CN1961157A - Clip - Google Patents
Clip Download PDFInfo
- Publication number
- CN1961157A CN1961157A CN 200580017774 CN200580017774A CN1961157A CN 1961157 A CN1961157 A CN 1961157A CN 200580017774 CN200580017774 CN 200580017774 CN 200580017774 A CN200580017774 A CN 200580017774A CN 1961157 A CN1961157 A CN 1961157A
- Authority
- CN
- China
- Prior art keywords
- piece
- stem
- portions
- separated
- rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Insertion Pins And Rivets (AREA)
Abstract
Description
技术领域technical field
本发明涉及一种所谓的树型卡子,在例如将车辆内装饰材料固The present invention relates to a so-called tree-type clip used, for example, to fasten
定到车身板上时使用这种卡子。Use these clips when attaching to body panels.
背景技术Background technique
这种类型的常规卡子(在附图中未具体例示)是用合成树脂模塑成的单件,包括头部和从头部下表面延伸的杆部,并且这样构造,使得在杆部的相对外周面上沿垂向设置多级径向延伸的弹性叶片(例如,参见专利文献1)。Conventional clips of this type (not specifically illustrated in the drawings) are molded in a single piece of synthetic resin, including a head and a stem extending from the lower surface of the head, and are constructed so that on opposite peripheral surfaces of the stem Multiple radially extending elastic blades are arranged vertically on the top (for example, refer to Patent Document 1).
在用此常规的卡子将作为车辆内装饰材料的顶装饰固定到顶盖上的情况下,将顶装饰重叠在顶盖上,以达到它们的安装孔对准的状态,并且,将杆部压进安装孔。于是,在使弹性叶片穿过安装孔的过程中,弹性叶片受到安装孔内周面的挤压并弯曲,并且,在穿到安装孔背面侧之后,弹性叶片恢复其初始状态,从而,避免杆部脱离安装孔。结果,使顶装饰固定在顶盖上。In the case of fixing the roof trim as a vehicle interior material to the roof with this conventional clip, the roof trim is superimposed on the roof so that their mounting holes are aligned, and the rod is pressed into the roof. Mounting holes. Then, in the process of passing the elastic blade through the mounting hole, the elastic blade is pressed and bent by the inner peripheral surface of the mounting hole, and after passing to the back side of the mounting hole, the elastic blade returns to its original state, thereby avoiding the rod out of the mounting hole. As a result, the top trim is fixed on the top cover.
专利文献1:JP-A-8-159125Patent Document 1: JP-A-8-159125
发明内容Contents of the invention
本发明所要解决的问题Problem to be solved by the present invention
据此,采用常规卡子的优点在于:通过选择性地利用多级弹性叶片,有效地吸收顶装饰和顶盖的总板厚,可以以单一的动作将顶装饰固定到顶盖侧上。然而,另一方面,在从安装孔取下卡子以解除顶装饰与顶盖固定状态的情况下,必须在相反方向很大程度弯曲多级弹性叶片的同时,用力拉出卡子。所以,通常不可避免地使用工具,诸如开槽螺丝刀。当被固定的对象由易损材料制成,如顶装饰的情况,特别地,在拉出操作中的工具使用必须十分小心。因此,存在的缺点在于:即使结合工具的使用,卡子本身的拉出操作非常麻烦。Accordingly, the advantage of using conventional clips is that the crown trim can be secured to the roof side in a single action by selectively utilizing the multi-stage elastic blades to effectively absorb the total plate thickness of the roof trim and roof. However, on the other hand, in the case of removing the clip from the mounting hole to release the fixed state of the top trim and the top cover, it is necessary to pull out the clip strongly while largely bending the multi-stage elastic blade in the opposite direction. Therefore, the use of a tool, such as a slotted screwdriver, is usually unavoidable. When the object to be fixed is made of fragile material, as is the case for crown trims, in particular, the use of tools in the pulling operation must be done with great care. Therefore, there is a disadvantage that the pulling out operation of the clip itself is very troublesome even with the use of a tool.
解决问题的方案solution to the problem
提出本发明以有效地解决上述常规卡子的问题,以及,在根据本发明的第一方面,卡子包括由第一件和第二件构成的两部分,第一件具有头部和杆部,以及,第二件具有凸缘部和支柱部,其特征在于:在第二件的凸缘部中形成开口,并且使第二件的支柱部分离开成为两个分隔开的支柱部,以在其间形成与开口连通的空隙,并且将第一件的杆部插进该空隙中,以及,其中:在分隔开的支柱部的外周面上,沿垂向以多级方式设置径向凸出的弹性叶片,从而,当通过开口将第一件的杆部插进分隔开的支柱部之间的空隙时,阻止分隔开的支柱部互相接近。The present invention is proposed to effectively solve the problems of the above-mentioned conventional clips, and, in a first aspect according to the present invention, the clip includes two parts consisting of a first piece and a second piece, the first piece having a head and a stem, and , the second piece has a flange portion and a strut portion, characterized in that: an opening is formed in the flange portion of the second piece, and the strut portion of the second piece is separated into two separated strut portions so that the A void communicating with the opening is formed, and the stem portion of the first member is inserted into the void, and wherein: on the outer peripheral surface of the divided pillar portion, radially protruding The elastic blades thereby prevent the spaced apart leg parts from approaching each other when the stem part of the first piece is inserted through the opening into the space between the spaced apart leg parts.
根据本发明的第二方面是基于第一方面提出的,以及,其特征在于:在形成于第二件凸缘部中的开口的内周面上,设置接合台肩,以及,在靠近于第一件的杆部末端的外周面上,设置锁紧凸出,当从分隔开的支柱部之间的空隙中拉出杆部时,使锁紧凸出与所述接合台肩不可分地接合。The second aspect according to the present invention is proposed based on the first aspect, and is characterized in that: on the inner peripheral surface of the opening formed in the flange portion of the second member, an engaging shoulder is provided, and, at a position close to the first member On the outer peripheral surface of the end of the one-piece shank, locking projections are provided for inseparably engaging said engagement shoulders when the shank is pulled out from the space between the spaced apart struts. .
根据本发明的第三方面是基于第一方面或者第二方面提出的,以及,其特征在于:在靠近于第一件杆部末端的外周面上,设置侧锁紧凸出,以及,当从分隔开的支柱部之间的空隙中拉出杆部时,使侧锁紧凸出邻接第二件凸缘部的下表面。According to the third aspect of the present invention, it is proposed based on the first aspect or the second aspect, and is characterized in that: on the outer peripheral surface close to the end of the first rod portion, a side locking protrusion is provided, and, when viewed from The side locking projection abuts the lower surface of the flange portion of the second piece when the stem portion is pulled out of the space between the spaced apart strut portions.
根据本发明的第四方面是基于第二方面或者第三方面提出的,以及,其特征在于:在靠近于第一件杆部基端的外周面上,设置装配凸出,以及,当将杆部插进分隔开的支柱部之间的空隙中时,使装配凸出与第二件侧的接合台肩可分离地接合。According to the fourth aspect of the present invention, it is proposed based on the second aspect or the third aspect, and it is characterized in that: on the outer peripheral surface close to the base end of the rod portion of the first piece, an assembly protrusion is provided, and when the rod portion The fitting projection is detachably engaged with the engaging shoulder on the second member side when inserted into the space between the spaced apart post portions.
根据本发明的第五方面基于第一方面提出,以及,其特征在于:当将第一件的杆部插进分隔开的支柱部之间的空隙中时,至少使杆部与各分隔开的支柱部的下端部彼此不可分地连接,同时,当从分隔开的支柱部之间的空隙中拉出杆部时,解除杆部与各分隔开的支柱部的下端部之间的连接。According to the fifth aspect of the present invention, based on the first aspect, it is characterized in that: when the rod portion of the first member is inserted into the gap between the separated pillar portions, at least the rod portion is separated from each partition The lower end portions of the separated strut portions are inseparably connected to each other, and at the same time, when the rod portion is pulled out from the gap between the separated strut portions, the connection between the rod portion and the lower end portions of each separated strut portion is released. connect.
根据本发明的第六方面是基于第四方面提出的,以及,其特征在于:将位于设置第一件装配凸出的部分之下的杆部部分,形成为细径部。A sixth aspect according to the present invention is based on the fourth aspect, and is characterized in that the stem portion located below the portion where the first piece fitting projection is provided is formed as a thin diameter portion.
根据本发明的第七方面是基于第一方面至第六方面提出的,以及,其特征在于:在第二件的凸缘部的下表面中,形成平行于各分隔开的支柱部的凹槽。According to a seventh aspect of the present invention, based on the first to sixth aspects, it is characterized in that: in the lower surface of the flange portion of the second member, recesses parallel to the separated pillar portions are formed. groove.
根据本发明的第八方面是基于第一方面提出的,以及,其特征在于:在第一件的杆部上,以对角方式连续设置一对肋壁,以使肋壁和杆部能够形成S形横截面,以及,在第二件的分隔开的支柱部上,对角方式设置一对插接部,该对插接部分别接合进入杆部侧面与各肋壁内周面之间的空隙中。The eighth aspect of the present invention is proposed based on the first aspect, and is characterized in that: on the stem portion of the first piece, a pair of rib walls are arranged continuously in a diagonal manner, so that the rib walls and the stem portion can be formed S-shaped cross-section, and, on the separated strut portion of the second piece, a pair of inserting portions are arranged diagonally, and the pair of inserting portions are respectively engaged between the side surface of the rod portion and the inner peripheral surface of each rib wall in the gap.
根据本发明的第九方面是基于第一方面提出的,以及,其特征在于:通过小桥片,使第一件的末端缘与第二件的凸缘部的开口边缘一体成型,以及,随后按压第一件的头部,以使第一件的杆部和第二件的支柱部成一体。According to the ninth aspect of the present invention, based on the first aspect, it is characterized in that: the end edge of the first piece is integrally formed with the opening edge of the flange portion of the second piece through the small bridge piece, and, subsequently Press the head of the first piece so that the stem of the first piece and the post of the second piece are integrated.
根据本发明的第十方面是基于第九方面提出的,以及,其特征在于:第一件的杆部具有形成为棱柱形的中心部,并且赋予中心部两侧的每一侧以T形,杆部末端侧上的T形部分削成楔面,从而使杆部末端的余部形成为矩形横截面,通过小桥片,使第一件的杆部在矩形横截面的四个拐角处连接在第二件凸缘部的开口边缘上。A tenth aspect according to the present invention is proposed based on the ninth aspect, and is characterized in that the stem portion of the first member has a central portion formed in a prism shape, and a T-shape is given to each of the two sides of the central portion, The T-shaped portion on the side of the end of the stem is cut into a wedge, so that the remainder of the end of the stem is formed into a rectangular cross-section, and the stem of the first piece is connected at the four corners of the rectangular cross-section through small bridge pieces. on the edge of the opening in the flange portion of the second piece.
根据本发明的第十一方面是基于第二方面提出的,以及,其特征在于:第一件的杆部具有形成为棱柱形的中心部,并且赋予中心部两侧的每一侧以T形,杆部末端侧上的T形部分削成楔面,从而使杆部末端的余部形成为矩形横截面,在矩形横截面形状的部分处设置锁紧凸出。An eleventh aspect according to the present invention is proposed based on the second aspect, and is characterized in that the stem portion of the first piece has a central portion formed in a prism shape, and a T-shape is given to each side of the central portion , the T-shaped portion on the side of the end of the rod is cut into a wedge surface, so that the remainder of the end of the rod is formed into a rectangular cross-section, and a locking protrusion is provided at the portion of the rectangular cross-sectional shape.
根据本发明的第十二方面是基于第一方面提出的,以及,其特征在于:第一件的杆部具有棱柱形状,以及,以对角方式在其角部形成凹口,同时,使在第二件的分隔开的支柱部之间形成的空隙与杆部的横截面形状相似。A twelfth aspect according to the present invention is proposed based on the first aspect, and is characterized in that: the stem portion of the first member has a prism shape, and recesses are formed at corners thereof in a diagonal manner, and at the same time, the The space formed between the spaced strut portions of the two pieces is similar to the cross-sectional shape of the stem portion.
根据本发明的第十三方面是基于第一方面至第十二方面提出的,以及,其特征在于:在第一件的头部与第二件的凸缘部之间形成空隙,以及,使头部的外径大于凸缘部的外径。A thirteenth aspect of the present invention is based on the first to twelfth aspects, and is characterized in that a gap is formed between the head portion of the first piece and the flange portion of the second piece, and that The outer diameter of the head portion is larger than the outer diameter of the flange portion.
本发明的优点Advantages of the invention
据此,在根据本的发明中第一方面,在固定所要固定对象的情况下,如果将第一件的杆部插进形成在第二件的分隔开的支柱部之间的空隙中,并且推进所要固定对象的安装孔中,可阻止分隔开的支柱部互相接近。所以,按照与常规情况下相同的方式,依靠设置在分隔开的支柱部外周面上的多级弹性叶片的作用,能将所要固定的对象可靠地固定。Accordingly, in the first aspect of the invention according to the present invention, in the case of fixing the object to be fixed, if the rod portion of the first piece is inserted into the space formed between the separated pillar portions of the second piece, And push it into the installation hole of the object to be fixed, so that the separated pillar parts can be prevented from approaching each other. Therefore, in the same manner as conventionally, the object to be fixed can be reliably fixed by virtue of the action of the multi-stage elastic blades provided on the outer peripheral surfaces of the divided pillar portions.
另一方面,在从被固定对象的安装孔中取下卡子本身以解除被固定对象的固定状态时,如果从第二件分隔开的支柱部之间的空隙中拉出第一件的杆部,第一件的杆部就不再位于第二件的分隔开的支柱部之间形成的空隙中。所以,如果之后握持第一件头部的同时,将第一件与第二件一起从被固定对象中取出,通过该空隙使分隔开的支柱部很大程度上向内挠曲,因而,能以操作人员的手指施加较轻的力容易地取下卡子本身,而不需要使用工具。另外,因为实际上不需要在相反的方向上弯曲多级弹性叶片,所以,如果在取下之后重新使用该卡子,在其保持力上的降低比较小。On the other hand, when removing the clip itself from the mounting hole of the fixed object to release the fixed state of the fixed object, if the rod of the first piece is pulled out from the gap between the pillar parts separated by the second piece portion, the stem portion of the first piece is no longer located in the space formed between the spaced-apart strut portions of the second piece. Therefore, if the first piece is taken out from the fixed object together with the second piece while holding the head of the first piece afterwards, the separated pillar portions are largely deflected inwardly through the gap, thereby , the clip itself can be easily removed with light force applied by the operator's fingers, without the need for tools. In addition, since there is virtually no need to bend the multi-stage elastic blades in opposite directions, if the clip is reused after removal, there is less drop in its holding force.
在根据本发明中的第二方面,在从被固定对象的安装孔中取下卡子的情况下,如果试图从第二件的支柱部中拉出第一件的杆部,使设置在第一件杆部上的锁紧凸出,与设置在第二件开口的内周面侧的接合台肩不可分地接合,因而,能以较轻的力量将第二件与第一件一起取下。According to the second aspect of the present invention, when the clip is removed from the mounting hole of the object to be fixed, if an attempt is made to pull out the stem portion of the first piece from the pillar portion of the second piece, the The locking protrusion on the shank of the part is inseparably engaged with the engaging shoulder provided on the inner peripheral surface side of the opening of the second part, so that the second part can be removed together with the first part with relatively light force.
在根据本发明中的第三方面,在从被固定对象的安装孔取下卡子的情况下,如果试图从第二件的支柱部拉出第一件的杆部,使锁紧凸出与接合台肩接合,而侧锁紧凸出邻接第二件凸缘部的下表面,因而,能更可靠地阻止第一件和第二件错误地分离。In accordance with the third aspect of the present invention, in the case of removing the clip from the mounting hole of the object to be fixed, if an attempt is made to pull out the stem portion of the first piece from the pillar portion of the second piece, the locking protrusion is engaged with the The shoulder engages and the side locking projection abuts against the lower surface of the flange portion of the second member, thereby more reliably preventing the first and second members from being erroneously separated.
在根据本发明中的第四方面,如果将第一件的杆部插进分隔开的支柱部之间的空隙中,使设置在第一件杆部上的装配凸出与设置在第二件开口的内周面侧上的接合台肩接合,因而,不存在两部件在运送和处理期间分开的可能性。另外,因为使装配凸出与接合台肩可分离地接合,所以,不用过大的力量,就能从第二件中拉出第一件。In accordance with the fourth aspect of the present invention, if the stem portion of the first member is inserted into the space between the separated pillar portions, the fitting protrusion provided on the stem portion of the first member is aligned with the fitting protrusion provided on the second member. The joining shoulder on the inner peripheral surface side of the opening of the parts is engaged, and thus, there is no possibility of the two parts being separated during shipping and handling. In addition, since the fitting projection is detachably engaged with the engaging shoulder, the first member can be pulled out from the second member without excessive force.
在根据本发明中的第五方面,如果将第一件的杆部插进第二件分隔开的支柱部之间的空隙中,使杆部与分隔开的支柱部彼此连接,以使其彼此不可分。所以,如果将处于此状态下的卡子插入所要固定对象的安装孔,即使分隔开的支柱部16的下端缘抵触并接触安装孔的孔缘,也不存在分隔开的支柱部16的下端部反向折起且不能压进的可能性。In accordance with the fifth aspect of the present invention, if the stem portion of the first member is inserted into the space between the separated pillar portions of the second member, the stem portion and the separated pillar portions are connected to each other so that They are inseparable from each other. Therefore, if the clip in this state is inserted into the mounting hole of the object to be fixed, even if the lower edge of the
在根据本发明中的第六方面,由于在设置装配凸出的部分之下的杆部的部分中形成细径部的关系,在经解除装配凸出与接合台肩之间的接合、从第二件侧拉出第一件杆部的情况下,拉出阻力在早期阶段尤其减小,因而,使拉出容易。In accordance with the sixth aspect of the present invention, since the thin-diameter portion is formed in the portion of the stem under the portion where the fitting projection is provided, in the engagement between the dismounting projection and the engaging shoulder, from the second In the case where the first-piece stem portion is pulled out on the two-piece side, the pull-out resistance is particularly reduced at an early stage, thus making the pull-out easy.
在根据本发明中的第七方面,由于第二件凸缘部的下表面具有凹槽的关系,在诸如被固定对象的总板厚较薄的情况下,很难使分隔开的支柱部中靠近凸缘部的部分向内挠曲。然而,此时,因为依靠凹槽使第二件的凸缘部自身挠曲,所以,能促进分隔开的支柱部的向内挠曲。In accordance with the seventh aspect of the present invention, since the lower surface of the flange portion of the second member has a groove relationship, it is difficult to separate the pillar portions when the total plate thickness of the fixed object is thin, such as The part near the flange part is deflected inward. However, at this time, since the flange portion of the second member itself is deflected by virtue of the groove, inward deflection of the divided post portions can be facilitated.
在根据本发明中的第八方面,由于在第一件杆部上对角方式设置一对肋壁、以使肋壁和杆部能够形成S形横截面的关系,肋壁和杆部的壁厚可以形成得较厚,从而能达到较高的刚性。同时,在第一件和第二件成一体的状态下,末端的形状可以形成得更尖,使得可引导性也得到改善。另外,由于分隔开的支柱部的插接部接合进杆部侧面与肋壁内表面之间的空隙的关系,使杆部和各分隔开的支柱部的下端部连接,以使其彼此不能分开。In accordance with the eighth aspect of the present invention, since a pair of rib walls are arranged diagonally on the stem portion of the first piece so that the rib walls and the stem portion can form an S-shaped cross section, the walls of the rib walls and the stem portion Thickness can be formed thicker, so that higher rigidity can be achieved. At the same time, in a state where the first piece and the second piece are integrated, the shape of the tip can be formed sharper, so that guideability is also improved. In addition, since the insertion portion of the separated pillar portion engages into the gap between the side surface of the stem portion and the inner surface of the rib wall, the stem portion and the lower end portion of each separated pillar portion are connected so as to be connected to each other. cannot be separated.
在根据本发明中的第九方面,由于依靠小桥片使第一件的末端缘与第二件凸缘部的开口边缘一体成型的关系,仅仅通过向第二件的支柱部内按压第一件的头部同时切断小桥片,就能使第一件和第二件成一体,因而,使得两部件的装配操作相当容易。According to the ninth aspect of the present invention, since the end edge of the first piece is integrally formed with the opening edge of the flange portion of the second piece by means of the small bridge piece, only by pressing the first piece into the pillar portion of the second piece Cutting off the small bridge pieces at the same time by the head of the head can make the first part and the second part integral, thus making the assembly operation of the two parts quite easy.
在根据本发明中的第十方面,由于依靠小桥片使第一件杆部在其末端矩形横截面的四个末端拐角处与第二件凸缘部的开口边缘连接的关系,能有效地避免第一件相对第二件倾斜或者摇动,同时使得能以较小的力量切断小桥片,因而,能更容易地进行两部件的装配操作。另外,借助于楔面的存在,即使出现切屑等,也能将第一件的杆部可靠地插进第二件侧上的空隙。In accordance with the tenth aspect of the present invention, due to the relationship that the stem portion of the first piece is connected with the opening edge of the flange portion of the second piece at the four end corners of the end rectangular cross-section thereof by means of the small bridge pieces, it is possible to effectively This prevents the first part from tilting or wobbling relative to the second part, and at the same time allows the small bridge to be cut off with less force, thus making it easier to carry out the assembly operation of the two parts. In addition, by virtue of the presence of the wedge surface, even if chips or the like occur, the shaft portion of the first member can be reliably inserted into the space on the side of the second member.
在根据本发明中的第十一方面,由于在第一件中具有矩形横截面形状的杆部末端处设置锁紧凸出的关系,可以尽可能地靠近杆部末端侧的位置处设置锁紧凸出。所以,当使锁紧凸出与第二件侧上的接合台肩接合时,在第二件的分隔开的支柱部之间形成的空隙中不再存在障碍,使得分隔开的支柱部能容易地向内挠曲。According to the eleventh aspect of the present invention, since the locking protrusion is provided at the end of the rod having a rectangular cross-sectional shape in the first piece, the locking can be provided at a position as close to the end side of the rod as possible. protruding. Therefore, when the locking projection is brought into engagement with the engaging shoulder on the side of the second part, there is no longer an obstacle in the space formed between the separated leg parts of the second part, so that the separated leg parts Can easily flex inward.
在根据本发明中的第十二方面,由于在第一件的棱柱形杆部上对角方式在角部处形成凹口,并且使得第二件侧上的空隙与杆部的横截面形状相似,在杆部的宽度方向上施加负荷的情况下,杆部的凸出端缘邻接被固定对象安装孔的孔缘,从而能避免偏移。同时,可以避免各分隔开的支柱部向杆部侧的倾倒,并且还可以避免分隔开的支柱部对安装孔孔缘的拍击。In accordance with the twelfth aspect of the present invention, since the notch is formed at the corner in a diagonal manner on the prismatic stem of the first piece, and the clearance on the side of the second piece is made similar to the cross-sectional shape of the stem When a load is applied in the width direction of the rod portion, the protruding end edge of the rod portion abuts against the edge of the mounting hole of the fixed object, so that deviation can be avoided. Simultaneously, it is possible to avoid the falling of each separated pillar part to the side of the rod part, and it is also possible to avoid the flapping of the separated pillar part against the edge of the mounting hole.
在根据本发明中的第十三方面,由于在第一件的头部和第二件的凸缘部之间形成空隙的关系,当试图从分隔开的支柱部之间的空隙拉出第一件的杆部时,可以抬起第一件的头部,使得能非常容易地进行操作。In accordance with the thirteenth aspect of the present invention, since the gap is formed between the head portion of the first piece and the flange portion of the second piece, when trying to pull out the first piece from the gap between the divided pillar portions, When removing the stem of one piece, the head of the first piece can be lifted, making it very easy to access.
附图说明Description of drawings
图1是例示根据本发明第一实施方式的卡子的外部透视图;1 is an external perspective view illustrating a clip according to a first embodiment of the present invention;
图2(A)是图1中A-A线的剖视图;Fig. 2 (A) is the sectional view of line A-A among Fig. 1;
图2(B)是图1中B-B线的剖视图;Fig. 2 (B) is the sectional view of B-B line among Fig. 1;
图3(A)是例示第一件的正视图;Fig. 3 (A) is the front view illustrating the first piece;
图3(B)是其侧视图;Fig. 3 (B) is its side view;
图4(A)是图3(A)中C-C线的剖视图;Fig. 4 (A) is the sectional view of line C-C among Fig. 3 (A);
图4(B)是图3(B)中D-D线的剖视图;Fig. 4 (B) is the sectional view of line D-D in Fig. 3 (B);
图5(A)是例示第二件的正视图;Fig. 5 (A) is the front view illustrating the second part;
图5(B)是图5(A)中E-E线的剖视图;Fig. 5 (B) is the sectional view of E-E line among Fig. 5 (A);
图6是例示使第一件与第二件成一体的状态的剖视图;Fig. 6 is a cross-sectional view illustrating a state in which the first member and the second member are integrated;
图7(A)是例示用卡子将顶装饰固定在顶盖上的状态的剖视图;FIG. 7(A) is a cross-sectional view illustrating a state in which the top decoration is fixed on the top cover with clips;
图7(B)是图7(A)中F-F线剖视图;Fig. 7 (B) is F-F line sectional view among Fig. 7 (A);
图8是例示从第二件的空隙中拉出第一件的状态的剖视图;8 is a cross-sectional view illustrating a state in which the first piece is pulled out from the gap of the second piece;
图9是例示根据本发明第二实施方式的卡子的外透视图;9 is an external perspective view illustrating a clip according to a second embodiment of the present invention;
图10(A)是图9中G-G线的剖视图;Fig. 10 (A) is the sectional view of G-G line among Fig. 9;
图10(B)是图9的H-H线的剖视图;Fig. 10 (B) is the sectional view of the H-H line of Fig. 9;
图11(A)是例示使第一件与第二件成一体的状态的剖视图;11(A) is a sectional view illustrating a state in which the first part and the second part are integrated;
图11(B)是图11(A)中I-I线的剖视图;以及Fig. 11 (B) is the sectional view of line I-I among Fig. 11 (A); And
图12是例示一对分隔开的支柱很大程度向内挠曲的状态的剖视图。Fig. 12 is a cross-sectional view illustrating a state where a pair of spaced struts are largely deflected inwardly.
标号说明Label description
1:第一件1: first item
2:第二件2: second piece
3:小桥片3: small bridge piece
4:扩大头部4: Expand the head
4a:台阶部4a: step part
5:杆部5: Rod
5a:凹口部5a: Notch
6:肋壁6: rib wall
7:楔面7: wedge surface
8:锁紧凸出8: locking protrusion
9:装配凸出9: Assembly protruding
10:细径部10: Small diameter part
11:凸缘部11: Flange
11a:台阶部11a: step part
12:支柱部12: Pillar Department
13:开口13: opening
14:凹槽14: Groove
15:接合台肩15: Joint shoulder
16:分隔开的支柱部16: Separated pillars
16a:凸出部16a: Protrusion
16b:插接部16b: socket part
17:空隙17: Gap
18:弹性叶片18: elastic leaf
19:连接槽19: Connection slot
20:间隙20: Gap
21:侧锁紧凸出21: side lock protrusion
P1:顶装饰P1: top decoration
H1:安装孔H1: Mounting hole
P2:顶盖P2: top cover
H2:安装孔H2: Mounting hole
具体实施方式Detailed ways
在本发明中,所谓的树式卡子配置成包括第一件和第二件,并且使第一件和第二件有机地结合。在固定所要固定对象的情况下,随着将第一件插进第二件侧,达到第一件和第二件成一体,并且,在此状态下使用此卡子。另一方面,在从被固定对象的安装孔中取下卡子以解除被固定对象固定状态的情况下,只需借助于必要的部分从第二件侧拉出第一件,使第二件的分隔开的支柱部向内挠曲,从而使得能从安装孔中将第一件与第二件一起简单地取下。In the present invention, the so-called tree clip is configured to include the first piece and the second piece, and to organically combine the first piece and the second piece. In the case of fixing the object to be fixed, as the first piece is inserted into the side of the second piece, the first piece and the second piece are integrated, and the clip is used in this state. On the other hand, in the case of removing the clip from the mounting hole of the fixed object to release the fixed state of the fixed object, it is only necessary to pull out the first piece from the second piece side by means of the necessary part, so that the second piece The spaced-apart strut portions flex inwardly, thereby enabling simple removal of the first piece together with the second piece from the mounting hole.
第一实施方式first embodiment
下面,基于附图中例示的优选实施方式,对本发明进行详细描述。与常规的单件不同,根据第一实施方式的卡子由两部分组成,包括第一件1和第二件2。特征在于:第一件1和第二件2由合成树脂一体成型,如图1所示。应当注意到,在一体成型时,这样设置排列,如图2所示,第一件1和第二件2在轴向上彼此偏移开,并且,用四个小桥片3使其彼此连接,同时,第一件1的杆部5(下文描述)的末端,与第二件2的开口13(下文描述)的边缘对齐。在这种状态下,在切断小桥片3的同时,将第一件1压进第二件2,从而,能非常简单地达到第一件1和第二件2形成一体的状态。Hereinafter, the present invention will be described in detail based on preferred embodiments illustrated in the drawings. Unlike conventional single pieces, the clip according to the first embodiment consists of two parts, comprising a first piece 1 and a
据此,首先,描述第一件1的结构。如图3以及图4所示,第一件1包括:盘状扩大头部4,其尺寸适合于握持;以及,棱柱形杆部5,从扩大头部4的下表面延伸。对于后述的杆部5,在角部上对角方式形成凹口部5a,使横截面形状成为以中心线作为分界线,相对宽度方向,凹口部5a左右错开布置。此外,一对肋壁6在轴向连续形成在两个侧面上,各肋壁6为T形,用于接合进入下述第二件2的连接槽19中。特别地,在杆部5的末端侧上,将各肋壁6削成楔面7,从而仅将余部分形成为矩形横截面形状,并且,使上述的小桥片3连接到矩形横截面形状的四个拐角上。此外,在各小桥片3上方的外周面上,设置一对锁紧凸出8,该对锁紧凸出8与下述第二件2的接合台肩15分别不可分地接合。应当注意到,为了使锁紧凸出8和接合台肩15不可分地接合,将锁紧凸出8的上表面侧形成为直角结合面,而其下表面侧形成为楔面。Accordingly, first, the structure of the first piece 1 is described. As shown in FIGS. 3 and 4 , the first piece 1 includes: a disc-shaped
另外,这次,在杆部5靠近扩大头部4侧的基端,在外周面上设置一对装配凸出9,装配凸出9与下述第二件2的接合台肩15可分离地接合。为了使装配凸出9和接合台肩15可分离地接合,装配凸出9的上下表面都形成为楔面。此外,当前采用这样一种结构,其中,在设置装配凸出9部分下方的杆部5部分形成为细径部10。In addition, this time, at the base end of the
下面,描述第二件2的结构。以及,如图5所示,第二件2包括:盘状凸缘部11,其小于第一件1的扩大头部4;以及圆筒状支柱部12,其从凸缘部11的下表面延伸。在上述的凸缘部11中,其中心处形成与下述空隙17连通的开口13,以及,在凸缘部11的下表面中,形成一对凹槽14,凹槽14平行于下述的一对分隔开的支柱部16延伸,而开口13位于凹槽14之间。同时,在开口13的相对内周面下侧上,设置接合台肩15,接合台肩15与上述第一件1的锁紧凸出8和装配凸出9分别接合。应当注意到,这些接合台肩15的下表面形成为直角接合面。Next, the structure of the
另外,后者支柱部12如此构造,使得支柱部12左右对称方式分离开成为两部分,以形成空隙17,空隙17与开口13连通,以及,将第一件1的杆部5插进一对分隔开的支柱部16之间的空隙17中,并且,在各分隔开的支柱部16的侧缘处,对角方式设置一对凸出部16a,凸出部16a向内凸出,并且与杆部5的凹口部5a相对。所以,空隙17与除了肋壁6之外的杆部5横截面形状相似。此外,在各分隔开的支柱部16的外周面上,沿垂向以多级方式设置径向向上凸出的弹性叶片18,同时,在分隔开的支柱部16的内周面上,分别形成一对相似形的连接槽19,其中保持T形肋壁6。In addition, the
据此,在使用上述结构的卡子,将作为车辆内装饰材料的顶装饰P1固定到作为车身板的顶盖P2上的情况下,为了使一体成型的第一件1和第二件2在安装之前成为一体,首先在其成型模具内部或者外部切断小桥片3,并且,按压第一件1的扩大头部4,以将第一件1的杆部5插进形成在分隔开的支柱部16之间的空隙17中。在这种情况下,由于第一件1的杆部5在其末端矩形横截面的四个末端拐角处与第二件2的凸缘部11的开口13的边缘连接的关系,以较小的力就能切断小桥片3,而不会导致第一件1相对于第二件2倾斜或者摇动,从而可容易地进行第一件1和第二件2的装配操作。另外,依靠在杆部5末端处存在的楔面7,即使出现切下碎屑等的情况,碎屑等也能被楔面7吸收,从而,使得能将第一件1的杆部5可靠地插入在第二件2侧的空隙17中。Accordingly, in the case of fixing the roof trim P1 as a vehicle interior material to the roof P2 as a vehicle body panel using the clip of the above structure, in order to make the integrally formed first member 1 and
另外,在第一件1和第二件2成一体的状态下,如图6所示,在设置于第一件1杆部5上的装配凸出9与设置在第二件2开口13的内周面上的接合台肩15相接合的同时,使锁紧凸出8在下端侧与对应分隔开的支柱部16的内周面保持压接触。所以,在运送或者处理期间,第一件1和第二件2都不存在脱离的可能性,并且,在棱柱形杆部5的各外周面与各分隔开的支柱部16的内周面之间,连续地形成微小的间隙20。In addition, in the state where the first piece 1 and the
据此,在使第一件1和第二件2成一体的状态下,该卡子与常规的单件卡子没有区别。Accordingly, in the state where the first part 1 and the
在达到第一件1和第二件2成一体的状态之后,使顶装饰P1重叠在顶盖P2上,以达到使其安装孔H1与H2对准的状态,并且,将支柱部12压进安装孔H1和H2中。然后,在将以多级方式设置于分隔开的支柱部16外周面上的弹性叶片18穿过安装孔H1和H2的过程中,弹性叶片18受到安装孔H1和H2内周面的挤压并弯曲,而且,在穿到安装孔H1和H2的背面侧之后,弹性叶片18恢复到其初始状态,从而阻止第二件2脱离安装孔H1和H2。结果,将顶装饰P1固定在顶盖P2上,如图7所示。After reaching the state where the first piece 1 and the
此外,在这种情况下,由于将第一件1的杆部5插入分隔开的支柱部16之间的空隙17,使分隔开的支柱部16彼此不再接近,因而,以与常规卡子相同的方式,能达到部件P1和P2两者的可靠且稳固的固定状态。另外,在将第二件2的支柱部12压进安装孔H1和H2时,即使分隔开的支柱部16的下端缘顶靠并且接触安装孔H1的孔缘,但由于第一件1的杆部5与第二件2的各分隔开的支柱部16彼此连接,因对应的肋壁6与连接槽19在其几乎全长上互相接合而不能彼此分开,所以,不存在分隔开的支柱部16的下端部无操作折起且不能压进安装孔H1和H2的可能性。同时,还能有效避免杆部5与分隔开的支柱部16之间的横向偏移。In addition, in this case, since the
另外,由于在第一件1棱柱形杆部5的角部处对角方式形成凹口部5a,并且,在第二件2各分隔开的支柱部16的侧缘处对角方式形成凸出部16a,这样,在杆部5的宽度方向上施加负荷的情况下,杆部5的相对凸出端缘邻接安装孔H1和H2的孔缘,从而能避免偏移。同时,可以避免各分隔开的支柱部16向杆部5侧倾倒,并且,也能避免分隔开的支柱部16相对安装孔H1和H2孔缘的击打声音。In addition, since the
安装孔H1和H2中反向取下卡子本身,以解除顶装饰P1与顶盖P2固定状态,这样的情况下,如果操作人员在用手指紧握第一件1的扩大头部4的同时,从第二件2的分隔开的支柱部16之间的空隙17中拉出第一件1的杆部5,利用间隙20(各形成在杆部5与各分隔开的支柱部16之间),将第一件1的杆部5从分隔开的支柱部16之间的空隙17中逐渐拉出。这时,如图8所示,锁紧凸出8与设置在开口13内周面上的接合台肩15不可分地接合。结果,不再阻碍空隙17内分隔开的支柱部16互相接近。此外,由于将锁紧凸出8设置在尽可能靠近杆部5最末端侧处,所以,如所描述的,几乎已不存在阻碍。Reversely remove the clip itself from the mounting holes H1 and H2 to release the fixed state of the top decoration P1 and the top cover P2. From the
应当注意到,在拉出之前,设置在第一件1的杆部5上的装配凸出9与接合台肩15相接合,如上所述。然而,由于装配凸出9与接合台肩15可分离方式接合,所以,不用过大的力,就能将第一件1的杆部5从第二件2的空隙17拉出。同时,由于在装配凸出9下面的部分处形成细径部10,所以,在通过解除装配凸出9与接合台肩15之间的接合以从第二件2侧拉出第一件1的杆部5的情况下,拉出阻力在早期阶段显著减小,使得拉出更为容易。It should be noted that the
据此,如果接着在继续紧握第一件1扩大头部4的同时,将第一件1连同处于锁定状态下的第二件2一起从安装孔H1和H2取下,由于空隙17,使分隔开的支柱部16很大程度上向内侧挠曲。所以,即使多级弹性叶片18斜向上延伸,实际上也不需要在相反方向上弯曲多级弹性叶片18,因而,用操作人员手指施加较轻的力就能取下卡子本身,而不需要使用常规方式中的工具。Accordingly, if the first piece 1 is then removed from the mounting holes H1 and H2 together with the
另外,在第一实施方式中,由于在第二件2凸缘部11下表面中设置凹槽14的关系,在诸如顶装饰P1和顶盖P2的总板厚相对较薄的情况下,很难使分隔开的支柱部16靠近凸缘部11的部分向内挠曲。然而,此时,因为第二件2的凸缘部11本身依靠凹槽14挠曲,能有效促进分隔开的支柱部16的向内挠曲,因而,在任何情况下,可以用操作人员的手指取下卡子自身,而不用使用工具。因此,即使顶装饰P1是由易损材料形成的,也不会易无操作导致顶装饰P1损坏。In addition, in the first embodiment, since the
应当注意到,在一旦从安装孔H1和H2取下卡子之后,再次使用该卡子来固定顶装饰P1和顶盖P2的情况下,预先应尽可能地使第一件1和第二件2成一体,并且如上所述将其作为整体推入安装孔H1和H2。但是,如果首先将第二件2单独推进安装孔H1和H2,并且随后将第一件1的杆部5推进第二件2的空隙17,就能用较小的力将具有多级弹性叶片18的第二件2支柱部12推进安装孔H1和H2中。It should be noted that in the case of reusing the clips once removed from the mounting holes H1 and H2 to fix the top trim P1 and top cover P2, the first piece 1 and the
第二实施方式second embodiment
下面,描述根据第二实施方式的卡子。根据第二实施方式的卡子与上述的第一实施方式的结构基本相同,其不同在于:首先,如图9和图10所示,省去了形成在第一件1杆部5的两个侧面上的T形肋壁6,并且,在杆部5的两个端面上对角方式在轴向上新连续形成一对肋壁6,其与棱柱形杆部5共同形成S形,在肋壁6的末端缘处凸出方式设置一对侧锁紧凸出21。设置结构为,当要从第二件2的分隔开的支柱16之间的空隙17中拉出第一件1的杆部5时,使侧锁紧凸出21与形成在第二件2的凸缘部11下表面中的凹槽14相邻接,从而,更可靠地阻止杆部5离开空隙17。Next, a clip according to a second embodiment is described. The structure of the clip according to the second embodiment is basically the same as that of the above-mentioned first embodiment, the difference is that: firstly, as shown in Figs. The T-shaped
为此,省略在第二件2的分隔开的支柱部16内周面中形成的连接槽19,取代方式为,在对角方式位于第二件2的分隔开的支柱部16上的端缘处,一体方式设置一对薄壁插接部16b,各薄壁插接部16b插进杆部5的侧面与各肋壁6的内表面之间的空隙。因此,同时采用这样一种结构,其中:在将第一件1的杆部5插进第二件2的分隔开的支柱部16之间的空隙17的状态下,使杆部5与分隔开的支柱部16的下端部互相连接,使其彼此不能分开,而在第二件2的支柱部12压进安装孔H1和H2的情况下,又避免分隔开的支柱部16的下端部出现不希望的折起。For this reason, the
其次,如图11所示,在第一件1的扩大头部4的下表面上,形成台阶部4a,并且,在第二件2的凸缘部11的上表面上,也形成与其相对的台阶部11a。设置结构为,在第一件1和第二件2成一体的状态下,在第一件1的扩大头部4与第二件2的凸缘部11之间形成固定空隙,带来的结果是,如果操作人员在用手指握持第一件的扩大头部4时,从第二件2的分隔开的支柱部16之间的空隙17中拉出第一件1的杆部5,第一件1的扩大头部4可提升,以方便操作。应当注意到,显然,在这种情况下,扩大头部4在直径上大于凸缘部11。Next, as shown in FIG. 11, on the lower surface of the
据此,在利用上述结构的卡子将顶装饰P1类似地固定到顶盖P2上的情况下,同样地,为了使一体成型的第一件1和第二件2成为一体,如果首先切断小桥片3,将第一件1的杆部5插进形成在第二件2的分隔开的支柱部16之间的空隙17,可以使第一件1和第二件2成为一体。然而,在这种情况下,在扩大头部4和凸缘部11之间形成固定空隙,并且各插接部16b(设置在第二件2的分隔开的支柱部16端缘处)接合在第一件1杆部5的侧面与各肋壁6的内表面之间的空隙中,从而允许分隔开的支柱部16通过杆部5彼此连接,使其彼此不能分开。Accordingly, in the case where the top trim P1 is similarly fixed to the top cover P2 by using the clips of the above structure, similarly, in order to integrate the integrally formed first piece 1 and the
在达到第一件1和第二件2成一体的状态之后,将顶装饰P1重叠在顶盖P2上,以达到使其安装孔H1与H2对准的状态,并且,将支柱部12压进安装孔H1和H2中。然后,在将以多级方式设置于分隔开的支柱部16外周面上的弹性叶片18穿过安装孔H1和H2的过程中,弹性叶片18受到安装孔H1和H2内周面的挤压并弯曲,而且,在穿到安装孔H1和H2的背面侧之后,弹性叶片18恢复到其初始状态,从而阻止第二件2脱离安装孔H1和H2。结果,尽管未具体图示,按照与第一实施方式相同的方式,将顶装饰P1可靠且牢固地固定在顶盖P2上。After reaching the state where the first piece 1 and the
在从安装孔H1和H2中反向取下卡子自身以解除顶装饰P1与顶盖P2固定状态的情况下,如果操作人员在用手指紧握第一件1的扩大头部4(由于存在空隙而提起来)的同时,从第二件2的分隔开的支柱部16之间的空隙17中拉出第一件1的杆部5,利用分别形成在杆部5与各分隔开的支柱部16之间的间隙20,将第一件1的杆部5从分隔开的支柱部16之间的空隙17中逐渐拉出。这时,使一对锁紧凸出8与设置在开口13内周面上的接合台肩15不可分地接合,并且,新设置的一对侧锁紧凸出21邻接形成在凸缘部11下表面中的凹槽14。所以,与第一实施方式的情况相比,依靠成对的接合和成对的邻接作用,能更可靠地阻止第一件1和第二件2误操作分离。应当注意到,结果,按照与第一实施方式中相同的方式,空隙17内分隔开的支柱部16互相接近的阻碍不存在了。In the case where the clip itself is reversely removed from the mounting holes H1 and H2 to release the fixed state of the top decoration P1 and the top cover P2, if the operator holds the
据此,如果随后在继续握持第一件1的扩大头部4的同时,将第一件1连同处于锁定状态下的第二件2一起从安装孔H1和H2取下,由于空隙17,使分隔开的支柱部16很大程度上向内挠曲,如图12所示。所以,即使多级弹性叶片18斜向上延伸,实际上也不需要在相反方向上弯曲多级弹性叶片18,因而,用操作人员手指施加较轻的力就能取下卡子自身,而不要使用常规方式中的工具。Accordingly, if the first piece 1 is subsequently removed from the mounting holes H1 and H2 together with the
工业适用性Industrial applicability
与常规的整件卡子不同,根据本发明的卡子配置成包括两部分,包括第一件和第二件,并且这样使用第一件和第二件,以使其能相对彼此拉出及插入地成一体。所以,根据本发明的卡子,非常适合用于的情况是:在诸如将车辆内装饰材料固定到车身板上时,出现解除其固定状态要求的情况。Unlike conventional one-piece clips, the clip according to the present invention is configured to include two parts, including a first piece and a second piece, and uses the first and second pieces in such a way that they can be pulled out and inserted relative to each other. into one. Therefore, the clip according to the present invention is very suitable for use in cases where there is a need to release its fixing state, such as when fixing a vehicle interior trim material to a body panel.
Claims (13)
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP160767/2004 | 2004-05-31 | ||
| JP2004160767 | 2004-05-31 | ||
| JP155796/2005 | 2005-05-27 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN1961157A true CN1961157A (en) | 2007-05-09 |
| CN100451357C CN100451357C (en) | 2009-01-14 |
Family
ID=38072116
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNB2005800177744A Expired - Fee Related CN100451357C (en) | 2004-05-31 | 2005-05-31 | Clips |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN100451357C (en) |
Cited By (32)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102192225A (en) * | 2010-03-10 | 2011-09-21 | 大和化成工业株式会社 | Clip |
| CN104235250A (en) * | 2013-06-11 | 2014-12-24 | 通用汽车环球科技运作有限责任公司 | Elastically deformable energy management arrangement and method of managing energy absorption |
| CN104766773A (en) * | 2014-01-06 | 2015-07-08 | 西门子公司 | Snap-in assembly and its fuse switch |
| US9278642B2 (en) | 2013-04-04 | 2016-03-08 | GM Global Technology Operations LLC | Elastically deformable flange locator arrangement and method of reducing positional variation |
| US9303667B2 (en) | 2013-07-18 | 2016-04-05 | Gm Global Technology Operations, Llc | Lobular elastic tube alignment system for providing precise four-way alignment of components |
| US9388838B2 (en) | 2013-04-04 | 2016-07-12 | GM Global Technology Operations LLC | Elastic retaining assembly for matable components and method of assembling |
| US9428046B2 (en) | 2014-04-02 | 2016-08-30 | GM Global Technology Operations LLC | Alignment and retention system for laterally slideably engageable mating components |
| US9429176B2 (en) | 2014-06-30 | 2016-08-30 | GM Global Technology Operations LLC | Elastically averaged alignment systems and methods |
| US9428123B2 (en) | 2013-12-12 | 2016-08-30 | GM Global Technology Operations LLC | Alignment and retention system for a flexible assembly |
| US9447840B2 (en) | 2013-06-11 | 2016-09-20 | GM Global Technology Operations LLC | Elastically deformable energy management assembly and method of managing energy absorption |
| US9447806B2 (en) | 2013-12-12 | 2016-09-20 | GM Global Technology Operations LLC | Self-retaining alignment system for providing precise alignment and retention of components |
| US9446722B2 (en) | 2013-12-19 | 2016-09-20 | GM Global Technology Operations LLC | Elastic averaging alignment member |
| US9457845B2 (en) | 2013-10-02 | 2016-10-04 | GM Global Technology Operations LLC | Lobular elastic tube alignment and retention system for providing precise alignment of components |
| US9458876B2 (en) | 2013-08-28 | 2016-10-04 | GM Global Technology Operations LLC | Elastically deformable alignment fastener and system |
| US9463538B2 (en) | 2012-08-13 | 2016-10-11 | GM Global Technology Operations LLC | Alignment system and method thereof |
| US9463831B2 (en) | 2013-09-09 | 2016-10-11 | GM Global Technology Operations LLC | Elastic tube alignment and fastening system for providing precise alignment and fastening of components |
| US9481317B2 (en) | 2013-11-15 | 2016-11-01 | GM Global Technology Operations LLC | Elastically deformable clip and method |
| US9488205B2 (en) | 2013-07-12 | 2016-11-08 | GM Global Technology Operations LLC | Alignment arrangement for mated components and method |
| US9511802B2 (en) | 2013-10-03 | 2016-12-06 | GM Global Technology Operations LLC | Elastically averaged alignment systems and methods |
| US9541113B2 (en) | 2014-01-09 | 2017-01-10 | GM Global Technology Operations LLC | Elastically averaged alignment systems and methods |
| US9556890B2 (en) | 2013-01-31 | 2017-01-31 | GM Global Technology Operations LLC | Elastic alignment assembly for aligning mated components and method of reducing positional variation |
| CN106460906A (en) * | 2014-08-14 | 2017-02-22 | 宝马股份公司 | Clip element, method for producing a component connection, and component connection |
| US9599279B2 (en) | 2013-12-19 | 2017-03-21 | GM Global Technology Operations LLC | Elastically deformable module installation assembly |
| US9618026B2 (en) | 2012-08-06 | 2017-04-11 | GM Global Technology Operations LLC | Semi-circular alignment features of an elastic averaging alignment system |
| US9657807B2 (en) | 2014-04-23 | 2017-05-23 | GM Global Technology Operations LLC | System for elastically averaging assembly of components |
| US9669774B2 (en) | 2013-10-11 | 2017-06-06 | GM Global Technology Operations LLC | Reconfigurable vehicle interior assembly |
| US9758110B2 (en) | 2015-01-12 | 2017-09-12 | GM Global Technology Operations LLC | Coupling system |
| US9812684B2 (en) | 2010-11-09 | 2017-11-07 | GM Global Technology Operations LLC | Using elastic averaging for alignment of battery stack, fuel cell stack, or other vehicle assembly |
| CN108291567A (en) * | 2015-12-08 | 2018-07-17 | 株式会社利富高 | Buckle |
| US10107319B2 (en) | 2015-03-02 | 2018-10-23 | GM Global Technology Operations LLC | Elastically averaged alignment systems and methods |
| CN112955669A (en) * | 2018-09-10 | 2021-06-11 | 智能配件有限公司 | Pin fastener |
| CN113906225A (en) * | 2019-05-24 | 2022-01-07 | 阿诺德成形技术有限责任两合公司 | Connecting element |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102052372A (en) * | 2009-11-09 | 2011-05-11 | 鸿富锦精密工业(深圳)有限公司 | Fan fixer |
| US10215214B2 (en) * | 2016-10-24 | 2019-02-26 | Ford Global Technologies, Llc | Multi-engagement push clip assembly |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS63275805A (en) * | 1987-04-30 | 1988-11-14 | 株式会社 ニフコ | Screw receiving tool |
| FR2790046B1 (en) * | 1999-02-19 | 2001-05-18 | Rapid Sa | DEVICE FOR FIXING TWO PANELS OR THE LIKE IN THE FORM OF TWO COOPERATING PARTS |
| JP2002019440A (en) * | 2000-07-07 | 2002-01-23 | Piolax Inc | Strut mounting structure |
| JP4235755B2 (en) * | 2000-09-29 | 2009-03-11 | 株式会社パイオラックス | clip |
| JP3708870B2 (en) * | 2001-12-20 | 2005-10-19 | 西川化成株式会社 | Assist grip mounting structure |
| JP2003232318A (en) * | 2002-02-08 | 2003-08-22 | Zen Kenchiku Sekkei Jimusho:Kk | Fastener |
-
2005
- 2005-05-31 CN CNB2005800177744A patent/CN100451357C/en not_active Expired - Fee Related
Cited By (36)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102192225A (en) * | 2010-03-10 | 2011-09-21 | 大和化成工业株式会社 | Clip |
| US9812684B2 (en) | 2010-11-09 | 2017-11-07 | GM Global Technology Operations LLC | Using elastic averaging for alignment of battery stack, fuel cell stack, or other vehicle assembly |
| US9618026B2 (en) | 2012-08-06 | 2017-04-11 | GM Global Technology Operations LLC | Semi-circular alignment features of an elastic averaging alignment system |
| US9463538B2 (en) | 2012-08-13 | 2016-10-11 | GM Global Technology Operations LLC | Alignment system and method thereof |
| US9556890B2 (en) | 2013-01-31 | 2017-01-31 | GM Global Technology Operations LLC | Elastic alignment assembly for aligning mated components and method of reducing positional variation |
| US9278642B2 (en) | 2013-04-04 | 2016-03-08 | GM Global Technology Operations LLC | Elastically deformable flange locator arrangement and method of reducing positional variation |
| US9388838B2 (en) | 2013-04-04 | 2016-07-12 | GM Global Technology Operations LLC | Elastic retaining assembly for matable components and method of assembling |
| CN104235250A (en) * | 2013-06-11 | 2014-12-24 | 通用汽车环球科技运作有限责任公司 | Elastically deformable energy management arrangement and method of managing energy absorption |
| US9447840B2 (en) | 2013-06-11 | 2016-09-20 | GM Global Technology Operations LLC | Elastically deformable energy management assembly and method of managing energy absorption |
| US9488205B2 (en) | 2013-07-12 | 2016-11-08 | GM Global Technology Operations LLC | Alignment arrangement for mated components and method |
| US9303667B2 (en) | 2013-07-18 | 2016-04-05 | Gm Global Technology Operations, Llc | Lobular elastic tube alignment system for providing precise four-way alignment of components |
| US9458876B2 (en) | 2013-08-28 | 2016-10-04 | GM Global Technology Operations LLC | Elastically deformable alignment fastener and system |
| US9463831B2 (en) | 2013-09-09 | 2016-10-11 | GM Global Technology Operations LLC | Elastic tube alignment and fastening system for providing precise alignment and fastening of components |
| US9457845B2 (en) | 2013-10-02 | 2016-10-04 | GM Global Technology Operations LLC | Lobular elastic tube alignment and retention system for providing precise alignment of components |
| US9511802B2 (en) | 2013-10-03 | 2016-12-06 | GM Global Technology Operations LLC | Elastically averaged alignment systems and methods |
| US9669774B2 (en) | 2013-10-11 | 2017-06-06 | GM Global Technology Operations LLC | Reconfigurable vehicle interior assembly |
| US9481317B2 (en) | 2013-11-15 | 2016-11-01 | GM Global Technology Operations LLC | Elastically deformable clip and method |
| US9447806B2 (en) | 2013-12-12 | 2016-09-20 | GM Global Technology Operations LLC | Self-retaining alignment system for providing precise alignment and retention of components |
| US9428123B2 (en) | 2013-12-12 | 2016-08-30 | GM Global Technology Operations LLC | Alignment and retention system for a flexible assembly |
| US9446722B2 (en) | 2013-12-19 | 2016-09-20 | GM Global Technology Operations LLC | Elastic averaging alignment member |
| US9599279B2 (en) | 2013-12-19 | 2017-03-21 | GM Global Technology Operations LLC | Elastically deformable module installation assembly |
| CN104766773A (en) * | 2014-01-06 | 2015-07-08 | 西门子公司 | Snap-in assembly and its fuse switch |
| CN104766773B (en) * | 2014-01-06 | 2017-04-12 | 西门子公司 | Clamping assembly and fuse switch provided with same |
| US9541113B2 (en) | 2014-01-09 | 2017-01-10 | GM Global Technology Operations LLC | Elastically averaged alignment systems and methods |
| US9428046B2 (en) | 2014-04-02 | 2016-08-30 | GM Global Technology Operations LLC | Alignment and retention system for laterally slideably engageable mating components |
| US9657807B2 (en) | 2014-04-23 | 2017-05-23 | GM Global Technology Operations LLC | System for elastically averaging assembly of components |
| US9429176B2 (en) | 2014-06-30 | 2016-08-30 | GM Global Technology Operations LLC | Elastically averaged alignment systems and methods |
| CN106460906A (en) * | 2014-08-14 | 2017-02-22 | 宝马股份公司 | Clip element, method for producing a component connection, and component connection |
| US9758110B2 (en) | 2015-01-12 | 2017-09-12 | GM Global Technology Operations LLC | Coupling system |
| US10107319B2 (en) | 2015-03-02 | 2018-10-23 | GM Global Technology Operations LLC | Elastically averaged alignment systems and methods |
| CN108291567A (en) * | 2015-12-08 | 2018-07-17 | 株式会社利富高 | Buckle |
| US11092179B2 (en) | 2015-12-08 | 2021-08-17 | Nifco Inc. | Clip |
| CN112955669A (en) * | 2018-09-10 | 2021-06-11 | 智能配件有限公司 | Pin fastener |
| CN113906225A (en) * | 2019-05-24 | 2022-01-07 | 阿诺德成形技术有限责任两合公司 | Connecting element |
| US11920620B2 (en) | 2019-05-24 | 2024-03-05 | Arnold Umformtechnik Gmbh & Co. Kg | Connecting element |
| CN113906225B (en) * | 2019-05-24 | 2024-03-19 | 阿诺德成形技术有限责任两合公司 | Connecting elements |
Also Published As
| Publication number | Publication date |
|---|---|
| CN100451357C (en) | 2009-01-14 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN1961157A (en) | Clip | |
| EP2536307B1 (en) | Quick fastening clip | |
| JP4499614B2 (en) | clip | |
| CN1190603C (en) | Device for assembling two panels or the like and formed by two co-operating parts | |
| US7470081B2 (en) | Joint structure between members | |
| CN1225604C (en) | Clamp for holding elongated article | |
| JP3795197B2 (en) | Plate material fixture | |
| CN1130276C (en) | Screwdriver bit and its combination with screw | |
| CN1224360C (en) | for sliders on zippers | |
| JP2018179051A (en) | clip | |
| CN1259871C (en) | Spring body for slide fastener and slider having the spring body mounted thereon | |
| CN1625994A (en) | Slider for slide fastener with automatic stopper | |
| CN1509962A (en) | Disk case | |
| CN107850100A (en) | Fixture | |
| CN107211202A (en) | For the utensil and its mounting structure thing after the improvement that vehicle installs audio tweeter | |
| KR20200087094A (en) | Tree fastener removal assemblies and methods therefor | |
| CN101052321A (en) | Buckle | |
| CN1427915A (en) | Vehicle window glass holder | |
| CN1721714A (en) | fastener | |
| CN1644126A (en) | Button | |
| JP2010014148A (en) | Clip | |
| CN1121581C (en) | Device for mounting scavenger fan | |
| CN1695514A (en) | Bottom stop for zippers | |
| JP3789182B2 (en) | Snap-fit engagement structure | |
| JP2003329021A (en) | Fastener structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C17 | Cessation of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090114 Termination date: 20140531 |