Prior art keywords
pipe fitting
plastic body
metal sleeve
plastic
ring wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010201432599U
Other languages
Chinese (zh)
Inventor
陈汉邦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongke Huafei Pipe Dongguan Co ltd
Original Assignee
Zhongke Huafei Pipe Dongguan Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongke Huafei Pipe Dongguan Co ltd filed Critical Zhongke Huafei Pipe Dongguan Co ltd
Priority to CN2010201432599U priority Critical patent/CN201680074U/en
Application granted granted Critical
Publication of CN201680074U publication Critical patent/CN201680074U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Rigid Pipes And Flexible Pipes (AREA)

Abstract

The utility model discloses a compound pipe fitting is moulded to two hot melt steel of screw thread formula belongs to the pipe connection accessory, the utility model discloses a first pipe fitting and second pipe fitting: the first pipe fitting is provided with a first screw joint end formed by a first plastic body and a first metal sleeve, the first screw joint end forms a first internal thread on the first plastic body, a second internal thread is formed on the first metal sleeve, and the first internal thread is positioned on the inner side of the second internal thread; the second pipe fitting has a second screwed end formed by a second plastic body and a second metal sleeve, the second screwed end forms a first external thread on the second plastic body, a second external thread is formed on the second metal sleeve, and the first external thread is positioned outside the second external thread. When in connection, the first pipe fitting and the second pipe fitting are connected to the end part of the pipe in a double hot melting connection mode, and then the first pipe fitting and the second pipe fitting are connected together through the connection of the first screwed end and the second screwed end, so that the operation is convenient.

Description

丝扣式双热熔钢塑复合管件 Screw-type double hot-melt steel-plastic composite pipe fittings

技术领域technical field

本实用新型涉及一种管道连接配件,尤其是一种丝扣式双热熔钢塑复合管件。The utility model relates to a pipe connection fitting, in particular to a screw-type double hot-melt steel-plastic composite pipe fitting.

背景技术Background technique

通过双热熔连接的塑料管或者金属塑料复合管(如内外层为塑料、中间层为金属的三层结构和外层为金属、内层为塑料的两层结构),其在防腐、防锈、防堵塞等方便优于传统的金属管(如镀锌管)。但在现场连接时,需要将热熔模具带至安装现场对双热熔的管件和管子进行加热后再能够实现连接,然而,在实际工作中,并非都便于将热熔模具带至安装现场,如在高空作业时、在狭小的吊顶内作业时,就不便于进行双热熔连接,因此使得通过双热熔连接的塑料管或者金属塑料复合管的推广应用受到限制。Plastic pipes or metal-plastic composite pipes connected by double heat fusion (such as a three-layer structure with plastic inner and outer layers and metal in the middle layer and a two-layer structure with metal outer layer and plastic inner layer) , Anti-clogging and other conveniences are superior to traditional metal pipes (such as galvanized pipes). However, when connecting on-site, it is necessary to bring the hot-melt mold to the installation site to heat the double-hot-melt pipe fittings and pipes before the connection can be realized. However, in actual work, it is not always convenient to bring the hot-melt mold to the installation site. For example, when working at high altitudes or in a narrow ceiling, it is not convenient to perform double hot-melt connection, so the popularization and application of plastic pipes or metal-plastic composite pipes connected by double hot-melt is limited.

实用新型内容Utility model content

本实用新型要解决的技术问题和提出的技术任务是克服通过双热熔连接的塑料管或者金属塑料复合管在高空、狭小等安装现场不便连接的缺陷,提供一种丝扣式双热熔钢塑复合管件,用以将该接头连接在管子的端部来改变塑料管或者金属塑料复合管的连接方式。为此,本实用新型采用以下技术方案:The technical problem to be solved and the technical task proposed by the utility model are to overcome the defects of inconvenient connection of plastic pipes or metal-plastic composite pipes connected by double hot-melt in high altitude and narrow installation sites, and provide a threaded double-hot-melt steel pipe Plastic composite pipe fittings are used to connect the joint at the end of the pipe to change the connection mode of plastic pipes or metal-plastic composite pipes. For this reason, the utility model adopts the following technical solutions:

丝扣式双热熔钢塑复合管件,包括第一管件和第二管件,其特征是:The screw-type double hot-melt steel-plastic composite pipe fitting, including the first pipe fitting and the second pipe fitting, is characterized by:

所述的第一管件由第一金属套嵌合在第一塑料本体上形成整体,该第一管件具有通过第一内部通道连通的第一熔接端和第一螺接端:所述的第一熔接端包括由所述的第一塑料本体形成第一内环壁、第一外环壁以及位于所述第一内环壁和第一外环壁之间的第一承接口;所述的第一螺接端由所述的第一塑料本体、第一金属套形成,在所述的第一塑料本体上形成第一内螺纹,在所述的第一金属套上形成第二内螺纹,所述的第一内螺纹位于第二内螺纹的内侧;The first pipe part is integrally formed by fitting the first metal sleeve on the first plastic body, and the first pipe part has a first welded end and a first screwed end communicated through a first internal channel: the first The welding end includes a first inner ring wall formed by the first plastic body, a first outer ring wall and a first socket between the first inner ring wall and the first outer ring wall; A threaded end is formed by the first plastic body and the first metal sleeve, a first internal thread is formed on the first plastic body, and a second internal thread is formed on the first metal sleeve, so The first internal thread is located on the inner side of the second internal thread;

所述的第二管件由第二金属套嵌合在第二塑料本体上形成整体,该第二管件具有通过第二内部通道连通的第二熔接端和第二螺接端:所述的第二熔接端包括由所述的第二塑料本体形成第二内环壁、第二外环壁以及位于所述第二内环壁和第二外环壁之间的第二承接口;所述的第二螺接端由所述的第二塑料本体、第二金属套形成,在所述的第二塑料本体上形成第一外螺纹,在所述的第二金属套上形成第二外螺纹,所述的第一外螺纹位于第二外螺纹的外侧;The second pipe part is integrally formed by fitting the second metal sleeve on the second plastic body, and the second pipe part has a second welded end and a second screwed end communicated through the second internal channel: the second The welding end includes a second inner ring wall formed by the second plastic body, a second outer ring wall and a second socket between the second inner ring wall and the second outer ring wall; the first The two threaded ends are formed by the second plastic body and the second metal sleeve, the first external thread is formed on the second plastic body, and the second external thread is formed on the second metal sleeve, so The first external thread is located on the outer side of the second external thread;

所述的第一内部通道由第一塑料本体形成;所述的第二内部通道由第二塑料本体形成。The first internal channel is formed by a first plastic body; the second internal channel is formed by a second plastic body.

本实用新型的有益效果是:可以将该丝扣式双热熔钢塑复合管件的第一管件和第二管件通过双热熔连接的方式先连接在塑料管或者金属塑料复合管的端部,再通过第一螺接端与第二螺接端的连接将第一管件和第二管件连接在一起,便于操作。相对于双热熔连接时需将热熔模具带至安装现场的作业方式,本实用新型对塑料管或者金属塑料复合管连接方式的改变则不受作业现场的限制。The beneficial effect of the utility model is that the first pipe fitting and the second pipe fitting of the screw-type double hot-melt steel-plastic composite pipe fitting can be connected to the end of the plastic pipe or the metal-plastic composite pipe through double hot-melt connection. Then, the first pipe piece and the second pipe piece are connected together through the connection between the first threaded end and the second threaded end, which is convenient for operation. Compared with the operation mode in which the hot-melt mold needs to be brought to the installation site during the double-hot-melt connection, the utility model is not restricted by the operation site for changing the connection mode of the plastic pipe or the metal-plastic composite pipe.

而且,通过设置金属套并在金属套上设置螺纹,保证第一管件与第二管件通过螺纹连接的强度。Moreover, by providing the metal sleeve and providing threads on the metal sleeve, the strength of the threaded connection between the first pipe piece and the second pipe piece is ensured.

附图说明Description of drawings

图1为本实用新型的第一管件双热熔连接金属塑料复合管的剖面结构示意图。Fig. 1 is a schematic cross-sectional structure diagram of the first pipe fitting double hot-melt connection metal-plastic composite pipe of the present invention.

图2为本实用新型的第二管件双热熔连接金属塑料复合管的剖面结构示意图。Fig. 2 is a schematic cross-sectional structure diagram of the second pipe fitting double hot-melt connection metal-plastic composite pipe of the present invention.

图3为本实用新型的第一管件、第二管件连接在一起的剖面结构示意图。Fig. 3 is a schematic cross-sectional structural view of the connection of the first pipe and the second pipe of the present invention.

图中标号说明:Explanation of symbols in the figure:

1-第一管件,11-第一金属套,12-第一塑料本体,13-第一内部通道,14-第一熔接端,15-第一螺接端,16-第一内环壁,17-第一外环壁,18-第一承接口,19-第一内螺纹,110-第二内螺纹,111-加强缘,112-排气孔,113-环槽,114-轴向支撑面,115-密封圈;1-first pipe fitting, 11-first metal sleeve, 12-first plastic body, 13-first internal channel, 14-first welded end, 15-first screwed end, 16-first inner ring wall, 17-first outer ring wall, 18-first socket, 19-first internal thread, 110-second internal thread, 111-reinforcing edge, 112-vent hole, 113-ring groove, 114-axial support Surface, 115-sealing ring;

2-第二管件,21-第二金属套,22-第二塑料本体,23-第二内部通道,24-第二熔接端,25-第二螺接端,26-第二内环壁,27-第二外环壁,28-第二承接口,29-第一外螺纹,210-第二外螺纹,211-加强缘,212-排气孔,213-环槽;2-second pipe fitting, 21-second metal sleeve, 22-second plastic body, 23-second internal channel, 24-second welded end, 25-second screwed end, 26-second inner ring wall, 27-second outer ring wall, 28-second socket, 29-first external thread, 210-second external thread, 211-reinforcing edge, 212-vent, 213-ring groove;

31、32-管子;41、42-盖子;51、52-熔瘤;61、62-内衬套。31, 32 - pipe; 41, 42 - cover; 51, 52 - fusion tumor; 61, 62 - inner liner.

具体实施方式Detailed ways

以下结合说明书对本实用新型做进一步说明。Below in conjunction with description, the utility model is further described.

本实用新型的丝扣式双热熔钢塑复合管件,包括第一管件1和第二管件2:The threaded double hot-melt steel-plastic composite pipe fitting of the utility model includes a first pipe fitting 1 and a second pipe fitting 2:

如图1所示,第一管件1由第一金属套11嵌合(如注塑时将第一金属套作为嵌件置于模具内与塑料注塑成不可分离的整体)在第一塑料本体12上形成整体,该第一管件1具有通过第一内部通道13连通的第一熔接端14和第一螺接端15:第一熔接端14包括由第一塑料本体12形成第一内环壁16、第一外环壁17以及位于第一内环壁16和第一外环壁17之间的第一承接口18(参见图3);第一螺接端15由第一塑料本体12、第一金属套11共同形成,在第一塑料本体12上形成第一内螺纹19,在第一金属套11上形成第二内螺纹110,第一内螺纹19位于第二内螺纹110的内侧;As shown in Figure 1, the first pipe piece 1 is embedded on the first plastic body 12 by the first metal sleeve 11 (for example, the first metal sleeve is placed in the mold as an insert during injection molding and plastic is injection molded into an inseparable whole) Formed as a whole, the first pipe 1 has a first welded end 14 and a first screwed end 15 communicated through a first internal passage 13: the first welded end 14 includes a first inner ring wall 16 formed by a first plastic body 12, The first outer ring wall 17 and the first socket 18 between the first inner ring wall 16 and the first outer ring wall 17 (see FIG. 3 ); the first threaded end 15 consists of the first plastic body 12, the first The metal sleeves 11 are formed together, a first internal thread 19 is formed on the first plastic body 12, a second internal thread 110 is formed on the first metal sleeve 11, and the first internal thread 19 is located inside the second internal thread 110;

如图2所示,第二管件2由第二金属套21嵌合(同样如注塑时将第一金属套作为嵌件置于模具内与塑料注塑成不可分离的整体)在第二塑料本体22上形成整体,该第二管件2具有通过第二内部通道23连通的第二熔接端24和第二螺接端25:第二熔接端24包括由第二塑料本体22形成第二内环壁26、第二外环壁27以及位于第二内环壁26和第二外环壁27之间的第二承接口28(参见图3);第二螺接端25由第二塑料本体22、第二金属套21形成,在第二塑料本体22上形成第一外螺纹29,在第二金属套21上形成第二外螺纹210,第一外螺纹29位于第二外螺纹210的外侧;As shown in Figure 2, the second pipe 2 is embedded by the second metal sleeve 21 (similarly, the first metal sleeve is placed in the mold as an insert during injection molding and is injection molded into an inseparable whole with the plastic) on the second plastic body 22 As a whole, the second pipe member 2 has a second welded end 24 and a second screwed end 25 communicated through a second internal passage 23: the second welded end 24 includes a second inner ring wall 26 formed by a second plastic body 22 , the second outer ring wall 27 and the second socket 28 between the second inner ring wall 26 and the second outer ring wall 27 (see FIG. 3 ); the second threaded end 25 consists of the second plastic body 22, the second Two metal sleeves 21 are formed, a first external thread 29 is formed on the second plastic body 22, a second external thread 210 is formed on the second metal sleeve 21, and the first external thread 29 is located outside the second external thread 210;

第一内部通道13由第一塑料本体12形成;第二内部通道23由第二塑料本体21形成。The first internal channel 13 is formed by the first plastic body 12 ; the second internal channel 23 is formed by the second plastic body 21 .

利用本实用新型的丝扣式双热熔钢塑复合管件连接管子时,如图1、2所示将管子31、32(塑料管或者金属塑料复合管)通过双热熔连接的方式分别连接在第一管件1的第一承接口18和第二管件2的第二承接口28内,再如图3所示通过第一螺接端15与第二螺接端25的连接将第一管件1和第二管件2连接在一起,便于操作。相对于双热熔连接时需将热熔模具带至安装现场的作业方式,本实用新型对塑料管或者金属塑料复合管连接方式的改变则不受作业现场的限制。为了防止第一金属套11、第二金属套21接触第一内部通道13、第二内部通道23内的介质而被腐蚀,通过第一螺接端15与第二螺接端25的连接时,要求形成在第一塑料本体12上的第一内螺纹19与形成在第二塑料本体22上的第一外螺纹29形成螺纹配合,从而将第一金属套11、第二金属套21与第一内部通道13、第二内部通道23隔离,避免接触介质而被腐蚀。When utilizing the thread button type double hot-melt steel-plastic composite pipe fittings of the present utility model to connect the pipes, as shown in Figures 1 and 2, the pipes 31, 32 (plastic pipes or metal-plastic composite pipes) are respectively connected in the double hot-melt connection mode. In the first socket 18 of the first pipe 1 and the second socket 28 of the second pipe 2, the first pipe 1 is connected to the first screw end 15 and the second screw end 25 as shown in FIG. It is connected with the second pipe fitting 2 for easy operation. Compared with the operation mode in which the hot-melt mold needs to be brought to the installation site during the double-hot-melt connection, the utility model is not restricted by the operation site for changing the connection mode of the plastic pipe or the metal-plastic composite pipe. In order to prevent the first metal sleeve 11 and the second metal sleeve 21 from being corroded in contact with the medium in the first internal passage 13 and the second internal passage 23, when the first screw connection end 15 and the second screw connection end 25 are connected, It is required that the first internal thread 19 formed on the first plastic body 12 is threadedly engaged with the first external thread 29 formed on the second plastic body 22, so that the first metal sleeve 11, the second metal sleeve 21 and the first The inner channel 13 and the second inner channel 23 are isolated to avoid corrosion due to contact with medium.

鉴于该丝扣式双热熔钢塑复合管件可以防止第一金属套11、第二金属套21被腐蚀,因此第一金属套11、第二金属套21可以选用钢材而不是铜来制造,以便节约制造成本。In view of the fact that the screw-type double hot-melt steel-plastic composite pipe fitting can prevent the first metal sleeve 11 and the second metal sleeve 21 from being corroded, the first metal sleeve 11 and the second metal sleeve 21 can be made of steel instead of copper, so that Save manufacturing cost.

进一步的,为了避免双热熔连接部位暴露,在管子31、32上各套一个盖子41、42将该热熔连接部位盖设,盖子41、42卡在对应的环槽113、213内。Further, in order to avoid exposure of the double hot-melt joints, a cover 41, 42 is placed on the pipes 31, 32 to cover the hot-melt joints, and the covers 41, 42 are stuck in the corresponding ring grooves 113, 213.

作为对上述技术方案的进一步完善和补充,本实用新型还包括以下附加的技术特征,虽然图13包含了以下所有附加技术特征,是本实用新型的较佳实施例,但是本实用新型并不限于该情形,在实施本实用新型时根据具体作用将它们选用在上段所述的技术方案上:As a further improvement and supplement to the above-mentioned technical solution, the utility model also includes the following additional technical features, although Fig. 13 includes all the following additional technical features, is a preferred embodiment of the utility model, but the utility model is not limited to This situation, when implementing the utility model, they are selected on the technical scheme described in the previous paragraph according to specific effects:

第一内螺纹19与第二内螺纹110邻接;第一外螺纹29与第二外螺纹210邻接。从而使得内螺纹、外螺纹分别成为一个整体,在制造时,可以形成第一管件、第二管件之后再加工出螺纹。The first internal thread 19 is adjacent to the second internal thread 110 ; the first external thread 29 is adjacent to the second external thread 210 . Therefore, the internal thread and the external thread are respectively integrated, and the thread can be processed after the first pipe piece and the second pipe piece are formed during manufacture.

第一塑料本体12位于第一内螺纹19内侧的部位形成有轴向支撑面114,在该轴向支撑面114处安置有对应形成第一外螺纹29的第二塑料本体22的密封圈115。从而在如图3所示连接在一起时,密封圈115被挤压在第一塑料本体的轴向支撑面114与第二塑料本体22的端部之间,达到更好的密封效果,有效地将第一金属套11、第二金属套21与第一内部通道13、第二内部通道23隔离。作为密封圈的具体形式,可以是○形圈,还可以是其它形式的密封圈。The part of the first plastic body 12 inside the first internal thread 19 forms an axial support surface 114 , and a sealing ring 115 corresponding to the second plastic body 22 forming the first external thread 29 is arranged on the axial support surface 114 . Therefore, when they are connected together as shown in FIG. 3 , the sealing ring 115 is squeezed between the axial support surface 114 of the first plastic body and the end of the second plastic body 22 to achieve a better sealing effect and effectively The first metal sleeve 11 and the second metal sleeve 21 are isolated from the first internal channel 13 and the second internal channel 23 . As a specific form of the sealing ring, it may be an o-ring or other forms of sealing rings.

第一金属套11、第二金属套21嵌合在塑料本体内的部分分别设置有加强缘111、211。用于保证第一金属套、第二金属套与塑料本体的结合强度。Reinforcing edges 111 and 211 are respectively provided on the parts where the first metal sheath 11 and the second metal sheath 21 are embedded in the plastic body. It is used to ensure the bonding strength of the first metal sleeve, the second metal sleeve and the plastic body.

第一塑料本体12、第二塑料本体12上分别开设连通第一承接口18、第二承接口28的排气孔112、212,避免在双热熔连接时形成气阻(在热熔连接时,承插口内的空气可以通过排气孔排出,避免封闭气腔的形成,减小承插阻力,避免在熔接部位形成气泡,确保熔接效果),因此,该排气孔可以是轴向孔,也可以是径向孔。The first plastic body 12 and the second plastic body 12 are respectively provided with exhaust holes 112, 212 communicating with the first socket 18 and the second socket 28, so as to avoid forming air resistance when double hot-melt connection (when hot-melt connection , the air in the socket can be discharged through the vent hole, avoiding the formation of a closed air cavity, reducing the socket resistance, avoiding the formation of air bubbles in the welding part, and ensuring the welding effect), therefore, the vent hole can be an axial hole, Radial holes are also possible.

第一外环壁17、第二外环壁27的内壁上开设有环槽113、213,用于收纳双热熔连接时产生的熔瘤51、52。The inner walls of the first outer ring wall 17 and the second outer ring wall 27 are provided with ring grooves 113 , 213 for accommodating the fusion tumors 51 , 52 generated during double hot-melt connection.

内衬套61、62可用铜制成,用于熔接时制成内环壁。The inner bushings 61, 62 can be made of copper, which can be used to make the inner ring wall when welding.

以上通过一个例子说明了本实用新型的丝扣式双热熔钢塑复合管件,但是作为本实用新型的其它形式,管件还可以是弯头、三通、四通等结构形式,但是为了便于安装,第一管件和第二管件均以具有一个熔接端为佳(只要安装场合适合,并不排除两个或者更多的熔接端,如第一管件、第二管件为三通时可以分别有一个螺接端和两个熔接端,如第一管件、第二管件为四通时可以分别有两个螺接端和两个熔接端或者分别有一个螺接端和三个熔接端)。The threaded double hot-melt steel-plastic composite pipe fitting of the present invention is illustrated through an example above, but as other forms of the present invention, the pipe fittings can also be in the form of elbows, tees, crosses, etc., but in order to facilitate installation , both the first pipe fitting and the second pipe fitting preferably have one welded end (as long as the installation occasion is suitable, two or more welded ends are not excluded, such as when the first pipe fitting and the second pipe fitting are tees, there can be one Screwed ends and two welded ends, such as the first pipe fitting and the second pipe fitting can have two screwed ends and two welded ends or one screwed end and three welded ends respectively when the first pipe fitting and the second pipe fitting are four-way).

该管件,还适用于PP-R管、PE管等阀门的过渡连接处。This pipe fitting is also suitable for the transition connection of valves such as PP-R pipes and PE pipes.

Claims (7)

1.丝扣式双热熔钢塑复合管件,包括第一管件(1)和第二管件(2),其特征是:1. Screw-type double hot-melt steel-plastic composite pipe fittings, including the first pipe fitting (1) and the second pipe fitting (2), characterized by: 所述的第一管件(1)由第一金属套(11)嵌合在第一塑料本体(12)上形成整体,该第一管件(1)具有通过第一内部通道(13)连通的第一熔接端(14)和第一螺接端(15):所述的第一熔接端(14)包括由所述的第一塑料本体(12)形成第一内环壁(16)、第一外环壁(17)以及位于所述第一内环壁(16)和第一外环壁(17)之间的第一承接口(18);所述的第一螺接端(15)由所述的第一塑料本体(12)、第一金属套(11)形成,在所述的第一塑料本体(12)上形成第一内螺纹(19),在所述的第一金属套(11)上形成第二内螺纹(110),所述的第一内螺纹(19)位于第二内螺纹(110)的内侧;The first pipe part (1) is integrally formed by fitting the first metal sleeve (11) on the first plastic body (12), and the first pipe part (1) has a first internal passage (13) communicating with it A welded end (14) and a first screwed end (15): the first welded end (14) includes a first inner ring wall (16) formed by the first plastic body (12), a first The outer ring wall (17) and the first socket (18) between the first inner ring wall (16) and the first outer ring wall (17); the first threaded end (15) is formed by The first plastic body (12) and the first metal sleeve (11) are formed, the first internal thread (19) is formed on the first plastic body (12), and the first metal sleeve (19) is formed on the first metal sleeve ( 11) forming a second internal thread (110), the first internal thread (19) is located inside the second internal thread (110); 所述的第二管件(2)由第二金属套(21)嵌合在第二塑料本体(22)上形成整体,该第二管件(2)具有通过第二内部通道(23)连通的第二熔接端(24)和第二螺接端(25):所述的第二熔接端(24)包括由所述的第二塑料本体(22)形成第二内环壁(26)、第二外环壁(27)以及位于所述第二内环壁(26)和第二外环壁(27)之间的第二承接口(28);所述的第二螺接端(25)由所述的第二塑料本体(22)、第二金属套(21)形成,在所述的第二塑料本体(22)上形成第一外螺纹(29),在所述的第二金属套(21)上形成第二外螺纹(210),所述的第一外螺纹(29)位于第二外螺纹(210)的外侧;The second pipe (2) is integrally formed by fitting the second metal sleeve (21) on the second plastic body (22), and the second pipe (2) has a second internal passage (23) communicating Two welded ends (24) and second screwed ends (25): the second welded end (24) includes the second inner ring wall (26) formed by the second plastic body (22), the second The outer ring wall (27) and the second socket (28) between the second inner ring wall (26) and the second outer ring wall (27); the second threaded end (25) is formed by The second plastic body (22) and the second metal sleeve (21) are formed, the first external thread (29) is formed on the second plastic body (22), and the second metal sleeve ( 21) forming a second external thread (210), the first external thread (29) is located outside the second external thread (210); 所述的第一内部通道(13)由第一塑料本体(12)形成;所述的第二内部通道(23)由第二塑料本体(22)形成。The first internal channel (13) is formed by the first plastic body (12); the second internal channel (23) is formed by the second plastic body (22). 2.根据权利要求1所述的丝扣式双热熔钢塑复合管件,其特征是所述的第一内螺纹(19)与第二内螺纹(110)邻接;所述的第一外螺纹(29)与第二外螺纹(210)邻接。2. The threaded double hot-melt steel-plastic composite pipe fitting according to claim 1, characterized in that the first internal thread (19) is adjacent to the second internal thread (110); the first external thread (29) adjoins the second external thread (210). 3.根据权利要求1所述的丝扣式双热熔钢塑复合管件,其特征是所述的第一塑料本体(12)位于所述第一内螺纹(19)内侧的部位形成有轴向支撑面(114),在该轴向支撑面(114)处安置有对应形成所述第一外螺纹(29)的第二塑料本体(22)的密封圈(115)。3. The screw-type double hot-melt steel-plastic composite pipe fitting according to claim 1, characterized in that the first plastic body (12) is located inside the first internal thread (19) to form an axial A supporting surface (114), on which a sealing ring (115) corresponding to the second plastic body (22) forming the first external thread (29) is arranged. 4.根据权利要求3所述的丝扣式双热熔钢塑复合管件,其特征是所述的密封圈(115)为○形圈。4. The threaded double hot-melt steel-plastic composite pipe fitting according to claim 3, characterized in that the sealing ring (115) is an ○-shaped ring. 5.根据权利要求1所述的丝扣式双热熔钢塑复合管件,其特征是所述的第一金属套(11)、第二金属套(21)嵌合在塑料本体内的部分分别设置有加强缘(111、211)。5. The screw-type double hot-melt steel-plastic composite pipe fitting according to claim 1, characterized in that the parts of the first metal sleeve (11) and the second metal sleeve (21) embedded in the plastic body are respectively A reinforcing edge (111, 211) is provided. 6.根据权利要求1所述的丝扣式双热熔钢塑复合管件,其特征是所述的第一塑料本体(12)、第二塑料本体(22)上分别开设连通第一承接口(18)、第二承接口(28)的排气孔(112、212)。6. The screw-type double hot-melt steel-plastic composite pipe fitting according to claim 1, characterized in that the first plastic body (12) and the second plastic body (22) are respectively provided with a connecting first socket ( 18), the exhaust holes (112, 212) of the second socket (28). 7.根据权利要求1所述的丝扣式双热熔钢塑复合管件,其特征是所述的第一外环壁(17)、第二外环壁(27)的内壁上开设有环槽(113、213)。7. The threaded double hot-melt steel-plastic composite pipe fitting according to claim 1, characterized in that ring grooves are opened on the inner walls of the first outer ring wall (17) and the second outer ring wall (27) (113, 213).
CN2010201432599U 2010-03-29 2010-03-29 Screw thread type double hot melt steel-plastic composite pipe fitting Expired - Fee Related CN201680074U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010201432599U CN201680074U (en) 2010-03-29 2010-03-29 Screw thread type double hot melt steel-plastic composite pipe fitting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010201432599U CN201680074U (en) 2010-03-29 2010-03-29 Screw thread type double hot melt steel-plastic composite pipe fitting

Publications (1)

Publication Number Publication Date
CN201680074U true CN201680074U (en) 2010-12-22

Family

ID=43345118

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010201432599U Expired - Fee Related CN201680074U (en) 2010-03-29 2010-03-29 Screw thread type double hot melt steel-plastic composite pipe fitting

Country Status (1)

Country Link
CN (1) CN201680074U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105479734A (en) * 2016-01-21 2016-04-13 刘纯风 Plastic tube welding protection opening

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105479734A (en) * 2016-01-21 2016-04-13 刘纯风 Plastic tube welding protection opening

Similar Documents

Publication Publication Date Title
CN201891953U (en) Lining type steel-plastic composite pipe
CN201884856U (en) Plastic bridge elbow fitting
CN101691972B (en) Main body member for heat exchanger or electric heater
CN201531701U (en) Groove type double-hot-melting joint
CN201680074U (en) Screw thread type double hot melt steel-plastic composite pipe fitting
CN201159352Y (en) Aluminum break valve with connection pipe
CN102261533A (en) Pipe with flange plate
CN103075612A (en) Pipe fitting for connecting combined type heat preservation pipe
CN201502823U (en) Metal and plastic composite pipe connecting device
CN2668980Y (en) Plastic pipe fitting with two-layer bellmouth structure
CN203131334U (en) Combined-type pipe fitting for connection of thermal insulation pipes
CN201096241Y (en) Pipeline enlarging jointing construction
CN202100875U (en) Water pipe elbow with metal sleeve
CN202302525U (en) Novel polyethylene steel-plastic transition pipe fitting
CN201382220Y (en) Plastic-aluminum pipe junction
CN212510007U (en) Pipe fitting and composite pipe fitting
CN203686450U (en) Socket and spigot connector used for steel strip reinforced polyethylene spiral corrugated pipe
CN202176832U (en) High-pressure corrosion-resistant high-temperature-resistant steel plastic composite pipe
CN203703470U (en) Steel-plastic transition pipe joint of polyethylene gas or water supply pipe
CN2670718Y (en) Plastic aluminium composite pipe
CN201858471U (en) 90-degree elbow pipe quick connector
CN105972344B (en) A kind of connection structure of heavy caliber enhancing tubing
CN201401595Y (en) Slip-tightening aluminum-plastic laminated pipe
CN201047468Y (en) PE-RT copper pipe
CN201014119Y (en) Double-insurance copper plastic composite pipe member

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101222

Termination date: 20170329

CF01 Termination of patent right due to non-payment of annual fee