CN113364120B - Method, device and equipment for checking control process of intelligent substation and storage medium - Google Patents
Method, device and equipment for checking control process of intelligent substation and storage medium Download PDFInfo
- Publication number
- CN113364120B CN113364120B CN202110623077.4A CN202110623077A CN113364120B CN 113364120 B CN113364120 B CN 113364120B CN 202110623077 A CN202110623077 A CN 202110623077A CN 113364120 B CN113364120 B CN 113364120B
- Authority
- CN
- China
- Prior art keywords
- prevention
- target
- intelligent substation
- interval
- prevention object
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 141
- 230000008569 process Effects 0.000 title claims abstract description 96
- 238000005259 measurement Methods 0.000 claims abstract description 95
- 238000012795 verification Methods 0.000 claims abstract description 4
- 230000009471 action Effects 0.000 claims description 2
- 241000272814 Anser sp. Species 0.000 description 40
- 230000006870 function Effects 0.000 description 17
- 238000004891 communication Methods 0.000 description 16
- 239000013307 optical fiber Substances 0.000 description 15
- 125000006850 spacer group Chemical group 0.000 description 11
- 238000012937 correction Methods 0.000 description 10
- 238000003745 diagnosis Methods 0.000 description 7
- 238000010586 diagram Methods 0.000 description 7
- 230000005540 biological transmission Effects 0.000 description 6
- 238000012423 maintenance Methods 0.000 description 5
- 238000012544 monitoring process Methods 0.000 description 4
- 230000002159 abnormal effect Effects 0.000 description 3
- 238000004458 analytical method Methods 0.000 description 3
- 230000006855 networking Effects 0.000 description 3
- 230000005856 abnormality Effects 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 230000009133 cooperative interaction Effects 0.000 description 2
- 238000001514 detection method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 229910052799 carbon Inorganic materials 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 230000008676 import Effects 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 238000010295 mobile communication Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000008707 rearrangement Effects 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 238000005070 sampling Methods 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000001228 spectrum Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00006—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment
- H02J13/00016—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using a wired telecommunication network or a data transmission bus
- H02J13/00017—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network characterised by information or instructions transport means between the monitoring, controlling or managing units and monitored, controlled or operated power network element or electrical equipment using a wired telecommunication network or a data transmission bus using optical fiber
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00032—Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
- H02J13/00034—Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving an electric power substation
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
- H02J13/00032—Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for
- H02J13/00036—Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving switches, relays or circuit breakers
- H02J13/0004—Systems characterised by the controlled or operated power network elements or equipment, the power network elements or equipment not otherwise provided for the elements or equipment being or involving switches, relays or circuit breakers involved in a protection system
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/16—Electric power substations
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
- Y04S40/12—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
- Y04S40/124—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wired telecommunication networks or data transmission busses
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Computer Networks & Wireless Communication (AREA)
- Selective Calling Equipment (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The invention discloses a method, a device, equipment and a storage medium for checking a control process of an intelligent substation. A method for checking a control process of an intelligent substation comprises the following steps: acquiring a station control layer message sent by a station control layer of an intelligent substation to an interval measurement and control device, and acquiring an interval remote control command; determining a target five-prevention object and an expected state of the target five-prevention object based on the interval remote control command; acquiring the five-prevention logic of the target five-prevention object based on the target five-prevention object and the expected state; acquiring process layer messages between an interval measurement and control device of an intelligent substation and five-prevention objects, and acquiring the current state of each five-prevention object; and judging whether the check passes according to the current state of each five-prevention object and the five-prevention logic. And judging whether the five-prevention logic setting of the target five-prevention object is correct or not by combining the five-prevention logic, thereby realizing the five-prevention logic verification of the target five-prevention object and improving the operation safety of the intelligent substation.
Description
Technical Field
The embodiment of the invention relates to an intelligent substation control technology, in particular to a method, a device, equipment and a storage medium for checking a control process of an intelligent substation.
Background
The intelligent substation adopts advanced, spectrum-dependent, integrated, low-carbon and environment-friendly intelligent equipment, and automatically performs basic functions such as information acquisition, measurement and calculation by taking total-station information digitization, communication platform networking and information sharing standardization as basic requirements.
In the working process of the intelligent transformer substation, various switches and disconnecting links arranged in the transformer substation need to be operated in a remote control mode, and therefore normal working regulation and control of the transformer substation are achieved. Problems of remote control locking, abnormal remote control outlet, abnormal switch or disconnecting link and the like often occur in the control process of the transformer substation, and the normal operation of the transformer substation is influenced. And the switch or the disconnecting link can be found to have the problems only after the operation, so that other related equipment is easily damaged, and the difficulty in maintenance is increased.
Disclosure of Invention
The invention provides a method, a device, equipment and a storage medium for checking a control process of an intelligent substation, which are used for timely finding out the five-prevention logic error problem in the operation process of the intelligent substation.
In a first aspect, an embodiment of the present invention provides a method for checking a control process of an intelligent substation, including:
the method comprises the steps that station control layer messages sent to an interval measurement and control device by a station control layer of an intelligent substation are obtained, and interval remote control commands are obtained, wherein the intelligent substation comprises a plurality of interval measurement and control devices, and each interval measurement and control device is correspondingly provided with a plurality of five-prevention objects;
determining a target five-prevention object and an expected state of the target five-prevention object based on the interval remote control command;
acquiring the five-prevention logic of the target five-prevention object based on the target five-prevention object and the expected state;
acquiring process layer messages between the interval measurement and control device of the intelligent substation and the five-prevention objects, and acquiring the current state of each five-prevention object;
and judging whether checking passes according to the current state of each five-prevention object and the five-prevention logic.
In a second aspect, an embodiment of the present invention further provides an apparatus for checking a control process of an intelligent substation, including:
the command acquisition module is used for acquiring station control layer messages sent to the interval measurement and control devices by a station control layer of the intelligent substation to acquire interval remote control commands, the intelligent substation comprises a plurality of interval measurement and control devices, and each interval measurement and control device is correspondingly provided with a plurality of five-prevention objects;
the expected state acquisition module is used for determining a target five-prevention object and an expected state of the target five-prevention object based on the interval remote control command;
a five-prevention logic acquisition module for acquiring the five-prevention logic of the target five-prevention object based on the target five-prevention object and the expected state;
the current state acquisition module is used for acquiring process layer messages between the interval measurement and control device of the intelligent substation and the five-prevention objects and acquiring the current state of each five-prevention object;
and the judging module is used for judging whether the check passes according to the current state of each five-prevention object and the five-prevention logic.
In a third aspect, an embodiment of the present invention further provides an intelligent substation control process checking device, where the device includes:
one or more processors;
a storage device to store one or more programs,
when executed by the one or more processors, cause the one or more processors to implement the intelligent substation control process checking method of the first aspect.
In a fourth aspect, an embodiment of the present invention further provides a storage medium containing computer-executable instructions, which when executed by a computer processor, are configured to perform the method for checking an intelligent substation control process according to the first aspect.
According to the method and the device, the interval remote control command is acquired from the station control layer message, the target five-prevention object required to be remotely controlled is further judged, the five-prevention logic corresponding to the target five-prevention object is determined, then the current state of each five-prevention object is acquired from the process layer message, and whether the five-prevention logic setting of the target five-prevention object is correct or not can be judged by combining the five-prevention logic, so that the five-prevention logic verification of the target five-prevention object is realized, the interval remote control command is prevented from being executed under the condition that the five-prevention logic of the target object is wrong or the current condition of the intelligent substation does not meet the interval remote control command, and the operation safety of the intelligent substation is improved.
Drawings
Fig. 1a is a flowchart of a checking method for a control process of an intelligent substation according to an embodiment of the present invention;
fig. 1b is a schematic diagram of a network structure of an intelligent substation according to an embodiment of the present invention;
fig. 2a is a flowchart of a method for checking a control process of an intelligent substation according to a second embodiment of the present invention;
fig. 2b is a network structure diagram of an intelligent substation according to a second embodiment of the present invention;
fig. 3 is a structural diagram of a checking device for a control process of an intelligent substation according to a third embodiment of the present invention;
fig. 4 is a structural diagram of a checking device in an intelligent substation control process according to a fourth embodiment of the present invention.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings and examples. It is to be understood that the specific embodiments described herein are merely illustrative of the invention and are not to be construed as limiting the invention. It should be further noted that, for the convenience of description, only some of the structures related to the present invention are shown in the drawings, not all of the structures.
In the embodiment of the invention, the intelligent transformer substation adopts advanced, reliable, integrated and environment-friendly intelligent equipment, and automatically completes basic functions such as information acquisition, measurement, control, protection, metering, detection and the like by taking total-station information digitization, communication platform networking and information sharing standardization as basic requirements, and meanwhile, has the transformer substation supporting advanced functions such as real-time automatic control, intelligent regulation, online analysis and decision making, cooperative interaction and the like of a power grid.
In the design and construction of the transformer substation, parts such as an incoming line, a main transformer high voltage, a main transformer low voltage, a main transformer, a low voltage outgoing line and the like are combined respectively, and each part is called as an interval. For example, the incoming line interval is formed by combining a line side grounding switch, a line side disconnecting link, a switch side grounding switch, a bus side disconnecting link and a bus grounding switch from a cable head at the end of a line, and all electrical equipment form the incoming line interval.
Five-prevention generally refers to that in order to ensure personal safety, five anti-misoperation functions are required for high-voltage electrical equipment, which are called for short, and are one of important measures for electric power safety.
The five-prevention system is main equipment for preventing misoperation of the transformer substation, ensures safe operation of the transformer substation and important equipment for preventing manual misoperation, and any normal switching operation must be subjected to simulation rehearsal and logic judgment of the five-prevention system, so that the five-prevention system is ensured to be complete and perfect, and power grid accidents can be greatly prevented and reduced. With the development of power grids, the power consumption of users is increasing day by day, the requirement on the reliability of power supply of the users is higher and higher, and the function of a five-prevention system is more important. The five-prevention concrete comprises: the circuit breakers are prevented from being opened and closed by mistake; the isolating switch is prevented from being switched on and off under load; prevent the electrified ground wire (earthing switch); preventing power transmission with ground wire; prevent the false entering of the charged interval. And the five-prevention logic is the interlocking logic relationship among all the devices set for realizing the five-prevention function.
Example one
Fig. 1a is a flowchart of a method for checking a control process of an intelligent substation according to an embodiment of the present invention, and fig. 1b is a schematic diagram of a network structure of the intelligent substation according to the embodiment of the present invention, where this embodiment is applicable to a situation of checking a five-prevention logic of the intelligent substation, and the method may be executed by a device for checking a control process of an intelligent substation, and specifically includes the following steps:
and 110, acquiring a station control layer message sent by a station control layer of the intelligent substation to the interval measurement and control device, and acquiring an interval remote control command.
In the embodiment of the invention, the intelligent substation comprises a plurality of interval measurement and control devices, and a plurality of five-prevention objects are correspondingly arranged below each interval measurement and control device.
The intelligent transformer substation adopts advanced, reliable, integrated and environment-friendly intelligent equipment, takes total station information digitization, communication platform networking and information sharing standardization as basic requirements, automatically completes basic functions of information acquisition, measurement, control, protection, metering, detection and the like, and simultaneously has advanced functions of supporting real-time automatic control, intelligent adjustment, on-line analysis decision, cooperative interaction and the like of a power grid. In an intelligent substation, traditional cable connection is not applied to engineering any more, but is replaced by an optical fiber cable, and a large number of electronic elements with high integration and low power consumption are used in various electronic devices.
The intelligent substation system is divided into 3 layers: a process layer, a spacer layer, and a station control layer. The process layer comprises intelligent equipment consisting of primary equipment and intelligent components, a merging unit and an intelligent terminal, and related functions of distribution, transformation, transmission, measurement, control, protection, metering, state monitoring and the like of the electric energy of the transformer substation are completed. The intelligent component is a flexibly configured physical device and can comprise one or more of a measuring unit, a control unit, a protection unit, a metering unit and a state monitoring unit. The bay level equipment generally refers to secondary equipment such as a relay protection device, a measurement and control device, a fault recording device and the like, and realizes the function of using data of one bay and acting on the bay primary equipment, namely, the bay level equipment is communicated with various remote input/output, intelligent sensors and controllers. The station control layer comprises subsystems such as an automation system, a station domain control system, a communication system and a time synchronization system, realizes measurement and control functions facing a whole station or more than one primary device, and completes related functions such as data acquisition and supervisory control (SCA-DA), operation locking, synchronous phasor acquisition, electric energy acquisition and protection information management.
In the embodiment of the invention, the station control layer refers to station control layer equipment of an intelligent substation automation system, the interval measurement and control device is interval layer equipment, and the five-prevention object is process layer equipment. Wherein, intelligent substation automation system station accuse layer equipment includes: the system comprises a monitoring host, a data communication gateway, a data server, a comprehensive application server, an operator station, an engineer workstation, a PMU data concentrator, a plan management terminal and the like; the spacer layer apparatus includes: a relay protection device, a measurement and control device, a fault recording device, a network recording analyzer, a stability and control device and the like; the process layer device includes: merging unit, intelligent terminal, intelligent component, switch etc..
The substation network can be logically divided into: station control layer network, interval layer network, and process layer network. The total station communication is composed of high-speed industrial Ethernet. The station control layer network is a network between the spacer layer equipment and the station control layer equipment, and realizes data transmission inside the station control layer and between the station control layer and the spacer layer; the process layer network is a network between the spacer layer equipment and the process layer equipment, and realizes data transmission between the spacer layer equipment and the process layer equipment; the communication between the devices in the interval layer can be mapped to a station control layer network physically, and also can be mapped to a process layer network physically.
The station control layer network equipment comprises a station control layer central switch and an interval switch. The central switch of the station control layer is connected with a data communication gateway machine, a monitoring host, a comprehensive application server, a data server and other equipment, and protection, measurement and control and other intelligent electronic equipment in the interval switch link interval. The interval switches and the central switches are connected into the same physical network through optical fibers. As mentioned above, the network communication protocol between the station control layer and the bay layer uses MMS, and is therefore also referred to as MMS network. The network can be divided into different logical segments, i.e. different channels, by dividing VLANs (virtual local area networks).
The process layer network comprises a GOOSE network and an SV network. GOOSE networks are used for status and control data exchange between spacer and process level devices. The GOOSE network is generally configured according to voltage class, double networks are adopted for voltage class above 220kV, and a GOOSE point-to-point communication mode is adopted between the protection device and the intelligent terminal at the interval. The SV network is used for transmitting sampling values between the spacing layer and the process layer equipment, and SV data is accessed between the protection device and the merging unit of the spacing layer in a point-to-point mode. Wherein, GOOSE network and SV network refer to two communication protocols commonly used in the power grid.
In the embodiment of the invention, the station control layer, the spacing layer and the process layer are interconnected through the messages of the MMS, GOOSE and SE protocols, the station control layer sends the control command to the spacing layer in the form of the MMS message, further sends the corresponding control command to the equipment of the process layer in the form of the GOOSE and SE messages through the spacing layer, and the process layer feeds back the state of the process layer to the spacing layer through the GOOSE and SE messages and further feeds back the state to the station control layer.
And step 120, determining the target five-prevention object and the expected state of the target five-prevention object based on the interval remote control command.
In the embodiment of the invention, the interval remote control command sent by the station control layer to the bay layer is a set of control commands for a plurality of interval measurement and control devices and five-prevention objects, that is, the control commands for a plurality of five-prevention objects are included in a single interval remote control command. In this step, it is necessary to determine the five-prevention object targeted in the interval remote control command as the target five-prevention object, and determine the expected state of each target five-prevention object, where the expected state refers to the specific content of the modification command for the target five-prevention object in the interval remote control command, that is, the state to which the target five-prevention object needs to be modified. For example: when the target fail-safe object is an electrical switch, the expected state of the corresponding electrical switch is an on state or an off state if the object has two states of on and off. It should be noted that the expected state is not related to the current state of the five-prevention object, but only to the interval remote control command issued by the station control layer to the interval layer. With the foregoing electrical switch, the present state may be an on state, and the expected state may be the same on state as the present state or an off state different from the present state.
And step 130, acquiring the five-prevention logic of the target five-prevention object based on the target five-prevention object and the expected state.
The five-prevention logic of the target five-prevention object refers to a logic relation formula of states which the other five-prevention objects which are key to the target five-prevention object need to be in when the target five-prevention object needs to be changed, and the target five-prevention object can be correctly placed in an expected state corresponding to the interval remote control command only when the other five-prevention objects meet the logic relation. In addition, the five-prevention logic of the target five-prevention object can have one or more pieces. For example: the electrical switch has at least one five-prevention logic corresponding to the on state and at least one five-prevention logic corresponding to the off state, and the on state and/or the off state may have other five-prevention logics besides the one five-prevention logic.
And 140, acquiring process layer messages between the interval measurement and control device of the intelligent substation and the five-prevention objects, and acquiring the current state of each five-prevention object.
In the embodiment of the invention, the five-prevention object of the intelligent substation sends the state of the five-prevention object to the interval measurement and control device and the station control layer at regular time or in response to the command of the interval measurement and control device and the station control layer, so that the current state of each five-prevention object can be obtained based on the process layer message sent by the five-prevention object.
For example, special information such as an address for characterizing the five-prevention object can be further included in the process layer message sent by the five-prevention object.
And 150, judging whether the check is passed according to the current state of each five-prevention object and the five-prevention logic.
By comparing the five-prevention logic of the target five-prevention object with the current state of each five-prevention object, whether the five-prevention logic of the target five-prevention object is correct can be judged.
According to the technical scheme, the interval remote control command is obtained from the station control layer message, the target five-prevention object required to be remotely controlled is further judged, the five-prevention logic corresponding to the target five-prevention object is determined, then the current state of each five-prevention object is obtained from the process layer message, and whether the five-prevention logic setting of the target five-prevention object is correct or not can be judged by combining the five-prevention logic, so that the five-prevention logic verification of the target five-prevention object is realized, the interval remote control command is prevented from being executed under the condition that the five-prevention logic of the target object is wrong or the current condition of the intelligent substation does not meet the interval remote control command, and the operation safety of the intelligent substation is improved.
Example two
Fig. 2 is a flowchart of a method for checking a control process of an intelligent substation according to a second embodiment of the present invention. The embodiment is a refinement based on the first embodiment, and describes in detail how to determine whether the five-prevention logic in the control process of the intelligent substation is wrong. The method specifically comprises the following steps:
step 201, importing a configuration description file of the intelligent substation.
The configuration description file of the intelligent Substation may be referred to as an SCD (Substation configuration description, SCD) file for short, and the Substation configuration description file describes each isolated intelligent electronic device in the intelligent Substation and a logical connection between each intelligent electronic device, and also describes example configurations and communication parameters of all the intelligent electronic devices, communication configurations between each intelligent electronic device, and a primary system structure of the Substation, and can completely describe how each isolated intelligent electronic device is integrated into a process of a Substation automation system with complete functions. Therefore, the substation configuration description file can be used as an important basis for the operation configuration of the secondary system of the substation, and in the reconstruction and extension project of the substation, the real-time control and analysis of the substation configuration description file can make more accurate judgment on the daily operation and fault diagnosis of the substation and perform maintenance operation on each electrical device and the secondary protection circuit in the substation in time.
The configuration description file contains information of the secondary device, and the information of the secondary device may include a device name, a device description, a manufacturer, a device model, a virtual terminal check code CRC, a model version, and the like. It should be noted that the secondary device is a device that is not directly connected with the electric energy in the substation, and is generally an auxiliary device that controls, protects, monitors, measures, and adjusts the operation of the primary device in the substation, and the primary device is a device used in a main system of power generation, transmission, and distribution in the substation, such as a generator, a transformer, a circuit breaker, a disconnector, a bus, a power cable, and a transmission line.
Step 202, acquiring index paths of each interval measurement and control device and the five-prevention object based on the configuration description file.
The information of each interval measurement and control device and the five-prevention object is recorded in a configuration description file of the intelligent substation, different interval measurement and control devices and different five-prevention objects correspond to different index paths in the configuration description file, and the index paths are unique.
In other embodiments, in addition to the index path, the identifier may be a unique identifier such as an equipment ID set for the interval measurement and control device and the five-prevention object.
And 203, acquiring a station control layer message sent by a station control layer of the intelligent substation to the interval measurement and control device.
In this embodiment, the specific explanatory contents refer to the step 110 portion in the first embodiment, consistent with the step 110 in the first embodiment.
The method for acquiring the station control layer message may be various, and a transfer device may be arranged between the station control layer and the interval measurement and control device for reading, or a method for reading from the station control layer or from the storage of the interval test device, and the like, which is not described herein in detail as long as the method for acquiring the station control layer message in the embodiment of the present invention can be implemented.
And step 204, respectively acquiring corresponding interval remote control commands based on each index path and the station control layer messages.
In the embodiment of the invention, a station control layer message sent by a station control layer contains interval remote control commands for a plurality of interval measurement and control devices and five-prevention objects, different parts in the station control layer message correspond to different index paths, namely, different parts correspond to different interval measurement and control devices and five-prevention objects, and in the step, the interval remote control commands for different interval measurement and control devices and five-prevention objects need to be distinguished and extracted. The index path generation here refers to the index paths of all five-prevention objects and the interval measurement and control devices.
Step 205, determining an index path of the interval remote control command.
In this step, the determination of the index path may be performed according to an interval remote control command in the station control layer, or may be performed from the database after determining a five-prevention object corresponding to the interval remote control command, where the obtaining manner is not specifically limited.
The index path generation here refers to an index path of a five-prevention object corresponding to the interval remote control command.
And step 206, determining the active five-prevention object based on the index path as a target five-prevention object.
In the foregoing steps, the index path of the five-prevention object targeted by the interval remote control command is determined, so that the specific five-prevention object targeted by the specific interval remote control command can be acquired, and the set of the specific five-prevention object is taken as the target five-prevention object. The index path generation here refers to an index path of a five-prevention object corresponding to an interval remote control command.
And step 207, determining an interval remote control command of each target five-prevention object based on the index path.
The index path generation here refers to an index path of a five-prevention object corresponding to the interval remote control command, and the interval remote control command is associated with an index path of a target five-prevention object.
And 208, correspondingly extracting the remote control instruction of the target five-prevention object from the interval remote control command of each target five-prevention object, and determining the expected state of the target five-prevention object.
In this embodiment, the obtaining manner of the expected state of the target five-prevention object is the same as that of step 120 in the first embodiment, and details are not repeated here, and specific explanatory contents refer to the step 120 in the first embodiment.
And step 209, determining an index path of the target five-prevention object. The index path is an index path of the target five-prevention object, and the index path is obtained by taking the target five-prevention object as a keyword.
And step 210, extracting the five-prevention logic of the target five-prevention object from a preset database by taking the index path and the expected state as keywords.
In the embodiment of the invention, a five-prevention logic library with five-prevention objects is constructed in advance, and all that is needed in the step is to extract corresponding five-prevention logic from the five-prevention logic library.
The pre-construction of the five-prevention logic library of the five-prevention objects can be realized by constructing a database, extracting an index path of each five-prevention object from an SCD (substation configuration description) file of the intelligent substation, determining all working states of each five-prevention object, confirming the association relation of each five-prevention object from the SCD file, and editing and storing the five-prevention logic of each working state of each five-prevention object by a management and maintenance worker of the intelligent substation. At this time, it should be noted that there may be more than one five-prevention logic for each five-prevention object, and at this time, all the five-prevention logics need to be listed and filled in the database.
Typical interval objects which can be specifically established in the database comprise line intervals, main transformer intervals, bus coupling subsection intervals and switch intervals. The attributes of the interval object comprise an interval type, a voltage level and a wiring type. And establishing five-prevention objects including a switch, a disconnecting link, a grounding switch and an analog quantity in each typical interval. And establishing a five-prevention logical relationship of each five-prevention object, wherein the five-prevention logical relationship comprises the states which are currently met by other five-prevention objects when each five-prevention object is converted from the current state to the next expected state.
The line interval of 110kV single bus connection is taken as an example for explanation, and a line interval object is established in a database, wherein the attributes of the line interval object comprise that the interval type is a line, the voltage class is 110kV, and the connection type is single bus connection. And then establishing a five-prevention object in the line interval object, wherein the five-prevention object comprises a bus side disconnecting link, a bus side grounding knife, a switch side grounding knife, a switch side disconnecting link, a line side grounding knife, a line current analog quantity and a bus voltage analog quantity. And then establishing a five-prevention logic for switching on the switch, wherein if the current state of the line switch is in an open position and the expected state is in a closed position, the five-prevention logic for switching on the line switch is that the adjacent side disconnecting links are in the closed position or in the open position, and the five-prevention logic can be described as follows: line switch closing = (busbar side disconnecting link = =1& & switching side disconnecting link = = 1) | (busbar side disconnecting link = =0& & switching side disconnecting link = = 0). Therefore, five-prevention check logic of other interval types such as main transformer intervals, bus-coupled subsection intervals, switch intervals and the like can be established similarly.
And step 211, acquiring process layer messages between the interval measurement and control device of the intelligent substation and the five-prevention objects, and acquiring the current state of each five-prevention object.
The intelligent substation adopts message form to communicate among the station control layer, the spacer layer and the process layer, the station control layer communicates with the spacer layer through MMS message, and the spacer layer communicates with the process layer through GOOSE message and SV message. The spacer layer mainly refers to a spacing measurement and control device, and the process layer mainly refers to a five-prevention object. In the embodiment of the invention, the process layer message between the interval measurement and control device and the five-prevention object needs to be acquired, and then the process layer message is analyzed, so that the self state feedback message sent by each five-prevention object to the interval measurement and control device is acquired, and the current state of each five-prevention object is determined.
And step 212, acquiring a remote control permission signal sent by the interval measurement and control device from the process layer message.
When the interval measurement and control device makes a control command on the five-prevention object, a remote control permission signal is required to be output to the five-prevention object, and the remote control permission signal can represent that remote control is permitted or prohibited, so that whether the five-prevention object responds to a received process layer signal or not is controlled, the reliability of the action of the five-prevention object is effectively improved, misoperation is avoided, and the like.
And step 213, judging whether the check is passed according to the current state of each five-prevention object, the remote control permission signal and the five-prevention logic.
And finally, acquiring the five-prevention logic of the target five-prevention object, and the remote control permission signal and the current state of each five-prevention object sent by the interval measurement and control device in the previous step, so that whether the remote control permission signal and the current state of each five-prevention object accord with the five-prevention logic of the target five-prevention object or not can be judged, and whether the check passes or not can be judged.
Optionally, when the current state of each five-prevention object meets the five-prevention logic and the remote control permission signal is in a permission state, judging that the checking is passed;
when the current state of at least one five-prevention object does not meet the five-prevention logic and the remote control permission signal is in a forbidden state, judging that the checking is passed;
when the current state of each five-prevention object meets the five-prevention logic and the remote control permission signal is in a forbidden state, judging that the checking does not pass;
and when the current state of at least one five-prevention object does not meet the five-prevention logic and the remote control permission signal is in a permission state, judging that the checking does not pass.
Optionally, a corresponding warning signal may be sent out after the judgment that the check fails, so as to prompt a maintenance worker to check the abnormal operation of the intelligent substation in time.
Further, in an optional embodiment, the position where the abnormality occurs may be determined, so as to further facilitate maintenance personnel to maintain the intelligent substation.
The information sent by the five-prevention object (intelligent terminal) to the interval measurement and control device specifically comprises a five-prevention object GOOSE return correction signal, a five-prevention object outlet relay recovery GOOSE signal, a corresponding interval switch position signal and a corresponding interval disconnecting link position signal.
When the diagnosis device checks the interval five-prevention logic operation correctly, an MMS remote control switch-on command sent by a station control layer is received, a GOOSE remote control switch-off outlet signal sent by an interval measurement and control device through a process layer optical fiber loop and a GOOSE remote control permission/prohibition signal of a related remote control object are received, a GOOSE return correction signal and an outlet relay return signal sent by the five-prevention object to the interval measurement and control device are received, and meanwhile, a GOOSE signal of a switch knife switch position and a remote control reverse correction result and a switch knife switch position signal which are fed back to the station control layer by the interval measurement and control device through an MMS message through a station control layer network are received, so that the situation that the interval five-prevention logic configuration, the switch, the knife switch, the secondary cable loop, the process layer optical fiber loop and the five-prevention object of the interval measurement and control device have no problems is judged;
when the diagnosis device checks the interval five-prevention logic operation correctly, an MMS remote control switch-on command sent by a station control layer is received, but a GOOSE remote control switch-off outlet signal sent by the interval measurement and control device through a process layer optical fiber loop and a GOOSE remote control permission/prohibition signal of a related remote control object are not received, and the positioning fault is caused by the interval five-prevention logic configuration error of the interval measurement and control device;
when the diagnosis device checks the interval five-prevention logic operation correctly, an MMS remote control switch-on command sent by a station control layer is received, a GOOSE remote control switch-off outlet signal sent by the interval measurement and control device through a process layer optical fiber loop and a GOOSE remote control permission/prohibition signal of a related remote control object are received, but a GOOSE return correction signal sent by the five-prevention object to the interval measurement and control device is not received, and then a fault area is positioned to be a five-prevention object or a process layer optical fiber loop;
when the diagnosis device checks the interval five-prevention logic operation correctly, an MMS remote control switch-on command sent by a station control layer is received, a GOOSE remote control switch-on/off outlet signal sent by the interval measurement and control device through a process layer optical fiber loop and a GOOSE remote control enable/disable signal of a related remote control object are received, a GOOSE return correction signal sent by the five-prevention object to the interval measurement and control device is received, and an outlet relay return signal of the five-prevention object is not received, so that a fault area is positioned as the five-prevention object;
when the diagnosis device checks the interval five-prevention logic operation correctly, an MMS remote control switch-on command sent by a station control layer is received, a GOOSE remote control opening and closing outlet signal sent by an interval measurement and control device through a process layer optical fiber loop and a GOOSE remote control permission/prohibition signal of a related remote control object are received, a GOOSE return correction signal and an outlet relay return signal sent by the five-prevention object to the interval measurement and control device are received, and a switch disconnecting link position GOOSE signal is not received, so that a fault area is positioned to be a secondary cable loop or a switch disconnecting link device;
when the diagnosis device checks the interval five-prevention logic operation correctly, an MMS remote control switch-on command sent by a station control layer is received, a GOOSE remote control switch-off outlet signal sent by an interval measurement and control device through a process layer optical fiber loop and a GOOSE remote control permission/prohibition signal of a related remote control object are received, a GOOSE return correction signal and an outlet relay return signal sent by the five-prevention object to the interval measurement and control device are received, a GOOSE signal of a switch knife-switch position is received, and a fault area is positioned to be the interval measurement and control device or the station control layer network if the interval measurement and control device receives a remote control reverse correction result and the switch knife-switch position signal which are fed back to the station control layer by the station control layer network through an MMS message;
as shown in fig. 4, under normal conditions, after receiving an MMS remote control switch-on command, the interval measurement and control device performs interval five-prevention logic operation inside the interval measurement and control device, and when the states of the five-prevention objects all meet the interval five-prevention logic, the interval measurement and control device sends a GOOSE remote control switch-on outlet signal and a GOOSE remote control enable/disable signal of the associated remote control object to the five-prevention objects through the process layer optical fiber loop. The five-prevention object can send GOOSE return correction signals to the interval measurement and control device after receiving GOOSE signals sent by the interval measurement and control device, meanwhile, the five-prevention object can drive the remote control opening and closing outlet relay and the five-prevention interlocking outlet relay to control the state of a switch or a disconnecting link through a secondary cable loop, send outlet relay return signals to the interval measurement and control device through a process layer optical fiber loop, then collect the state of the switch or the disconnecting link through the secondary cable loop, and send switch disconnecting link position signals to the interval measurement and control device in a GOOSE form through the process layer optical fiber loop. And finally, feeding back the remote control anti-calibration result and the switch disconnecting link position to the station control layer through the station control layer network by the interval measurement and control device through MMS messages.
When an abnormality occurs, if the diagnostic device receives a GOOSE remote control switch-on outlet signal and a GOOSE remote control enable/disable signal of a related remote control object which are sent by the interval measurement and control device through the process layer optical fiber loop, but does not receive a GOOSE return correction signal sent by the five-prevention object after receiving the GOOSE signal sent by the interval measurement and control device, the fault area can be positioned as the five-prevention object or the process layer optical fiber loop.
EXAMPLE III
Fig. 3 is a structural diagram of a checking device for a control process of an intelligent substation according to a third embodiment of the present invention. The device comprises: the system comprises a command acquisition module 301, an expected state acquisition module 302, a five-prevention logic acquisition module 303, a current state acquisition module 304 and a judgment module 305. Wherein:
the command acquisition module 301 is configured to acquire a station control layer message sent by a station control layer of an intelligent substation to an interval measurement and control device, and acquire an interval remote control command, where the intelligent substation includes multiple interval measurement and control devices, and each interval measurement and control device is provided with multiple five-prevention objects correspondingly;
an expected state acquisition module 302, configured to determine a target five-prevention object and an expected state of the target five-prevention object based on an interval remote control command;
a five-prevention logic obtaining module 303, configured to obtain a five-prevention logic of the target five-prevention object based on the target five-prevention object and the expected state;
a current state acquisition module 304, configured to acquire a process layer message between an interval measurement and control device of an intelligent substation and a five-prevention object, and acquire a current state of each five-prevention object;
and the judging module 305 is configured to judge whether the check passes according to the current state of each five-prevention object and the five-prevention logic.
Before the command obtaining module 301 obtains a station control layer message sent from a station control layer of the intelligent substation to the interval measurement and control device and obtains an interval remote control command, the method further includes:
the import module is used for importing the configuration description file of the intelligent substation;
and the index path acquisition module is used for acquiring the index paths of each interval measurement and control device and the five-prevention object based on the configuration description file.
The command acquisition module 301 includes:
the station control message acquisition unit is used for acquiring a station control layer message sent to the interval measurement and control device by a station control layer of the intelligent substation;
and the command acquisition unit is used for respectively acquiring corresponding interval remote control commands based on each index path and the station control layer messages.
The expected state acquisition module 302 includes:
a first index path determination unit for determining an index path of an interval remote control command;
the target five-prevention object determining unit is used for determining a five-prevention object with an effect based on the index path as a target five-prevention object;
the remote control command determining unit is used for determining an interval remote control command of each target five-prevention object based on the index path;
and the expected state determining unit is used for correspondingly extracting the remote control instruction of the target five-prevention object from the interval remote control command of each target five-prevention object and determining the expected state of the target five-prevention object.
The five-prevention logic acquisition module 303 includes:
the first index path determining unit is used for determining an index path of the target five-prevention object;
and the five-prevention logic extraction unit is used for extracting the five-prevention logic of the target five-prevention object from a preset database by taking the index path and the expected state as key words.
The determining module 305 includes:
the checking passing unit is used for judging that the checking passes when the current state of the five-prevention object meets the five-prevention logic;
and the checking non-passing unit is used for judging that the checking is not passed when the current state of the five-prevention object does not meet the five-prevention logic.
Optionally, before the determining module 305, the method further includes:
the remote control permission signal acquisition unit is used for acquiring a remote control permission signal sent by the interval measurement and control device from the process layer message;
then, the determining module 305 includes:
when the current state of each five-prevention object meets the five-prevention logic and the remote control permission signal is in a permission state, judging that the checking is passed;
when the current state of at least one five-prevention object does not meet the five-prevention logic and the remote control permission signal is in a forbidden state, judging that the checking is passed;
when the current state of each five-prevention object meets the five-prevention logic and the remote control permission signal is in a forbidden state, judging that the check does not pass;
and when the current state of at least one five-prevention object does not meet the five-prevention logic and the remote control permission signal is in a permission state, judging that the checking does not pass.
The intelligent substation control process checking device provided by the embodiment of the invention can execute the intelligent substation control process checking method provided by any embodiment of the invention, and has corresponding functional modules and beneficial effects of the execution method.
Example four
Fig. 4 is a structural diagram of a checking device in an intelligent substation control process according to a fourth embodiment of the present invention. As shown in fig. 4, the electronic apparatus includes a processor 40, a memory 41, a communication module 42, an input device 43, and an output device 44; the number of the processors 40 in the electronic device may be one or more, and one processor 40 is taken as an example in fig. 4; the processor 40, the memory 41, the communication module 42, the input device 43 and the output device 44 in the electronic apparatus may be connected by a bus or other means, and the connection by the bus is exemplified in fig. 4.
The memory 41 is used as a computer-readable storage medium, and can be used for storing software programs, computer-executable programs, and modules, such as modules corresponding to an intelligent substation control process checking method in this embodiment (for example, a command obtaining module 301, an expected state obtaining module 302, a five-prevention logic obtaining module 303, a current state obtaining module 304, and a determining module 305 in an intelligent substation control process checking apparatus). The processor 40 executes various functional applications and data processing of the electronic device by running software programs, instructions and modules stored in the memory 41, so as to implement the above-mentioned method for checking the control process of the intelligent substation.
The memory 41 may mainly include a storage program area and a storage data area, wherein the storage program area may store an operating system, an application program required for at least one function; the storage data area may store data created according to use of the electronic device, and the like. Further, the memory 41 may include high speed random access memory, and may also include non-volatile memory, such as at least one magnetic disk storage device, flash memory device, or other non-volatile solid state storage device. In some examples, memory 41 may further include memory located remotely from processor 40, which may be connected to electronic devices over a network. Examples of such networks include, but are not limited to, the internet, intranets, local area networks, mobile communication networks, and combinations thereof.
And the communication module 42 is used for establishing connection with the display screen and realizing data interaction with the display screen. The input device 43 may be used to receive input numeric or character information and to generate key signal inputs relating to user settings and function controls of the electronic apparatus.
The electronic device provided by this embodiment of the present invention can perform the method for checking the control process of the intelligent substation provided by any embodiment of the present invention, and has corresponding functions and advantages.
EXAMPLE five
An embodiment of the present invention further provides a storage medium containing computer-executable instructions, where the computer-executable instructions are executed by a computer processor to perform a method for checking a control process of an intelligent substation, and the method includes:
the method comprises the steps that a station control layer message sent to an interval measurement and control device by a station control layer of the intelligent substation is obtained, an interval remote control command is obtained, the intelligent substation comprises a plurality of interval measurement and control devices, and each interval measurement and control device is correspondingly provided with a plurality of five-prevention objects;
determining a target five-prevention object and an expected state of the target five-prevention object based on the interval remote control command;
acquiring the five-prevention logic of the target five-prevention object based on the target five-prevention object and the expected state;
acquiring process layer messages between an interval measurement and control device of an intelligent substation and five-prevention objects, and acquiring the current state of each five-prevention object;
and judging whether the check passes according to the current state of each five-prevention object and the five-prevention logic.
Of course, the storage medium including the computer-executable instructions provided in the embodiments of the present invention is not limited to the method operations described above, and may also perform related operations in the method for checking the control process of the intelligent substation provided in any embodiment of the present invention.
From the above description of the embodiments, it is obvious for those skilled in the art that the present invention can be implemented by software and necessary general hardware, and certainly, can also be implemented by hardware, but the former is a better embodiment in many cases. Based on such understanding, the technical solutions of the present invention may be embodied in the form of a software product, which can be stored in a computer-readable storage medium, such as a floppy disk, a Read-only Memory (ROM), a Random Access Memory (RAM), a FLASH Memory (FLASH), a hard disk or an optical disk of a computer, and includes instructions for enabling a computer electronic device (which may be a personal computer, a server, or a network electronic device) to execute the methods according to the embodiments of the present invention.
It should be noted that, in the embodiment of the apparatus for checking the control process of the intelligent substation, each unit and each module included in the apparatus are only divided according to functional logic, but are not limited to the above division, as long as the corresponding function can be implemented; in addition, specific names of the functional units are only for convenience of distinguishing from each other, and are not used for limiting the protection scope of the present invention.
It is to be noted that the foregoing is only illustrative of the preferred embodiments of the present invention and the technical principles employed. It will be understood by those skilled in the art that the present invention is not limited to the particular embodiments described herein, but is capable of various obvious changes, rearrangements and substitutions as will now become apparent to those skilled in the art without departing from the scope of the invention. Therefore, although the present invention has been described in greater detail by the above embodiments, the present invention is not limited to the above embodiments, and may include other equivalent embodiments without departing from the spirit of the present invention, and the scope of the present invention is determined by the scope of the appended claims.
Claims (10)
1. A method for checking a control process of an intelligent substation is characterized by comprising the following steps:
the method comprises the steps that station control layer messages sent to an interval measurement and control device by a station control layer of an intelligent substation are obtained, and interval remote control commands are obtained, wherein the intelligent substation comprises a plurality of interval measurement and control devices, and each interval measurement and control device is correspondingly provided with a plurality of five-prevention objects;
determining a target five-prevention object and an expected state of the target five-prevention object based on the interval remote control command;
acquiring the five-prevention logic of the target five-prevention object based on the target five-prevention object and the expected state;
acquiring process layer messages between the interval measurement and control device of the intelligent substation and the five-prevention objects, and acquiring the current state of each five-prevention object;
judging whether checking passes according to the current state of each five-prevention object and the five-prevention logic;
wherein the determining whether checking passes according to the current state of each five-prevention object and the five-prevention logic comprises:
when the current state of each five-prevention object meets the five-prevention logic and a remote control permission signal is in a permission state, judging that the checking is passed;
when the current state of at least one five-prevention object does not meet the five-prevention logic and the remote control permission signal is in a forbidden state, judging that checking is passed;
when the current state of each five-prevention object meets the five-prevention logic and the remote control permission signal is in a forbidden state, judging that the checking does not pass;
and when the current state of at least one five-prevention object does not meet the five-prevention logic and the remote control permission signal is in a permission state, judging that the checking does not pass.
2. The method for checking the control process of the intelligent substation according to claim 1, wherein before the obtaining of the station control layer message sent by the station control layer of the intelligent substation to the interval measurement and control device and the obtaining of the interval remote control command, the method further comprises:
importing a configuration description file of the intelligent substation;
and acquiring the index paths of each interval measurement and control device and the five-prevention object based on the configuration description file.
3. The method for checking the control process of the intelligent substation according to claim 2, wherein the step of obtaining a station control layer message sent by a station control layer of the intelligent substation to the interval measurement and control device to obtain an interval remote control command comprises:
acquiring a station control layer message sent by a station control layer of an intelligent substation to an interval measurement and control device;
and respectively acquiring corresponding interval remote control commands based on the index paths and the station control layer messages.
4. The intelligent substation control process check method of claim 2, wherein the determining a target five-prevention object and an expected state of the target five-prevention object based on the bay remote control command comprises:
determining the index path of the interval remote control command;
determining the five-prevention object of action based on the index path as a target five-prevention object;
determining the interval remote control command of each target five-prevention object based on the index path;
correspondingly extracting a remote control instruction of the target five-prevention object from the interval remote control command of each target five-prevention object, and determining the expected state of the target five-prevention object.
5. The intelligent substation control process verification method of claim 2, wherein the obtaining five-prevention logic of the target five-prevention object based on the target five-prevention object and the expected state comprises:
determining the index path of the target five-prevention object;
and extracting the five-prevention logic of the target five-prevention object from a preset database by taking the index path and the expected state as key words.
6. The intelligent substation control process checking method according to claim 1, wherein the judging whether the checking passes according to the current state of each five-prevention object and the five-prevention logic comprises:
when the current state of the five-prevention object meets the five-prevention logic, judging that the checking is passed;
and when the current state of the five-prevention object does not meet the five-prevention logic, judging that the checking does not pass.
7. The intelligent substation control process checking method according to claim 6, wherein before the determining whether checking passes according to the current state of each five-prevention object and the five-prevention logic, the method further comprises:
and acquiring a remote control permission signal sent by the interval measurement and control device from the process layer message.
8. The utility model provides an intelligent substation control process check device which characterized in that includes:
the command acquisition module is used for acquiring station control layer messages sent to the interval measurement and control devices by a station control layer of the intelligent substation to acquire interval remote control commands, the intelligent substation comprises a plurality of interval measurement and control devices, and each interval measurement and control device is correspondingly provided with a plurality of five-prevention objects;
the expected state acquisition module is used for determining a target five-prevention object and an expected state of the target five-prevention object based on the interval remote control command;
a five-prevention logic acquisition module for acquiring the five-prevention logic of the target five-prevention object based on the target five-prevention object and the expected state;
the current state acquisition module is used for acquiring process layer messages between the interval measurement and control device of the intelligent substation and the five-prevention objects and acquiring the current state of each five-prevention object;
the judging module is used for judging whether checking passes or not according to the current state of each five-prevention object and the five-prevention logic;
wherein the determining whether checking passes according to the current state of each of the five-prevention objects and the five-prevention logic comprises:
when the current state of each five-prevention object meets the five-prevention logic and a remote control permission signal is in a permission state, judging that checking is passed;
when the current state of at least one five-prevention object does not meet the five-prevention logic and the remote control permission signal is in a forbidden state, judging that checking is passed;
when the current state of each five-prevention object meets the five-prevention logic and the remote control permission signal is in a forbidden state, judging that the checking does not pass;
and when the current state of at least one five-prevention object does not meet the five-prevention logic and the remote control permission signal is in a permission state, judging that the checking does not pass.
9. An intelligent substation control process check device, characterized in that the device includes:
one or more processors;
a storage device for storing one or more programs,
when executed by the one or more processors, cause the one or more processors to implement the intelligent substation control process checking method of any one of claims 1-7.
10. A storage medium containing computer executable instructions for performing the intelligent substation control process checking method of any one of claims 1 to 7 when executed by a computer processor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110623077.4A CN113364120B (en) | 2021-06-04 | 2021-06-04 | Method, device and equipment for checking control process of intelligent substation and storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110623077.4A CN113364120B (en) | 2021-06-04 | 2021-06-04 | Method, device and equipment for checking control process of intelligent substation and storage medium |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113364120A CN113364120A (en) | 2021-09-07 |
CN113364120B true CN113364120B (en) | 2023-01-20 |
Family
ID=77532027
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110623077.4A Active CN113364120B (en) | 2021-06-04 | 2021-06-04 | Method, device and equipment for checking control process of intelligent substation and storage medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113364120B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113809826B (en) * | 2021-09-10 | 2024-05-03 | 广东电网有限责任公司 | Switching control system and method for transformer substation |
CN114123192A (en) * | 2021-11-30 | 2022-03-01 | 广东电网有限责任公司 | Method, system, equipment and medium for checking the running state of busbar in power grid plants and stations |
CN115102289B (en) * | 2022-07-22 | 2024-07-05 | 国网江苏省电力有限公司电力科学研究院 | Control method, system, computer readable storage medium and computing device for realizing unique remote control right of intelligent substation |
CN115883414B (en) * | 2022-12-05 | 2024-07-09 | 南方电网科学研究院有限责任公司 | Network testing method, device, equipment and storage medium |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101776913A (en) * | 2009-12-25 | 2010-07-14 | 广东电网公司电力科学研究院 | Five-prevention logic testing method and system of transformer substation |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101887269B (en) * | 2010-05-26 | 2012-05-23 | 广东电网公司电力科学研究院 | Five-prevention logic test method and system for 61850 transformer substation |
CN103928985B (en) * | 2014-04-09 | 2015-10-28 | 国家电网公司 | Based on the connection latching logic automatic testing method of GOOSE communication mechanism |
CN104037937B (en) * | 2014-05-05 | 2016-12-28 | 中国南方电网有限责任公司电网技术研究中心 | Analog simulation intelligent substation measurement and control device |
CN105388370B (en) * | 2015-10-16 | 2018-08-14 | 中国电力科学研究院 | A kind of substation's wall connection latching logic automated closed-loop test method |
CN105656202A (en) * | 2016-01-27 | 2016-06-08 | 江苏省电力公司检修分公司 | Measurement and control five-prevention operation device for reducing unlocking frequency of five-prevention system of substation |
CN111585343B (en) * | 2020-05-09 | 2021-11-30 | 中国南方电网有限责任公司 | Equipment five-prevention control method, system, device, computer equipment and storage medium |
-
2021
- 2021-06-04 CN CN202110623077.4A patent/CN113364120B/en active Active
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101776913A (en) * | 2009-12-25 | 2010-07-14 | 广东电网公司电力科学研究院 | Five-prevention logic testing method and system of transformer substation |
Also Published As
Publication number | Publication date |
---|---|
CN113364120A (en) | 2021-09-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN113364120B (en) | Method, device and equipment for checking control process of intelligent substation and storage medium | |
EP3301784B1 (en) | Intelligent power server applied to protection and control system for intelligent substation | |
CN104716745B (en) | A kind of Topology g eneration method and its system towards distribution power automation terminal | |
CN108931972A (en) | A kind of substation secondary device condition intelligent diagnostic method based on model-driven | |
CN102447305B (en) | Topological anti-misoperation system for power grid | |
CN103414251A (en) | Substation network communication simulation system based on IEC 61850 | |
CN104283215A (en) | A detection test method and device for an intelligent distributed power distribution terminal | |
CN111458586B (en) | Batch synchronization detection method and system for multi-interval localized line protection devices in smart substations | |
CN107255761A (en) | Intelligent substation closed loop test system based on GOOSE network | |
CN111917179B (en) | Real-time online misoperation prevention system of transformer substation based on multimode internet of things | |
CN111276929B (en) | Information recording method for fault expert diagnosis of power system | |
CN109633345B (en) | Secondary equipment on-line monitoring and analyzing device | |
CN111327474B (en) | Power system fault diagnosis method based on topology analysis | |
CN206920532U (en) | Intelligent substation closed loop test system based on GOOSE network | |
CN104991525A (en) | Electric power automatic control system | |
CN107478922A (en) | Intelligent substation closed loop test method based on GOOSE network | |
Altaher et al. | Reliability investigation of digital substation networks design using fmea technique | |
Zhang et al. | Summary of research on error prevention technology of secondary safety measures in smart substations | |
Xiaolong et al. | Research on Integrated Smart Preventing Mal-Operation System of Intelligent Substation [J] | |
CN105633960A (en) | Multi-adaptive black-start apparatus | |
CN111323676A (en) | Fault diagnosis expert system for power system | |
CN204536868U (en) | Power auto-control system | |
Li et al. | The analysis and research of the programming operation based on substation equipment status | |
CN115051475B (en) | Multi-terminal closed-loop joint debugging system and method based on analog state device | |
CN220156284U (en) | Station service power switching system for providing standby power for multiple generator sets |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |