CN202156792U - Ship loading device suitable for various water levels - Google Patents
Ship loading device suitable for various water levels Download PDFInfo
- Publication number
- CN202156792U CN202156792U CN2011202419187U CN201120241918U CN202156792U CN 202156792 U CN202156792 U CN 202156792U CN 2011202419187 U CN2011202419187 U CN 2011202419187U CN 201120241918 U CN201120241918 U CN 201120241918U CN 202156792 U CN202156792 U CN 202156792U
- Authority
- CN
- China
- Prior art keywords
- chute
- fixed
- support frame
- dolly
- various water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 16
- 239000000463 material Substances 0.000 claims abstract description 16
- 238000005096 rolling process Methods 0.000 description 6
- 239000002184 metal Substances 0.000 description 3
- 239000013590 bulk material Substances 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000000295 complement effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Landscapes
- Ship Loading And Unloading (AREA)
Abstract
The utility model discloses a shipping device suitable for various water level heights, which comprises a supporting frame, wherein at least two upper and lower layers of receiving funnels are arranged on the supporting frame, the lower opening of each receiving funnel is connected with a fixed chute towards the side surface, and the fixed chute is connected with a rotating chute; a lower chute communicated with each other is arranged between the upper receiving hopper and the lower receiving hopper, a track in the vertical direction is arranged on the side edge of the support frame, a trolley is matched with the track, and the trolley is connected with a trolley winch on the support frame through a rope; the trolley is hinged with one end of a movable swinging chute, and the movable swinging chute is connected with a chute winch on the supporting frame through a rope; the movable rotating chute is matched with the rotating chute; a rotary valve is arranged between the fixed chute and the lower chute. Compared with the prior art, the device has the advantages of convenient shipment, capability of randomly changing the height and the angle of the chute for conveying materials, time and labor saving in adjustment and suitability for various water level heights.
Description
Technical field
The utility model relates to a kind of shipment device of bulk material, particularly a kind of shipment device that is suitable for multiple elevation of water surface.
Background technology
It highly also changes thereupon with the variation of elevation of water surface to be positioned at freighter waterborne, and the load transfer devices that use when load for bulk material are adjusted the load transfer device height and made it to be complementary with ship storehouse height and bother very much at present, waste time and energy.
Summary of the invention
The purpose of the utility model provides a kind of tube height that slips can arbitrarily adjust, load onto ship the time saving and energy saving shipment device that is suitable for multiple elevation of water surface.
The shipment device that is suitable for multiple elevation of water surface of the utility model; Support frame is arranged; On support frame, be provided with the two-layer receiving cone of at least two upper and lower settings, the end opening place of each receiving cone all is connected to sideways fixed chute, and fixed chute is connected with swivel chute; The following chute that is interconnected is arranged between the neighbouring receiving cone, and the track of vertical direction is furnished with dolly mutually with track about the side of bracing frame has, and dolly joins through the dolly winch on rope and the bracing frame; One end of dolly and mobile oscillating chute is hinged, moves oscillating chute and joins through the chute winch on rope and the bracing frame; Moving swivel chute and described swivel chute matches; Between fixed chute and following chute, be provided with changeover valve.
Be connected to the oil cylinder that the driven in rotation chute rotates between described fixed chute and the swivel chute.
The shipment device that is suitable for multiple elevation of water surface of the utility model, have compared with prior art that shipment is convenient, the slide tube of convey materials arbitrarily the conversion height, adjust time saving and energy saving, as to be suitable for multiple elevation of water surface advantage.
Description of drawings
Fig. 1 is the structural representation of the utility model specific embodiment.
The specific embodiment
As shown in Figure 1: 2 is support frame, can adopt ferro-concrete to build moulding, and forms multiple-structure, is provided with the walking stair between the adjacent layer.
The superiors at support frame 2 are fixed with first receiving cone, 9, the first receiving cones 9 for the metal sheet making, through bolt.The exit is connected to first time chute 17 and first fixed chute, 11, the first fixed chutes, 11 lower ends to laterally inclined below first receiving cone 9.15 is first swivel chute, is rotationally connected through first rotating shaft 16 between an end of first swivel chute 15 and the termination of first fixed chute 11, between first swivel chute 15 and first fixed chute 11, first oil cylinder 13 is installed.During 13 actions of first oil cylinder, first swivel chute 15 can rotate with respect to first fixed chute 11, promptly forms straight line and is used for the rolling material, may rotate to certain angle during not rolling material.Between first fixed chute 11 and first time chute 17, be provided with first changeover valve 10.
On the second layer above the support frame 2, be fixed with second receiving cone, 6, the second receiving cones 6 and make, through bolt for metal sheet.The exit is connected to second time chute 4 and second fixed chute, 5, the second fixed chutes, 5 lower ends to laterally inclined below second receiving cone 6.19 is second swivel chute, is rotationally connected through second rotating shaft 20 between an end of second swivel chute 19 and the termination of second fixed chute 5, between second swivel chute 19 and second fixed chute 5, second oil cylinder 3 is installed.During 3 actions of second oil cylinder, second swivel chute 19 can rotate with respect to second fixed chute 5, promptly forms straight line and is used for the rolling material, may rotate to certain angle during not rolling material.Between second fixed chute 5 and second time chute 4, be provided with second changeover valve 18.Be communicated with between first time chute 17 and second receiving cone 6.
On above the support frame 2 the 3rd layer, be fixed with the 3rd receiving cone 21, the three receiving cones 21 and make, through bolt for metal sheet.Below the 3rd receiving cone 21, be connected to the 3rd laterally inclined fixed chute 23; 22 is the 3rd swivel chute; Be rotationally connected through the 3rd rotating shaft 24 between one end of the 3rd swivel chute 22 and the termination of the 3rd fixed chute 23, between the 3rd swivel chute 22 and the 3rd fixed chute 23, the 3rd oil cylinder 1 be installed.During 1 action of the 3rd oil cylinder, the 3rd swivel chute 22 can rotate with respect to the 3rd fixed chute 23, promptly forms straight line and is used for the rolling material, may rotate to certain angle during not rolling material.
Being fixed with vertical track 27,26 at the side of support frame 2 is dolly, road wheel is installed on the dolly 26 and track 27 matches.Dolly winch 7 and dolly fixed pulley 12 are installed above support frame 2, and rope is walked around dolly fixed pulley 12 1 ends and dolly 26 joins, and the other end and dolly winch 7 join, and can drive dolly during 7 work of dolly winch and move up and down along track 27.Dolly 26 is hinged with an end of mobile oscillating chute 25.Chute winch 8 and chute fixed pulley 14 are installed on support frame 2; Rope is walked around chute fixed pulley 14 1 ends and mobile oscillating chute 25 joins; The other end and chute winch 8 join, and can drive during 8 work of chute winch to move oscillating chute 25 with respect to dolly 26 swings.Being installed with the travel switch of installing on travel switch collision block and the dolly 26 at support frame 2 every layer of control position place matches.
First receiving cone, 9 places suitable for reading match with the material conveyer mechanism, and promptly material is in conveyer mechanism is transported to first receiving cone 9.
Working process is following: when water level hanged down ship-loading operation, material fed 10 rotations of first receiving cone, 9, the first changeover valves by conveyer mechanism and closes first fixed chute 11; Material gets in second receiving cone 6 from first time chute 17; Second changeover valve 18 is closed second fixed chute 5, and material gets in the 3rd receiving cone 21 from second time chute 4, gets in the 3rd fixed chute 23 again; This moment the 3rd oil cylinder with the 3rd swivel chute 22 rotate with the 3rd fixed chute 23 in line; And dolly winch 7 work, dolly 26 moves and makes and moves that oscillating chute 25 is suitable for reading to connect with the 3rd swivel chute 22, and the angle of oscillating chute 25 is moved in the 8 work adjustment of chute winch; It is aligned with the ship Hatch Opening mutually, and getting into material in the 3rd fixed chute 23 can be through the 3rd swivel chute 22, move oscillating chute 25 gets into the ship storehouses.When the higher ship-loading operation of water level; Dolly winch 7 and 8 actions of chute winch; Dolly 26 and mobile oscillating chute 25 are upwards carried; The action of first oil cylinder 13 with first swivel chute 15 turn to first fixed chute 11 in line, move that oscillating chute 25 is suitable for reading to join with first swivel chute 15, first changeover valve 10 rotates first receiving cone 9 is communicated with first fixed chute 11; Close chute 17 first time, get into material in first receiving cone 9 through first fixed chute 11, first swivel chute 15, move oscillating chute 25 and get into the ship storehouse of improving with water level.When water level is in the meta ship-loading operation, dolly 26 is moved to intermediate altitude, load onto ship in a manner described.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011202419187U CN202156792U (en) | 2011-07-11 | 2011-07-11 | Ship loading device suitable for various water levels |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011202419187U CN202156792U (en) | 2011-07-11 | 2011-07-11 | Ship loading device suitable for various water levels |
Publications (1)
Publication Number | Publication Date |
---|---|
CN202156792U true CN202156792U (en) | 2012-03-07 |
Family
ID=45764435
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011202419187U Expired - Fee Related CN202156792U (en) | 2011-07-11 | 2011-07-11 | Ship loading device suitable for various water levels |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN202156792U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108008732A (en) * | 2017-11-28 | 2018-05-08 | 海洋石油工程(青岛)有限公司 | The method adjusted and carried is loaded onto ship for large structure trolley |
CN110451296A (en) * | 2019-08-05 | 2019-11-15 | 宜都博美机电设备有限公司 | The high drop in harbour is vertically moved up or down conveying device |
-
2011
- 2011-07-11 CN CN2011202419187U patent/CN202156792U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108008732A (en) * | 2017-11-28 | 2018-05-08 | 海洋石油工程(青岛)有限公司 | The method adjusted and carried is loaded onto ship for large structure trolley |
CN110451296A (en) * | 2019-08-05 | 2019-11-15 | 宜都博美机电设备有限公司 | The high drop in harbour is vertically moved up or down conveying device |
CN110451296B (en) * | 2019-08-05 | 2024-04-16 | 宜都博美机电设备有限公司 | Port high drop vertical lifting conveying device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2018041163A1 (en) | Bucket-wheel stacker reclaimer | |
CN205526237U (en) | Big inclination multi -point discharging chain -bucket elevator | |
WO2021072894A1 (en) | Large-span bulk material conveying system | |
CN103449204B (en) | A kind of bucket continuous ship unloader | |
CN101613022B (en) | Buffer breakage-proof flat bottom silo | |
CN102942066B (en) | Intelligent material stacking trolley | |
CN108557501A (en) | A kind of packaged type horizontal warehouse Bulk Grain binning device systems | |
CN207206773U (en) | a concrete production line | |
CN110697436B (en) | A horizontally rotating folding arm conveyor | |
CN202156792U (en) | Ship loading device suitable for various water levels | |
CN107032142A (en) | Bulk grain ship unloader and operation method thereof | |
CN103538939B (en) | A kind of bulk material is unloaded a ship method and device | |
CN101020541B (en) | High-place tippler | |
CN203345728U (en) | Elevated conveyor belt | |
CN206926070U (en) | A kind of preform production line | |
CN109650091B (en) | A working method of a bulk material conveying system | |
CN206955257U (en) | Bulk grain ship unloader | |
CN208843158U (en) | A kind of finished product material conveyor | |
CN110697435B (en) | Working method of folding arm conveyor | |
CN206255524U (en) | A kind of concrete material sorting unit | |
CN205442085U (en) | Change over to bulk material over to from train railway carriage conveying equipment of container | |
CN205526777U (en) | Grain delivery machine of flexible operation | |
CN210526892U (en) | A rotary lifting and unloading cloth mechanism | |
CN105438712B (en) | A kind of space transmission system for keeping conveying continuation | |
CN208199802U (en) | A kind of packaged type horizontal warehouse Bulk Grain binning device systems |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20120307 Termination date: 20140711 |
|
EXPY | Termination of patent right or utility model |