The slope protection structure that is used for the highway Dumping Sites
Technical field
The utility model relates to the prevention and control of soil erosion field, is specifically related to a kind of slope protection structure for Dumping Sites.
Background technology
In excavation roadbed, tunnel, can produce a large amount of dregs in the processes such as construction bridge in the highway construction process, in these dregs, except small part was applied to engineering, all the other major parts all will be thrown aside at Highways ', formed Dumping Sites.For the soil erosion that prevents that Dumping Sites is domatic; usually to afforest the domatic of Dumping Sites in conventional art; but because the domatic normally dregs of Dumping Sites, crushed stone and sand grains mix; uneven; poor stability, permeability is strong, and water-holding capacity is very poor; it is domatic that thereby the vegetation that causes traditional planting patterns load-carrying is difficult to adapt to Dumping Sites, is difficult for survival.
In side slope protection engineering of the prior art; in order to guarantee the survival of plant; usually can be provided for the structure of cultural vegetation on side slope; a kind of green edge slope safeguard structure is disclosed as Chinese patent literature CN2866605Y; this structure comprises a plurality of object-accommodating bags; be placed with plant growth material, absorbent material and vegetable seeds in object-accommodating bag; described a plurality of object-accommodating bag close-packed arrays; and be fixed on side slope by traction nail; be provided with one deck grid on described object-accommodating bag, described grid is fixed on object-accommodating bag by traction nail.This slope protection structure makes object-accommodating bag be difficult for scattering by becoming an integral body with object-accommodating bag and side slope are affixed, and the absorbent material in object-accommodating bag can store up and receive enough moisture, thus the growth of assurance vegetation.
Above-mentioned slope protection structure of the prior art is by arranging described object-accommodating bag, make plant growth can access sufficient moisture, but above-mentioned slope protection structure of the prior art also is not suitable for the Dumping Sites slope protection, reason is, because the slope stability of Dumping Sites is very poor, easily form the landslide, therefore described object-accommodating bag is difficult to be stably fixed on Dumping Sites domatic by traction nail; In addition, because above-mentioned slope protection structure need to use a large amount of grids, therefore when large tracts of land is used, also increased the Master Cost of structure, economic performance is relatively poor.
The utility model content
Be difficult to be stably fixed on Dumping Sites domatic in order to solve slope protection structure of the prior art, be not suitable for the relatively poor problem of Dumping Sites slope protection and economic performance, the utility model provides a kind of can stablizing to be arranged on the domatic upper and lower slope protection structure of cost of Dumping Sites.
The technical scheme of the slope protection structure for Dumping Sites described in the utility model is:
A kind of edge slope structure for Dumping Sites comprises:
The hole is planted in many seedings, described plantation hole digs moulding on described side slope, plantation on every adjacent two rows is cheated and is staggered, the bottom of cheating in each described plantation is equipped with degradable geotextile, above described degradable geotextile and be positioned at described plantation hole and be filled with soil horizon, plantation has plant in described soil horizon;
The wall that described plantation hole is positioned at described side slope downstream one side vertically arranges, and in described plantation hole, is close to described wall and is provided with the dry stone wall layer of vertically piling up;
In described plantation is cheated, also be provided with Base with Sand Gravel Cushion between described dry stone wall layer and described soil horizon.
Described plantation hole is provided with three rows or more than three rows, described many seedings are planted the hole and are the X-type arrangement.
When the angle of the domatic and horizontal plane of described side slope during greater than 45 °,, be connected by platform between domatic in every adjacent two minutes described domatic a plurality of be parallel to each other minute domatic that are divided into along the gliding direction of described side slope.
The angle of described platform and horizontal direction is 1 ~ 2%, and raises gradually along the gliding direction of described side slope.
The thickness of described Base with Sand Gravel Cushion is 100~200mm.
The thickness of described dry stone wall layer is 150-250mm.
Described plant is one or more in white oak, the seed of Chinese dodder, macleaya cordata, azalea, Chinese holly Chinese ilex, Smallfruit Rose Root, fiery sour jujube, masson pine and Qinggang oak.
Described edaphic height is greater than 30cm.
It is 1.5-2m that upper adjacent two spacings of planting the hole in hole are planted in every seeding.
Slope protection structure for Dumping Sites described in the utility model, advantage is:
(1) slope protection structure for Dumping Sites described in the utility model, comprise: the hole is planted in many seedings, plantation on every adjacent two rows is cheated and is staggered, described plantation hole digs moulding on described side slope, the bottom of cheating in each described plantation is equipped with degradable geotextile, and plantation has plant and is filled with the soil that is suitable for plant growth in described plantation is cheated; The wall that described plantation hole is positioned at described side slope downstream one side vertically arranges, and in described plantation hole, is close to described wall and is provided with the dry stone wall layer; In described plantation is cheated, be close to described dry stone wall layer and also be provided with Base with Sand Gravel Cushion.The utility model is planted the hole by many seedings are set, and lays degradable geotextile in the bottom in each described plantation hole, makes the moisture and the nutrient in soil that enter in described plantation hole be difficult for running off from the bottom, has played the effect of preserve moisture and fertility; Simultaneously, the degradable geotextile that the utility model uses can be degraded after long-term the use, thereby can the production of root system of plant do not had a negative impact.
The utility model arranges the wall that described plantation hole is positioned at described side slope downstream one side and vertically arranges, and in described plantation hole, is close to described wall and is provided with the dry stone wall layer; By described dry stone wall layer is set, can be effectively support the soil in described plantation hole, make the soil in described plantation hole can not subside along the slope body because of rain drop erosion or other inducements; Slope protection structure in while the utility model, be close between described dry stone wall layer and soil horizon and also be provided with Base with Sand Gravel Cushion, gravel particle diameter in described Base with Sand Gravel Cushion is less, can fill the gap of dry stone wall layer, thereby effectively prevent a large amount of losses of water and soil.
In addition, the dry stone wall layer of the slope protection structure in the utility model and the raw material of Base with Sand Gravel Cushion are available anywhere at Dumping Sites, and cost is lower, thereby greatly reduce the cost of material of engineering construction.
(2) slope protection structure for Dumping Sites described in the utility model when the length of described side slope during greater than 10m, is provided with a plurality of be parallel to each other domatic along the gliding direction of described side slope, and every adjacent two are connected by platform between domatic.The advantage that arranges like this is, but the length of described side slope is during greater than 10m, and it is more unstable that slope protection structure becomes, and easily comes down, and by described step is set, can effectively improve the stability of side slope, prevents the phenomenon that comes down.
(3) slope protection structure for Dumping Sites described in the utility model, the angle that described platform and horizontal direction are set is 1 ~ 2%, and raises gradually along the gliding direction of described side slope.Raise gradually along the gliding direction of described side slope by described step is set, make moisture be difficult for flowing downward along described step, further played the effect of water conservation.
(4) slope protection structure for Dumping Sites described in the utility model, described plant is one or more in white oak, the seed of Chinese dodder, macleaya cordata, azalea, Chinese holly Chinese ilex, Smallfruit Rose Root, fiery sour jujube, masson pine and Qinggang oak, above-mentioned vegetation is shrub or the arbor of easy survival, has comparatively flourishing root system; In order to guarantee the necessary soil of plant growth, the utility model also arranges described edaphic height greater than 30cm.
Description of drawings
In order to make technical scheme described in the utility model more be convenient to understand, below in conjunction with the drawings and specific embodiments, technical scheme described in the utility model is described further.
The sectional view in tree planting described in the utility model hole as shown in Figure 1;
The structure chart of slope protection structure described in the utility model as shown in Figure 2;
The structure chart that is provided with the slope protection structure of platform described in the utility model as shown in Figure 3 and Figure 4.
Reference numeral is:
The 1-kind is planted the hole; 2-dry stone wall layer; The 3-Base with Sand Gravel Cushion; The 4-degradable geotextile; The 5-plant; 6-is domatic; 7-divides domatic; The 8-platform.
The specific embodiment
Embodiment 1
The slope protection structure that is used for Dumping Sites described in the present embodiment comprises as shown in Figure 1:
Hole 1 is planted in two seedings, and it is 1.5m that two spacings of planting hole 1 that are connected on hole 1 are planted in every seeding; Described plantation hole 1 digs moulding on described side slope; Described two seedings are planted the hole and 1 are staggered, and 1 bottom is equipped with degradable geotextile 4 in each described plantation hole, and above described degradable geotextile 4 and be positioned at described plantation hole 1 and be filled with soil horizon, described edaphic height is 30cm; Plantation has plant 5 in described soil horizon; The described plant 5 of planting in the present embodiment is white oak; The length of side slope described in the present embodiment is 9m, and the angle α of described side slope and horizontal plane is 30 °.
The wall that described plantation hole 1 is positioned at described side slope downstream one side vertically arranges, and in described plantation hole 1, is close to described wall and is provided with dry stone wall layer 2; Cheat in 1 in described plantation, also be provided with Base with Sand Gravel Cushion 3 between described dry stone wall layer 2 and described soil horizon;
The thickness of Base with Sand Gravel Cushion described in the present embodiment 3 is 100mm, and the thickness of described dry stone wall layer 2 is 150mm.
Embodiment 2
The slope protection structure that is used for Dumping Sites described in the present embodiment comprises as shown in Figure 2:
Hole 1 is planted in four seedings, and it is 2m that two spacings of planting hole 1 that are connected on hole 1 are planted in every seeding; Described plantation hole 1 digs moulding on described side slope, the degree of depth that described tree planting is cheated is 50cm; Described many seedings are planted hole 1 and are the X-type arrangement.1 bottom is equipped with degradable geotextile 4 in each described plantation hole, and above described degradable geotextile 4 and be positioned at described plantation hole 1 and be filled with soil horizon, described edaphic height is 50cm; Plantation has plant 5 in described soil horizon; The described plant 5 of planting in the present embodiment is azalea; The angle α of the inclined plane of described side slope and horizontal plane is 50 °, this enforcement along the gliding direction of described side slope with described domatic 6 be divided into 3 be parallel to each other minutes domatic 7, be connected by platform 8 between every adjacent two minutes domatic 7, described platform 8 is 1 ° with the angle of horizontal direction, and raises gradually along the gliding direction of described side slope.Described in the present embodiment, the total length of 3 minutes domatic 7 is 15m.
The wall that described plantation hole 1 is positioned at described side slope downstream one side vertically arranges, and in described plantation hole 1, is close to described wall and is provided with dry stone wall layer 2; Cheat in 1 in described plantation, also be provided with Base with Sand Gravel Cushion 3 between described dry stone wall layer 2 and described soil horizon;
The thickness of Base with Sand Gravel Cushion described in the present embodiment 3 is 200mm, and the thickness of described dry stone wall layer 2 is 200mm.
Embodiment 3
Obviously the slope protection structure that is used for Dumping Sites described in the present embodiment as shown in Figure 2, comprising:
Hole 1 is planted in three seedings, and it is 1.8m that two spacings of planting hole 1 that are connected on hole 1 are planted in every seeding; Described plantation hole 1 digs moulding on described side slope, the degree of depth that described tree planting is cheated is 50cm; Described many seedings are planted hole 1 and are the X-type arrangement.1 bottom is equipped with degradable geotextile 4 in each described plantation hole, and above described degradable geotextile 4 and be positioned at described plantation hole 1 and be filled with soil horizon, described edaphic height is 40cm, and plantation has plant 5 in described soil horizon; The described plant 5 of planting in the present embodiment is azalea; The angle α of the inclined plane of side slope described in the present embodiment and horizontal plane is 55 °, this enforcement along the gliding direction of described side slope with described domatic 6 be divided into 2 be parallel to each other minutes domatic 7, be connected by platform 8 between 2 minutes domatic 7, described platform 8 is 1 ° with the angle of horizontal direction, and raises gradually along the gliding direction of described side slope.Described in the present embodiment, the total length of 2 minutes domatic 7 is 13m.
The wall that described plantation hole 1 is positioned at described side slope downstream one side vertically arranges, and in described plantation hole 1, is close to described wall and is provided with dry stone wall layer 2; Cheat in 1 in described plantation, also be provided with Base with Sand Gravel Cushion 3 between described dry stone wall layer 2 and described soil horizon;
The thickness of Base with Sand Gravel Cushion described in the present embodiment 3 is 200mm, and the thickness of described dry stone wall layer 2 is 200mm.
Need to prove, " X " type in " described many seedings are planted the hole and are the X-type arrangement " described in the utility model is those skilled in the art's Essential Terms, i.e. two seedings are planted the hole and are staggered, and each plantation hole is positioned on the center line in its adjacent row, nearest two plantation holes.
Above-described embodiment is only for example clearly is described, and is not the restriction to embodiment.For those of ordinary skill in the field, can also make other changes in different forms on the basis of the above description.Here need not also can't give all embodiments exhaustive.And the apparent variation of being extended out thus or change still are among the protection domain of the utility model creation.