[go: up one dir, main page]

CN112963156A - Composite reinforcing method and composite reinforcing structure for shallow tunnel in soil-rock composite stratum - Google Patents

Composite reinforcing method and composite reinforcing structure for shallow tunnel in soil-rock composite stratum Download PDF

Info

Publication number
CN112963156A
CN112963156A CN202110297747.8A CN202110297747A CN112963156A CN 112963156 A CN112963156 A CN 112963156A CN 202110297747 A CN202110297747 A CN 202110297747A CN 112963156 A CN112963156 A CN 112963156A
Authority
CN
China
Prior art keywords
grouting
tunnel
pipe
rock
holes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110297747.8A
Other languages
Chinese (zh)
Inventor
陈士海
宫嘉辰
陈春超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huaqiao University
Original Assignee
Huaqiao University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaqiao University filed Critical Huaqiao University
Priority to CN202110297747.8A priority Critical patent/CN112963156A/en
Publication of CN112963156A publication Critical patent/CN112963156A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/18Arch members ; Network made of arch members ; Ring elements; Polygon elements; Polygon elements inside arches
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Soil Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention provides a composite reinforcement method of a shallow tunnel in a soil-rock composite stratum, which sequentially comprises the steps of earth surface grouting, pipe shed support, advanced small pipe support and the like, and also provides a composite reinforcement structure of the shallow tunnel in the soil-rock composite stratum, which comprises a surface soil layer, a rock stratum and a tunnel excavation area; the tunnel excavation device is characterized in that a grouting hole group is formed in the earth surface, a surrounding rock arch part is formed above the tunnel excavation region, a plurality of large-caliber steel pipes which are obliquely arranged relative to a horizontal plane are inserted in the surrounding rock arch part, the tunnel excavation region is provided with a tunnel face, a steel arch is arranged in the tunnel excavation region, a grout stopping disc is arranged on the tunnel face, and small-caliber steel pipes which are inserted in the tunnel face are inserted in the grout stopping disc at the same time. According to the invention, the soil body strength can be improved through surface grouting, the anti-seepage performance is relatively high, and the stability and the safety before and after tunnel excavation are ensured by utilizing the combined action of reinforcement measures such as surface grouting, pipe shed support, advanced small pipe support and the like.

Description

Composite reinforcing method and composite reinforcing structure for shallow tunnel in soil-rock composite stratum
Technical Field
The invention relates to a tunnel reinforcing method and a tunnel reinforcing structure, in particular to a composite reinforcing method and a composite reinforcing structure for a shallow tunnel in a soil-rock composite stratum.
Background
With the high-speed development of urban underground rail transit, urban tunnels show a trend of increasing year by year. For a shallow small-clear-distance tunnel buried in a city under complex geology, the earth covering buried depth is shallow, the earth covering stratum is a weak stratum and a gravel layer, the actual engineering construction problems of large ground dynamic load, strong water permeability of vault surrounding rock and the like exist, and reinforcement and support are needed.
The Chinese utility model patent with publication number CN203961998U discloses a combined primary support structure for a shallow tunnel, which comprises a cover arch section and a tunnel body support section, wherein the cover arch section is formed by a section steel frame and comprises a plurality of sections of steel arch units, the steel arch units are connected with each other through connecting steel plates and connecting bolts, and a pipe shed guide pipe is arranged at the arch back of the section steel frame; the hole body supporting section is formed by steel bar grids, the steel bar grids are connected into a whole through longitudinal connecting ribs, a layer of long pipe shed is arranged at the arch back position of each steel bar grid, the long pipe shed is shaped through finish rolling deformed steel bars, anchoring and reinforcing are carried out through anchor rods, a layer of concrete layer is formed on the inner side of each steel bar grid, and reinforcing is carried out between the concrete layer and each steel bar grid through a steel bar net. Although the supporting structure can reinforce the stratum to a certain extent, the strength of the soil body is not increased, and the seepage-proofing performance is relatively poor.
In view of the above, the applicant has conducted intensive research on a composite reinforcing method and a composite reinforcing structure for a shallow tunnel in a soil-rock composite stratum, and has generated the present application.
Disclosure of Invention
The invention aims to provide a composite reinforcing method and a composite reinforcing structure of a shallow tunnel, which can improve the strength of a complex stratum and have relatively high seepage-proofing performance.
In order to achieve the purpose, the invention adopts the following technical scheme:
a composite reinforcing method for a shallow tunnel in a soil-rock composite stratum sequentially comprises the following steps:
s1, performing surface grouting, vertically arranging a plurality of grouting holes on a surface soil layer above a shallow tunnel to be excavated to form a grouting hole group, wherein in the grouting hole group, the hole bottoms of the grouting holes positioned right above the shallow tunnel are positioned on the contour line of the shallow tunnel, then injecting mixed double grout of cement paste and water glass into the grouting holes, and filling and tamping the mouth parts of the grouting holes by adopting concrete;
s2, supporting a pipe shed, inserting a large-diameter steel pipe into a surrounding rock arch of the shallow tunnel from high to low, forming a first hole in the side wall of the large-diameter steel pipe, pressing cement slurry into the large-diameter steel pipe, and enabling part of the cement slurry to flow out of the first hole and be fixedly connected to the surrounding rock arch;
s3, advancing the support of the small guide pipe, spraying concrete to seal the tunnel face of the shallow tunnel and form a grout stopping disc on the tunnel face, then forming a plurality of support holes in the grout disc from high to low, penetrating small-caliber steel pipes into the support holes, supporting the small-caliber steel pipes on a steel arch frame, forming second holes in the side walls of the small-caliber steel pipes, pressing grout into the small-caliber steel pipes, and enabling part of the grout to flow out of the second holes and be solidified.
As an improvement of the present invention, in step S1, before injecting the mixed grout of cement paste and water glass into each grouting hole, a grouting pipe is inserted into each grouting hole, the lower end of the grouting pipe is sealed, a grout stop plug is sleeved outside the grouting pipe, a plurality of grout overflow holes are formed in the side wall of the grouting pipe at a position below the grout stop plug, and when injecting the mixed grout of cement paste and water glass into each grouting hole, the grouting pipe is grouted by performing low-pressure slow-permeation and then high-pressure grouting.
In step 1, when injecting the mixed double grout of cement paste and water glass into each grouting hole, alternate grouting is adopted.
As an improvement of the invention, the following steps are carried out after the tunnel excavation:
and S4, primary support, namely performing spray anchor support on the surrounding rock of the shallow tunnel, wherein anchor rods adopted by the spray anchor support are hollow grouting anchor rods and mortar anchor rods.
In step S4, a wet shotcrete is used to perform a primary shotcrete on the surrounding rock, and the mesh reinforcement is laid after the thickness of the primary shotcrete reaches 3-5cm, so that the mesh reinforcement and the shotcrete are integrated.
A composite reinforced structure of a soil-rock composite stratum shallow tunnel comprises a surface soil layer, a rock stratum located below the surface soil layer and a tunnel excavation area located on the surface soil layer and the rock stratum simultaneously;
the ground surface is provided with a grouting hole group, the grouting hole group comprises a plurality of grouting holes which are vertically arranged respectively, the hole bottoms of the grouting holes positioned right above the tunnel excavation area are positioned on the contour line of the tunnel excavation area, the hole bottoms of other grouting holes are positioned on the boundary line between the ground surface layer and the rock stratum, and each grouting hole is filled with double grout mixed by cement paste and water glass;
a surrounding rock arch part is formed above the tunnel excavation area, a plurality of large-diameter steel pipes which are obliquely arranged relative to the horizontal plane are inserted into the surrounding rock arch part, a first hole is formed in the side wall of each large-diameter steel pipe, and cement slurry is filled in each large-diameter steel pipe;
the tunnel excavation region has a face, just the tunnel excavation region is provided with the steel bow member, the steel bow member is fixed through locking the foot stock, be provided with on the face and end the thick liquid dish, it has the simultaneous interlude to end to alternate on the thick liquid dish small-bore steel pipe in the face, small-bore steel pipe supports on the steel bow member simultaneously, the second punchhole has been seted up on the lateral wall of small-bore steel pipe, just the small-bore steel intraductal packing has grout.
As an improvement of the invention, a grouting pipe is inserted into each grouting hole, the lower end of the grouting pipe is sealed, a grout stop plug is sleeved outside the grouting pipe, a plurality of grout overflow holes are formed in the position, below the grout stop plug, of the side wall of the grouting pipe, and the position, below the grout stop plug, between the grouting pipe and the grouting hole and inside the grouting pipe, of the grout and water glass mixed double grout is filled.
As an improvement of the invention, the grout stopping plug is a grout stopping film bag.
As an improvement of the present invention, on the cross section of the tunnel excavation region, two rays are made which are symmetrical with respect to the center line of the contour of the tunnel excavation region, taking the intersection point between the center line of the contour of the tunnel excavation region and the tunnel lower contour line of the tunnel excavation region as an origin, when the included angle between the two rays is 60 °, the region corresponding to the region formed between the surrounding rock arch and the two rays is the layout range of the large-caliber steel pipe, and when the included angle between the two rays is 120 °, the region corresponding to the region formed between the grout stopping disk and the two rays is the layout range of the small-caliber steel pipe.
By adopting the technical scheme, the invention has the following beneficial effects:
1. according to the invention, on the basis of the pipe shed support, the soil body strength can be improved through surface grouting, the seepage-proofing performance is relatively high, and the stability and the safety before and after tunnel excavation are ensured by utilizing the combined action of reinforcement measures such as surface grouting, pipe shed support, advanced small conduit support and the like.
2. Aiming at the problems of shallow buried depth of the covering soil and the like, double-liquid high-pressure grouting is adopted for the ground surface, the strength and the seepage-proofing level of the soil body around the vault are improved, and meanwhile, the influence of the upper load of the tunnel on the tunnel structure is reduced.
3. The forepoling and the preliminary bracing form a whole by mutually welding and spraying concrete, the settlement of the surrounding rock in the surrounding rock excavation process is strictly controlled, the preliminary self-supporting capability of the tunnel surrounding rock is fully exerted, and collapse caused by excavation disturbance is avoided.
4. The whole composite grouting reinforcement measure effectively controls the influence of the upper load of the tunnel on the surrounding rock and the structure of the tunnel, and improves the stability of the tunnel structure.
Drawings
FIG. 1 is a schematic cross-sectional view of an exemplary composite reinforcing structure;
FIG. 2 is a schematic cross-sectional view of surface grouting in an example;
FIG. 3 is a schematic diagram of a fitting structure between a grouting hole and a grouting pipe in the embodiment;
FIG. 4 is a schematic diagram of a layout structure of a large-diameter steel pipe in the embodiment;
FIG. 5 is a schematic view of a connection structure of a large-diameter steel pipe in the embodiment;
FIG. 6 is a schematic view of the layout structure of small-caliber steel pipes in the example;
FIG. 7 is a schematic view of a connection structure of small-caliber steel pipes in an embodiment;
the designations in the figures correspond to the following:
10-a surface soil layer; 11-grouting holes;
12-grouting pipes; 13-stop plug;
14-slurry overflow hole; 15-large diameter steel pipe;
16-small-caliber steel pipes; 20-a rock formation;
30-tunnel excavation area; 31-tunnel upper contour line;
32-tunnel lower contour line; 50-locking the anchor rod.
Detailed Description
The invention is further described with reference to the following figures and specific embodiments.
As shown in fig. 1 and with reference to fig. 2-7, the present embodiment provides a composite reinforced structure of a shallow tunnel in an earth-rock composite stratum, comprising a surface soil layer 10, a rock layer 20 located below the surface soil layer 10, and a tunnel excavation region 30 located on both the surface soil layer 10 and the rock layer 20, wherein the tunnel excavation region 30 is excavated to form a shallow tunnel, the side wall of the shallow tunnel is located to form the contour of the tunnel excavation region 30, the contour line of the tunnel excavation region 30 includes an arched tunnel upper contour line 31 and a U-shaped tunnel lower contour line 32, the tunnel upper contour line 31 is located above the tunnel lower contour line 32, and both ends of the tunnel upper contour line 31 are connected with both ends of the tunnel lower contour line 32 one-to-one to-form a closed loop line, of course, the specific shapes of the tunnel upper contour line 31 and the tunnel lower contour line 32 can be adjusted according to actual needs. A surrounding rock arch is formed above the tunnel excavation region 30, the definition of the surrounding rock arch is the same as that in conventional tunnel construction, and the surrounding rock arch is located above the tunnel upper contour line 31 and at a position directly contacting the tunnel upper contour line 31 as viewed from the cross section of the tunnel excavation region 30, and belongs to a part of the surface soil layer 10. In addition, the tunnel excavation region 30 has a tunnel face, which is also called tunnel face, and the specific definition of the tunnel face is the same as that in tunnel construction, and is a vertical working face for excavating tunnels and continuously pushing forwards; the tunnel excavation region 30 is further provided with a plurality of steel arches (not shown in the drawings) sequentially arranged in the depth direction of the excavated region in the tunnel excavation region 30, the steel arches are fixed by the foot-locking anchor rods 50, and the structures and relative positional relationships of the excavation region 30, the surrounding rock arches, the tunnel face, and the steel arches are the same as those in the conventional tunnel construction, and are not the focus of the embodiment, and will not be described in detail here.
The method comprises the following steps that a grouting hole group is formed in a surface soil layer 10 and comprises a plurality of grouting holes 11 which are arranged in a quincunx hole arrangement mode and are vertically arranged respectively, namely the grouting holes 11 are arranged in multiple rows, the grouting holes 11 in two adjacent rows are arranged in a staggered mode to form the quincunx mode, the hole distance between every two adjacent grouting holes 11 in the same row is 1.5m, the projection of a tunnel excavation region 30 on the upper end face of the surface soil layer 10 is located in the arrangement range of the grouting hole group, the distance between the two sides of the grouting hole group and the side face corresponding to the tunnel excavation region 30 is larger than 2.0m, and particularly, the arrangement range of the grouting hole group is 2.0m outside a tunnel branch contour line; the bottom of the grouting holes 11 located right above the tunnel-excavated area 30 are located at a position 0.5m below the tunnel upper-portion contour line 31 of the tunnel-excavated area 30, and the bottom of the other grouting holes 11 are located at the boundary between the surface soil layer 10 and the rock layer 20.
The grouting holes 11 are filled with mixed double grout of cement paste and water glass; specifically, as shown in fig. 1 to 3, a grouting pipe 12 is inserted into each grouting hole 11, the lower end of the grouting pipe 12 is sealed (i.e., plugged with a plug), a grout stop plug 13 is sleeved outside the grouting pipe 12, the grout stop plug 13 is a grout stop film bag in this embodiment, a plurality of grout overflow holes 14 are formed in the side wall of the grouting pipe 12 at a position below the grout stop plug 13, a mixture of cement grout and water glass is filled between the grouting pipe 12 and the grouting hole 11 at a position below the grouting plug 13 and in the grouting pipe 12, and concrete, preferably rapid-setting concrete, is filled between the grouting pipe 12 and the grouting hole 11 at a position above the grouting plug 13.
As shown in fig. 1 to 7, a plurality of large-diameter steel pipes 15 are inserted into the surrounding rock arch, and the specific inclination angle and the arrangement position of the large-diameter steel pipes 15 need to be determined according to actual geological conditions. It should be noted that the large caliber corresponds to the small caliber mentioned below, and is only for distinguishing the relative caliber size between the two steel pipes, that is, the caliber of the steel pipe 15 is larger than the caliber of the steel pipe 16 mentioned below, and does not refer to the actual caliber of the steel pipe, and the specific caliber can be determined according to actual needs, in this embodiment, the caliber of the large caliber steel pipe 15 is phi 108mm, and the inclination angle of the large caliber steel pipe 15 with respect to the horizontal plane is 1-2 °. In addition, a first hole is formed in the side wall of the large-diameter steel pipe 15, and cement paste is filled in the large-diameter steel pipe.
The tunnel face is provided with a grout stopping disc, the grout stopping disc is provided with small-caliber steel pipes 16 which are inserted into the tunnel face simultaneously in an inserting mode, the small-caliber steel pipes are supported on the steel arch frames simultaneously, similarly, the side walls of the small-caliber steel pipes 16 are provided with second holes, and the small-caliber steel pipes 16 are filled with cement grout.
Preferably, on the cross section of the tunnel excavation region 30, two rays (which are virtual lines and do not exist actually) are made to be symmetrical about the center line of the contour of the tunnel excavation region 30 with the intersection point between the center line of the contour of the tunnel excavation region 30 and the tunnel lower contour line of the tunnel excavation region 30 as the origin, when the included angle between the two rays is 60 °, the region corresponding to the region formed between the surrounding rock arch and the two rays is the layout range of the large-diameter steel pipe 15, and when the included angle between the two rays is 120 °, the region corresponding to the region formed between the grout stopping disk and the two rays is the layout range of the small-diameter steel pipe 16.
The embodiment also provides a composite reinforcing method for the shallow tunnel capable of realizing the composite reinforcing structure, the construction object of the method is the urban small-clear-distance shallow tunnel, the vault is the distribution of fourth-system cohesive soil and gravel soil, the surrounding rock of the tunnel is classified into V grade, the single-hole span of the tunnel is large, the soil covering along the tunnel is shallow, the soil layer has poor self-stability, and the excavation is easy to collapse; the section of the tunnel is positioned in a soft loess layer and a gravel layer, and the tunnel has high water permeability; underground pipelines (such as drainage pipes, cable pipes and the like) above the tunnel are more; the ground traffic has large frequency dynamic load and large load, and is easy to collapse due to repeated disturbance excavation of the soil body.
Referring to fig. 1 to 7, the method provided in this embodiment includes the following steps performed in sequence:
and S1, performing earth surface grouting, vertically arranging a plurality of grouting holes 11 on the earth surface above the shallow tunnel to be excavated in a quincunx hole arrangement mode according to the sequence of alternately arranging and jumping holes to form a grouting hole group, wherein in the grouting hole group, the hole bottoms of the grouting holes 11 positioned right above the shallow tunnel are positioned below the tunnel upper contour line 31 of the shallow tunnel, the hole bottoms of other grouting holes 11 are positioned at earth-rock boundary lines, wherein the earth-rock boundary lines are the boundary lines between the surface soil layer 10 and the rock layer 20, and the positions of the earth-rock boundary lines need to be pre-explored before earth surface grouting. Specifically, firstly, a Luoyang shovel is adopted to dig holes, the digging depth is deeper than 1m below the bottom of the underground pipeline so as to avoid damaging the underground pipeline, then a down-the-hole drill is adopted to drill holes, the clear distance between the drilling position and the underground pipeline is not less than 1m, the drilling depth is 0.5m below the contour line of the upper part of the tunnel from the ground, and the drilling range is 2.0m outside the contour line of the primary support and is from the upper surface of the ground to the boundary line of the earth rock. The diameter of the grouting holes 11 is 90mm, and the distance between two adjacent grouting holes 11 in the same row of grouting holes is 400 mm.
Then injecting mixed double grout of cement paste and water glass into each grouting hole 11, and filling the mouth part of each grouting hole 11 with concrete for tamping; preferably, before injecting the cement slurry and the water glass mixed double slurry into each grouting hole 11, a grouting pipe 12 is inserted into each grouting hole 11, the grouting pipe 12 is a steel pipe, the outer diameter of the grouting pipe is phi 42mm, the outer diameter of the grouting pipe is smaller than the inner diameter of the grouting hole 11, the lower end of the grouting pipe 12 is sealed, a grout stop plug 13 (in the embodiment, a grout stop film bag is used as the grout stop plug 13) is sleeved outside the grouting pipe 12, the grout stop plug 13 is fixed on the corresponding grouting pipe 12, the axial length of the grout stop plug 13 is not less than 1m, and the distance between the bottom end surface of the grout stop plug 13 and the bottom of an underground pipeline is not less than 2 m. The side wall of the grouting pipe 12 is provided with a plurality of grout overflow holes 14 at the position below the grout stop plug 13, when grout and water glass mixed double grout are injected into each grouting hole 11, the grouting is performed on the grouting pipe 11 in a mode of low-pressure slow seepage and high-pressure grouting (the low pressure and the high pressure refer to the relative pressure of the grout and the water glass, but not specific pressure), so that the grout and the water glass mixed double grout can permeate into the surface soil layer 10 through the grout overflow holes 14 to reinforce the surface soil layer 10, meanwhile, the concrete at the opening part of the grouting hole 11 has enough setting time, the grout and the water glass mixed double grout are prevented from being sprayed out from the grouting holes 11 under the action of high pressure, and the specific grouting pressure can be selected according to actual needs and is usually selected within the range of 0.3-0.8 MpA. When injecting the mixed double grout of cement paste and water glass into each grouting hole 11, alternate grouting is adopted, namely the grouting holes 11 which are continuously grouted for two times are not adjacent.
The reliability of the reinforcing effect is ensured through the steps; the grouting range and pressure are controllable, and the principle of low-pressure slow seepage and high-pressure grouting is adopted for grouting to achieve good pre-reinforcing and seepage-proofing effects on the soft surrounding rock and gravel stratum of the arch crown.
And S2, supporting the pipe shed, inserting a large-diameter steel pipe 15 (namely a pipe shed steel pipe) into the surrounding rock arch part of the shallow tunnel from high to low, forming a first hole on the side wall of the large-diameter steel pipe 15, pressing cement paste into the large-diameter steel pipe 15, and enabling part of the cement paste to flow out of the first hole and be fixedly connected to the surrounding rock arch part. Specifically, the pipe shed steel pipes are jacked by adopting a principle that phi 108mm pipe shed steel pipes replace drill pipes, a pipe shed drilling machine is selected to drill large-diameter steel pipes 15 serving as the pipe shed steel pipes into the surrounding rock arch part according to a certain inclination angle from a high hole position to a low hole position, the drilling external insertion angle is preferably 1-2 degrees, the arrangement range of the large-diameter steel pipes 15 is determined according to specific geological conditions, and the large-diameter steel pipes can be distributed in the range of 60 degrees in the surrounding rock arch part in the embodiment. The large-diameter steel pipe 15 can be formed by splicing a plurality of pipe sections, and the drilled hole should be drilled with a perforated pipe section (i.e. a pipe section with a first hole) first, and then the drilled hole should be drilled with a non-perforated pipe section after grouting. The pipe head is welded into a cone shape to facilitate the hole entering, the steel pipe joint is connected by screw threads, and one end of the large-caliber steel pipe 15 which firstly penetrates into the arch part of the surrounding rock needs to be sealed. After the large-diameter steel pipe 15 is inserted, the opening peripheral wall of a hole formed at the position of the opening end of the steel pipe corresponding to the surrounding rock arch part is sealed by cement. During grouting, cement slurry is pressed into the large-diameter steel pipe by high pressure, and the slurry is injected into the gap of the hole wall through the first intraocular pressure to consolidate the adjacent rock stratum. The large-diameter steel pipes 15 are sequentially numbered according to the arrangement sequence of quincunx holes, wherein odd-numbered holes are single-numbered holes, even-numbered holes are double-numbered holes, the single-numbered holes are firstly poured for grouting, and the double-numbered holes are poured after solidification for 1 to 2 days.
S3, advancing the small duct support, wherein advancing means that the small duct support step is performed before the preliminary support step, and wherein small in the small duct means that the outer diameter of the duct used in this step is smaller than the outer diameter of the pipe shed steel pipe. The concrete step is that concrete is sprayed to seal the tunnel face of the shallow tunnel, a grout stopping disc with the thickness of 5-10 cm is formed on the tunnel face, then a drilling machine is adopted to form a plurality of supporting holes on the grout disc in a quincunx hole distribution mode from high to low, and the hole distribution range is distributed in a fan shape of 120 degrees by taking the center of the section as an axis. Then, a small-caliber steel pipe 16 (namely a conduit) penetrates into the supporting hole, the small-caliber steel pipe 16 is simultaneously supported on the steel arch frame, a plurality of second holes are formed in the side wall of the small-caliber steel pipe 16, and then cement paste is pressed into the small-caliber steel pipe 16, so that part of the cement paste flows out of the second holes and is solidified. Specifically, the small-caliber steel pipe 16 is a hot-rolled seamless steel perforated pipe with the outer diameter of phi 50mm, the wall thickness is 3.5mm, the aperture of the second perforation is 6mm, the distance between the second perforation and the small-caliber steel pipe is 15cm, the small-caliber steel pipe is arranged in a quincunx shape, the front section of the small-caliber steel pipe 16 is made into a garlic clove-shaped cone, and the second perforation is not drilled in a certain range of the tail end (the specific range can be determined according to actual urgent needs) so as to serve as a pulp stopping. The small-caliber steel pipes 16 are arranged in a double-layer mode, the longitudinal distance is 240cm, the circumferential distance is 35cm, the inclination angles are 10 degrees and 30 degrees respectively, and the small-caliber steel pipes are distributed in the range of 120 degrees of the surrounding rock arch portion. During construction, the small-caliber steel pipe 16 is directly driven into the steel arch from the upper part and/or the middle part of the steel arch by a rock drill, is exposed by 20cm and supported on the steel arch behind an excavation surface, and is firmly welded with a steel frame to form a pre-supporting system; and then, adopting a grouting pump to press and inject cement paste, wherein the protective hole is tightly blocked after grouting.
And S4, primary support, excavating by adopting a two-stage step method, immediately carrying out spray anchor support on the surrounding rock of the shallow tunnel after the tunnel is excavated, wherein anchor rods adopted by the spray anchor support are hollow grouting anchor rods and mortar anchor rods. And primarily spraying the surrounding rock by adopting wet-type sprayed concrete, and paving and hanging the reinforcing mesh after the thickness of the primarily sprayed concrete reaches 3-5cm so as to enable the reinforcing mesh and the sprayed concrete to form a whole. Specifically, after a tunnel is excavated, spray anchor supporting is immediately carried out on surrounding rocks, the anchor rods are hollow grouting anchor rods with the diameter of 25mm and mortar anchor rods with the diameter of 22mm, after grouting is finished, backing plates and fastening nuts are installed after the strength of cement paste meets the requirement, wet-type sprayed concrete construction is adopted, reinforcing steel bar nets are laid and hung after primary sprayed concrete reaches 3-5cm, the reinforcing steel bar nets and the sprayed concrete are integrated, the reinforcing steel bar nets are bound and fixed on the anchor rods in the early construction, then reinforcing steel bar pieces are welded into nets, and the lap joint length of the net pieces is 1-2 grids. After the excavation of the tunnel bottom is finished, the primary support of the bottom is timely followed up, steel frames are completely enclosed in a hole and are connected into a whole by bolts, then the arch springing and the foot-locking anchor pipe 50 are welded into a whole to form a reinforced support, or the arch springing is reinforced and supported by adopting a longitudinal joist and foot-locking anchor pipe 50 with the diameter of phi 108mm through grouting; the lock pin anchor pipe 50 is grouted through the rock and soil interface of the upper and lower steps. When a large gap exists between the steel frame and the primary sprayed concrete in the installation process, the steel frame and the primary sprayed concrete are wedged tightly by concrete precast blocks at intervals of 2m, and the back of the steel frame is densely filled with the sprayed concrete. In order to enhance the overall stability of the steel frame, the steel frame and the anchor rod are welded together, the steel frame is longitudinally connected by steel pipes, and the circumferential distance is 1 m.
Preferably, after the above steps are completed, the following steps can be further performed:
s5, grouting and reinforcing the middle rock pillar: and before excavating the backward hole, drilling holes layer by layer in the forward hole from top to bottom by using a down-the-hole drill, wherein the drilling holes are uniformly distributed in two rows of quincunx shapes along the middle rock pillar, the drilling angle is 10-15 degrees, and the distance is 40 cm. A grout stopping film bag is used as a grout stopping plug, a grouting pipe is a seamless steel flower pipe with the diameter of 42mm and the thickness of 5mm, holes are drilled at intervals of 20cm, the diameter of each hole is 6mm, and the top end of each hole is closed. Grouting is carried out in a mode of mixed double-liquid grouting at the separation hole, and gaps between the steel pipes above the grout stopping film bags and the drilled holes are filled with double-liquid grouting. And the risk during the construction of the small clear distance tunnel is greatly reduced while the bearing capacity of the medium rock pillar is fully exerted by grouting the medium rock wall.
According to the composite reinforcing method provided by the embodiment, the surrounding rock settlement amount in the surrounding rock excavation process is strictly controlled; the initial self-supporting capacity of the tunnel surrounding rock is fully exerted; on the basis, the influence of the vehicle load of the main road on the tunnel structure is reduced, the integrity of the surface pipelines before and after tunnel excavation is ensured, and the surface pipelines before and after tunnel excavation are not damaged. The primary support of the tunnel surrounding rock is carried out in time by adopting the spray anchor and the steel arch frame, the integrity of the support structure is enhanced by welding and spraying concrete between the spray anchor and the steel arch frame, and the primary self-supporting capability of the tunnel surrounding rock is fully exerted; in order to fully play the supporting role of the steel arch on the surrounding rock, the arch feet of the steel arch are reinforced by grouting through the foot locking anchor pipes 50, and the foot locking anchor pipes 50 penetrate through rock strata and soil layers of the upper step and the lower step, so that the integrity and the stability of the upper stratum and the lower stratum are enhanced, and the deformation of the surrounding rock is effectively reduced. The whole composite grouting reinforcement method obtains excellent social and economic benefits.
The present invention is described in detail with reference to the attached drawings, but the embodiments of the present invention are not limited to the above embodiments, and those skilled in the art can make various modifications to the present invention based on the prior art, which fall within the scope of the present invention.

Claims (9)

1.一种土岩复合地层浅埋隧道的复合加固方法,其特征在于,依次包括以下步骤:1. a composite reinforcement method of a shallow buried tunnel in an earth-rock composite stratum, is characterized in that, comprises the following steps successively: S1,地表注浆,在准备挖掘的浅埋隧道上方的地表上垂直开设多个注浆孔形成注浆孔组,在所述注浆孔组中,位于所述浅埋隧道正上方的所述注浆孔的孔底位于所述浅埋隧道的轮廓线上,其他所述注浆孔的孔底位于土岩分界线,然后在各所述注浆孔中注入水泥浆和水玻璃混合双浆液,并采用混凝土将各所述注浆孔的口部填满捣实;S1, surface grouting, vertically opening a plurality of grouting holes on the surface above the shallow buried tunnel to be excavated to form a grouting hole group, in the grouting hole group, the The bottom of the grouting hole is located on the outline of the shallow buried tunnel, and the bottom of the other grouting holes is located on the boundary between soil and rock, and then the double slurry mixed with cement slurry and water glass is injected into each of the grouting holes , and the mouth of each said grouting hole is filled and tamped with concrete; S2,管棚支护,在所述浅埋隧道的围岩拱部按从高到低的顺序穿插大口径钢管,所述大口径钢管的侧壁上开设有第一孔眼,然后将水泥浆压入所述大口径钢管,使得部分水泥浆从所述第一孔眼流出并固结在所述围岩拱部上;S2, pipe shed support, insert large-diameter steel pipes in the order from high to low in the surrounding rock arch of the shallow buried tunnel, the side walls of the large-diameter steel pipes are provided with first holes, and then the cement slurry is pressed into the large-diameter steel pipe, so that part of the cement slurry flows out from the first hole and is consolidated on the surrounding rock arch; S3、超前小导管支护,先喷射混凝土封闭所述浅埋隧道的掌子面并在所述掌子面上形成止浆盘,然后按从高到低的顺序在所述止浆盘上开设多个支护孔,之后在所述支护孔中穿入小口径钢管,所述小口径钢管同时支撑在钢拱架上,所述小口径钢管的侧壁上开设有第二孔眼,然后将水泥浆压入所述小口径钢管,使得部分水泥浆从所述第二孔眼流出并固结。S3. Advance the support of small conduits. First, spray concrete to seal the face of the shallow buried tunnel and form a stopper plate on the surface of the tunnel, and then open the stopper plate in the order from high to low. A plurality of support holes are inserted into the support holes, and then small-diameter steel pipes are inserted into the support holes. The small-diameter steel pipes are supported on the steel arch at the same time. The side walls of the small-diameter steel pipes are provided with second holes. The grout is pressed into the small diameter steel pipe so that part of the grout flows out of the second hole and consolidates. 2.如权利要求1所述的土岩复合地层浅埋隧道的复合加固方法,其特征在于,在步骤S1中,在各所述注浆孔中注入水泥浆和水玻璃混合双浆液前,先在各所述注浆孔中穿插注浆管,所述注浆管的下端封口,所述注浆管外套设有止浆塞,且所述注浆管的侧壁位于所述止浆塞下方的位置处开设有多个溢浆孔,在各所述注浆孔中注入水泥浆和水玻璃混合双浆液时,采用先低压慢渗后高压注浆的方式向所述注浆管注浆。2. The composite reinforcement method for shallow buried tunnels in soil-rock composite strata as claimed in claim 1, characterized in that, in step S1, before injecting cement slurry and water glass mixed double slurry into each said grouting hole, first A grouting pipe is inserted into each of the grouting holes, the lower end of the grouting pipe is sealed, a grouting pipe is provided with a grouting stopper, and the side wall of the grouting pipe is located below the grouting stopper A plurality of grouting holes are opened at the position of the grouting hole. When the cement slurry and the water glass mixed double slurry are injected into each of the grouting holes, the grouting pipe is grouted by means of low pressure and slow infiltration followed by high pressure grouting. 3.如权利要求1所述的土岩复合地层浅埋隧道的复合加固方法,其特征在于,在步骤1中,在各所述注浆孔中注入水泥浆和水玻璃混合双浆液时,采用间隔交替注浆。3. The composite reinforcement method for shallow buried tunnels in soil-rock composite strata as claimed in claim 1, characterized in that, in step 1, when injecting cement slurry and water glass mixed double slurry into each of the grouting holes, using Alternate grouting at intervals. 4.如权利要求1所述的土岩复合地层浅埋隧道的复合加固方法,其特征在于,在隧道开挖之后还进行了以下步骤:4. the composite reinforcement method of soil-rock composite stratum shallow buried tunnel as claimed in claim 1, is characterized in that, also carried out following steps after tunnel excavation: S4、初期支护,对所述浅埋隧道的围岩进行喷锚支护,所述喷锚支护所采用的锚杆为中空注浆锚杆和砂浆锚杆。S4, initial support, the surrounding rock of the shallow buried tunnel is supported by shotcrete, and the bolts used in the shotcrete support are hollow grouting bolts and mortar bolts. 5.如权利要求4所述的浅埋隧道的复合加固方法,其特征在于,在步骤S4中,采用湿式喷射混凝土对围岩进行初喷,钢筋网在初喷混凝土的厚度达到3-5cm后铺挂,使其与喷射混凝土形成一体。5. the composite reinforcement method of shallow buried tunnel as claimed in claim 4, is characterized in that, in step S4, adopts wet shotcrete to carry out initial spraying to surrounding rock, after the thickness of steel mesh reaches 3-5cm of initial shotcrete Pave so that it is integrated with the shotcrete. 6.一种土岩复合地层浅埋隧道的复合加固结构,其特征在于,包括地表土层、位于所述地表土层下方的岩层以及同时位于所述地表土层和所述岩层上的隧道挖掘区域;6. A composite reinforcement structure for a shallow buried tunnel in an earth-rock composite stratum, characterized in that it comprises a surface soil layer, a rock layer located below the surface soil layer, and a tunnel excavation simultaneously located on the surface soil layer and the rock layer area; 所述地表土层上开设有注浆孔组,所述注浆孔组包括多个分别竖直布置的注浆孔,位于所述隧道挖掘区域正上方的所述注浆孔的孔底位于所述隧道挖掘区域的隧道上部轮廓线上,其他所述注浆孔的孔底位于所述地表土层和所述岩层之间的分界线,各所述注浆孔中填充有水泥浆和水玻璃混合双浆液;The surface soil layer is provided with a grouting hole group, the grouting hole group includes a plurality of grouting holes arranged vertically respectively, and the bottom of the grouting hole located directly above the tunnel excavation area is located at the bottom of the grouting hole. On the upper contour line of the tunnel in the tunnel excavation area, the bottoms of the other grouting holes are located on the boundary between the surface soil layer and the rock layer, and each of the grouting holes is filled with cement slurry and water glass mixed double slurry; 所述隧道挖掘区域的上方形成有围岩拱部,所述围岩拱部上穿插有多个相对于水平面倾斜布置的大口径钢管,所述大口径钢管的侧壁上开设有第一孔眼,且所述大口径钢管内填充有水泥浆;A surrounding rock arch is formed above the tunnel excavation area, and a plurality of large-diameter steel pipes inclined relative to the horizontal plane are inserted through the surrounding rock arch, and a first hole is opened on the side wall of the large-diameter steel pipe. and the large-diameter steel pipe is filled with cement slurry; 所述隧道挖掘区域具有掌子面,且所述隧道挖掘区域设置有钢拱架,所述钢拱架通过锁脚锚杆固定,所述掌子面上设置有止浆盘,所述止浆盘上穿插有同时穿插在所述掌子面中的小口径钢管,所述小口径钢管同时支撑在钢拱架上,所述小口径钢管的侧壁上开设有第二孔眼,且所述小口径钢管内填充有水泥浆。The tunnel excavation area has a face, and the tunnel excavation area is provided with a steel arch frame, the steel arch frame is fixed by the locking foot anchor rod, the face is provided with a pulp stop plate, and the pulp stop Small-diameter steel pipes that are simultaneously inserted into the face of the face are interspersed on the disk, the small-diameter steel pipes are simultaneously supported on the steel arch, the side walls of the small-diameter steel pipes are provided with second holes, and the small-diameter steel pipes are The diameter steel pipe is filled with cement slurry. 7.如权利要求6所述的土岩复合地层浅埋隧道的复合加固结构,其特征在于,各所述注浆孔中穿插有注浆管,所述注浆管的下端封口,所述注浆管外套设有止浆塞,且所述注浆管的侧壁位于所述止浆塞下方的位置处开设有多个溢浆孔,所述水泥浆和水玻璃混合双浆液填充在所述注浆管和所述注浆孔之间位于所述注浆塞下方的位置处以及所述注浆管内。7 . The composite reinforcement structure for shallow buried tunnels in soil-rock composite strata according to claim 6 , wherein a grouting pipe is inserted through each of the grouting holes, the lower end of the grouting pipe is sealed, and the grouting pipe is sealed. 8 . The outer casing of the slurry pipe is provided with a slurry stopper, and the side wall of the grouting pipe is provided with a plurality of slurry overflow holes at a position below the slurry stopper, and the mixed double slurry of cement slurry and water glass is filled in the slurry pipe. The position between the grouting pipe and the grouting hole is located below the grouting plug and inside the grouting pipe. 8.如权利要求7所述的土岩复合地层浅埋隧道的复合加固结构,其特征在于,所述止浆塞为止浆膜袋。8 . The composite reinforcement structure of the shallow buried tunnel in the soil-rock composite stratum according to claim 7 , wherein the slurry stopper stops the serosa bag. 9 . 9.如权利要求6所述的土岩复合地层浅埋隧道的复合加固结构,其特征在于,在所述隧道挖掘区域的横截面上,以所述隧道挖掘区域的轮廓的中心线与所述隧道挖掘区域的隧道下部轮廓线之间的交点为原点,做两个以所述隧道挖掘区域的轮廓的中心线为中心对称的射线,当两个所述射线之间的夹角为60°时,所述围岩拱部与两个所述射线之间所形成的区域对应的区域为所述大口径钢管的布设范围,当两个所述射线之间的夹角为120°时,所述止浆盘与两个所述射线之间所形成的区域对应的区域为所述小口径钢管的布设范围。9 . The composite reinforcement structure for shallow buried tunnels in soil-rock composite strata according to claim 6 , wherein, on the cross section of the tunnel excavation area, the center line of the outline of the tunnel excavation area and the The intersection between the contour lines of the lower part of the tunnel in the tunnel excavation area is the origin, and two rays are made with the center line of the contour of the tunnel excavation area as the center. When the angle between the two rays is 60° , the area corresponding to the area formed between the surrounding rock arch and the two rays is the layout range of the large-diameter steel pipe. When the angle between the two rays is 120°, the The area corresponding to the pulp stop disk and the area formed between the two rays is the layout range of the small-diameter steel pipe.
CN202110297747.8A 2021-03-19 2021-03-19 Composite reinforcing method and composite reinforcing structure for shallow tunnel in soil-rock composite stratum Pending CN112963156A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110297747.8A CN112963156A (en) 2021-03-19 2021-03-19 Composite reinforcing method and composite reinforcing structure for shallow tunnel in soil-rock composite stratum

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110297747.8A CN112963156A (en) 2021-03-19 2021-03-19 Composite reinforcing method and composite reinforcing structure for shallow tunnel in soil-rock composite stratum

Publications (1)

Publication Number Publication Date
CN112963156A true CN112963156A (en) 2021-06-15

Family

ID=76277847

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110297747.8A Pending CN112963156A (en) 2021-03-19 2021-03-19 Composite reinforcing method and composite reinforcing structure for shallow tunnel in soil-rock composite stratum

Country Status (1)

Country Link
CN (1) CN112963156A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114135318A (en) * 2021-12-06 2022-03-04 江西丰强科技发展有限公司 A kind of close-fitting underpass tunnel lining structure and construction method thereof
CN114263163A (en) * 2021-12-29 2022-04-01 成都大学 Grouting reinforcement method for diversion culvert passing through gravel stratum in high and cold regions and construction method
CN114278310A (en) * 2021-12-06 2022-04-05 中交一公局集团有限公司 Construction method for micro steel pipe pile lattice beam at shallow buried section of tunnel
CN114718602A (en) * 2022-03-31 2022-07-08 广西北投交通养护科技集团有限公司 Reinforcement treatment method for tunnel to pass through loose gravel waste soil pile
CN114876494A (en) * 2022-04-12 2022-08-09 中铁十二局集团第七工程有限公司 Shallow tunnel ground beam and tie rod combined settlement inhibiting device and construction method
CN116104545A (en) * 2023-01-04 2023-05-12 青岛理工大学 Construction method for soil stratum tunnel to pass through pipeline leakage area

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103410527A (en) * 2013-08-29 2013-11-27 中南大学 Preliminary bracing construction method for tunnel with surrounding rocks containing collapsible loess and soft rocks
CN111502674A (en) * 2020-04-24 2020-08-07 中国十九冶集团有限公司 Advanced support structure and construction method for shallow-buried underground tunnel in water-rich and impurity-filled soil area
CN111997624A (en) * 2020-08-18 2020-11-27 中交二公局第三工程有限公司 A construction method for shallowly buried large-section undercut rectangular tunnel
WO2020248596A1 (en) * 2019-06-13 2020-12-17 河南理工大学 Protection structure for preventing ground heave caused by tunnel grouting reinforcement and grouting method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103410527A (en) * 2013-08-29 2013-11-27 中南大学 Preliminary bracing construction method for tunnel with surrounding rocks containing collapsible loess and soft rocks
WO2020248596A1 (en) * 2019-06-13 2020-12-17 河南理工大学 Protection structure for preventing ground heave caused by tunnel grouting reinforcement and grouting method
CN111502674A (en) * 2020-04-24 2020-08-07 中国十九冶集团有限公司 Advanced support structure and construction method for shallow-buried underground tunnel in water-rich and impurity-filled soil area
CN111997624A (en) * 2020-08-18 2020-11-27 中交二公局第三工程有限公司 A construction method for shallowly buried large-section undercut rectangular tunnel

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114135318A (en) * 2021-12-06 2022-03-04 江西丰强科技发展有限公司 A kind of close-fitting underpass tunnel lining structure and construction method thereof
CN114278310A (en) * 2021-12-06 2022-04-05 中交一公局集团有限公司 Construction method for micro steel pipe pile lattice beam at shallow buried section of tunnel
CN114263163A (en) * 2021-12-29 2022-04-01 成都大学 Grouting reinforcement method for diversion culvert passing through gravel stratum in high and cold regions and construction method
CN114718602A (en) * 2022-03-31 2022-07-08 广西北投交通养护科技集团有限公司 Reinforcement treatment method for tunnel to pass through loose gravel waste soil pile
CN114876494A (en) * 2022-04-12 2022-08-09 中铁十二局集团第七工程有限公司 Shallow tunnel ground beam and tie rod combined settlement inhibiting device and construction method
CN114876494B (en) * 2022-04-12 2024-02-23 中铁十二局集团第七工程有限公司 Shallow-buried tunnel ground beam tie bar combined sinking inhibition device and construction method
CN116104545A (en) * 2023-01-04 2023-05-12 青岛理工大学 Construction method for soil stratum tunnel to pass through pipeline leakage area

Similar Documents

Publication Publication Date Title
CN112963156A (en) Composite reinforcing method and composite reinforcing structure for shallow tunnel in soil-rock composite stratum
CN105041325B (en) Construction method of high-tension water-rich extra-large-section weak breccia tunnel
CN105840207B (en) Construction method for comprehensive tunnel entering structure of large-span tunnel penetrating shallow-buried bias-pressure loose accumulation body
CN103410527B (en) Preliminary bracing construction method for tunnel with surrounding rocks containing collapsible loess and soft rocks
CN101929340B (en) Pre-grouting advance support construction process for pipe shed of underground flat inclined roadway of coal mine
CN110130948A (en) A kind of two-step with inverted arch fast closed tunnel support structure and construction method
CN112412475A (en) Surrounding rock reinforcement and excavation method and surrounding rock support for ice-water accumulation tunnel under the influence of seasonal rainfall
CN103898916B (en) Mini stake Composite Braced Retaining Structure and construction method
CN108708743B (en) Method for treating tunnel collapse by grouting
CN103615273A (en) Square steel confined concrete arch center wall back filling bolting-grouting support system and construction method
WO2020259059A1 (en) Tbm parallel heading tunnel trunk construction method
CN108798702B (en) Supporting method for large-section soft rock large-deformation tunnel
CN110878696B (en) Method for reinforcing surrounding rock of tunnel section at junction of upper soft and lower hard stratum shield method and mine method
CN106437726A (en) Ground fracture crushed zone passing construction method for shallow-buried tunnel excavation
CN111119935A (en) Multi-layer grouting reinforcement method for surrounding rock of soft and broken roadway structure
CN115324591B (en) A comprehensive construction method of partial dewatering and support for saturated soft loess tunnels
CN112228082A (en) A tunnel collapse treatment method for combined grouting of pipe shed and advanced small conduit
CN111677520A (en) Construction method of excavating station structure by tunnel first and then station pipe curtain hole pile method
CN113107489A (en) High-ground-pressure three-soft coal seam along-empty crossheading advanced grouting reinforcement method
CN111594184A (en) Main hole excavating method for hole bias tunnel
CN116816397A (en) A construction method for ultra-shallow burial and long-span underground excavation subway stations
CN115306439A (en) A construction method for pre-reinforcement of surrounding rock suitable for large-span expansion tunnels
CN114370288A (en) A kind of strengthening device and construction method for initial support collapse treatment of highway tunnel
CN114352292A (en) Shallow-buried bias-pressure multi-arch tunnel construction method for weathering phyllite stratum
CN113803077B (en) Advanced support construction method for horizontal joint argillaceous shale water-rich tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination