CN202248389U - Connection structure of lightweight wallboard - Google Patents
Connection structure of lightweight wallboard Download PDFInfo
- Publication number
- CN202248389U CN202248389U CN2011203742024U CN201120374202U CN202248389U CN 202248389 U CN202248389 U CN 202248389U CN 2011203742024 U CN2011203742024 U CN 2011203742024U CN 201120374202 U CN201120374202 U CN 201120374202U CN 202248389 U CN202248389 U CN 202248389U
- Authority
- CN
- China
- Prior art keywords
- wallboard
- groove
- tenon
- width
- connection structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Finishing Walls (AREA)
Abstract
A connection structure of a lightweight wallboard is obtained through mortising a wallboard (4) with a groove and a wallboard (5) with a tenon. According to the connection structure of the lightweight wallboard, the width a of wallboard tenon (2) is equipped to equal with or smaller than the width A of the groove end of wallboard groove (1); the length b of the wallboard tenon (2) is equipped to smaller than the groove depth B of the wallboard groove (1); dovetail inclination of a dovetail structure of the wallboard tenon (2) is consistent with concave surface inclination of the wallboard groove (1); a space c is provided between the top end of the wallboard tenon (2) and the bottom of the wallboard groove (1); and the space for mortising the wallboard tenon (2) and the wallboard groove (1) is internally provided with solidification type filling material (3). The connection structure of the lightweight wallboard is advantageous in that: the tenon and groove of the wallboard can facilitate splicing; and a splicing seam crack problem of the wallboard is settled.
Description
Technical field
The utility model relates to the wall board structure technical field, relates in particular to the mutual syndeton of Light trabs.
Background technology
In the building partition engineering; The Light trabs of producing according to national standard has lightweight, thin body, intensity height, shock resistance, heat insulation, sound insulation, fire prevention, waterproof usually, is prone to cut, fluting, environmental protection, the incomparable comprehensive advantage of high other materials for walls of efficiency of construction arbitrarily;, applied rapidly progressively by people's understanding.
Connection between the Light trabs adopts tongue and groove to splice usually, and seam crossing uses the wallboard cementitious materials.For ease of installing, common tongue and groove adopts trapezoidal or semicircular structure closely cooperates.Trapezoidal or semicircle tongue and groove connection mode can retrain the wall surface levelling that wallboard constitutes, and wallboard itself expands with heat and contract with cold or reason such as vibrations causes the splicing seams cracking but be difficult to retrain.It is present Light trabs installation common quality defects encountered that crackle appears in the Light trabs splicing seams, also is the problem of engineering circle headache.
Summary of the invention
The purpose of the utility model provides a kind of Light trabs syndeton for the defective that overcomes above-mentioned prior art existence just.
The purpose of the utility model realizes through following technical scheme.
A kind of Light trabs syndeton; Form by the wallboard of band groove and the wallboard joggle of band tenon; The tenon width a of the utility model wallboard tenon is set to be equal to or less than the groove end width A of wallboard groove, and the tenon length b of wallboard tenon is set to the depth of groove B less than the wallboard groove; The dovetail gradient of said wallboard tenon swallowtail-shaped structure should be consistent with the concave surface gradient of wallboard groove, and the bottom on the top of wallboard tenon apart from the wallboard groove is provided with a spacing c; In the spacing of wallboard tenon and wallboard groove joggle, be provided with and solidify the formula packing material.
The beneficial effect of the utility model is; Through changing the interconnective tongue and groove structure of Light trabs; Groove is made into the section of Bottle cap connected with bottle shape big in young; Tenon is made into the section of swallowtail shape, guarantees that the width on tenon swallowtail-shaped structure top is big or small consistent or smaller with the width of slot opening, thereby can guarantee that the tenon of wallboard and groove can conveniently splice; Solidify the cementitious material that formula is filled through perfusion in groove; After solidifying, form ungulate inlay spacing; Utilize the closely knit formed rigid structures of groove that is filled in Bottle cap connected with bottle shape big in young of ungulate inlay pitch space parcel swallow-tail form tenon and shoe-shaped inlay, thereby overcome the cracking problem of wallboard splicing seams.
Description of drawings
Fig. 1 is the wallboard concaveconvex structure sketch map of the utility model;
Fig. 2 is the wallboard mortise structure sketch map of the utility model.
The specific embodiment
Like Fig. 1; Shown in Figure 2; A kind of Light trabs syndeton; Formed by the wallboard 4 of band groove and wallboard 5 joggles of band tenon, the tenon width a of the utility model wallboard tenon 2 is set to be equal to or less than the groove end width A of wallboard groove 1, and the tenon length b of wallboard tenon 2 is set to the depth of groove B less than wallboard groove 1; The dovetail gradient of said wallboard tenon 2 swallowtail-shaped structures should be consistent with the concave surface gradient of wallboard groove 1, and the bottom on the top of wallboard tenon 2 apart from wallboard groove 1 is provided with a spacing c; In the spacing of wallboard tenon 2 and wallboard groove 1 joggle, be provided with and solidify formula packing material 3.
The utility model can be according to wallboard thickness, choose reasonable tenon and groove sectional dimension.According to tenon and the groove sectional dimension selected, can when wallboard manufacture, adopt mould or after the wallboard manufacture completion, carry out craft or the automatic processing and fabricating of machine goes out tenon and groove finished product with cutting tool.After tenon and groove complete, can be before tenon and groove splicing in groove an amount of semi-fluid cementitious material of perfusion, the extruding force that embeds the groove generation through tenon solidify to form ungulate inlay, thereby finally accomplishes the utility model syndeton; Also can be with behind the tenon of wallboard and the groove splicing location, solidify the formula packing material at an end filler for fluid of splicing seams, solidify the back and form ungulate inlay, thereby finally accomplish the utility model syndeton.
The described a kind of Light trabs syndeton of the utility model is made up of wallboard groove and wallboard tenon, it is characterized in that, forms the style of the shoe inlay that prevents generation slit, tongue and groove joint portion by cementitious material to solidify between said wallboard groove and the wallboard tenon.Require: the wallboard groove be young in big Bottle cap connected with bottle cross-section structure; The wallboard tenon is a swallowtail-shaped structure, and the width on structure top is consistent or smaller with the A/F of wallboard groove, and the wallboard tenon can embed in the wallboard groove easily when guaranteeing connection; The height of wallboard tenon is consistent or smaller with wallboard groove bevel altitude, and the dovetail gradient of wallboard tenon swallowtail-shaped structure should be consistent with wallboard groove inclined-plane gradient, and the shoe-shaped inlay limit wall thickness that the cementitious material to solidify that pours into when guaranteeing connection forms is consistent; There is a distance on the top of wallboard tenon apart from the bottom of wallboard groove, and certain bonding thickness and intensity are arranged at the bottom of the ungulate inlay that the cementitious material to solidify that pours into when guaranteeing connection forms.
Concrete fabrication and processing can be according to following method:
Make wallboard tenon and groove: according to wallboard thickness, the dovetail top width of choose reasonable tenon and tenon height; Guarantee that the slot opening width is consistent or smaller with the dovetail top width and the tenon height of tenon with the groove bevel altitude; There is a distance on the top of assurance tenon apart from the bottom of wallboard groove.According to tenon and the groove sectional dimension of design, can when wallboard manufacture, adopt mould or after wallboard manufacture completion, carry out craft or the automatic processing and fabricating of machine goes out tenon and groove finished product with cutting tool.
Make ungulate inlay: can before tenon and groove splicing, in groove, pour into an amount of semi-fluid cementitious material, the extruding force that embeds the groove generation through tenon solidify to form ungulate inlay; Also can in an end filler for fluid cementitious material of splicing seams, solidify the back and form ungulate inlay behind the tenon of wallboard and the groove splicing location.
Claims (1)
1. Light trabs syndeton; Form by the wallboard (4) of band groove and wallboard (5) joggle of band tenon; It is characterized in that; The tenon width a of wallboard tenon (2) is set to be equal to or less than the groove end width A of wallboard groove (1), and the tenon length b of wallboard tenon (2) is set to the depth of groove B less than wallboard groove (1); The dovetail gradient of said wallboard tenon (2) swallowtail-shaped structure should be consistent with the concave surface gradient of wallboard groove (1), and the bottom on the top of wallboard tenon (2) apart from wallboard groove (1) is provided with a spacing c; In the spacing of wallboard tenon (2) and wallboard groove (1) joggle, be provided with and solidify formula packing material (3).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011203742024U CN202248389U (en) | 2011-09-29 | 2011-09-29 | Connection structure of lightweight wallboard |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011203742024U CN202248389U (en) | 2011-09-29 | 2011-09-29 | Connection structure of lightweight wallboard |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202248389U true CN202248389U (en) | 2012-05-30 |
Family
ID=46109651
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011203742024U Expired - Fee Related CN202248389U (en) | 2011-09-29 | 2011-09-29 | Connection structure of lightweight wallboard |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202248389U (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103174311A (en) * | 2013-03-08 | 2013-06-26 | 王中好 | Flat plate component connection structure of retractable garage |
CN103696491A (en) * | 2014-01-02 | 2014-04-02 | 黄军海 | Novel mounting structure of building and house using mounting structure |
CN103806440A (en) * | 2014-03-05 | 2014-05-21 | 中国建筑股份有限公司 | Assembled plug-in-connection-type self-clamped hollow fabricated underground diaphragm wall and construction method thereof |
CN106592859A (en) * | 2016-12-13 | 2017-04-26 | 山东隆和节能科技股份有限公司 | Interior partition board and construction method |
WO2018032824A1 (en) * | 2016-08-15 | 2018-02-22 | 宣中光 | Connectable wall |
CN109297169A (en) * | 2018-10-29 | 2019-02-01 | 浙江汇隆空调设备有限公司 | Coil pipe of air-conditioner blower grid |
CN109667351A (en) * | 2019-01-16 | 2019-04-23 | 中南大学 | Assembled architecture prefabricated panel horizontal joint mud jacking Alveolus type waterproof connecting structure |
WO2020238152A1 (en) * | 2019-05-24 | 2020-12-03 | 蓬莱正泰木业有限公司 | Panel insert-connection edge structure and insert-connection component and assembly method |
CN112761274A (en) * | 2019-10-21 | 2021-05-07 | 广东松本绿色新材股份有限公司 | Special component for integrated composite wall, manufacturing process thereof and assembled wall system thereof |
CN113137004A (en) * | 2021-03-31 | 2021-07-20 | 恒尊集团有限公司 | Quick assembly type building wallboard |
CN115573233A (en) * | 2022-09-20 | 2023-01-06 | 青岛伟力环保建材有限公司 | A pavement repair structure and construction method using rubber-modified asphalt |
-
2011
- 2011-09-29 CN CN2011203742024U patent/CN202248389U/en not_active Expired - Fee Related
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103174311A (en) * | 2013-03-08 | 2013-06-26 | 王中好 | Flat plate component connection structure of retractable garage |
CN103174311B (en) * | 2013-03-08 | 2015-04-01 | 王中好 | Flat plate component connection structure of retractable garage |
CN103696491A (en) * | 2014-01-02 | 2014-04-02 | 黄军海 | Novel mounting structure of building and house using mounting structure |
CN103696491B (en) * | 2014-01-02 | 2016-02-17 | 黄军海 | A kind of mounting structure of building and apply the house of this mounting structure |
CN103806440A (en) * | 2014-03-05 | 2014-05-21 | 中国建筑股份有限公司 | Assembled plug-in-connection-type self-clamped hollow fabricated underground diaphragm wall and construction method thereof |
CN103806440B (en) * | 2014-03-05 | 2016-05-25 | 中国建筑股份有限公司 | One can be assembled and be inserted self-clamping type precast hollow diaphram wall and construction method thereof |
WO2018032824A1 (en) * | 2016-08-15 | 2018-02-22 | 宣中光 | Connectable wall |
CN106592859A (en) * | 2016-12-13 | 2017-04-26 | 山东隆和节能科技股份有限公司 | Interior partition board and construction method |
CN109297169A (en) * | 2018-10-29 | 2019-02-01 | 浙江汇隆空调设备有限公司 | Coil pipe of air-conditioner blower grid |
CN109297169B (en) * | 2018-10-29 | 2019-09-27 | 浙江汇隆空调设备有限公司 | Coil pipe of air-conditioner blower grid |
CN109667351A (en) * | 2019-01-16 | 2019-04-23 | 中南大学 | Assembled architecture prefabricated panel horizontal joint mud jacking Alveolus type waterproof connecting structure |
CN109667351B (en) * | 2019-01-16 | 2024-01-30 | 中南大学 | Tooth socket type waterproof connecting structure of prefabricated wallboard horizontal joint grouting method of assembled building |
WO2020238152A1 (en) * | 2019-05-24 | 2020-12-03 | 蓬莱正泰木业有限公司 | Panel insert-connection edge structure and insert-connection component and assembly method |
CN112761274A (en) * | 2019-10-21 | 2021-05-07 | 广东松本绿色新材股份有限公司 | Special component for integrated composite wall, manufacturing process thereof and assembled wall system thereof |
CN113137004A (en) * | 2021-03-31 | 2021-07-20 | 恒尊集团有限公司 | Quick assembly type building wallboard |
CN115573233A (en) * | 2022-09-20 | 2023-01-06 | 青岛伟力环保建材有限公司 | A pavement repair structure and construction method using rubber-modified asphalt |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202248389U (en) | Connection structure of lightweight wallboard | |
CN207260068U (en) | Ecoscape combines shore protection | |
CN201620509U (en) | Heat insulating block for building | |
CN205116713U (en) | Concrete wall post mould with water and electricity pipeline provided groove fetal membrane | |
CN102691277B (en) | Special-shaped block as well as wall and earth-retaining slope-protecting structures built thereby | |
CN106223209B (en) | A kind of buried anchor box and construction method of post-tensioned method prestressed concrete box beam construction | |
CN202247903U (en) | Weak stratum open cut tunnel with deformation joint having shear resistance function | |
CN207260071U (en) | Universal prestressing force ecoscape combines shore protection | |
CN203905326U (en) | Construction form for construction of roof exhaust pipe piers | |
CN206571004U (en) | A kind of nothing is built by laying bricks or stones, nothing is plastered, complete cast-in-place building filling wall construction | |
CN203383245U (en) | Cement board waterproof protective layer construction structure | |
CN201420338Y (en) | Light composite wallboard | |
CN206173983U (en) | Building foundation water -blocking weir | |
CN216331152U (en) | Plastic stone rockery formed by splicing cement rock slices | |
CN205276317U (en) | Utility tunnel's steel construction | |
CN205171386U (en) | Interim mound in aquatic suitable for bridge erection | |
CN202626939U (en) | Specially-shaped building block and basic building block matched with specially-shaped building block | |
CN107988994A (en) | Universal prestressing force ecoscape combines shore protection | |
CN103266712B (en) | A kind of wall-building brick | |
CN102286958A (en) | Method for excavating out face rockfill dam toe slab concrete with quality defects in construction period | |
CN207998831U (en) | A kind of river course slope protection masonry and river course slope protection | |
CN207582743U (en) | Light and thin type prefabricated section | |
CN201850537U (en) | Anti-cracking normal state concrete gravity dam | |
CN204781428U (en) | Xin qiang and old wall connecting piece | |
CN205935372U (en) | Straight board cavity of wall body module |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120530 Termination date: 20180929 |