CN113186900B - Carbon fiber electroosmotic chain type vertical reinforcement structure and its soft base treatment method - Google Patents
Carbon fiber electroosmotic chain type vertical reinforcement structure and its soft base treatment method Download PDFInfo
- Publication number
- CN113186900B CN113186900B CN202110373832.8A CN202110373832A CN113186900B CN 113186900 B CN113186900 B CN 113186900B CN 202110373832 A CN202110373832 A CN 202110373832A CN 113186900 B CN113186900 B CN 113186900B
- Authority
- CN
- China
- Prior art keywords
- carbon fiber
- type vertical
- chain
- reinforcement
- vertical direction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/11—Improving or preserving soil or rock, e.g. preserving permafrost soil by thermal, electrical or electro-chemical means
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Structural Engineering (AREA)
- Agronomy & Crop Science (AREA)
- Environmental & Geological Engineering (AREA)
- Soil Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
本发明公开了一种碳纤维电渗链式竖直方向增强体结构及其软基的处理方法。包括:将散粒体材料用碳纤维经编导电网包裹形成网兜,用碳纤维条将网兜连接成空间正四面体结构,散粒体材料为建筑垃圾再生骨料;将正四面体结构充分搅拌后,沉入含双螺旋上升碳纤维条和PVC排水管的竖直方向增强体内;在软基上铺设砂石垫层形成复合地基,垫层为铺设水平PVC排水管的砂石垫层;连接竖直方向增强体内的PVC排水管和水平PVC排水管,构成完整的排水系统;将竖直方向增强体内的双螺旋上升的碳纤维条与稳压直流电源连接,形成电渗加速排水;本发明的软基处理方法能加速软基排水速率,缩短固结周期,提高复合地基承载力,且具有环保、施工简单等优点。
The invention discloses a carbon fiber electroosmosis chain type vertical reinforcement structure and a processing method for its soft base. Including: wrapping the granular material with carbon fiber warp-knitted conductive mesh to form a net bag, connecting the net bag with carbon fiber strips to form a space regular tetrahedron structure, and the granular body material is recycled aggregate of construction waste; after fully stirring the regular tetrahedral structure, sink It is inserted into the vertical reinforcement body containing double-spiral rising carbon fiber strips and PVC drainage pipes; sand and gravel cushions are laid on the soft foundation to form a composite foundation, and the cushions are sand and gravel cushions for laying horizontal PVC drainage pipes; the connection is reinforced in the vertical direction The PVC drainage pipe and the horizontal PVC drainage pipe in the body constitute a complete drainage system; the double-spiral rising carbon fiber strip in the vertical direction strengthens the inner body and the regulated DC power supply is connected to form electroosmotic accelerated drainage; the soft foundation treatment method of the present invention It can accelerate the drainage rate of soft foundation, shorten the consolidation period, improve the bearing capacity of composite foundation, and has the advantages of environmental protection and simple construction.
Description
技术领域technical field
本发明涉及软基处理技术领域,具体涉及一种碳纤维电渗链式竖直方向增强体结构及其软基的处理方法。The invention relates to the technical field of soft base treatment, in particular to a carbon fiber electroosmosis chain type vertical reinforcement structure and a soft base treatment method thereof.
背景技术Background technique
随着我国国民经济的快速发展,国家对基础设施建设的不断加大,我国高层建筑、高速公路、铁路建设取得了迅猛发展,同时产生的建筑垃圾,无法妥善处理,造成环境污染;软土地基问题日益突出,已成为影响工程质量,建设工期和工程造价的关键因素之一。在软弱土地基处理时,需要地基土排水固结,使地基土具有一定的强度,刚性桩复合地基往往因桩与桩间土的刚度相差过大,地基土排水固结后大量沉降,会引起桩体负摩阻力,引起刚性桩失效,尤其是桩体无法穿透深厚高含水率地基时,不能使用刚性桩处理方式;碎石桩等散体材料桩复合地基往往因桩间土体强度较低,桩体容易发生很大的侧向的膨胀,碎石填料侧向挤出,无法起到地基加固作用,在碎石桩中注射水泥浆虽然可以提高碎石桩上部强度,但无法处理深部碎石及桩间土,压浆法处理效果因桩间土性质的差异处理效果差异显著,质量控制相对困难,处理成本高;电渗法加固软土地基比较环保、高效,但是对软土地基仅具有排水固结作用,处理周期较长,处理深度有限,对软土地基强度提高作用有限。总的来说,虽然用于软土地基处理的方法较多,但在对其进行治理时,采用上述传统方法因工期长、造价高、工后质量难以控制、提高软土地基强度有限等原因,在处理较深软土地基的过程中效果并不明显。With the rapid development of my country's national economy and the continuous increase in infrastructure construction by the state, the construction of high-rise buildings, highways and railways in my country has achieved rapid development. At the same time, the construction waste generated cannot be properly disposed of, causing environmental pollution; soft soil foundations The problem has become increasingly prominent and has become one of the key factors affecting project quality, construction period and project cost. In the treatment of soft soil foundation, it is necessary to drain and consolidate the foundation soil to make the foundation soil have a certain strength. The rigid pile composite foundation is often due to the excessive difference in the stiffness of the soil between the pile and the pile, and the foundation soil settles a lot after drainage and consolidation, which will cause The negative friction resistance of the pile body causes the failure of the rigid pile, especially when the pile body cannot penetrate deep and high water content foundations, the rigid pile treatment method cannot be used; Low, the pile body is prone to large lateral expansion, and the crushed stone filler is extruded laterally, which cannot play the role of foundation reinforcement. Although the injection of cement slurry into the crushed stone pile can improve the strength of the upper part of the crushed stone pile, it cannot deal with the deep part. Crushed stone and soil between piles, the treatment effect of grouting method is significantly different due to the difference in soil properties between piles, the quality control is relatively difficult, and the treatment cost is high; It only has the effect of drainage and consolidation, the treatment period is long, the treatment depth is limited, and the effect of improving the strength of soft soil foundation is limited. In general, although there are many methods for the treatment of soft soil foundations, the traditional methods mentioned above are used for reasons such as long construction period, high cost, difficult to control post-construction quality, and limited improvement of soft soil foundation strength. , the effect is not obvious in the process of dealing with deeper soft soil foundation.
发明内容SUMMARY OF THE INVENTION
本发明为解决背景技术中传统方法处理软土地基存在的不足;提供一种既能提高排水效率、加速软土地基固结、缩短工期、降低工程造价,又能约束竖直方向增强体侧向膨胀,提高承载力,减少工后沉降的一种碳纤维电渗链式竖直方向增强体结构及其软基的处理方法。The present invention solves the deficiencies of the conventional methods for processing soft soil foundations in the background technology; provides a method that can not only improve drainage efficiency, accelerate the consolidation of soft soil foundations, shorten the construction period, and reduce engineering costs, but also constrain the lateral direction of the reinforcing body in the vertical direction. The invention relates to a carbon fiber electroosmosis chain type vertical reinforcement structure and its soft foundation treatment method, which can expand, improve bearing capacity and reduce post-construction settlement.
为实现上述目的,本发明提供的技术方案如下:For achieving the above object, the technical scheme provided by the invention is as follows:
第一方面,本发明提供一种碳纤维电渗链式竖直方向增强体结构,其特征在于:包括散粒体材料,若干碳纤维经编导电网,若干双螺旋上升的碳纤维条,若干稳压直流电电源导线,若干PVC排水管和砂石垫层;所述若干PVC排水管包括竖直方向布置的PVC排水管和水平方向布置的PVC排水管;所述若干水平方向布置的PVC排水管构成水平方向的PVC排水管网;所述碳纤维经编导电网包裹散粒体材料,形成网兜;所述碳纤维条与网兜连接,构成空间正四面体的框架结构;将所述空间正四面体结构充分搅拌后,所述网兜与网兜之间连接的碳纤维条相互缠绕,形成一个相互咬合的整体(由于网兜是用碳纤维条连接到,将空间正四面体结构搅拌,网兜与网兜之间连接的碳纤维条相互缠绕,形成一个相互咬合的整体);再投置到增强体的增强体孔(由于这个结构类似于钻孔灌注桩,施工的第一步是钻孔,将空间正四面体结构充分搅拌后,投入竖向增强体孔内,震动后,再次投入空间正四面体结构咬合体,直至地面,形成竖向增强体结构)中,同时铺设双螺旋上升的碳纤维条作为电极材料,铺设竖直方向的PVC排水管,作为增强体内的排水装置;竖向增强体外围包裹有一层碳纤维经编导电网(采用的是相同材料的碳纤维经编导电网,只是设置的位置不同,这里的一层碳纤维经编导电网是指竖向增强体外围的包裹碳纤维经编导电网,而形成网兜碳纤维经编导电网是从属关系,即网兜中碳纤维经编导电网在竖向增强体外围的包裹碳纤维经编导电网内),使得网兜中的碳纤维经编导电网在竖向增强体外围的包裹碳纤维经编导电网内部;所述砂石垫层铺设在软基上,还铺设水平方向的PVC排水管网和稳压直流电电源导线,使增强体中的竖直方向PVC排水管与水平方向的PVC排水管网连通,构成完整的排水系统;所述稳压直流电电源导线与增强体中螺旋上升的碳纤维条连接;所述稳压直流电电源导线与直流电源装置连通,采用单一阳极,周围均为阴极的方式。In the first aspect, the present invention provides a carbon fiber electroosmosis chain-type vertical reinforcement structure, which is characterized by comprising: granular material, a plurality of carbon fiber warp-knitted conductive nets, a plurality of double-spiral carbon fiber strips, and a plurality of regulated DC power sources. Conductive wire, several PVC drainage pipes and sand and gravel cushions; the plurality of PVC drainage pipes include PVC drainage pipes arranged in a vertical direction and PVC drainage pipes arranged in a horizontal direction; the PVC drainage pipes arranged in a horizontal direction constitute a horizontal PVC drainage pipe network; the carbon fiber warp-knitted conductive net wraps the granular material to form a net pocket; the carbon fiber strips are connected with the net pocket to form a space regular tetrahedron frame structure; after the space regular tetrahedron structure is fully stirred, the The carbon fiber strips connected between the net pockets and the net pockets are intertwined with each other to form an interlocking whole (because the net pockets are connected by carbon fiber strips, the space regular tetrahedral structure is stirred, and the carbon fiber strips connected between the net pockets and the net pockets are intertwined with each other to form a A whole that meshes with each other); and then put it into the reinforcement hole of the reinforcement (since this structure is similar to a bored pile, the first step of construction is to drill a hole. After fully stirring the space regular tetrahedron structure, put it into the vertical direction. In the reinforcing body hole, after the vibration, it is put into the space regular tetrahedron structure occlusal body again, until the ground, forming a vertical reinforcing body structure), at the same time laying double-spiral rising carbon fiber strips as electrode materials, laying vertical PVC drainage pipes , as a drainage device in the reinforcement body; a layer of carbon fiber warp knitted conductive mesh is wrapped around the vertical reinforcement body (the carbon fiber warp knitted conductive mesh of the same material is used, but the location is different. A layer of carbon fiber warp knitted conductive mesh here refers to the vertical The wrapping carbon fiber warp knitted conductive net around the reinforcement body, and the formation of the net pocket carbon fiber warp knitted conductive net is a subordinate relationship, that is, the carbon fiber warp knitted conductive net in the net pocket is in the wrapped carbon fiber warp knitted conductive net on the periphery of the vertical reinforcement), so that the carbon fiber warp knitted conductive net in the net pocket guides The power grid is inside the wrapped carbon fiber warp-knitted conductive mesh on the periphery of the vertical reinforcement; the sand and gravel cushion is laid on the soft base, and the horizontal PVC drainage pipe network and the regulated DC power supply wire are also laid to make the vertical reinforcement in the reinforcement body. The directional PVC drainage pipe is connected with the horizontal PVC drainage pipe network to form a complete drainage system; the regulated DC power supply wire is connected with the carbon fiber strips spirally rising in the reinforcement body; the regulated DC power supply wire is connected with the DC power supply device , using a single anode, surrounded by cathodes.
第二方面,本发明提供一种碳纤维电渗链式竖直方向增强体结构及其软基的处理方法,其特征在于:In the second aspect, the present invention provides a carbon fiber electroosmosis chain type vertical direction reinforcement structure and a processing method for its soft base, characterized in that:
S1:将散粒体材料用碳纤维经编导电网包裹,形成网兜;S1: wrap the granular material with a carbon fiber warp-knitted conductive mesh to form a mesh pocket;
S2:将网兜连接成空间正四面体框架结构,充分搅拌后,沉入含碳纤维条和竖直方向PVC排水管的增强体内;S2: Connect the net bag into a space regular tetrahedron frame structure, after fully stirring, sink into the reinforcement body containing carbon fiber strips and vertical PVC drainage pipes;
S3:在软弱土地基上铺设砂石垫层形成复合地基;S3: Lay sand and gravel cushions on soft soil foundations to form composite foundations;
S4:连接竖直方向增强体内PVC排水管和砂石垫层中PVC排水管,构成排水系统;S4: Connect the PVC drainage pipe in the vertical reinforcement body and the PVC drainage pipe in the sand and gravel cushion to form a drainage system;
S5:将竖直方向增强体内的双螺旋上升的碳纤维条与稳压直流电源导线连接,形成电渗;S5: Connect the double-spiral carbon fiber strips in the vertical reinforcement body to the regulated DC power supply wire to form electroosmosis;
经过上述步骤之后,待地下水降到设计水位以下时,停止通入直流电,采用静荷载试验检验加固效果,待承载力满足设计要求后,从而进行上部工程施工。After the above steps, when the groundwater drops below the design water level, stop the direct current, and use the static load test to check the reinforcement effect. After the bearing capacity meets the design requirements, the upper engineering construction is carried out.
首先,将散粒体材料用碳纤维经编导电网包裹,形成网兜,用碳纤维条链式连接网兜,形成空间正四面体框架结构,再将碳纤维经编导电网铺设在钢套筒内壁上;在软弱土地基中使用轻型钻孔机钻孔,成孔后,下沉内壁铺设碳纤维经编导电网的钢套筒,将用碳纤维条连接的正四面体框架结构充分搅拌后,沉入含碳纤维条和竖直方向PVC排水管的增强体孔内;其次,在软弱土地基上铺设砂石垫层形成复合地基,同时在砂石垫层中铺设水平PVC排水管,将砂石垫层中铺设的水平PVC排水管与链式竖直方向增强体内的PVC排水管连通,构成完整的排水系统,使链式竖直方向增强体结构中的水迅速排出;最后,将链式竖直方向增强体中的双螺旋上升的碳纤维条与稳压直流电源导线连接,形成电渗,连接方式采用单一阳极,阳极周围均为阴极的策略;待地下水下降到设计水位以下时,停止通入直流电,采用静荷载试验检验加固效果,待承载力满足设计要求后,再进行上部结构施工。First, wrap the granular material with a carbon fiber warp-knitted conductive net to form a net pocket, connect the net pockets with carbon fiber chains to form a space regular tetrahedral frame structure, and then lay the carbon fiber warp-knitted conductive net on the inner wall of the steel sleeve; A light drilling machine is used to drill holes in the foundation. After the holes are formed, a steel sleeve with carbon fiber warp-knitted conductive mesh is laid on the inner wall. After fully stirring the regular tetrahedral frame structure connected with carbon fiber strips, it is sunk into the carbon fiber strips and vertical In the reinforcement hole of the PVC drainage pipe; secondly, lay a sand and gravel cushion on the soft soil foundation to form a composite foundation, and at the same time lay a horizontal PVC drainage pipe in the sand and gravel cushion to drain the horizontal PVC laid in the sand and gravel cushion. The pipe is connected with the PVC drainage pipe in the chain vertical reinforcement body to form a complete drainage system, so that the water in the chain vertical reinforcement structure can be quickly discharged; finally, the double helix in the chain vertical reinforcement body is discharged. The rising carbon fiber strip is connected with the regulated DC power supply wire to form electroosmosis. The connection method adopts the strategy of a single anode, and the anode is surrounded by cathodes; when the groundwater drops below the design water level, the DC power supply is stopped, and the static load test is used to check the reinforcement. After the bearing capacity meets the design requirements, the superstructure construction will be carried out.
上述碳纤维电渗链式竖直方向增强体软基处理方法的技术施工方法,主要技术步骤:The technical construction method of the above-mentioned carbon fiber electroosmosis chain type vertical direction reinforcement soft base treatment method, the main technical steps:
(1)碳纤维经编导电网包裹散粒体材料示意图如图1所示,将散粒体材料用碳纤维经编导电网包裹,形成网兜,用碳纤维条链式连接网兜,形成空间正四面体框架结构;(1) The schematic diagram of the carbon fiber warp-knitted conductive mesh wrapping the granular material is shown in Figure 1, the granular material is wrapped with the carbon fiber warp-knitted conductive mesh to form a net pocket, and the carbon fiber chain is used to connect the net pocket to form a space regular tetrahedron frame structure;
(2)碳纤维经编导电网链式竖直方向增强体结构布置示意图如图3所示,首先,将碳纤维经编导电网铺设在钢套筒内壁上,碳纤维经编导电网的长度大于链式竖直方向增强体长100~200mm,采用机械咬合方式将碳纤维经编导电网端部连接在一起。碳纤维经编导电网宽度大于链式竖直方向增强体周长100~200mm,采用机械咬合方式将碳纤维编导电网端部连接在一起。其次,采用轻型钻孔设备钻孔,清孔并检查成孔质量,下沉钢套筒,铺设双螺旋上升结构的碳纤维条和竖直方向PVC排水管,将用碳纤维条链式连接的正四面体框架结构充分搅拌后,按要求沉入使竖直方向增强体结构每次升高设计高度的散粒体材料,振动设备进行振动,振动密实后,缓慢拔出钢套筒,重复以上操作,直至地面,形成链式竖直方向增强体结构。链式竖直方向增强体结构中心位置偏差不应超过20mm,散粒体骨料质地坚硬、具有一定的强度、水稳定性好、不易风化且级配良好,含泥量小于5%,严格控制钢套筒的上拔高度;(2) The schematic diagram of the structural arrangement of the carbon fiber warp-knitted conductive mesh in the vertical direction of the chain is shown in Figure 3. First, the carbon fiber warp-knitted conductive mesh is laid on the inner wall of the steel sleeve. The length of the reinforcing body is 100-200mm, and the ends of the carbon fiber warp knitted conductive mesh are connected together by mechanical engagement. The width of the carbon fiber warp knitted conductive net is 100-200 mm greater than the circumference of the chain-type vertical reinforcement body, and the ends of the carbon fiber knitted conductive net are connected together by mechanical clinching. Secondly, use light drilling equipment to drill holes, clear the holes and check the quality of the holes, sink the steel sleeve, lay the carbon fiber strips of the double-spiral rising structure and the vertical PVC drainage pipes, and connect the four sides of the front and the four sides connected by the carbon fiber strips in a chain. After the body frame structure is fully stirred, sink into the granular material that increases the design height of the vertical reinforcing body structure each time as required, and vibrate the vibration equipment. Up to the ground, a chain-type vertical reinforcement structure is formed. The deviation of the central position of the chain-type vertical reinforcement structure should not exceed 20mm. The granular aggregate has a hard texture, a certain strength, good water stability, not easy to weathering and good gradation. The mud content is less than 5% and strictly controlled. The pull-up height of the steel sleeve;
(3)在软弱土地基上铺设砂石垫层形成复合地基,协调变形,减少地基沉降,在铺设砂石垫层的同时进行水平PVC排水管网的铺设。铺设砂石垫层为土工加筋砂石材料,按照设计要求预留水平PVC排水管沟槽,沟槽内先铺设粗砂垫层,下入水平PVC排水管,连接PVC排水管及其附属构件形成网络,其中砂石垫层厚度为400~500mm,采用退铺法,先铺设底层,夯实刮平后,再铺设碎石中粗砂垫层,最后铺设中粗砂垫层,夯实刮平后,砂垫层铺设完成。粒径为20~50mm,砂石垫层中含泥量不大于5%;(3) Lay sand and gravel cushions on soft soil foundations to form composite foundations, coordinate deformation, reduce foundation settlement, and lay horizontal PVC drainage pipe networks at the same time as sand and gravel cushions are laid. The sand and gravel cushion shall be geo-reinforced sand and gravel material, and the horizontal PVC drainage pipe groove shall be reserved according to the design requirements. Coarse sand cushion shall be laid in the groove first, and then the horizontal PVC drainage pipe shall be lowered to connect the PVC drainage pipe and its auxiliary components. A network is formed, in which the thickness of the sandstone cushion is 400-500mm. The back-laying method is adopted. The bottom layer is first laid, compacted and leveled, then the medium-coarse sand cushion is laid in the gravel, and finally the medium-coarse sand cushion is laid. , the sand cushion laying is completed. The particle size is 20-50mm, and the mud content in the sandstone cushion is not more than 5%;
(4)将砂石垫层中的水平PVC排水管与链式竖直方向增强体中的竖直方向PVC排水管连通,构成完整的排水系统,使链式竖直方向增强体中的水迅速排出。,将砂石垫层中预留的水平PVC排水管端部与链式竖直方向增强体内的竖直方向PVC排水管用连通,回填沟槽,夯实刮平,砂石垫层中的水平PVC排水管网、链式竖直方向增强体内的竖直方向PVC排水管及其附属构件构成完整的排水系统;(4) Connect the horizontal PVC drainage pipe in the sandstone cushion with the vertical PVC drainage pipe in the chain-type vertical direction reinforcement body to form a complete drainage system, so that the water in the chain-type vertical direction reinforcement body can be quickly discharge. , Connect the end of the horizontal PVC drainage pipe reserved in the sandstone cushion with the vertical direction PVC drainage pipe in the chain-type vertical reinforcement body, backfill the groove, compact and level, and the horizontal PVC drainage in the sandstone cushion The pipe network, the vertical PVC drainage pipe and its auxiliary components in the chain-type vertical reinforcement body constitute a complete drainage system;
(5)将链式竖直方向增强体中双螺旋上升的碳纤维条与稳压直流电源导线(电压为30~60V)连接,形成电渗,连接采用单一阳极,阳极周围均为阴极的策略,开启稳压直流电源,输出直流电,根据排水速率的要求和含水量的多少来调节稳压直流电源通电间断时长和电动势的大小;(5) Connect the double-spiral carbon fiber strips in the chain-type vertical reinforcement with the regulated DC power supply wire (voltage is 30-60V) to form electroosmosis. The connection adopts the strategy of a single anode, and the anode is surrounded by cathodes. Turn on the regulated DC power supply, output DC power, and adjust the intermittent duration of the regulated DC power supply and the size of the electromotive force according to the requirements of the drainage rate and the amount of water content;
(6)经过上述步骤之后,待地下水降到设计要求水位以下时,停止通入直流电,采用静载荷试验检验一种基于碳纤维电渗技术的链式竖直方向增强体结构及软基处理方法的加固效果,待承载力满足设计要求后,再进行上部结构施工。(6) After the above steps, when the groundwater drops below the design required water level, stop supplying direct current, and use a static load test to test the performance of a chain-type vertical reinforcement structure based on carbon fiber electroosmosis technology and a soft foundation treatment method. Reinforcement effect, after the bearing capacity meets the design requirements, the superstructure construction will be carried out.
本发明的有益效果与优点如下:The beneficial effects and advantages of the present invention are as follows:
本发明兼具竖直方向增强体复合地基和电渗法处理软土地基的优点,实现软基排水固结和竖直方向增强一体化结构和一步到位,并在增强方面比传统碎石桩具有更高的处理效果,在加速软土排水方面与普通排水相比极大提高渗透效率;竖直方向增强体结构多孔,有利于加快电渗排水速率,碳纤维经编导电网不仅作为电极材料,加快电渗排水,且具有约束竖直方向增强体结构侧向膨胀的作用,提高承载力。应用于施工工期短、软土深厚、沉降和承载力要求较高的大面积软弱地基,如高速公路、铁路、机场软土地基处理。具体如:The invention has the advantages of the vertical reinforcement composite foundation and the electroosmotic treatment of the soft soil foundation, realizes the integrated structure of the drainage consolidation of the soft foundation and the reinforcement in the vertical direction, and achieves one step in place. The higher treatment effect greatly improves the penetration efficiency compared with ordinary drainage in accelerating the drainage of soft soil; the structure of the reinforcement in the vertical direction is porous, which is conducive to accelerating the drainage rate of electroosmosis. Seepage drainage, and has the function of restraining the lateral expansion of the vertical reinforcement structure, improving the bearing capacity. It is applied to large-area weak foundations with short construction period, deep soft soil, high settlement and bearing capacity requirements, such as soft soil foundation treatment of expressways, railways and airports. Specifically, such as:
1、链式竖直方向增强体结构的填料选用的是建筑垃圾再生骨料,建筑垃圾再生骨料和碎石的力学性能相差无几,在满足工程质量要求的同时,二次利用建筑垃圾,不仅降低了工程造价,也避免了建筑垃圾污染环境。1. The filler of the chain-type vertical reinforcement structure is made of construction waste recycled aggregate. The mechanical properties of construction waste recycled aggregate and crushed stone are almost the same. While meeting the quality requirements of the project, the secondary use of construction waste not only The project cost is reduced, and the environment pollution by construction waste is avoided.
2、将散粒体材料使用碳纤维经编导电网包裹,形成网兜,网兜对散粒体材料有约束作用,采用碳纤维条链式将网兜成连接成四面体框架结构,充分正四面体框架结构后,使正四面体框架结构相互咬合形成一个整体结构,增加碳纤维经编导电网包裹散粒体材料的整体性,减少侧向膨胀,且散粒体材料具有孔隙率大,有利于软弱土基中的自由水快速排出。2. The granular material is wrapped with carbon fiber warp-knitted conductive mesh to form a net pocket, which has a constraining effect on the granular material. The carbon fiber chain is used to connect the net pocket into a tetrahedral frame structure. After sufficient regular tetrahedral frame structure, The regular tetrahedral frame structure is interlocked to form a whole structure, which increases the integrity of the carbon fiber warp knitted conductive mesh to wrap the granular material, reduces the lateral expansion, and the granular material has a large porosity, which is conducive to the freedom of the soft soil foundation. Water drains quickly.
3、碳纤维是一种十分稳定的材料,采用碳纤维条作为电极材料,在通电的情况下,碳纤维条不发生电解;避免电渗过程中电极材料的腐蚀,电极电解产生胶体,有效的解决了加入某种化学溶液电渗产生胶体、金属电极腐蚀,影响后期排水速率的问题和避免排水过程中将化学溶液排出,电解液稀释,电渗速率减弱的不足。3. Carbon fiber is a very stable material. Carbon fiber strips are used as electrode materials. Under the condition of electrification, carbon fiber strips do not undergo electrolysis; to avoid the corrosion of electrode materials during the electroosmosis process, the electrode electrolysis produces colloid, which effectively solves the problem of adding Electroosmosis of a certain chemical solution produces colloid and metal electrode corrosion, which affects the problem of later drainage rate and avoids the problem that the chemical solution is discharged during the drainage process, the electrolyte is diluted, and the electroosmosis rate is weakened.
4、碳纤维经编导电网的强度较高,约束链式竖直方向增强体结构水平方向的膨胀,提高链式竖直方向增强体结构的承载力。碳纤维经编导电网的耐腐蚀性能极好,不容易被腐蚀,可以长期有效的对链式竖直方向增强体结构起到约束作用。4. The strength of the carbon fiber warp-knitted conductive mesh is high, which constrains the horizontal expansion of the chain-type vertical reinforcement structure and improves the bearing capacity of the chain-type vertical reinforcement structure. The carbon fiber warp knitted conductive mesh has excellent corrosion resistance and is not easy to be corroded, and can effectively restrain the chain-type vertical reinforcement structure for a long time.
5、碳纤维材料的导电性能良好,电阻率小,产生的热量很小,不至于造成电能消耗,且采用的是间断性通直流电,可根据实际的工期长短来确定间断性通电的时间,在间断通直流电的这段时间,不仅可以节约电能,还可以使地基土中的孔隙水压力得到消散,有效应力增加,饱和土体固结,地基土的承载力提高。5. The carbon fiber material has good electrical conductivity, low resistivity, and generates very little heat, which will not cause power consumption, and uses intermittent direct current, which can be determined according to the actual construction period. During this period of direct current, not only electric energy can be saved, but also the pore water pressure in the foundation soil can be dissipated, the effective stress can be increased, the saturated soil body can be consolidated, and the bearing capacity of the foundation soil can be improved.
6、将链式竖直方向增强体结构中的碳纤维条与稳压直流电源连接,连接方式采用单一阳极竖直方向增强体结构,且阳极竖直方向增强体结构周围均为阴极的策略,由于自由水中带阳离子的水溶液较多,阴极的水面总是比阳极高,采用一个阳极的策略,在相同能耗下,采用单一阳极的策略,最大限度的降低软土地基中的地下水,使软土地基中的地下水有效快速地下降,从而提高排水效率。6. The carbon fiber strip in the chain-type vertical reinforcement structure is connected to the regulated DC power supply. The connection method adopts a single anode vertical reinforcement structure, and the anode vertical reinforcement structure is surrounded by cathodes. There are more aqueous solutions with cations in free water, and the water surface of the cathode is always higher than that of the anode. The strategy of one anode is adopted. Under the same energy consumption, the strategy of single anode is adopted to minimize the groundwater in the soft soil foundation and make the soft soil more stable. The groundwater in the foundation drops effectively and quickly, thereby improving drainage efficiency.
7、电渗法加固软土地基存在处理周期较长,提高软土地基强度有限等不足。电渗法结合链式竖直方向增强体结构,不仅可以缩短处理周期,而且由于链式竖直方向增强体具有一定的承载力,可以弥补电渗法处理软土地基强度有限的不足。7. The electroosmosis method for strengthening the soft soil foundation has the disadvantages of long treatment period and limited improvement of the strength of the soft soil foundation. The electroosmosis method combined with the chain vertical reinforcement structure can not only shorten the treatment period, but also make up for the limited strength of the soft soil foundation treated by the electroosmosis method because the chain vertical reinforcement has a certain bearing capacity.
8、电渗过程中未加入化学溶液,也不产生污染气体,不会对土体产生污染,环保。8. No chemical solution is added in the electroosmosis process, and no polluting gas is generated, which will not pollute the soil, and is environmentally friendly.
综上所述,本发明具有加速软土地基排水速率、缩短固结周期、提高链式竖直方向增强体承载力、环保、施工简单等优点。本发明用于处理低洼河谷地区的深厚软土地基,具有技术和经济优势,在保证地基承载力达到设计要求的同时,缩短了软土地基固结时间,缩短工期,降低设备租赁资金,具有良好的应用前景,目前尚无一种基于碳纤维电渗技术的链式竖直方向增强体结构及软基处理方法的报道,本发明主要应用于施工期短、软土深厚、要求较高的大面积软弱地基,如高速公路、铁路、机场软土地基处理。To sum up, the invention has the advantages of accelerating the drainage rate of soft soil foundation, shortening the consolidation period, improving the bearing capacity of the chain-type vertical reinforcing body, environmental protection, and simple construction. The invention is used for processing deep soft soil foundations in low-lying river valley areas, and has technical and economic advantages. While ensuring that the bearing capacity of the foundation meets the design requirements, it shortens the consolidation time of the soft soil foundation, shortens the construction period, and reduces equipment rental funds. At present, there is no report of a chain-type vertical reinforcement structure and a soft foundation treatment method based on carbon fiber electroosmosis technology. The present invention is mainly applied to large areas with short construction period, deep soft soil and high requirements. Soft ground, such as highway, railway, airport soft ground treatment.
附图说明Description of drawings
图1是基于本发明的链式连接碳纤维经编导电网包裹散粒体材料示意图;Fig. 1 is based on the chain connection carbon fiber warp knitted conductive net wrapping granular material schematic diagram of the present invention;
图2是基于本发明的碳纤维经编导电网包裹散粒体材料1-1剖面示意图;2 is a schematic cross-sectional view of the carbon fiber warp-knitted conductive mesh wrapped granular material 1-1 based on the present invention;
图3是基于本发明的碳纤维经编导电网竖直方向增强体结构布置示意图;3 is a schematic diagram of the structural arrangement of the vertical direction reinforcement of the carbon fiber warp-knitted conductive mesh based on the present invention;
图4是基于本发明的链式竖直方向增强体电极连接示意图;FIG. 4 is a schematic diagram of the connection of a chain-type vertical reinforcement electrode based on the present invention;
图5是基于本发明的PVC排水管网布置示意图;5 is a schematic diagram of the layout of the PVC drainage pipe network based on the present invention;
图6是基于本发明的链式竖直方向增强体结构剖面示意图;6 is a schematic cross-sectional view of a chain-type vertical reinforcement structure based on the present invention;
图7是本发明的具体施工图;Fig. 7 is the concrete construction drawing of the present invention;
图8是本发明的链式竖向增强体结构详图。FIG. 8 is a detailed structural view of the chain-type vertical reinforcement of the present invention.
图中:1、散粒体材料,2、碳纤维经编导电网,3、碳纤维条,4、稳压直流电电源导线,5、增强体,5-1、阴极增强体,5-2、阳极增强体,6、PVC排水管,7、砂石垫层,8、桩间土。In the picture: 1. Particulate material, 2. Carbon fiber warp-knitted conductive mesh, 3. Carbon fiber strip, 4. Voltage-stabilized DC power supply wire, 5. Reinforcing body, 5-1, Cathode reinforcement, 5-2, Anode reinforcement , 6, PVC drainage pipe, 7, gravel cushion, 8, soil between piles.
具体实施方式Detailed ways
以下参照附图及具体实施例对本发明的方案作进一步地详细阐述。The solution of the present invention will be further elaborated below with reference to the accompanying drawings and specific embodiments.
实施例1Example 1
本实施例中碳纤维电渗链式竖直方向增强体软基处理方法具体的施工步骤:The concrete construction steps of the carbon fiber electroosmosis chain type vertical direction reinforcement soft base treatment method in this embodiment:
S1:链式连接碳纤维经编导电网包裹散粒体材料示意图如图1所示,将散粒体材料1用碳纤维经编导电网2包裹,形成网兜,用碳纤维条3链式连接网兜,形成空间正四面体框架结构,散粒体材料1为建筑垃圾再生骨料;S1: Chain connection of carbon fiber warp-knitted conductive mesh to wrap the granular material is shown in Figure 1. The
S2:碳纤维经编导电网链式竖直方向增强体结构布置示意图如图3所示,碳纤维经编导电网2的长度大于链式竖直方向增强体长100~200mm,采用机械咬合方式将碳纤维经编导电网2端部连接在一起。碳纤维经编导电网2宽度大于链式竖直方向增强体周长100~200mm,采用机械咬合方式将碳纤维编导电网2端部连接在一起,形成圆筒状并将碳纤维经编导电网2铺设在钢套筒内壁上;S2: Schematic diagram of the structural arrangement of the carbon fiber warp-knitted conductive mesh chain-type vertical reinforcement body as shown in Figure 3, the length of the carbon fiber warp-knitted
S3:采用轻型钻孔设备钻孔,清孔并检查成孔质量,下沉内壁铺设碳纤维经编导电网2的钢套筒,将用碳纤维条3链式连接的空间正四面体框架结构充分搅拌后,按要求沉入使竖直方向增强体结构每次升高的设计高度的散粒体材料1,在沉入散粒体材料1的同时铺设双螺旋上升结构的碳纤维条3和竖直方向PVC排水管,振动设备进行振动,振动密实后,缓慢拔出钢套筒,重复以上操作,直至地面,形成链式竖直方向增强体结构。链式竖直方向增强体结构中心位置偏差不应超过20mm,散粒体1骨料质地坚硬、具有一定的强度、水稳定性好、不易风化且级配良好,含泥量小于5%,严格控制钢套筒的上拔高度;S3: Use light drilling equipment to drill, clear the holes and check the quality of the holes, lay the steel sleeve of the carbon fiber warp-knitted
S4:在软弱土地基上铺设砂石垫层7形成复合地基,协调变形,减少地基沉降,在铺设砂石垫层7的同时进行水平PVC排水管6管网的铺设。铺设砂石垫层7为土工加筋砂石材料,按照设计要求预留水平PVC排水管6沟槽,沟槽内先铺设粗砂垫层,下入水平PVC排水管6,连接水平PVC排水管6及其附属构件形成网络,并预留连接竖直方向PVC排水管6接头,其中砂石垫层7厚度为500mm,采用退铺法先铺设150mm厚的底层,夯实刮平后,再铺设150mm厚碎石、中粗砂垫层,最后铺设200mm厚覆层碎石、中粗砂垫层,夯实刮平后,砂石垫层7铺设完成。粒径为20~50mm,砂石垫层7中含泥量不大于5%;S4: Lay the sand and
S5:将砂石垫层7中的水平PVC排水管6管网与链式竖直方向增强体内的竖直方向PVC排水管6连通,构成完整的排水系统,使链式竖直方向增强体中的水迅速排出。将砂石垫层7中预留的水平PVC排水管6接头与链式竖直方向增强体内的竖直方向PVC排水管6用连通,砂石垫层7中的水平PVC排水管6管网、链式竖直方向增强体内的竖直方向PVC排水管7及其附属构件构成完整的排水系统;S5: Connect the pipe network of the horizontal
S6:将链式竖直方向增强体顶端双螺旋上升的碳纤维条3与稳压直流电源导线4(电压为30~60V)连接,形成电渗,连接采用单一阳极,阳极周围均为阴极的策略,注意稳压直流电源正负极与链式竖直方向增强体顶端双螺旋上升的碳纤维条3的连接,连接完成后,开启稳压直流电源,输出直流电,根据排水速率的要求和含水量的多少来调节稳压直流电源的通电间断时长和电动势的大小;S6: Connect the
S7:经过上述步骤之后,待地下水降到设计水位以下时,关闭电源,停止通入直流电,采用静载荷试验检验加固效果,待承载力满足设计要求后,再进行上部工程施工。S7: After the above steps, when the groundwater drops below the design water level, turn off the power supply, stop the direct current supply, and use the static load test to check the reinforcement effect. After the bearing capacity meets the design requirements, the upper engineering construction will be carried out.
本发明用碳纤维经编导电网包裹建筑垃圾再生骨料形成网兜,链式连接网兜成空间正四面体框架结构,充分搅拌正四面体框架结构后,使空间正四面体框架结构形成一个相互咬合的链式整体结构,提高整体性。在相同能耗下,采用单一阳极的策略,最大限度的降低软土地基中的地下水,使软土地基中的地下水有效快速地下降,从而提高排水效率,加速固结。In the invention, the carbon fiber warp-knitted conductive net is used to wrap the recycled aggregate of construction waste to form a net pocket, the net pockets are connected in a chain to form a space regular tetrahedron frame structure, and after the regular tetrahedron frame structure is fully stirred, the space regular tetrahedron frame structure forms an interlocking chain The overall structure is improved, and the integrity is improved. Under the same energy consumption, the strategy of single anode is adopted to minimize the groundwater in the soft soil foundation, so that the groundwater in the soft soil foundation can be effectively and rapidly decreased, thereby improving the drainage efficiency and accelerating the consolidation.
上述实施例仅仅是对本发明技术方案所做的举例说明。本实施例中提供一种碳纤维电渗链式竖直方向增强体结构及其软基的处理方法,既能加速软土地基固结排水效率、缩短工期、降低工程造价,又能约束链式竖直方向增强体侧向膨胀,提高承载力,减少工后沉降。The above-mentioned embodiments are merely examples to illustrate the technical solutions of the present invention. This embodiment provides a carbon fiber electroosmosis chain-type vertical reinforcement structure and a method for treating its soft foundation, which can not only accelerate the consolidation and drainage efficiency of soft-soil foundations, shorten the construction period, reduce the project cost, but also restrain the chain-type vertical reinforcement structure. The lateral expansion of the reinforcement body in the straight direction increases the bearing capacity and reduces the settlement after construction.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110373832.8A CN113186900B (en) | 2021-04-07 | 2021-04-07 | Carbon fiber electroosmotic chain type vertical reinforcement structure and its soft base treatment method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110373832.8A CN113186900B (en) | 2021-04-07 | 2021-04-07 | Carbon fiber electroosmotic chain type vertical reinforcement structure and its soft base treatment method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113186900A CN113186900A (en) | 2021-07-30 |
CN113186900B true CN113186900B (en) | 2022-04-29 |
Family
ID=76974929
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110373832.8A Active CN113186900B (en) | 2021-04-07 | 2021-04-07 | Carbon fiber electroosmotic chain type vertical reinforcement structure and its soft base treatment method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113186900B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN118895792B (en) * | 2024-09-29 | 2024-12-20 | 中铁四局集团有限公司 | Foundation pit rotary spray injection reinforcement imaging method and device based on carbon powder reinforced three-dimensional printing conductive material |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102817355B (en) * | 2012-09-10 | 2014-11-26 | 温州大学 | Simple reinforcing method of vacuum electroosmosis combined prepressing soft soil foundation |
CN105297783B (en) * | 2015-10-22 | 2017-03-08 | 昆明理工大学 | One kind can monitor many material joint seepage prevention systems |
CN106769318A (en) * | 2017-01-04 | 2017-05-31 | 浙江大学城市学院 | A kind of pre-manufactured model stake for electric osmose joint stake reinforcing soft ground model test and preparation method thereof |
CN107747263B (en) * | 2017-10-27 | 2019-06-14 | 中国科学院寒区旱区环境与工程研究所 | The system and control evaluation method of frozen soil perforation void ratio are adjusted using air bag |
CN108612078B (en) * | 2018-05-08 | 2020-12-01 | 河海大学 | A method for eliminating cathode bubbles in the reinforcement of soft foundation by electroosmosis |
-
2021
- 2021-04-07 CN CN202110373832.8A patent/CN113186900B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN113186900A (en) | 2021-07-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101368383B (en) | A method for treating soft soil roadbed with artificial composite hard shell | |
CN105735075B (en) | The temporary construction subgrade electric osmose solidification processing method of hydraulic reclamation soil site | |
CN102409663B (en) | Method for processing soft foundation by combining electrochemical grouting with slurry-cemented discrete material pile | |
CN102888834B (en) | A kind of construction method of major diameter broken stone pile | |
CN110965416B (en) | A bamboo reinforcement system and construction method for the reinforcement of high-fill subgrades in mountainous areas | |
CN106884433A (en) | Control vibrations pile pulling causes the structure of underground structure depression and control depression method | |
CN206902488U (en) | A kind of soft soil foundation high-filled embankment of effectively control settlement after construction | |
CN108411889A (en) | A kind of cementing broken stone pile of structuring and its construction method | |
CN107288120A (en) | A kind of stabilization by drainage structure of new and old roadbed in the firm splicing of watersplash | |
CN104763127B (en) | A kind of resistance to heavy duty acid-proof terrace and its construction method | |
CN113186900B (en) | Carbon fiber electroosmotic chain type vertical reinforcement structure and its soft base treatment method | |
CN108824412B (en) | Soft foundation treatment method based on gabion wall reinforced soil and dynamic compaction | |
CN111335297A (en) | Steel pipe pile structure | |
CN207032212U (en) | A kind of stabilization by drainage structure of new and old roadbed in the firm splicing of watersplash | |
CN206752209U (en) | A kind of high-speed railway lattice embankment structure | |
CN102535485B (en) | Back-shaped reinforced geotechnical retaining structure of soft soil cutting slope and its reverse construction method | |
CN206625207U (en) | A kind of collapsible loess foundation rubble frame structure reinforcement system | |
CN111379251B (en) | A composite foundation composed of controllable rigid piles and compacted sand and gravel piles and a construction method thereof | |
CN205420939U (en) | Roadbed structure of crowded native bored concrete pile stake net of bidirectional screw | |
CN210507517U (en) | Combined member suitable for retaining wall heightening | |
CN209760216U (en) | reinforcement system based on soft soil foundation drainage consolidation | |
CN106087946A (en) | A kind of carbonate rock boulder strong rammer is combined to change to fill changes foundation reinforcement method | |
CN207017097U (en) | Deep super embankment on soft soil | |
CN104452737B (en) | A kind of soft base fast processing constructional method of dyke | |
CN205875227U (en) | Utilize pore pressure to provide foundation structure of bearing capacity |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20240809 Address after: 510030 unit F, 14th, 15th, 16th and 17th floors, West building, 338 Huanshi East Road, Yuexiu District, Guangzhou, Guangdong Patentee after: GUANGZHOU FIRST MUNICIPAL ENGINEERING Co.,Ltd. Country or region after: China Patentee after: HUBEI University OF TECHNOLOGY Address before: 430068 No. 28 Nanli Road, Hongshan District, Wuhan City, Hubei Province Patentee before: HUBEI University OF TECHNOLOGY Country or region before: China |
|
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 430068 No. 28 Nanli Road, Hongshan District, Wuhan City, Hubei Province Patentee after: HUBEI University OF TECHNOLOGY Country or region after: China Patentee after: GUANGZHOU FIRST MUNICIPAL ENGINEERING Co.,Ltd. Address before: 510030 unit F, 14th, 15th, 16th and 17th floors, West building, 338 Huanshi East Road, Yuexiu District, Guangzhou, Guangdong Patentee before: GUANGZHOU FIRST MUNICIPAL ENGINEERING Co.,Ltd. Country or region before: China Patentee before: HUBEI University OF TECHNOLOGY |