[go: up one dir, main page]

CN108086706A - Beam-string structure system and its construction method in portal-rigid frames reinforcing - Google Patents

Beam-string structure system and its construction method in portal-rigid frames reinforcing Download PDF

Info

Publication number
CN108086706A
CN108086706A CN201711188088.4A CN201711188088A CN108086706A CN 108086706 A CN108086706 A CN 108086706A CN 201711188088 A CN201711188088 A CN 201711188088A CN 108086706 A CN108086706 A CN 108086706A
Authority
CN
China
Prior art keywords
girder steel
portal
extended segment
lower edge
structure system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201711188088.4A
Other languages
Chinese (zh)
Inventor
陈瑞生
陈晓义
吴勇
周凤中
何约微
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University Of Technology Engineering Design Group Co Ltd
WENZHOU DONGOU CONSTRUCTION GROUP CO Ltd
Original Assignee
Zhejiang University Of Technology Engineering Design Group Co Ltd
WENZHOU DONGOU CONSTRUCTION GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University Of Technology Engineering Design Group Co Ltd, WENZHOU DONGOU CONSTRUCTION GROUP CO Ltd filed Critical Zhejiang University Of Technology Engineering Design Group Co Ltd
Priority to CN201711188088.4A priority Critical patent/CN108086706A/en
Publication of CN108086706A publication Critical patent/CN108086706A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A kind of beam-string structure system in being reinforced the invention discloses portal-rigid frames, roof girder steel both sides lower end is fixed with lower pendant, prestressed stretch-draw has lower edge in two lower pendants, interval is supported with lower support bar between lower edge and girder steel, lower support bar lower end is fixedly connected with lower edge, and post upper is hinged with girder steel.In the present invention, active reinforcing mode is belonged to using the external prestressing strengthening technology of beam-string structure system, after tensioned prestressing bar, presstressed reinforcing steel shifts to an earlier date stress, it works asynchronously with original structure component, stress difference is not present in the two, and is reinforced using external prestressing technique, to the current Influence to operation very little of original building, it can be reinforced under conditions of use is not limited, lower pendant is fixed in girder steel both sides lower end, lower pendant is set to facilitate tensioning lower edge, and the lower edge that tensioning is formed more balances.

Description

Beam-string structure system and its construction method in portal-rigid frames reinforcing
Technical field
A kind of beam-string structure system in being reinforced the present invention relates to portal-rigid frames.The invention further relates to above-mentioned portal-rigid frames to add The construction method of beam-string structure system in Gu.
Background technology
With reform and opening-up, since the eighties in last century, China has built substantial amounts of industrial premises.With work in recent years The development of industry modernization, large quantities of Portal Rigid Frame Factory Structures that early period builds generally face using changes of function and cause structure The problem of load increase, this causes original structural-load-carrying capacity to have been unable to meet current specifications requirement, is badly in need of reinforcing.
Conventional portal-rigid frames reinforcing generally is passive type reinforcing, and generally use uses increasing section, adds rest etc. Method is reinforced, and newly-increased component has secondary loading, can not ensure with original structure cooperative bearing, only when load-bearing reaches During to certain value, newly-increased component just works, and causing original structure component, there are stress differences with newly-increased component.And newly-increased structure Part and the direct welding job amount of former component are big, can not ensure construction quality, in the welding process in fusion pair after the melting of steel Original structure intensity also has considerable damage.And the reinforcing mode of traditional increasing section influences very existing building clear height Greatly, the use function of existing building is seriously affected;And traditional reinforcing mode is typically necessary setting temporary support, occupies factory The production space in room so that workshop normal operation can not carry out.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of door that can preferably strengthen Portal Rigid Frame Factory Structure Beam-string structure system in the reinforcing of formula rigid frame.The technical problems to be solved by the invention are to provide a kind of above-mentioned portal-rigid frames and reinforce In beam-string structure system construction method.
For this purpose, the beam-string structure system in portal-rigid frames reinforcing provided by the invention, roof girder steel both sides lower end is fixed with Lower pendant, prestressed stretch-draw has lower edge in two lower pendants, and interval is supported with lower support bar between lower edge and girder steel, under lower support bar End is fixedly connected with lower edge, and lower support bar upper end is hinged with girder steel.
The construction method of beam-string structure system in being reinforced the present invention also provides above-mentioned portal-rigid frames, it is characterized in that:Bag Include following steps:A, the lower pendant is fixed on the downside of girder steel both ends;B, each lower support bar upper end is articulated on the downside of girder steel, under Supporting rod lower end is fixedly connected with lower edge;C, the lower edge is pre-tightened into tensioning between the lower pendant at both ends;D, in side column upper end Extended segment in setting sets side extended segment in the side of girder steel, and the one end that will wind up is connected through roof with girder steel, the other end is set up It is connected in the end of upper extended segment and side extended segment with side column and pre-tightens tensioning.
The technique effect of the present invention:
1st, active reinforcing mode is belonged to using the external prestressing strengthening technology of beam-string structure system, after tensioned prestressing bar, in advance Stress rib shifts to an earlier date stress, works asynchronously with original structure component, and stress difference is not present in the two;
2nd, due to presstressed reinforcing steel scale of construction very little itself, presstressed reinforcing steel the space occupied is seldom after reinforcing, can adapt to below girder steel Small space;
3rd, the lower edge arrangement that prestress wire is formed is flexible, can be according to the position of equipment installation flexible arrangement steel strand wires It puts, and the workload very little welded is needed in work progress, it is guaranteed to construction quality;
4th, reinforced using external prestressing technique, to the current Influence to operation very little of original building, the condition that uses can not limited Under reinforced;
5th, lower pendant is fixed in girder steel both sides lower end, lower pendant is set to facilitate tensioning lower edge, and the lower edge that tensioning is formed is more flat Weighing apparatus.
Description of the drawings
Fig. 1 is the beam-string structure architectural schematic during the portal-rigid frames that the first embodiment of the invention provides are reinforced.
Fig. 2 is the structure diagram of the U-shaped clip in Fig. 1.
Fig. 3 is the beam-string structure architectural schematic during the portal-rigid frames that second of embodiment of the invention provides are reinforced.
Specific embodiment
The present invention is further described in detail below with reference to the accompanying drawings and embodiments, described in specific embodiment It is only used to explain the present invention, be not intended to limit the present invention.
It is shown in reference picture 1, Fig. 2, the beam-string structure system in the portal-rigid frames reinforcing that the first embodiment of the invention provides, 1 both sides lower end of factory roof girder steel is fixed with lower pendant 2, and lower pendant 2 uses bracket structure, prestressed stretch-draw in two lower pendants 2 There is lower edge 3, interval is supported with lower support bar 4 between lower edge 3 and girder steel 1, and 4 lower end of lower support bar is fixedly connected with lower edge 3, lower branch 4 upper end of strut is hinged with girder steel 1.In the present embodiment, the two side ends of portal-rigid frames are set up on side column 5, are fixed on side column 5 Upper extended segment 9,1 side of girder steel carry side extended segment 11, wind up 12 one end it is oblique be connected with girder steel 1, the other end process The end of the upper extended segment 9 and the end of side extended segment 11 pre-tighten with 5 tensioning of side column and connect, described to wind up 12 through on described The perforation of extended segment 9, winding up in the structure 12 makes full use of narrow space, by pretightning force in a manner that turnover pre-tightens connection Be distributed on extended segment 9, side extended segment 11 and side column 5, and 1 top of girder steel be subject to wind up 12 oblique pull after further enhance Bearing capacity.
Beam-string structure system in being reinforced with reference to the portal-rigid frames that shown in Fig. 3, second of embodiment of the present invention provides and the A kind of embodiment is essentially identical, differs only in:In order to preferably strengthen side column 5, while strengthen girder steel 1 again, the gate-type is firm The outside of side column 5 of frame is provided with reinforcing prop 6, reinforcing prop 6 be close to 5 outside of side column and along side column short transverse using U-shaped clip 7 with Side column banding, 7 openend of U-shaped clip are tensed using bolt 8, and 6 upper end of reinforcing prop is using bolt 8 and the outboard end of girder steel 1 It is fixedly connected.
It is shown in reference picture 1, Fig. 2, the portal-rigid frames that above-mentioned the first embodiment provides reinforce in beam-string structure system Construction method comprises the following steps:A, the lower pendant 2 is fixed on the downside of 1 both ends of girder steel;B, each 4 upper end of lower support bar is cut with scissors 1 downside of girder steel is connected to, 4 lower end of lower support bar is fixedly connected with lower edge 3;C, the lower edge 3 is pre-tightened into tensioning in the lower extension at both ends Between part 2;Extended segment in side column upper end is set, side extended segment is set in the side of girder steel D, the one end that will wind up passes through roof It is connected with girder steel, the other end is erected at upper extended segment and the end of side extended segment is connected with side column and pre-tightens tensioning.

Claims (4)

1. the beam-string structure system in a kind of portal-rigid frames reinforcing, it is characterized in that:Roof girder steel both sides lower end is fixed with lower pendant, Prestressed stretch-draw has lower edge in two lower pendants, and interval is supported with lower support bar between lower edge and girder steel, and lower support bar lower end is under String is fixedly connected, and post upper is hinged with girder steel.
2. the beam-string structure system in portal-rigid frames reinforcing according to claim 1, it is characterized in that:The portal-rigid frames Two side ends are set up on side column, and extended segment is fixed on side column, and the girder steel side carries side extended segment, and the one end winded up is oblique To be connected with girder steel, the other end pre-tightens connection by end and the side column tensioning of the end and side extended segment of the upper extended segment.
3. the beam-string structure system in portal-rigid frames reinforcing according to claim 1, it is characterized in that:It is described to wind up through institute State the perforation of extended segment.
4. the construction method of the beam-string structure system in portal-rigid frames reinforcing described in a kind of claim 1, it is characterized in that:Including with Lower step:A, the lower pendant is fixed on the downside of girder steel both ends;B, each lower support bar upper end is articulated on the downside of girder steel, lower support Bar lower end is fixedly connected with lower edge;C, the lower edge is pre-tightened into tensioning between the lower pendant at both ends;D, set in side column upper end Upper extended segment sets side extended segment in the side of girder steel, will wind up one end through on roof is connected with girder steel, the other end is erected at The end of extended segment and side extended segment is connected with side column and pre-tightens tensioning.
CN201711188088.4A 2017-11-24 2017-11-24 Beam-string structure system and its construction method in portal-rigid frames reinforcing Withdrawn CN108086706A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711188088.4A CN108086706A (en) 2017-11-24 2017-11-24 Beam-string structure system and its construction method in portal-rigid frames reinforcing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711188088.4A CN108086706A (en) 2017-11-24 2017-11-24 Beam-string structure system and its construction method in portal-rigid frames reinforcing

Publications (1)

Publication Number Publication Date
CN108086706A true CN108086706A (en) 2018-05-29

Family

ID=62172908

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711188088.4A Withdrawn CN108086706A (en) 2017-11-24 2017-11-24 Beam-string structure system and its construction method in portal-rigid frames reinforcing

Country Status (1)

Country Link
CN (1) CN108086706A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109779277A (en) * 2019-01-09 2019-05-21 国粮武汉科学研究设计院有限公司 Steel-structure factory building Enlargement of Section reinforcement of weld construction method
CN113250484A (en) * 2021-05-21 2021-08-13 安徽海螺建材设计研究院有限责任公司 Concrete warehouse external truss repairing method and concrete warehouse external truss repairing structure

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0492046A (en) * 1990-08-07 1992-03-25 Kurosawa Kensetsu Kk Composite beam structure
CN201660966U (en) * 2010-02-02 2010-12-01 中冶建筑研究总院有限公司 Mast suspension cable joist tensile integral structure
CN203924483U (en) * 2014-06-11 2014-11-05 江苏科技大学 A kind of truss string structure of built-in oblique guy rope
CN106978883A (en) * 2017-03-31 2017-07-25 天津城建大学 A kind of folding beam string
CN208152606U (en) * 2017-11-24 2018-11-27 温州东瓯建设集团有限公司 Beam-string structure system in portal-rigid frames reinforcing

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0492046A (en) * 1990-08-07 1992-03-25 Kurosawa Kensetsu Kk Composite beam structure
CN201660966U (en) * 2010-02-02 2010-12-01 中冶建筑研究总院有限公司 Mast suspension cable joist tensile integral structure
CN203924483U (en) * 2014-06-11 2014-11-05 江苏科技大学 A kind of truss string structure of built-in oblique guy rope
CN106978883A (en) * 2017-03-31 2017-07-25 天津城建大学 A kind of folding beam string
CN208152606U (en) * 2017-11-24 2018-11-27 温州东瓯建设集团有限公司 Beam-string structure system in portal-rigid frames reinforcing

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109779277A (en) * 2019-01-09 2019-05-21 国粮武汉科学研究设计院有限公司 Steel-structure factory building Enlargement of Section reinforcement of weld construction method
CN113250484A (en) * 2021-05-21 2021-08-13 安徽海螺建材设计研究院有限责任公司 Concrete warehouse external truss repairing method and concrete warehouse external truss repairing structure

Similar Documents

Publication Publication Date Title
CN104975566B (en) Apply the steel pipe support in cable-stayed bridge arch tower is constructed
CN101581074B (en) Large-span steel truss arch construction method
CN103643800B (en) The erection & lift system of buckling-restrained bracing member and construction method thereof
CN208152606U (en) Beam-string structure system in portal-rigid frames reinforcing
CN111119494A (en) High-altitude in-situ construction method for ultra-large span string arched steel structure
CN114215170A (en) Method for lifting super-altitude giant hanging multi-layer connected structure
CN111794381A (en) Reverse cable-stayed device for installing cable-supported grid steel structure and implementation method thereof
CN108086706A (en) Beam-string structure system and its construction method in portal-rigid frames reinforcing
CN111827678A (en) A hoisting method of truss steel structure at the top of a silo
CN206599919U (en) A kind of integral prefabricated reinforcing bar web frame of shear wall
CN110056218B (en) Single-storey factory building column-drawing steel frame structure
CN108643364A (en) Single-arch progressive net rack mounting method
CN208152607U (en) Beam-string structure system in the reinforcing of large span rigid frame
CN117627374A (en) Large-span truss anti-sedimentation installation construction process
CN108086707A (en) Beam-string structure system and its construction method in the reinforcing of large span rigid frame
CN210917735U (en) Supporting jig frame structure for large-span prestressed inhaul cable structure
CN112281685B (en) Lifting construction method of steel arch structure
CN205617805U (en) Steel jig frame for daylighting roof steel structure construction
CN213112170U (en) Box girder prefabricating field steel reinforcement framework lifting appliance
CN104085832A (en) Flexible component lifting device and lifting method thereof
CN212475790U (en) Integral hoisting device for roof color steel plate
CN108517970A (en) A kind of large-span truss hanging method
CN215760347U (en) A temporary steel truss device for the roof construction of cement silo
CN207277212U (en) A kind of novel steel beam floorings construction formwork supporting structure
CN217325017U (en) Bent cap construction bracket with mounting platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20180529

WW01 Invention patent application withdrawn after publication