[go: up one dir, main page]

CN114293702A - Mounting structure of main joist and stull fossil fragments - Google Patents

Mounting structure of main joist and stull fossil fragments Download PDF

Info

Publication number
CN114293702A
CN114293702A CN202111560989.8A CN202111560989A CN114293702A CN 114293702 A CN114293702 A CN 114293702A CN 202111560989 A CN202111560989 A CN 202111560989A CN 114293702 A CN114293702 A CN 114293702A
Authority
CN
China
Prior art keywords
keel
plate
pendant
main
hanging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111560989.8A
Other languages
Chinese (zh)
Inventor
丁欣欣
丁泽成
周东珊
姜凯庭
蒋明哲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yasha Decoration Co Ltd
Original Assignee
Zhejiang Yasha Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yasha Decoration Co Ltd filed Critical Zhejiang Yasha Decoration Co Ltd
Priority to CN202111560989.8A priority Critical patent/CN114293702A/en
Publication of CN114293702A publication Critical patent/CN114293702A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

本发明属于吊顶安装技术领域,具体涉及一种主龙骨与横撑龙骨的安装结构,由主龙骨、横撑龙骨以及挂件组成;挂件与主龙骨卡接;挂件的四角均设有连接部;挂件与主龙骨卡接后,两连接部位于主龙骨的一侧,另两连接部位于主龙骨的另一侧;横撑龙骨的一端与一主龙骨一侧的两连接部卡接,另一端与另一主龙骨一侧的两连接部卡接;横撑龙骨通过与连接部卡接而设置于相邻两主龙骨之间。本发明将纵向布置的主龙骨与横向布置的副龙骨设置在同一高度平面上,能够节省顶部吊顶空间,增加建筑顶部空间利用率;将挂件的四角均设有连接部,保证位于同一平面的主龙骨与横撑龙骨整体承载能力强,强度高。

Figure 202111560989

The invention belongs to the technical field of ceiling installation, and in particular relates to an installation structure of a main keel and a transverse support keel, which is composed of a main keel, a transverse support keel and a pendant; the pendant is clamped with the main keel; the four corners of the pendant are provided with connecting parts; After being clamped with the main keel, the two connecting parts are located on one side of the main keel, and the other two connecting parts are located on the other side of the main keel; The two connecting parts on one side of the other main keel are clamped; the cross-bracing keel is arranged between the two adjacent main keels by being clamped with the connecting part. The invention arranges the longitudinally arranged main keel and the laterally arranged auxiliary keel on the same height plane, which can save the ceiling space at the top and increase the utilization rate of the space at the top of the building; the four corners of the pendant are provided with connecting parts to ensure that the main keel located on the same plane is The overall bearing capacity of the keel and the cross-bracing keel is strong and the strength is high.

Figure 202111560989

Description

一种主龙骨与横撑龙骨的安装结构An installation structure of main keel and transverse support keel

技术领域technical field

本发明属于吊顶安装技术领域,具体涉及一种主龙骨与横撑龙骨的安装结构。The invention belongs to the technical field of ceiling installation, and in particular relates to an installation structure of a main keel and a transverse support keel.

背景技术Background technique

现阶段,吊顶安装过程中通常采用双层龙骨的安装方式,安装的双层龙骨在高度上相互叠加,对于顶部层高侵占空间较多,导致建筑顶部空间利用率低。At this stage, the installation method of double-layer keel is usually adopted in the installation process of suspended ceiling. The installed double-layer keel is superimposed on each other in height, which occupies a lot of space for the top floor height, resulting in low utilization rate of space at the top of the building.

例如公开号为CN213233975U的中国专利公布了一种主副龙骨连接件及吊顶,包括本体以及设置于本体上的钩挂部和连接部,钩挂部被配置为钩挂于主龙骨上,连接部被配置为卡入副龙骨的型材槽中,连接部上设置有卡接部,卡接部与型材槽的槽口边缘的折边卡接,连接部卡入副龙骨的型材槽中,连接部上设置有卡接部,卡接部与型材槽的槽口边缘的折边卡接,从而实现主副龙骨连接件与副龙骨的连接,钩挂部钩挂于主龙骨上,从而将副龙骨固定于主龙骨上,主龙骨与副龙骨连接完成后位于不同的高度平面,占用较多吊顶空间。For example, a Chinese patent with publication number CN213233975U discloses a main and auxiliary keel connector and a ceiling, including a main body, a hooking part and a connecting part arranged on the main body, the hooking part is configured to be hooked on the main keel, and the connecting part It is configured to be clipped into the profile groove of the auxiliary keel, the connecting part is provided with a clipping part, the clipping part is clipped with the folded edge of the notch edge of the profile slot, and the connecting part is clipped into the profile slot of the auxiliary keel. There is a clamping part on the upper part, and the clamping part is connected with the folded edge of the notch edge of the profile groove, so as to realize the connection between the main and auxiliary keel connectors and the auxiliary keel, and the hooking part is hooked on the main keel, so as to connect the auxiliary keel. It is fixed on the main keel. After the main keel and the auxiliary keel are connected, they are located in different height planes, occupying more ceiling space.

发明内容SUMMARY OF THE INVENTION

基于现有技术中存在的上述缺点和不足,本发明的目的之一是至少解决现有技术中存在的上述问题之一或多个,换言之,本发明的目的之一是提供满足前述需求之一或多个的一种。Based on the above-mentioned shortcomings and deficiencies in the prior art, one of the objectives of the present invention is to at least solve one or more of the above-mentioned problems existing in the prior art. In other words, one of the objectives of the present invention is to provide one of the aforementioned requirements or one of more than one.

为了达到上述发明目的,本发明采用以下技术方案:In order to achieve the above-mentioned purpose of the invention, the present invention adopts the following technical solutions:

一种主龙骨与横撑龙骨的安装结构,包括主龙骨与横撑龙骨,由主龙骨、横撑龙骨以及挂件组成;挂件与主龙骨卡接;挂件的四角均设有连接部;挂件与主龙骨卡接后,两连接部位于主龙骨的一侧,另两连接部位于主龙骨的另一侧;横撑龙骨的一端与一主龙骨一侧的两连接部卡接,另一端与另一主龙骨一侧的两连接部卡接;横撑龙骨通过与连接部卡接而设置于相邻两主龙骨之间。An installation structure of a main keel and a transverse support keel, comprising a main keel and a transverse support keel, and is composed of a main keel, a transverse support keel and a pendant; the pendant is clamped with the main keel; the four corners of the pendant are provided with connecting parts; After the keel is clamped, the two connecting parts are located on one side of the main keel and the other two connecting parts are located on the other side of the main keel; The two connecting parts on one side of the main keel are clamped; the transverse support keel is arranged between two adjacent main keels by being clamped with the connecting parts.

进一步地,主龙骨包括第一龙骨板,第一龙骨板相对两边均垂直连接有第二龙骨板,第一龙骨板与两第二龙骨板构成第一龙骨槽,第二龙骨板远离第一龙骨板的一边向第一龙骨槽内弯折180度后向其对边方向延伸一段长度,第二龙骨板的弯折处构成第二龙骨槽。Further, the main keel includes a first keel plate, and two opposite sides of the first keel plate are vertically connected with a second keel plate, the first keel plate and the two second keel plates form a first keel groove, and the second keel plate is far away from the first keel. One side of the plate is bent 180 degrees into the first keel groove and then extends for a length in the direction opposite to the side, and the bending part of the second keel plate constitutes the second keel groove.

进一步地,第一龙骨板与第二龙骨板之间通过弧形龙骨板过渡。Further, the arc-shaped keel plate transitions between the first keel plate and the second keel plate.

进一步地,横撑龙骨的结构与主龙骨的结构相同。Further, the structure of the cross brace keel is the same as that of the main keel.

进一步地,挂件包括第一挂件板,第一挂件板的相对两边均垂直连接有第二挂件板,第一挂件板与两第二挂件板构成第一挂件槽;第一挂件槽套设于主龙骨外,第一挂件板与第一龙骨板贴合,两第二挂件板分别与两第二龙骨板贴合。Further, the pendant includes a first pendant plate, two opposite sides of the first pendant plate are vertically connected with a second pendant plate, the first pendant plate and the two second pendant plates form a first pendant slot; the first pendant slot is sleeved on the main plate. Outside the keel, the first pendant plate is attached to the first keel plate, and the two second pendant plates are attached to the two second keel plates respectively.

进一步地,第二挂件板与两第三挂件板相互围绕构成第二挂件槽;第三挂件板靠近第一挂件板的一边向第二挂件槽内弯折180度后向其对边方向延伸一段长度,第三挂件板的弯折处内嵌于横撑龙骨的第二龙骨槽内。Further, the second hanging plate and the two third hanging plates surround each other to form a second hanging groove; the side of the third hanging plate close to the first hanging plate is bent 180 degrees into the second hanging groove and then extends for a section towards the opposite side. length, the bending part of the third pendant plate is embedded in the second keel groove of the cross brace keel.

进一步地,第一挂件板与第二挂件板之间、第二挂件板与第三挂件板之间均通过弧形挂件板过渡。Further, the transition between the first hanging board and the second hanging board and between the second hanging board and the third hanging board is through the arc hanging board.

进一步地,第一挂件板、第二挂件板以及第三挂件板均为方形板;第二挂件板长边与第一挂件板的长边连接,第二挂件板的长度与第一挂件板的长度相同;第三挂件板的长边与的第二挂件板的短边连接,第三挂件板的长度小于第二挂件板的宽度。Further, the first pendant plate, the second pendant plate and the third pendant plate are all square plates; the long side of the second pendant plate is connected with the long side of the first pendant plate, and the length of the second pendant plate is the same as the length of the first pendant plate. The lengths are the same; the long side of the third hanging board is connected with the short side of the second hanging board, and the length of the third hanging board is smaller than the width of the second hanging board.

进一步地,第三挂件板的一端与第二挂件板远离第一挂件板的一端对齐,第三挂件板的弯折端位于第三挂件板的另一端。Further, one end of the third hanging plate is aligned with one end of the second hanging plate away from the first hanging plate, and the bent end of the third hanging plate is located at the other end of the third hanging plate.

进一步地,四个第三挂件板以第一挂件槽为中心对称设置。Further, the four third hanging plates are symmetrically arranged with the first hanging slot as the center.

本发明与现有技术相比,有益效果是:Compared with the prior art, the present invention has the following beneficial effects:

(1)本发明将纵向布置的主龙骨与横向布置的横撑龙骨设置在同一高度平面上,能够节省顶部吊顶空间,增加建筑顶部空间利用率;将挂件的四角均设有连接部,保证位于同一平面的主龙骨与横撑龙骨整体承载能力强,强度高;(1) In the present invention, the longitudinally arranged main keel and the horizontally arranged transverse support keel are arranged on the same height plane, which can save the ceiling space at the top and increase the utilization rate of the space at the top of the building; The main keel and the transverse support keel on the same plane have strong overall bearing capacity and high strength;

(2)本发明挂件与主龙骨可拆卸安装,横撑龙骨与挂件可拆卸安装,保证主龙骨与横撑龙骨安装拆卸简单,同时后期拆卸维修容易;(2) The pendant and the main keel of the present invention can be detachably installed, and the horizontal support keel and the pendant can be detachably installed, ensuring that the main keel and the horizontal support keel are easy to install and disassemble, and at the same time, the later disassembly and maintenance are easy;

(3)本发明中安装过程工艺简单,施工效率高,并且安装过程中避免污染,减少噪音,减少灰尘;(3) In the present invention, the installation process is simple, the construction efficiency is high, and the installation process avoids pollution, reduces noise, and reduces dust;

(4)同时主龙骨、横撑龙骨均可重复实用,节省资源,减少浪费;(4) At the same time, the main keel and the horizontal support keel can be repeated and practical, saving resources and reducing waste;

(5)主龙骨、横撑龙骨、以及挂件规格统一,容易集成,便于连接。(5) The main keel, the horizontal support keel, and the pendant have uniform specifications, which are easy to integrate and connect.

附图说明Description of drawings

图1为本实施例整体结构图;Fig. 1 is the overall structure diagram of this embodiment;

图2为主龙骨、横撑龙骨以及挂件连接结构示意图;Figure 2 is a schematic diagram of the connection structure of the main keel, the cross-bracing keel and the pendant;

图3为主龙骨局部结构示意图;Figure 3 is a schematic diagram of the partial structure of the main keel;

图4为挂件结构示意图;Fig. 4 is a structural schematic diagram of a pendant;

图中,1主龙骨、11第一龙骨板、12第二龙骨板、13第一龙骨槽、14第二龙骨槽、15弧形龙骨板、2横撑龙骨、3挂件、31第一挂件板、32第二挂件板、33第三挂件板、34弧形挂件板、35第一挂件槽、36第二挂件槽。In the figure, 1 main keel, 11 first keel plate, 12 second keel plate, 13 first keel groove, 14 second keel groove, 15 arc keel plate, 2 cross brace keel, 3 pendant, 31 first pendant plate , 32 the second hanging plate, 33 the third hanging plate, 34 arc hanging plate, 35 the first hanging slot, 36 the second hanging slot.

具体实施方式Detailed ways

为了更清楚地说明本发明实施例,下面将对照附图说明本发明的具体实施方式。显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图,并获得其他的实施方式。In order to describe the embodiments of the present invention more clearly, the following will describe specific embodiments of the present invention with reference to the accompanying drawings. Obviously, the accompanying drawings in the following description are only some embodiments of the present invention. For those of ordinary skill in the art, other drawings can also be obtained from these drawings without creative efforts, and obtain other implementations.

如图1-4所示,本实施例一种主龙骨1与横撑龙骨2的安装结构,由主龙骨1、横撑龙骨2以及挂件3组成;挂件3与主龙骨1卡接;挂件3的四角均设有连接部;挂件3与主龙骨1卡接后,两连接部位于主龙骨1的一侧,另两连接部位于主龙骨1的另一侧;横撑龙骨2的一端与一主龙骨1一侧的两连接部卡接,另一端与另一主龙骨1一侧的两连接部卡接;横撑龙骨2通过与连接部卡接而设置于相邻两主龙骨1之间。主龙骨1、横撑龙骨2以及挂件3位于同一水平面,若干主龙骨1纵向水平设置,若干横撑龙骨2横向设置。单个横撑龙骨2横向设置于相邻两主龙骨1之间。主龙骨1与横撑龙骨2构成纵横交错的网状。后置物件可与横撑龙骨2连接,后置物件将重力传递给横撑龙骨2,横撑龙骨2将后置物件的重力连通自身重力传递给挂件3的连接部,挂件3的每一连接部受力均等。连接部的受力均等有利于保证挂件3与主龙骨1之间连接的稳定性,而挂件3与主龙骨1之间连接的稳定性有利于保证位于同一平面的主龙骨1与横撑龙骨2整体承载能力强,强度高。因此,本实施例所有主龙骨1与所有横撑龙骨2均位于同一高度平面,能够节省顶部吊顶空间,增加建筑顶部空间利用率;将挂件3的四角均设有连接部,保证位于同一平面的主龙骨1与横撑龙骨2整体承载能力强,强度高。As shown in Figures 1-4, an installation structure of a main keel 1 and a transverse support keel 2 in this embodiment is composed of a main keel 1, a transverse support keel 2 and a pendant 3; the pendant 3 is clamped with the main keel 1; the pendant 3 The four corners are provided with connecting parts; after the pendant 3 is clamped with the main keel 1, the two connecting parts are located on one side of the main keel 1, and the other two connecting parts are located on the other side of the main keel 1; The two connecting parts on one side of the main keel 1 are clamped, and the other end is clamped with the two connecting parts on one side of the other main keel 1; . The main keel 1 , the transverse support keel 2 and the pendant 3 are located on the same horizontal plane, a plurality of main keels 1 are arranged vertically and horizontally, and a number of transverse support keels 2 are arranged horizontally. A single cross brace keel 2 is laterally arranged between two adjacent main keels 1 . The main keel 1 and the transverse support keel 2 form a criss-crossed mesh. The rear object can be connected with the cross brace keel 2, the rear object transmits the gravity to the cross brace keel 2, and the cross brace keel 2 communicates the gravity of the rear object with its own gravity and transmits it to the connecting part of the pendant 3. Each connection of the pendant 3 The force is equal. The equal force of the connecting part is conducive to ensuring the stability of the connection between the pendant 3 and the main keel 1, and the stability of the connection between the pendant 3 and the main keel 1 is conducive to ensuring that the main keel 1 and the cross-bracing keel 2 are located on the same plane. The overall bearing capacity is strong and the strength is high. Therefore, in this embodiment, all the main keels 1 and all the cross-bracing keels 2 are located on the same height plane, which can save the ceiling space at the top and increase the utilization rate of the space at the top of the building; the four corners of the pendant 3 are provided with connecting parts to ensure that the The main keel 1 and the transverse support keel 2 have strong overall bearing capacity and high strength.

主龙骨1包括第一龙骨板11,第一龙骨板11相对两边均垂直连接有第二龙骨板12,第一龙骨板11与两第二龙骨板12构成第一龙骨槽13,第二龙骨板12远离第一龙骨板11的一边向第一龙骨槽13内弯折180度后向其对边方向延伸一段长度,第二龙骨板12的弯折处构成第二龙骨槽14。第二龙骨板12的弯折处位于第一龙骨槽13的开口端。为便于第一龙骨板11与第二龙骨板12连接,第一龙骨板11与第二龙骨板12之间通过弧形龙骨板15过渡。为便于主龙骨1、横撑龙骨2与建筑楼板连接,主龙骨1的第一龙骨板11、横撑龙骨2的第一龙骨板11均设有龙骨安装孔。横撑龙骨2与主龙骨1的结构相同,安装的过程中,主龙骨1的第一龙骨槽13开口朝下,横撑龙骨2的第一龙骨槽13开口朝上。位于同一横向的横撑龙骨2有数个。安装完成后的主龙骨1与横撑龙骨2构成纵横交错的网状结构。The main keel 1 includes a first keel plate 11, and two opposite sides of the first keel plate 11 are vertically connected with a second keel plate 12. The first keel plate 11 and the two second keel plates 12 form a first keel groove 13, and the second keel plate The side of 12 away from the first keel plate 11 is bent 180 degrees into the first keel groove 13 and then extends for a length in the opposite direction. The bend of the second keel plate 12 is located at the open end of the first keel groove 13 . In order to facilitate the connection between the first keel plate 11 and the second keel plate 12 , the arc-shaped keel plate 15 transitions between the first keel plate 11 and the second keel plate 12 . In order to facilitate the connection of the main keel 1 and the transverse support keel 2 with the building floor, the first keel plate 11 of the main keel 1 and the first keel plate 11 of the transverse support keel 2 are provided with keel installation holes. The structure of the transverse support keel 2 is the same as that of the main keel 1. During the installation process, the opening of the first keel groove 13 of the main keel 1 faces downward, and the opening of the first keel groove 13 of the transverse support keel 2 faces upward. There are several cross brace keels 2 located in the same horizontal direction. After the installation is completed, the main keel 1 and the cross-bracing keel 2 form a criss-cross network structure.

本实施例的主龙骨1通过挂件与横撑龙骨2连接。为便于主龙骨1与挂件连接,本实施例的挂件包括第一挂件板31,第一挂件板31的相对两边均垂直连接有第二挂件板32,第一挂件板31与两第二挂件板32构成第一挂件槽35。第一挂件槽35套设于主龙骨1外,第一挂件板31与第一龙骨板11贴合,两第二挂件板32分别与两第二龙骨板12贴合。为保证第一挂件槽35的稳定性,第一挂件槽35的内尺寸与第一龙骨槽13的外尺寸相等。固定第一挂件槽35时,只需保证主龙骨1的第一龙骨槽13开口向下,第一挂件槽35的开口向下,将第一挂件槽35倒扣在第一龙骨槽13的外表面即可。The main keel 1 in this embodiment is connected to the cross-bracing keel 2 through a pendant. In order to facilitate the connection between the main keel 1 and the pendant, the pendant in this embodiment includes a first pendant plate 31, and two opposite sides of the first pendant plate 31 are vertically connected with a second pendant plate 32, the first pendant plate 31 and two second pendant plates. 32 constitutes a first hanger slot 35 . The first pendant slot 35 is sleeved outside the main keel 1 , the first pendant plate 31 is attached to the first keel plate 11 , and the two second pendant plates 32 are attached to the two second keel plates 12 respectively. In order to ensure the stability of the first hanger slot 35 , the inner dimension of the first hanger slot 35 is equal to the outer dimension of the first keel slot 13 . When fixing the first pendant slot 35, it is only necessary to ensure that the opening of the first keel slot 13 of the main keel 1 is downward, the opening of the first pendant slot 35 is downward, and the first pendant slot 35 is buckled upside down outside the first keel slot 13. surface.

第二挂件板32的相对两侧均与位于第一挂件槽35外的第三挂件板33垂直连接。第二挂件板32与两第三挂件板33相互围绕构成第二挂件槽36,第三挂件板33靠近第一挂件板31的一边向第二挂件槽36内弯折180度后向其对边方向延伸一段长度,第三挂件板33的弯折处内嵌于横撑龙骨2的第二龙骨槽14内。为保证挂件与横撑龙骨2之间连接的稳定形,第二挂件槽36的外尺寸等于横撑龙骨2第一龙骨槽13的内尺寸,以使得横撑龙骨2第一龙骨槽13对应的两第二龙骨板12分别与第二挂件槽36对应的两第二挂件板32贴合。为便于第一挂件板31与第二挂件板32连接,第一挂件板31与第二挂件板32之间通过弧形挂件板过渡。为便于第二挂件板32与第三挂件板33连接,第二挂件板32与第三挂件板33之间均通过弧形挂件板34过渡。Both opposite sides of the second hanging plate 32 are vertically connected to the third hanging plate 33 located outside the first hanging slot 35 . The second hanging plate 32 and the two third hanging plates 33 surround each other to form a second hanging slot 36. The side of the third hanging plate 33 close to the first hanging plate 31 is bent 180 degrees into the second hanging groove 36 and then faces the opposite side. The direction extends for a certain length, and the bending part of the third hanging plate 33 is embedded in the second keel groove 14 of the cross brace keel 2 . In order to ensure the stable shape of the connection between the pendant and the cross brace keel 2, the outer dimension of the second pendant groove 36 is equal to the inner dimension of the first keel groove 13 of the cross brace keel 2, so that the corresponding The two second keel plates 12 are respectively attached to the two second hanging plates 32 corresponding to the second hanging grooves 36 . In order to facilitate the connection between the first hanging plate 31 and the second hanging plate 32, the transition between the first hanging plate 31 and the second hanging plate 32 is through an arc hanging plate. In order to facilitate the connection between the second hanging plate 32 and the third hanging plate 33 , the arc hanging plate 34 transitions between the second hanging plate 32 and the third hanging plate 33 .

第一挂件板31、第二挂件板32、第三挂件板33均为平板状;第二挂件板32长边与第一挂件板31的长边连接,第二挂件板32的长度与第一挂件板31的长度相同;第三挂件板33的长边与的第二挂件板32的短边连接,第三挂件板33的长度小于第二挂件板32的宽度。为保证第三挂件板33的弯折端距离第一挂件板31有一定距离,第三挂件板33的一端与第二挂件板32远离第一挂件板31的一端对齐,第三挂件板33的弯折端位于第三挂件板33的另一端。为方便一挂件能连接相邻的两横撑龙骨2,四个第三挂件板33以第一挂件槽35为中心对称设置。四个第三挂件板33分别分布在挂件的四角,充分保证挂件受力均衡,同时使得挂件具有较强的承载能力。The first hanging board 31 , the second hanging board 32 and the third hanging board 33 are all flat plates; the long side of the second hanging board 32 is connected with the long side of the first hanging board 31 , and the length of the second hanging board 32 The lengths of the hanging boards 31 are the same; the long side of the third hanging board 33 is connected with the short side of the second hanging board 32 , and the length of the third hanging board 33 is smaller than the width of the second hanging board 32 . In order to ensure that the bent end of the third hanging plate 33 has a certain distance from the first hanging plate 31, one end of the third hanging plate 33 is aligned with the end of the second hanging plate 32 away from the first hanging plate 31, and the end of the third hanging plate 33 is aligned. The bent end is located at the other end of the third hanging plate 33 . In order to facilitate that a pendant can be connected to two adjacent cross brace keels 2 , the four third pendant plates 33 are symmetrically arranged with the first pendant slot 35 as the center. The four third pendant plates 33 are respectively distributed at the four corners of the pendant, which fully ensures that the pendant receives a balanced force, and at the same time enables the pendant to have a strong bearing capacity.

安装横撑龙骨2时,只需要将相邻的两第三挂件板33伸入至横撑龙骨2的第一龙骨槽13内,并使第三挂件板33的弯折处嵌入至横撑龙骨2的第二龙骨槽14内即可。因此,本实施例的挂件与主龙骨1可拆卸安装,横撑龙骨2与挂件可拆卸安装,保证了主龙骨1与横撑龙骨2安装拆卸简单,同时后期拆卸维修容易。When installing the horizontal support keel 2, it is only necessary to extend the adjacent two third hanging plates 33 into the first keel groove 13 of the horizontal support keel 2, and make the bending part of the third hanging plate 33 embedded in the horizontal support keel. 2 in the second keel groove 14. Therefore, the pendant and the main keel 1 in this embodiment can be detachably installed, and the transverse support keel 2 and the pendant can be detachably installed, which ensures that the main keel 1 and the transverse support keel 2 are easy to install and disassemble, and at the same time, the later disassembly and maintenance are easy.

本实施例的安装原理为:首先将挂件3套接在主龙骨1外;之后将横撑龙骨2的两端分别卡接在相邻两主龙骨1的两挂件上,使第三挂件板33的弯折处内嵌至横撑龙骨2的第二龙骨槽14内。The installation principle of this embodiment is as follows: firstly, the pendant 3 is sleeved outside the main keel 1; then the two ends of the horizontal support keel 2 are respectively clamped on the two pendants of the two adjacent main keels 1, so that the third pendant plate 33 The bending part of the cross brace keel 2 is embedded in the second keel groove 14 of the cross brace keel 2 .

综上,本实施例将纵向布置的主龙骨1与横向布置的横撑龙骨2设置在同一高度平面上,能够节省顶部吊顶空间,增加建筑顶部空间利用率;将挂件3的四角均设有连接部,保证位于同一平面的主龙骨1与横撑龙骨2整体承载能力强,强度高;主龙骨1、横撑龙骨以及挂件2配合使用,即使主龙骨1与横撑龙骨2位于同一平面,也能使吊顶整体承载能力强,强度高,适应较重的后置物品的安装;主龙骨1、横撑龙骨2、挂件3均为工厂预制件,规格统一,无需进行表涂刷等操作,容易集成,便于连接,后期维修拆卸容易,可重复利用,在安装的过程中能够避免环境污染,减少噪音,减少灰尘,节约资源,安装过程简单,施工效率高。To sum up, in this embodiment, the longitudinally arranged main keel 1 and the horizontally arranged transverse support keel 2 are arranged on the same height plane, which can save the ceiling space at the top and increase the utilization rate of the space at the top of the building; the four corners of the pendant 3 are provided with connection to ensure that the main keel 1 and the transverse support keel 2 on the same plane have strong overall bearing capacity and high strength; the main keel 1, the transverse support keel and the pendant 2 are used together, even if the main keel 1 and the transverse support keel 2 are on the same plane The overall bearing capacity and strength of the ceiling can be strong, and it is suitable for the installation of heavy rear items; the main keel 1, the horizontal support keel 2, and the pendant 3 are all prefabricated parts in the factory, with uniform specifications, no need for surface painting and other operations, easy to use Integrated, easy to connect, easy to dismantle in later maintenance, reusable, can avoid environmental pollution, reduce noise, reduce dust, save resources, simple installation process, and high construction efficiency during the installation process.

应当说明的是,上述实施例均可根据需要自由组合。以上所述仅是对本发明的优选实施例及原理进行了详细说明,对本领域的普通技术人员而言,依据本发明提供的思想,在具体实施方式上会有改变之处,而这些改变也应视为本发明的保护范围。It should be noted that the above embodiments can be freely combined as required. The above is only a detailed description of the preferred embodiments and principles of the present invention. For those of ordinary skill in the art, according to the ideas provided by the present invention, there will be changes in the specific implementation, and these changes should also be It is regarded as the protection scope of the present invention.

Claims (10)

1.一种主龙骨与横撑龙骨的安装结构,包括主龙骨与横撑龙骨,其特征在于:1. an installation structure of a main keel and a horizontal support keel, comprising a main keel and a horizontal support keel, it is characterized in that: 由主龙骨、横撑龙骨以及挂件组成;挂件与主龙骨卡接;挂件的四角均设有连接部;挂件与主龙骨卡接后,两连接部位于主龙骨的一侧,另两连接部位于主龙骨的另一侧;横撑龙骨的一端与一主龙骨一侧的两连接部卡接,另一端与另一主龙骨一侧的两连接部卡接;横撑龙骨通过与连接部卡接而设置于相邻两主龙骨之间。It consists of a main keel, a horizontal support keel and a pendant; the pendant is clamped to the main keel; the four corners of the pendant are provided with connecting parts; The other side of the main keel; one end of the transverse support keel is clamped with the two connecting parts on one side of a main keel, and the other end is clamped with the two connecting parts on one side of the other main keel; the transverse support keel is clamped with the connecting parts It is arranged between two adjacent main keels. 2.根据权利要求1所述的主龙骨与横撑龙骨的安装结构,其特征在于:2. the installation structure of the main keel and the transverse strut keel according to claim 1, is characterized in that: 主龙骨包括第一龙骨板,第一龙骨板相对两边均垂直连接有第二龙骨板,第一龙骨板与两第二龙骨板构成第一龙骨槽,第二龙骨板远离第一龙骨板的一边向第一龙骨槽内弯折180度后向其对边方向延伸一段长度,第二龙骨板的弯折处构成第二龙骨槽。The main keel includes a first keel plate, and two opposite sides of the first keel plate are vertically connected with a second keel plate, the first keel plate and the two second keel plates form a first keel groove, and the second keel plate is away from the side of the first keel plate. After being bent 180 degrees into the first keel groove, it extends for a length in the opposite direction, and the bending part of the second keel plate constitutes the second keel groove. 3.根据权利要求2所述的主龙骨与横撑龙骨的安装结构,其特征在于:3. The installation structure of the main keel and the transverse strut keel according to claim 2, is characterized in that: 第一龙骨板与第二龙骨板之间通过弧形龙骨板过渡。The arc-shaped keel plate transitions between the first keel plate and the second keel plate. 4.根据权利要求3所述的主龙骨与横撑龙骨的安装结构,其特征在于:横撑龙骨的结构与主龙骨的结构相同。4 . The installation structure of the main keel and the transverse support keel according to claim 3 , wherein the structure of the transverse support keel is the same as that of the main keel. 5 . 5.根据权利要求2所述的主龙骨与横撑龙骨的安装结构,其特征在于:挂件包括第一挂件板,第一挂件板的相对两边均垂直连接有第二挂件板,第一挂件板与两第二挂件板构成第一挂件槽;第一挂件槽套设于主龙骨外,第一挂件板与第一龙骨板贴合,两第二挂件板分别与两第二龙骨板贴合。5. The installation structure of the main keel and the cross-bracing keel according to claim 2, characterized in that: the pendant comprises a first pendant plate, and two opposite sides of the first pendant plate are vertically connected with a second pendant plate, and the first pendant plate A first hanging slot is formed with the two second hanging boards; the first hanging slot is sleeved outside the main keel, the first hanging board is fit with the first keel board, and the two second hanging boards are fit with the two second keel boards respectively. 6.根据权利要求5所述的主龙骨与横撑龙骨的安装结构,其特征在于:第二挂件板的相对两侧均与位于第一挂件槽外的第三挂件板垂直连接;第二挂件板与两第三挂件板相互围绕构成第二挂件槽;第三挂件板靠近第一挂件板的一边向第二挂件槽内弯折180度后向其对边方向延伸一段长度,第三挂件板的弯折处内嵌于横撑龙骨的第二龙骨槽内。6. The installation structure of the main keel and the cross-bracing keel according to claim 5, characterized in that: the opposite sides of the second pendant plate are vertically connected with the third pendant plate outside the first pendant slot; the second pendant plate The plate and the two third hanging plates surround each other to form a second hanging slot; the side of the third hanging plate close to the first hanging plate is bent 180 degrees into the second hanging slot and then extends for a length towards the opposite side. The third hanging plate The bending part of the cross brace is embedded in the second keel groove of the cross brace keel. 7.根据权利要求6所述的主龙骨与横撑龙骨的安装结构,其特征在于:第一挂件板与第二挂件板之间、第二挂件板与第三挂件板之间均通过弧形挂件板过渡。7 . The installation structure of the main keel and the cross-bracing keel according to claim 6 , wherein the arc-shaped passages are formed between the first pendant plate and the second pendant plate, and between the second pendant plate and the third pendant plate. 8 . Pendant board transition. 8.根据权利要求6所述的主龙骨与横撑龙骨的安装结构,其特征在于:第一挂件板、第二挂件板以及第三挂件板均为方形板;第二挂件板长边与第一挂件板的长边连接,第二挂件板的长度与第一挂件板的长度相同;第三挂件板的长边与的第二挂件板的短边连接,第三挂件板的长度小于第二挂件板的宽度。8. The installation structure of the main keel and the transverse support keel according to claim 6, characterized in that: the first hanging plate, the second hanging plate and the third hanging plate are all square plates; The long side of a pendant board is connected, the length of the second pendant board is the same as the length of the first pendant board; the long side of the third pendant board is connected with the short side of the second pendant board, and the length of the third The width of the pendant board. 9.根据权利要求8所述的主龙骨与横撑龙骨的安装结构,其特征在于:9. The installation structure of the main keel and the transverse strut keel according to claim 8, is characterized in that: 第三挂件板的一端与第二挂件板远离第一挂件板的一端对齐,第三挂件板的弯折端位于第三挂件板的另一端。One end of the third hanging plate is aligned with the end of the second hanging plate away from the first hanging plate, and the bent end of the third hanging plate is located at the other end of the third hanging plate. 10.根据权利要求9所述的主龙骨与横撑龙骨的安装结构,其特征在于:10. The installation structure of the main keel and the transverse strut keel according to claim 9, characterized in that: 四个第三挂件板以第一挂件槽为中心对称设置。The four third hanging plates are symmetrically arranged with the first hanging slot as the center.
CN202111560989.8A 2021-12-20 2021-12-20 Mounting structure of main joist and stull fossil fragments Pending CN114293702A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111560989.8A CN114293702A (en) 2021-12-20 2021-12-20 Mounting structure of main joist and stull fossil fragments

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111560989.8A CN114293702A (en) 2021-12-20 2021-12-20 Mounting structure of main joist and stull fossil fragments

Publications (1)

Publication Number Publication Date
CN114293702A true CN114293702A (en) 2022-04-08

Family

ID=80967141

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111560989.8A Pending CN114293702A (en) 2021-12-20 2021-12-20 Mounting structure of main joist and stull fossil fragments

Country Status (1)

Country Link
CN (1) CN114293702A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202380621U (en) * 2012-01-06 2012-08-15 孙江平 Keel connector
CN205134687U (en) * 2015-11-26 2016-04-06 文登蓝岛建筑工程有限公司 Keel connecting piece convenient to diversified switching
CN105544838A (en) * 2015-12-23 2016-05-04 杭州飞神工业设计有限公司 Integrated suspended ceiling structure
EP3246482A1 (en) * 2016-05-20 2017-11-22 Saint-Gobain Ecophon AB Cross runner connector, main runner and cross runner connector arrangement for a suspended ceiling system
CN209509294U (en) * 2018-11-20 2019-10-18 中建八局第二建设有限公司 A kind of fixed device of plaster tablet suspended ceiling lightgage steel joist
CN112267612A (en) * 2020-10-27 2021-01-26 北京华邑建设集团有限公司 Long-span metal ceiling keel mounting structure
CN112780020A (en) * 2020-12-18 2021-05-11 山东集顶装饰科技有限公司 Perpendicular connecting piece for ceiling keel and connecting structure thereof
CN214117201U (en) * 2020-10-30 2021-09-03 浙江德清康品集成家居股份有限公司 Keel connecting piece and keel assembly
CN216920953U (en) * 2021-12-20 2022-07-08 浙江亚厦装饰股份有限公司 Mounting structure of main joist and stull joist

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202380621U (en) * 2012-01-06 2012-08-15 孙江平 Keel connector
CN205134687U (en) * 2015-11-26 2016-04-06 文登蓝岛建筑工程有限公司 Keel connecting piece convenient to diversified switching
CN105544838A (en) * 2015-12-23 2016-05-04 杭州飞神工业设计有限公司 Integrated suspended ceiling structure
EP3246482A1 (en) * 2016-05-20 2017-11-22 Saint-Gobain Ecophon AB Cross runner connector, main runner and cross runner connector arrangement for a suspended ceiling system
CN209509294U (en) * 2018-11-20 2019-10-18 中建八局第二建设有限公司 A kind of fixed device of plaster tablet suspended ceiling lightgage steel joist
CN112267612A (en) * 2020-10-27 2021-01-26 北京华邑建设集团有限公司 Long-span metal ceiling keel mounting structure
CN214117201U (en) * 2020-10-30 2021-09-03 浙江德清康品集成家居股份有限公司 Keel connecting piece and keel assembly
CN112780020A (en) * 2020-12-18 2021-05-11 山东集顶装饰科技有限公司 Perpendicular connecting piece for ceiling keel and connecting structure thereof
CN216920953U (en) * 2021-12-20 2022-07-08 浙江亚厦装饰股份有限公司 Mounting structure of main joist and stull joist

Similar Documents

Publication Publication Date Title
CN102900193A (en) Cellular board ceiling system
CN111336321A (en) Fixed support and hanger capable of being quickly assembled into group of pipelines
CN114293702A (en) Mounting structure of main joist and stull fossil fragments
CN114319698A (en) Assembly type ceiling T-shaped keel hanging structure
CN216920953U (en) Mounting structure of main joist and stull joist
CN114319700A (en) Mounting structure of main joist and false keel
CN216920954U (en) Assembled furred ceiling individual layer fossil fragments clamp structure
CN216920962U (en) Keel hanging piece
CN217353158U (en) Split type assembled furred ceiling I-shaped piece structure of lengthening
CN216920948U (en) Hooking type kneading bearing keel
CN216920925U (en) Assembled furred ceiling
CN216920963U (en) Mounting structure of main joist and false keel
CN114592638A (en) Hanging structure of split type assembly type ceiling
CN204510805U (en) A kind of without latch keel
CN216920951U (en) Mounting structure of fossil fragments and worker's word piece
CN215949066U (en) Assembled wall body connection angle sign indicating number
CN211526366U (en) Ceiling lamp light trough connecting piece for indoor ceiling decoration
CN114319695A (en) An assembled ceiling single-layer keel clamping structure
CN212957202U (en) Big board tower bridge mounting structure of aluminium honeycomb
CN217580987U (en) Structure is hung futilely to advance construction stone material
CN114319697A (en) Mounting structure of fossil fragments and worker's word spare
CN210622074U (en) Suspended ceiling side plate system
CN209958614U (en) Reinforced house H-shaped steel beam
CN114319696A (en) A kind of installation structure of keel and I-shaped piece
CN204475624U (en) The connector of a kind of dry-hang ceramic plate curtain skeleton and hanger system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination