[go: up one dir, main page]

CN1252354C - 构建简支以及连续组合桥的方法 - Google Patents

构建简支以及连续组合桥的方法 Download PDF

Info

Publication number
CN1252354C
CN1252354C CNB008196303A CN00819630A CN1252354C CN 1252354 C CN1252354 C CN 1252354C CN B008196303 A CNB008196303 A CN B008196303A CN 00819630 A CN00819630 A CN 00819630A CN 1252354 C CN1252354 C CN 1252354C
Authority
CN
China
Prior art keywords
bridge
support member
concrete
abutments
abutment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB008196303A
Other languages
English (en)
Chinese (zh)
Other versions
CN1494628A (zh
Inventor
丘民世
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from KR1020000031515A external-priority patent/KR20000054500A/ko
Priority claimed from KR1020000035471A external-priority patent/KR20000058716A/ko
Priority claimed from KR2020000018176U external-priority patent/KR200212395Y1/ko
Application filed by Individual filed Critical Individual
Publication of CN1494628A publication Critical patent/CN1494628A/zh
Application granted granted Critical
Publication of CN1252354C publication Critical patent/CN1252354C/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D1/00Bridges in general
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced
    • E01D2101/28Concrete reinforced prestressed
    • E01D2101/285Composite prestressed concrete-metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
CNB008196303A 2000-06-08 2000-12-21 构建简支以及连续组合桥的方法 Expired - Fee Related CN1252354C (zh)

Applications Claiming Priority (6)

Application Number Priority Date Filing Date Title
KR1020000031515A KR20000054500A (ko) 2000-06-08 2000-06-08 단경간 및 다경간 합성형 구조물에서 단부 지점의 하강 및상승공정을 이용 및 조절하여 부모멘트 구간 바닥판콘크리트와 정모멘트 구간 하부플랜지에 압축응력을도입시키는 시공법
KR2000/31515 2000-06-08
KR2000/35471 2000-06-26
KR2000/18176U 2000-06-26
KR1020000035471A KR20000058716A (ko) 2000-06-26 2000-06-26 빔과 교각을 일체화시키고 단부 지점을 하강 및상승시키는 다경간 연속 합성형의 시공법
KR2020000018176U KR200212395Y1 (ko) 2000-06-26 2000-06-26 하부구조와 상부주형을 일체화시킨 단면 구조

Publications (2)

Publication Number Publication Date
CN1494628A CN1494628A (zh) 2004-05-05
CN1252354C true CN1252354C (zh) 2006-04-19

Family

ID=36716992

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB008196303A Expired - Fee Related CN1252354C (zh) 2000-06-08 2000-12-21 构建简支以及连续组合桥的方法

Country Status (5)

Country Link
JP (1) JP3588325B2 (ja)
KR (1) KR100522170B1 (ja)
CN (1) CN1252354C (ja)
AU (1) AU2001222332A1 (ja)
WO (1) WO2001096665A1 (ja)

Families Citing this family (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060137115A1 (en) * 2002-12-30 2006-06-29 Park Young J Prestressed composite girder, continuous prestressed composite girder structure and methods of fabricating and connecting the same
ES2283179B1 (es) * 2005-03-11 2008-12-01 Iglesias Y Revilla, S.L. Estructuras mixtas para su aplicacion a naves industriales prefabricadas.
JP4318694B2 (ja) * 2006-02-13 2009-08-26 朝日エンヂニヤリング株式会社 床版橋構造
JP4863268B2 (ja) * 2006-06-01 2012-01-25 公益財団法人鉄道総合技術研究所 橋梁の構築工法およびその橋梁構造物
KR100742206B1 (ko) * 2006-10-25 2007-07-25 (주)한맥기술 모멘트 재분배에 의하여 장경간 및 저형고를 가지는 강합성라멘교 및 그 시공방법
JP4245657B1 (ja) 2008-10-24 2009-03-25 朝日エンヂニヤリング株式会社 橋脚とコンクリート桁の剛結合構造
KR101046940B1 (ko) * 2008-11-17 2011-07-07 지에스건설 주식회사 피에스씨 거더와 강재 플레이트 거더를 이용한 연속교 시공방법
JP5342312B2 (ja) * 2009-04-21 2013-11-13 大成建設株式会社 プレキャスト部材の架設方法
CN101694087B (zh) * 2009-10-13 2011-05-11 毕承会 一种新型桥的建造方法
CN102877417B (zh) * 2012-10-26 2014-12-03 中铁上海设计院集团有限公司 一种连续梁拱组合桥主梁吊杆的锚固方法
CN103205930B (zh) * 2013-04-25 2015-06-03 福州大学 一种既有简支空心板梁桥连续化改造的结构及其施工方法
CN104480858A (zh) * 2014-10-20 2015-04-01 中建三局第二建设工程有限责任公司 一种预应力混凝土箱梁横梁锚槽封锚的施工方法
CN104612056B (zh) * 2014-12-10 2016-06-29 中铁第四勘察设计院集团有限公司 一种框架桥整体快速顶推横移方法
CN104594194B (zh) * 2015-02-04 2016-08-24 河南省交通规划设计研究院股份有限公司 应用于大跨径桥梁和城市桥梁上的组合桥面板
KR101586320B1 (ko) * 2015-09-10 2016-01-18 오종훈 H-빔으로 이루어진 커넥터로 교각과 거더가 강결되는 psc 거더 합성형 라멘교 및 이의 시공방법
CN105926423B (zh) * 2016-04-15 2018-06-12 浙江大学 一种应用于空心板梁桥的组合梁式桥面连续装置及桥面连续方法
CN106284046A (zh) * 2016-10-09 2017-01-04 北京市市政工程设计研究总院有限公司 桥梁钢砼平弯组合梁制作方法
PH12017000177A1 (en) * 2017-06-16 2019-02-04 Wookyung Tech Co Ltd Method for manufacturing steel i beam segment of positive moment and negative moment and method for constructing simple bridge and continuous bridge
CN109977453B (zh) * 2019-01-15 2023-04-18 河北工程大学 固体充填液压支架工作阻力设计方法
CN112446069A (zh) * 2019-08-14 2021-03-05 深圳市建筑设计研究总院有限公司 一种结构构件的预内力及其计算方法
CN114232489B (zh) * 2021-12-20 2023-08-25 福建宏盛建设集团有限公司 一种大跨度钢混结构建筑物施工方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3009582B2 (ja) * 1994-01-07 2000-02-14 三菱重工業株式会社 コンクリート床版と鋼桁との連続合成桁橋の架設工法
KR100341165B1 (ko) * 1998-07-03 2002-11-29 (주)한국해외기술공사 공장제작에의한프리플렉스합성형의시공법

Also Published As

Publication number Publication date
KR100522170B1 (ko) 2005-10-18
CN1494628A (zh) 2004-05-05
JP3588325B2 (ja) 2004-11-10
JP2002004224A (ja) 2002-01-09
KR20030014686A (ko) 2003-02-19
WO2001096665A1 (en) 2001-12-20
AU2001222332A1 (en) 2001-12-24

Similar Documents

Publication Publication Date Title
CN1252354C (zh) 构建简支以及连续组合桥的方法
CN1250820C (zh) 预应力结合桁架梁及其制作方法
CN101080534A (zh) 制造预应力钢组合梁的方法及其制造的预应力钢组合梁
CA2061871C (en) Composite, prestressed structural member and method of forming same
CN1408042A (zh) 设计和制造预应力桁架的多步拉伸方法
CN113774811A (zh) 一种组合梁斜拉桥上部结构建造方法
CN212096869U (zh) 一种预制梁加工装置
CN1062933C (zh) 预应力复合梁结构物施工方法及用于该方法的预应力复合梁
CN101230605A (zh) 一种空心板用结构组合部件
KR101455632B1 (ko) 프리스트레스가 도입된 허니컴 i형 거더의 제조 방법 및 이를 이용한 교량의 시공 방법
CN212077623U (zh) 一种用于组合结构桥梁的可拆卸式预制桥面板
KR100944005B1 (ko) 강 거더에 프리스트레싱을 도입하는 방법 및 이 방법에의해 제작된 강 거더
KR100529518B1 (ko) 솔 플레이트를 이용한 프리스트레스트 콘크리트 빔 중간 지점부 연속화 구조 및 방법
KR100341342B1 (ko) 가 지점의 상승.하강을 이용한 피에스씨 빔교의 시공 및 보수, 보강공법
CN1877048A (zh) 一种结构承力式模板构件
CN101230656A (zh) 一种楼盖用承力式模板构件
CN115125829B (zh) 拱梁组合轻型化预制盖梁及其施工方法
KR200297321Y1 (ko) 프리스트레스를 도입한 강재보
CN1904276A (zh) 一种砼楼盖用结构承力式叠合构件
CN114232489B (zh) 一种大跨度钢混结构建筑物施工方法
CN1904275A (zh) 一种砼楼盖用结构承力式叠合构件
CN109252622B (zh) 叠合梁预制底板组合件与叠合梁
CN1904279A (zh) 一种结构承力式模板构件
CN101230655A (zh) 一种楼盖用承力式模板构件
CN117211149A (zh) 一种钢混结构式先简支后连续组合梁及其施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20060419

Termination date: 20131221