CN112727474B CN202110186622.8A CN202110186622A CN112727474B CN 112727474 B CN112727474 B CN 112727474B CN 202110186622 A CN202110186622 A CN 202110186622A CN 112727474 B CN112727474 B CN 112727474B
Authority
CN
China
Prior art keywords
grouting
borehole
branch
drill bit
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110186622.8A
Other languages
Chinese (zh)
Other versions
CN112727474A (en
Inventor
丁春福
邓洪亮
张维
赵明
李凌宜
时光
曹亮
刘雪朝
刘振民
何彬
李小鹏
闫云飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing University of Technology
Beijing Municipal Road and Bridge Co Ltd
Original Assignee
Beijing University of Technology
Beijing Municipal Road and Bridge Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing University of Technology, Beijing Municipal Road and Bridge Co Ltd filed Critical Beijing University of Technology
Priority to CN202110186622.8A priority Critical patent/CN112727474B/en
Publication of CN112727474A publication Critical patent/CN112727474A/en
Application granted granted Critical
Publication of CN112727474B publication Critical patent/CN112727474B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/001Improving soil or rock, e.g. by freezing; Injections
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/20Flexible or articulated drilling pipes, e.g. flexible or articulated rods, pipes or cables
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/20Flexible or articulated drilling pipes, e.g. flexible or articulated rods, pipes or cables
    • E21B17/206Flexible or articulated drilling pipes, e.g. flexible or articulated rods, pipes or cables with conductors, e.g. electrical, optical
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/04Driving tunnels or galleries through loose materials; Apparatus therefor not otherwise provided for

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Mechanical Engineering (AREA)
  • Soil Sciences (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

一种羽状定向软岩隧道超前注浆预加固结构和方法,属于地下工程与岩土工程施工领域。加固结构,包括羽状定向注浆钻孔(1)、柔性钻具(2)、定向钻头(3)、钻头导向控制器(4);其中,羽状定向注浆钻孔(1)包括中心钻孔和向四周分散的多个分支钻孔,中心钻孔为钻机预打与隧道轴长方向一致的长钻孔,在长钻孔内下入保护井壁的钢护筒,分支钻孔为从中心钻孔向四周延伸出多个弯曲的指向隧道(6)内壁的钻孔,分支钻孔在中心钻孔的周向为2‑6个,且分支钻孔沿中心钻孔的轴长方向均匀分布,中心钻孔和分支钻孔整体结构呈羽毛状结构;向分支钻孔内注浆形成加固结构。

A feather-shaped directional soft rock tunnel advance grouting pre-reinforcement structure and method, belonging to the field of underground engineering and geotechnical engineering construction. The reinforcement structure comprises a feather-shaped directional grouting borehole (1), a flexible drilling tool (2), a directional drill bit (3), and a drill bit guide controller (4); wherein the feather-shaped directional grouting borehole (1) comprises a central borehole and a plurality of branch boreholes dispersed in all directions, the central borehole is a long borehole pre-drilled by a drilling rig in the same direction as the axial length of the tunnel, a steel casing for protecting the well wall is inserted into the long borehole, and the branch boreholes are a plurality of curved boreholes extending from the central borehole to the surroundings and pointing to the inner wall of the tunnel (6), the number of branch boreholes in the circumferential direction of the central borehole is 2-6, and the branch boreholes are evenly distributed along the axial length direction of the central borehole, and the overall structure of the central borehole and the branch boreholes is a feather-shaped structure; grouting is injected into the branch boreholes to form the reinforcement structure.

Description

Advanced grouting pre-reinforcement structure and method for pinnate directional soft rock tunnel
Technical Field
The invention relates to a pinnate directional soft rock tunnel advanced grouting pre-reinforcement method, and belongs to the field of underground engineering and geotechnical engineering construction methods.
Background
For soft rock tunnels, due to low surrounding rock strength and poor self-stabilization capability, construction risks such as collapse, large deformation and the like are easy to generate, and construction quality problems, a grouting reinforcement method is usually adopted to perform full-section grouting pre-reinforcement treatment on surrounding rock in front of a tunnel face before tunnel excavation, grouting holes are arranged in a quincuncial shape on the tunnel face, and cement slurry is injected into the holes to reinforce the surrounding rock in front. However, because the tunnel face space is limited, construction equipment is difficult to position, great difficulty is brought to construction, a large number of grouting holes are required to be constructed, engineering quantity waste and material waste are caused, and economic benefit is poor.
The invention relates to an advanced grouting pre-reinforcing method for a pinnate directional soft rock tunnel, which is used for constructing a small amount of drilling holes, carrying out pinnate directional pore-forming and directional grouting, carrying out full-section grouting pre-reinforcing on surrounding rocks in front of a tunnel face, effectively controlling construction risk and improving engineering quality.
Disclosure of Invention
The invention discloses an advanced grouting pre-reinforcement method of a pinnate directional soft rock tunnel, which is a full-section grouting reinforcement structure of the soft rock tunnel, and comprises pinnate directional grouting drilling holes (1), flexible drilling tools (2), directional drilling bits (3) and a drill bit guiding controller (4), wherein the pinnate directional grouting drilling holes (1) comprise central drilling holes and a plurality of branch drilling holes which are dispersed to the periphery, the central drilling holes are long drilling holes which are consistent with the axial length direction of the tunnel, a steel casing for protecting a well wall is arranged in the long drilling holes in a descending manner, the branch drilling holes are drilling holes which extend from the central drilling holes to the periphery and are bent and are directed to the inner wall of the tunnel (6), the number of the branch drilling holes is 2-6 in the circumferential direction of the central drilling holes, the branch drilling holes are uniformly distributed along the axial length direction of the central drilling holes, and the overall structure of the central drilling holes and the branch drilling holes is in a feather structure;
The flexible drilling tool (2) comprises a connecting screw thread (2.1), a connecting body (2.2), lugs (2.3), pins/holes (2.4) and an outer wall rubber high-pressure protection structure (2.5), wherein one end of the connecting body (2.2) is the connecting screw thread (2.1), the other end of the connecting body is the lugs (2.3), the lugs (2.3) are provided with the pins/holes (2.4), the connecting parts are connected with the connecting screw thread (2.1) and the lugs (2.3) in an end-to-end mode, the pins/holes (2.4) are used for fixing, a flexible long connecting body is formed, the periphery of the flexible long connecting body is the outer wall rubber high-pressure protection structure (2.5), one end of the flexible long connecting body extends into a drill hole and is used for grouting, the other end of the flexible long connecting body is positioned outside the drill hole and is used for being connected with a grouting pump, and one end part extending into the drill hole is a directional drill bit (3);
The connecting body (2.2) is arranged in the flexible drilling tool and is a main body part of the drilling tool and plays a role in transmitting pressure and torque;
The pin/hole (2.4) is arranged in the flexible drilling tool and is a main body part of the drilling tool, and is connected with and fixedly connected with the connecting body (2.2);
The outer wall rubber high-pressure protection structure (2.5) is characterized in that the drilling tool connector is limited, circulating slurry and cement slurry are injected, and the pressure-resistant grade is higher than the grouting pressure;
The directional drill (3) comprises a drill body and a drill guiding controller (4), wherein the drill guiding controller (4) is fixed on the drill body, the ground control system controls the guide (4), and the position of the drill is measured and the drilling direction of the drill is controlled;
The diameter of the drilling hole is larger than the outer diameter of the drilling hole casing;
The outer diameter of the casing is larger than that of the pilot bit (3);
The method is suitable for pre-reinforcing surrounding rock (8) in front of the tunnel face (7) in the soft rock (8) tunnel (6).
The invention discloses a pinnate directional soft rock tunnel advanced grouting pre-reinforcement method, which is a soft rock tunnel full-section grouting reinforcement method and comprises the following steps:
Firstly, on-site lofting to determine the position of a grouting hole, and installing horizontal drilling equipment;
secondly, constructing a horizontal drilling hole to the depth of a grouting area (A) by adopting a horizontal directional drilling machine, namely, driving a pile casing in the area A of the initial end area of the central drilling hole;
Thirdly, a flexible drilling tool (2) and a directional drilling bit (3) are put into a to-be-drilled hole, the drilling direction is controlled by a drill bit guiding controller (4) to be deflected along the track direction and the position of a grouting hole of a designed branch drilling hole, and a first branch drilling hole is prepared; the method comprises the steps of connecting a grouting pump at the other end part of a drilling tool flexibly, pumping cement slurry through the flexible drilling tool, performing high-pressure rotary jetting grouting on a first section (A-1) of the end part of the drilling head at the end part of a first branch drilling hole, stopping after the grouting time is reached under the designed grouting pressure, backing the drilling tool, stopping after the drilling head reaches a second grouting section (A-2), performing high-pressure rotary jetting grouting, stopping after the grouting time is reached under the designed grouting pressure, and so on to complete all inclined hole grouting work in the first branch drilling hole;
continuously constructing horizontal drilling holes to the depth of a first grouting area (B), namely, continuously driving a pile casing into the front area of a central drilling hole starting end area A, and sequentially preparing all branch drilling holes in the grouting area (B) and performing all inclined hole grouting according to the third step;
And step five, and so on, continuously constructing horizontal drilling holes to different areas in the front of the grouting area (B) according to the step four, continuously driving a pile casing, and respectively carrying out preparation and all inclined hole grouting work on all branch drilling holes in each area until all the branch drilling holes corresponding to the whole central drilling hole are completely grouted.
Step five, the analogy is carried out, horizontal drilling is continuously carried out to each area in front of the grouting area (B) according to the step four, the grouting area is generally divided into A, B, C, D and the grouting area from near to far, the size division of the areas and the grouting area is determined according to the design requirement, and the grouting sequence is carried out from near to far;
In the third step, each branch drilling hole is divided into sections A-1, A-2, A-3, and the like from far to near according to the distance from the center drilling hole, the size of the grouting section is determined according to the stratum property and the grouting equipment capacity, and the grouting sequence is carried out from far to near;
the first step, the central drilling hole is arranged in the middle of the tunnel face, the grouting position is fully distributed in a feathered mode according to the full section of tunnel excavation, and the track direction of the grouting hole is controlled by a ground control system to conduct deflecting construction by a guide controller (4);
the deflecting directions of grouting holes in the same grouting area can be crossed and sequentially performed in different directions;
The invention can also be used for vertical directional grouting;
The present invention includes, but is not limited to, the above.
The invention has the advantages that:
the pre-grouting pre-reinforcement method for the pinnate directional soft rock tunnel has the following advantages:
(1) Fully utilizing limited ground space, constructing the least grouting holes, and carrying out full-section grouting pre-reinforcement on surrounding rocks in front of tunnel face surfaces;
(2) According to the invention, the flexible drilling tool and the directional drilling bit are adopted, the direction and the position of the grouting hole can be controlled through the ground control system, and the tunnel surrounding rock can be precisely positioned and grouting at any position can be performed;
(3) The invention is suitable for directional grouting in any direction and directional grouting along a layer surface;
(4) The invention realizes positioning and directional grouting, can save a great amount of grouting materials and construction workload, effectively improves economic benefit and social benefit, and realizes green construction.
(5) The invention has theoretical value and application value, and has replicability and generalizability.
Drawings
FIG. 1 is a schematic diagram of pre-grouting and pre-reinforcing of a tunnel face feathered directional soft rock tunnel;
FIG. 2 is a schematic diagram of directional grouting partition and construction sequence of surrounding rock of a tunnel face;
FIG. 3 is a schematic diagram of directional grouting segments of surrounding rock of a tunnel face;
FIG. 4 is a tunnel face structure diagram;
FIG. 5 is a diagram of a flexible drilling tool and drill bit relationship;
Wherein:
1. feathered directional grouting drilling;
2. 2.1 connecting screw threads, 2.2 connecting bodies, 2.3 lugs and 2.4 pins/holes;
3. Directional drill bit
4. Drill bit guiding controller
5. Grouting partition
6. Tunnel
7. Face of hand
8. Surrounding rock.
Detailed Description
The present invention will be further described with reference to the following example of a subway tunnel in Beijing, but the present invention is not limited to the following example.
The underground of a certain Beijing subway tunnel is 0-15 m in the form of a powder clay and sand layer, the underground water is rich, the underground water type is in a diving-bearing water mixed mode, the section of the subway tunnel is about 100m 2, and the tunnel construction method is a CRD method. When the tunnel (6) is constructed to the face (7) in the soft rock stratum (8), grouting pre-reinforcement is carried out on surrounding rock in front of the face.
The first step of the invention is that a drilling machine is in place, construction lofting is carried out according to a tunnel design drawing, the position of a grouting hole is determined, and the drilling position is basically arranged at the center of a tunnel face of a tunnel;
secondly, grouting hole construction is carried out by adopting a horizontal drilling machine, and the grouting hole construction is firstly carried out to an A grouting area according to the designed grouting partition position;
thirdly, directionally controlling the drill bit in a ground control chamber, controlling the position and the direction of a drill bit guiding controller (4), directionally deflecting and drilling holes along the grouting direction of the designed branch drilling holes by using a flexible drilling tool and a directional drill bit, and flushing the drilling holes to the position of the section A-1 of the grouting area A of the tunnel face;
Fourthly, installing a flange plate at the orifice, connecting a grouting pump, and grouting the section A-1 of the grouting area of the tunnel face by using a flexible drilling tool and a drill bit at a high pressure, wherein the grouting pressure is about 0.5, and the stable grouting time is about 1 hour;
fifthly, backing the drilling tool by about 0.5 meter, carrying out high-pressure grouting on the section A-2 of the grouting area of the tunnel face, wherein the grouting pressure is about 0.5, and the stable grouting time is about 1 hour;
sequentially backing back the drilling tool, and carrying out high-pressure grouting on each grouting direction and each grouting section of the grouting area A by about 0.5 meter each time, wherein each grouting direction is crossed and sequentially carried out, so as to finish grouting reinforcement of the grouting area A of the tunnel face;
seventh, according to the grouting partition (5) of the tunnel, continuing to construct grouting holes to the grouting area B along the horizontal drilling holes, continuing to drive the pile casing (1), and repeating the third to sixth steps to finish grouting reinforcement of each grouting direction and each grouting section of the grouting area B;
Eighth, continuing to construct grouting holes to a grouting area C along the horizontal drilling, continuously driving a pile casing (1), and repeating the third step to the sixth step to sequentially finish grouting reinforcement of grouting directions and grouting sections of grouting areas C, D, E, F and the like;
and the grouting of all the designed sections is gradually constructed and completed, so that a surrounding rock reinforcement area in front of the tunnel face is formed, and then the excavation work of the tunnel face is carried out.
The pre-grouting pre-reinforcement method for the pinnate directional soft rock tunnel comprises the steps, is not limited to the steps, and is also suitable for related methods of directional grouting of vertical equal-drilling holes.

Claims (6)

1.采用一种羽状定向软岩隧道超前注浆预加固结构进行注浆预加固的方法,其特征在于,羽状定向软岩隧道超前注浆预加固结构,包括羽状定向注浆钻孔(1)、柔性钻具(2)、定向钻头(3)、钻头导向控制器(4);其中,羽状定向注浆钻孔(1)包括中心钻孔和向四周分散的多个分支钻孔,中心钻孔为钻机预打与隧道轴长方向一致的长钻孔,在长钻孔内下入保护井壁的钢护筒,分支钻孔为从中心钻孔向四周延伸出多个弯曲的指向隧道(6)内壁的钻孔,分支钻孔在中心钻孔的周向为2-6个,且分支钻孔沿中心钻孔的轴长方向均匀分布,中心钻孔和分支钻孔整体结构呈羽毛状结构;1. A method for grouting pre-reinforcement using a feather-shaped directional soft rock tunnel advance grouting pre-reinforcement structure, characterized in that the feather-shaped directional soft rock tunnel advance grouting pre-reinforcement structure comprises a feather-shaped directional grouting borehole (1), a flexible drilling tool (2), a directional drill bit (3), and a drill bit guide controller (4); wherein the feather-shaped directional grouting borehole (1) comprises a central borehole and a plurality of branch boreholes dispersed in all directions, the central borehole being a long borehole pre-drilled by a drilling rig in the same direction as the axial length of the tunnel, a steel casing for protecting the well wall being inserted into the long borehole, the branch borehole being a plurality of curved boreholes extending from the central borehole in all directions and pointing to the inner wall of the tunnel (6), the number of branch boreholes being 2 to 6 in the circumferential direction of the central borehole, and the branch boreholes being evenly distributed in the axial length direction of the central borehole, and the overall structure of the central borehole and the branch boreholes being a feather-shaped structure; 柔性钻具(2)包括连接丝扣(2.1)、连接体(2.2)、耳片(2.3)、销钉/孔(2.4)和外壁橡胶高压防护结构(2.5);连接体(2.2)的一端为连接丝扣(2.1),另一端为耳片(2.3),耳片(2.3)上设有销钉/孔(2.4),多个连接体(2.2)首尾相连,相连处为:连接丝扣(2.1)与耳片(2.3)连接采用销钉/孔(2.4)固定,形成柔性长连接体,柔性长连接体的外周为外壁橡胶高压防护结构(2.5);柔性长连接体一端伸入到钻孔内用于钻孔和注浆,另一端位于钻孔外用于与注浆泵连接;柔性长连接体伸入钻孔内的一端端部为定向钻头(3);所述定向钻头(3)包括钻头本体和钻头导向控制器(4),钻头导向控制器(4)固定到钻头本体上,通过地面控制系统控制钻头导向控制器(4),测量钻头位置和控制钻头钻进方向;The flexible drilling tool (2) comprises a connecting thread (2.1), a connector (2.2), an ear piece (2.3), a pin/hole (2.4) and an outer wall rubber high-pressure protection structure (2.5); one end of the connecting body (2.2) is a connecting thread (2.1), and the other end is an ear piece (2.3), and the ear piece (2.3) is provided with a pin/hole (2.4); a plurality of connecting bodies (2.2) are connected end to end, and the connection is as follows: the connecting thread (2.1) and the ear piece (2.3) are connected and fixed by the pin/hole (2.4), so as to form a flexible long connection. The outer periphery of the flexible long connector is an outer wall rubber high-pressure protective structure (2.5); one end of the flexible long connector extends into the borehole for drilling and grouting, and the other end is located outside the borehole for connection with a grouting pump; the end of the flexible long connector extending into the borehole is a directional drill bit (3); the directional drill bit (3) comprises a drill bit body and a drill bit guide controller (4), the drill bit guide controller (4) is fixed to the drill bit body, and the drill bit guide controller (4) is controlled by a ground control system to measure the drill bit position and control the drill bit drilling direction; 具体方法包括以下步骤:The specific method includes the following steps: 第一步:现场放样确定注浆孔位置,安装水平钻机设备;Step 1: Locate the grouting holes on site and install the horizontal drilling equipment; 第二步:注浆区距离中心钻孔起始端由近到远分为:A,B,C,D……区,注浆区大小划分按设计要求确定,注浆顺序由近到远顺序进行;采用水平钻机施工中心钻孔至注浆区A区的深度,打入护筒;Step 2: The grouting area is divided into A, B, C, D... areas from the starting point of the central drilling hole to the farthest point. The size of the grouting area is determined according to the design requirements, and the grouting sequence is from near to far. Use a horizontal drilling rig to drill the central hole to the depth of the grouting area A, and drive in the casing; 第三步:钻孔内下入柔性钻具(2)和定向钻头(3),沿设计的分支钻孔的注浆孔轨迹方向和位置,由钻头导向控制器(4)控制钻进的方向进行造斜,钻进第一个分支钻孔;通过柔性钻具泵入水泥浆液,各分支钻孔注浆时按距离中心钻孔由远到近分为A-1,A-2,A-3……段,注浆段大小根据地层性质和注浆设备能力确定,注浆顺序由远到近顺序进行;对第一个分支钻孔端部的第一段A-1进行高压旋喷注浆,在设计的注浆压力下达到注浆时间后停止;回退钻具,在钻头达到第二注浆段A-2,进行高压旋喷注浆,在设计的注浆压力下达到注浆时间后停止;依次类推,完成第一个分支钻孔内全部斜孔注浆工作;然后进行第二个分支钻孔的钻进和全部斜孔注浆工作,以此类推完成中心钻孔的起始端区域A区内所有的分支钻孔的钻进和全部斜孔注浆工作;Step 3: insert the flexible drilling tool (2) and the directional drill bit (3) into the borehole, and drill the first branch borehole along the designed grouting hole trajectory direction and position of the branch borehole, with the drill bit guide controller (4) controlling the drilling direction to create an inclination; pump cement slurry into the branch boreholes through the flexible drilling tool, and divide the branch boreholes into A-1, A-2, A-3, etc. sections according to the distance from the central borehole from far to near during grouting. The size of the grouting section is determined according to the formation properties and the capacity of the grouting equipment, and the grouting sequence is carried out from far to near; the first branch borehole end is grouted. The first section A-1 of the first branch is subjected to high-pressure rotary grouting, and the grouting time is reached at the designed grouting pressure, and the grouting is stopped; the drill is retracted, and the high-pressure rotary grouting is carried out when the drill bit reaches the second grouting section A-2, and the grouting time is reached at the designed grouting pressure, and the grouting is stopped; and so on, the grouting work of all the inclined holes in the first branch borehole is completed; then the second branch borehole is drilled and the grouting work of all the inclined holes is completed, and so on, the drilling and grouting of all the branch boreholes in the starting end area A of the central borehole are completed; 第四步:继续施工中心钻孔至第二注浆区B区的深度,继续打入护筒;并按第三步依次对注浆区B区内所有的分支钻孔进行钻进和全部斜孔注浆工作;Step 4: Continue to drill the center hole to the depth of the second grouting area B, and continue to drive the casing; and drill all the branch holes in the grouting area B and grout all the inclined holes in turn according to the third step; 第五步;依次类推,按照第四步依次继续施工中心钻孔至注浆区B区前部不同的各区域,继续打入护筒并分别对各区域内所有的分支钻孔进行钻进和全部斜孔注浆工作,直至整个中心钻孔对应的分支钻孔全部注浆完毕。Step 5: By analogy, continue to construct the central borehole to different areas in front of the grouting area B according to step 4, continue to drive in casing and drill all branch boreholes in each area and grout all inclined holes respectively until all branch boreholes corresponding to the entire central borehole are grouted. 2.按照权利要求1所述的方法,其特征在于,第一步中心钻孔布置在隧道掌子面中间位置,注浆位置按隧道开挖全断面成羽状满布,注浆孔轨迹方向由地面控制系统控制钻头导向控制器(4)造斜施工。2. The method according to claim 1 is characterized in that the first step is to arrange the central drilling hole in the middle of the tunnel face, the grouting positions are distributed in a feather shape according to the entire section of the tunnel excavation, and the direction of the grouting hole trajectory is controlled by the ground control system to control the drill bit guide controller (4) to make the inclined construction. 3.按照权利要求1所述的方法,其特征在于,同一注浆区注浆孔造斜方向在不同方向交叉顺序进行。3. The method according to claim 1 is characterized in that the deflection directions of the grouting holes in the same grouting area are carried out in a cross-sequence in different directions. 4.按照权利要求1所述的方法,其特征在于,所述连接体(2.2)置于柔性钻具内,为钻具的主体部分,起传递压力和扭矩作用;所述销钉/孔(2.4)置于柔性钻具内,为钻具的主体部分,连接和固定连接体(2.2)。4. The method according to claim 1 is characterized in that the connector (2.2) is placed in the flexible drill tool, is the main part of the drill tool, and plays a role in transmitting pressure and torque; the pin/hole (2.4) is placed in the flexible drill tool, is the main part of the drill tool, and connects and fixes the connector (2.2). 5.按照权利要求1所述的方法,其特征在于,所述钻孔直径大于护筒外径;所述护筒外径大于定向钻头(3)外径。5. The method according to claim 1, characterized in that the borehole diameter is larger than the outer diameter of the casing; and the outer diameter of the casing is larger than the outer diameter of the directional drill bit (3). 6.按照权利要求1所述的方法,其特征在于,所述羽状定向软岩隧道超前注浆预加固结构位于隧道(6)内掌子面(7)的前方用于围岩(8)的预加固。6. The method according to claim 1, characterized in that the feather-shaped directional soft rock tunnel advance grouting pre-reinforcement structure is located in front of the tunnel face (7) in the tunnel (6) for pre-reinforcement of the surrounding rock (8).
CN202110186622.8A 2021-02-10 2021-02-10 A feather-shaped directional soft rock tunnel advance grouting pre-reinforcement structure and method Active CN112727474B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110186622.8A CN112727474B (en) 2021-02-10 2021-02-10 A feather-shaped directional soft rock tunnel advance grouting pre-reinforcement structure and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110186622.8A CN112727474B (en) 2021-02-10 2021-02-10 A feather-shaped directional soft rock tunnel advance grouting pre-reinforcement structure and method

Publications (2)

Publication Number Publication Date
CN112727474A CN112727474A (en) 2021-04-30
CN112727474B true CN112727474B (en) 2024-12-13

Family

ID=75596708

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110186622.8A Active CN112727474B (en) 2021-02-10 2021-02-10 A feather-shaped directional soft rock tunnel advance grouting pre-reinforcement structure and method

Country Status (1)

Country Link
CN (1) CN112727474B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118223800B (en) * 2024-05-24 2024-07-19 西安石油大学 Bionic flexible drill rod with ultra-short radius

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101078335A (en) * 2007-06-28 2007-11-28 北京万维亿通科技发展有限公司 Ultra-short radius radial horizontal well drilling, completion tool and technique thereof
CN109899089A (en) * 2019-03-07 2019-06-18 中煤科工集团西安研究院有限公司 Goaf grouting method based on pinniform horizontal branch directional drilling technique
CN215718753U (en) * 2021-02-10 2022-02-01 北京市政路桥股份有限公司 An advanced grouting pre-reinforcement structure for a feather-shaped directional soft rock tunnel

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6923273B2 (en) * 1997-10-27 2005-08-02 Halliburton Energy Services, Inc. Well system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101078335A (en) * 2007-06-28 2007-11-28 北京万维亿通科技发展有限公司 Ultra-short radius radial horizontal well drilling, completion tool and technique thereof
CN109899089A (en) * 2019-03-07 2019-06-18 中煤科工集团西安研究院有限公司 Goaf grouting method based on pinniform horizontal branch directional drilling technique
CN215718753U (en) * 2021-02-10 2022-02-01 北京市政路桥股份有限公司 An advanced grouting pre-reinforcement structure for a feather-shaped directional soft rock tunnel

Also Published As

Publication number Publication date
CN112727474A (en) 2021-04-30

Similar Documents

Publication Publication Date Title
CN107355226B (en) Broken area hole section processing structure of TBM construction tunnel fault
CN111764863B (en) Method for blocking water gushing of high-pressure drilling hole in underground fault fracture zone
CN113073983B (en) Enclosure type grouting construction method for submarine tunnel to penetrate through water-rich fault fracture zone
CN111520146B (en) Excavation method of rock roadway in coal mine based on hydraulic fracturing technology
CN108265706A (en) Engineering pile in karst cave geology and pile forming process
CN111335901A (en) Construction method for auxiliary small-diameter open TBM tunneling of pipe shed at unfavorable geological tunnel section
CN112727474B (en) A feather-shaped directional soft rock tunnel advance grouting pre-reinforcement structure and method
CN206396745U (en) Long spire stake machine with the Counterboring apparatus that spins
CN116291482A (en) Advanced grouting reinforcement method for deep-buried long tunnel on earth surface
CN112012746A (en) Construction method of railway tunnel deep and large vertical shaft under condition of thick-layer water-rich broken zone
CN216198097U (en) A U-shaped double-layer fully enclosed grouting water-stop device for water-rich sand tunnel construction
CN107083964B (en) Advanced support method for shield tunnel construction of stratum with uneven hardness
CN215718753U (en) An advanced grouting pre-reinforcement structure for a feather-shaped directional soft rock tunnel
CN210194627U (en) Hole wall guniting device
CN106089216B (en) Rock tunnel broken rock construction method
CN116291585B (en) Single-point multi-pile dual high-pressure jet grouting system and method
CN209818093U (en) Be used for soft rock tunnel face reinforcing apparatus
KR102609304B1 (en) A grouting method using a direction-controlled borehole and a grouting system for the soft ground and void area
CN115680695B (en) A large deformation control system and construction method for a tunnel in a soft rock formation with high ground stress
CN109854251A (en) Tunnel horizontal jet grouting construction method
Clark Extreme excavation in fault zones and squeezing ground at the Kargi HEPP in Turkey
CN109538240B (en) Tunnel construction method for earth surface directional large-diameter deep hole grouting
CN106640098B (en) Subway tunnel shield construction method
CN108590668A (en) A kind of Station overlength pipe shed trombone slide method
CN115748650B (en) Construction method of steel tube concrete wall structure for soft geological structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant