CN202245072U - Chain conveyor for opening and closing concrete pipe piles - Google Patents
Chain conveyor for opening and closing concrete pipe piles Download PDFInfo
- Publication number
- CN202245072U CN202245072U CN2011203518921U CN201120351892U CN202245072U CN 202245072 U CN202245072 U CN 202245072U CN 2011203518921 U CN2011203518921 U CN 2011203518921U CN 201120351892 U CN201120351892 U CN 201120351892U CN 202245072 U CN202245072 U CN 202245072U
- Authority
- CN
- China
- Prior art keywords
- chain
- chain conveyor
- concrete pipe
- pipe pile
- mould
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
Abstract
The utility model relates to a concrete pipe pile opens, compound die chain conveyer, including the frame and establish the chain conveyor in the frame, its innovation point lies in: a plurality of brackets which are uniformly distributed along the chain conveyor belt are fixed on the chain conveyor belt, and rollers are arranged at two ends of each bracket; and guide rails for supporting rollers are arranged on two sides of the upper-layer chain of the chain conveyor belt. After feeding, the concrete pipe pile mould is moved to the chain conveyer belt by the manipulator on the crane, the concrete pipe pile mould is supported by the bracket and then is moved to the tensioning area by the chain conveyer belt, and in the moving process of the concrete pipe pile mould, bolts of the mould are locked manually by an air wrench. When the bolts for locking the bottom die and the cover die need to be loosened between the sheet placing process and the die stripping process, the moving step and the bolt locking or loosening step can be synchronously carried out by adopting the same method, so that the time of the whole process is shortened, and the working efficiency is improved.
Description
Technical field
The utility model relates to a kind of chain converyer, particularly a kind of concrete tubular pile opening and closing template strand bar conveyer.
Background technology
Along with the development of concrete technology, the technology of concrete tubular pile also reaches its maturity, and except that being applied to industry, civil construction, also is widely used in each field such as bridge, harbour, railway or hydraulic engineering.
When carrying out the production of concrete tubular pile, need through feeding, stretch-draw, centrifugal, normal temperature is steam-cured, put open, master operations such as the demoulding and high-pressure steaming and cultivating.After feeding process, need bed die after the concrete tubular pile closure and cover mold be carried out bolt locking, traditional method is passed through artificial lock bolt in the original place after adopting feeding, hangs mobile through row again.Putting between Zhang Gong's preface and the stripping process, need unclamp the bolt of locking bed die and cover mold, bolt was unclamped in manual work after traditional method adopted and puts Zhang Gong's preface, lifted up into row through row again and moved.The locking of bed die and cover mold, unclamp and move and separately to carry out, increased whole activity time, inefficiency.
Summary of the invention
The technical matters that the utility model will solve provides a kind of concrete tubular pile opening and closing template strand bar conveyer that improves process efficiency.
For solving the problems of the technologies described above; The technical scheme of the utility model is: a kind of concrete tubular pile opening and closing template strand bar conveyer; Comprise frame and be located at the chain conveyor on the frame; Its innovative point is: be fixed with somely along chain conveyor well-distributed carriage on the said chain conveyor, the two ends of said carriage are equipped with roller; The chain both sides, upper strata of said chain conveyor are provided with the guide rail of one section supporting rollern.
Further, prevent down around guide rail on the upper strata that is provided with one section supporting chain below the upper strata chain of said chain conveyor.
Further, the lower floor that is provided with one section supporting rollern below lower floor's chain of said chain conveyor prevents down around guide rail.
Further, said carriage upper surface is an arc.
The advantage of the utility model is: after the feeding; The manipulator that row hangs on moves to chain conveyor with concrete pipe pile mould; After holding concrete pipe pile mould by carriage; Through chain conveyor it is moved to stretched zone, in the process that concrete pipe pile mould moves, through the gas spanner bolt of mould is locked by manual work.Putting between Zhang Gong's preface and the stripping process, in the time of need unclamping the bolt of locking bed die and cover mold, can adopt identical method, will move step and bolt and lock or unclamp step and carry out synchronously, shortening the time of whole operation, improving work efficiency.
It is anti-down around guide rail that the upper strata chain below of chain conveyor is provided with the upper strata of one section supporting chain, and it is anti-down around guide rail that lower floor chain below is provided with the lower floor of one section supporting rollern, can prevent chain following around, guarantee the more stable work of chain.
Description of drawings
Fig. 1 is the utility model concrete tubular pile opening and closing template strand bar conveyor construction scheme drawing.
Fig. 2 is along A-A line cutaway view among Fig. 1.
The specific embodiment
Like Fig. 1, shown in 2, comprise that frame 1, chain 2, drive sprocket 3, motor 9, carriage 4, roller 5, guide rail 6, upper strata are anti-anti-down around guide rail 8 around guide rail 7, lower floor down.
Above-mentioned frame 1 is provided with chain conveyor, and this chain conveyor mainly contains a pair of symmetrically arranged chain 2, the drive sprocket 3 of chain drive-belt 2, and drive sprocket 3 is connected with motor 9 through transmission device.
Be fixed with on the chain 2 of chain conveyor that some the two ends of carriage 4 are equipped with roller 5 along chain conveyor well-distributed carriage 4, the upper surface of carriage 4 is an arc.The running wheel gap length of the corresponding concrete pipe pile mould of the spacing distance of each carriage 4 makes concrete pipe pile mould be placed on 4 last times of carriage, and each running wheel of concrete pipe pile mould all drops on the carriage 4.
The chain both sides, upper strata of chain conveyor are provided with the guide rail 6 of one section supporting rollern 5, can support the carriage 4 that is positioned on the chain of upper strata.
The chain below, upper strata of chain conveyor is provided with the upper strata of one section supporting chain 2 and prevents down around guide rail 7.The lower floor that the lower floor chain below of chain conveyor is provided with one section supporting rollern 5 prevents down around guide rail 8.
During use; Concrete pipe pile mould hangs manipulator by row and places on the chain conveyor; Be positioned at carriage 4 on the chain of upper strata and hold the running wheel of concrete pipe pile mould; Realize moving of concrete pipe pile mould by the operation of motor 9 chain drive-belt load-transfer devices, in moving process, use the gas spanner that the concrete pipe pile mould that moves is carried out bolt locking by operating personal.
Claims (4)
1. concrete tubular pile opening and closing template strand bar conveyer; Comprise frame and be located at the chain conveyor on the frame; It is characterized in that: be fixed with somely along chain conveyor well-distributed carriage on the said chain conveyor, the two ends of said carriage are equipped with roller; The chain both sides, upper strata of said chain conveyor are provided with the guide rail of one section supporting rollern.
2. concrete tubular pile opening and closing template strand bar conveyer according to claim 1 is characterized in that: the chain below, upper strata of said chain conveyor is provided with the upper strata of one section supporting chain and prevents down around guide rail.
3. concrete tubular pile opening and closing template strand bar conveyer according to claim 1 is characterized in that: the lower floor that the lower floor chain below of said chain conveyor is provided with one section supporting rollern prevents down around guide rail.
4. concrete tubular pile opening and closing template strand bar conveyer according to claim 1, it is characterized in that: said carriage upper surface is an arc.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011203518921U CN202245072U (en) | 2011-09-20 | 2011-09-20 | Chain conveyor for opening and closing concrete pipe piles |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011203518921U CN202245072U (en) | 2011-09-20 | 2011-09-20 | Chain conveyor for opening and closing concrete pipe piles |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202245072U true CN202245072U (en) | 2012-05-30 |
Family
ID=46106349
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011203518921U Expired - Fee Related CN202245072U (en) | 2011-09-20 | 2011-09-20 | Chain conveyor for opening and closing concrete pipe piles |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202245072U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102442521A (en) * | 2011-09-20 | 2012-05-09 | 国鼎(南通)管桩有限公司 | Concrete pipe pile die opening and closing chain conveyor |
CN107226420A (en) * | 2017-06-29 | 2017-10-03 | 嘉兴欣创混凝土制品有限公司 | The cover mold suspender of prefabricated pile |
-
2011
- 2011-09-20 CN CN2011203518921U patent/CN202245072U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102442521A (en) * | 2011-09-20 | 2012-05-09 | 国鼎(南通)管桩有限公司 | Concrete pipe pile die opening and closing chain conveyor |
CN107226420A (en) * | 2017-06-29 | 2017-10-03 | 嘉兴欣创混凝土制品有限公司 | The cover mold suspender of prefabricated pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206872036U (en) | Stacking machine | |
CN102502269B (en) | Stacking method for green bricks and stacking device for green bricks | |
CN202336766U (en) | Double mechanical hand structure on assembly line for producing aluminum tubes and aluminum bars | |
CN206985178U (en) | The palletizing apparatus of stacking machine | |
CN107442595A (en) | A kind of aluminium section bar drawing-in machine jaw automatic charging positioner | |
CN107021344A (en) | A kind of air-entrained concrete building block finished product packing production line | |
CN102366918B (en) | Automatic production line for concrete tubular pile | |
CN202245072U (en) | Chain conveyor for opening and closing concrete pipe piles | |
CN102442521A (en) | Concrete pipe pile die opening and closing chain conveyor | |
CN202279529U (en) | Stacking device for green bricks | |
CN202318561U (en) | Automatic production line for concrete pipe piles | |
CN202245074U (en) | Chain type concrete pipe pile mould conveyor | |
RU2008116767A (en) | METHOD OF PROFESSOR KARIMAN UNDERGROUND DEVELOPMENT OF LAYOUT DEPOSITS OF USEFUL FOSSILS WITH EXCHANGE OF THEIR UNITS AND TRANSPORTATION BY EXCALATORS | |
CN209635759U (en) | A kind of reinforcing bar cage hoisting machine | |
CN208247156U (en) | Track plates production service sleeve Zai Zhi robot | |
CN108789809B (en) | Centrifugal concrete pile production line | |
CN206857668U (en) | A kind of air-entrained concrete building block finished product packing production line | |
CN205367573U (en) | Elevator | |
CN209319994U (en) | A centrifugal concrete pile production line | |
CN204528613U (en) | The automatic blank separating machine of a kind of porous baked brick | |
CN103395117A (en) | Concrete elastic support stripper machine | |
CN203485291U (en) | Stripper machine for concrete elastic support | |
CN202805406U (en) | Improved production line of centrifugal pile | |
CN101274678B (en) | Novel hexagon-shaping device of bar or pipe hexagon-shaping equipment | |
CN208563132U (en) | A kind of U-shaped aqueduct body arc internal model carriage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120530 Termination date: 20180920 |
|
CF01 | Termination of patent right due to non-payment of annual fee |