[go: up one dir, main page]

CN113250484A - Concrete warehouse external truss repairing method and concrete warehouse external truss repairing structure - Google Patents

Concrete warehouse external truss repairing method and concrete warehouse external truss repairing structure Download PDF

Info

Publication number
CN113250484A
CN113250484A CN202110557386.6A CN202110557386A CN113250484A CN 113250484 A CN113250484 A CN 113250484A CN 202110557386 A CN202110557386 A CN 202110557386A CN 113250484 A CN113250484 A CN 113250484A
Authority
CN
China
Prior art keywords
truss
steel
concrete
warehouse
repairing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110557386.6A
Other languages
Chinese (zh)
Inventor
李家发
李俊
罗钊
罗勤桂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Conch Construction Materials Design Institute Co Ltd
Original Assignee
Anhui Conch Construction Materials Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Conch Construction Materials Design Institute Co Ltd filed Critical Anhui Conch Construction Materials Design Institute Co Ltd
Priority to CN202110557386.6A priority Critical patent/CN113250484A/en
Publication of CN113250484A publication Critical patent/CN113250484A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • E04C2003/0404Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal beams, girders, or joists characterised by cross-sectional aspects
    • E04C2003/0443Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal beams, girders, or joists characterised by cross-sectional aspects characterised by substantial shape of the cross-section
    • E04C2003/0452H- or I-shaped

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

本发明提供一种应用于水泥工厂水泥库或生料库等构筑物库技术领域的混凝土库库外桁架修复方法,本发明还涉及一种混凝土库库外桁架修复结构,所述的混凝土库库外桁架修复方法的修复步骤为:将钢梁(1)吊装到混凝土库(4)库顶放置,钢梁(1)与混凝土库(4)库内的桁架(2)垂直布置;库顶板(9)凿出开孔,用钢绞线(3)绕过桁架(2)和钢梁(1),对钢绞线(3)进行张拉;钢绞线(3)张拉过程中,下沉的桁架(2)恢复到初始位置;在钢梁(1)和桁架(2)节点之间焊接槽钢(6),本发明的混凝土库库外桁架修复方法及修复结构,对桁架进行加固和纠偏,处理节点裂缝,使得桁架重新满足要求,不需要进入库内进行维修,便于施工。The present invention provides a method for repairing the outer truss of a concrete silo, which is applied to the technical field of a cement silo or a raw material silo in a cement factory. The repair steps of the truss repair method are as follows: hoist the steel beam (1) to the top of the concrete storehouse (4) and place it, and the steel beam (1) is vertically arranged with the truss (2) in the concrete storehouse (4); the storehouse roof (9) ) to cut out openings, and use the steel strand (3) to bypass the truss (2) and the steel beam (1) to stretch the steel strand (3); during the tensioning process of the steel strand (3), the The truss (2) is restored to the original position; the channel steel (6) is welded between the steel beam (1) and the truss (2) node, the repairing method and repairing structure of the truss outside the concrete storehouse of the present invention are used to reinforce and repair the truss. Correct deviation and deal with joint cracks, so that the truss can meet the requirements again, and it is not necessary to enter the warehouse for maintenance, which is convenient for construction.

Description

Concrete warehouse external truss repairing method and concrete warehouse external truss repairing structure
Technical Field
The invention belongs to the technical field of a structure warehouse such as a cement warehouse or a raw material warehouse of a cement factory, and particularly relates to a method for repairing a truss outside a concrete warehouse.
Background
Very large diameter reinforced concrete stores are built in cement plants for cement or raw stock storage. The large-diameter warehouse designed in the early stage is large in diameter, a truss form is adopted for the bearing structure on the top of the warehouse, and in the long-term use process, due to the fact that stacking is too high, material pressure has a certain destructive effect on the truss, or the truss is damaged and sinks due to reasons such as welding quality and the like, so that the top of the warehouse is driven to sink, and use and structural safety are affected. Since the truss is in the warehouse, it is difficult to weld and restore the truss itself. In the use process, due to factors such as stacking lateral extrusion or welding quality, the original supporting truss rod in the warehouse falls off, the truss sinks integrally, if the truss is not processed, water and dust are accumulated on the top of the warehouse, the load is increased, the overall collapse of the top of the warehouse is caused, the use is influenced, and the structure safety is influenced, so that when the truss has problems, the original truss must be reinforced, and the sinking part is corrected to meet the process use requirements. In the structure in the prior art, the top truss is located in the warehouse, so that the dust in the warehouse is large, lighting and ventilation are avoided, the construction difficulty is high, the maintenance is inconvenient, the maintenance cost is high, the labor intensity is high, and the efficiency is low.
Disclosure of Invention
The technical problem to be solved by the invention is as follows: the method for repairing the truss outside the concrete warehouse is simple in steps, can be used for reinforcing and rectifying the truss by taking the construction feasibility into consideration on the basis of not dismantling the original warehouse top structure, and treating the joint cracks by adding the steel beam on the upper portion of the warehouse top and utilizing the connection and positioning functions of the steel beam and the steel strand outside the warehouse, so that the truss meets the design requirements and the use requirements again, the structure safety is guaranteed, the truss does not need to enter the warehouse for maintenance, and the construction is convenient.
To solve the technical problems, the invention adopts the technical scheme that:
the invention relates to a method for repairing a truss outside a concrete warehouse, which comprises the following steps:
s1, manufacturing more than two steel beams, hoisting the steel beams to the top of a concrete warehouse for placement, and arranging the steel beams and trusses in the concrete warehouse vertically;
s2, chiseling a hole in a warehouse top plate at the lower part of the intersection of the steel beam and the truss, and stretching the steel strand by using the steel strand to bypass the truss and the steel beam;
s3, in the process of tensioning the steel strand, restoring the sunk truss to the initial position;
s4, welding channel steel between the steel beam and the truss node, and connecting the truss with the steel beam;
and S5, after the truss is reinforced, leveling and waterproofing the top of the concrete warehouse.
And after the steel strand is tensioned to restore the sunk truss to the initial position, fixing the two ends of the steel strand by using a special clamp to prevent the steel strand from loosening.
The protective sleeve is sleeved on the part of the steel strand, which is in contact with the steel beam, and the lower protective sleeve is sleeved on the part of the steel strand, which is in contact with the truss.
The steel beam be H shaped steel roof beam, the steel beam sets up two.
When the steel beam is hoisted to the top of the concrete warehouse for placement, the end part of the steel beam is clamped in the clamping groove at the upper part of the concrete warehouse or welded with the embedded steel bar at the upper part of the concrete warehouse.
The invention also relates to a concrete warehouse external truss repairing structure which is simple in structure, can be used for reinforcing and rectifying the truss by taking construction feasibility into consideration on the basis of not dismantling the original warehouse top structure, and treating node cracks by adding a steel beam on the upper part of the warehouse top and utilizing the connecting and positioning functions of the steel beam and the steel strand outside the warehouse, so that the truss meets the design requirement and the use requirement again, the structure safety is guaranteed, the truss repairing structure does not need to enter the warehouse for maintenance, and the construction is convenient.
The structure is restoreed to truss outside concrete storehouse include girder steel, steel strand wires, the girder steel sets up to the structure that can place at the concrete storehouse top, the girder steel arranges with the truss in the concrete storehouse is perpendicular, the steel strand wires sets up to the structure that can pass the trompil of the storehouse roof of girder steel and the crossing department lower part of truss and bypass truss and girder steel.
The outer truss repair structure of concrete storehouse still include protective sheath and lower protective sheath, go up the protective sheath and be the steel pipe protective sheath with lower protective sheath, go up the protective sheath and all set up to the structure that is the U font with lower protective sheath.
The steel strand wires and the position of girder steel contact suit protective sheath on, go up the protective sheath and clamp at girder steel upper portion position, the protective sheath is down installed to the position suit of steel strand wires and truss contact, lower protective sheath clamps in truss lower part position.
The structure is restoreed to truss outside concrete storehouse still include special fixture, special fixture sets up to can be fixed steel strand wires both ends and prevent the not hard up structure of steel strand wires.
The steel beam be H shaped steel roof beam, the steel beam sets up two.
By adopting the technical scheme of the invention, the following beneficial effects can be obtained:
the invention provides an improvement on the concrete warehouse external truss repairing method and structure, aiming at the problems in the prior art. In the prior art, because the truss is arranged inside the concrete warehouse, when the truss needs to be maintained, an operator needs to enter the interior of the concrete warehouse to operate. And the dust in the warehouse is large, lighting and ventilation are not generated, the construction difficulty is large, the maintenance is inconvenient, the maintenance cost is high, the labor intensity is high, and the efficiency is low. Therefore, the invention provides improvement based on a completely different thought from the prior art, so that the truss can be maintained outside the concrete warehouse without entering the concrete warehouse by personnel, the problems in the prior art are avoided, the construction safety of the personnel is guaranteed, the labor intensity is reduced, and the maintenance efficiency is improved. When maintenance is carried out, firstly, a steel beam is manufactured and hoisted to the position of the top of the warehouse, and the steel beam is vertical to the original truss; drilling a hole on a warehouse top plate at the intersection of a steel beam and a truss, connecting the truss positioned below with steel by using a steel strand, tensioning, taking the steel beam as a stress fulcrum, and forming upward tension on the truss when the steel strand is tightened so as to restore the sunk truss to the initial level; after the sunk truss is restored to the original shape, fixing two ends of the steel strand by using a special clamp, applying a positioning force to the steel beam and the truss by using the steel strand at the moment, enabling the truss not to sink, and then welding channel steel between the steel beam and truss nodes, so that the truss and the steel beam are ensured to be reliably connected; and after the warehouse top truss is reinforced, leveling and waterproofing the warehouse top. The method and the structure for repairing the truss outside the concrete warehouse have low cost, can add the steel beam on the upper part of the warehouse top by considering the construction feasibility on the basis of not removing the original warehouse top structure, and utilize the connecting and positioning functions of the steel beam and the steel strand outside the warehouse to reinforce and correct the truss and treat the joint crack, so that the truss meets the design requirement and the use requirement again, the structure safety is ensured, the truss does not need to enter the warehouse for maintenance, and the construction is convenient.
Drawings
The contents of the description and the references in the drawings are briefly described as follows:
FIG. 1 is a schematic structural diagram of a concrete warehouse external truss repair structure according to the present invention;
FIG. 2 is a schematic top view of the concrete warehouse external truss repair structure according to the present invention;
FIG. 3 is a schematic cross-sectional view of the side A-A of the concrete warehouse external truss repair structure shown in FIG. 2;
FIG. 4 is a schematic structural diagram of a truss of the concrete warehouse external truss repair structure according to the present invention;
in the drawings, the reference numbers are respectively: 1. a steel beam; 2. a truss; 3. steel strand wires; 4. a concrete reservoir; 5. an upper protective sleeve; 6. connecting channel steel; 7. a special fixture; 8. a lower protective sleeve; 9. a top plate of the warehouse.
Detailed Description
The following detailed description of the embodiments of the present invention, such as the shapes and structures of the components, the mutual positions and connection relations among the components, the functions and operation principles of the components, will be made by referring to the accompanying drawings and the description of the embodiments:
as shown in the attached drawings 1-4, the invention relates to a method for repairing a truss outside a concrete reservoir, which comprises the following steps:
s1, manufacturing more than two steel beams 1, hoisting the steel beams 1 to the top of a concrete warehouse 4, and placing the steel beams 1 and a truss 2 in the concrete warehouse 4 vertically; s2, chiseling a hole in a warehouse top plate 9 at the lower part of the intersection of the steel beam 1 and the truss 2, winding the truss 2 and the steel beam 1 by using a steel strand 3, tensioning the steel strand 3, applying force to the truss 2 by using the steel strand, and pulling up the truss 2; s3, in the process of tensioning the steel strand 3, the sunk truss 2 is restored to the initial position; s4, welding channel steel 6 between the steel beam 1 and the truss 2 node, and connecting the truss 2 with the steel beam 1; and S5, after the truss 2 is reinforced, leveling and waterproofing are carried out on the top of the concrete warehouse 4. The above structure provides an improvement to the problems in the prior art. In the prior art, since the truss 2 is arranged inside the concrete warehouse, when the truss 2 needs to be maintained, an operator needs to enter the concrete warehouse for operation. And the dust in the warehouse is large, lighting and ventilation are not generated, the construction difficulty is large, the maintenance is inconvenient, the maintenance cost is high, the labor intensity is high, and the efficiency is low. Therefore, the invention provides improvement based on a completely different thought from the prior art, so that the truss 2 can be maintained outside the concrete warehouse without personnel entering the concrete warehouse, therefore, the problems in the prior art do not exist, the construction safety of the personnel is ensured, the labor intensity is reduced, and the maintenance efficiency is improved. When maintenance is carried out, firstly, a steel beam is manufactured and hoisted to the position of the top of the warehouse, and the steel beam is vertical to the original truss; chiseling an opening at the intersection of the steel beam and the truss, connecting the truss positioned below with the steel by using a steel strand, tensioning, taking the steel beam as a stress fulcrum, and forming upward tension on the truss when the steel strand is tightened so as to restore the sunk truss to the initial level; after the sunk truss recovers the original shape, fixing two ends of the steel strand by using a special clamp, applying a positioning force to the steel beam and the truss 2 by using the steel strand at the moment, enabling the truss 2 not to sink, and then welding channel steel between the steel beam and truss nodes, so that the truss and the steel beam are ensured to be reliably connected; and after the warehouse top truss is reinforced, leveling and waterproofing the warehouse top. The method for repairing the truss outside the concrete warehouse has simple steps, can be used for reinforcing and rectifying the truss by adding the steel beam on the top of the warehouse and utilizing the connecting and positioning functions of the steel beam and the steel strand outside the warehouse without dismantling the original warehouse top structure in consideration of construction feasibility, and treating the joint cracks, so that the truss meets the design requirement and the use requirement again, the structure safety is ensured, the truss does not need to enter the warehouse for maintenance, and the construction is convenient.
And after the steel strand 3 is tensioned to restore the sunk truss 2 to the initial position, fixing the two ends of the steel strand 3 by using a special clamp 7 to prevent the steel strand 3 from loosening. Like this, because girder steel rigidity, steel strand wires are to truss 2 back of pulling up to the position, fixed steel strand wires, also be exactly fixed girder steel and truss 2's relative position, then can be to welding channel-section steel 6 between girder steel 1 and the truss 2 node, realize girder steel 1 and truss 2's reliable connection, realize truss 2 location again.
The protective sleeve 5 is sleeved on the part, in contact with the steel beam 1, of the steel strand 3, and the lower protective sleeve 8 is sleeved on the part, in contact with the truss 2, of the steel strand 3. Like this, go up the setting of protective sheath and lower protective sheath, because girder steel and truss 2 are heavier, in order to prevent that steel strand wires and truss and girder steel combination department from wearing and tearing, set up metal material's protective sheath, like this, effectively protect the safety in the work progress.
Girder steel 1 be H shaped steel roof beam, girder steel 1 sets up two.
When the steel beam 1 is hoisted to the top of the concrete warehouse 4 for placement, the end part of the steel beam 1 is clamped in the clamping groove at the upper part of the concrete warehouse 4 or welded with the embedded steel bar at the upper part of the concrete warehouse 4. Therefore, after the steel beam is arranged, the steel beam needs to be welded with the truss and then serves as a part of the supporting truss, so that the steel beam needs to be positioned, and the method can reliably realize the positioning of the steel beam and avoid the shifting and falling. The stability of the truss after welding is effectively guaranteed, and the use safety of the concrete warehouse is improved.
The invention also relates to a concrete warehouse external truss repairing structure which is simple in structure, can be used for reinforcing and rectifying the truss by taking construction feasibility into consideration on the basis of not dismantling the original warehouse top structure, and treating node cracks by adding a steel beam on the upper part of the warehouse top and utilizing the connecting and positioning functions of the steel beam and the steel strand outside the warehouse, so that the truss meets the design requirement and the use requirement again, the structure safety is guaranteed, the truss repairing structure does not need to enter the warehouse for maintenance, and the construction is convenient.
The structure is restoreed to outer truss of concrete storehouse include girder steel 1, steel strand wires 3, girder steel 1 sets up to the structure that can place at 4 storehouses tops of concrete storehouse, girder steel 1 arranges with 2 vertical arrangement of truss in the 4 storehouses of concrete storehouse, steel strand wires 3 sets up to the trompil that can pass girder steel 1 and the storehouse roof 9 of 2 crossing lower parts of truss and walk around truss 2 and the structure of girder steel 1. Like this, because girder steel rigidity, steel strand wires are to truss 2 back of pulling up to the position, fixed steel strand wires, also be exactly fixed girder steel and truss 2's relative position, then can be to welding channel-section steel 6 between girder steel 1 and the truss 2 node, realize girder steel 1 and truss 2's reliable connection, realize truss 2 location again.
Concrete storehouse outer truss repair structure still include protective sheath 5 and lower protective sheath 6, go up protective sheath 5 and protective sheath 8 down and be the steel pipe protective sheath, go up protective sheath 5 and protective sheath 8 down and all set up to be the structure of U font. The steel strand 3 with the position suit of girder steel 1 contact go up protective sheath 5, go up protective sheath 5 and clamp at 1 upper portion position of girder steel, the position suit protective sheath 8 down of steel strand 3 and truss 2 contact, lower protective sheath 8 clamps at truss 2 lower part position. Like this, go up the setting of protective sheath and lower protective sheath, because girder steel and truss 2 are heavier, in order to prevent that steel strand wires and truss and girder steel combination department from wearing and tearing, set up metal material's protective sheath, like this, effectively protect the safety in the work progress.
The structure is restoreed to truss outside concrete storehouse still include special fixture 7, special fixture 7 sets up to can be fixed 3 both ends of steel strand wires and prevent the not hard up structure of steel strand wires 3.
Girder steel 1 be H shaped steel roof beam, girder steel 1 sets up two.
The invention provides an improvement on the concrete warehouse external truss repairing method and structure, aiming at the problems in the prior art. In the prior art, because the truss is arranged inside the concrete warehouse, when the truss needs to be maintained, an operator needs to enter the interior of the concrete warehouse to operate. And the dust in the warehouse is large, lighting and ventilation are not generated, the construction difficulty is large, the maintenance is inconvenient, the maintenance cost is high, the labor intensity is high, and the efficiency is low. Therefore, the invention provides improvement based on a completely different thought from the prior art, so that the truss can be maintained outside the concrete warehouse without entering the concrete warehouse by personnel, the problems in the prior art are avoided, the construction safety of the personnel is guaranteed, the labor intensity is reduced, and the maintenance efficiency is improved. When maintenance is carried out, firstly, a steel beam is manufactured and hoisted to the position of the top of the warehouse, and the steel beam is vertical to the original truss; drilling a hole on a warehouse top plate at the intersection of a steel beam and a truss, connecting the truss positioned below with steel by using a steel strand, tensioning, taking the steel beam as a stress fulcrum, and forming upward tension on the truss when the steel strand is tightened so as to restore the sunk truss to the initial level; after the sunk truss is restored to the original shape, fixing two ends of the steel strand by using a special clamp, applying a positioning force to the steel beam and the truss by using the steel strand at the moment, enabling the truss not to sink, and then welding channel steel between the steel beam and truss nodes, so that the truss and the steel beam are ensured to be reliably connected; and after the warehouse top truss is reinforced, leveling and waterproofing the warehouse top. The method and the structure for repairing the truss outside the concrete warehouse have low cost, can add the steel beam on the upper part of the warehouse top by considering the construction feasibility on the basis of not removing the original warehouse top structure, and utilize the connecting and positioning functions of the steel beam and the steel strand outside the warehouse to reinforce and correct the truss and treat the joint crack, so that the truss meets the design requirement and the use requirement again, the structure safety is ensured, the truss does not need to enter the warehouse for maintenance, and the construction is convenient.
The present invention has been described in connection with the accompanying drawings, and it is to be understood that the invention is not limited to the specific embodiments disclosed, but is intended to cover various modifications, changes and equivalents of the embodiments of the invention, and its application to other applications without departing from the spirit and scope of the invention.

Claims (10)

1.一种混凝土库库外桁架修复方法,其特征在于:所述的混凝土库库外桁架修复方法的修复步骤为:1. a concrete storehouse outside truss repair method is characterized in that: the repair step of the described concrete storehouse outside truss repair method is: S1.制作两根以上钢梁(1),将钢梁(1)吊装到混凝土库(4)库顶放置,钢梁(1)与混凝土库(4)库内的桁架(2)垂直布置;S1. Make more than two steel beams (1), hoist the steel beams (1) to the top of the concrete storehouse (4) and place them, and the steel beams (1) are vertically arranged with the trusses (2) in the concrete storehouse (4); S2.将钢梁(1)与桁架(2)相交处下部的库顶板(9)凿出开孔,用钢绞线(3)绕过桁架(2)和钢梁(1),对钢绞线(3)进行张拉;S2. Cut out a hole in the lower warehouse roof (9) where the steel beam (1) and the truss (2) intersect, use the steel strand (3) to bypass the truss (2) and the steel beam (1), The wire (3) is stretched; S3.钢绞线(3)张拉过程中,下沉的桁架(2)恢复到初始位置;S3. During the tensioning process of the steel strand (3), the sinking truss (2) is restored to its original position; S4.在钢梁(1)和桁架(2)节点之间焊接槽钢(6),桁架(2)和钢梁(1)连接;S4. Weld the channel steel (6) between the steel beam (1) and the truss (2) node, and the truss (2) and the steel beam (1) are connected; S5.桁架(2)加固完成后,对混凝土库(4)库顶进行找平和防水。S5. After the reinforcement of the truss (2) is completed, the roof of the concrete storehouse (4) is leveled and waterproofed. 2.根据权利要求1所述的混凝土库库外桁架修复方法,其特征在于:所述的钢绞线(3)进行张拉将下沉的桁架(2)恢复到初始位置后,用专用夹具(7)将钢绞线(3)两端固定,阻止钢绞线(3)松动。2. The method for repairing the outer truss of a concrete warehouse according to claim 1, characterized in that: after the steel strand (3) is stretched to restore the sinking truss (2) to its initial position, a special clamp is used (7) Fix both ends of the steel strand (3) to prevent the steel strand (3) from loosening. 3.根据权利要求1或2所述的混凝土库库外桁架修复方法,其特征在于:所述的钢绞线(3)与钢梁(1)接触的部位套装上保护套(5),钢绞线(3)与桁架(2)接触的部位套装下保护套(8)。3. The method for repairing the outer truss of a concrete storehouse according to claim 1 or 2, characterized in that: the part where the steel strand (3) is in contact with the steel beam (1) is covered with a protective cover (5), and the steel The part where the strand (3) contacts the truss (2) is covered with a lower protective sleeve (8). 4.根据权利要求1或2所述的混凝土库库外桁架修复方法,其特征在于:所述的钢梁(1)为H型钢梁,钢梁(1)设置两根。4 . The method for repairing the outer truss of a concrete warehouse according to claim 1 or 2 , wherein the steel beams ( 1 ) are H-shaped steel beams, and two steel beams ( 1 ) are provided. 5 . 5.根据权利要求1或2所述的混凝土库库外桁架修复方法,其特征在于:所述的钢梁(1)吊装到混凝土库(4)库顶放置时,钢梁(1)端部卡装在混凝土库(4)上部的卡槽内或与混凝土库(4)上部的预埋钢筋焊接。5. The method for repairing the outer truss of a concrete storehouse according to claim 1 or 2, characterized in that: when the steel beam (1) is hoisted to the top of the concrete storehouse (4) and placed on top of the storehouse, the end of the steel beam (1) The card is installed in the card groove of the upper part of the concrete storehouse (4) or welded with the pre-embedded steel bars at the upper part of the concrete storehouse (4). 6.一种混凝土库库外桁架修复结构,其特征在于:所述的混凝土库库外桁架修复结构包括钢梁(1)、钢绞线(3),钢梁(1)设置为能够放置在混凝土库(4)库顶的结构,钢梁(1)与混凝土库(4)库内的桁架(2)垂直布置,钢绞线(3)设置为能够穿过钢梁(1)与桁架(2)相交处下部的库顶板(9)的开孔而绕过桁架(2)和钢梁(1)的结构。6. An outer truss repair structure of a concrete warehouse, characterized in that: said concrete warehouse outer truss repair structure comprises steel beams (1) and steel strands (3), and the steel beams (1) are arranged to be able to be placed on The structure of the roof of the concrete storehouse (4), the steel beams (1) and the trusses (2) in the concrete storehouse (4) are arranged vertically, and the steel strands (3) are arranged to pass through the steel beams (1) and the trusses ( 2) The opening of the warehouse roof (9) at the lower part of the intersection bypasses the structure of the truss (2) and the steel beam (1). 7.根据权利要求6所述的混凝土库库外桁架修复结构,其特征在于:所述的混凝土库库外桁架修复结构还包括上保护套(5)和下保护套(6),上保护套(5)和下保护套(8)均为钢管保护套,上保护套(5)和下保护套(8)均设置为呈U字形的结构。7. The repairing structure for the outer truss of the concrete storehouse according to claim 6, characterized in that: the repairing structure for the outer truss of the concrete storehouse further comprises an upper protective cover (5) and a lower protective cover (6), and the upper protective cover (5) and the lower protective sleeve (8) are both steel pipe protective sleeves, and both the upper protective sleeve (5) and the lower protective sleeve (8) are arranged in a U-shaped structure. 8.根据权利要求8所述的混凝土库库外桁架修复结构,其特征在于:钢绞线(3)与钢梁(1)接触的部位套装上保护套(5),上保护套(5)卡装在钢梁(1)上部位置,钢绞线(3)与桁架(2)接触的部位套装下保护套(8),下保护套(8)卡装在桁架(2)下部位置。8. The truss repair structure outside the concrete storehouse according to claim 8, characterized in that: a protective cover (5) is set on the part where the steel strand (3) contacts with the steel beam (1), and the upper protective cover (5) It is clamped on the upper part of the steel beam (1), the part where the steel strand (3) is in contact with the truss (2) is covered with a lower protective sleeve (8), and the lower protective sleeve (8) is clamped on the lower part of the truss (2). 9.根据权利要求6或7所述的混凝土库库外桁架修复结构,其特征在于:所述的混凝土库库外桁架修复结构还包括专用夹具(7),专用夹具(7)设置为能够将钢绞线(3)两端固定而阻止钢绞线(3)松动的结构。9. The repair structure for the outer truss of the concrete storehouse according to claim 6 or 7, characterized in that: the repair structure for the outer truss of the concrete storehouse further comprises a special clamp (7), and the special clamp (7) is set to be able to The two ends of the steel strand (3) are fixed to prevent the steel strand (3) from loosening. 10.根据权利要求6或7所述的混凝土库库外桁架修复结构,其特征在于:所述的钢梁(1)为H型钢梁,钢梁(1)设置两根。10 . The repair structure for the truss outside the concrete storehouse according to claim 6 or 7 , wherein the steel beams ( 1 ) are H-shaped steel beams, and two steel beams ( 1 ) are provided. 11 .
CN202110557386.6A 2021-05-21 2021-05-21 Concrete warehouse external truss repairing method and concrete warehouse external truss repairing structure Pending CN113250484A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110557386.6A CN113250484A (en) 2021-05-21 2021-05-21 Concrete warehouse external truss repairing method and concrete warehouse external truss repairing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110557386.6A CN113250484A (en) 2021-05-21 2021-05-21 Concrete warehouse external truss repairing method and concrete warehouse external truss repairing structure

Publications (1)

Publication Number Publication Date
CN113250484A true CN113250484A (en) 2021-08-13

Family

ID=77183607

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110557386.6A Pending CN113250484A (en) 2021-05-21 2021-05-21 Concrete warehouse external truss repairing method and concrete warehouse external truss repairing structure

Country Status (1)

Country Link
CN (1) CN113250484A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH251598A (en) * 1944-12-19 1947-11-15 Couvy Claire Hydrocarbon tank with roof reinforcement device.
FR2563557A1 (en) * 1984-04-26 1985-10-31 Gary Jean Pierre Method for converting a truss and means for implementing this method
CN105781142A (en) * 2016-04-26 2016-07-20 中南大学 Reinforcement structure and reinforcement method for column removal of top layer of building structure
CN108086706A (en) * 2017-11-24 2018-05-29 温州东瓯建设集团有限公司 Beam-string structure system and its construction method in portal-rigid frames reinforcing
CN108252529A (en) * 2018-01-10 2018-07-06 上海润昱电力工程有限公司 A kind of method that steel-structure factory building reinforces installation photovoltaic power generation plate
CN108343259A (en) * 2018-02-06 2018-07-31 广东省基础工程集团有限公司 A kind of prestressed reinforcement beam and its construction method
CN209585684U (en) * 2019-01-10 2019-11-05 中亿丰建设集团股份有限公司 A kind of top plate exempts from bracing reinforcement component

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH251598A (en) * 1944-12-19 1947-11-15 Couvy Claire Hydrocarbon tank with roof reinforcement device.
FR2563557A1 (en) * 1984-04-26 1985-10-31 Gary Jean Pierre Method for converting a truss and means for implementing this method
CN105781142A (en) * 2016-04-26 2016-07-20 中南大学 Reinforcement structure and reinforcement method for column removal of top layer of building structure
CN108086706A (en) * 2017-11-24 2018-05-29 温州东瓯建设集团有限公司 Beam-string structure system and its construction method in portal-rigid frames reinforcing
CN108252529A (en) * 2018-01-10 2018-07-06 上海润昱电力工程有限公司 A kind of method that steel-structure factory building reinforces installation photovoltaic power generation plate
CN108343259A (en) * 2018-02-06 2018-07-31 广东省基础工程集团有限公司 A kind of prestressed reinforcement beam and its construction method
CN209585684U (en) * 2019-01-10 2019-11-05 中亿丰建设集团股份有限公司 A kind of top plate exempts from bracing reinforcement component

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张继文等: "采用预应力技术抽除承重墙改造房屋的应用", 施工技术, vol. 32, no. 6, pages 14 - 15 *

Similar Documents

Publication Publication Date Title
CN101100902A (en) Inclined drawing steel truss high-supported formwork structure system and construction method thereof
CN104652242B (en) Derrick connecting structure used for reinforcing PSC (Pre-stressed Concrete) continuous box girder bridge and construction method
CN205036072U (en) A shaped steel formwork support that encorbelments for high altitude structure of encorbelmenting
CN102535648A (en) Steel pipe column ring beam column node structure and construction method thereof
KR100760435B1 (en) Adjustable Temporary Shores
CN111593674A (en) Suspended casting beam cable construction structure and construction method for n-shaped beam bridge
CN104989109A (en) Method for lifting roof girders and purlines at the same time
KR101658390B1 (en) Reinforcement method of culvert
CN104652244B (en) A kind of Suspension bridge structure for reinforcing PSC Continuous Box Girder Bridge and construction method
CN100570106C (en) Heritage building ridge holistic hoisting method
KR102066355B1 (en) The method of composite girder to minimize side buckling
CN113250484A (en) Concrete warehouse external truss repairing method and concrete warehouse external truss repairing structure
JP6632157B2 (en) Replacement method of truss structure members
CN109972512A (en) A cast-in-place construction method for a profiled steel plate-concrete composite bridge deck
CN105696549A (en) Novel steel reinforcement cage interior supporting structure and application thereof
CN109307108A (en) A kind of concrete delivery pump pipe angle turning tool formula fixed structure and its construction method
CN104310234B (en) External Suspension Climbing Tower Crane Support System
CN106451271B (en) A kind of cable passageway portal structure and its installation method
CN206319597U (en) A kind of cantilever steel girder erecting device
KR101605011B1 (en) Repair and Reinforcement method of lower structure of bridge
JP2019178607A (en) Truss bridge member replacement method and rebuilding method
CN115341701B (en) Hanging formwork construction method for high-altitude overhanging steel bar truss floor support plate
CN206283215U (en) A kind of cable passageway portal structure
KR102245034B1 (en) Modular trench, trench structure including the same, and method of constructing the trench structure
CN115142666A (en) Inverted cone shell water tower construction device and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210813