[go: up one dir, main page]

CN113294126A - Natural gas hydrate combined mining method and device for stabilizing stratum - Google Patents

Natural gas hydrate combined mining method and device for stabilizing stratum Download PDF

Info

Publication number
CN113294126A
CN113294126A CN202110627142.0A CN202110627142A CN113294126A CN 113294126 A CN113294126 A CN 113294126A CN 202110627142 A CN202110627142 A CN 202110627142A CN 113294126 A CN113294126 A CN 113294126A
Authority
CN
China
Prior art keywords
well
production
gas
horizontal section
hydrate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110627142.0A
Other languages
Chinese (zh)
Other versions
CN113294126B (en
Inventor
欧芬兰
许振强
于彦江
李彬
申凯翔
史浩贤
陈靓
于浩雨
黄芳飞
宁波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Marine Geological Survey
Original Assignee
Guangzhou Marine Geological Survey
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Marine Geological Survey filed Critical Guangzhou Marine Geological Survey
Priority to CN202110627142.0A priority Critical patent/CN113294126B/en
Publication of CN113294126A publication Critical patent/CN113294126A/en
Application granted granted Critical
Publication of CN113294126B publication Critical patent/CN113294126B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/01Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/70Combining sequestration of CO2 and exploitation of hydrocarbons by injecting CO2 or carbonated water in oil wells

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physical Or Chemical Processes And Apparatus (AREA)

Abstract

The invention discloses a natural gas hydrate combined mining method and a natural gas hydrate combined mining device for stabilizing a stratum, wherein the combined mining method comprises the following steps: building an offshore mining platform and an injection platform, and laying a mining well and a gas injection well, wherein the horizontal section of the mining well is laid at the junction position of an upper covering layer and a hydrate reservoir layer, and the horizontal section of the gas injection well is laid in the hydrate reservoir layer and is positioned below the horizontal section of the mining well; putting a perforation and fracturing combined tool under the gas injection well, injecting carbon dioxide hot medium to perform perforation and fracturing operation on the horizontal section of the gas injection well, and performing replacement reaction on the gas injection well after soaking; a production pipe column and a directional hydraulic perforation fracturing tool are put into the exploitation well, a support material, hot seawater and exploited formation water are injected into the production pipe column, perforation fracturing operation is carried out on a hydrate reservoir layer under the exploitation well, and a high diversion channel is formed and is used for communicating the hydrate reservoir layer between the horizontal section of the exploitation well and the horizontal section of the gas injection well; extracting natural gas and residual carbon dioxide gas.

Description

Natural gas hydrate combined mining method and device for stabilizing stratum
Technical Field
The invention relates to the technical field of natural gas hydrate exploitation, in particular to a natural gas hydrate combined exploitation method and device for stabilizing a stratum.
Background
The natural gas hydrate is a cage-shaped unit cell compound formed by natural gas and water under the environment of low temperature and high pressure, and the conservation estimation of the global hydrate resource amount is about 3.0 х 1015m3And the quantity of the oil gas resources is higher by one order of magnitude than that of the conventional oil gas resources. In addition, the natural gas hydrate has the characteristics of green and pollution-free combustion, is known as clean energy with the most development value and prospect in the 21 st century, and is expected to improve the energy framework of the current non-clean energy occupying the market leading.
The natural gas hydrate is mainly distributed in land permafrost zones with harsh engineering conditions and submarine sediments with water depth more than 300m, and more than 90% of the natural gas hydrate is distributed in ocean areas. The sea natural gas hydrate reservoir has the characteristics of shallow burial, poor cementation, poor permeability, non-uniform distribution and the like, and an overlying underlayer stratum generally has certain permeability. In order to realize large-area commercial exploitation of natural gas hydrates in the future, natural disasters and environmental problems such as geological collapse, collapse and natural gas leakage caused by large-area decomposition of the natural gas hydrates need to be concerned.
Aiming at the problem of stratum deformation and settlement caused by exploitation, the prior art adopts a method of injecting cement slurry into an overlying underlayer to form an artificial dense cover layer, so that the recovery ratio of a depressurization method is improved, andeffectively prevent methane leakage and prevent geological disasters. Or by injecting a displacement gas into the overlying underlayer to cause a displacement reaction to form CO2/N2The hydrate effectively enhances the soil body strength of the contact surface, reduces the creep deformation of the soil body of the contact surface and the relative displacement of different soil bodies, effectively increases the gas production rate of the reservoir and solves the problem of reservoir instability caused by direct mass mining. However, the above method has problems in three aspects: firstly, extra operation and measures are needed to realize the stabilization of the stratum and improve the exploitation cost, for example, a large amount of cement paste is injected by perforating operation on an overlying underlayer, the cost of the exploited material is improved, the environmental pollution is easy to cause, replacement gas is injected on the overlying underlayer, and the cost of the exploited material and time is improved due to the slow replacement reaction rate; secondly, the stable coverage, supporting strength and stabilizing effect of the stratum cannot be accurately known, the trend and action position of the injected material cannot be accurately known by adopting the operation of injecting cement slurry or injecting replacement gas to establish a stabilizing layer, and the overall balanced stabilizing effect of the mining area cannot be realized. Thirdly, the actual implementation of the project is difficult, and the cement slurry has an instant solidification phenomenon, so that a large amount of cement slurry is accumulated at the position close to the well casing of the perforation, and the transverse extension cannot be realized. Gas injection replacement has the problems of slow reaction rate and low replacement rate, a stable cover layer structure cannot be efficiently realized, and in addition, if stratum temperature and pressure do not meet the requirements of replacement conditions, the problems of replacement gas leakage and the like are easy to occur.
Disclosure of Invention
The invention provides a natural gas hydrate combined mining method and a natural gas hydrate combined mining device for stabilizing a stratum, aiming at the defects in the prior art.
The technical scheme adopted by the invention for solving the technical problems is as follows: a method of integrated natural gas hydrate production to create a consolidated formation, the integrated production method comprising:
well cementation: the method comprises the following steps of constructing an offshore mining platform and an injection platform, and respectively arranging a mining well connected with the mining platform and a gas injection well connected with the injection platform, wherein the horizontal section of the mining well is arranged at the junction position of an upper cover layer and a hydrate reservoir layer, and the horizontal section of the gas injection well is arranged in the hydrate reservoir layer and is positioned below the horizontal section of the mining well;
fracturing a gas injection well: putting a perforation and fracturing combined tool under the gas injection well, injecting carbon dioxide hot medium to perform perforation and fracturing operation on the horizontal section of the gas injection well, and performing replacement reaction on the gas injection well after soaking;
fracturing a production well: a production pipe column and a directional hydraulic perforation fracturing tool are put into the exploitation well, a support material, hot seawater and exploited formation water are injected into the production pipe column, perforation fracturing operation is carried out on a hydrate reservoir layer under the exploitation well, and a high diversion channel is formed and is used for communicating the hydrate reservoir layer between the horizontal section of the exploitation well and the horizontal section of the gas injection well;
an extraction step: and (4) putting a production casing under the exploitation well, and extracting natural gas and residual carbon dioxide gas.
In the method for producing gas hydrate in combination with stabilized formation according to the present invention, after the extracting step, the method for producing gas hydrate in combination further includes:
and opening the gas injection well, and repeating the gas injection well fracturing step, the production well fracturing step and the extraction step until the production is finished.
In the gas hydrate combined mining method for stabilizing the stratum, the horizontal section of the gas injection well is positioned at two thirds of the thickness of the hydrate reservoir from top to bottom.
In the method for jointly producing gas hydrate for stabilizing a stratum, before the step of fracturing the gas injection well, the method for jointly producing gas hydrate for stabilizing a stratum further comprises the following steps:
and (3) a step of pressure reduction mining: and (3) putting a production casing pipe under the gas injection well, carrying out depressurization exploitation, and stopping depressurization exploitation when the pressure of the hydrate reservoir is reduced to below 15% of the phase equilibrium pressure of the methane hydrate corresponding to the temperature of the hydrate reservoir.
In the gas hydrate combined production method for stabilizing the stratum, the fracturing step of the gas injection well specifically comprises the following steps:
putting a perforation and fracturing combined tool under the gas injection well, injecting a carbon dioxide hot medium to perform perforation and fracturing operation on the horizontal section of the gas injection well, and detecting temperature and pressure data of the horizontal section of the gas injection well;
stopping injecting the carbon dioxide heat medium when the temperature and pressure data of the horizontal section of the gas injection well reaches the phase equilibrium condition generated by the carbon dioxide hydrate;
and (4) carrying out replacement reaction by gas injection well soaking.
In the natural gas hydrate combined mining method for stabilizing the stratum, the fracturing step of the mining well specifically comprises the following steps:
when the temperature pressure data of the horizontal section of the gas injection well reaches the critical phase balance condition of methane hydrate generation, a production pipe column and a directional hydraulic perforation fracturing tool are put into the exploitation well, supporting materials, hot seawater and exploited formation water are injected into the production pipe column, perforation fracturing operation is carried out on a hydrate reservoir layer under the exploitation well, and a high diversion channel is formed and used for communicating the hydrate reservoir layer between the horizontal section of the exploitation well and the horizontal section of the gas injection well.
In the method for jointly exploiting natural gas hydrates for stabilizing the stratum, the carbon dioxide heat medium comprises one or more of gaseous carbon dioxide, liquid carbon dioxide, emulsion carbon dioxide, supercritical carbon dioxide or carbon dioxide gas mixture.
The other technical scheme adopted by the invention for solving the technical problem is as follows: constructing a natural gas hydrate combined exploitation device for stabilizing a stratum, wherein the combined exploitation device comprises an exploitation platform and an injection platform which are arranged on the sea, an exploitation well connected with the exploitation platform, and a gas injection well connected with the injection platform, wherein the horizontal section of the exploitation well is arranged at the junction position of an upper covering layer and a hydrate reservoir layer, and the horizontal section of the gas injection well is arranged in the hydrate reservoir layer and is positioned below the horizontal section of the exploitation well;
the combined mining apparatus further comprises:
the perforation and fracturing combined tool is used for putting into the gas injection well and injecting carbon dioxide heat medium to carry out perforation and fracturing operation on the horizontal section of the gas injection well;
the production pipe column and the directional hydraulic perforation fracturing tool are used for descending into the production well, injecting a supporting material, hot seawater and produced formation water into the production pipe column, carrying out perforation fracturing operation on a hydrate reservoir layer under the production well, and forming a high diversion channel for communicating the hydrate reservoir layer between the horizontal section of the production well and the horizontal section of the gas injection well;
and the production casing is used for descending into the production well and extracting natural gas and residual carbon dioxide gas.
In the natural gas hydrate combined exploitation device for stabilizing the stratum, the combined exploitation device further comprises a first gas-liquid separation storage device arranged on the exploitation platform, a first gas storage tank arranged on the exploitation platform and communicated with the first gas-liquid separation storage device, a hydraulic perforation fracturing device arranged on the exploitation platform, and a liquid storage heating device arranged on the exploitation platform and communicated with the hydraulic perforation fracturing device.
In the natural gas hydrate combined exploitation device for stabilizing the stratum, the combined exploitation device further comprises a second gas-liquid separation storage device arranged on the injection platform, a second gas storage tank arranged on the injection platform and communicated with the second gas-liquid separation storage device, a perforation and fracturing combined device arranged on the injection platform, and a liquid storage tank arranged on the injection platform and communicated with the second gas-liquid separation storage device.
The implementation of the natural gas hydrate joint mining method and the device for stabilizing the stratum has the following beneficial effects: when the natural gas hydrate combined mining method for stabilizing the stratum is implemented, the well body structure of the mining well is directly used as the structure for stabilizing the stratum, additional operation and measures are not needed to stabilize the stratum, the integrally balanced stabilizing state of a mining area can be realized, and the stability and the safety of the subsequent mining construction of a lower hydrate reservoir layer are facilitated. Secondly, the method adopts a mode of injecting a carbon dioxide thermal medium to carry out perforation fracturing and replacement operation on the gas injection well, can effectively supplement the heat lost by the stratum after pressure reduction exploitation, improves the fracturing range and the fracturing effect, and improves the rate and the efficiency of the replacement reaction. Furthermore, the invention adopts a mode of reinjecting produced stratum water to carry out perforation fracturing operation on the production well, can effectively and uniformly permeate the stratum water into the reservoir, and can combine with residual carbon dioxide gas to generate new carbon dioxide hydrate while forming a high diversion channel, thereby improving the replacement efficiency, uniformly generating stable carbon dioxide hydrate in the reservoir in a large range, and ensuring the stability of the reservoir. In addition, the method of reinjecting produced formation water can effectively solve the problem of treatment and discharge of the produced formation water, and because the produced formation water has biological toxicity and pollutes the environment and cannot be directly discharged, the reinjecting method not only can uniformly stabilize the formation, but also can realize the purposes of protecting the environment, simplifying the operation requirement and reducing the production cost. Meanwhile, the invention adopts hot seawater and carbon dioxide heat medium as fracturing fluid medium, adopts heat medium as perforating and fracturing operation material of the exploitation well and the injection well, supplements heat to the stratum in time during fracturing, and adopts a mode of interval injection from the upper well to the lower well and repeated exploitation steps for many times, so that the whole exploitation process does not need additional heating operation, has lower energy dissipation, and is beneficial to the temperature and pressure control of the whole hydrate reservoir.
Drawings
The invention will be further described with reference to the accompanying drawings and examples, in which:
FIG. 1 is a schematic flow diagram of a first embodiment of a consolidated natural gas hydrate cogeneration method of this invention;
FIG. 2 is a schematic diagram of a first embodiment of a formation-stabilized natural gas hydrate cogeneration apparatus of the invention;
fig. 3 is a partial structural view of a first embodiment of the formation-stabilized natural gas hydrate cogeneration apparatus of the invention.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, embodiments of the present invention will be described in detail with reference to the accompanying drawings.
As shown in fig. 1, in a first embodiment of the present invention, a method for consolidated natural gas hydrate cogeneration, the method comprises:
a well cementation step S101: and constructing an offshore mining platform and an injection platform, and respectively arranging a mining well connected with the mining platform and a gas injection well connected with the injection platform, wherein the horizontal section of the mining well is arranged at the junction position of the upper cover layer and the hydrate reservoir, and the horizontal section of the gas injection well is arranged in the hydrate reservoir and is positioned below the horizontal section of the mining well.
Selecting a sea natural gas hydrate reservoir as a mining object, respectively building an offshore mining platform and an injection platform, firstly, performing drilling operation of a mining well, arranging a horizontal well section of the mining well at the junction position of an upper covering layer and the hydrate reservoir, putting a casing into the well, and injecting cement into an annular space between the well and the casing to complete well cementation operation.
And then, performing drilling operation of the gas injection well, wherein the horizontal section of the gas injection well is distributed in the hydrate storage layer and is positioned below the horizontal section of the exploitation well, a sleeve is put in, and cement is injected into the annular space between the well hole and the sleeve to complete well cementation operation.
It is understood that in other embodiments, the gas injection well may be provided first, followed by the production well, or both.
Gas injection well fracturing step S102: and (3) putting a perforation and fracturing combined tool under the gas injection well, injecting carbon dioxide hot medium to perform perforation and fracturing operation on the horizontal section of the gas injection well, and performing replacement reaction on the gas injection well after soaking.
And (2) putting a perforation and fracturing combined tool under the gas injection well, performing perforation and fracturing operation on the horizontal section of the gas injection well, injecting a carbon dioxide heat medium for replacement reaction, controlling the temperature and pressure condition of a hydrate reservoir by controlling the pressure of an injection pump and the temperature of the carbon dioxide heat medium, stopping injecting the carbon dioxide heat medium when the temperature and pressure condition of the horizontal section of the gas injection well reaches the phase equilibrium condition generated by the carbon dioxide hydrate, and performing soaking replacement reaction on the gas injection well.
A producing well fracturing step S103: and (2) putting a production pipe column and a directional hydraulic perforation fracturing tool into the exploitation well, injecting a support material, hot seawater and exploited formation water into the production pipe column, performing perforation fracturing operation on a hydrate reservoir layer under the exploitation well, and forming a high diversion channel for communicating the hydrate reservoir layer between the horizontal section of the exploitation well and the horizontal section of the gas injection well.
Monitoring the temperature and pressure condition of the horizontal section of the gas injection well in real time, when the temperature and pressure condition is about to reach the critical phase equilibrium condition for generating methane hydrate, putting a production pipe column and a directional hydraulic perforation fracturing tool into the exploitation well, injecting a supporting material, hot seawater and exploitation formation water, performing perforation fracturing operation on a hydrate reservoir layer under (below) the horizontal section of the exploitation well, and forming a high diversion channel for communicating the horizontal section of the exploitation well with the hydrate reservoir layer of the horizontal section of the gas injection well.
An extraction step S104: and (4) putting a production casing under the exploitation well, and extracting natural gas and residual carbon dioxide gas.
And (4) putting a production casing under the exploitation well, and extracting natural gas and residual carbon dioxide gas obtained after the replacement reaction. It will be appreciated that the natural gas component is primarily methane gas.
Further, the natural gas and residual carbon dioxide gas obtained after the displacement reaction are extracted and treated by gas-liquid separation and storage equipment. Firstly, performing gas-liquid separation operation, separating formation water for hydraulic perforation fracturing operation of a production well, then performing gas separation on the separated natural gas and residual carbon dioxide gas, enabling the obtained pure natural gas to enter a gas storage tank for storage and transportation, and enabling the obtained carbon dioxide gas to form a carbon dioxide thermal medium again for subsequent injection displacement reaction.
When the natural gas hydrate combined mining method for stabilizing the stratum is implemented, the well body structure of the mining well is directly used as the structure for stabilizing the stratum, additional operation and measures are not needed to stabilize the stratum, the integrally balanced stabilizing state of a mining area can be realized, and the stability and the safety of the subsequent mining construction of a lower hydrate reservoir layer are facilitated. Secondly, the method adopts a mode of injecting a carbon dioxide thermal medium to carry out perforation fracturing and replacement operation on the gas injection well, can effectively supplement the heat lost by the stratum after pressure reduction exploitation, improves the fracturing range and the fracturing effect, and improves the rate and the efficiency of the replacement reaction. Furthermore, the invention adopts a mode of reinjecting produced stratum water to carry out perforation fracturing operation on the production well, can effectively and uniformly permeate the stratum water into the reservoir, and can combine with residual carbon dioxide gas to generate new carbon dioxide hydrate while forming a high diversion channel, thereby improving the replacement efficiency, uniformly generating stable carbon dioxide hydrate in the reservoir in a large range, and ensuring the stability of the reservoir. In addition, the method of reinjecting produced formation water can effectively solve the problem of treatment and discharge of the produced formation water, and because the produced formation water has biological toxicity and pollutes the environment and cannot be directly discharged, the reinjecting method not only can uniformly stabilize the formation, but also can realize the purposes of protecting the environment, simplifying the operation requirement and reducing the production cost. Meanwhile, the invention adopts hot seawater and carbon dioxide heat medium as fracturing fluid medium, adopts heat medium as perforating and fracturing operation material of the exploitation well and the injection well, supplements heat to the stratum in time during fracturing, and adopts a mode of interval injection from the upper well to the lower well and repeated exploitation steps for many times, so that the whole exploitation process does not need additional heating operation, has lower energy dissipation, and is beneficial to the temperature and pressure control of the whole hydrate reservoir.
During the production process, after the natural gas and residual carbon dioxide gas extraction, the combined production method further comprises:
and opening the gas injection well, and repeating the gas injection well fracturing step, the production well fracturing step and the extraction step until the production is finished.
Preferably, the horizontal section of the gas injection well is located at two thirds of the thickness of the hydrate reservoir from top to bottom.
Further, prior to the gas injection well fracturing step, the combined production method further comprises:
and (3) a step of pressure reduction mining: and (3) putting a production casing pipe under the gas injection well, carrying out depressurization exploitation, and stopping depressurization exploitation when the pressure of the hydrate reservoir is reduced to below 15% of the phase equilibrium pressure of the methane hydrate corresponding to the temperature of the hydrate reservoir.
Preferably, the gas injection well fracturing step specifically comprises:
and (3) putting a perforation and fracturing combined tool under the gas injection well, injecting a carbon dioxide hot medium to perform perforation and fracturing operation on the horizontal section of the gas injection well, and detecting temperature and pressure data of the horizontal section of the gas injection well.
And stopping injecting the carbon dioxide heat medium when the temperature and pressure data of the horizontal section of the gas injection well reaches the phase equilibrium condition of the generation of the carbon dioxide hydrate.
And (4) carrying out replacement reaction by gas injection well soaking.
Further preferably, the fracturing step of the production well specifically comprises:
when the temperature pressure data of the horizontal section of the gas injection well reaches the critical phase balance condition of methane hydrate generation, a production pipe column and a directional hydraulic perforation fracturing tool are put into the exploitation well, supporting materials, hot seawater and exploited formation water are injected into the production pipe column, perforation fracturing operation is carried out on a hydrate reservoir layer under the exploitation well, and a high diversion channel is formed and used for communicating the hydrate reservoir layer between the horizontal section of the exploitation well and the horizontal section of the gas injection well.
In this embodiment, the carbon dioxide thermal medium comprises one or more of gaseous carbon dioxide, liquid carbon dioxide, emulsion carbon dioxide, supercritical carbon dioxide, or a mixture of carbon dioxide.
As shown in fig. 2 to 3, in the first embodiment of the gas hydrate combined production device for stabilizing a stratum according to the present invention, the combined production device 10 comprises a production platform 11 and an injection platform 12 which are arranged at sea, a production well 13 connected with the production platform 11, and a gas injection well 14 connected with the injection platform 12, wherein a horizontal section of the production well 13 is arranged at the junction position of an upper cover layer 23 and a hydrate reservoir layer 24, and a horizontal section of the gas injection well 14 is arranged in the hydrate reservoir layer 24 and is positioned below the horizontal section of the production well 13;
the combined mining apparatus 10 further includes:
the perforating and fracturing combined tool is used for putting the gas injection well 14 and injecting carbon dioxide heat medium to perform perforating and fracturing operation on the horizontal section of the gas injection well 14;
the production string and the directional hydraulic perforation fracturing tool are used for descending the production well 13, injecting a supporting material 25, hot seawater and produced formation water into the production string, carrying out perforation fracturing operation on a hydrate reservoir 24 under the production well 13, and forming a high diversion channel for communicating the hydrate reservoir 24 between the horizontal section of the production well 13 and the horizontal section of the gas injection well 14;
a production casing for lowering into the production well 13 for extracting natural gas and residual carbon dioxide gas.
The combined mining apparatus 10 performs the combined mining method described above during operation.
The specific implementation mode of the combined mining device 10 is that an offshore mining platform 11 and an injection platform 12 are built, and a mining well 13 connected with the mining platform 11 and a gas injection well 14 connected with the injection platform 12 are respectively arranged, wherein the horizontal section of the mining well 13 is arranged at the junction position of an upper covering layer 23 and a hydrate reservoir layer 24, and the horizontal section of the gas injection well 14 is arranged in the hydrate reservoir layer 24 and is positioned below the horizontal section of the mining well 13.
Selecting a sea natural gas hydrate reservoir stratum 24 as a mining object, respectively building an offshore mining platform 11 and an injection platform 12, firstly, performing drilling operation of a mining well 13, arranging a horizontal well section of the mining well 13 at the junction position of an upper covering layer 23 and the hydrate reservoir stratum 24, putting a casing pipe in the well, and injecting cement into an annular space between a well hole and the casing pipe to finish well cementation operation.
And then, carrying out the drilling operation of the gas injection well 14, arranging the horizontal section of the gas injection well 14 in the hydrate reservoir stratum 24 and below the horizontal section of the exploitation well 13, putting a casing pipe, and injecting cement into the annular space between the well hole and the casing pipe to finish the well cementation operation.
It is understood that in other embodiments, the gas injection well 14 may be provided first, and then the production well 13 may be provided, or both.
And (3) putting a perforation and fracturing combined tool under the gas injection well 14, injecting carbon dioxide heat medium to carry out perforation and fracturing operation on the horizontal section of the gas injection well 14, and carrying out replacement reaction on the soaking well of the gas injection well 14.
And (2) putting a perforation and fracturing combined tool under the gas injection well 14, performing perforation and fracturing operation on the horizontal section of the gas injection well 14, injecting a carbon dioxide heat medium for a displacement reaction, controlling the temperature and pressure condition of the hydrate reservoir 24 by controlling the pressure of an injection pump and the temperature of the carbon dioxide heat medium, and stopping injecting the carbon dioxide heat medium when the temperature and pressure condition of the horizontal section of the gas injection well 14 reaches the phase equilibrium condition generated by the carbon dioxide hydrate, and performing soaking and displacement reaction on the gas injection well 14.
And (3) putting a production pipe column and a directional hydraulic perforation fracturing tool into the production well 13, injecting a supporting material 25, hot seawater and produced formation water into the production pipe column, and carrying out perforation fracturing operation on a hydrate reservoir 24 under the production well 13 to form a high diversion channel for communicating the hydrate reservoir 24 between the horizontal section of the production well 13 and the horizontal section of the gas injection well 14.
And monitoring the temperature and pressure condition of the horizontal section of the gas injection well 14 in real time, when the temperature and pressure condition is about to reach the critical phase equilibrium condition for generating methane hydrate, putting a production pipe column and a directional hydraulic perforation fracturing tool into the exploitation well 13, injecting a supporting material 25, hot seawater and exploitation formation water, performing perforation fracturing operation on a hydrate reservoir 24 underlying the horizontal section of the exploitation well 13, and forming a high diversion channel for communicating the horizontal section of the exploitation well 13 with the hydrate reservoir 24 of the horizontal section of the gas injection well 14.
A production casing is run in the production well 13 and natural gas and residual carbon dioxide gas are extracted.
And (4) putting a production casing pipe in the exploitation well 13, and extracting natural gas and residual carbon dioxide gas obtained after the replacement reaction.
Further, the combined production device 10 further includes a first gas-liquid separation storage device 15 disposed on the production platform 11, a first gas storage tank 16 disposed on the production platform 11 and communicated with the first gas-liquid separation storage device 15, a hydraulic perforation fracturing device 17 disposed on the production platform 11, and a liquid storage heating device 18 disposed on the production platform 11 and communicated with the hydraulic perforation fracturing device 17.
Further, the combined mining apparatus 10 further includes a second gas-liquid separation storage device 19 disposed on the injection platform 12, a second gas storage tank 20 disposed on the injection platform 12 and communicated with the second gas-liquid separation storage device 19, a perforation and fracturing combined equipment 21 disposed on the injection platform 12, and a liquid storage tank 22 disposed on the injection platform 12 and communicated with the second gas-liquid separation storage device 19.
The first gas-liquid splitting storage device and the second gas-liquid splitting storage device are used for gas-liquid splitting of the mined natural gas-liquid mixture. The first and second gas tanks 16 and 20 are each used to store produced natural gas. The hydraulic perforation fracturing apparatus 17 is used to inject support material 25, hot seawater and produced formation water into the production string and the directional hydraulic perforation fracturing tool, and the reservoir heating apparatus 18 is used to provide hot seawater to the hydraulic perforation fracturing apparatus 17. Further, it functions to support the formation by injecting the support material 25.
The perforation and fracturing combined equipment 21 is used for injecting carbon dioxide thermal medium into the perforation and fracturing combined tool, and the liquid storage tank 22 is used for storing extracted liquid mixture such as formation water.
In addition, in the present invention, unless otherwise expressly specified or limited, the terms "connected," "stacked," and the like are to be construed broadly, e.g., as meaning permanently connected, detachably connected, or integrally formed; either directly or indirectly through intervening media, either internally or in any other relationship. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
The above description is only an embodiment of the present invention, and not intended to limit the scope of the present invention, and all modifications of equivalent structures and equivalent processes performed by the present specification and drawings, or directly or indirectly applied to other related technical fields, are included in the scope of the present invention.

Claims (10)

1.一种稳固地层的天然气水合物联合开采方法,其特征在于,所述联合开采方法包括:1. a natural gas hydrate combined exploitation method for stabilizing stratum, is characterized in that, described combined exploitation method comprises: 固井步骤:搭建海上开采平台和注入平台,分别布设与开采平台连接的开采井和与注入平台连接的注气井,其中,所述开采井水平段布设于上覆盖层和水合物储层交界位置处,所述注气井水平段布设于水合物储层内并位于所述开采井水平段下方;Cementing step: build an offshore production platform and an injection platform, respectively lay out a production well connected to the production platform and a gas injection well connected to the injection platform, wherein the horizontal section of the production well is arranged at the junction of the upper overburden layer and the hydrate reservoir where, the horizontal section of the gas injection well is arranged in the hydrate reservoir and below the horizontal section of the production well; 注气井压裂步骤:在注气井下入射孔压裂联作工具,注入二氧化碳热介质对注气井水平段进行射孔压裂作业,注气井焖井进行置换反应;The fracturing step of the gas injection well: inject the injection hole fracturing joint tool under the gas injection well, inject carbon dioxide heat medium to carry out the perforation fracturing operation on the horizontal section of the gas injection well, and perform the replacement reaction of the gas injection well; 开采井压裂步骤:在开采井下入生产管柱和定向水力射孔压裂工具,向生产管柱注入支撑材料、热海水和采出地层水,对开采井下伏的水合物储层进行射孔压裂作业,形成高导流通道用于连通开采井水平段和注气井水平段之间的水合物储层;Production well fracturing steps: run a production string and a directional hydraulic perforating fracturing tool into the production well, inject support materials, hot seawater and produced formation water into the production string, and perforate the underlying hydrate reservoir in the production well Fracturing operation to form a high conductivity channel to connect the hydrate reservoir between the horizontal section of the production well and the horizontal section of the gas injection well; 抽取步骤:在开采井下入生产套管,抽取出天然气和残余的二氧化碳气体。Extraction step: run the production casing in the production well to extract natural gas and residual carbon dioxide gas. 2.根据权利要求1所述的稳固地层的天然气水合物联合开采方法,其特征在于,在所述抽取步骤之后,所述联合开采方法还包括:2 . The method for joint exploitation of natural gas hydrates in a stable formation according to claim 1 , wherein after the extraction step, the joint exploitation method further comprises: 3 . 打开注气井,重复所述注气井压裂步骤、开采井压裂步骤和抽取步骤,直至开采结束。The gas injection well is opened, and the gas injection well fracturing step, the production well fracturing step and the extraction step are repeated until the production ends. 3.根据权利要求1所述的稳固地层的天然气水合物联合开采方法,其特征在于,所述注气井水平段位于水合物储层从上至下厚度的三分之二处。3 . The combined natural gas hydrate exploitation method for stable formation according to claim 1 , wherein the horizontal section of the gas injection well is located at two-thirds of the thickness of the hydrate reservoir from top to bottom. 4 . 4.根据权利要求1所述的稳固地层的天然气水合物联合开采方法,其特征在于,在所述注气井压裂步骤之前,所述联合开采方法还包括:4 . The method for joint exploitation of natural gas hydrate for stable formation according to claim 1 , wherein, before the step of fracturing the gas injection well, the joint exploitation method further comprises: 5 . 降压开采步骤:在注气井下入生产套管,进行降压开采,当水合物储层的压力降至水合物储层温度对应甲烷水合物相平衡压力的15%以下时,停止降压开采。Depressurization production steps: run the production casing in the gas injection well to carry out depressurization production. When the pressure of the hydrate reservoir falls below 15% of the equilibrium pressure of the methane hydrate phase corresponding to the temperature of the hydrate reservoir, the depressurization production is stopped. . 5.根据权利要求1所述的稳固地层的天然气水合物联合开采方法,其特征在于,所述注气井压裂步骤具体包括:5. The method for joint exploitation of natural gas hydrates in a stable formation according to claim 1, wherein the fracturing step of the gas injection well specifically comprises: 在注气井下入射孔压裂联作工具,注入二氧化碳热介质对注气井水平段进行射孔压裂作业,检测注气井水平段的温压数据;The injection hole fracturing combined tool is used under the gas injection well, and carbon dioxide heat medium is injected to carry out perforation and fracturing operation in the horizontal section of the gas injection well, and the temperature and pressure data of the horizontal section of the gas injection well are detected; 在注气井水平段的温压数据达到二氧化碳水合物生成的相平衡条件时,停止注入二氧化碳热介质;When the temperature and pressure data of the horizontal section of the gas injection well reaches the phase equilibrium condition for the formation of carbon dioxide hydrate, the injection of carbon dioxide heat medium is stopped; 注气井焖井进行置换反应。Gas injection wells are simmered for replacement reaction. 6.根据权利要求5所述的稳固地层的天然气水合物联合开采方法,其特征在于,所述开采井压裂步骤具体包括:6. The method for joint exploitation of natural gas hydrate of stable formation according to claim 5, wherein the fracturing step of the exploitation well specifically comprises: 在注气井水平段的温压数据达到甲烷水合物生成的临界相平衡条件时,在开采井下入生产管柱和定向水力射孔压裂工具,向生产管柱注入支撑材料、热海水和采出地层水,对开采井下伏的水合物储层进行射孔压裂作业,形成高导流通道用于连通开采井水平段和注气井水平段之间的水合物储层。When the temperature and pressure data of the horizontal section of the gas injection well reaches the critical phase equilibrium condition for the formation of methane hydrate, the production string and directional hydraulic perforation fracturing tool are installed in the production well, and the production string is injected with support materials, hot seawater and production. The formation water is used to perforate and fract the hydrate reservoir underlying the production well to form a high conductivity channel to connect the hydrate reservoir between the horizontal section of the production well and the horizontal section of the gas injection well. 7.根据权利要求1-6中任一项所述的稳固地层的天然气水合物联合开采方法,其特征在于,所述二氧化碳热介质包括气态二氧化碳、液态二氧化碳、乳液二氧化碳、超临界二氧化碳或者二氧化碳混合气中一种或多种。7. The method for joint exploitation of natural gas hydrate in a stable formation according to any one of claims 1-6, wherein the carbon dioxide heat medium comprises gaseous carbon dioxide, liquid carbon dioxide, emulsion carbon dioxide, supercritical carbon dioxide or carbon dioxide mixed one or more in the air. 8.一种稳固地层的天然气水合物联合开采装置,其特征在于,所述联合开采装置包括设置于海上的开采平台和注入平台、与开采平台连接的开采井、与注入平台连接的注气井,所述开采井水平段设置于上覆盖层和水合物储层交界位置处,所述注气井水平段设置于水合物储层内并位于所述开采井水平段下方;8. A natural gas hydrate combined exploitation device for stabilizing the stratum, characterized in that the combined exploitation device comprises a exploitation platform and an injection platform arranged on the sea, a exploitation well connected with the exploitation platform, and a gas injection well connected with the injection platform, The horizontal section of the production well is arranged at the junction of the overburden layer and the hydrate reservoir, and the horizontal section of the gas injection well is arranged in the hydrate reservoir and below the horizontal section of the production well; 所述联合开采装置还包括:The combined mining device also includes: 射孔压裂联作工具,用于下入注气井,注入二氧化碳热介质对注气井水平段进行射孔压裂作业;The combined perforation and fracturing tool is used to run gas injection wells and inject carbon dioxide heat medium to perform perforation and fracturing operations on the horizontal section of gas injection wells; 生产管柱和定向水力射孔压裂工具,用于下入开采井,向生产管柱注入支撑材料、热海水和采出地层水,对开采井下伏的水合物储层进行射孔压裂作业,形成高导流通道用于连通开采井水平段和注气井水平段之间的水合物储层;Production strings and directional hydraulic perforating fracturing tools are used to run into production wells, inject support materials, hot seawater and produced formation water into production strings, and perform perforating fracturing operations on hydrate reservoirs underlying production wells , forming a high conductivity channel to connect the hydrate reservoir between the horizontal section of the production well and the horizontal section of the gas injection well; 生产套管,用于下入开采井,抽取出天然气和残余的二氧化碳气体。Production casing for running into production wells to extract natural gas and residual carbon dioxide gas. 9.根据权利要求8所述的稳固地层的天然气水合物联合开采装置,其特征在于,所述联合开采装置还包括设置于所述开采平台上的第一气液分离存储设备、设置于所述开采平台上并与所述第一气液分离存储设备连通的第一储气罐、设置于所述开采平台上的水力射孔压裂设备、设置于所述开采平台上并与所述水力射孔压裂设备连通的储液加热设备。9 . The natural gas hydrate combined exploitation device for stabilizing the formation according to claim 8 , wherein the combined exploitation device further comprises a first gas-liquid separation and storage device arranged on the exploitation platform, and arranged on the The first gas storage tank on the production platform and communicated with the first gas-liquid separation and storage equipment, the hydraulic perforation fracturing equipment arranged on the production platform, the The storage fluid heating equipment connected to the hole fracturing equipment. 10.根据权利要求8或9所述的稳固地层的天然气水合物联合开采装置,其特征在于,所述联合开采装置还包括设置于所述注入平台上的第二气液分离存储设备、设置于所述注入平台上与所述第二气液分离存储设备连通的第二储气罐、设置于所述注入平台上的射孔压裂联作设备、以及设置于所述注入平台上与所述第二气液分离存储设备连通的储液罐。10. The natural gas hydrate combined exploitation device for stable formation according to claim 8 or 9, characterized in that, the combined exploitation device further comprises a second gas-liquid separation and storage device arranged on the injection platform, The second gas storage tank on the injection platform communicated with the second gas-liquid separation storage device, the perforation and fracturing combined equipment provided on the injection platform, and the The liquid storage tank communicated with the second gas-liquid separation storage device.
CN202110627142.0A 2021-06-04 2021-06-04 Natural gas hydrate combined mining method and device for stabilizing stratum Expired - Fee Related CN113294126B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110627142.0A CN113294126B (en) 2021-06-04 2021-06-04 Natural gas hydrate combined mining method and device for stabilizing stratum

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110627142.0A CN113294126B (en) 2021-06-04 2021-06-04 Natural gas hydrate combined mining method and device for stabilizing stratum

Publications (2)

Publication Number Publication Date
CN113294126A true CN113294126A (en) 2021-08-24
CN113294126B CN113294126B (en) 2022-08-30

Family

ID=77327215

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110627142.0A Expired - Fee Related CN113294126B (en) 2021-06-04 2021-06-04 Natural gas hydrate combined mining method and device for stabilizing stratum

Country Status (1)

Country Link
CN (1) CN113294126B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113959923A (en) * 2021-10-25 2022-01-21 中国地质调查局油气资源调查中心 Evaluation method of natural gas hydrate unconsolidated reservoir porous medium framework reinforcing material
CN114183115A (en) * 2021-12-07 2022-03-15 中国矿业大学 A system and method for efficient exploitation of natural gas hydrate
CN114320239A (en) * 2021-12-30 2022-04-12 中国石油大学(北京) Marine hydrate exploitation and reinjection system and method
CN114483187A (en) * 2021-12-21 2022-05-13 陕西延长石油(集团)有限责任公司 Carbon dioxide sequestration method after carbon dioxide fracturing
CN115478815A (en) * 2022-09-23 2022-12-16 清华大学 Exploitation method, system and application of natural gas hydrate in warm high-pressure reservoir in sea area
WO2023041090A1 (en) * 2021-12-28 2023-03-23 中国科学院广州能源研究所 Device for jetting nitrogen and carbon dioxide mixed gas in horizontal well, and production method
CN115929258A (en) * 2023-02-23 2023-04-07 中国石油大学(华东) Hydrate exploitation method for methane solubilization-assisted depressurization
CN117150812A (en) * 2023-09-25 2023-12-01 同济大学 CO taking creep effect into consideration 2 Method for evaluating flow conductivity of fracturing natural gas hydrate

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170051596A1 (en) * 2015-08-18 2017-02-23 Statoil Canada Limited Pressure swing solvent assisted well stimulation
CN108868736A (en) * 2018-05-24 2018-11-23 中国石油大学(华东) Utilize the double L well constructions and method of pressure break exploiting ocean hydrate hiding
CN109736752A (en) * 2019-01-21 2019-05-10 燕山大学 A kind of depressurization method assisted temperature-controlled CO2 replacement of natural gas hydrate exploitation method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170051596A1 (en) * 2015-08-18 2017-02-23 Statoil Canada Limited Pressure swing solvent assisted well stimulation
CN108868736A (en) * 2018-05-24 2018-11-23 中国石油大学(华东) Utilize the double L well constructions and method of pressure break exploiting ocean hydrate hiding
CN109736752A (en) * 2019-01-21 2019-05-10 燕山大学 A kind of depressurization method assisted temperature-controlled CO2 replacement of natural gas hydrate exploitation method

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113959923A (en) * 2021-10-25 2022-01-21 中国地质调查局油气资源调查中心 Evaluation method of natural gas hydrate unconsolidated reservoir porous medium framework reinforcing material
CN114183115A (en) * 2021-12-07 2022-03-15 中国矿业大学 A system and method for efficient exploitation of natural gas hydrate
CN114483187A (en) * 2021-12-21 2022-05-13 陕西延长石油(集团)有限责任公司 Carbon dioxide sequestration method after carbon dioxide fracturing
WO2023041090A1 (en) * 2021-12-28 2023-03-23 中国科学院广州能源研究所 Device for jetting nitrogen and carbon dioxide mixed gas in horizontal well, and production method
CN114320239A (en) * 2021-12-30 2022-04-12 中国石油大学(北京) Marine hydrate exploitation and reinjection system and method
CN115478815A (en) * 2022-09-23 2022-12-16 清华大学 Exploitation method, system and application of natural gas hydrate in warm high-pressure reservoir in sea area
CN115478815B (en) * 2022-09-23 2024-02-09 清华大学 Sea area high-temperature and high-pressure reservoir natural gas hydrate exploitation method, system and application
CN115929258A (en) * 2023-02-23 2023-04-07 中国石油大学(华东) Hydrate exploitation method for methane solubilization-assisted depressurization
CN115929258B (en) * 2023-02-23 2023-05-05 中国石油大学(华东) A hydrate recovery method with methane solubilization and depressurization
CN117150812A (en) * 2023-09-25 2023-12-01 同济大学 CO taking creep effect into consideration 2 Method for evaluating flow conductivity of fracturing natural gas hydrate
CN117150812B (en) * 2023-09-25 2024-05-14 同济大学 Evaluation method of conductivity of natural gas hydrate under CO2 fracturing considering creep effect

Also Published As

Publication number Publication date
CN113294126B (en) 2022-08-30

Similar Documents

Publication Publication Date Title
CN113294126B (en) Natural gas hydrate combined mining method and device for stabilizing stratum
CN105625998B (en) A kind of reverse recovery method of sea bed gas hydrate stabilized zone and its winning apparatus
CN109488259B (en) Method for mining type I hydrate system based on warm seawater-gravel huff and puff displacement
CN108278100B (en) A kind of natural gas hydrate exploitation method and system
CN108180001B (en) Method for transforming marine argillaceous silt type natural gas hydrate reservoir by foam grouting method
CN106761588B (en) The recovery method and quarrying apparatus of jet crushing, reacting cycle conveying slurry ocean gas hydrate
CN105003237B (en) Apparatus and method for integrating geothermal exploitation of natural gas hydrate and CO2 waste gas reinjection treatment
US10683736B2 (en) Method and system for recovering gas in natural gas hydrate exploitation
WO2019223346A1 (en) Nitrogen composite huff-puff method for closed fault block oil reservoir
US9187246B2 (en) Methods for storing carbon dioxide compositions in subterranean geological formations and arrangements for use in such methods
CN110644963B (en) Method for exploiting hydrate based on multilateral well
CN108868706B (en) A method of directional drilling supercritical carbon dioxide fracturing replacement to recover natural gas hydrate
CN103216219A (en) A CO2/N2 Underground Replacement Method for Exploiting Natural Gas Hydrate
WO2019223265A1 (en) Method and system for mining natural gas hydrate solid-state flow under under-balanced forward circulation condition
CN110159233B (en) A method for enhancing the recovery of natural gas hydrate reservoirs through artificial tight caprocks
CN109736752A (en) A kind of depressurization method assisted temperature-controlled CO2 replacement of natural gas hydrate exploitation method
CN112253057B (en) Efficient exploitation method of pore filling type natural gas hydrate
CN114135254B (en) A Combined Production Method of Hydrate Solid Fluidization and Depressurization
CN112610191A (en) Method for exploiting natural gas hydrate reservoir permeable by cover layer by utilizing branch horizontal well
CN112709552B (en) Device and method for developing marine natural gas hydrate system based on hydrate method
CN211448630U (en) Device for extracting natural gas hydrate by depressurization and double-pipe injection of modified fluid
CN206144543U (en) Device for cycle oil recovery of taking in and send out in pit with super supercritical carbon dioxide
CN111395962A (en) A kind of marine natural gas hydrate gas lift reverse circulation drilling system and exploitation method
White et al. Designing a pilot-scale experiment for the production of natural gas hydrates and sequestration of CO2 in class 1 hydrate accumulations
US4359092A (en) Method and apparatus for natural gas and thermal energy production from aquifers

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220830