[go: up one dir, main page]

CN113699847A - Tunnel composite epoxy asphalt drainage pavement structure and process method - Google Patents

Tunnel composite epoxy asphalt drainage pavement structure and process method Download PDF

Info

Publication number
CN113699847A
CN113699847A CN202111102384.4A CN202111102384A CN113699847A CN 113699847 A CN113699847 A CN 113699847A CN 202111102384 A CN202111102384 A CN 202111102384A CN 113699847 A CN113699847 A CN 113699847A
Authority
CN
China
Prior art keywords
asphalt
epoxy asphalt
layer
epoxy
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111102384.4A
Other languages
Chinese (zh)
Inventor
封基良
孙武云
张林艳
解斌
杨吉龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Wuruoxian Expressway Co ltd
Yunnan Smooth Technology Co ltd
Original Assignee
Yunnan Wuruoxian Expressway Co ltd
Yunnan Smooth Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Wuruoxian Expressway Co ltd, Yunnan Smooth Technology Co ltd filed Critical Yunnan Wuruoxian Expressway Co ltd
Priority to CN202111102384.4A priority Critical patent/CN113699847A/en
Publication of CN113699847A publication Critical patent/CN113699847A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/32Coherent pavings made in situ made of road-metal and binders of courses of different kind made in situ
    • E01C7/325Joining different layers, e.g. by adhesive layers; Intermediate layers, e.g. for the escape of water vapour, for spreading stresses
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/225Paving specially adapted for through-the-surfacing drainage, e.g. perforated, porous; Preformed paving elements comprising, or adapted to form, passageways for carrying off drainage
    • E01C11/226Coherent pavings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/24Methods or arrangements for preventing slipperiness or protecting against influences of the weather
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/46Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for preparing and placing the materials, e.g. slurry seals
    • E01C19/47Hydraulic cement concrete mixers combined with distributing means specially adapted for road building
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/48Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for laying-down the materials and consolidating them, or finishing the surface, e.g. slip forms therefor, forming kerbs or gutters in a continuous operation in situ
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/08Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for roughening or patterning; for removing the surface down to a predetermined depth high spots or material bonded to the surface, e.g. markings; for maintaining earth roads, clay courts or like surfaces by means of surface working tools, e.g. scarifiers, levelling blades
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C9/00Special pavings; Pavings for special parts of roads or airfields
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/30Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention belongs to the technical field of tunnel pavement, and relates to a tunnel composite epoxy asphalt drainage pavement structure and a process method. The structural layer sequentially comprises an epoxy asphalt drainage concrete upper surface layer, a dense graded asphalt concrete stress absorption layer, a bonding layer and a base layer from top to bottom; the upper layer of the epoxy asphalt drainage concrete is epoxy asphalt drainage mixture EOGFC-13 or EOGFC-16, the post-mixing process is adopted for implementation, the dense grading stress absorption layer is FAC-10 with rich asphalt dosage, the bonding layer is an epoxy asphalt bonding layer or ultrahigh viscosity modified asphalt, and the base layer is common cement concrete PCC or continuous reinforced concrete CRCP. The problems of insufficient durability, high skid resistance and attenuation, poor hot-mixing construction environmental condition, high maintenance and repair cost, high potential safety hazard and the like of the common tunnel pavement can be effectively solved. The tunnel pavement solution which is energy-saving, noise-reducing, environment-friendly, safe, comfortable and sustainable in development can be provided.

Description

Tunnel composite epoxy asphalt drainage pavement structure and process method
Technical Field
The invention belongs to the technical field of road pavement, and relates to a tunnel composite epoxy asphalt drainage pavement structure and a process method.
Background
At present, the main structure of the tunnel pavement in China is a composite pavement structure of a 4cm modified asphalt concrete +6cm modified asphalt concrete lower surface layer + 22-28 cm cement concrete rigid base layer. The paving material mainly takes a dense-graded asphalt mixture or SMA as a main material. The cementing material comprises thermoplastic rubber or plastic modified asphalt such as SBS modified asphalt, rubber asphalt and the like, and has poor adhesion with aggregate.
With the rapid development of economy in China, highway construction is also advanced from plain to mountain areas, the tunnel proportion is increased, the mileage of highway tunnels, particularly extra-long tunnels, is remarkably increased, and the mileage of China is rapidly increased by 1100km every year. However, the tunnel space is narrow and small, the driving sight is poor, the traffic detouring cost and the cost are high, under the heavy load effect, the tunnel pavement has the problems of too fast attenuation of the anti-skid functional index, short service life, poor durability and the like, and even if a flame retardant is added, the combustion essence of the tunnel pavement cannot be changed.
The OGFC is an open-graded and large-pore mixture, has excellent anti-skid, noise-reducing and water-discharging performances, and can improve the driving safety of tunnels and reduce noise. The longest service life of the epoxy asphalt reaches 49 years, the epoxy asphalt is a mature high-performance material, and the warm-mixed epoxy asphalt is used as a binding material, so that the problem of performance attenuation caused by small contact area of aggregate can be solved, and the service life and the durability of the epoxy asphalt are guaranteed. The post-doping process can overcome the problem that the epoxy asphalt is difficult to implement and apply due to short holding time and large influence of temperature, and provides a new solution for selection and determination of the tunnel pavement.
Disclosure of Invention
The invention provides a tunnel composite epoxy asphalt drainage pavement structure and a process method, aiming at solving the problems of quick anti-skid property attenuation, high noise, poor durability and the like of the existing tunnel pavement structure and providing a new solution for the tunnel pavement.
The invention provides a tunnel composite epoxy asphalt drainage pavement structure, which adopts the following technical scheme:
a tunnel composite epoxy asphalt drainage pavement structure comprises a drainage epoxy asphalt concrete surface layer (1), an oil-rich dense-graded asphalt concrete stress absorption layer (2), a bonding layer (3) and a base layer (4) which are sequentially arranged from top to bottom;
the epoxy asphalt drainage concrete is a warm-mixed epoxy asphalt drainage mixture EOGFC-13 or EOGFC-16, has the thickness of 20 mm-50 mm, and is implemented by adopting a post-mixing process. The performance indexes are as follows: marshall stability is not less than 15KN, immersion residual stability is not less than 85%, freeze-thaw cleavage residual strength ratio (TSR) is not less than 80%, rutting test dynamic stability is not less than 10000 times/mm, low-temperature bending test damage strain is not less than 2800 mu epsilon (cold zone)/2500 mu epsilon (cold zone and cold zone), drainage coefficient (Marshall test piece) is not less than 0.2cm/s, and water seepage coefficient (rutting plate) is not less than 5000 mL/min.
The stress absorption layer of the oil-rich dense-graded asphalt mixture is FAC-10, and the thickness of the stress absorption layer is 10 mm-30 mm. The cementing material is ultrahigh viscosity modified asphalt which is compositely modified by materials such as high polymer, tackifying resin, compatibilizer, natural asphalt and the like, and the dynamic viscosity at 60 ℃ is more than 100 ten thousand Pa ∙ s. The softening point is more than or equal to 95 ℃.
The bonding layer is epoxy asphalt bonding layer or ultrahigh viscosity modified asphalt, and the spreading amount is 0.4L/m2~0.6L/m2
The preparation process of the epoxy asphalt bonding layer comprises the following components in percentage by weight: (1) the epoxy resin curing agent is prepared by uniformly mixing the component A, namely the epoxy resin, the component B, namely the matrix asphalt, the curing agent, the curing accelerator and other modification aids, respectively heating to 70 +/-10 ℃ and 150 +/-5 ℃, uniformly mixing according to the mass ratio of 100 (300-500) and carrying out quantitative spraying construction.
The bonding layer of the ultrahigh-viscosity modified asphalt is the ultrahigh-viscosity modified asphalt which is compositely modified by materials such as high polymer, tackifying resin, compatibilizer and natural asphalt, and the dynamic viscosity at 60 ℃ is more than 100 ten thousand Pa ∙ s. The softening point is more than or equal to 95 ℃.
The base layer is made of ordinary cement concrete PCC or continuous reinforced concrete CRCP, the thickness of the base layer is 220 mm-280 mm, and the surface of the base layer needs to be processed by a fine milling or shot blasting roughening process.
The epoxy asphalt drainage concrete is a warm-mixed epoxy asphalt drainage mixture EOGFC-13 or EOGFC-16, and the construction adopts a post-mixing process, and the concrete flow is as follows:
(1) mixing and stirring the matrix asphalt, the curing agent, the curing accelerator, the auxiliary agent and other modifiers according to a certain proportion at 110-140 ℃ for 20-30 min to prepare the epoxy asphalt B component.
(2) And heating the epoxy asphalt B component, the aggregate, the mineral powder and the admixture to 120-150 ℃ in a mixing station, and carrying out dry mixing for 5-15 seconds and wet mixing for 22-35 seconds to produce the epoxy asphalt B component mixture.
(3) When the mixture of the component B of the epoxy asphalt is transported to a construction site for paving, the component A of the epoxy asphalt is added in a mist spraying manner by adopting special paving equipment designed by a medium and large company and adopting a large-width and segregation-resistant DT series after-doping method according to the mass ratio of A to B of 100 (500-1000), and the mixture is evenly mixed for the second time,
(4) paving the epoxy asphalt drainage mixture which is mixed uniformly for the second time, rolling and curing, and finishing the construction of the tunnel road surface structure of the post-mixing warm-mixed epoxy asphalt EOGFC-13 or EOGFC-16.
The technical scheme has the advantages and characteristics that:
the structure has the functional characteristics of high driving comfort and high safety of the asphalt pavement and the structural characteristics of high durability and high bearing capacity of the cement concrete pavement. The epoxy asphalt drainage mixture is used as a road surface wearing layer, and due to the excellent performances of the epoxy asphalt, such as durability, corrosion resistance, fatigue resistance, ageing resistance and the like, the epoxy asphalt drainage pavement durability can be effectively improved, the anti-skid function attenuation and the material deformation are reduced, the driving comfort and safety are guaranteed, and the driving noise can be reduced. Meanwhile, the bonding material of the epoxy asphalt has excellent bonding and shearing resistance performance, so that the shearing slippage damage between layers can be effectively relieved. And the oil-rich dense-graded mixture FAC-10 is adopted between the epoxy asphalt drainage pavement surface layer and the cement concrete base layer as a stress absorption layer, so that the upward reflection of the reflection cracks of the cement concrete rigid base layer can be effectively inhibited, the downward permeation of moisture can be blocked, and the influence of the water action on the tunnel drainage pavement structure can be well reduced. Meanwhile, the construction process of the warm-mixed epoxy asphalt drainage pavement by adopting the 'after-mixing method' can improve the construction environment of the tunnel pavement, reduce the quality risks of links such as epoxy asphalt mixing, loading, transporting and paving waiting materials, effectively solve the risks of short curing reaction time of the epoxy asphalt mixture, difficult quality in the mixing and transporting process, limited application and popularization and the like, reduce the construction difficulty and reduce the application limit.
Drawings
FIG. 1 is a schematic cross-sectional view of a tunnel composite epoxy asphalt drainage pavement structure.
FIG. 1 depicts the following: a tunnel combined type epoxy asphalt drainage pavement structure is arranged from top to bottom in sequence: 1-a water-draining epoxy asphalt concrete upper surface layer; 2-oil-rich dense-graded asphalt concrete stress absorbing layer; 3-an epoxy asphalt adhesive layer; 4-substrate.
Detailed Description
The present application is described in further detail below with reference to FIG. 1.
The embodiment of the invention discloses a tunnel composite epoxy asphalt drainage pavement structure, the described embodiment is only a part of embodiment of the invention, but not all embodiments, and all other embodiments obtained by the related technical personnel in the field without creative labor achievement belong to the protection scope of the invention.
Referring to the legend, a tunnel combined type epoxy asphalt drainage pavement structure is arranged from top to bottom in sequence: 1-a water-draining epoxy asphalt concrete upper surface layer; 2-oil-rich dense-graded asphalt concrete stress absorbing layer; 3-an adhesive layer; 4-substrate.
The upper layer is prepared and produced by adopting warm-mixed epoxy asphalt, coarse aggregate, fine aggregate, filler, admixture and other materials according to a post-mixing method process of adding and mixing in two stages, and the structure with large pores, high strength, high modulus, fatigue resistance, rut resistance and excellent skid resistance after paving, rolling and maintenance is completed.
The stress absorbing layer of the lower layer oil-rich dense-graded asphalt concrete is ultrahigh viscosity modified asphalt compositely modified by high polymer, tackifying resin, compatibilizer, natural asphalt and other materials, the dosage of the ultrahigh viscosity modified asphalt is increased by 0.3-0.5 percent compared with the optimal oilstone ratio determined by normal Marshall test, the ultrahigh viscosity modified asphalt is mixed with coarse aggregate and fine aggregate, and after the filler is mixed by mixing equipment, the concrete is paved and rolled at the discharge temperature of 170-190 ℃, so that the stress absorbing layer can prevent the drainage infiltration of the upper layer epoxy asphalt concrete OGFC, and inhibit the crack reflection caused by the fracture of base joints, construction joints and plates.
The bonding layer is an important measure for enhancing the bonding force between the stress absorbing layer and the base layer, improving the interlaminar deformation and the anti-shearing capability and enabling the structure to form a whole. The bonding layer material adopts epoxy asphalt or ultrahigh viscosity modified asphalt, if the epoxy asphalt is adopted, the components of an epoxy condensate are higher than those of the epoxy asphalt cementing material on the upper layer, and the ultrahigh viscosity modified asphalt material is the same as the stress absorbing layer.
The base layer is a common cement concrete pavement CC or continuous reinforced concrete CRCP, and mainly plays a role in structural bearing.
Example 1: the thickness of the epoxy asphalt drainage concrete surface layer is 30mm, EOGFC-13 warm-mixed epoxy asphalt mixture is adopted, the maximum nominal particle size is 16mm, the void ratio is 21.2%, the Marshall stability is 27.6kN, the flow value is 2.6, the structure depth is 1.12mm, the water seepage coefficient is 5253mL/min, the friction coefficient is 73, the dynamic stability is 16242 times/mm, the water immersion residual stability is 9.17%, the freeze-thaw cleavage residual strength ratio is 90.4%, and the low-temperature bending damage strain is 2800 mu (%) epsilon.
The oil-rich dense-graded asphalt concrete stress absorption layer FAC-10 is 10mm thick, the dynamic stability of the oil-rich dense-graded asphalt concrete stress absorption layer FAC-10 is 3580 times/mm, the residual stability of the oil-rich dense-graded asphalt concrete stress absorption layer FAC-10 is 88.3 percent, the Marshall stability of the oil-rich dense-graded asphalt concrete stress absorption layer FAC-10 is 11.6kN, the asphalt dosage is 6.5 percent, the passing rate below 0.075mm is 7.5 percent, and the content of 4.75-9.5mm accounts for 62 percent.
The bonding layer is epoxy asphalt bonding layer or ultrahigh viscosity modified asphalt, and epoxy asphalt bonding material is sprayed on the surface of clean and dry cement concrete, wherein the spraying amount is 0.6L/m2The shear strength reaches 2.565MPa, and the drawing strength reaches 0.867 MPa.
The base layer is a common cement concrete (PCC) pavement, the thickness is 280mm, the modulus reaches the bending tensile strength standard value and is 5MPa, and the surface of the cement concrete base layer needs to be subjected to a fine milling and planing or shot blasting roughening process so as to improve the friction coefficient between layers, enhance the mechanical connection between the epoxy asphalt bonding layer and the surface layer as well as the base layer and improve the capability of the tunnel stress absorption layer for resisting interlaminar shear and push damage.
The structure base layer, the surface treatment, the bonding layer and the oil-rich dense-graded asphalt concrete stress absorption layer are implemented according to the existing technical Specification for road asphalt pavement construction (JTG F40).
Epoxy asphalt is a chemically modified material, has allowable time limit in construction, and is greatly influenced by temperature. Therefore, the construction difficulty is high, and the application is limited. In addition, when the epoxy asphalt is not cured, the bonding strength is low, and the hidden danger that traffic damage cannot be interrupted during curing is large. Therefore, the key is to solve the construction and rapid curing of the epoxy asphalt, the construction process method adopts a post-mixing epoxy asphalt mixture construction process (ZL 201610910189.7), the quality risks of the links of mixing, loading, transporting, paving, waiting and the like of the epoxy asphalt are reduced, the risks of short curing reaction time, difficult quality in the mixing and transporting process, application and popularization limitation and the like of the epoxy asphalt mixture can be effectively solved, the construction difficulty is reduced, and the application limitation is reduced.

Claims (7)

1. A tunnel composite epoxy asphalt drainage pavement structure and a process method are characterized in that: the tunnel pavement structure comprises an epoxy asphalt drainage concrete surface layer (1), an oil-rich dense-graded asphalt concrete stress absorption (water sealing) layer (2), an epoxy asphalt bonding layer (3) and a base layer (4) which are sequentially arranged from top to bottom;
the upper surface layer of the epoxy asphalt drainage concrete is a high-strength, high-flexibility and fast-curing warm-mixed epoxy asphalt drainage mixture EOGFC-13 or EOGFC-16, post-mixing process construction is adopted, and the performance indexes are as follows: the stability is not less than 15KN, the immersion residual stability is not less than 85%, the freeze-thaw cleavage residual strength ratio (TSR) is not less than 80%, the rutting test dynamic stability is not less than 10000 times/mm, the low-temperature bending test destructive strain is not less than 2800 mu epsilon (winter cold zone)/2500 mu epsilon (winter cold zone and winter warm zone), the drainage coefficient (Marshall test piece) is not less than 0.2cm/s, the water permeability coefficient (rutting plate) is not less than 5000mL/min, and the curing strength of natural curing under the room temperature condition is not less than 8 kN;
the stress absorbing layer of the oil-rich dense-graded asphalt concrete is a framework compact type FAC-10 with the maximum nominal grain diameter of 9.5, the cementing material is a composite modified ultrahigh-viscosity modified asphalt material such as high polymer, tackifying resin, compatibilizer, high-softening-point natural asphalt and the like, the dynamic viscosity at 60 ℃ is more than 100 ten thousand Pa ∙ s, and the softening point is more than or equal to 95 ℃; the optimal oilstone ratio determined by the mixture oilstone comparison standard Marshall test method is 0.3-0.5%;
the bonding layer is an epoxy asphalt bonding layer or ultrahigh-viscosity modified asphalt, the mixing amount of an epoxy system of the epoxy asphalt bonding layer is higher than that of a binding material of epoxy asphalt drainage concrete, and the oil-rich dense-graded asphalt stress absorption layer cementing material of the ultrahigh-viscosity modified asphalt is the same as that of the ultrahigh-viscosity modified asphalt;
the base layer is ordinary cement concrete PCC or continuous reinforced concrete CRCP.
2. The tunnel composite epoxy asphalt drainage pavement structure and the process method according to claim 1, which are characterized in that: the epoxy asphalt drainage asphalt concrete is high-strength, high-flexibility and fast-curing warm-mixed epoxy asphalt EOGFC-13 or EOGFC-16, and the thickness of the epoxy asphalt drainage asphalt concrete is 20 mm-50 mm.
3. The tunnel composite epoxy asphalt drainage pavement structure and the process method according to claim 1, which are characterized in that: the stress absorbing layer of the oil-rich dense-graded asphalt mixture is composite ultrahigh-viscosity modified asphalt FAC-10, and the thickness of the stress absorbing layer is 10-20 mm.
4. The tunnel composite epoxy asphalt drainage pavement structure and the process method according to claim 1, which are characterized in that: the bonding layer is an epoxy asphalt bonding layer or ultrahigh viscosity modified asphalt, and the spreading amount is 4L/m2~0.6L/m2
5. The tunnel composite epoxy asphalt drainage pavement structure and the process method according to claim 1, which are characterized in that: the base layer is made of ordinary cement concrete PCC or continuous reinforced concrete CRCP, the thickness of the base layer is 220 mm-320 mm, and the surface of the base layer needs to be processed by a fine milling or shot blasting grinding process.
6. The tunnel composite epoxy asphalt drainage pavement structure and the process method according to claim 1, which are characterized in that: the epoxy asphalt drainage concrete process comprises the following steps:
(1) mixing and stirring matrix asphalt, a curing agent, a curing accelerator, an auxiliary agent and other modifiers according to a certain proportion at 110-140 ℃ for 20-30 min to obtain an epoxy asphalt B component;
(2) heating the epoxy asphalt B component, the aggregate with the maximum nominal particle size of 13.2mm or 16mm, the filler and the admixture which are prepared according to the proportion to 120-150 ℃ in a mixing station, dry-mixing for 5-15 seconds, and wet-mixing for 22-35 seconds to produce a warm-mixed epoxy asphalt B component mixture;
(3) when the mixture of the component B is transported to a field for spreading, adopting special spreading equipment DT series equipment which is designed by the large-width and segregation-resistant post-mixing method of the middle and large mechanical group Limited liability company in Shaanxi, adding the component A of the epoxy asphalt in a mist-like spraying manner according to the mass ratio of A: B (700-1300), and uniformly mixing for the second time;
(4) and paving, rolling and curing the mixture which is uniformly mixed for the second time, and finishing the construction of the tunnel road surface structure of the post-mixing warm-mixed epoxy asphalt EOGFC-13 or EOGFC-16 tunnel with the void ratio of 20-25%.
7. The tunnel composite epoxy asphalt drainage pavement structure and the process method according to claim 1, which are characterized in that: the epoxy asphalt binder comprises the following components in percentage by weight:
(1) respectively heating the component A, namely epoxy resin E51 or E44, and the component B, namely matrix asphalt, a curing agent, a curing accelerator and other modification aids to the temperature of (87 +/-3) DEG C and the temperature of (150 +/-3);
(2) and (3) uniformly mixing according to the mass ratio of 100 (300-500) to obtain the epoxy asphalt interlayer binding material.
CN202111102384.4A 2021-09-22 2021-09-22 Tunnel composite epoxy asphalt drainage pavement structure and process method Pending CN113699847A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111102384.4A CN113699847A (en) 2021-09-22 2021-09-22 Tunnel composite epoxy asphalt drainage pavement structure and process method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111102384.4A CN113699847A (en) 2021-09-22 2021-09-22 Tunnel composite epoxy asphalt drainage pavement structure and process method

Publications (1)

Publication Number Publication Date
CN113699847A true CN113699847A (en) 2021-11-26

Family

ID=78661335

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111102384.4A Pending CN113699847A (en) 2021-09-22 2021-09-22 Tunnel composite epoxy asphalt drainage pavement structure and process method

Country Status (1)

Country Link
CN (1) CN113699847A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114775356A (en) * 2022-04-24 2022-07-22 中交路桥建设有限公司 Implementation method of wear-resistant and skid-resistant tunnel cement concrete pavement
CN115075082A (en) * 2022-07-21 2022-09-20 中国极地研究中心(中国极地研究所) Method for increasing friction coefficient of ice and snow runway surface of polar region

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100823352B1 (en) * 2008-01-25 2008-04-17 (주)무량기술 Method for manufacturing mesophilic asphalt composition, low noise drainage and water-retaining modified asphalt concrete, and construction of colored asphalt pavement
CN101671991A (en) * 2009-08-10 2010-03-17 武汉理工大学 Method for paving combination paving layer for tunnel road surface
CN104652216A (en) * 2015-02-09 2015-05-27 南京同安道路工程有限公司 Water-discharging noise-lowering asphalt pavement structure of cement concrete bridge deck and laying process
CN106351102A (en) * 2016-10-19 2017-01-25 封基良 Construction technique of later-admixing-process epoxy asphalt mixture
CN212077528U (en) * 2020-04-08 2020-12-04 广西交通设计集团有限公司 Karst area porous asphalt concrete combined type tunnel pavement structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100823352B1 (en) * 2008-01-25 2008-04-17 (주)무량기술 Method for manufacturing mesophilic asphalt composition, low noise drainage and water-retaining modified asphalt concrete, and construction of colored asphalt pavement
CN101671991A (en) * 2009-08-10 2010-03-17 武汉理工大学 Method for paving combination paving layer for tunnel road surface
CN104652216A (en) * 2015-02-09 2015-05-27 南京同安道路工程有限公司 Water-discharging noise-lowering asphalt pavement structure of cement concrete bridge deck and laying process
CN106351102A (en) * 2016-10-19 2017-01-25 封基良 Construction technique of later-admixing-process epoxy asphalt mixture
CN212077528U (en) * 2020-04-08 2020-12-04 广西交通设计集团有限公司 Karst area porous asphalt concrete combined type tunnel pavement structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114775356A (en) * 2022-04-24 2022-07-22 中交路桥建设有限公司 Implementation method of wear-resistant and skid-resistant tunnel cement concrete pavement
CN115075082A (en) * 2022-07-21 2022-09-20 中国极地研究中心(中国极地研究所) Method for increasing friction coefficient of ice and snow runway surface of polar region

Similar Documents

Publication Publication Date Title
US9783940B2 (en) Structure and method of pavement on steel deck bridge
CN102173654B (en) Cold spraying type epoxy thin bridge deck paving material and preparation method thereof
CN101200873A (en) A pavement method for composite structure of resin poured asphalt concrete steel box girder bridge deck
CN101187193A (en) A semi-flexible drainage anti-skid noise reduction pavement structure
CN101913800A (en) Ultra-thin wearing layer asphalt concrete material for bridge deck pavement and preparation method thereof
CN111574109A (en) A kind of epoxy asphalt mastic crushed stone mixture suitable for airport pavement and preparation method thereof
CN103964751A (en) Epoxy mortar bridge floor thin layer paving material and preparation method thereof
CN110952447A (en) High-toughness, durable and anti-skid steel bridge deck pavement structure and construction method thereof
CN106320129A (en) Method for designing mix proportion of bituminous mixture for ultra-thin wearing course
CN113699847A (en) Tunnel composite epoxy asphalt drainage pavement structure and process method
CN110683792A (en) Modified asphalt and preparation method thereof, asphalt thin-layer pavement material and preparation method thereof
CN109594471B (en) Paving structure of steel bridge deck and construction method thereof
CN106592369A (en) Highway heavy load asphalt pavement
CN101654903A (en) Pavement structure of cement concrete bridge deck
CN113322743A (en) Epoxy modified cement pavement anti-skid wearing layer and construction method thereof
CN106168013B (en) Steel bridge deck pavement structure and pavement method thereof
CN205387650U (en) But split bituminous pavement structure that shears
CN103696366B (en) Pavement structure and pavement method of combined steel bridge deck
CN211848904U (en) Compound pouring type pavement structure
CN113235351B (en) Airport pavement structure and pavement method with asphalt layer on old cement airport runway
CN105463990B (en) steel bridge deck paving structure and method
CN106995302B (en) High-performance mixture and construction method thereof
CN112030658B (en) Preventive maintenance method for pavement
CN210104563U (en) Pavement structure of steel bridge deck
CN115369712A (en) An asphalt pavement structure for large and medium bridge decks on expressways

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination