CN114922440A - Self-balancing column type double-track curtain wall mounting device and mounting method - Google Patents

Self-balancing column type double-track curtain wall mounting device and mounting method Download PDF

Info

Publication number
CN114922440A
CN114922440A CN202210588759.0A CN202210588759A CN114922440A CN 114922440 A CN114922440 A CN 114922440A CN 202210588759 A CN202210588759 A CN 202210588759A CN 114922440 A CN114922440 A CN 114922440A
Authority
CN
China
Prior art keywords
curtain wall
rail
self
wire rope
double
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202210588759.0A
Other languages
Chinese (zh)
Inventor
李余兵
周李茂
何浩
汤骞
董夺
李辉
任泳利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuye Group Decoration Engineering Co ltd
Original Assignee
Wuye Group Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuye Group Decoration Engineering Co ltd filed Critical Wuye Group Decoration Engineering Co ltd
Priority to CN202210588759.0A priority Critical patent/CN114922440A/en
Publication of CN114922440A publication Critical patent/CN114922440A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/167Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention discloses a self-balancing column type double-track curtain wall mounting device and a mounting method, the device comprises a slide rail mechanism, a plurality of independent frames are arranged on the slide rail mechanism, each independent frame comprises a balancing mechanism and a mounting mechanism, each mounting mechanism comprises an upright (1), a cross rod (2) is arranged on each upright (1), a mounting hanging basket (3) and a unit plate glass curtain wall (4) are arranged at one end, close to the outer side of a building, of each cross rod (2), each balancing mechanism comprises a flexible protective sleeve (5) fixed on a ring beam (25), and each flexible protective sleeve (5) is connected with the other end of each cross rod (2) through a flexible protective sleeve steel wire rope (6). The self-balancing curtain wall mounting device disclosed by the invention realizes self-balancing of the curtain wall mounting device, greatly improves the safety in the curtain wall mounting process, greatly reduces the mounting difficulty of the unit plate glass curtain wall (4), and improves the construction efficiency.

Description

一种自平衡立柱式双轨道幕墙安装装置及安装方法A self-balancing column type double track curtain wall installation device and installation method

技术领域technical field

本发明涉及幕墙安装装置技术领域,尤其涉及一种自平衡立柱式双轨道幕墙安装装置及安装方法。The invention relates to the technical field of curtain wall installation devices, in particular to a self-balancing column type double track curtain wall installation device and an installation method.

背景技术Background technique

幕墙是建筑的外墙围护,不承重,像幕布一样挂上去,故又称为“帷幕墙”,是现代大型和高层建筑常用的带有装饰效果的轻质墙体。由面板和支承结构体系组成的,可相对主体结构有一定位移能力或自身有一定变形能力、不承担主体结构所作用的建筑外围护结构或装饰性结构(外墙框架式支撑体系也是幕墙体系的一种)。幕墙按其材料可分为铝合金玻璃幕墙,铝板幕墙(铝合金单板或复合铝板),钢板幕墙、石板幕墙、陶瓷板幕墙以及用上述材料组合而成的组合式幕墙。按外形可分为:平直幕墙、折线幕墙、圆弧幕墙、曲面幕墙和异形幕墙等。按结构形式可分为:有框幕墙、隐框幕墙和半隐框幕墙。由于上述各种幕墙使建筑物路面建筑造型新颖多变,虚实对比强烈,环境色彩鲜艳明快,给人们以喜闻乐见的建筑艺术形象,使城市增加了无穷的魅力。The curtain wall is the outer wall of the building. It is not load-bearing and hangs like a curtain, so it is also called "curtain wall". It is a lightweight wall with decorative effects commonly used in modern large and high-rise buildings. It is composed of panels and supporting structure systems, which can have a certain displacement ability relative to the main structure or have a certain deformation ability, and do not assume the role of the main structure. a kind). The curtain wall can be divided into aluminum alloy glass curtain wall, aluminum plate curtain wall (aluminum alloy veneer or composite aluminum plate), steel plate curtain wall, stone plate curtain wall, ceramic plate curtain wall and combined curtain wall made of the above materials. According to the shape, it can be divided into: straight curtain wall, broken line curtain wall, arc curtain wall, curved curtain wall and special-shaped curtain wall. According to the structure, it can be divided into: framed curtain wall, hidden frame curtain wall and semi-hidden frame curtain wall. Because of the above-mentioned various curtain walls, the building pavement has a novel and changeable architectural shape, a strong contrast between the virtual and the real, and the environment is bright and bright, giving people a popular architectural art image and adding infinite charm to the city.

单元板块玻璃幕墙即单元式幕墙,单元式幕墙是指由各种墙面板与支承框架在工厂制成完整的幕墙结构基本单位,直接安装在主体结构上的建筑幕墙。单元式幕墙主要可分为:单元式幕墙和半单元式幕墙又称坚挺单元式幕墙,半单元式幕墙详分又可分为:立挺分片单元组合式幕墙,窗间墙单元式幕墙。The unit panel glass curtain wall is the unitized curtain wall. The unitized curtain wall refers to the building curtain wall that is made into a complete basic unit of the curtain wall structure in the factory by various wall panels and supporting frames, and is directly installed on the main structure. The unitized curtain wall can be mainly divided into: unitized curtain wall and semi-unitized curtain wall, also known as rigid unitized curtain wall.

然而常规的幕墙安装方式是采用登高车作业或者在建筑顶端安置滑轮升降系统,对于高层建筑的幕墙安装而言,登高作业车难以举升至合适高度,而在建筑顶端安装升降系统会耗费大量的时间,成本较高,传统的提拉装置又难以实现自平衡,存在较大的安全隐患。However, the conventional method of curtain wall installation is to use climbing trucks or install a pulley lifting system at the top of the building. For the curtain wall installation of high-rise buildings, it is difficult for the climbing operation vehicle to lift to a suitable height, and installing the lifting system at the top of the building will cost a lot of money. The time and cost are high, and the traditional lifting device is difficult to achieve self-balancing, and there is a great potential safety hazard.

发明内容SUMMARY OF THE INVENTION

本发明的目的之一是提供一种自平衡立柱式双轨道幕墙安装装置,以解决现有的幕墙安装装置存在安装效率较低、成本过高、难以实现自平衡、存在较大安全隐患的技术问题。One of the objectives of the present invention is to provide a self-balancing column type double-track curtain wall installation device, so as to solve the technical problems of low installation efficiency, high cost, difficult to achieve self-balancing, and large safety hazards in the existing curtain wall installation device question.

本发明的第一个目的是采用以下技术方案实现的:一种自平衡立柱式双轨道幕墙安装装置,包括滑轨机构,所述滑轨机构上设置有多个独立架设,所述独立架设包括平衡机构和安装机构,所述安装机构包括立柱,所述立柱上设置有横杆,所述横杆靠近建筑物外侧的一端设置有安装吊篮和单元板块玻璃幕墙,所述平衡机构包括固定于圈梁上的柔性保护套,所述柔性保护套通过柔性保护套钢丝绳与横杆的另一端相连接。The first object of the present invention is achieved by adopting the following technical solutions: a self-balancing column type double-track curtain wall installation device, comprising a slide rail mechanism, and a plurality of independent erections are arranged on the slide rail mechanism, and the independent erection includes: A balance mechanism and an installation mechanism, the installation mechanism includes a column, the column is provided with a cross bar, and the end of the cross bar close to the outside of the building is provided with an installation gondola and a unit panel glass curtain wall, the balance mechanism includes a fixed A flexible protective sleeve on the ring beam, the flexible protective sleeve is connected with the other end of the cross bar through a wire rope of the flexible protective sleeve.

进一步的,所述独立架设还包括支撑钢通,所述支撑钢通一端与滑轨机构相连接,另一端与横杆靠近建筑物的一端相连接。Further, the independent erection further includes a support steel pass, one end of the support steel pass is connected with the slide rail mechanism, and the other end is connected with the end of the cross bar close to the building.

进一步的,所述滑轨机构包括双轨道滑轨,所述双轨道滑轨上设置有多个用以固定立柱和支撑钢通的轨道预埋件。Further, the slide rail mechanism includes a double-track slide rail, and a plurality of rail embedded parts for fixing the upright column and supporting the steel pass are arranged on the double-track slide rail.

进一步的,所述双轨道滑轨上还设置有多个轨道接头,所述轨道接头包括轨道接头钢板和镀锌螺栓,通过轨道接头钢板和镀锌螺栓分别将多段双轨道滑轨连接起来。Further, a plurality of rail joints are provided on the double-track slide rail, and the rail joints include rail joint steel plates and galvanized bolts, and the multi-section double-track slide rails are respectively connected by the rail joint steel plates and galvanized bolts.

进一步的,所述平衡机构还包括张拉钢丝绳,所述张拉钢丝绳穿过设置于立柱顶部的定滑轮对横杆进行张拉。Further, the balance mechanism further includes a tensioning wire rope, and the tensioning wire rope passes through a fixed pulley arranged on the top of the column to tension the cross bar.

进一步的,所述张拉钢丝绳一端通过横杆卡环与横杆相连接,另一端通过张拉钢丝绳固定件与横杆相连接。Further, one end of the tensioning wire rope is connected to the crossbar through a crossbar snap ring, and the other end is connected to the crossbar through a tensioning wire rope fixing member.

进一步的,所述横杆通过T型结构件固定于立柱上,所述T型结构件上设置有用于紧固T型结构件的T型结构件固定螺杆。Further, the cross bar is fixed on the upright column through a T-shaped structural member, and the T-shaped structural member is provided with a T-shaped structural member fixing screw for fastening the T-shaped structural member.

进一步的,所述安装吊篮通过安装吊篮型钢设置于横杆上,所述安装吊篮型钢与安装吊篮之间还设置有安装吊篮牵引绳。Further, the installation gondola is arranged on the cross bar through the installation gondola section steel, and an installation gondola traction rope is also arranged between the installation gondola section steel and the installation gondola.

进一步的,所述单元板块玻璃幕墙通过单元板块玻璃幕墙型钢设置于横杆上,所述单元板块玻璃幕墙型钢与单元板块玻璃幕墙之间还设置有单元板块玻璃幕墙牵引绳。Further, the unit panel glass curtain wall is arranged on the crossbar through the unit panel glass curtain wall profile steel, and a unit panel glass curtain wall traction rope is also arranged between the unit panel glass curtain wall profile steel and the unit panel glass curtain wall.

本发明的第二个目的是提供一种自平衡立柱式双轨道幕墙安装装置的安装方法,以解决现有的幕墙安装装置存在安装效率较低的技术问题。The second object of the present invention is to provide an installation method of a self-balancing column type double-track curtain wall installation device, so as to solve the technical problem of low installation efficiency of the existing curtain wall installation device.

本发明的第二个目的是通过以下技术方案实现的:一种自平衡立柱式双轨道幕墙安装装置的安装方法,采用权利要求1-9任意一项所述的自平衡立柱式双轨道幕墙安装装置,其特征在于,包括如下步骤:The second object of the present invention is achieved through the following technical solutions: an installation method of a self-balancing column type double-track curtain wall installation device, using the self-balancing column type double-track curtain wall installation described in any one of claims 1-9 The device is characterized in that it comprises the following steps:

通过轨道接头将多段双轨道滑轨连接起来;Connect multiple sections of double track rails through track joints;

将立柱通过轨道预埋件固定于双轨道滑轨上;Fix the column on the double-track slide rail through the track embedded parts;

将横杆通过T型结构件固定于立柱上;Fix the crossbar on the column through the T-shaped structural member;

将张拉钢丝绳分别穿过横杆卡环和定滑轮,然后通过张拉钢丝绳固定件固定于横杆上;Pass the tension wire rope through the cross bar snap ring and the fixed pulley respectively, and then fix it on the cross bar through the tension wire rope fixing piece;

在横杆靠近建筑物的一端增设支撑钢通,并将支撑钢通与双轨道滑轨相连接;A supporting steel pass is added at the end of the crossbar close to the building, and the supporting steel pass is connected with the double-track slide rail;

将柔性保护套缠绕与建筑物下方第二层的圈梁上,并通过柔性保护套钢丝绳与横杆靠近建筑物的一端相连接;Wrap the flexible protective sleeve around the ring beam on the second floor below the building, and connect it with the end of the crossbar close to the building through the flexible protective sleeve steel wire rope;

在横杆靠近建筑物外侧的一端通过安装吊篮型钢和单元板块玻璃幕墙型钢分别安装固定安装吊篮和单元板块玻璃幕墙。At the end of the crossbar near the outside of the building, install the hanging basket and the unit panel glass curtain wall by installing the hanging basket section steel and the unit plate glass curtain wall section steel respectively.

本发明的有益效果在于:实现了幕墙安装装置的自平衡,大大提高了幕墙安装过程中的安全性,极大程度上降低了单元板块玻璃幕墙的安装难度,提升了施工效率;可实现较低成本的大批量快速安装,可以广泛适用于幕墙安装、外立面装饰单元板块等工程实践中。The beneficial effects of the invention are as follows: the self-balancing of the curtain wall installation device is realized, the safety in the installation process of the curtain wall is greatly improved, the installation difficulty of the unit plate glass curtain wall is greatly reduced, and the construction efficiency is improved; It can be widely used in engineering practice such as curtain wall installation, facade decoration unit panels and so on.

附图说明Description of drawings

为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图示出的结构获得其他的附图。In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the accompanying drawings that are used in the description of the embodiments or the prior art, and the drawings in the following description are only the present invention. For some embodiments of the present invention, for those of ordinary skill in the art, other drawings can also be obtained according to the structures shown in these drawings without any creative effort.

图1为本发明结构示意图;Fig. 1 is the structural representation of the present invention;

图2为滑轨机构结构示意图;Figure 2 is a schematic structural diagram of a slide rail mechanism;

图3为轨道接头结构示意图;Figure 3 is a schematic diagram of the structure of the track joint;

图中,1-立柱,2-横杆,3-安装吊篮,4-单元板块玻璃幕墙,5-柔性保护套,6-柔性保护套钢丝绳,7-张拉钢丝绳,8-支撑钢通,9-双轨道滑轨,10-横杆卡环,11-定滑轮,12-张拉钢丝绳固定件,13-柔性保护套钢丝绳固定件,14-钢丝绳固定螺杆,15-T型结构件,16- T型结构件固定螺杆,17-安装吊篮型钢,18-单元板块玻璃幕墙型钢,19-安装吊篮牵引绳,20-单元板块玻璃幕墙牵引绳,21-轨道预埋件,22-轨道接头,23-轨道接头钢板,24-镀锌螺栓,25-圈梁。In the figure, 1-upright column, 2-cross bar, 3-installation basket, 4-unit panel glass curtain wall, 5-flexible protective sleeve, 6-flexible protective sleeve wire rope, 7-tension wire rope, 8-support steel pass, 9-Dual-track slide rail, 10-Cross bar snap ring, 11-Fixed pulley, 12-Tension wire rope fixing piece, 13-Flexible protective sleeve wire rope fixing piece, 14-Wire rope fixing screw, 15-T-shaped structural piece, 16 - T-shaped structural parts fixing screw, 17-installation basket section steel, 18-unit plate glass curtain wall section steel, 19-installation gondola traction rope, 20-unit plate glass curtain wall traction rope, 21-track embedded parts, 22-track Joint, 23- Track Joint Steel Plate, 24- Galvanized Bolt, 25- Ring Beam.

具体实施方式Detailed ways

由于常规的幕墙安装方式是采用登高车作业或者在建筑顶端安置滑轮升降系统,对于高层建筑的幕墙安装而言,登高作业车难以举升至合适高度,而在建筑顶端安装升降系统会耗费大量的时间,成本较高,传统的提拉装置又难以实现自平衡,存在较大的安全隐患。因此亟需一种新型的幕墙安装装置来解决上述技术问题,对此,本申请提出了一种解决方案,具体参见本发明的实施例。Since the conventional curtain wall installation method is to use a climbing truck or install a pulley lifting system at the top of the building, for the curtain wall installation of a high-rise building, it is difficult for the climbing operation vehicle to lift to a suitable height, and the installation of the lifting system at the top of the building will cost a lot of money. The time and cost are high, and the traditional lifting device is difficult to achieve self-balancing, and there is a great potential safety hazard. Therefore, a new type of curtain wall installation device is urgently needed to solve the above-mentioned technical problems, for which, the present application proposes a solution, with details referring to the embodiments of the present invention.

为使本发明实施例的目的、技术方案和优点更加清楚,下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本发明一部分实施例,而不是全部的实施例。通常在此处附图中描述和示出的本发明实施例的组件可以以各种不同的配置来布置和设计。In order to make the purposes, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments These are some embodiments of the present invention, but not all embodiments. The components of the embodiments of the invention generally described and illustrated in the drawings herein may be arranged and designed in a variety of different configurations.

因此,以下对在附图中提供的本发明的实施例的详细描述并非旨在限制要求保护的本发明的范围,而是仅仅表示本发明的选定实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。Thus, the following detailed description of the embodiments of the invention provided in the accompanying drawings is not intended to limit the scope of the invention as claimed, but is merely representative of selected embodiments of the invention. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.

实施例1:Example 1:

参阅图1-3,一种自平衡立柱式双轨道幕墙安装装置,包括滑轨机构,所述滑轨机构上设置有多个独立架设,所述独立架设包括平衡机构和安装机构,所述安装机构包括立柱1,所述立柱1上设置有横杆2,所述横杆2靠近建筑物外侧的一端设置有安装吊篮3和单元板块玻璃幕墙4,所述平衡机构包括固定于圈梁25上的柔性保护套5,所述柔性保护套5通过柔性保护套钢丝绳6与横杆2的另一端相连接。Referring to Figures 1-3, a self-balancing column type double-track curtain wall installation device includes a slide rail mechanism, and a plurality of independent erections are arranged on the slide rail mechanism. The independent erection includes a balance mechanism and an installation mechanism. The mechanism includes a vertical column 1 on which a cross bar 2 is arranged, and one end of the horizontal bar 2 close to the outside of the building is provided with an installation gondola 3 and a unit plate glass curtain wall 4, and the balance mechanism includes a ring beam 25 fixed on the The flexible protective sleeve 5 is connected to the other end of the cross bar 2 through the flexible protective sleeve wire rope 6 .

在本实施例当中,所述独立架设还包括支撑钢通8,所述支撑钢通8一端与滑轨机构相连接,另一端与横杆2靠近建筑物的一端相连接。In this embodiment, the independent erection further includes a support steel pass 8, one end of the support steel pass 8 is connected with the sliding rail mechanism, and the other end is connected with the end of the cross bar 2 close to the building.

在本实施例当中,所述独立架设在滑轨机构上间隔3米以上进行设置。In this embodiment, the independent erection is arranged on the slide rail mechanism at an interval of more than 3 meters.

在本实施例当中,所述滑轨机构包括双轨道滑轨9,所述双轨道滑轨9上设置有多个用以固定立柱1和支撑钢通8的轨道预埋件21,通过轨道预埋件21便于独立架设横向调节方向。In this embodiment, the sliding rail mechanism includes a dual-track sliding rail 9, and a plurality of rail embedded parts 21 for fixing the column 1 and the supporting steel pass 8 are arranged on the dual-track sliding rail 9. The embedded part 21 is convenient for independent erection and lateral adjustment of the direction.

在本实施例当中,所述双轨道滑轨9上还设置有多个轨道接头22,所述轨道接头22包括轨道接头钢板23和镀锌螺栓24,通过轨道接头钢板23和镀锌螺栓24分别将多段双轨道滑轨9连接起来。In this embodiment, a plurality of rail joints 22 are also provided on the double rail slide rail 9. The rail joints 22 include rail joint steel plates 23 and galvanized bolts 24. The rail joint steel plates 23 and the galvanized bolts 24 are respectively Connect the multi-segment double track rails 9 together.

在本实施例当中,所述平衡机构还包括张拉钢丝绳7,所述张拉钢丝绳7穿过设置于立柱1顶部的定滑轮11对横杆2进行张拉。In this embodiment, the balance mechanism further includes a tensioning wire rope 7 , and the tensioning wire rope 7 stretches the cross bar 2 through the fixed pulley 11 disposed on the top of the column 1 .

在本实施例当中,所述张拉钢丝绳7一端通过横杆卡环10与横杆2相连接,另一端通过张拉钢丝绳固定件12与横杆2相连接。In this embodiment, one end of the tension wire rope 7 is connected to the cross bar 2 through the cross bar snap ring 10 , and the other end is connected to the cross bar 2 through the tension wire rope fixing member 12 .

在本实施例当中,所述柔性保护套钢丝绳6通过柔性保护套钢丝绳固定件13与横杆2相连接。进一步的,所述张拉钢丝绳固定件12和柔性保护套钢丝绳固定件13均通过钢丝绳固定螺杆14固定于横杆2上。In this embodiment, the flexible protective cover wire rope 6 is connected to the cross bar 2 through the flexible protective cover wire rope fixing member 13 . Further, the tensioning wire rope fixing member 12 and the flexible protective sheath wire rope fixing member 13 are both fixed to the cross bar 2 by the wire rope fixing screw 14 .

本发明将柔性保护套5固定于圈梁25上,所述圈梁25为带施工建筑物下方第二层的圈梁25,并通过柔性保护套钢丝绳6将柔性保护套5与横杆2连接起来,对安装于横杆2上的安装吊篮3起到牵引自平衡的作用。(圈梁是为防止地基的不均匀沉降或较大振动荷载等对房屋的不利影响,一般应在墙体中设置钢筋混凝土圈梁或钢筋砖圈梁,以增强砖石结构房屋的整体刚度。圈梁道数的设置应根据房屋的结构和构造情况确定。对空间较大的单层房屋,如车间、仓库、食堂,当墙厚等于或小于一砖时,檐口标高为5~8米时,应设置圈梁一道,当檐口标高大于8米时,宜增设圈梁一道;对有电动桥式吊车或较大振动设备的单层工业厂房,除在檐口或窗顶设置钢筋混凝土圈梁外,尚宜在吊车梁标高处或墙中适当位置增设一道圈梁; 对多层民用房屋,如宿舍、办公楼等,当墙厚等于或小于一砖,且层数不少于三层时,宜设圈梁一道,当超过四层时,可适当增设。圈梁应连续设置在墙的同一水平上,并尽可能地形成封闭圈并与横向墙柱适当连接,当圈梁为门窗洞口切断不能通过时,应在洞口上部砌体中设置一道附加圈梁。钢筋混凝土圈梁的宽度一般应与墙厚相同,当墙厚大于一砖时,圈梁不宜小于2/3墙厚,钢筋混凝土圈梁的高度应等于砌体每皮砖厚度的倍数。钢筋砖圈梁应采用不低于50号的砂浆砌筑,圈梁高度一般为4~6皮砖,分上下两层设置。钢筋混凝土圈梁一般采用现浇,但也可以采用预制装配现浇接头方式。)In the present invention, the flexible protective sleeve 5 is fixed on the ring beam 25, and the ring beam 25 is the ring beam 25 with the second layer below the construction building, and the flexible protective sleeve 5 is connected with the cross bar 2 through the flexible protective sleeve wire rope 6 It plays the role of self-balancing of traction for the installation gondola 3 installed on the cross bar 2 . (The ring beam is to prevent the adverse effects of uneven settlement of the foundation or large vibration load on the house, generally, reinforced concrete ring beam or reinforced brick ring beam should be set in the wall to enhance the overall rigidity of the masonry structure house. The number of ring beams should be determined according to the structure and structure of the house. For single-storey houses with large space, such as workshops, warehouses, and canteens, when the wall thickness is equal to or less than one brick, the cornice elevation is 5 to 8 meters. One ring beam should be set up. When the elevation of the cornice is greater than 8 meters, one ring beam should be added; for single-story industrial workshops with electric bridge cranes or large vibration equipment, in addition to setting reinforced concrete ring beams on the cornice or window top , it is advisable to add a ring beam at the elevation of the crane beam or at an appropriate position in the wall; for multi-storey civil houses, such as dormitories, office buildings, etc., when the wall thickness is equal to or less than one brick and the number of floors is not less than three, One ring beam should be set up, and when it exceeds four floors, it can be added appropriately. The ring beam should be continuously arranged on the same level of the wall, and should form a closed circle as much as possible and be properly connected with the horizontal wall column. If it cannot pass through, an additional ring beam should be set in the upper masonry of the opening. The width of the reinforced concrete ring beam should generally be the same as the wall thickness. The height of the ring beam should be equal to the multiple of the thickness of each brick of the masonry. The reinforced brick ring beam should be built with mortar not less than No. 50. The height of the ring beam is generally 4 to 6 skin bricks, which are divided into upper and lower layers. Reinforced concrete Ring beams are generally cast-in-place, but prefabricated cast-in-place joints can also be used.)

在本实施例当中,所述横杆2通过T型结构件15固定于立柱1上,所述T型结构件15上设置有用于紧固T型结构件15的T型结构件固定螺杆16。In this embodiment, the cross bar 2 is fixed on the column 1 through a T-shaped structural member 15 , and the T-shaped structural member 15 is provided with a T-shaped structural member fixing screw 16 for fastening the T-shaped structural member 15 .

在本实施例当中,所述安装吊篮3通过安装吊篮型钢17设置于横杆2上,所述安装吊篮型钢17与安装吊篮3之间还设置有安装吊篮牵引绳19。In this embodiment, the mounting basket 3 is arranged on the cross bar 2 through the mounting basket shaped steel 17 , and a mounting basket traction rope 19 is also provided between the mounting basket shaped steel 17 and the mounting basket 3 .

在本实施例当中,所述单元板块玻璃幕墙4通过单元板块玻璃幕墙型钢18设置于横杆2上,所述单元板块玻璃幕墙型钢18与单元板块玻璃幕墙4之间还设置有单元板块玻璃幕墙牵引绳20。In this embodiment, the unit panel glass curtain wall 4 is disposed on the cross bar 2 through the unit panel glass curtain wall profile steel 18 , and a unit panel glass curtain wall is also provided between the unit panel glass curtain wall profile steel 18 and the unit panel glass curtain wall 4 Tow rope 20.

本发明的安装方法为:The installation method of the present invention is:

通过轨道接头22将多段双轨道滑轨9连接起来;The multi-section double-track slide rails 9 are connected through the track joints 22;

将立柱1通过轨道预埋件21固定于双轨道滑轨9上;Fix the column 1 on the double-track slide rail 9 through the track embedded parts 21;

将横杆2通过T型结构件15固定于立柱1上;Fix the cross bar 2 on the column 1 through the T-shaped structural member 15;

将张拉钢丝绳7分别穿过横杆卡环10和定滑轮11,然后通过张拉钢丝绳固定件12固定于横杆2上;Pass the tensioning wire rope 7 through the crossbar snap ring 10 and the fixed pulley 11 respectively, and then fix it on the crossbar 2 through the tensioning wire rope fixing member 12;

在横杆2靠近建筑物的一端增设支撑钢通8,并将支撑钢通8与双轨道滑轨9相连接;A support steel pass 8 is added at one end of the cross bar 2 close to the building, and the support steel pass 8 is connected with the double-track slide rail 9;

将柔性保护套5缠绕与建筑物下方第二层的圈梁25上,并通过柔性保护套钢丝绳6与横杆2靠近建筑物的一端相连接;The flexible protective sleeve 5 is wound on the ring beam 25 of the second floor below the building, and is connected with one end of the crossbar 2 close to the building through the flexible protective sleeve wire rope 6;

在横杆2靠近建筑物外侧的一端通过安装吊篮型钢17和单元板块玻璃幕墙型钢18分别安装固定安装吊篮3和单元板块玻璃幕墙4。The hanging basket 3 and the unit panel glass curtain wall 4 are respectively installed and fixed at the end of the crossbar 2 near the outside of the building by installing the hanging basket shaped steel 17 and the unit panel glass curtain wall shaped steel 18 .

进一步的,轨道接头22中的轨道接头钢板23可焊接于每一段双轨道滑轨9的前后两端,然后通过镀锌螺栓24将焊接于双轨道滑轨9前后两端的轨道接头钢板23固定起来,实现双轨道滑轨9的安装。Further, the rail joint steel plate 23 in the rail joint 22 can be welded to the front and rear ends of each double-track slide rail 9, and then the rail joint steel plate 23 welded to the front and rear ends of the double-track slide rail 9 is fixed by galvanized bolts 24. , to realize the installation of double-track slide rails 9.

进一步的,立柱1底部设置有与轨道预埋件21相匹配的连接件,所述连接件可以是螺栓,立柱1通过螺栓固定于轨道预埋件21上,进而完成对立柱1的安装。Further, the bottom of the column 1 is provided with a connecting piece that matches the embedded track 21 , and the connecting piece can be a bolt. The column 1 is fixed on the embedded track 21 by bolts, thereby completing the installation of the column 1 .

进一步的,从立柱1顶部穿过T型结构件15,并在便于安装单元板块玻璃幕墙4的位置穿过横杆2,并通过T型结构件固定螺杆16紧固T型结构件15,进而实现横杆2的安装。Further, pass through the T-shaped structural member 15 from the top of the column 1, and pass through the crossbar 2 at a position where the unit panel glass curtain wall 4 is easily installed, and fasten the T-shaped structural member 15 through the T-shaped structural member fixing screw 16, and then The installation of the cross bar 2 is realized.

进一步的,横杆卡环10可事先通过焊接的方式设置于横杆2靠近建筑物外侧的一端上,定滑轮11也可事先通过焊接的方式设置于立柱1的顶部,然后将张拉钢丝绳7先穿过横杆卡环10,再穿过定滑轮11,最后通过张拉钢丝绳固定件7将张拉钢丝绳7的另一端固定到横杆2(靠近建筑物的一端)上,并通过钢丝绳固定螺杆14进行固定,进而完成一部分平衡机构的安装。Further, the cross bar snap ring 10 can be pre-welded on the end of the cross bar 2 close to the outside of the building, and the fixed pulley 11 can also be pre-welded on the top of the column 1, and then the tension wire rope 7 First pass through the cross bar snap ring 10, then pass through the fixed pulley 11, and finally fix the other end of the tension wire rope 7 to the cross bar 2 (the end close to the building) through the tension wire rope fixing member 7, and fix it by the wire rope The screw 14 is fixed to complete the installation of a part of the balance mechanism.

进一步的,在横杆2靠近建筑物的一端增设支撑钢通8,所述支撑钢通8可通过螺栓固定于横杆2(需事先在横杆2上开设用以固定支撑钢通8的螺栓孔)上,也可以通过焊接的方式固定于横杆2上,支撑钢通8的另一端通过螺栓固定于轨道预埋件21上。Further, a support steel pass 8 is added at one end of the cross bar 2 close to the building, and the support steel pass 8 can be fixed to the cross bar 2 by bolts (bolts for fixing the support steel pass 8 need to be opened on the cross bar 2 in advance. It can also be fixed on the cross bar 2 by welding, and the other end of the support steel through 8 is fixed on the track embedded part 21 by bolts.

进一步的,柔性保护套钢丝绳6通过柔性保护套钢丝绳固定件13设置于横杆2上,并通过钢丝绳固定螺杆14进行固定,进而完成整个平衡机构的安装。Further, the flexible protective cover wire rope 6 is arranged on the cross bar 2 through the flexible protective cover wire rope fixing member 13, and is fixed by the wire rope fixing screw 14, thereby completing the installation of the entire balance mechanism.

进一步的,固定安装吊篮3通过安装吊篮牵引绳19固定于安装吊篮型钢17上,单元板块玻璃幕墙4通过单元板块玻璃幕墙牵引绳20固定于单元板块玻璃幕墙型钢18上,完成整个安装装置的安装。Further, the fixed installation gondola 3 is fixed on the installation gondola section steel 17 through the installation gondola traction rope 19, and the unit plate glass curtain wall 4 is fixed on the unit plate glass curtain wall section steel 18 through the unit plate glass curtain wall traction rope 20, and the whole installation is completed. installation of the device.

本发明实现了幕墙安装装置的自平衡,大大提高了幕墙安装过程中的安全性,极大程度上降低了单元板块玻璃幕墙的安装难度,提升了施工效率;可实现较低成本的大批量快速安装,可以广泛适用于幕墙安装、外立面装饰单元板块等工程实践中。The invention realizes the self-balancing of the curtain wall installation device, greatly improves the safety in the installation process of the curtain wall, greatly reduces the installation difficulty of the unit plate glass curtain wall, and improves the construction efficiency; It can be widely used in engineering practice such as curtain wall installation, facade decoration unit plate and so on.

需要说明的是,对于前述的实施例,为了简单描述,故将其都表述为一系列的动作组合,但是本领域技术人员应该知悉,本申请并不受所描述的动作顺序的限制,因为依据本申请,某一些步骤可以采用其他顺序或者同时进行。其次,本领域技术人员也应该知悉,说明书中所描述的实施例属于优选实施例,所涉及的动作并不一定是本申请所必须的。It should be noted that, for the sake of simplicity of description, the foregoing embodiments are described as a series of action combinations, but those skilled in the art should know that the present application is not limited by the described action sequence, because according to In this application, certain steps may be performed in other sequences or simultaneously. Secondly, those skilled in the art should also know that the embodiments described in the specification belong to the preferred embodiments, and the actions involved are not necessarily required by the present application.

此外,术语“连接”、“设置”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“连接”、“设置”的特征可以明示或者隐含的包括一个或者更多个该特征。而且,术语“连接”、“设置”等是用于区别类似的对象,而不必用于描述特定的顺序或先后次序。应该理解这样使用的数据在适当情况下可以互换,以便这里描述的本发明的实施例能够以除了在这里图示或描述的那些以外的顺序实施。In addition, the terms "connected" and "arranged" are only used for descriptive purposes, and should not be understood as indicating or implying relative importance or implying the number of indicated technical features. Thus, features defined as "connected" or "arranged" may expressly or implicitly include one or more of such features. Also, the terms "connected," "arranged," and the like are used to distinguish similar objects, and are not necessarily used to describe a particular order or sequence. It is to be understood that the data so used may be interchanged under appropriate circumstances such that the embodiments of the invention described herein can be practiced in sequences other than those illustrated or described herein.

上述实施例中,描述了本发明的基本原理和主要特征和本发明的优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是说明本发明的原理,在不脱离本发明精神和范围的前提下,本领域人员所进行的改动和变化不脱离本发明的精神和范围,则都应在本发明所附权利要求的保护范围内。In the above-described embodiments, the basic principles and main features of the present invention and the advantages of the present invention are described. Those skilled in the art should understand that the present invention is not limited by the above-mentioned embodiments, and the descriptions in the above-mentioned embodiments and the description are only to illustrate the principle of the present invention, without departing from the spirit and scope of the present invention. Modifications and changes without departing from the spirit and scope of the present invention should all fall within the protection scope of the appended claims of the present invention.

Claims (10)

1. The utility model provides a self-balancing column double track way curtain installation device, its characterized in that, includes slide rail mechanism, it erects independently to be provided with a plurality of on the slide rail mechanism, independently erect including balance mechanism and installation mechanism, installation mechanism includes stand (1), be provided with horizontal pole (2) on stand (1), the one end that horizontal pole (2) are close to the building outside is provided with installation hanging flower basket (3) and unit plate glass curtain wall (4), balance mechanism is including being fixed in flexible protective sheath (5) on collar tie beam (25), flexible protective sheath (5) are connected with the other end of horizontal pole (2) through flexible protective sheath wire rope (6).
2. The self-balancing column type double-rail curtain wall mounting device as claimed in claim 1, wherein the independent frame further comprises a support steel through (8), one end of the support steel through (8) is connected with the sliding rail mechanism, and the other end of the support steel through (8) is connected with one end of the cross bar (2) close to the building.
3. The self-balancing column type double-rail curtain wall mounting device as claimed in claim 1, wherein the rail mechanism comprises a double-rail (9), and a plurality of rail embedded parts (21) for fixing the column (1) and supporting the steel tube (8) are arranged on the double-rail (9).
4. The self-balancing column type double-rail curtain wall mounting device as claimed in claim 3, wherein a plurality of rail joints (22) are further arranged on the double-rail sliding rails (9), the rail joints (22) comprise rail joint steel plates (23) and galvanized bolts (24), and the rail joint steel plates (23) and the galvanized bolts (24) are used for respectively connecting the sections of the double-rail sliding rails (9).
5. The self-balancing column type double-rail curtain wall installation device as claimed in claim 1, wherein the balancing mechanism further comprises a tension steel wire rope (7), and the tension steel wire rope (7) passes through a fixed pulley (11) arranged at the top of the column (1) to tension the cross bar (2).
6. The self-balancing column type double-rail curtain wall mounting device as claimed in claim 5, wherein one end of the tension steel wire rope (7) is connected with the cross rod (2) through a cross rod snap ring (10), and the other end is connected with the cross rod (2) through a tension steel wire rope fixing member (12).
7. The self-balancing column type double-rail curtain wall mounting device as claimed in claim 1, wherein the cross bar (2) is fixed on the column (1) through a T-shaped structural member (15), and a T-shaped structural member fixing screw (16) for fastening the T-shaped structural member (15) is arranged on the T-shaped structural member (15).
8. The self-balancing column type double-rail curtain wall mounting device as claimed in claim 1, wherein the mounting basket (3) is arranged on the cross bar (2) through a mounting basket section steel (17), and a mounting basket traction rope (19) is further arranged between the mounting basket section steel (17) and the mounting basket (3).
9. The self-balancing column type double-rail curtain wall installation device as claimed in claim 1, wherein the unit plate glass curtain wall (4) is arranged on the cross bar (2) through unit plate glass curtain wall section steel (18), and a unit plate glass curtain wall traction rope (20) is further arranged between the unit plate glass curtain wall section steel (18) and the unit plate glass curtain wall (4).
10. A method for installing a self-balancing column type double-rail curtain wall installation device, which adopts the self-balancing column type double-rail curtain wall installation device of any one of claims 1 to 9, and is characterized by comprising the following steps:
a plurality of sections of double-track slide rails (9) are connected through a track joint (22);
fixing the upright post (1) on a double-track slide rail (9) through a track embedded part (21);
fixing the cross rod (2) on the upright post (1) through a T-shaped structural member (15);
respectively penetrating a tension steel wire rope (7) through a cross rod clamping ring (10) and a fixed pulley (11), and then fixing the tension steel wire rope (7) on a cross rod (2) through a tension steel wire rope fixing piece (12);
a support steel through hole (8) is additionally arranged at one end of the cross bar (2) close to the building, and the support steel through hole (8) is connected with a double-track slide rail (9);
winding a flexible protective sleeve (5) on a ring beam (25) on the second layer below the building, and connecting one end of a cross rod (2) close to the building through a steel wire rope (6) of the flexible protective sleeve;
one end of the cross bar (2) close to the outer side of the building is respectively provided with a fixed installation hanging basket (3) and a unit plate glass curtain wall (4) through installation hanging basket section steel (17) and unit plate glass curtain wall section steel (18).
CN202210588759.0A 2022-05-27 2022-05-27 Self-balancing column type double-track curtain wall mounting device and mounting method Pending CN114922440A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210588759.0A CN114922440A (en) 2022-05-27 2022-05-27 Self-balancing column type double-track curtain wall mounting device and mounting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210588759.0A CN114922440A (en) 2022-05-27 2022-05-27 Self-balancing column type double-track curtain wall mounting device and mounting method

Publications (1)

Publication Number Publication Date
CN114922440A true CN114922440A (en) 2022-08-19

Family

ID=82810357

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210588759.0A Pending CN114922440A (en) 2022-05-27 2022-05-27 Self-balancing column type double-track curtain wall mounting device and mounting method

Country Status (1)

Country Link
CN (1) CN114922440A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2894150A1 (en) * 2012-12-07 2014-06-12 Illinois Tool Works Inc. Curtain wall panel installation system
CN204703534U (en) * 2015-05-27 2015-10-14 中建三局(厦门)建设有限公司 A kind of large-scale unit plates of curtain wall two-rail hanging apparatus
CN111706060A (en) * 2020-06-22 2020-09-25 中国五冶集团有限公司 Steel wire rope inclined-pulling type hanging basket device
CN112049402A (en) * 2020-09-15 2020-12-08 中国五冶集团有限公司 Stand shoulder pole type double-track hanging basket construction system
CN212101770U (en) * 2020-02-28 2020-12-08 五冶集团装饰工程有限公司 Double-rail device convenient to install and detach quickly and used for hoisting curtain wall unit plate
CN112320606A (en) * 2020-10-26 2021-02-05 中铁十四局集团建筑工程有限公司 Special device for integral lifting, mounting and construction of assembled curtain wall and using method
CN216076228U (en) * 2021-06-30 2022-03-18 浙江交工集团股份有限公司 Rail mounted hanging flower basket support device
CN114482576A (en) * 2022-02-28 2022-05-13 中建海峡(厦门)建设发展有限公司 Building external inclined curved surface curtain wall installation construction device and construction method thereof
CN217420580U (en) * 2022-05-27 2022-09-13 五冶集团装饰工程有限公司 Self-balancing column type double-track curtain wall mounting device

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2894150A1 (en) * 2012-12-07 2014-06-12 Illinois Tool Works Inc. Curtain wall panel installation system
CN204703534U (en) * 2015-05-27 2015-10-14 中建三局(厦门)建设有限公司 A kind of large-scale unit plates of curtain wall two-rail hanging apparatus
CN212101770U (en) * 2020-02-28 2020-12-08 五冶集团装饰工程有限公司 Double-rail device convenient to install and detach quickly and used for hoisting curtain wall unit plate
CN111706060A (en) * 2020-06-22 2020-09-25 中国五冶集团有限公司 Steel wire rope inclined-pulling type hanging basket device
CN112049402A (en) * 2020-09-15 2020-12-08 中国五冶集团有限公司 Stand shoulder pole type double-track hanging basket construction system
CN112320606A (en) * 2020-10-26 2021-02-05 中铁十四局集团建筑工程有限公司 Special device for integral lifting, mounting and construction of assembled curtain wall and using method
CN216076228U (en) * 2021-06-30 2022-03-18 浙江交工集团股份有限公司 Rail mounted hanging flower basket support device
CN114482576A (en) * 2022-02-28 2022-05-13 中建海峡(厦门)建设发展有限公司 Building external inclined curved surface curtain wall installation construction device and construction method thereof
CN217420580U (en) * 2022-05-27 2022-09-13 五冶集团装饰工程有限公司 Self-balancing column type double-track curtain wall mounting device

Similar Documents

Publication Publication Date Title
WO2023208250A1 (en) Curtain wall construction platform
CN201962932U (en) Sectional cantilevered external scaffolding for building construction
CN210152069U (en) Assembled high-rise steel structure residential system
CN114482349B (en) Construction method for supporting large-span glass curtain wall system by using through double-pull-rod steel frame
CN115298400A (en) Construction method
CN113152664A (en) Steel structural framework and modularized additional elevator
CN217420580U (en) Self-balancing column type double-track curtain wall mounting device
JPH09158470A (en) Prefabricated scaffolding for bridge pier
CN108894329B (en) Overhanging type pipe truss and mounting method of supporting rod thereof
CN106437261B (en) A concrete frame seismic reinforcement structure using steel mesh
CN114922440A (en) Self-balancing column type double-track curtain wall mounting device and mounting method
RU2399731C1 (en) Method for erection of multilayer building wall, which is self-bearing within floor
CN110258876A (en) The mounting structure and its installation method of inclined curtain wall
CN113152658B (en) Large-span corridor with comprehensive curtain wall at bottom and construction method
CN213418435U (en) Be applied to external protection frame of assembly type construction
CN208870409U (en) A kind of vertical pump line room external fixer of concrete
CN208763390U (en) A kind of suspended operating platform
CN219160602U (en) Hidden mounting structure of air condensing units
CN112962916A (en) Novel cold-formed thin-walled steel elevator well
JP2004052455A (en) External scaffolding device and construction method therefor
JP2585174B2 (en) How to fix scaffolding for temporary tents
RU2282697C1 (en) Method for multilayer building wall erection
CN221972951U (en) Large-size steel overhanging scaffold structure at door opening
JP2004116154A (en) Small business buildings and their construction methods
CN209114976U (en) A kind of dismountable environment protection fence

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20220819