determined after technical and economic comparison.

下面结合附图和具体实施方式对本实用新型作进一步的描述。Below in conjunction with accompanying drawing and specific embodiment, the utility model is further described.

附图说明Description of drawings

图1是本实用新型实施例的结构示意图。Fig. 1 is a schematic structural view of an embodiment of the utility model.

具体实施方式Detailed ways

实施例Example

图1示出,本实用新型的一种电气化铁道具体实施方式为:将电分段S1、S2、S3分别接于第一接触网1和第一中性段1、第二接触网2和第二中性段2、第一中性段1和第二中性段2之间,列车驶过时,受电弓将电分段S1、S2、S3两端的导线瞬时接通;开关K1、K2和K3分别跨接于电分段S1、S2和S3上,星形电阻器组R两端跨接于电分段S3上,另一端接地,与轨道(地)相连;开关K1、K2和K3与测控单元构成自动切换系统。Figure 1 shows that a specific embodiment of an electrified railway of the present invention is as follows: the electric segments S1, S2, and S3 are respectively connected to the first catenary 1 and the first neutral section 1, the second catenary 2 and the second catenary Between the second neutral section 2, the first neutral section 1 and the second neutral section 2, when the train passes by, the pantograph instantly connects the wires at both ends of the electric sections S1, S2, and S3; the switches K1, K2 and K3 is respectively connected across the electrical segments S1, S2 and S3, the two ends of the star-shaped resistor group R are connected across the electrical segment S3, and the other end is grounded and connected to the track (ground); the switches K1, K2 and K3 are connected to the track (ground). The measurement and control unit constitutes an automatic switching system.

本实用新型的工作原理是:通常开关K1、K2处于接通状态,开关3处于断开状态,通过开关K1和K2的电流之差为零;若列车从第一接触网1方向到来驶过电分段S1并使得通过开关K1和K2的电流之差非零(即通过开关K1的电流大于通过开关K2的电流)时,开关K1断开,然后立刻接通开关K3,列车转由第二接触网2供电;列车驶过电分段S3进入第二中性段2后,若通过开关K2和K3的电流之差非零(即通过开关K2的电流大于通过开关K3的电流)时,断开开关K3,再接通开关K1,否则,经过一段的时间(大于列车通过电分相的时间,但小于最小行车间隔)延迟后,断开开关K3,再接通开关K1。同理,列车从第二接触网2方向到来,则按相同规则依次断开K2,接通K3,列车驶过后,再断开K3,接通K2,而开关K1保持接通。The working principle of the utility model is: usually the switches K1 and K2 are in the on state, the switch 3 is in the off state, and the difference between the currents passing through the switches K1 and K2 is zero; Segment S1 and make the difference between the currents passing through the switches K1 and K2 non-zero (that is, the current passing through the switch K1 is greater than the current passing through the switch K2), the switch K1 is turned off, and then the switch K3 is turned on immediately, and the train turns to the second contact Network 2 supplies power; after the train passes through the electric segment S3 and enters the second neutral segment 2, if the difference between the currents passing through the switches K2 and K3 is non-zero (that is, the current passing through the switch K2 is greater than the current passing through the switch K3), it is disconnected Switch K3, then turn on switch K1, otherwise, after a period of time (greater than the time when the train passes through the electrical phase separation, but less than the minimum running interval) delay, turn off switch K3, and then turn on switch K1. In the same way, when the train arrives from the direction of the second catenary 2, K2 is turned off sequentially according to the same rule, and K3 is turned on. After the train passes, K3 is turned off, and K2 is turned on, while the switch K1 remains on.

图1还示出了列车L过分相的过程。列车L在线路上自左至右运行,到达电分段S1之前由第一接触网1为之供电,通过开关K1和开关K2的电流(如小于1A)相同,其电流之差为零,开关K1和K2保持接通,开关K3保持断开。若列车L驶过电分段S1后使得通过开关K1和开关K2的电流之差非零时,即通过开关K1的电流大于通过开关K2的电流时,则开关K1断开,然后立刻接通开关K3,列车L转由第二接触网2供电,列车失电时间仅为两组开关切换时间;列车L驶过电分段S3驶入第二中性段2,此时,若通过开关K2和K3的电流之差非零,即通过开关K2的电流大于通过开关K3的电流,则断开开关K3,再接通开关K1,否则,经过一段的时间(大于列车通过电分相的时间,但小于最小行车间隔)延迟后,再断开开关K3,通开关K1,等待下趟列车到来。同理,列车L从第二接触网2方向到来,则按相同规则依次断开K2,接通K3,列车L驶过后,再断开K3,接通K2,而开关K1保持接通,等待下趟列车到来。Fig. 1 also shows the process of train L passing through phases. The train L runs from left to right on the line, and it is powered by the first catenary 1 before reaching the electric segment S1. The current (such as less than 1A) passing through the switch K1 and the switch K2 is the same, and the difference between the currents is zero. The switch K1 and K2 remain on, switch K3 remains off. If the difference between the currents passing through the switch K1 and the switch K2 is non-zero after the train L passes through the electric segment S1, that is, when the current passing through the switch K1 is greater than the current passing through the switch K2, the switch K1 is turned off, and then the switch is turned on immediately K3, the train L is powered by the second catenary 2, and the power loss time of the train is only the switching time of two groups of switches; the train L passes through the electric segment S3 and enters the second neutral segment 2. At this time, if the switch K2 and The current difference of K3 is non-zero, that is, the current through switch K2 is greater than the current through switch K3, then switch K3 is turned off, and then switch K1 is turned on; Less than the minimum running interval) after the delay, switch off switch K3, pass switch K1, and wait for the arrival of the next train. In the same way, when the train L arrives from the direction of the second catenary 2, K2 is turned off sequentially according to the same rules, and K3 is turned on. A train arrives.

Claims (2)

1.一种电气化铁道星形阻尼式开关自动切换过分相装置,其特征在于:将电分段S1、S2、S3分别接于第一接触网1和第一中性段1、第二接触网2和第二中性段2、第一中性段1和第二中性段2之间;开关K1、K2和K3分别跨接于电分段S1、S2和S3上,星形电阻器组R两端跨接于电分段S3上,另一端接地;开关K1、K2和K3与测控单元构成自动切换系统。1. An electrified railway star-shaped damping switch automatically switches over the phase-splitting device, which is characterized in that: the electric segments S1, S2, and S3 are respectively connected to the first catenary 1, the first neutral section 1, and the second catenary 2 and the second neutral section 2, the first neutral section 1 and the second neutral section 2; the switches K1, K2 and K3 are respectively connected across the electrical segments S1, S2 and S3, and the star resistor group Both ends of R are connected to the electrical segment S3, and the other end is grounded; switches K1, K2 and K3 and the measurement and control unit form an automatic switching system. 2.根据权利要求1所述的一种电气化铁道星形阻尼式开关自动切换过分相装置,其特征在于:通常情况下开关K1、K2处于接通状态,开关3处于断开状态。2. A star-shaped damping switch automatic switching over-phase splitting device for electrified railway according to claim 1, characterized in that: normally, the switches K1 and K2 are in the on state, and the switch 3 is in the off state.
CN 201220666752 2012-12-06 2012-12-06 A star-connection resistor set damping-type switch auto-switching phase break passing device for an electric railway Expired - Fee Related CN203032416U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220666752 CN203032416U (en) 2012-12-06 2012-12-06 A star-connection resistor set damping-type switch auto-switching phase break passing device for an electric railway

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220666752 CN203032416U (en) 2012-12-06 2012-12-06 A star-connection resistor set damping-type switch auto-switching phase break passing device for an electric railway

Publications (1)

Publication Number Publication Date
CN203032416U true CN203032416U (en) 2013-07-03

Family

ID=48684556

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220666752 Expired - Fee Related CN203032416U (en) 2012-12-06 2012-12-06 A star-connection resistor set damping-type switch auto-switching phase break passing device for an electric railway

Country Status (1)

Country Link
CN (1) CN203032416U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103057439A (en) * 2012-12-06 2013-04-24 西南交通大学 Automatic switching passing neutral section system of electrified railway star damping switch
CN104192026A (en) * 2014-09-17 2014-12-10 铁道第三勘察设计院集团有限公司 Power switching based electric disconnector for electrified railway overhead line system and monitoring method thereof
CN105015366A (en) * 2015-07-16 2015-11-04 西南交通大学 Phase switching method for rapidly adjusting phase of reference voltage of inverter
CN105292141A (en) * 2014-07-30 2016-02-03 株洲南车时代电气股份有限公司 Automatic passing neutral section control system and method for electric motor train unit
CN106347175A (en) * 2016-09-28 2017-01-25 北京易菲盛景科技有限责任公司 Improved intelligent electrical sectioning device for alternating current electrified railway
CN106488858A (en) * 2014-06-26 2017-03-08 株式会社明电舍 The power-supply device of AC electric vehicle

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103057439A (en) * 2012-12-06 2013-04-24 西南交通大学 Automatic switching passing neutral section system of electrified railway star damping switch
CN103057439B (en) * 2012-12-06 2015-04-22 西南交通大学 Automatic switching passing neutral section system of electrified railway star damping switch
CN106488858A (en) * 2014-06-26 2017-03-08 株式会社明电舍 The power-supply device of AC electric vehicle
CN106488858B (en) * 2014-06-26 2017-10-13 株式会社明电舍 The power-supply device of AC electric vehicle
CN105292141A (en) * 2014-07-30 2016-02-03 株洲南车时代电气股份有限公司 Automatic passing neutral section control system and method for electric motor train unit
CN105292141B (en) * 2014-07-30 2018-02-02 株洲南车时代电气股份有限公司 A kind of electric EMU auto-passing neutral section control system and control method
CN104192026A (en) * 2014-09-17 2014-12-10 铁道第三勘察设计院集团有限公司 Power switching based electric disconnector for electrified railway overhead line system and monitoring method thereof
CN104192026B (en) * 2014-09-17 2016-04-20 铁道第三勘察设计院集团有限公司 Based on electrification railway contact net electric isolating switch and the method for supervising of power supply switching type
CN105015366A (en) * 2015-07-16 2015-11-04 西南交通大学 Phase switching method for rapidly adjusting phase of reference voltage of inverter
CN105015366B (en) * 2015-07-16 2017-04-12 西南交通大学 Phase switching method for rapidly adjusting phase of reference voltage of inverter
CN106347175A (en) * 2016-09-28 2017-01-25 北京易菲盛景科技有限责任公司 Improved intelligent electrical sectioning device for alternating current electrified railway
CN106347175B (en) * 2016-09-28 2022-05-31 北京易菲盛景科技有限责任公司 Improved intelligent electric phase splitting device for alternating current electrified railway

Similar Documents

Publication Publication Date Title
CN106183897B (en) A kind of electric railway subregion institute's automatic neutral-section passing system and its control method
CN103057439B (en) Automatic switching passing neutral section system of electrified railway star damping switch
CN203032416U (en) A star-connection resistor set damping-type switch auto-switching phase break passing device for an electric railway
CN105799553B (en) A kind of electronic type ground automatic neutral-section passing device
CN104057842B (en) Coaxial cable power supply system of electrified railway
CN103231668B (en) Self-check type auto-passing neutral section system and auto-passing neutral section method of electrified railway
EP3216644B1 (en) Distributed protection system for power supply at sections of electrified railway propulsion system
EP3321125A1 (en) Intelligent electric phase splitting device for alternating-current electrified railway
CN103625310B (en) A kind of electric railway subregion institute's automatic neutral-section passing system and automatic passing over of neutral section method thereof
CN110239398B (en) A kind of in-phase power supply traction substation feeder protection tripping method
CN101934746A (en) Automatic phase separation device for electric locomotive
CN107627906A (en) A kind of railway contact line overlap formula electricity segmentation arc suppressing means and its method
CN106114294B (en) A kind of non-shut-brake neutral-section passing system of EMU and fault recognition method
CN101364727B (en) An overvoltage suppressing device in the process of locomotive over-phase separation in traction power supply system
CN102765333B (en) A kind of electric railway damping type automatic switchover passing phase insulator device
CN201833895U (en) Auto-passing split-phase device of electric locomotive
CN206086435U (en) Electric Railway sectioning post auto -passing phase separation system
CN105691244A (en) System no-load monitoring device for electrified railway cut-through power supply and monitoring method thereof
CN101767540B (en) Automatic neutral section passing device without switch switching for electrified railway
CN103625309B (en) A kind of electric railway automatic neutral-section passing system and automatic passing over of neutral section method thereof
CN205395812U (en) Electric Railway link up unloaded monitoring device of system of power supply
CN202669541U (en) Damping-type automatic passing over phase splitter equipment for electrified railway
CN201559547U (en) A high-speed EMU automatic phase separation device without opening the brake
CN203293938U (en) Electric railway self-detecting-type automatic neutral-section passing device
CN203920466U (en) A kind of electrified railway coaxial cable power supply system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130703

Termination date: 20151206

EXPY Termination of patent right or utility model