CN1281474C - Method for mounting lift-well door of elevator equipment and inlaid frame - Google Patents
Method for mounting lift-well door of elevator equipment and inlaid frame Download PDFInfo
- Publication number
- CN1281474C CN1281474C CNB021428980A CN02142898A CN1281474C CN 1281474 C CN1281474 C CN 1281474C CN B021428980 A CNB021428980 A CN B021428980A CN 02142898 A CN02142898 A CN 02142898A CN 1281474 C CN1281474 C CN 1281474C
- Authority
- CN
- China
- Prior art keywords
- frame
- shaft door
- embedding
- door opening
- template
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B13/00—Doors, gates, or other apparatus controlling access to, or exit from, cages or lift well landings
- B66B13/30—Constructional features of doors or gates
- B66B13/303—Details of door panels
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B19/00—Mining-hoist operation
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/0007—Implements for finishing work on buildings for mounting doors, windows or frames; their fitting
- E04F21/0015—Implements for finishing work on buildings for mounting doors, windows or frames; their fitting for mounting frames
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Elevator Door Apparatuses (AREA)
- Door And Window Frames Mounted To Openings (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
- Cage And Drive Apparatuses For Elevators (AREA)
Abstract
The present invention refers to a process for installing a hoistway door (11) in an elevator assembly. Said process consists in assembling a template (1) that embodies a positioning element (3) and an insertion frame (2) for a hoistway door aperture (RS). The insertion frame (2) is joined to the hoistway wall, thereafter the positioning element (3) is separated from the insertion frame (2) and finally the hoistway door (11) is mounted into the door aperture of the final hoistway door (9), which was configured by means of the insertion frame (2). The aforementioned process allows the hoistway doors to be easily and accurately installed.
Description
Technical field
The present invention relates to a kind of method and a kind of embedding frame that is used to install the lift facility shaft door that is used to install the lift facility shaft door.
Background technology
In US 3 984 952, disclosed a kind of template that the door opening of elevator door is handled when building is fitted up, be convenient to.Adopt connecting element that template is fixed on the guide rail, described guide rail is installed in the vertical shaft, and with Template Location on desired location.Because template is of a size of doorway dimension and in the additional 2.5cm tolerance limit of each side, is poured into the template position place so must will have the wall of door opening with concrete casting.Template must be removed fully after the use.Adopt this mode to set up to embedding the door opening of shaft door later on.The shortcoming of the template of this recommendation is, the guide rail of shaft door must be installed before constructing hoistway wall.In addition, determine that in construction stage the exact location of shaft door is very difficult.When final doorframe is installed, must readjust the position.Another shortcoming of this known arrangement is, because the dismounting of template, so the wall of concrete overlay and the interface between the template will be damaged.At this moment must be again by bricklayer or plasterer to have an opening but removed the wall after the template and handled again.This finishing process subsequently needs the coordination between time and elevator engineer and bricklayer or the plasterer.Therefore will prolong the set-up time greatly.Will make dirty the main frame of door opening of these finishing process of following, this names a person for a particular job and causes the work that adds.Because the expense that install whole elevator at the interface of door itself is occupied very big proportion, these additional work to door opening have improved erected cost greatly.
Summary of the invention
The objective of the invention is to propose a kind of method and a kind of embedding frame that is used to implement this method that shaft door is installed, described method and embed frame do not have above-mentioned shortcoming and can realize to shaft door rapidly, more accurate and clean and tidy installation.
Purpose of the present invention adopts the scheme with following characteristics to be achieved:
A kind of method that is used to install the shaft door of lift facility, the template that wherein at first will comprise locations and embedding frame embeds in the blank shaft door opening, by embedding on the frame locations is disassembled and subsequently shaft door is installed in by embedding the shaft door opening that frame constitutes, embed frame and have and be used for being fixed on fixedly joint tongue in the shaft door opening of qualification with embedding frame, described fixedly joint tongue can be pulled out by embedding on the frame bending.
According to further design of the present invention, template is aimed at the desired location of blank shaft door opening.
According to further design of the present invention, depart from the fixedly joint tongue that embeds frame and be embedded in the space that embeds between frame and the blank shaft door perforated wall.
According to further design of the present invention, to embedding the space cast concrete between frame and the blank shaft door perforated wall.
According to further design of the present invention, the embedding frame is cast concrete, to the follow-up finishing process of wall with on the wall of the shaft door opening that forms shaft door is installed also plays a part reference plane.
According to further design of the present invention, template is made of sheet steel.
According to further design of the present invention, the adaptive gap that is installed in the vertical shaft doorframe in the embedding frame and embeds between the frame is clogged with silicone resin.
The scheme that realizes purpose of the present invention also is, a kind of embedding frame that is used to install the shaft door of lift facility, the embedding frame that is used to install is connected with positioning piece, wherein embedding frame has and is used on hoistway wall fixing fixedly joint tongue, described fixedly joint tongue adopts and cuts towards process forming, can pull out from bending on the embedding frame.
The invention has the advantages that and to realize being accurate to millimetre-sized installation, wherein can accurately embed prefabricated vertical shaft doorframe subsequently embedding frame.Do not need wall is redressed.
Embed frame and can play a part the reference plane that cast mixes earth.The advantage of this point is, can realize the smooth, meticulous of the shaft door opening that limits and the finishing that improves.
Another advantage of the present invention is, shaft door and embedding between the frame, and promptly sheet steel and joint capacity between the sheet steel are better than engaging between traditional cement concrete and the sheet steel.This point is to realize by the template that is made of sheet steel.
Generally speaking, the present invention has following further advantage:
Do not need screw and bolt will embed frame and be positioned on the blank shaft door wall, thereby can saving in material and set-up time.
Can avoid bricklayer/mason's construction group and elevator that the dependence of the coordinated time between technician's group is installed.Two groups can draft its working schedule mutually insusceptibly and can implement this plan uninterruptedly.
Adopt method of the present invention can improve prefabricated degree.
Almost any one work can be carried out under drying regime.
After end is installed, between vertical shaft doorframe and shaft door opening, have only very little gap, and this gap can't cause expensive finishing.
All above-mentioned features are not only applicable to corresponding described combination, and are applicable to other combination or application separately, and can not depart from scope of the present invention.
Description of drawings
Schematically illustrate different embodiment of the present invention in the accompanying drawing, will be described further these embodiment below.Shown in the figure:
Fig. 1 embeds the comprehensive view of the template of blank shaft door opening for the present invention;
Fig. 2 illustrates the embedding frame of embodiment of the invention template;
Fig. 3 illustrates of the present invention with embedding the locations that frame is used;
Fig. 3 a is the lateral plan of Fig. 3 locations;
Fig. 4 has the shaft door opening that fixes the embedding frame as shown in Figure 1;
Fig. 5 is the partial top view at the interface of the shaft door opening of vertical shaft doorframe qualification;
Fig. 6 illustrates the template that is in unassembled state;
Fig. 7 illustrate the template of template on blank shaft door opening the location and
Fig. 8 illustrates the embodiment of other fixed mechanism.
The specific embodiment
Fig. 1 is the comprehensive view of template 1, and wherein template 1 comprises embedding frame 2 and locations 3.Embedding frame 2 removably is connected with locations 3.Wherein locations 3 is arranged on and embeds in the frame 2.Template 1 is embedded in the shaft door opening RS, and described shaft door opening goes out several centimetres in that the building side is wide.
Fig. 2 is the detail drawing that template 1 embeds frame 2, and described embedding frame is used for accurately installing lift-well door, embeds frame 2 and is also preferably made by sheet steel for rectangle substantially.Embed frame and preferably be made of three parts, promptly it can have two vertical horizontal profiled pieces and the horizontal profiled piece 22 above.These three parts are assembled into the embedding frame 2 of rectangle.The periphery that embeds frame 2 conforms to the size of the shaft door 11 that is embedded into subsequently substantially.Fixedly joint tongue 4 plays a part the embedding frame is fixed on elevator shaft walls, and described fixedly joint tongue is arranged on the outside that embeds frame 2.Fixedly joint tongue 4 is set in parallel on the outer peripheral face that embeds frame 2.When installing condition, fixedly joint tongue 4 is bent, and withstands hoistway wall, thereby is provided with corresponding to the side face that embeds frame 2 with being tilted.Fixedly an end E1 of joint tongue 4 remains fixed in and embeds on the frame 2 and the vertical line of the other end and embedding frame 2 has an angle α.
Fig. 3 illustrates locations 3, and described locations constitutes template 1 with embedding frame 2.In the present embodiment, locations 3 has the longitudinal rod 5 in a left side and the longitudinal rod 6 on a right side, described longitudinal rod by three transverse bars 7 substantially with equal altitudes link together.Locations 3 also comprises connecting element 8 in addition, utilizes this connecting element 8 will embed frame 2 and is fixed on the locations 3.Locations 3 also has standard 14 in addition, by additional connecting element 15 standard 14 is installed on the longitudinal rod 5,6
Fig. 3 a is the lateral plan of locations 3, wherein can be clear that standard 14.Each standard 14 has a bench mark M, and described bench mark can be line, mark or a groove.These standards 14 are used for accurately template 1 being positioned and being pivotably mounted in this example longitudinal rod 5,6.Described standard in fact can be from rotating to the vertical mode of operation of basic and longitudinal rod accordingly 5,6 with the dormant state of corresponding longitudinal rod 5,6 substantially parallel settings basically.In Fig. 3 a, represent that with P this moves.By the plumb line L or the laser beam that are suspended in the vertical shaft, to template 1 correct positioning.Plumb line L aims at the Fiducial marks M of the standard 14 that is arranged on mode of operation.
Fig. 4 illustrates the shaft door 11 that is in installing condition.Embed frame 2 and be installed in the shaft door opening 9 of qualification, the fixedly joint tongue that is wherein screwed out by cemented on shaft door wall 10.With cement the shaft door wall is filled on the direction of shaft door opening by the mason, embed frame rib 2.1 (referring to Fig. 5) until reaching.Generally speaking, the inside face O of the shaft door opening 9 of qualification partly be constitute by cement concrete (corridor G direction) and part constitute by embedding frame 2 (vertical shaft S direction).Therefore can't see from the outside and embed frame.This means, embed frame 2 can't see perpendicular to the angle of the vertical shaft shop front accurately from corridor G.The inner face O of the shaft door opening 9 that constitutes is perpendicular to having the vertical shaft shop front (see figure 5) that embeds frame rib 2.1.This details for for simplicity only in Fig. 4 (details A) part illustrate.Preferred cast concrete on the whole outer peripheral face that embeds frame 2 in this way.Vertical shaft doorframe 12 adaptive being installed on the shaft door opening 9 that constitutes by embedding frame 2.Between embedding frame 2 and vertical shaft doorframe 12 very little gap 13 is only arranged, this gap is easy to for example clog with silicone resin when end is installed.
Fig. 6 illustrates the template that is in decomposing state.Three profiled pieces 21,22 that embed frame 2 are installed in the periphery of locations 3.
Fig. 7 illustrates securing device 16 and how to aim at and be fixed on template in the blank shaft door opening.Securing device 16 is fastened between top ceiling D and the floor B.Securing device 16 utilizes 17 pairs of templates 1 of cantilever to support.
Fig. 8 illustrates the possible form of another connecting element 15 embodiment, and described connecting element has a screw rod 18 and wing nut 19.
The step of the method for installation shaft door is as follows substantially:
For constituting template 1, at first will embed frame 2 and be fixed on (see figure 6) on the connecting element 3.Then template 2 is fixed on the blank shaft door opening RS of lift well S, embedding frame 2 is positioned on the correct position.Template 1 is between top ceiling and floor and utilize securing device 16 fastened (see figure 7)s.Thereby utilize securing device that template 1 is embedded on the correct position, and do not need to adopt any screw or bolt.The fixedly joint tongue 4 that embeds frame 2 is pulled out, make fixing joint tongue between embedding frame 2 and adjacent blank shaft door perforated wall RS.Bricklayer is for example filled the space R that embeds between frame 2 and the blank shaft door perforated wall RS with cement concrete then.Therefore fixedly joint tongue 4 is also fixing in position by cement concrete.Embed the reference plane of frame 2 pairs of bricklayers playing a part cast concrete and can make things convenient for its work greatly.Bricklayer is filled the shaft door perforated wall of shaft door opening direction with cement concrete, arrives until cement concrete and embeds frame rib 2.1.Therefore realize embedding frame 2 fixing on hoistway wall.Then locations 3 is disassembled by embedding on the frame 2, thereby can subsequently prefabricated shaft door 11 be embedded in the vertical shaft opening 9 that constitutes.Shaft door 11 comprises vertical shaft doorframe 12 and preferred door-plate 12 '.The locations 3 that disassembles then can be used for other floor.Can use sealing substance without a doubt as mentioned above to the minimum clearance 13 between the shaft door opening 9 of vertical shaft doorframe 12 and formation, for example clog with silicone resin.
Because vertical shaft doorframe 12 and embed frame 2 and can preferably constitute by identical materials by sheet steel, thus doorframe with embed frame, promptly sheet steel is better than the steel-sheet joint capacity and tidiness is better than sheet steel and concrete traditional engaging.Thereby can simplify finishing process then greatly and in the cement concrete drying, all working is once finished.This names a person for a particular job and causes spick-and-span installation.
Claims (8)
1. method that the shaft door (11) of lift facility is installed, the template (1) that wherein at first will comprise locations (3) and embedding frame (2) embeds in the blank shaft door opening (RS), then upward locations (3) is disassembled and follow shaft door (11) is installed in the shaft door opening (9) that limits that is formed by embedding frame (2) by embedding frame (2), it is characterized in that, embed frame (2) and have the interior fixedly joint tongue (4) of shaft door opening (9) that is used for embedding frame (2) is fixed on qualification, described fixedly joint tongue can be gone up bending by embedding frame (2) and pull out.
2. wherein template (1) is aimed in accordance with the method for claim 1, the desired location of blank shaft door opening (RS).
3. wherein will be embedded in the space (R) that embeds between frame (2) and blank shaft door opening (RS) wall in accordance with the method for claim 1, by embedding the fixedly joint tongue (4) of pulling out on the frame (2).
4. each described method in requiring according to aforesaid right wherein charges into cement concrete to the space (R) that embeds between frame (2) and blank shaft door opening (RS) wall.
5. according to each described method among the claim 1-3, wherein embed frame (2) also play a part to charge into cement concrete, to the follow-up finishing process of wall with the shaft door reference plane is installed on the wall of the shaft door opening (9) that limits.
6. according to each described method among the claim 1-3, wherein template (1) is made of sheet steel.
7. according to each described method among the claim 1-3, wherein the adaptive gap that embeds the interior vertical shaft doorframe (12) of frame (2) and embed between the frame (2) that is installed in is clogged with silicone resin.
8. embedding frame that is used to install the shaft door of lift facility, the embedding frame that is used to install is connected with positioning piece (3), wherein embedding frame (2) has and is used on hoistway wall fixing fixedly joint tongue (4), it is characterized in that, described fixedly joint tongue (4) adopts and cuts towards process forming, can go up bending from embedding frame (2) and pull out.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP01810931 | 2001-09-24 | ||
EP01810931.4 | 2001-09-24 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1410339A CN1410339A (en) | 2003-04-16 |
CN1281474C true CN1281474C (en) | 2006-10-25 |
Family
ID=8184156
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB021428980A Expired - Fee Related CN1281474C (en) | 2001-09-24 | 2002-09-23 | Method for mounting lift-well door of elevator equipment and inlaid frame |
Country Status (13)
Country | Link |
---|---|
EP (1) | EP1295839B1 (en) |
CN (1) | CN1281474C (en) |
AR (1) | AR036574A1 (en) |
AT (1) | ATE310705T1 (en) |
AU (1) | AU2002301166B2 (en) |
BR (1) | BR0203867A (en) |
DE (1) | DE50205010D1 (en) |
ES (1) | ES2253481T3 (en) |
HK (1) | HK1055285A1 (en) |
IL (1) | IL151511A (en) |
MX (1) | MXPA02009112A (en) |
NO (1) | NO322984B1 (en) |
ZA (1) | ZA200207640B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2010104515A1 (en) | 2009-03-13 | 2010-09-16 | Otis Elevator Company | Elevator system with guide rail bracket |
JP5676496B2 (en) | 2009-03-13 | 2015-02-25 | オーチス エレベータ カンパニーOtis Elevator Company | Elevator system door frame supporting guide rail |
CN102414114B (en) * | 2009-04-29 | 2014-09-03 | 因温特奥股份公司 | Marking device in elevator system, and marking method using the same |
EP2774887B1 (en) * | 2013-03-08 | 2016-05-18 | KONE Corporation | Door sill unit and method for an elevator landing door unit |
IT201700047221A1 (en) * | 2017-05-02 | 2018-11-02 | Giuseppe Memoli | LAYING EQUIPMENT FOR COUNTERFRAMES FOR DOORS AND WINDOWS |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2352144A1 (en) * | 1976-05-18 | 1977-12-16 | Gattoni Bruno | Framework for apertures in buildings, for windows - has exterior and interior profiles, joined together and with bent out plates for securing to masonry |
JP2521590B2 (en) * | 1991-05-16 | 1996-08-07 | 三菱電機株式会社 | Mortar finishing method and equipment for elevator hall |
DE69223370T2 (en) * | 1991-09-25 | 1998-07-02 | Otis Elevator Co | Universal door frame |
JPH10139335A (en) * | 1996-11-06 | 1998-05-26 | Mitsubishi Denki Bill Techno Service Kk | Landing frame of elevator |
-
2002
- 2002-08-28 IL IL151511A patent/IL151511A/en not_active IP Right Cessation
- 2002-09-18 MX MXPA02009112A patent/MXPA02009112A/en active IP Right Grant
- 2002-09-19 DE DE50205010T patent/DE50205010D1/en not_active Expired - Fee Related
- 2002-09-19 AT AT02020912T patent/ATE310705T1/en not_active IP Right Cessation
- 2002-09-19 EP EP02020912A patent/EP1295839B1/en not_active Expired - Lifetime
- 2002-09-19 ES ES02020912T patent/ES2253481T3/en not_active Expired - Lifetime
- 2002-09-23 NO NO20024552A patent/NO322984B1/en unknown
- 2002-09-23 AR ARP020103571A patent/AR036574A1/en not_active Application Discontinuation
- 2002-09-23 ZA ZA200207640A patent/ZA200207640B/en unknown
- 2002-09-23 CN CNB021428980A patent/CN1281474C/en not_active Expired - Fee Related
- 2002-09-23 AU AU2002301166A patent/AU2002301166B2/en not_active Ceased
- 2002-09-24 BR BR0203867-6A patent/BR0203867A/en not_active Application Discontinuation
-
2003
- 2003-09-26 HK HK03106992A patent/HK1055285A1/en not_active IP Right Cessation
Also Published As
Publication number | Publication date |
---|---|
AR036574A1 (en) | 2004-09-15 |
EP1295839B1 (en) | 2005-11-23 |
BR0203867A (en) | 2003-06-03 |
DE50205010D1 (en) | 2005-12-29 |
CN1410339A (en) | 2003-04-16 |
ES2253481T3 (en) | 2006-06-01 |
NO20024552D0 (en) | 2002-09-23 |
ZA200207640B (en) | 2003-05-08 |
IL151511A0 (en) | 2003-04-10 |
MXPA02009112A (en) | 2004-12-13 |
HK1055285A1 (en) | 2004-01-02 |
NO20024552L (en) | 2003-03-25 |
AU2002301166B2 (en) | 2007-12-06 |
IL151511A (en) | 2006-10-31 |
NO322984B1 (en) | 2006-12-18 |
ATE310705T1 (en) | 2005-12-15 |
EP1295839A1 (en) | 2003-03-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2020217448B2 (en) | Integrated steel concrete building and construction method thereof | |
CN1112497C (en) | Elevator vertical shaft | |
CN1055513C (en) | Improved building techniques | |
CN1324975A (en) | Premade bath room | |
CN1281474C (en) | Method for mounting lift-well door of elevator equipment and inlaid frame | |
CN111733873A (en) | Construction method of assembled subway station | |
CN1059483C (en) | Construction of stair and stair case and units of stair | |
CN1195734A (en) | Factory building method and modular construction for building workshop | |
CN214575220U (en) | Subway station access & exit prefabricated assembled perpendicular pedestrian stair | |
CN1086435C (en) | A set of parts for use in building and a method of using same | |
CN1076776C (en) | prefabricated buildings | |
CN218374567U (en) | Can fix a position ALC wallboard reinforced structure that can exempt from to plaster | |
CN211922959U (en) | Integral prefabricated balcony module suitable for through-beam type steel frame | |
CN213626235U (en) | Adjustable support piece and prefabricated floor slab supporting structure system | |
SK9411Y1 (en) | Elevator and method of its assembly | |
CN114876201A (en) | Core tube building construction method | |
KR100365138B1 (en) | Stairway room construction method use of precast concrete | |
CN1195064A (en) | Semi precast method of construction of multi-storey buildings | |
CN220848142U (en) | Prefabricated assembled filling wall part product synchronously constructed with main body structure | |
KR100763027B1 (en) | PC frame waterproof jaw | |
CN219931379U (en) | Fixed keel for suspended ceiling | |
CN219671804U (en) | Semi-prefabricated plate and finished floor plate | |
GB2577113A (en) | Method of installing a balcony, and device for the same | |
CN101720372B (en) | Wall panel and wall panel clamp | |
CN208618739U (en) | A kind of modular outdoor installation elevator shaft |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C19 | Lapse of patent right due to non-payment of the annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |