[go: up one dir, main page]

CN202370251U - Through the wall combined water-stop screw - Google Patents

Through the wall combined water-stop screw Download PDF

Info

Publication number
CN202370251U
CN202370251U CN2011205560622U CN201120556062U CN202370251U CN 202370251 U CN202370251 U CN 202370251U CN 2011205560622 U CN2011205560622 U CN 2011205560622U CN 201120556062 U CN201120556062 U CN 201120556062U CN 202370251 U CN202370251 U CN 202370251U
Authority
CN
China
Prior art keywords
screw
wall
screw rod
iron sheet
stop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011205560622U
Other languages
Chinese (zh)
Inventor
王洪伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2011205560622U priority Critical patent/CN202370251U/en
Application granted granted Critical
Publication of CN202370251U publication Critical patent/CN202370251U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a be used for construction, template works such as underground and above-ground water-proof wall, post, roof beam, oblique roofing stabilize and reinforced (rfd) wall combination stagnant water screw rod, for components of a whole that can function independently integrated configuration, including internal screw rod and outer screw rod, fixed hexagon nut has all been welded at both ends outside the internal screw rod nears the wall, and the welding of the fixed hexagon nut outside has template zinc-plated location iron sheet, form two stagnant water devices between location iron sheet and stagnant water iron sheet, outer screw rod has increased steel pipe mountain type card when fixed wooden template, makes stagnant water screw rod installation technology simple structure, and it is convenient to roll over the dress, resources are saved, improves material turnover number of times, can improve construction process, improves the engineering quality of wall body, and the stagnant water effect is better, strengthens whole engineering quality.

Description

Combination sealing up screw through walls
Technical field
This practicality is involved in building operations, underground and on the ground mine dam, post, beam, the oblique stable and combination sealing up screw through walls reinforced of form work engineerings such as roofing.
Background technology
In building operations, waterproofing is a huge object of construction production beyond doubt, during the underground outer shear wall of concrete pouring; The normal whole screw rod through walls that has the sealing metallic gasket that adopt set up and support shuttering, in the present construction work shear wall wooden form mounting technique, uses whole screw rod that the inside and outside wooden form of shear wall is installed; And then add the soldering iron sheet at screw rod middle part and stop outdoor water in the screw rod inlet chamber; Reaching in the fixing inside and outside wooden form of shear wall again can be up to the effect of sealing, but owing to use one whole screw rod, length is longer; The wooden form splicing is big and heavy; Be not easy stripping from long bolt during form removal, and behind the stripping, stay outside on the wall unnecessary screw rod also will slice off.Its shortcoming is structure more complicated when screw rod is installed, and screw rod is disposable use, and waste is big; Form removal quite bothers, and in addition, the unnecessary screw rod that stretches out surface of wall need cut off with oxygen-acetylene; Doing like this when taking a lot of work very much, also is to cost waste, strengthens the engineering construction cost.
The utility model content
The utility model purpose provides a kind of simple in structure, and the folding dress is convenient, economizes on resources, and improves the material number of turnover, can improve construction technology, improves the workmanship of body of wall, and stagnant water effect better makes up sealing up screw.
For realizing above-mentioned purpose, the utility model can be taked following technical scheme:
The described combination sealing up screw through walls of the utility model; Be the split combining structure, comprise getting in the shear wall fully and fullly in the centre position being welded with the inner screw of sealing iron sheet and passing wooden form and the fixing external screw rod of wooden form; The sealing iron sheet is a galvanized sheet iron in the middle of the said inner screw; Said inner screw all is welded with fixedly hex nut near the outer two ends of wall, and the said fixedly hex nut outside is welded with the zinc-plated location of template iron plate, forms two antiprimings between said location iron sheet and sealing iron sheet; The corresponding fixedly hex nut screw of said location iron sheet central point; Said external screw rod has additional steel pipe mountain type card when fixing wooden form, the steel pipe that said steel pipe mountain type card centre bore passes external screw rod and combines two horizontal positioned is fixing wooden form together, and is locked with movable hex nut.
Preferably, said external screw rod shaft evenly is covered with screw thread, and screw thread is the compact screw thread, can improve the sealing function.
Preferably, said external screw rod outermost end is provided with the hexagonal screw rod of 5 centimeter length, reverses with spanner when making things convenient for external screw rod to connect with inner screw to install and fix and dismantle.
Preferably; Said steel pipe mountain type card up and down two ends is designed to the hook arc shape, and two inboard centers are provided with in one and press arc up and down, presses arc to be used for pressing the firm steel pipe of deciding two horizontal positioned in said; Can effectively strengthen the fixed effect that wooden form is installed, improve stability.
Preferably, said inner screw and external screw rod thread connection place have additional metallic gasket, and be tightr after making external screw rod and inner screw connecting, and is not prone to loosening.
Preferably, said inner screw is the circular section screw rod with external screw rod, and the big I of screw rod is decided according to the engineering size.
The beneficial effect that the utility model adopts above scheme to produce is: said combination sealing up screw through walls, adopt the split combining structure, and the folding dress is convenient during use; Convenient construction, the life cycle number of times of raising material economizes on resources; Reduce labour intensity, save more human resources, the sealing iron sheet is a galvanized iron sheet in the middle of the said inner screw; Fixedly the hex nut outside is welded with the zinc-plated location of Template Location iron plate, forms two antiprimings between said location iron sheet and sealing iron sheet, can more effectively improve stagnant water effect; Improve the engineering total quality, said iron plate adopts zinc-plating material can play anti-oxidation effect, can improve the iron sheet quality; Thereby raising stagnant water effect, and can improve service life and the service property (quality) of inner screw in mast, said external screw rod have additional steel pipe mountain type card when fixing plank sheathing; Said steel pipe mountain type card is in conjunction with two steel pipes of horizontal positioned and turn round traveling nut fixing plank sheathing jointly, can effectively strengthen the fixed effect that plank sheathing is installed, and improves stability; Make the plank sheathing convenient disassembly, the agents enhance overall construction quality reduces plank sheathing and in unloading process, damages body of wall.
Description of drawings
Accompanying drawing 1 is the utility model decomposing schematic representation;
Accompanying drawing 2 is the utility model A-A sectional drawing;
Accompanying drawing 3 is the utility model B-B sectional drawing;
In the accompanying drawing, 1 inner screw, 2 external screw rods, 3 sealing iron sheets, 4 location iron sheets, 5 fixing hex nuts, 6 steel pipe mountain type cards, 7 movable hex nuts, 8 pressure arcs, 9 hexagonal screw rods.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment further explain the utility model; Based on the embodiment in the utility model; Those of ordinary skills belong to the scope that the utility model is protected not making all embodiment that obtained under the creative work prerequisite.
Present embodiment, with reference to Fig. 1 Fig. 2 Fig. 3, described combination sealing up screw through walls; Be the split combining structure, comprise getting in the shear wall fully and fullly in the centre position being welded with the inner screw 1 of sealing iron sheet 3 and passing plank sheathing and the fixing external screw rod 2 of plank sheathing; Sealing iron sheet 3 is a galvanized iron sheet in the middle of the said inner screw 1, and said inner screw 1 all is welded with fixedly hex nut 5 near the outer two ends of wall, and said fixedly hex nut 5 outsides are welded with the zinc-plated location of template iron plate 4; Adopt zinc-plating material can play anti-oxidation effect, can improve the iron sheet quality, thereby improve stagnant water effect; And can improve service life and the service property (quality) of inner screw 1 in mast, 3 on said location iron sheet 4 and sealing iron sheet form two antiprimings, can more effectively improve stagnant water effect; Improve the engineering total quality, the corresponding fixedly hex nut 5 of said location iron sheet 4 central points, said external screw rod 2 have additional steel pipe mountain type card 6 when fixing plank sheathing; Said steel pipe mountain type card 6 centre bores pass external screw rod 2 and in conjunction with the steel pipe of two horizontal positioned fixing plank sheathing together, and fasten with movable hex nut lock 7, and steel pipe mountain type card is designed to the hook arc shape in two ends about in the of 6; And two inboard centers are provided with pressure arc 8 in up and down, and the said interior arc 8 of pressing is used for pressing the firm steel pipe of deciding two horizontal positioned, can effectively strengthen the fixed effect to the plank sheathing installation; Improve stability; Make the plank sheathing convenient disassembly, the agents enhance overall construction quality reduces plank sheathing and in unloading process, damages body of wall.
Installation process: novel sealing up screw is the split combining structure, and construction sequence can simply and in an orderly manner make up in the process of installing, and reverses the hexagonal screw rod 9 and 1 stable connection of inner screw of external screw rod 2 outer ends with spanner; Install wooden form at body of wall, and two steel pipes of horizontal positioned, at last with the fixing steel pipe and tighten fixing of steel pipe mountain type card 6 with traveling nut 7; Reach firm in structure; Easy to operate, can support without cement, spacer, material is saved in more convenient construction; Unloading process: novel sealing up screw is dismantled wall external screw rod 2 earlier in unloading process, and external screw rod reverses hexagonal screw rod 9 easy removal through fixedly hex nut 5 is continuous with pulling within the walls; This moment, template did not have any resistance; So can easy removal, because of simple to operate time saving and energy saving, template zero loss; Result of use: novel sealing up screw does not need gas cutting fully, and it is pollution-free not have discharging, wall leveling, and unloading process does not have damage, is beneficial to construction in later period; Points for attention: should follow operating sequence in the installation process, the hold-down nut 5 that two ends external screw rod 2 is connected with middle inner screw in the installation process must be screwed.

Claims (6)

1.穿墙组合止水螺杆,为分体组合结构,包括在中间位置饱满焊接有止水铁皮的内螺杆,和穿过木模板并固定木模板的外螺杆,其特征在于:所述内螺杆中间止水铁皮为镀锌铁皮,所述内螺杆接近墙外两端均焊接有固定六角螺母,所述固定六角螺母外侧焊接有模板镀锌定位铁片,所述定位铁皮与止水铁皮间形成双止水装置,所述定位铁皮中心点对应固定六角螺母螺孔,所述外螺杆在固定木模板时增设有钢管山型卡,所述钢管山型卡中心孔穿过外螺杆并结合两根水平放置的钢管一起固定木模板,并用活动六角螺母锁紧固定。 1. The combined water-stop screw through the wall is a split composite structure, including an inner screw fully welded with a water-stop iron sheet in the middle, and an outer screw passing through and fixing the wooden formwork, characterized in that: the inner screw The middle water-stop iron sheet is galvanized iron sheet, fixed hex nuts are welded at both ends of the inner screw close to the wall, and the outer side of the fixed hex nut is welded with a template galvanized positioning iron sheet, forming a double The water stop device, the center point of the positioning iron sheet corresponds to the screw hole of the fixed hexagonal nut, and the outer screw rod is additionally provided with a steel pipe mountain clip when fixing the wooden formwork, and the center hole of the steel pipe mountain clip passes through the outer screw rod and combines two horizontal The placed steel pipes fix the wooden formwork together, and lock and fix it with movable hex nuts. 2.根据权利要求1所述穿墙组合止水螺杆,其特征在于:所述外螺杆杆身均匀布满螺纹,且螺纹为紧凑型防水螺纹。 2. The wall-penetrating combined water-stop screw according to claim 1, characterized in that: the body of the outer screw is evenly covered with threads, and the threads are compact waterproof threads. 3.根据权利要求1所述穿墙组合止水螺杆,其特征在于:所述外螺杆最外端设置有5厘米长的六角螺杆。 3. The wall-penetrating combined water-stop screw according to claim 1, characterized in that: the outermost end of the outer screw is provided with a 5 cm long hexagonal screw. 4.根据权利要求1所述穿墙组合止水螺杆,其特征在于:所述钢管山型卡上下两端设计为钩弧形状,并在上下两内侧中心位置上设置有一个内压弧。 4. The wall-penetrating combined water-stop screw according to claim 1, characterized in that: the upper and lower ends of the mountain-shaped clamp of the steel pipe are designed in the shape of hook arcs, and an internal pressure arc is arranged at the center of the upper and lower inner sides. 5.根据权利要求1所述穿墙组合止水螺杆,其特征在于:所述内螺杆与外螺杆螺纹联接处增设有金属垫片。 5. The wall-penetrating combined water-stop screw according to claim 1, wherein a metal gasket is additionally provided at the joint of the inner screw and the outer screw. 6.根据权利要求1所述穿墙组合止水螺杆,其特征在于:所述内螺杆跟外螺杆为圆截面螺杆。 6. The wall-penetrating combined water-stop screw according to claim 1, wherein the inner screw and the outer screw are circular cross-section screws.
CN2011205560622U 2011-12-28 2011-12-28 Through the wall combined water-stop screw Expired - Fee Related CN202370251U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205560622U CN202370251U (en) 2011-12-28 2011-12-28 Through the wall combined water-stop screw

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205560622U CN202370251U (en) 2011-12-28 2011-12-28 Through the wall combined water-stop screw

Publications (1)

Publication Number Publication Date
CN202370251U true CN202370251U (en) 2012-08-08

Family

ID=46593958

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205560622U Expired - Fee Related CN202370251U (en) 2011-12-28 2011-12-28 Through the wall combined water-stop screw

Country Status (1)

Country Link
CN (1) CN202370251U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103061505A (en) * 2013-01-14 2013-04-24 河北省第四建筑工程公司 Multifunctional split bolt and application thereof
CN103089009A (en) * 2013-02-05 2013-05-08 中国十七冶集团有限公司 Middle-buried type rubber waterstop fixing split bolt and use method thereof
CN105421769A (en) * 2015-12-14 2016-03-23 国网北京市电力公司 Mold support auxiliary tool

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103061505A (en) * 2013-01-14 2013-04-24 河北省第四建筑工程公司 Multifunctional split bolt and application thereof
CN103061505B (en) * 2013-01-14 2015-07-29 河北省第四建筑工程有限公司 A kind of multi-functional split bolt and uses thereof
CN103089009A (en) * 2013-02-05 2013-05-08 中国十七冶集团有限公司 Middle-buried type rubber waterstop fixing split bolt and use method thereof
CN103089009B (en) * 2013-02-05 2015-05-20 中国十七冶集团有限公司 Middle-buried type rubber waterstop fixing split bolt and use method thereof
CN105421769A (en) * 2015-12-14 2016-03-23 国网北京市电力公司 Mold support auxiliary tool

Similar Documents

Publication Publication Date Title
CN106381926A (en) Detachable assembly type splicing node for reinforced concrete columns
CN204163196U (en) A kind of embedded concrete-filled steel square tubular column in T-steel top flange and steel beam connecting joint
CN202370251U (en) Through the wall combined water-stop screw
CN206245471U (en) A kind of dismountable assembled steel reinforced concrete column splices node with post
CN208717762U (en) A kind of assembling type steel corrugated plating Combined concrete arch culvert
CN101498173A (en) Anti-floating construction method for cast-in-place concrete hollow building roof
CN203546912U (en) Penetrating rib type node of channel steel connected rectangular concrete filled steel tubular column and steel girder
CN205063315U (en) Outer wall scaffold connecting piece
CN203947774U (en) A kind of building concrete outer wall template adds fixing bolt
CN103225396B (en) Beam frame type construction template system
CN108612404A (en) Building with dust-proof environmental-protection function applies ancillary equipment
CN201539098U (en) Detachable and convenient support device for steel structure building formwork
CN208440996U (en) A kind of novel inlet pipe
CN206204992U (en) Detachable waterproof node structure between prefabricated comprehensive pipe gallery joints
CN206245709U (en) A kind of outrigger wall-connecting piece
CN212200908U (en) A prefabricated concrete mixing station silo partition wall
CN205591579U (en) Adopt girder steel to consolidate aerated concrete roof boarding structure
CN204282609U (en) A kind of separate type precast truss frame floor support plate
CN204238830U (en) A kind of gate, assembly type building site
CN203729510U (en) Thermal insulation gutter board capable of combining steels and concrete
CN210032098U (en) Steel structure horizontal beam
CN210032130U (en) Assembly type structure large-span steel structure beam and concrete column rigid connection mechanism
CN203238971U (en) Combination and adjustment device of truss end portions
CN209244293U (en) Temporary fixing device for movable arched rod
CN202299432U (en) Waterproof concrete shear wall tool type water-stopping split bolt

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120808

Termination date: 20141228

EXPY Termination of patent right or utility model