CN201686953U - Novel wall fence used for road - Google Patents
Novel wall fence used for road Download PDFInfo
- Publication number
- CN201686953U CN201686953U CN2010202130261U CN201020213026U CN201686953U CN 201686953 U CN201686953 U CN 201686953U CN 2010202130261 U CN2010202130261 U CN 2010202130261U CN 201020213026 U CN201020213026 U CN 201020213026U CN 201686953 U CN201686953 U CN 201686953U
- Authority
- CN
- China
- Prior art keywords
- cast
- prefabricated
- layer
- fence
- novel wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 230000002787 reinforcement Effects 0.000 claims abstract description 9
- 238000011065 in-situ storage Methods 0.000 claims description 8
- 239000003292 glue Substances 0.000 claims description 4
- 229920002521 macromolecule Polymers 0.000 claims description 4
- 238000012423 maintenance Methods 0.000 abstract description 3
- 229910000831 Steel Inorganic materials 0.000 abstract description 2
- 238000000034 method Methods 0.000 abstract description 2
- 239000010959 steel Substances 0.000 abstract description 2
- NIXOWILDQLNWCW-UHFFFAOYSA-N Acrylic acid Chemical compound OC(=O)C=C NIXOWILDQLNWCW-UHFFFAOYSA-N 0.000 abstract 1
- 229920002125 Sokalan® Polymers 0.000 abstract 1
- 229960001631 carbomer Drugs 0.000 abstract 1
- 238000007493 shaping process Methods 0.000 abstract 1
- 238000013461 design Methods 0.000 description 7
- 238000010276 construction Methods 0.000 description 5
- 238000012545 processing Methods 0.000 description 4
- 230000003014 reinforcing effect Effects 0.000 description 3
- 230000008901 benefit Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 239000003550 marker Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 239000004570 mortar (masonry) Substances 0.000 description 2
- 238000000465 moulding Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 229920000742 Cotton Polymers 0.000 description 1
- 240000007594 Oryza sativa Species 0.000 description 1
- 235000007164 Oryza sativa Nutrition 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 238000010923 batch production Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000011083 cement mortar Substances 0.000 description 1
- 238000005520 cutting process Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 239000004746 geotextile Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 235000009566 rice Nutrition 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
Images
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model discloses a novel wall fence used for a road, which comprises an inside prefabricated layer and an outside cast-in-place layer that are solidified together, wherein the outside cast-in-place layer is formed by the cast-in-place of a framework of steel reinforcement and concrete; the inside prefabricated layer is formed by arranging prefabricated blocks side by side; and carbomer is filled in the gas between the adjacent prefabricated blocks. The novel wall fence is made by the method of combining a prefabricated fence panel and the cast-in-place and has high strength, attractive shaping and high fineness; in addition, a vibrating table is prefabricated, thereby avoiding the honeycomb and the pitted surface, reducing the porosity of the cast-in-place concrete and improving the grade strength and the compactedness of fence, so as to effectively prolong the service life of the fence and lower the maintenance cost at the later stage.
Description
One. technical field: the utility model relates to a kind of highway barrier, particularly relates to a kind of novel wall fence for highway.
Two. background technology: along with the development of economic technology, China Higher level highway is more and more, various forms of bridges are also more and more, in order to adapt to expressway safety, requirement economic, practical, attractive in appearance, on highway and bridge, all design guardrail during design, the guardrail that has is the railing type waveform configuration, is made of column and horizontal Crashworthy plate, generally is used in the roadbed range section; Another guardrail is a wall type structure, and cast-in-site forms, and generally is used in bridge construction beyond the region of objective existence side.But, corrugated guardrail only is used in the roadbed range section at present, be used in the requirement that to satisfy security performance on the works, and the cast-in-site wall fence security performance of bridge construction beyond the region of objective existence side is low, road not attractive in appearance scape is inharmonious, speed of application slow, later maintenance expense height.
Three. the content of utility model:
Technical problem to be solved in the utility model is: overcome the deficiencies in the prior art, provide a kind of novel in design unique, intensity is high, safety good and the novel wall fence for highway of long service life.
The utility model is that the technical scheme that the technical solution problem is taked is:
A kind of novel wall fence for highway contains inboard preformed layer and outside cast in situs layer, and described inboard preformed layer is set in outside cast in situs layer, and described outside LIFT is formed by cage of reinforcement and concrete cast in situs.
Described inboard preformed layer is arranged side by side by prefabricated section and forms.
Be filled with macromolecule glue in the slit between the adjacent described prefabricated section.
The beneficial effects of the utility model are:
1, the utility model is made by the method that prefabricated guardrail panel and cast-in-site combine, have the intensity height, moulding is attractive in appearance, highly polished, adopt vibroplatform prefabricated in addition, avoid honeycomb, pitted skin, reduced the concrete pore rate of cast-in-site, improved the grade strength and the compactness of guardrail, thereby effectively improve the application life of guardrail, reduce later stage maintenance cost.
2, the utility model prefabricated section and cage of reinforcement are all made according to designing requirement in the processing space unification, and be transported to the job site then and carry out assembly unit, the construction of batch production production line, its high efficiency, cost of manufacture is low.
3, the utility model integrates numerous advantages such as short construction period, cost be low, is applicable to the making of multiple highway and Bridge guardrail, has good economic benefit after the popularization.
Four. description of drawings:
Fig. 1 is the structural representation of novel wall fence for highway.
Five. the specific embodiment:
Embodiment: referring to Fig. 1, among the figure, the inboard preformed layer 1 of novel wall fence for highway is set in outside cast in situs layer 2, and outside LIFT 2 is formed by cage of reinforcement 3 and concrete cast in situs.
Inboard preformed layer 1 is arranged side by side by a plurality of prefabricated sections and forms.And, be filled with macromolecule glue (not drawing among the figure) in the slit between contiguous prefabricated.
Its making step is:
A, site operation setting-out: according to construction design drawing, go out the inside and outside sideline of guardrail with total powerstation accurate setting-out on bridge hollow board, and along absolute altitude control point of the every 4-5 rice layout of inner edge, measure the elevation at each absolute altitude control point with level gauge, guarantee that the height of guardrail meets design requirement;
The installation of b, cage of reinforcement: according to the inner edge of the guardrail of site operation setting-out and the thickness of prefabricated section, on hollowcore slab, indicate the inner edge of cage of reinforcement with the line of ink marker, at a guardrail reinforcing bar of distance guardrail outer edge design protection layer thickness place with the outside control line of a line of ink marker as cage of reinforcement, the guardrail reinforcing bar is processed into semiproduct in the unification of reinforcing bar processing space according to code requirement, is transported to connect weldering with the prestressed cored slab reserved steel bar behind the job site and make type;
C, leveling layer is set: with the M12.5 mortar the wide leveling layer of 5cm is set along the guardrail inner edge on the hollowcore slab top;
D, prefabricated section and outboard template are installed: prefabricated section is in the unified processing of prefabricated processing space, be transported to the job site with transport vehicle, guardrail inner edge according to the site operation setting-out is provided with control line with cotton rope with the absolute altitude control point on the cage of reinforcement of guardrail upper end, with the elevation and the line style of this control line control prefabricated section; After the leveling layer mortar reaches certain intensity, by outside vertical columns and the outside horizontal support bar supporting outboard template is installed, with crane prefabricated section is lifted on the leveling layer then, after prefabricated section is just flat, install and fix the inboard vertical columns and the inboard horizontal support bar of prefabricated section, and prefabricated section and outboard template are closely connected into an integral body by the twice drag link of inboard vertical columns top and bottom, prefabricated section and outboard template are carried out essence put down by adjusting the drag link that is connected with inboard vertical columns and diagonal member;
E, concreting: at first water is moistening with hollowcore slab top and prefabricated section, use the bucket special of making according to guardrail width suitable for reading that the guardrail concrete is discharged in the guardrail template then, the guardrail concrete is built moulding at twice, for shortening the time interval of two-step pouring, each cover equipment that vibrates of front and back is constructed continuously;
F, health: after finishing, concreting in time covers with geotextiles, and the health of after concrete final set, sprinkling water;
G, piece are handled: after treating that the guardrail concrete reaches the intensity of design and code requirement, carry out the prefabricated section piece and handle.At first the cement mortar in the piece is rejected, with pencil and ruler the not straight suitable part of piece is marked then, subsequently according to the pencil line that indicates, with the small-size concrete cutting machine the not straight suitable part of piece is repaired, guarantee that piece is directly suitable up and down, seam is wide evenly, size is consistent, clog piece with macromolecule glue at last.
The above, it only is preferred embodiment of the present utility model, be not that the utility model is done any pro forma restriction, every foundation technical spirit of the present utility model all still belongs in the scope of technical solutions of the utility model any simple modification, equivalent variations and modification that above embodiment did.
Claims (3)
1. a novel wall fence for highway contains inboard preformed layer and outside cast in situs layer, and it is characterized in that: described inboard preformed layer is set in outside cast in situs layer, and described outside LIFT is formed by cage of reinforcement and concrete cast in situs.
2. novel wall fence for highway according to claim 1 is characterized in that: described inboard preformed layer is arranged side by side by prefabricated section and forms.
3. novel wall fence for highway according to claim 2 is characterized in that: be filled with macromolecule glue in the slit between the adjacent described prefabricated section.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202130261U CN201686953U (en) | 2010-06-03 | 2010-06-03 | Novel wall fence used for road |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010202130261U CN201686953U (en) | 2010-06-03 | 2010-06-03 | Novel wall fence used for road |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201686953U true CN201686953U (en) | 2010-12-29 |
Family
ID=43375238
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010202130261U Expired - Lifetime CN201686953U (en) | 2010-06-03 | 2010-06-03 | Novel wall fence used for road |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201686953U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102493340A (en) * | 2011-12-19 | 2012-06-13 | 中国一冶集团有限公司 | External mounting type anti-collision guardrails for landscape bridge |
CN102493350A (en) * | 2011-12-19 | 2012-06-13 | 中国一冶集团有限公司 | Construction method of landscape bridge outside-hanging crash barrier |
CN103061267A (en) * | 2013-01-15 | 2013-04-24 | 广州市市政工程设计研究院 | Construction method of combined prefabricated bridge anti-collision wall |
CN107587422A (en) * | 2016-07-07 | 2018-01-16 | 上海公路桥梁(集团)有限公司 | Precast splice type anti-collision wall and its manufacture method |
CN111472303A (en) * | 2018-12-07 | 2020-07-31 | 杭州江润科技有限公司 | Middle pier anti-collision system and construction method |
-
2010
- 2010-06-03 CN CN2010202130261U patent/CN201686953U/en not_active Expired - Lifetime
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102493340A (en) * | 2011-12-19 | 2012-06-13 | 中国一冶集团有限公司 | External mounting type anti-collision guardrails for landscape bridge |
CN102493350A (en) * | 2011-12-19 | 2012-06-13 | 中国一冶集团有限公司 | Construction method of landscape bridge outside-hanging crash barrier |
CN103061267A (en) * | 2013-01-15 | 2013-04-24 | 广州市市政工程设计研究院 | Construction method of combined prefabricated bridge anti-collision wall |
CN107587422A (en) * | 2016-07-07 | 2018-01-16 | 上海公路桥梁(集团)有限公司 | Precast splice type anti-collision wall and its manufacture method |
CN111472303A (en) * | 2018-12-07 | 2020-07-31 | 杭州江润科技有限公司 | Middle pier anti-collision system and construction method |
CN111472303B (en) * | 2018-12-07 | 2021-08-20 | 杭州江润科技有限公司 | Middle pier anti-collision system and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101864744B (en) | Construction method of novel wall fence for highway | |
CN101487332B (en) | Prefabricated hollow superposed beam, and cast-in-situ construction method for beam and precast slab | |
CN106378861B (en) | A kind of prefabricated assembled concrete stairway die and stair manufacturing method | |
CN206070562U (en) | Subassembly formula underground structure | |
CN201686953U (en) | Novel wall fence used for road | |
CN201395769Y (en) | Tie bar arch type bracket used for building bridge pylon concrete upper cross beam | |
CN101831875A (en) | Precast assembly process of prestressed concrete cylindrical hollow pier | |
CN104963289A (en) | Integral one-time pouring construction method of large-volume concrete for special-shaped pier stud | |
CN103255717A (en) | Method for constructing hit-preventing wall | |
CN111749133A (en) | Beam-arch combined rigid frame bridge and construction method of bridge pier thereof | |
CN203174510U (en) | Movable assembly type hanging basket for bridge anti-collision guardrail construction and formwork for construction | |
CN101148862A (en) | Pier body cap cracking body outside stress reinforcing method | |
CN201908380U (en) | Small simulation framework structure of large-span prestressed concrete beam plate | |
CN204266136U (en) | Stone arch bridge cover arch rib shotcrete ruggedized construction | |
CN101298796A (en) | Self-bearing type preprocessing component, self-bearing type preprocessing concrete structure and construction method thereof | |
CN102071740A (en) | Long-span prestressed concrete slab small pre-frame structure and construction method thereof | |
CN105401525B (en) | Cast-in-situ construction method of beam flange plates of acoustic barriers through movable mold base vehicles | |
CN104032741B (en) | The rapid constructing method of a kind of hydraulic engineering large volume temperature control | |
CN202989755U (en) | Integral-casting and fabricated prestressing force bridge structure | |
CN210289267U (en) | Assembled platform canopy | |
CN203593973U (en) | Continuous beam long cast-in-site section bracket balancing method construction device | |
CN106914984A (en) | A kind of construction method of prefabricated composite construction board | |
CN203878460U (en) | Prefabricated assembly combined type portal pier | |
CN209703203U (en) | The prefabricated H-type sheet-pile combined track structure of rail traffic | |
CN207919935U (en) | A kind of light prefabricated stair of reinforced concrete beam type |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term |
Granted publication date: 20101229 |
|
CX01 | Expiry of patent term |