[go: up one dir, main page]

CN114313109B - A quick-removable anchor equipment paralleler - Google Patents

A quick-removable anchor equipment paralleler Download PDF

Info

Publication number
CN114313109B
CN114313109B CN202210012648.5A CN202210012648A CN114313109B CN 114313109 B CN114313109 B CN 114313109B CN 202210012648 A CN202210012648 A CN 202210012648A CN 114313109 B CN114313109 B CN 114313109B
Authority
CN
China
Prior art keywords
clamp body
groove
quick
equipment
mooring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202210012648.5A
Other languages
Chinese (zh)
Other versions
CN114313109A (en
Inventor
王冠琳
梁冠辉
李淑江
徐腾飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Marine Science And Technology Center
First Institute of Oceanography MNR
Original Assignee
First Institute of Oceanography MNR
Qingdao National Laboratory for Marine Science and Technology Development Center
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Institute of Oceanography MNR, Qingdao National Laboratory for Marine Science and Technology Development Center filed Critical First Institute of Oceanography MNR
Priority to CN202210012648.5A priority Critical patent/CN114313109B/en
Publication of CN114313109A publication Critical patent/CN114313109A/en
Application granted granted Critical
Publication of CN114313109B publication Critical patent/CN114313109B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a quick-detachable anchor system equipment parallel connection device, relates to the technical field of ocean observation, and solves the problem that the connection process of anchor system equipment and an anchor system cable is complicated in the prior art; the parallel connector comprises a quick connector connected to anchoring equipment, the quick connector comprises a first clamp body and a second clamp body, and the first clamp body and the second clamp body are rotatably connected; at least one of the first clamp body and the second clamp body is rotatably connected with the anchoring equipment; the first clamp body and one side of the second clamp body, which is far away from the anchoring equipment, are detachably connected through a lock catch; at least one of the opposite sides of the first clamp body and the second clamp body is provided with a cavity for the anchor mooring rope to pass through. The paralleling device in the technical scheme of the application can install the mooring equipment on the mooring cable or detach the mooring cable from the mooring cable quickly, thereby avoiding the situation that the mooring system is interrupted continuously in the releasing and recovering process so as to disassemble and assemble the equipment, and greatly improving the speed and the safety of field operation.

Description

一种可快速拆装的锚系设备并联器A quick-removable anchor device paralleler

技术领域technical field

本发明涉及海洋观测技术领域,尤其是一种可快速拆装的锚系设备并联器。The invention relates to the technical field of ocean observation, in particular to a quick-removable parallel connection of mooring equipment.

背景技术Background technique

在对海洋进行监测和勘探时往往需要用到多种监测设备对海洋参数进行长期定点的观测,例如温盐深测量仪、溶解氧测量仪、浊度测量仪、海流测量仪等等,该类仪器的特点是需要维持在特定的深度进行长期观测,且根据不同的观测深度在一套系统中需要使用多个。In the monitoring and exploration of the ocean, it is often necessary to use a variety of monitoring equipment for long-term fixed-point observation of ocean parameters, such as temperature and salinity measuring instruments, dissolved oxygen measuring instruments, turbidity measuring instruments, current measuring instruments, etc. The characteristics of the instrument are that it needs to be maintained at a specific depth for long-term observation, and according to different observation depths, it is necessary to use multiple in a system.

在进行观测时一般是需要将这些设备并联在潜标或浮标等系统的锚系缆绳上,目前将该类设备连接在锚系缆绳上的方法主要有两种,一种是自带锚系夹的设备,通过锚系夹将设备连接在锚系缆绳上;另外一种是不带锚系夹的设备,需要自制锚系夹。设备自带或自制的锚系夹原理基本类似,一般由两部分组成,一部分固定在待连接的设备上,另一部分则使用两个螺栓连接在第一部分上,这两部分共同将锚系缆绳抱住,通常每部分配置2个螺丝以用于固定。这就使得安装或拆卸一个仪器需要操作4个或4个以上的螺丝。因为浮标或潜标等锚系系统在布放或回收时,需要将大量锚系缆绳从线滚上取下或绕上,也就是说上述并联仪器的安装或拆卸只能在系统布放或回收的过程中同步进行。如果按照现有产品的设计,对多个螺丝的操作导致时间过长,因此在安装多个仪器的时候不得不多次锁住正在投放或回收的潜标或浮标等系统,这将导致系统布放或回收的过程不连续。尤其在现场海况较差时,对正在投放或回收的系统进行锁定操作比较危险,也非常容易对锚系缆绳造成伤害,从而危及整个锚系系统的安全,甚至导致观测失败。When conducting observations, it is generally necessary to connect these devices in parallel to the mooring cables of systems such as submersible buoys or buoys. At present, there are two main methods for connecting such devices to the mooring cables. One is to bring their own mooring clips. The device is connected to the mooring cable through the mooring clip; the other is the device without mooring clip, which requires self-made mooring clips. The principle of the self-made or self-made anchor clips is basically similar. Generally, it consists of two parts. One part is fixed on the equipment to be connected, and the other part is connected to the first part using two bolts. These two parts jointly hold the anchor cable. Live, usually 2 screws per part for fixing. This makes it necessary to operate 4 or more screws to install or remove an instrument. Because mooring systems such as buoys or submersibles are deployed or recovered, a large number of mooring cables need to be removed or reeled from the line reel, that is to say, the installation or removal of the above-mentioned parallel instruments can only be deployed or recovered in the system. process synchronously. According to the design of the existing product, the operation of multiple screws leads to a long time, so when installing multiple instruments, the system such as the submersible or buoy that is being released or recovered has to be locked many times, which will cause the system to deploy. The process of disposal or recycling is discontinuous. Especially when the on-site sea conditions are poor, it is dangerous to lock the system that is being released or recovered, and it is very easy to cause damage to the mooring cable, thus endangering the safety of the entire mooring system, and even causing observation failure.

发明内容SUMMARY OF THE INVENTION

本发明针对现有技术中存在的不足之处,提供一种快速将待安装的锚系设备固定在锚系缆绳上的锚系设备并联器。Aiming at the deficiencies in the prior art, the present invention provides a mooring device paralleler for quickly fixing the mooring device to be installed on the mooring cable.

本发明的目的是以下述方式实现的:The purpose of this invention is to realize in the following way:

一种可快速拆装的锚系设备并联器,包括连接在锚系设备上的快速连接器,所述快速连接器包括第一夹体和第二夹体,且所述第一夹体与所述第二夹体之间可转动连接;所述第一夹体及所述第二夹体中的至少一个与所述锚系设备可转动连接;所述第一夹体与所述第二夹体远离所述锚系设备的一侧通过锁扣可拆卸连接;所述第一夹体与所述第二夹体的相对侧中至少有一侧开设有用于穿过锚系缆绳的空腔。A quick-removable anchoring device paralleler, comprising a quick connector connected to the anchoring device, the quick connector comprising a first clip body and a second clip body, and the first clip body is connected to the The second clip body is rotatably connected; at least one of the first clip body and the second clip body is rotatably connected to the anchoring device; the first clip body and the second clip body are rotatably connected The side of the body away from the anchoring device is detachably connected through a lock; at least one of the opposite sides of the first clip body and the second clip body is provided with a cavity for passing the mooring cable.

作为本发明技术方案的一种可选方案,所述空腔所在侧的夹体上开设有插槽,所述插槽内插设有挤压片,所述挤压片远离对应夹体的一侧开设有凹槽。As an optional solution of the technical solution of the present invention, a slot is opened on the clip body on the side where the cavity is located, and an extrusion sheet is inserted in the slot, and the extrusion sheet is far away from a side of the corresponding clip body. There are grooves on the side.

作为本发明技术方案的一种可选方案,所述锚系设备通过连接件连接有连接杆;所述快速连接器设置在所述连接杆远离所述锚系设备的一侧。As an optional solution of the technical solution of the present invention, the anchoring equipment is connected with a connecting rod through a connecting piece; the quick connector is arranged on a side of the connecting rod away from the anchoring equipment.

作为本发明技术方案的一种可选方案,所述连接件为一闭环状连接件;所述连接件包括用于套穿所述锚系设备的第一连接端以及用于套穿所述连接杆的第二连接端;所述第一连接端与所述第二连接端之间穿设有紧固件。As an optional solution of the technical solution of the present invention, the connecting piece is a closed-loop connecting piece; the connecting piece includes a first connecting end used to pass through the anchoring device and a first connecting end used to pass through the connection The second connecting end of the rod; a fastener is passed between the first connecting end and the second connecting end.

作为本发明技术方案的一种可选方案,所述连接件的两侧分别开设有通槽以及紧固槽,所述通槽以及所述紧固槽均位于所述第一连接端与所述第二连接端之间;所述通槽内可转动地设置有一紧固螺栓,所述紧固螺栓的另一端穿过所述紧固槽且螺旋连接有一紧固螺母。As an optional solution of the technical solution of the present invention, two sides of the connecting piece are respectively provided with a through slot and a fastening slot, and the through slot and the fastening slot are located between the first connecting end and the Between the second connecting ends; a tightening bolt is rotatably arranged in the through groove, and the other end of the tightening bolt passes through the tightening groove and is screwed with a tightening nut.

作为本发明技术方案的一种可选方案,所述连接杆的一侧设置有连接头,所述连接杆的另一端设置有连接槽,且一个所述连接杆的连接头能够与另一所述连接杆的连接槽螺纹连接。As an optional solution of the technical solution of the present invention, one side of the connecting rod is provided with a connecting head, the other end of the connecting rod is provided with a connecting groove, and the connecting head of one of the connecting rods can be connected with the other. The connecting groove of the connecting rod is threaded.

作为本发明技术方案的一种可选方案,所述连接杆的两端均连接有连接板;所述连接板上开设有连接孔;所述连接头穿过对应侧的所述连接板上的连接孔并螺纹连接有连接螺母;所述连接槽所在侧设置有一连接螺栓,所述连接螺栓穿过对应侧所述连接板上的连接孔并与所述连接槽螺纹连接;所述快速连接器连接设置在所述连接板上。As an optional solution of the technical solution of the present invention, both ends of the connecting rod are connected with connecting plates; the connecting plates are provided with connecting holes; the connecting heads pass through the holes on the connecting plates on the corresponding side. The connection hole is threadedly connected with a connection nut; the side where the connection groove is located is provided with a connection bolt, and the connection bolt passes through the connection hole on the connection plate on the corresponding side and is threadedly connected with the connection groove; the quick connector Connections are provided on the connection board.

作为本发明技术方案的一种可选方案,所述第一夹体及所述第二夹体上均开设有插槽,且所述第一夹体上与所述第二夹体上的所述插槽为相对设置;所述挤压片的相对侧均固定设置有柔性垫。As an optional solution of the technical solution of the present invention, slots are provided on both the first clip body and the second clip body, and all the slots on the first clip body and the second clip body are The slots are arranged oppositely; and flexible pads are fixedly arranged on opposite sides of the extrusion sheet.

作为本发明技术方案的一种可选方案,所述第一夹体及所述第二夹体均由玻璃微珠浮力材料制成。As an optional solution of the technical solution of the present invention, the first clip body and the second clip body are both made of glass microbead buoyancy material.

本发明的有益效果是:The beneficial effects of the present invention are:

本发明技术方案中的可快速拆装的锚系设备并联器,其一端可快速安装到锚系缆绳上或从锚系缆绳上拆下,另一端可轻松连接多种需要并联的仪器。在现场操作时,操作人员可以将需要并联到锚系缆绳上的仪器预先装配在并联器上,在锚系系统投放或回收时可以快速操作该设备将其和已经装配好的仪器安装到锚系缆绳上或从其上拆下。从而避免了在系统投放和回收过程中不停被中断的状况,在很大程度上提高了现场操作时人员和系统的安全性,从而保障整个观测工作顺利进行。One end of the quickly detachable mooring equipment paralleler in the technical solution of the present invention can be quickly installed on or detached from the mooring cable, and the other end can be easily connected to various instruments that need to be connected in parallel. During field operation, the operator can pre-assemble the instrument that needs to be connected to the mooring line in parallel on the paralleler, and can quickly operate the device and the assembled instrument to install it and the assembled instrument to the mooring system when the mooring system is released or recovered. on or off the cable. This avoids the situation that the system is continuously interrupted during the delivery and recovery process, and greatly improves the safety of personnel and systems during field operations, thereby ensuring the smooth progress of the entire observation work.

附图说明Description of drawings

为了更清楚地说明本发明实施例中的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其他的附图。In order to illustrate the technical solutions in the embodiments of the present invention more clearly, the following briefly introduces the drawings required in the embodiments. Obviously, the drawings in the following description are only some embodiments of the present invention. For those of ordinary skill in the art, other drawings can also be obtained from these drawings without any creative effort.

图1为本发明公开的一个实施例中快速连接器的结构示意图。FIG. 1 is a schematic structural diagram of a quick connector in an embodiment disclosed in the present invention.

图2为本发明公开的一个实施例中挤压块及其对应的夹体的结构示意图。FIG. 2 is a schematic structural diagram of an extrusion block and its corresponding clamping body in an embodiment disclosed in the present invention.

图3为本发明实施例2中锚系设备与快速连接器的连接示意图。3 is a schematic diagram of the connection between the anchoring device and the quick connector in Embodiment 2 of the present invention.

图4为本发明实施例1中连接件的结构示意图。FIG. 4 is a schematic structural diagram of a connector in Embodiment 1 of the present invention.

图5为本发明实施例3中多个锚系设备并联的连接示意图。FIG. 5 is a schematic diagram of the parallel connection of multiple mooring devices in Embodiment 3 of the present invention.

图6为本发明实施例3中连接杆的结构示意图。FIG. 6 is a schematic structural diagram of a connecting rod in Embodiment 3 of the present invention.

图7为本发明实施例3中多个锚系设备并联的另一种连接示意图。FIG. 7 is another schematic diagram of connection of multiple mooring devices in parallel in Embodiment 3 of the present invention.

附图标记:Reference number:

100-快速连接器;110-第一夹体;120-第二夹体;130-锁扣;140-空腔;141-插槽;150-挤压片;151-凹槽;160-连接件;161-第一连接端;162-第二连接端;163-转动槽;164-通槽;165-紧固槽;166-紧固螺栓;167-紧固螺母;168-转轴;170-连接杆;171-连接头;172-连接槽;180-连接板;181-连接孔;200-锚系设备。100-quick connector; 110-first clip body; 120-second clip body; 130-lock; 140-cavity; 141-slot; 150-extrusion piece; 151-groove; 160-connector ; 161-first connection end; 162-second connection end; 163-rotation groove; 164-through groove; 165-fastening groove; 166-fastening bolt; 167-fastening nut; 171-connecting head; 172-connecting groove; 180-connecting plate; 181-connecting hole; 200-anchoring equipment.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, not all of the embodiments.

需要说明,本发明实施例中所有方向性指示(诸如上、下、左、右、前、后……)仅用于解释在某一特定姿态(如附图所示)下各部件之间的相对位置关系、运动情况等,如果该特定姿态发生改变时,则该方向性指示也相应地随之改变。It should be noted that all directional indications (such as up, down, left, right, front, back, etc.) in the embodiments of the present invention are only used to explain the relationship between various components under a certain posture (as shown in the accompanying drawings). The relative positional relationship, the movement situation, etc., if the specific posture changes, the directional indication also changes accordingly.

在实施例的描述中,除非另有明确的规定和限定,术语“设置”、“连接”等应做广义理解。例如,可以是固定连接,也可以是可拆卸连接,或一体连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中介媒体相连,还可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本发明中的具体含义。In the description of the embodiments, the terms "arrangement", "connection" and the like should be construed in a broad sense unless otherwise explicitly specified and limited. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or a connection through an intermediary medium, or a connection between the two components. . For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood in specific situations.

实施例1Example 1

本实施例公开了一种可快速拆装的锚系设备并联器,包括快速连接器100,在本实施例中,该快速连接器可直接预先连接在待投放的锚系设备200上,如图1所示,快速连接器100包括第一夹体110和第二夹体120,且第一夹体110与第二夹体120之间可转动连接。This embodiment discloses a quick-removable anchoring device paralleler, including a quick connector 100. In this embodiment, the quick connector can be directly pre-connected to the anchoring device 200 to be released, as shown in FIG. As shown in 1, the quick connector 100 includes a first clip body 110 and a second clip body 120, and the first clip body 110 and the second clip body 120 are rotatably connected.

在实际使用的过程中可在第一夹体110与第二夹体之间设置连接轴,第一夹体110与第二夹体120中的至少一个能够绕该连接轴转动,连接的过程中可直接将该连接轴与待投放的锚系设备自有的或自制锚系夹的第一部分固定连接,就能够使得第一夹体110及第二夹体120中的至少一个与锚系设备200可转动连接。In the actual use process, a connecting shaft can be set between the first clip body 110 and the second clip body, and at least one of the first clip body 110 and the second clip body 120 can rotate around the connecting shaft. During the connection process The connecting shaft can be directly and fixedly connected to the first part of the anchoring device's own or self-made anchoring clip to be released, so that at least one of the first clip body 110 and the second clip body 120 can be connected to the anchoring device 200. Swivel connection.

第一夹体110与第二夹体120远离锚系设备200的一侧通过锁扣130可拆卸连接,锁扣130采用现有的扣合式快扣快拆锁扣;第一夹体110与第二夹体120的相对侧中至少有一侧开设有用于穿过锚系缆绳的空腔140,在使用的过程中,将锚系缆绳穿过该空腔后,转动第一夹体110和/或第二夹体120,使得第一夹体110与第二夹体120扣合将锚系缆绳挤压在第一夹体与第二夹体之间。The side of the first clip body 110 and the second clip body 120 away from the anchoring device 200 is detachably connected by a lock buckle 130, and the lock buckle 130 adopts an existing snap-fit quick-release lock; At least one of the opposite sides of the two clip bodies 120 is provided with a cavity 140 for passing the mooring cable. During use, after the mooring cable is passed through the cavity, the first clip body 110 and/or the first clip body 110 is rotated and/or The second clip body 120, so that the first clip body 110 and the second clip body 120 are buckled to squeeze the anchor cable between the first clip body and the second clip body.

也即在该方案中,待连接锚系设备200与快速连接器100之间的连接可以在岸上预先进行,在实际浮标或潜标等锚系系统布放时,再将快速连接器与锚系缆绳进行快速连接,即可避免锚系系统投放过程中不停被中断的状况;同样地,在锚系系统回收时,也能够快速地将快速连接器100从锚系缆绳上拆卸。因此本该技术方案相对于现有的安拆手段能极大地减少在锚系系统投放或回收过程中的占用时间,提高了现场操作时人员和系统的安全性。That is to say, in this solution, the connection between the mooring equipment 200 to be connected and the quick connector 100 can be carried out in advance on the shore. The quick connection of the cable can avoid the situation that the mooring system is continuously interrupted during the release process; similarly, when the mooring system is recovered, the quick connector 100 can also be quickly detached from the mooring cable. Therefore, compared with the existing installation and dismantling methods, the technical solution can greatly reduce the occupied time in the process of launching or recovering the mooring system, and improve the safety of personnel and systems during on-site operation.

在以上的技术方案中,锚系缆绳是从第一夹体110和/或第二夹体120上开设的空腔140之间穿过去的,也即锚系缆绳实际是由空腔140的腔壁进行挤压的,在实际使用的过程中锚系缆绳的规格可能会有多种,当锚系缆绳较细时,就会造成快速连接器100与锚系缆绳的连接效果不佳,因此在有的技术方案中,如图1和图2所示,空腔140所在侧的夹体上开设有插槽141,插槽141内插设有挤压片150,挤压片150远离对应夹体的一侧开设有凹槽151,也即在实际使用的过程中,锚系缆绳是被挤压在挤压片150的凹槽151之间的,在这种技术方案中,当锚系缆绳的规格发生变化时,只需更换与之匹配的挤压片150即可,使得快速连接器100能够适用于不同规格的锚系缆绳。In the above technical solution, the mooring cable is passed between the cavities 140 opened on the first clip body 110 and/or the second clip body 120 , that is, the mooring cable is actually passed through the cavity of the cavity 140 . If the wall is squeezed, there may be various specifications of the mooring cable in the actual use process. When the mooring cable is thin, the connection effect between the quick connector 100 and the mooring cable will be poor. In some technical solutions, as shown in FIG. 1 and FIG. 2 , a slot 141 is opened on the clip body on the side where the cavity 140 is located, and an extrusion sheet 150 is inserted in the slot 141, and the extrusion sheet 150 is far away from the corresponding clip body. A groove 151 is opened on one side of the anchorage cable, that is, in the process of actual use, the mooring cable is squeezed between the grooves 151 of the extruded sheet 150. In this technical solution, when the mooring cable is When the specification is changed, it is only necessary to replace the matched extruded sheet 150, so that the quick connector 100 can be applied to the mooring cables of different specifications.

可以理解地是,为了使得快速连接器100对锚系缆绳的夹持效果更好,第一夹体110及第二夹体120上均开设有插槽141,且第一夹体110上与第二夹体120上的插槽141为相对设置;也即两侧的挤压片150为相对设置的,锚系缆绳从相对设置的挤压片之间的凹槽151中穿过的,进而被挤压在相对的凹槽151中,当然,为了进一步提高对锚系缆绳的夹持效果,第一夹体110或第二夹体120上均可设置多个插槽141,本领域技术人员在本申请文件思想的指导下,可以根据实际需要选择合适的插槽141的数量;挤压片150的相对侧均固定设置有柔性垫,柔性垫的设置能够进一步保证对锚系缆绳的夹持效果。在实际使用的过程中,柔性片可以为柔性的橡胶、硅胶等材料制成。It can be understood that, in order to make the quick connector 100 hold the mooring cable better, slots 141 are provided on both the first clip body 110 and the second clip body 120 , and the first clip body 110 is connected to the second clip body 110 . The slots 141 on the two clamping bodies 120 are oppositely arranged; that is, the extruded sheets 150 on both sides are oppositely arranged, and the anchor cable passes through the grooves 151 between the oppositely arranged extruded sheets, and is then Squeeze in the opposite grooves 151, of course, in order to further improve the clamping effect of the mooring cable, the first clamping body 110 or the second clamping body 120 can be provided with a plurality of slots 141. Under the guidance of the idea of this application document, the appropriate number of slots 141 can be selected according to actual needs; flexible pads are fixed on the opposite sides of the extrusion sheet 150, and the flexible pads can further ensure the clamping effect on the mooring cable. . In actual use, the flexible sheet can be made of flexible rubber, silicone and other materials.

在以上的技术方案中,快速连接器100的作用是为了将锚系设备200快速连接在锚系缆绳上,然而在一个更好的方案中,第一夹体110及第二夹体120均由玻璃微珠浮力材料制成。在这种方案中使得快速连接器100不仅能够实现快速连接的功能,而且能够为锚系设备提供一定的浮力,方便锚系设备200的回收。In the above technical solution, the function of the quick connector 100 is to quickly connect the mooring device 200 to the mooring cable. However, in a better solution, the first clip body 110 and the second clip body 120 are both composed of Made of glass bead buoyancy material. In this solution, the quick connector 100 can not only realize the function of quick connection, but also provide a certain buoyancy for the mooring equipment, so as to facilitate the recovery of the mooring equipment 200 .

实施例2Example 2

本实施例提供的一种可快速拆装的锚系设备并联器与实施例1不同的是,在本实施例中,如图3所示,锚系设备200通过连接件160连接有连接杆170;快速连接器100设置在连接杆160远离锚系设备200的一侧。在实际使用的过程中,可以理解的是,连接杆优选选用不锈钢杆。The quick-removable anchoring device parallel connector provided in this embodiment is different from Embodiment 1 in that, in this embodiment, as shown in FIG. ; The quick connector 100 is arranged on the side of the connecting rod 160 away from the anchoring device 200 . In the process of actual use, it can be understood that the connecting rod is preferably a stainless steel rod.

也即在本申请文件中,锚系设备200通过连接件160与连接杆170连接,快速连接器100也与连接杆170连接,为了方便拆装,快速连接器100与连接杆170之间可采用可拆卸式的连接方式。That is, in this application document, the anchoring device 200 is connected to the connecting rod 170 through the connecting piece 160, and the quick connector 100 is also connected to the connecting rod 170. In order to facilitate disassembly and assembly, the quick connector 100 and the connecting rod 170 can be Detachable connection.

在实际操作的过程中,预先将锚系设备200通过连接件160连接在连接杆170上,再将快速连接器100也连接在连接杆170上,之后在锚系系统的投放过程中,使用快速连接器与锚系缆绳快速连接。In the actual operation process, the anchoring device 200 is connected to the connecting rod 170 through the connecting piece 160 in advance, and then the quick connector 100 is also connected to the connecting rod 170. The connector quickly connects to the mooring cable.

本实施例的技术方案相对于实施例1的技术方案来说,其优点主要表现在:Compared with the technical solution of Embodiment 1, the advantages of the technical solution of this embodiment are mainly as follows:

在实施例1中,快速连接器100是与待投放的锚系设备200连接的,也即一个待投放的锚系设备200上至少需要设置有一个快速连接器,在实际工作的过程中,当有N个锚系设备需要投放时,就至少需要N个快速连接器,N个快速连接器与锚系缆绳就需要进行N次连接,也即需要进行N次锁扣的扣合;In Embodiment 1, the quick connector 100 is connected with the mooring device 200 to be released, that is, at least one quick connector needs to be provided on the mooring device 200 to be released. When there are N anchor devices to be released, at least N quick connectors are required, and N quick connectors and anchor cables need to be connected N times, that is, N times of locking of the locks are required;

在本实施例中,待投放的锚系设备200事先通过连接件160与连接杆170连接,当有多个待投放的锚系设备200时,选择合适长度的连接杆,将多个锚系设备200均通过连接件160连接在连接杆上,连接杆170的端部可以连接一个或者两个快速连接器100,这就使得多个锚系设备200通过一个或者两个快速连接器即可连接在锚系缆绳上,进一步减少了对锚系系统投放过程中的干扰。In this embodiment, the anchoring equipment 200 to be released is connected to the connecting rod 170 through the connecting member 160 in advance. When there are multiple anchoring equipment 200 to be released, a connecting rod of an appropriate length is selected to connect the multiple anchoring equipment 200 to the connecting rod. 200 are all connected to the connecting rod through the connecting piece 160, and the end of the connecting rod 170 can be connected to one or two quick connectors 100, which enables multiple anchoring devices 200 to be connected to the connecting rod through one or two quick connectors. On the mooring cable, the disturbance to the mooring system is further reduced.

如图4所示,本实施例中的连接件160为一闭环状连接件;连接件160包括用于套穿锚系设备的第一连接端161以及用于套穿连接杆的第二连接端162;第一连接端161与第二连接端162之间穿设有紧固件。As shown in FIG. 4 , the connecting member 160 in this embodiment is a closed-loop connecting member; the connecting member 160 includes a first connecting end 161 for passing through the anchoring device and a second connecting end for passing through the connecting rod 162; Fasteners are provided between the first connecting end 161 and the second connecting end 162.

这种技术方案中,在实际使用时,将待投放的锚系设备200穿入第一连接端161,将连接杆170穿过第二连接端162,再使用紧固件进行紧固,便能实现通过一次的紧固就可以将第一连接端161抱紧锚系设备200,同时第二连接端162抱紧连接杆170,提高了锚系设备与连接杆170的连接效率。In this technical solution, in actual use, the anchoring device 200 to be cast is inserted into the first connecting end 161, the connecting rod 170 is passed through the second connecting end 162, and then fastened with fasteners, the It is realized that the first connection end 161 can be held tightly to the anchoring device 200 by one tightening, while the second connecting end 162 is held tightly to the connecting rod 170 , which improves the connection efficiency between the anchoring equipment and the connecting rod 170 .

在实际使用的过程中,使用穿过连接件170的螺栓作为紧固件即可实现上述技术效果,但是一种更好的方案是,在连接件160的两侧分别开设有通槽164以及紧固槽165,通槽164以及紧固槽165均位于第一连接端161与第二连接端162之间;通槽164内可转动地设置有一紧固螺栓166,紧固螺栓166的另一端穿过紧固槽165且螺旋连接有一紧固螺母167。In the process of actual use, the above technical effect can be achieved by using the bolts passing through the connecting piece 170 as a fastener, but a better solution is that through grooves 164 and a tightening hole are respectively opened on both sides of the connecting piece 160 . The fixing groove 165, the through groove 164 and the tightening groove 165 are all located between the first connection end 161 and the second connection end 162; A tightening nut 167 is screwed through the tightening groove 165 .

在这种技术方案中,紧固螺栓166是可转动地设置在通槽164中的,实际连接的过程中可以在紧固螺栓166与通槽的连接处设置转轴168,对应在通槽164中开设转动槽163,转轴168转动地设置在转动槽163中即可,转动设置的紧固螺栓166使得在连接的过程中能够适应性地调整紧固螺栓的方向,使得与紧固螺栓166连接的紧固螺母167能够贴合在连接件160的侧壁上,提高了连接强度。In this technical solution, the fastening bolts 166 are rotatably arranged in the through grooves 164. During the actual connection process, a rotating shaft 168 can be provided at the connection between the fastening bolts 166 and the through grooves, corresponding to the through grooves 164. The rotating groove 163 is opened, and the rotating shaft 168 is rotatably arranged in the rotating groove 163. The rotating set of the tightening bolts 166 enables the direction of the tightening bolts to be adjusted adaptively during the connection process, so that the bolts connected to the tightening bolts 166 can be adjusted. The tightening nut 167 can fit on the side wall of the connecting piece 160 to improve the connecting strength.

实施例3Example 3

本实施例提供的一种可快速拆装的锚系设备并联器是在实施例2的基础上做出的改进,在本实施例中,如图6所示,连接杆170的一侧设置有连接头171,连接杆170的另一端设置有连接槽172,且一个连接杆的连接头171能够与另一连接杆的连接槽172螺纹连接。The quick-removable anchoring device parallel connector provided in this embodiment is an improvement made on the basis of Embodiment 2. In this embodiment, as shown in FIG. 6 , one side of the connecting rod 170 is provided with a The connecting head 171 and the other end of the connecting rod 170 are provided with a connecting groove 172, and the connecting head 171 of one connecting rod can be threadedly connected with the connecting groove 172 of the other connecting rod.

也即在本实施例中,如图5所示,不同的连接杆170之间是可以相互拼接的,当需要投放多个锚系设备200时,可以使用多个连接杆170拼接成适应的长度即可,无需提前定制多种规格的连接杆170。That is to say, in this embodiment, as shown in FIG. 5 , different connecting rods 170 can be spliced with each other. When multiple anchoring devices 200 need to be put in, multiple connecting rods 170 can be spliced into a suitable length. That is, there is no need to customize the connecting rods 170 of various specifications in advance.

与这种连接杆170适应地,再次如图5所示,连接杆170的两端均连接有连接板180;连接板180上开设有连接孔181;快速连接器100直接连接在连接板180上,连接头171穿过对应侧的连接板180上的连接孔181并螺纹连接有连接螺母;连接槽172所在侧设置有一连接螺栓,连接螺栓穿过对应侧连接板180上的连接孔并与连接槽172螺纹连接;快速连接器100连接设置在连接板180上。在实际工作中,连接板优先选用尼龙板。Adapting to this connecting rod 170, again as shown in FIG. 5, both ends of the connecting rod 170 are connected with a connecting plate 180; the connecting plate 180 is provided with a connecting hole 181; , the connecting head 171 passes through the connecting hole 181 on the connecting plate 180 on the corresponding side and is screwed with a connecting nut; the side where the connecting groove 172 is located is provided with a connecting bolt, and the connecting bolt passes through the connecting hole on the connecting plate 180 on the corresponding side and is connected with The groove 172 is screwed; the quick connector 100 is connected and provided on the connecting plate 180 . In practical work, the connecting plate is preferably made of nylon.

在这种技术方案中,连接头171与连接槽172的设置一方面可以使得连接杆之间可以进行拼接组装,另外也可以方便地对连接板180进行连接,也即可以方便地对快速连接器进行连接。In this technical solution, the setting of the connecting head 171 and the connecting groove 172 can, on the one hand, enable splicing and assembly between the connecting rods, and on the other hand, the connecting plate 180 can be conveniently connected, that is, the quick connector can be easily connected. to connect.

另外,本实施例中的技术方案相对于实施例2以及实施例1中的技术方案,其优点是,快速连接器100的数量设置更为灵活,在实施例1中,一个待投放的锚系设备对应一个或者两个快速连接器,N个锚系设备至少需要N个快速连接器;在实施例2的技术方案中,N个锚系设备对应1个或者两个快速连接器,而在本实施例中,快速连接器的数量可以灵活设置,比如快速连接器100可以设置在拼接后连接杆的两端,也可以采用如7图所示的连接方式,即一个连接杆的连接头穿过一个连接板后与另一个连接件的连接槽连接,这就使得N个连接杆相互拼接时,可以设置1~(N+1)个快速连接器,其灵活性更强,可以兼顾连接杆与锚系缆绳的连接强度与连接效率。In addition, compared with the technical solutions in Embodiment 2 and Embodiment 1, the technical solution in this embodiment has the advantage that the number of quick connectors 100 can be set more flexibly. The device corresponds to one or two quick connectors, and N anchor devices need at least N quick connectors; in the technical solution of Embodiment 2, N anchor devices correspond to one or two quick connectors, while in this case In the embodiment, the number of quick connectors can be set flexibly. For example, the quick connectors 100 can be set at both ends of the connecting rod after splicing, or the connection method as shown in Fig. 7 can be adopted, that is, the connecting head of one connecting rod passes through. One connecting plate is connected with the connecting groove of the other connecting piece, which makes it possible to set 1 to (N+1) quick connectors when N connecting rods are spliced to each other, which is more flexible and can take into account both the connecting rod and the The connection strength and connection efficiency of the mooring cable.

可以理解的是,本申请文件中涉及到的紧固螺栓、紧固螺母、连接螺栓、连接螺母等优先选用不锈钢材质。It can be understood that the fastening bolts, fastening nuts, connecting bolts, connecting nuts, etc. involved in this application document are preferably made of stainless steel.

以上仅为本发明的较佳实施例而已,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。另外,各个实施例之间的技术方案可以相互结合,但是必须是以本领域普通技术人员能够实现为基础;当技术方案的结合出现相互矛盾或无法实现时应当认为这种技术方案的结合不存在,也不在本发明要求的保护范围之内。The above are only preferred embodiments of the present invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention should be included within the protection scope of the present invention. In addition, the technical solutions between the various embodiments can be combined with each other, but must be based on the realization by those of ordinary skill in the art; when the combination of technical solutions is contradictory or cannot be realized, it should be considered that the combination of technical solutions does not exist. , is not within the scope of protection required by the present invention.

Claims (7)

1. The utility model provides a but quick assembly disassembly's anchorage equipment parallel connection ware which characterized in that: comprises a quick connector connected to the anchoring device, the quick connector comprises a first clamp body and a second clamp body
The first clamp body is rotatably connected with the second clamp body;
at least one of the first clamp body and the second clamp body is rotatably connected with the anchoring device;
the first clamp body and one side, far away from the anchoring equipment, of the second clamp body are detachably connected through a lock catch;
at least one of the opposite sides of the first clamp body and the second clamp body is provided with a cavity for passing an anchoring cable;
the anchoring equipment is connected with a connecting rod through a connecting piece;
the quick connector is arranged on one side, away from the anchoring equipment, of the connecting rod;
the connecting piece is a closed ring-shaped connecting piece; the connecting piece comprises a first connecting end used for sleeving the anchoring equipment and a second connecting end used for sleeving the connecting rod;
and a fastener penetrates between the first connecting end and the second connecting end.
2. A quick disconnect tie-down apparatus in parallel according to claim 1, wherein: the clamp body at the side of the cavity is provided with a slot, an extrusion sheet is inserted into the slot, and one side of the extrusion sheet, which is far away from the corresponding clamp body, is provided with a groove.
3. A quick disconnect tie-down apparatus in parallel according to claim 1, wherein: a through groove and a fastening groove are respectively formed in two sides of the connecting piece, and the through groove and the fastening groove are both positioned between the first connecting end and the second connecting end;
a fastening bolt is rotatably arranged in the through groove, and the other end of the fastening bolt penetrates through the fastening groove and is spirally connected with a fastening nut.
4. The quick-release mooring equipment parallel connector according to claim 1, wherein one side of the connecting rods is provided with a connector, the other end of the connecting rods is provided with a connecting groove, and the connector of one connecting rod can be in threaded connection with the connecting groove of the other connecting rod.
5. The quickly detachable and attachable mooring equipment parallel connection device according to claim 4, wherein connecting plates are connected to both ends of the connecting rod;
the connecting plate is provided with a connecting hole;
the connector penetrates through the connecting hole on the connecting plate on the corresponding side and is in threaded connection with a connecting nut;
a connecting bolt is arranged on the side of the connecting groove, penetrates through the connecting hole in the connecting plate on the corresponding side and is in threaded connection with the connecting groove;
the quick connector is connected and arranged on the connecting plate.
6. A quick disconnect tie-down apparatus paralleler according to claim 2, wherein: slots are formed in the first clamp body and the second clamp body, and the slots in the first clamp body and the slots in the second clamp body are arranged oppositely;
and flexible pads are fixedly arranged on the opposite sides of the squeezing pieces.
7. A quick disconnect tie-down apparatus according to any one of claims 1 to 6, wherein: the first clamp body and the second clamp body are both made of glass bead buoyancy materials.
CN202210012648.5A 2022-01-07 2022-01-07 A quick-removable anchor equipment paralleler Active CN114313109B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202210012648.5A CN114313109B (en) 2022-01-07 2022-01-07 A quick-removable anchor equipment paralleler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202210012648.5A CN114313109B (en) 2022-01-07 2022-01-07 A quick-removable anchor equipment paralleler

Publications (2)

Publication Number Publication Date
CN114313109A CN114313109A (en) 2022-04-12
CN114313109B true CN114313109B (en) 2022-06-03

Family

ID=81024996

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202210012648.5A Active CN114313109B (en) 2022-01-07 2022-01-07 A quick-removable anchor equipment paralleler

Country Status (1)

Country Link
CN (1) CN114313109B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3742535A (en) * 1971-03-31 1973-07-03 Bendix Corp Open ocean shallow water moor
CN1472112A (en) * 2003-06-14 2004-02-04 山东省科学院海洋仪器仪表研究所 Buoy temperature salt chain mooring device
CN101318541A (en) * 2007-06-06 2008-12-10 中国科学院海洋研究所 A self-sustaining marine environment monitoring system
CN103072675A (en) * 2012-12-21 2013-05-01 海洋化工研究院有限公司 Umbilical cable floating body
CN107179071A (en) * 2016-03-11 2017-09-19 国家海洋局南海预报中心 A kind of subsurface buoy for oceanographic observation
CN109367705A (en) * 2018-11-26 2019-02-22 国家海洋局第海洋研究所 A quasi-real-time communication submersible in polar seasonal ice area
CN211543814U (en) * 2020-01-22 2020-09-22 中国科学院海洋研究所 Be used for submerged buoy current meter fixing device
CN112758255A (en) * 2021-01-28 2021-05-07 中国科学院海洋研究所 Device and method for recycling and arranging water body profile observation system
CN112793726A (en) * 2020-12-30 2021-05-14 山东省科学院海洋仪器仪表研究所 An underwater patrol chain mobile observation platform

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3742535A (en) * 1971-03-31 1973-07-03 Bendix Corp Open ocean shallow water moor
CN1472112A (en) * 2003-06-14 2004-02-04 山东省科学院海洋仪器仪表研究所 Buoy temperature salt chain mooring device
CN101318541A (en) * 2007-06-06 2008-12-10 中国科学院海洋研究所 A self-sustaining marine environment monitoring system
CN103072675A (en) * 2012-12-21 2013-05-01 海洋化工研究院有限公司 Umbilical cable floating body
CN107179071A (en) * 2016-03-11 2017-09-19 国家海洋局南海预报中心 A kind of subsurface buoy for oceanographic observation
CN109367705A (en) * 2018-11-26 2019-02-22 国家海洋局第海洋研究所 A quasi-real-time communication submersible in polar seasonal ice area
CN211543814U (en) * 2020-01-22 2020-09-22 中国科学院海洋研究所 Be used for submerged buoy current meter fixing device
CN112793726A (en) * 2020-12-30 2021-05-14 山东省科学院海洋仪器仪表研究所 An underwater patrol chain mobile observation platform
CN112758255A (en) * 2021-01-28 2021-05-07 中国科学院海洋研究所 Device and method for recycling and arranging water body profile observation system

Also Published As

Publication number Publication date
CN114313109A (en) 2022-04-12

Similar Documents

Publication Publication Date Title
US4309263A (en) Cathodic clamp apparatus
BR0016701B1 (en) pipe abandonment method, abandonment and rescue system, pipe laying vessel, method and system for disconnecting a winch line from a pipe.
CN114313109B (en) A quick-removable anchor equipment paralleler
CN210669358U (en) Cable support frame used during ship subsection building
CN105914663B (en) A kind of submarine cable hitch structure and its installation method
US11148257B2 (en) Clamping tool
US6328583B2 (en) Re-connectable pipeline connection for direct heating system
BR0017170A (en) Throwing apparatus for throwing an object into a fluid, clip, ship, and method for throwing a charge into a fluid.
CN212354308U (en) Telescopic anchor frame
CN209860534U (en) Boats and ships shore connection cable runs through device
CN211193583U (en) Clamp for marine transverse supply frame cable
US5902463A (en) Submersible anode and method
WO2018093070A1 (en) Apparatus for passively preventing marine floating body from twisting during mooring
CN107045174A (en) A kind of special gold utensil of 8 word optical cable
CN209289144U (en) A kind of attaching/detaching apparatus of organic film
CN209760831U (en) Cable clamping device
CN209850802U (en) A portable joint connection device
CN203135338U (en) Underwater cable protecting device
CN112744338A (en) Underwater auxiliary recovery device and using method thereof
CN111619762A (en) Continuous rod drilling type horizontal directional drill and underwater unmanned cable penetrating operation method
PT91298B (en) A REMOTE PROGRESSIVE DETACH SYSTEM OF A SERIES OF PRESSURE ELEMENTS SUCCESSFULLY TIGHTENED THROUGH A UNDERWEIGHT STRUCTURE AND PROCESS FOR THEIR REALIZATION
CN218298200U (en) Natural gas safety inspection equipment
CN114803838A (en) Auxiliary fixture is put in navel cord cable of internal diameter adjustable hanging
GB2147976A (en) Clamp
CN210555512U (en) Fixing structure of life jacket

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: No. 6 Xianxialing Road, Laoshan District, Qingdao City, Shandong Province

Patentee after: FIRST INSTITUTE OF OCEANOGRAPHY, MNR

Country or region after: China

Patentee after: Qingdao Marine Science and Technology Center

Address before: Laoshan District xianxialing road 266061 Shandong city of Qingdao province No. 6

Patentee before: FIRST INSTITUTE OF OCEANOGRAPHY, MNR

Country or region before: China

Patentee before: QINGDAO NATIONAL LABORATORY FOR MARINE SCIENCE AND TECHNOLOGY DEVELOPMENT CENTER