CN114319700A - Mounting structure of main joist and false keel - Google Patents
Mounting structure of main joist and false keel Download PDFInfo
- Publication number
- CN114319700A CN114319700A CN202111561317.9A CN202111561317A CN114319700A CN 114319700 A CN114319700 A CN 114319700A CN 202111561317 A CN202111561317 A CN 202111561317A CN 114319700 A CN114319700 A CN 114319700A
- Authority
- CN
- China
- Prior art keywords
- keel
- main
- plate
- pendant
- auxiliary
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Floor Finish (AREA)
Abstract
本发明属于吊顶安装技术领域,具体涉及一种主龙骨与副龙骨的安装结构,由主龙骨、副龙骨以及挂件组成;数个主龙骨纵向水平设置,相邻主龙骨之间设有数个横向放置的副龙骨,单个主龙骨两侧的副龙骨错位布置;副龙骨的两端分别与相邻两主龙骨插接;副龙骨与主龙骨位于同一水平高度;挂件的顶部挂装于副龙骨。本发明采用单层交错龙骨安装方式,将纵向布置的主龙骨与横向布置的副龙骨设置在同一高度平面上,能够节省顶部吊顶空间;同时主龙骨与副龙骨单层纵横交错,主龙骨中间增加用于横撑的副龙骨,整体呈现网格状,整体承载能力强;同时,副龙骨上设有可拆卸的挂件,便于副龙骨通过挂件与工字件连接。
The invention belongs to the technical field of ceiling installation, and in particular relates to an installation structure of a main keel and an auxiliary keel, which is composed of a main keel, an auxiliary keel and a pendant; The auxiliary keel on both sides of a single main keel is dislocated; the two ends of the auxiliary keel are respectively inserted into the adjacent two main keels; the auxiliary keel and the main keel are located at the same level; the top of the pendant is hung on the auxiliary keel. The invention adopts the single-layer staggered keel installation method, and the longitudinally arranged main keel and the horizontally arranged auxiliary keel are arranged on the same height plane, which can save the ceiling space at the top; at the same time, the main keel and the auxiliary keel are crisscrossed in a single layer, and the middle of the main keel is increased. The auxiliary keel used for the horizontal bracing has a grid shape as a whole, and the overall bearing capacity is strong.
Description
技术领域technical field
本发明属于吊顶安装技术领域,具体涉及一种主龙骨与副龙骨的安装结构。The invention belongs to the technical field of ceiling installation, and particularly relates to an installation structure of a main keel and an auxiliary keel.
背景技术Background technique
现阶段,吊顶安装过程中通常采用双层龙骨的安装方式,整体安装调平效率低,并且对于顶部层高侵占空间较多,导致建筑顶部空间利用率低。At this stage, the installation method of double-layer keel is usually adopted in the installation process of the suspended ceiling. The overall installation and leveling efficiency is low, and more space is occupied for the top floor height, resulting in a low utilization rate of the space at the top of the building.
如公告号CN206625435U的中国专利公布了一种室内吊顶,包括若干平行设置的吊顶板、横向主龙骨和纵向副龙骨,纵向副龙骨设置于横向主龙骨下方并于横向主龙骨垂直交叉设置。虽然CN206625435U的专利能够防止横向主龙骨发生晃动,提高固定效果,但是横向主龙骨和纵向副龙骨分布在室内吊顶高度上的两层,占用吊顶空间较多,在房价上涨愈演愈烈的今天,空间侵占会增加用户使用成本。此外,龙骨与安装吊顶用的其他安装件连接较为复杂。For example, the Chinese Patent Publication No. CN206625435U discloses an indoor suspended ceiling, which includes several parallel ceiling panels, a horizontal main keel and a vertical auxiliary keel. Although the patent of CN206625435U can prevent the horizontal main keel from shaking and improve the fixing effect, the horizontal main keel and the vertical auxiliary keel are distributed on two floors at the height of the indoor ceiling, occupying a lot of ceiling space. Today, with the rising house prices, space encroachment will Increase user cost. In addition, the connection between the keel and other mounting parts for installing the suspended ceiling is more complicated.
发明内容SUMMARY OF THE INVENTION
基于现有技术中存在的上述缺点和不足,本发明的目的之一是至少解决现有技术中存在的上述问题之一或多个,换言之,本发明的目的之一是提供满足前述需求之一或多个的一种。Based on the above-mentioned shortcomings and deficiencies in the prior art, one of the objectives of the present invention is to at least solve one or more of the above-mentioned problems existing in the prior art. In other words, one of the objectives of the present invention is to provide one of the aforementioned requirements or one of more than one.
为了达到上述发明目的,本发明采用以下技术方案:In order to achieve the above-mentioned purpose of the invention, the present invention adopts the following technical solutions:
一种主龙骨与副龙骨的安装结构,由主龙骨、副龙骨以及挂件组成;数个主龙骨纵向水平设置,相邻主龙骨之间设有数个横向放置的副龙骨,单个主龙骨两侧的副龙骨错位布置;副龙骨的两端分别与相邻两主龙骨插接;副龙骨与主龙骨位于同一水平高度;挂件的顶部挂装于副龙骨。An installation structure of a main keel and an auxiliary keel, which consists of a main keel, an auxiliary keel and a pendant; several main keels are arranged vertically and horizontally, and several horizontally placed auxiliary keels are arranged between adjacent main keels. The auxiliary keel is dislocated; the two ends of the auxiliary keel are respectively inserted into the adjacent two main keels; the auxiliary keel and the main keel are located at the same level; the top of the pendant is hung on the auxiliary keel.
进一步地,主龙骨包括连接成L状的第一主龙骨板与第二主龙骨板,第一主龙骨板竖向放置,第二主龙骨板水平放置;第一主龙骨板沿其长度方向设有数个第一通孔,第二主龙骨板沿其长度方向设有数个第二通孔。Further, the main keel includes a first main keel plate and a second main keel plate connected in an L shape, the first main keel plate is placed vertically, and the second main keel plate is placed horizontally; the first main keel plate is arranged along its length direction. There are several first through holes, and the second main keel plate is provided with several second through holes along its length direction.
进一步地,第一主龙骨板与第二主龙骨板之间通过弧形主龙骨板过渡连接。Further, the first main keel plate and the second main keel plate are transitionally connected by an arc-shaped main keel plate.
进一步地,副龙骨包括连接成T状的第一副龙骨板与第二副龙骨板,第一副龙骨板竖向放置,第二副龙骨板水平放置;第一副龙骨板两端均设有可插入第一通孔内的插头。Further, the auxiliary keel includes a first auxiliary keel plate and a second auxiliary keel plate connected in a T shape, the first auxiliary keel plate is placed vertically, and the second auxiliary keel plate is placed horizontally; both ends of the first auxiliary keel plate are provided with A plug that can be inserted into the first through hole.
进一步地,插头为与第一副龙骨板位于同一平面的平板状。Further, the plug is in the shape of a flat plate located on the same plane as the first auxiliary keel plate.
进一步地,插头位于第一副龙骨板端部的中间位置。Further, the plug is located in the middle of the end of the first auxiliary keel plate.
进一步地,插头远离第一副龙骨板的一端为弧形状。Further, one end of the plug away from the first auxiliary keel plate is arc-shaped.
进一步地,挂件包括第一挂件板,第一挂件板的相对两边分别连接有第二挂件板与第三挂件板,第一挂件板、第二挂件板与第三挂件板构成第一挂件槽;第一挂件槽套设于第二副龙骨板外。Further, the pendant includes a first pendant plate, and the opposite sides of the first pendant plate are respectively connected with a second pendant plate and a third pendant plate, and the first pendant plate, the second pendant plate and the third pendant plate constitute a first pendant slot; The first pendant slot is sleeved outside the second auxiliary keel plate.
进一步地,第三挂件板远离第一挂件板的一端设有第一挂件卡槽与第二挂件卡槽。Further, one end of the third hanging plate away from the first hanging plate is provided with a first hanging fitting slot and a second hanging fitting slot.
进一步地,第三挂件板远离第一挂件板的一端设有缺口,第一挂件卡槽、第二挂件卡槽均与缺口连通。Further, an end of the third pendant plate away from the first pendant plate is provided with a notch, and both the first pendant card slot and the second pendant card slot are communicated with the notch.
本发明与现有技术相比,有益效果是:Compared with the prior art, the present invention has the following beneficial effects:
(1)本发明采用单层交错龙骨安装方式,将纵向布置的主龙骨与横向布置的副龙骨设置在同一高度平面上,能够节省顶部吊顶空间,增加建筑顶部空间利用率,降低层高,节约用户成本;同时主龙骨与副龙骨单层纵横交错,主龙骨中间增加用于横撑的副龙骨,整体呈现网格状,保证位于同一平面的主龙骨与副龙骨整体承载能力强,强度高,能够适应较重的后置物品的安装;同时,副龙骨上设有可拆卸的挂件,便于副龙骨通过挂件与工字件连接。(1) The present invention adopts the single-layer staggered keel installation method, and the longitudinally arranged main keel and the laterally arranged auxiliary keel are arranged on the same height plane, which can save the ceiling space at the top, increase the utilization rate of the space at the top of the building, reduce the floor height, and save energy. User cost; at the same time, the main keel and the auxiliary keel are criss-crossed in a single layer, and the auxiliary keel used for the cross brace is added in the middle of the main keel, and the whole is in a grid shape, which ensures that the main keel and the auxiliary keel on the same plane have strong overall bearing capacity and high strength. It can be adapted to the installation of heavy rear items; at the same time, the auxiliary keel is provided with a detachable pendant, which is convenient for the auxiliary keel to be connected with the I-shaped piece through the pendant.
(2)本发明主龙骨与副龙骨可拆卸连接,副龙骨与挂件可拆卸连接,整体安装拆卸简单,后期维修拆卸容易。(2) The main keel and the auxiliary keel of the present invention are detachably connected, and the auxiliary keel and the pendant are detachably connected, the overall installation and removal are simple, and the later maintenance and removal are easy.
(3)本发明中安装过程采用工厂预制方案,采用标准化部件,部件可重重复利用,节约资源,减少浪费;无需现场加工,拆包即按,节能高效,工艺简单,安装步骤简单,施工效率高,并且安装过程中避免污染,减少噪音,减少灰尘;(3) The installation process in the present invention adopts the factory prefabrication scheme, adopts standardized components, and the components can be reused, saving resources and reducing waste; no need for on-site processing, unpacking and pressing, energy saving and high efficiency, simple process, simple installation steps, and construction efficiency High, and avoid pollution, reduce noise and reduce dust during installation;
(4)主龙骨、副龙骨以及挂件规格统一,容易集成,便于连接;挂件可定制接口,可以适应不用形状的龙骨安装。(4) The specifications of the main keel, the auxiliary keel and the pendant are unified, which is easy to integrate and easy to connect; the pendant can be customized with an interface, which can be adapted to the installation of keels of different shapes.
附图说明Description of drawings
图1为本实施例整体结构图;Fig. 1 is the overall structure diagram of this embodiment;
图2为主龙骨与副龙骨连接结构示意图;Figure 2 is a schematic diagram of the connection structure between the main keel and the auxiliary keel;
图3为副龙骨与挂件连接结构示意图;Figure 3 is a schematic diagram of the connection structure between the auxiliary keel and the pendant;
图4为主龙骨结构示意图;Figure 4 is a schematic diagram of the main keel structure;
图5为副龙骨结构示意图;Figure 5 is a schematic diagram of the auxiliary keel structure;
图6为挂件结构示意图。Figure 6 is a schematic diagram of the structure of the pendant.
图中,1主龙骨、11第一主龙骨板、12第二主龙骨板、13弧形主龙骨板、14第一通孔、15第二通孔、2副龙骨、21第一副龙骨板、22第二副龙骨板、23插头、3挂件、31第一挂件板、32第二挂件板、33第三挂件板、34第一挂件槽、35第一挂件卡槽、36第二挂件卡槽、37缺口、38弧形挂件板。In the figure, 1 main keel, 11 first main keel plate, 12 second main keel plate, 13 arc main keel plate, 14 first through hole, 15 second through hole, 2 auxiliary keels, 21 first auxiliary keel plate , 22 second auxiliary keel plate, 23 plug, 3 pendant, 31 first pendant plate, 32 second pendant plate, 33 third pendant plate, 34 first pendant slot, 35 first pendant card slot, 36 second pendant card Slot, 37 notch, 38 arc pendant board.
具体实施方式Detailed ways
为了更清楚地说明本发明实施例,下面将对照附图说明本发明的具体实施方式。显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图,并获得其他的实施方式。In order to describe the embodiments of the present invention more clearly, the following will describe specific embodiments of the present invention with reference to the accompanying drawings. Obviously, the accompanying drawings in the following description are only some embodiments of the present invention. For those of ordinary skill in the art, other drawings can also be obtained from these drawings without creative efforts, and obtain other implementations.
如图1-6所示,本实施例一种主龙骨与副龙骨的安装结构,由主龙骨、副龙骨以及挂件组成。数个主龙骨1纵向水平设置,相邻主龙骨1之间设有数个横向放置的副龙骨,单个主龙骨1两侧的副龙骨2错位布置。副龙骨2的两端分别与相邻主龙骨1插接。副龙骨2与主龙骨1位于同一水平高度。挂件3的顶部挂装于副龙骨2,底部可与工字件卡接。工字件通过挂件3悬挂在副龙骨2的下方。吊顶板通过与工字件卡接设置于相邻两工字件之间。因此,本实施例通过将主龙骨1与副龙骨2布置在同一高度平面,能够节省顶部吊顶空间,增加建筑顶部空间利用率,降低层高,节约用户成本;同时主龙骨1与副龙骨2单层纵横交错,主龙骨1中间增加用于横撑的副龙骨2,整体呈现网格状,保证位于同一平面的主龙骨1与副龙骨2整体承载能力强,强度高,能够适应较重的后置物品的安装。同时,副龙骨上设有可拆卸的挂件,便于副龙骨通过挂件与工字件连接。As shown in Figures 1-6, an installation structure of a main keel and an auxiliary keel in this embodiment is composed of a main keel, an auxiliary keel and a pendant. Several main keels 1 are arranged vertically and horizontally, and several auxiliary keels placed horizontally are arranged between adjacent main keels 1 , and the auxiliary keels 2 on both sides of a single main keel 1 are arranged in dislocation. Both ends of the auxiliary keel 2 are respectively inserted into the adjacent main keel 1 . The auxiliary keel 2 and the main keel 1 are located at the same level. The top of the
本实施例的主龙骨1包括连接成L状的第一主龙骨板11与第二主龙骨板12,第一主龙骨板11竖向放置,第二主龙骨板12水平放置。第一主龙骨板11沿其长度方向设有数个第一通孔14。为便于主龙骨与建筑楼板连接,第二主龙骨板12沿其长度方向设有数个第二通孔15。螺栓的一端与建筑楼板连接,另一端可贯穿第二通孔15与第二主龙骨板12连接。第一主龙骨板11与第二主龙骨板12之间通过弧形主龙骨板13过渡连接。The main keel 1 of this embodiment includes a first
本实施例的副龙骨2包括连接成T状的第一副龙骨板21与第二副龙骨板22,第一副龙骨板21竖向放置,第二副龙骨板22水平放置。第一副龙骨板21两端均设有可贯穿第一通孔14的插头23。安装时,使副龙骨一端的插头23贯穿一主龙骨的第一通孔14直至无法挪动该插头23,此时该插头23所在的第一副龙骨板21的端部与该插头23所在的第一主龙骨板11相抵;之后,将另一主龙骨的第一通孔14与该副龙骨另一端的插头23插接牢固;此时便完成了将在两主龙骨之间安装副龙骨的过程。副龙骨安装完成后,每一副龙骨的两端分别与相邻两主龙骨的第一主龙骨板11相抵。The auxiliary keel 2 of this embodiment includes a first
第一通孔14为竖向长条状,插头23为与第一副龙骨板21位于同一平面的平板状。插头23远离第一副龙骨板21的一端为弧形状,以便于插头23插入第一通孔14内。因此,本实施例主龙骨与副龙骨通过插接的形式可拆卸连接,整体安装拆卸简单,后期维修拆卸容易。The first through
为便于在副龙骨的底部安装工字件,本实施例的挂件包括第一挂件板31,第一挂件板31的相对两边分别连接有第二挂件板32与第三挂件板33,第一挂件板31、第二挂件板32与第三挂件板33构成第一挂件槽34。第一挂件槽34套设于第二副龙骨板22外,第二副龙骨板22位于第一挂件槽34内。第三挂件板33的底部延伸至第一副龙骨板21的底部所在高度。In order to facilitate the installation of the I-shaped piece at the bottom of the auxiliary keel, the pendant in this embodiment includes a
为便于挂件3与工字件进行卡接,第三挂件板33远离第一挂件板31的一端设有第一挂件卡槽35与第二挂件卡槽36。第三挂件板33远离第一挂件板31的一端设有缺口37,第一挂件卡槽35、第二挂件卡槽36均与缺口37连通。第一挂件卡槽35、第二挂件卡槽36均为U形槽。第一挂件卡槽35的开口端与第二挂件卡槽36的开口端相对。第一挂件卡槽35、第二挂件卡槽36以及缺口37位于同一直线。第二挂件板32的长边、第三挂件板33的长边分别与第一挂件板31的两长边连接。第二挂件板32的短边尺寸小于第三挂件板33的短边尺寸。第二挂件板32的短边满足使第二T形副龙骨嵌入至第一挂件槽34内即可。In order to facilitate the attachment of the
安装工字件时,工字件可置于第一挂件卡槽35与第二挂件卡槽36内。拆卸工字件时,直接将工字件从第一挂件卡槽35与第二挂件卡槽36内取出即可。为便于第一挂件板31与第二挂件板32连接,第一挂件板31与第二挂件板32通过弧形挂件板38过渡连接。为便于第一挂件板31与第三挂件板33连接,第一挂件板31与第三挂件板33通过弧形挂件板38过渡连接。When installing the I-shaped piece, the I-shaped piece can be placed in the
本实施例的安装原理为:首先将副龙骨2的两端的插头23分别插入相邻两主龙骨1的插孔内;之后将挂件3的第一挂件槽34挂设于副龙骨2的第二副龙骨板22。The installation principle of this embodiment is as follows: first, insert the
综上,本实施例采用单层交错龙骨安装方式,将纵向布置的主龙骨1与横向布置的副龙骨2设置在同一高度平面上,能够节省顶部吊顶空间,增加建筑顶部空间利用率,降低层高,节约用户成本;同时主龙骨1与副龙骨2单层纵横交错,主龙骨1中间增加用于横撑的副龙骨2,整体呈现网格状,保证位于同一平面的主龙骨1与副龙骨2整体承载能力强,强度高,能够适应较重的后置物品的安装;本实施例的主龙骨1与副龙骨2可拆卸连接,挂件3与副龙骨2可拆卸连接,整体安装拆卸简单,后期维修拆卸容易。本实施例安装过程采用工厂预制方案,采用标准化部件,部件可重重复利用,节约资源,减少浪费;无需现场加工,拆包即按,节能高效,工艺简单,安装步骤简单,施工效率高,并且安装过程中避免污染,减少噪音,减少灰尘。本实施例主龙骨、副龙骨、以及挂件规格统一,容易集成,便于连接;挂件可定制接口,可以适应不用形状的龙骨安装。In summary, this embodiment adopts the single-layer staggered keel installation method, and the longitudinally arranged main keel 1 and the laterally arranged auxiliary keel 2 are arranged on the same height plane, which can save the ceiling space at the top, increase the utilization rate of the space at the top of the building, and reduce the floor space. At the same time, the main keel 1 and the auxiliary keel 2 are crisscrossed in a single layer, and the auxiliary keel 2 used for the cross brace is added in the middle of the main keel 1, and the overall appearance is grid-like, ensuring that the main keel 1 and the auxiliary keel are located on the same plane. 2. The overall bearing capacity is strong and the strength is high, which can adapt to the installation of heavy rear items; the main keel 1 and the auxiliary keel 2 in this embodiment are detachably connected, and the
应当说明的是,上述实施例均可根据需要自由组合。以上所述仅是对本发明的优选实施例及原理进行了详细说明,对本领域的普通技术人员而言,依据本发明提供的思想,在具体实施方式上会有改变之处,而这些改变也应视为本发明的保护范围。It should be noted that the above embodiments can be freely combined as required. The above is only a detailed description of the preferred embodiments and principles of the present invention. For those of ordinary skill in the art, according to the ideas provided by the present invention, there will be changes in the specific implementation, and these changes should also be It is regarded as the protection scope of the present invention.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111561317.9A CN114319700A (en) | 2021-12-20 | 2021-12-20 | Mounting structure of main joist and false keel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111561317.9A CN114319700A (en) | 2021-12-20 | 2021-12-20 | Mounting structure of main joist and false keel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN114319700A true CN114319700A (en) | 2022-04-12 |
Family
ID=81053270
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202111561317.9A Pending CN114319700A (en) | 2021-12-20 | 2021-12-20 | Mounting structure of main joist and false keel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN114319700A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117344907A (en) * | 2023-12-05 | 2024-01-05 | 中国建筑一局(集团)有限公司 | Exposed frame tensile net suspended ceiling with single keel as main keel and construction method thereof |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6205732B1 (en) * | 1999-05-19 | 2001-03-27 | Acoustic Ceiling Products, L.L.C. | Surface mounted grid system |
CN108868139A (en) * | 2018-08-11 | 2018-11-23 | 天津市盛世基建岩土工程有限公司 | A kind of method of furred ceiling |
CN209397814U (en) * | 2018-12-17 | 2019-09-17 | 深圳安星建设集团有限公司 | A kind of bright keel steel plate suspended ceiling structure of plug-in |
CN110397211A (en) * | 2019-07-17 | 2019-11-01 | 金点石(北京)建筑设计咨询服务有限责任公司 | Furred ceiling component, grid system and building body |
CN211548324U (en) * | 2019-12-20 | 2020-09-22 | 北京施图美达装饰工程有限公司 | Spliced ceiling structure |
US20200318350A1 (en) * | 2016-05-20 | 2020-10-08 | Saint-Gobain Ecophon Ab | Cross runner connector and cross runner connector arrangement for a suspended ceiling system |
CN112144733A (en) * | 2020-10-26 | 2020-12-29 | 浙江亚厦装饰股份有限公司 | Room clear height lifting ceiling structure and mounting method thereof |
CN113323261A (en) * | 2021-07-14 | 2021-08-31 | 浙江亚厦装饰股份有限公司 | Assembly type suspension rod-free suspended ceiling structure and mounting method thereof |
CN113482228A (en) * | 2021-08-10 | 2021-10-08 | 苏州美瑞德建筑装饰有限公司 | Modularization arc GRG furred ceiling design mounting structure |
CN214461695U (en) * | 2021-03-25 | 2021-10-22 | 太原市悍世分合建材科技有限公司 | Fast-assembling gypsum board flat top module |
CN216920963U (en) * | 2021-12-20 | 2022-07-08 | 浙江亚厦装饰股份有限公司 | Mounting structure of main joist and false keel |
-
2021
- 2021-12-20 CN CN202111561317.9A patent/CN114319700A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6205732B1 (en) * | 1999-05-19 | 2001-03-27 | Acoustic Ceiling Products, L.L.C. | Surface mounted grid system |
US20200318350A1 (en) * | 2016-05-20 | 2020-10-08 | Saint-Gobain Ecophon Ab | Cross runner connector and cross runner connector arrangement for a suspended ceiling system |
CN108868139A (en) * | 2018-08-11 | 2018-11-23 | 天津市盛世基建岩土工程有限公司 | A kind of method of furred ceiling |
CN209397814U (en) * | 2018-12-17 | 2019-09-17 | 深圳安星建设集团有限公司 | A kind of bright keel steel plate suspended ceiling structure of plug-in |
CN110397211A (en) * | 2019-07-17 | 2019-11-01 | 金点石(北京)建筑设计咨询服务有限责任公司 | Furred ceiling component, grid system and building body |
CN211548324U (en) * | 2019-12-20 | 2020-09-22 | 北京施图美达装饰工程有限公司 | Spliced ceiling structure |
CN112144733A (en) * | 2020-10-26 | 2020-12-29 | 浙江亚厦装饰股份有限公司 | Room clear height lifting ceiling structure and mounting method thereof |
CN214461695U (en) * | 2021-03-25 | 2021-10-22 | 太原市悍世分合建材科技有限公司 | Fast-assembling gypsum board flat top module |
CN113323261A (en) * | 2021-07-14 | 2021-08-31 | 浙江亚厦装饰股份有限公司 | Assembly type suspension rod-free suspended ceiling structure and mounting method thereof |
CN113482228A (en) * | 2021-08-10 | 2021-10-08 | 苏州美瑞德建筑装饰有限公司 | Modularization arc GRG furred ceiling design mounting structure |
CN216920963U (en) * | 2021-12-20 | 2022-07-08 | 浙江亚厦装饰股份有限公司 | Mounting structure of main joist and false keel |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117344907A (en) * | 2023-12-05 | 2024-01-05 | 中国建筑一局(集团)有限公司 | Exposed frame tensile net suspended ceiling with single keel as main keel and construction method thereof |
CN117344907B (en) * | 2023-12-05 | 2024-02-02 | 中国建筑一局(集团)有限公司 | Exposed frame tensile net suspended ceiling with single keel as main keel and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN114319700A (en) | Mounting structure of main joist and false keel | |
CN114319698A (en) | Assembly type ceiling T-shaped keel hanging structure | |
CN216920963U (en) | Mounting structure of main joist and false keel | |
CN216920954U (en) | Assembled furred ceiling individual layer fossil fragments clamp structure | |
CN211572124U (en) | Novel vertical keel hanging and partition wall fixing and mounting structure | |
CN216920953U (en) | Mounting structure of main joist and stull joist | |
CN216920951U (en) | Mounting structure of fossil fragments and worker's word piece | |
CN214993234U (en) | Town road sound-proof wall | |
CN216920962U (en) | Keel hanging piece | |
CN114293702A (en) | Mounting structure of main joist and stull fossil fragments | |
CN114319695A (en) | An assembled ceiling single-layer keel clamping structure | |
CN213508987U (en) | Window edge sealing fixing piece of assembled building external wall heat insulation integrated plate | |
CN210857573U (en) | Light noise elimination wallboard | |
CN210597753U (en) | Special keel for double-sided partition wall | |
CN209799460U (en) | Square tube heavy steel and light steel combined suspended house structure | |
CN221502548U (en) | A new wall functional board | |
CN218779760U (en) | Assembled furred ceiling individual layer keel structure | |
CN114319697A (en) | Mounting structure of fossil fragments and worker's word spare | |
CN221095552U (en) | Quick connecting and positioning mechanism for dry hanging curtain wall board | |
CN218176155U (en) | External hanging type wall body and main body connecting device | |
CN217897121U (en) | Assembled kitchen wall structure | |
CN219621957U (en) | Assembled movable house | |
CN216428876U (en) | Low-carbon energy-saving building wallboard | |
CN219158170U (en) | An assembled steel structure beam | |
CN222701289U (en) | Frame type building curtain wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |