CN114934516A - Connecting device for joint positions of SMW construction method pile and Larsen steel sheet pile and construction method - Google Patents

Connecting device for joint positions of SMW construction method pile and Larsen steel sheet pile and construction method Download PDF

Info

Publication number
CN114934516A
CN114934516A CN202210465274.2A CN202210465274A CN114934516A CN 114934516 A CN114934516 A CN 114934516A CN 202210465274 A CN202210465274 A CN 202210465274A CN 114934516 A CN114934516 A CN 114934516A
Authority
CN
China
Prior art keywords
pile
steel sheet
construction method
sheet pile
smw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210465274.2A
Other languages
Chinese (zh)
Inventor
于庭富
郑忠良
张建英
王晓磊
孙龙彪
王子鸣
徐陈
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN202210465274.2A priority Critical patent/CN114934516A/en
Publication of CN114934516A publication Critical patent/CN114934516A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/18Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/03Prefabricated parts, e.g. composite sheet piles
    • E02D5/04Prefabricated parts, e.g. composite sheet piles made of steel
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/02Sheet piles or sheet pile bulkheads
    • E02D5/14Sealing joints between adjacent sheet piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Composite Materials (AREA)
  • Chemical & Material Sciences (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

本发明提供一种SMW工法桩和拉森钢板桩接缝位置的连接装置及施工方法,涉及基坑支护技术领域。本装置包括工法桩连接板和钢板桩连接板,工法桩连接板的端部与钢板桩连接板的一端固定连接,钢板桩连接板的另一端弯折,形成卡槽结构。工法桩连接板竖直伸入至SMW工法桩体系的水泥搅拌桩中,钢板桩连接板上的卡槽与拉森钢板桩的端部卡接。本装置结构简单,操作方便,能够快速实现钢板桩与工法桩之间的连接,有效解决了钢板桩与SMW工法桩接缝位置渗水、流沙以及流泥等问题,保证了支护桩的施工质量,提高了基坑的安全性。同时减少了因处理渗漏问题的人工使用,提高了工作效率,创造了良好的经济效益和社会效益。

Figure 202210465274

The invention provides a connection device and a construction method for the joint position of an SMW construction method pile and a Larsen steel sheet pile, and relates to the technical field of foundation pit support. The device includes a construction method pile connection plate and a steel sheet pile connection plate, the end of the construction method pile connection plate is fixedly connected with one end of the steel sheet pile connection plate, and the other end of the steel sheet pile connection plate is bent to form a slot structure. The connection plate of the construction method pile is vertically extended into the cement mixing pile of the SMW construction method pile system, and the slot on the connection plate of the steel sheet pile is clamped with the end of the Larsen steel sheet pile. The device has simple structure and convenient operation, can quickly realize the connection between the steel sheet pile and the construction method pile, effectively solve the problems of water seepage, quicksand and quick mud at the joint position between the steel sheet pile and the SMW construction method pile, and ensures the construction quality of the supporting pile. , improve the safety of the foundation pit. At the same time, the manual use for dealing with leakage problems is reduced, the work efficiency is improved, and good economic and social benefits are created.

Figure 202210465274

Description

SMW工法桩和拉森钢板桩接缝位置的连接装置及施工方法Connection device and construction method of joint position of SMW construction method pile and Larsen steel sheet pile

技术领域technical field

本发明涉及基坑支护技术领域,尤其涉及一种SMW工法桩和拉森钢板桩接缝位置的连接装置及施工方法。The invention relates to the technical field of foundation pit support, in particular to a connection device and a construction method for the joint position of an SMW construction method pile and a Larsen steel sheet pile.

背景技术Background technique

SMW工法桩和拉森钢板桩具有绿色环保、施工速度快、施工费用低等特点,被广泛应用于建桥围堰、大型管道铺设、临时沟渠开挖时用于挡土、挡水、挡沙以及基坑支护等工程。在传统基坑支护工程中,钢板桩经常与SMW工法桩分段使用,工法桩多用于深基坑,钢板桩多用于浅基坑。但是由于两种支护桩不能有效密闭连接,在工法桩与钢板桩的结合部位经常出现渗水、流泥等现象,对基坑安全及基坑内其他工序施工造成不利影响。因此,如何处理SMW工法桩支护体系和拉森钢板桩支护体系之间的接缝,成为基坑支护工程中一大难题。SMW construction method piles and Larsen steel sheet piles have the characteristics of green environmental protection, fast construction speed and low construction cost, and are widely used in bridge cofferdam construction, large-scale pipeline laying, and temporary trench excavation for soil, water and sand retention. And foundation pit support and other projects. In traditional foundation pit support engineering, steel sheet piles are often used in sections with SMW construction method piles. Construction method piles are mostly used for deep foundation pits, and steel sheet piles are mostly used for shallow foundation pits. However, because the two types of supporting piles cannot be effectively and tightly connected, water seepage and mud flow often occur at the joint of the construction method pile and the steel sheet pile, which adversely affects the safety of the foundation pit and the construction of other processes in the foundation pit. Therefore, how to deal with the joint between the SMW construction method pile support system and the Larsen steel sheet pile support system has become a major problem in foundation pit support engineering.

发明内容SUMMARY OF THE INVENTION

有鉴于此,本发明的目的在于提出一种SMW工法桩和拉森钢板桩接缝位置的连接装置及施工方法,以解决上述问题。In view of this, the purpose of the present invention is to provide a connection device and a construction method for the joint position of the SMW construction method pile and the Larsen steel sheet pile, so as to solve the above problems.

基于上述目的,本发明提供了一种SMW工法桩和拉森钢板桩接缝位置的连接装置,包括:工法桩连接板和钢板桩连接板;工法桩连接板的端部与钢板桩连接板的一端固定连接,钢板桩连接板的另一端弯折,形成卡槽结构;工法桩连接板竖直伸入至SMW工法桩体系的水泥搅拌桩中,钢板桩连接板上的卡槽与拉森钢板桩的端部卡接。Based on the above purpose, the present invention provides a connection device for the joint position of SMW construction method pile and Larsen steel sheet pile, including: construction method pile connection plate and steel sheet pile connection plate; One end is fixedly connected, and the other end of the steel sheet pile connecting plate is bent to form a slot structure; the construction method pile connecting plate extends vertically into the cement mixing pile of the SMW construction method pile system, and the slot on the steel sheet pile connecting plate is connected to the Larsen steel plate. The end of the pile is snapped.

进一步地工法桩连接板与钢板桩连接板之间呈135度夹角;与钢板桩的结构相适配。Further, the angle between the pile connecting plate and the steel sheet pile connecting plate is 135 degrees; it is suitable for the structure of the steel sheet pile.

进一步地,工法桩连接板为矩形钢板;用于插入水泥搅拌桩中,确保支护结构的稳定性。Further, the construction method pile connecting plate is a rectangular steel plate; it is used to insert into the cement mixing pile to ensure the stability of the supporting structure.

SMW工法桩和拉森钢板桩接缝位置的施工方法,按以下步骤进行:The construction method of the joint position of the SMW construction method pile and the Larsen steel sheet pile is carried out according to the following steps:

S1、进行基坑的SMW工法桩支护体系中工法桩支护墙体的施工;S1. Carry out the construction of the construction method pile support wall in the SMW construction method pile support system of the foundation pit;

S2、在SMW工法桩支护体系的水泥搅拌桩未完全硬化时,将连接装置连接在SMW工法桩支护体系的端部,连接装置上的工法桩连接板插入至水泥搅拌桩中;S2. When the cement mixing pile of the SMW construction method pile supporting system is not completely hardened, connect the connecting device to the end of the SMW construction method pile supporting system, and insert the construction method pile connecting plate on the connecting device into the cement mixing pile;

S3、进行基坑的拉森钢板桩支护体系中钢板桩支护墙体的施工,并将连接装置上的钢板桩连接板的端部勾在拉森钢板桩的端部。S3. Carry out the construction of the steel sheet pile support wall in the Larsen steel sheet pile support system of the foundation pit, and hook the end of the steel sheet pile connecting plate on the connecting device to the end of the Larsen steel sheet pile.

进一步地,S1的具体过程按如下步骤进行:Further, the specific process of S1 is carried out according to the following steps:

S11、在基坑外侧开设工法桩沟槽;S11. Open a construction method pile trench outside the foundation pit;

S12、在工法桩沟槽内施工水泥搅拌桩;S12. Construct cement mixing piles in the construction method pile trench;

S13、在水泥搅拌桩中插入型钢骨架。S13. Insert a profiled steel frame into the cement mixing pile.

进一步地,S3中的进行基坑的拉森钢板桩支护体系中钢板桩支护墙体的施工,按如下步骤进行:Further, in S3, the construction of the steel sheet pile supporting wall in the Larsen steel sheet pile supporting system of the foundation pit is carried out according to the following steps:

S31、在基坑外侧开设钢板桩沟槽;S31. Open a steel sheet pile groove on the outside of the foundation pit;

S32、在钢板桩沟槽内插入拉森钢板桩。S32, inserting a Larsen steel sheet pile into the steel sheet pile groove.

与现有技术相比,本发明的有益效果在于:使用本装置连接钢板桩与工法桩,将工法桩连接板插入至水泥搅拌桩中,再将钢板桩连接板的端部与拉森钢板桩的端部勾连在一起,完成两种支护体系之间的连接。本装置结构简单,操作方便,能够快速实现钢板桩与工法桩之间的连接,有效解决了钢板桩与SMW工法桩接缝位置渗水、流沙以及流泥等问题,保证了支护桩的施工质量,提高了基坑的安全性。同时减少了因处理渗漏问题的人工使用,提高了工作效率,创造了良好的经济效益和社会效益。Compared with the prior art, the beneficial effect of the present invention is: using the device to connect the steel sheet pile and the construction method pile, inserting the construction method pile connecting plate into the cement mixing pile, and then connecting the end of the steel sheet pile connecting plate to the Larsen steel sheet pile. The ends are hooked together to complete the connection between the two support systems. The device has simple structure and convenient operation, can quickly realize the connection between the steel sheet pile and the construction method pile, effectively solve the problems of water seepage, quicksand and quick mud at the joint position between the steel sheet pile and the SMW construction method pile, and ensures the construction quality of the supporting pile. , which improves the safety of the foundation pit. At the same time, the manual use for dealing with leakage problems is reduced, the work efficiency is improved, and good economic and social benefits are created.

附图说明Description of drawings

图1为本发明实施例提供的SMW工法桩和拉森钢板桩接缝位置的连接装置示意图;FIG. 1 is a schematic diagram of a connection device for a joint position of an SMW construction method pile and a Larsen steel sheet pile provided by an embodiment of the present invention;

图2为本发明实施例提供的SMW工法桩和拉森钢板桩接缝位置的连接装置的俯视图;Fig. 2 is the top view of the connection device of the joint position of the SMW construction method pile and the Larsen steel sheet pile provided by the embodiment of the present invention;

图3为本发明实施例提供的SMW工法桩和拉森钢板桩接缝位置的连接装置的SMW工法桩施工示意图;3 is a schematic diagram of the SMW construction method pile construction of the connection device at the joint position of the SMW construction method pile and the Larsen steel sheet pile provided by the embodiment of the present invention;

图4为本发明实施例提供的SMW工法桩和拉森钢板桩接缝位置的连接装置的工法桩连接板安装示意图;4 is a schematic diagram of the installation of the construction method pile connecting plate of the connection device at the joint position of the SMW construction method pile and the Larsen steel sheet pile provided by the embodiment of the present invention;

图5为本发明实施例提供的SMW工法桩和拉森钢板桩接缝位置的连接装置的安装示意图;Fig. 5 is the installation schematic diagram of the connection device at the joint position of the SMW construction method pile and the Larsen steel sheet pile provided by the embodiment of the present invention;

图6为图5中A处结构放大图。FIG. 6 is an enlarged view of the structure at A in FIG. 5 .

附图说明图中标记为:1、工法桩连接板;2、钢板桩连接板;3、拉森钢板桩;4、水泥搅拌桩;5、型钢骨架。Description of the drawings: 1. Construction method pile connecting plate; 2. Steel sheet pile connecting plate; 3. Larsen steel sheet pile; 4. Cement mixing pile; 5. Profiled steel frame.

具体实施方式Detailed ways

为使本发明的目的、技术方案和优点更加清楚明白,以下结合具体实施例,对本发明进一步详细说明。In order to make the objectives, technical solutions and advantages of the present invention clearer, the present invention will be further described in detail below with reference to specific embodiments.

如图1所示,本发明提出的一种SMW工法桩和拉森钢板桩接缝位置的连接装置,由工法桩连接板1和钢板桩连接板2等组成。如图2所示,工法桩连接板1为矩形钢板,工法桩连接板1的端部与钢板桩连接板2的一端固定连接,钢板桩连接板2的另一端弯折,形成卡槽结构。工法桩连接板1竖直伸入至SMW工法桩体系的水泥搅拌桩4中,钢板桩连接板2端部的卡槽与拉森钢板桩3的端部卡槽勾连在一起。As shown in FIG. 1 , a connection device for the joint position of the SMW construction method pile and the Larsen steel sheet pile proposed by the present invention is composed of a construction method pile connecting plate 1 and a steel sheet pile connecting plate 2 and the like. As shown in Figure 2, the construction method pile connecting plate 1 is a rectangular steel plate, the end of the construction method pile connecting plate 1 is fixedly connected to one end of the steel sheet pile connecting plate 2, and the other end of the steel sheet pile connecting plate 2 is bent to form a slot structure. The construction method pile connecting plate 1 is vertically extended into the cement mixing pile 4 of the SMW construction method pile system.

在使用时,采用钢板制作工法桩连接板1,工法桩连接板1的尺寸设置为长9至12m,宽为0.3m,厚为4mm。采用钢板制作钢板桩连接板2,钢板桩连接板2的尺寸设置为长9至12m,宽为0.2m,厚为4mm,钢板桩连接板2端部的卡槽高为3cm,宽为3cm。将工法桩连接板1与钢板桩连接板2焊接在一起,构成连接装置,用于SMW工法桩和拉森钢板桩3接缝位置的连接。In use, the construction method pile connecting plate 1 is made of steel plates, and the size of the construction method pile connecting plate 1 is set to be 9 to 12 m in length, 0.3 m in width, and 4 mm in thickness. The steel sheet pile connecting plate 2 is made of steel sheets. The size of the steel sheet pile connecting plate 2 is set to be 9 to 12 m long, 0.2 m wide, and 4 mm thick. The slot at the end of the steel sheet pile connecting plate 2 is 3 cm high and 3 cm wide. The construction method pile connecting plate 1 and the steel sheet pile connecting plate 2 are welded together to form a connection device, which is used for the connection of the joint position between the SMW construction method pile and the Larsen steel sheet pile 3 .

SMW工法桩和拉森钢板桩接缝位置的施工方法,按以下步骤进行:The construction method of the joint position of the SMW construction method pile and the Larsen steel sheet pile is carried out according to the following steps:

S1、进行基坑的SMW工法桩支护体系中工法桩支护墙体的施工,具体包括以下步骤:S1. Carry out the construction of the construction method pile supporting wall in the SMW construction method pile support system of the foundation pit, which specifically includes the following steps:

S11、在基坑外侧需要使用SMW工法桩进行支护的位置开设工法桩沟槽。S11. Open construction method pile trenches at positions outside the foundation pit where SMW construction method piles need to be used for support.

S12、使用钻掘搅拌机在工法桩沟槽内施工水泥搅拌桩4,将水泥土充分搅拌均匀。S12. Use a drilling mixer to construct the cement mixing pile 4 in the construction method pile groove, and fully mix the cement and soil evenly.

S13、如图3所示,在水泥搅拌桩4中插入型钢骨架5。S13 , as shown in FIG. 3 , insert the shaped steel frame 5 into the cement mixing pile 4 .

S2、在SMW工法桩支护体系的水泥搅拌桩4未完全硬化时,如图4所示,将连接装置连接在SMW工法桩支护体系的端部,连接装置上的工法桩连接板1插入至水泥搅拌桩4中。S2. When the cement mixing pile 4 of the SMW construction method pile supporting system is not completely hardened, as shown in Figure 4, connect the connecting device to the end of the SMW construction method pile supporting system, and insert the construction method pile connecting plate 1 on the connecting device. to the cement mixing pile 4.

S3、进行基坑的拉森钢板桩3支护体系中钢板桩支护墙体的施工,具体包括以下步骤;S3, carry out the construction of the steel sheet pile support wall in the Larsen steel sheet pile 3 support system of the foundation pit, which specifically includes the following steps;

S31、在基坑外侧开设钢板桩沟槽。S31, opening a steel sheet pile groove on the outside of the foundation pit.

S32、如图5所示,在钢板桩沟槽内插入拉森钢板桩3,并将连接装置上的钢板桩连接板2的端部勾在拉森钢板桩3的端部,如图6所示,完成SMW工法桩与拉森钢板桩3之间的连接。所有SMW工法桩与拉森钢板桩3之间的接缝位置均可使用本装置进行连接,有效解决了钢板桩与SMW工法桩接缝位置渗水、流沙以及流泥等问题,保证了支护桩的施工质量,提高了基坑的安全性。S32. As shown in Figure 5, insert the Larsen steel sheet pile 3 into the steel sheet pile groove, and hook the end of the steel sheet pile connecting plate 2 on the connecting device to the end of the Larsen steel sheet pile 3, as shown in Figure 6 The connection between the SMW construction method pile and the Larsen steel sheet pile 3 is completed. All joints between SMW piles and Larsen steel sheet piles 3 can be connected by this device, which effectively solves the problems of water seepage, quicksand and flowing mud at the joints between steel sheet piles and SMW piles, and ensures the support of the supporting piles. The construction quality is improved, and the safety of the foundation pit is improved.

本发明的实施例旨在涵盖落入所附权利要求的宽泛范围之内的所有这样的替换、修改和变型。因此,凡在本发明的精神和原则之内,所做的任何省略、修改、等同替换、改进等,均应包含在本发明的保护范围之内。Embodiments of the present invention are intended to cover all such alternatives, modifications and variations that fall within the broad scope of the appended claims. Therefore, any omission, modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included within the protection scope of the present invention.

Claims (6)

1. A connecting device for joint positions of SMW construction method piles and Larsen steel plate piles comprises: a construction method pile connecting plate and a steel sheet pile connecting plate; it is characterized in that the preparation method is characterized in that,
the end part of the pile connecting plate in the construction method is fixedly connected with one end of the steel sheet pile connecting plate, and the other end of the steel sheet pile connecting plate is bent to form a clamping groove structure; the construction method pile connecting plate vertically extends into a cement mixing pile of the SMW construction method pile system, and a clamping groove in the steel sheet pile connecting plate is clamped with the end part of the Larsen steel sheet pile.
2. The apparatus of claim 1, wherein the construction method pile connecting plate and the steel pile connecting plate form an angle of 135 degrees with each other.
3. The connecting device for a joint position of an SMW construction method pile and a Larsen steel plate pile as claimed in claim 1, wherein the construction method pile connecting plate is a rectangular steel plate.
4. A construction method of a joint position of a SMW method pile and a larsen steel sheet pile using the connecting device of a joint position of a SMW method pile and a larsen steel sheet pile according to any one of claims 1 to 3, comprising the steps of:
s1, constructing a construction method pile supporting wall in the SMW construction method pile supporting system of the foundation pit;
s2, when a cement mixing pile of the SMW-method pile support system is not completely hardened, connecting a connecting device to the end of the SMW-method pile support system, and inserting a construction-method pile connecting plate on the connecting device into the cement mixing pile;
and S3, constructing a steel sheet pile supporting wall in the Larsen steel sheet pile supporting system of the foundation pit, and hooking the end part of the steel sheet pile connecting plate on the connecting device at the end part of the Larsen steel sheet pile.
5. The SMW construction method pile and Larsen steel sheet pile joint position construction method according to claim 4, wherein the specific process of S1 is performed as follows:
s11, forming a pile groove of the construction method on the outer side of the foundation pit;
s12, constructing a cement mixing pile in the pile groove of the construction method;
and S13, inserting a steel skeleton into the cement mixing pile.
6. The construction method of the joint position of the SMW construction method pile and the Larsen steel sheet pile according to claim 4, wherein the construction of the steel sheet pile supporting wall in the Larsen steel sheet pile supporting system of the foundation pit in S3 is carried out according to the following steps:
s31, forming a steel sheet pile groove on the outer side of the foundation pit;
and S32, inserting Larsen steel sheet piles into the steel sheet pile grooves.
CN202210465274.2A 2022-04-29 2022-04-29 Connecting device for joint positions of SMW construction method pile and Larsen steel sheet pile and construction method Pending CN114934516A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210465274.2A CN114934516A (en) 2022-04-29 2022-04-29 Connecting device for joint positions of SMW construction method pile and Larsen steel sheet pile and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210465274.2A CN114934516A (en) 2022-04-29 2022-04-29 Connecting device for joint positions of SMW construction method pile and Larsen steel sheet pile and construction method

Publications (1)

Publication Number Publication Date
CN114934516A true CN114934516A (en) 2022-08-23

Family

ID=82861919

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210465274.2A Pending CN114934516A (en) 2022-04-29 2022-04-29 Connecting device for joint positions of SMW construction method pile and Larsen steel sheet pile and construction method

Country Status (1)

Country Link
CN (1) CN114934516A (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB9816698D0 (en) * 1998-07-31 1998-09-30 British Steel Plc Steel sheet piling
JP2002081058A (en) * 2000-09-11 2002-03-22 Taisei Corp Joining structure between wall body and sheet pile member
JP2007262789A (en) * 2006-03-29 2007-10-11 Kurita Water Ind Ltd Construction method of underground wall
JP2009221803A (en) * 2008-03-18 2009-10-01 Taisei Corp Underground wall structure
CN107268636A (en) * 2017-07-18 2017-10-20 江苏景源万河环境科技有限公司 The diaphragm wall foundation ditch that the steel cylinder or steel sheet pile of a kind of seal groove and occlusion structure are constituted is with going along with sb. to guard him and construction method
CN207934040U (en) * 2017-03-22 2018-10-02 江苏科技大学 A kind of foundation pit supporting construction combining Larsen steel sheet pile and H profile steel
DE102017007798A1 (en) * 2017-08-21 2019-02-21 Richard Heindl Connection profile for Larssen sheet piles
CN110629763A (en) * 2019-08-19 2019-12-31 中国一冶集团有限公司 Drag pipe well chamber foundation pit supporting structure and construction method thereof
CN111851466A (en) * 2020-07-28 2020-10-30 中交二公局第四工程有限公司 Lap structure and construction method of two support systems in deep foundation pit in soft soil
CN112832257A (en) * 2021-02-22 2021-05-25 上海铁能建设工程有限公司 A kind of foundation pit enclosure form LHW construction method
CN217128254U (en) * 2022-04-29 2022-08-05 中国二十二冶集团有限公司 Connecting device for joint positions of SMW construction method pile and Larsen steel plate pile

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB9816698D0 (en) * 1998-07-31 1998-09-30 British Steel Plc Steel sheet piling
US6443664B1 (en) * 1998-07-31 2002-09-03 Corus Uk Limited Metal sheet piling
JP2002081058A (en) * 2000-09-11 2002-03-22 Taisei Corp Joining structure between wall body and sheet pile member
JP2007262789A (en) * 2006-03-29 2007-10-11 Kurita Water Ind Ltd Construction method of underground wall
JP2009221803A (en) * 2008-03-18 2009-10-01 Taisei Corp Underground wall structure
CN207934040U (en) * 2017-03-22 2018-10-02 江苏科技大学 A kind of foundation pit supporting construction combining Larsen steel sheet pile and H profile steel
CN107268636A (en) * 2017-07-18 2017-10-20 江苏景源万河环境科技有限公司 The diaphragm wall foundation ditch that the steel cylinder or steel sheet pile of a kind of seal groove and occlusion structure are constituted is with going along with sb. to guard him and construction method
DE102017007798A1 (en) * 2017-08-21 2019-02-21 Richard Heindl Connection profile for Larssen sheet piles
CN110629763A (en) * 2019-08-19 2019-12-31 中国一冶集团有限公司 Drag pipe well chamber foundation pit supporting structure and construction method thereof
CN111851466A (en) * 2020-07-28 2020-10-30 中交二公局第四工程有限公司 Lap structure and construction method of two support systems in deep foundation pit in soft soil
CN112832257A (en) * 2021-02-22 2021-05-25 上海铁能建设工程有限公司 A kind of foundation pit enclosure form LHW construction method
CN217128254U (en) * 2022-04-29 2022-08-05 中国二十二冶集团有限公司 Connecting device for joint positions of SMW construction method pile and Larsen steel plate pile

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
饶天赞、曹喜仁编著: "高层建筑基础工程施工", vol. 7, 31 October 1995, 湖南科学技术出版社 , pages: 262 - 275 *

Similar Documents

Publication Publication Date Title
CN102900089B (en) With the combination piling bar cofferdam of hydro-expansive rubber waterproof fore shaft
CN203034467U (en) Combined steel pile cofferdam with water-proof fore shafts
CN207062931U (en) A kind of continuous wall connector
CN210439300U (en) Separable anti-seepage support combined steel sheet pile
CN113026782A (en) Steel sheet pile cofferdam construction process
CN217128254U (en) Connecting device for joint positions of SMW construction method pile and Larsen steel plate pile
CN209941663U (en) PC construction method pile with variable connection angle
CN111155535A (en) Underground continuous wall and foundation slab's pre-buried steel sheet connection structure
CN114934516A (en) Connecting device for joint positions of SMW construction method pile and Larsen steel sheet pile and construction method
CN107246030A (en) Construction method based on steel sheet pile device for plugging
CN218374050U (en) Ultra-deep underground diaphragm wall joint
CN214994124U (en) Novel plug-in vertical film paving device for impervious wall
CN217517631U (en) Waterstop steel pipe pile diaphragm wall
CN105442528B (en) Cement grouting sheet pile with sealing ring
CN211312487U (en) Steel pipe and steel plate combined sheet pile enclosure structure
CN221001090U (en) Assembled slotless wall reinforced underground diaphragm wall slotted cofferdam
CN218090795U (en) A Larsen steel sheet pile with sealing device
CN208105241U (en) Concrete-pile and the continuous seepage-proofing water-sealing wall spliced using the concrete-pile
CN206706788U (en) Latch assembled steel cofferdam
CN213358634U (en) Concrete-filled steel tube-Larsen steel sheet pile composite structure for foundation pit enclosure
CN110552347A (en) Pile foundation construction template tool
CN216920406U (en) High slope and foundation pit top drainage structures
CN221256773U (en) Construction structure for half reverse construction method of large-diameter shield tunnel originating well
CN206752531U (en) A kind of slight leakage plugging structure of diaphram wall
CN219196019U (en) Underground open caisson of municipal works

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20220823