CN112663998B - Mortise-tenon joint assembly type light wall farm house and construction method - Google Patents
Mortise-tenon joint assembly type light wall farm house and construction method Download PDFInfo
- Publication number
- CN112663998B CN112663998B CN202011413529.8A CN202011413529A CN112663998B CN 112663998 B CN112663998 B CN 112663998B CN 202011413529 A CN202011413529 A CN 202011413529A CN 112663998 B CN112663998 B CN 112663998B
- Authority
- CN
- China
- Prior art keywords
- tenon
- wall
- ring beam
- mortise
- light wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 28
- 229910000831 Steel Inorganic materials 0.000 claims description 32
- 239000010959 steel Substances 0.000 claims description 32
- 239000004570 mortar (masonry) Substances 0.000 claims description 19
- 239000004567 concrete Substances 0.000 claims description 14
- 238000009434 installation Methods 0.000 claims description 11
- 238000011065 in-situ storage Methods 0.000 claims description 6
- 238000012937 correction Methods 0.000 claims description 3
- 230000010354 integration Effects 0.000 claims description 3
- 238000005192 partition Methods 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 abstract description 7
- 238000011161 development Methods 0.000 abstract description 6
- 239000011150 reinforced concrete Substances 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 6
- 238000005516 engineering process Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 239000011449 brick Substances 0.000 description 2
- 235000001674 Agaricus brunnescens Nutrition 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000009418 renovation Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A40/00—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
- Y02A40/10—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
- Y02A40/25—Greenhouse technology, e.g. cooling systems therefor
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
Description
技术领域technical field
本发明属于装配式建筑研究领域,具体涉及一种榫卯连接装配式轻墙农房及施工方法。The invention belongs to the research field of prefabricated buildings, in particular to a tenon-and-mortise connection prefabricated light-wall farmhouse and a construction method.
背景技术Background technique
装配式建筑目前在城市发展的较好,但在农村地区有待于进一步发展。装配式农房建设有助于建设美丽乡村,提高居民的生活质量。装配式建筑的发展必须在城市和农村均得到发展,才是可持续发展的模式,作为装配式建筑发展的薄弱环节,我国农村地区有着广阔的市场,新农村建设需要翻新或建设大量的农房,装配式农房有着庞大的市场。Prefabricated buildings are currently developing well in cities, but need to be further developed in rural areas. The construction of prefabricated farm houses helps to build beautiful villages and improve the quality of life of residents. The development of prefabricated buildings must be developed in both urban and rural areas, which is a sustainable development model. As a weak link in the development of prefabricated buildings, there is a broad market in rural areas in my country, and new rural construction requires renovation or construction of a large number of farm houses. , Prefabricated farm houses have a huge market.
随着近年国家推广装配式建筑,装配式构件的生产水平有了质的提高,构件的尺寸精度等有了很大提升,装配式构件厂如雨后春笋般建成,装配式构件的生产能力和质量等有了提高。本发明的预制构造柱、预制圈梁等均需要精细化制作、生产,目前的装配式构件厂均能满足制作工艺的要求。With the promotion of prefabricated buildings by the country in recent years, the production level of prefabricated components has been qualitatively improved, and the dimensional accuracy of components has been greatly improved. Prefabricated component factories have sprung up like mushrooms after a rain. There has been improvement. The prefabricated structural columns, prefabricated ring beams, etc. of the present invention all require refined fabrication and production, and the current prefabricated component factories can all meet the requirements of the fabrication process.
装配式农房在农村地区建设的必要性也在增加。随着城市化的发展,农村的青壮年都外出务工,如仍采用砖混砌体结构,需要大量的劳动力进行施工,而装配式轻墙农房体系需要的劳动力比较少,适合目前农村的状况。The necessity of constructing prefabricated farm houses in rural areas is also increasing. With the development of urbanization, young and middle-aged people in rural areas are all out to work. If the brick-concrete structure is still used, a large amount of labor is required for construction, while the prefabricated light-wall farm house system requires less labor, which is suitable for the current situation in rural areas. .
我国部分地区的装配式农房为轻钢龙骨别墅,造价较高,与传统的砖墙差别较大,很多地区的居民不接受;而榫卯连接装配式轻墙农房与现有民居相接近,更容易被居民接受。如能做好装配式农房示范,被居民所接受,有助于装配式建筑在农村地区的推广。The prefabricated farm houses in some parts of our country are light steel keel villas, which are relatively expensive and are quite different from the traditional brick walls, which are not accepted by residents in many areas; and the prefabricated light wall farm houses connected by mortise and tenon joints are similar to the existing dwellings. , more easily accepted by residents. If the prefabricated farm house demonstration can be done well and accepted by the residents, it will help the promotion of prefabricated buildings in rural areas.
榫卯连接是具有中国智慧的建筑构造技术,中国古代的应县木塔等典型建筑,均使用了榫卯连接结构,应县木塔到现在仍保存完好,经历了风雨和地震,说明榫卯连接是可靠的连接方式。The tenon-and-mortise connection is a building construction technology with Chinese wisdom. The typical buildings such as the Yingxian wooden pagoda in ancient China all used the tenon-and-mortise connection structure. A connection is a reliable way to connect.
发明内容SUMMARY OF THE INVENTION
针对目前大部分农房仍然采用砌砖的方式、施工效率低、能源消耗大的问题,本发明提供了一种榫卯连接装配式轻墙农房及施工方法,适用于层数为2到3层的农村地区高品质农房、景区民宿建设;符合建筑工业化的发展趋势,本发明将榫卯连接应用于装配式钢筋混凝土结构, 将工厂精益制造与现场施工结合,减少现场粗糙施工带来的误差与瑕疵。Aiming at the problems that most of the farm houses still use brick laying, low construction efficiency and high energy consumption, the present invention provides a tenon-and-mortise connection assembled light-wall farm house and a construction method, which are suitable for 2 to 3 floors. In line with the development trend of building industrialization, the present invention applies tenon-and-mortise joints to prefabricated reinforced concrete structures, combines factory lean manufacturing with on-site construction, and reduces damage caused by rough on-site construction. Errors and Defects.
本发明采用的技术方案为:一种榫卯连接装配式轻墙农房,包括构造柱、圈梁和轻墙;所述构造柱上设有榫卯结构,能够与同样具有榫卯结构的圈梁和轻墙插入配合。The technical scheme adopted in the present invention is as follows: a mortise-and-mortise-connected assembled light-wall farmhouse, comprising a structural column, a ring beam and a light wall; the structural column is provided with a tenon-and-mortise structure, which can be combined with a ring-like structure with a tenon-and-mortise structure. Beam and light wall insert mates.
进一步,根据所述构造柱的安装位置不同,包括一字型墙体中部构造柱、L型墙体角部构造柱、T字形墙体相交处构造柱和十字型墙体相交处构造柱;所述一字型墙体中部构造柱的两个相对的侧面有突出的榫,用于与轻墙的卯相连接;所述L型墙体角部构造柱的两个相邻的侧面有突出的榫,用于与轻墙的卯相连接;所述T字形墙体相交处构造柱的三个侧面有突出的榫,用于与轻墙的卯相连接;所述十字型墙体相交处构造柱的四个侧面有突出的榫,用于与轻墙的卯相连接;所述构造柱与圈梁相连的部位,在构造柱上设有卯;所述构造柱下部设有孔洞,上部设有突出的钢筋,实现上下层构造柱的插筋灌浆连接。Further, according to the different installation positions of the structural columns, it includes the structural column in the middle of the in-line wall, the structural column in the corner of the L-shaped wall, the structural column at the intersection of the T-shaped wall and the structural column at the intersection of the cross-shaped wall; The two opposite sides of the structural column in the middle of the in-line wall have protruding tenons for connecting with the sockets of the light wall; the two adjacent sides of the structural column in the corner of the L-shaped wall have protruding tenons. Tenons are used to connect with the sockets of the light walls; there are protruding tenons on the three sides of the structural columns at the intersection of the T-shaped walls, which are used to connect with the sockets of the light walls; the intersection of the cross-shaped walls is constructed There are protruding tenons on the four sides of the column, which are used to connect with the sockets of the light wall; the part where the structure column is connected with the ring beam is provided with a socket on the structure column; the lower part of the structure column is provided with a hole, and the upper part is provided with a socket. There are protruding steel bars to realize the grouting connection of the upper and lower structural columns.
进一步,所述圈梁的左右端设有榫,用于插入构造柱的卯中,临时固定圈梁;所述圈梁下部局部设置突出的榫,用于插入轻墙的孔洞中,增强整体性。Further, the left and right ends of the ring beam are provided with tenons for inserting into the sockets of the structural columns to temporarily fix the ring beam; the lower part of the ring beam is partially provided with protruding tenons for inserting into the holes of the light wall to enhance the integrity .
进一步,所述圈梁两端突出的榫为长方体,下部突出榫为圆柱体,所述榫的内部有钢筋,所述钢筋为圈梁内部钢筋的延伸。Further, the tenons protruding from both ends of the ring beam are rectangular parallelepipeds, the lower protruding tenons are cylinders, and there are steel bars inside the tenons, and the steel bars are extensions of the steel bars inside the ring beam.
进一步,所述轻墙采用混凝土板,且上下两端并排开有若干孔洞,用于与圈梁插接;与构造柱相邻的轻墙两侧为卯,所述构造柱与轻墙之间通过榫卯连接;相邻块轻墙中一侧为榫,一侧为卯,相邻两块轻墙之间通过榫卯连接。Further, the light wall adopts concrete slabs, and there are several holes side by side at the upper and lower ends for plugging with the ring beam; both sides of the light wall adjacent to the structural column are 卯, between the structural column and the light wall. It is connected by tenon and mortise; one side of the adjacent light walls is tenon and one side is mortise, and the two adjacent light walls are connected by tenon and mortise.
一种榫卯连接装配式轻墙农房的施工方法,包括以下步骤:A construction method for a tenon-and-mortise connected assembled light-wall farm house, comprising the following steps:
步骤一:预制构造柱、圈梁和轻墙;根据构造柱所在不同部位,分别预制与轻墙等厚的一字型墙体中部构造柱、L型墙体角部构造柱、T字形墙体相交处构造柱和十字型墙体相交处构造柱;在预制圈梁上部预留裸露钢筋,或设置钢筋桁架。Step 1: Prefabricate structural columns, ring beams and light walls; according to the different positions of the structural columns, prefabricate the central structural columns of the in-line wall, the corner structural columns of the L-shaped wall, and the T-shaped wall with the same thickness as the light wall. At the intersection of the structural column and the cross-shaped wall at the intersection of the structural column; reserve exposed steel bars on the upper part of the prefabricated ring beam, or set up a steel truss.
步骤二:现浇地圈梁;根据农房的产地大小和规模,设置合理的功能分区与房间布置,现浇地圈梁;在有构造柱的部位,地圈梁预留突出的钢筋,插入构造柱下部的孔洞中并进行灌浆;在轻墙对应的地圈梁部位,有一个或两个突出的榫,插入到轻墙的空洞中。Step 2: cast-in-situ ground ring beam; according to the size and scale of the farm house, set up reasonable functional partitions and room layout, cast-in-situ ground ring beam; in the position with structural columns, the ground ring beam reserves the protruding steel bars, inserted into the ground ring beam The holes in the lower part of the columns are constructed and grouted; in the part of the ground ring beam corresponding to the light wall, there are one or two protruding tenons, which are inserted into the holes of the light wall.
步骤三:安装构造柱与轻墙;安装前在地圈梁上抹上砂浆;一块一块安装相邻的墙板,安装时在突出的榫上均匀抹上砂浆,实现和卯的紧密结合;再安装构造柱。Step 3: Install the structural column and the light wall; apply mortar on the ground ring beam before installation; install the adjacent wall panels one by one, and apply mortar evenly on the protruding tenons during installation to achieve close integration with the Mao; Install the structural column.
步骤四:安装圈梁;在圈梁两端和下部突出的榫上抹上砂浆,将圈梁下部突出的榫插入轻墙上的孔洞中,两侧的榫插入构造柱的卯中。Step 4: Install the ring beam; put mortar on the protruding tenons at both ends and the lower part of the ring beam, insert the tenons protruding from the lower part of the ring beam into the holes on the light wall, and insert the tenons on both sides into the sockets of the structural columns.
步骤五:吊装楼板,楼板预留钢筋深入到圈梁上部,和圈梁上部预留的钢筋进行绑扎,整体浇筑圈梁上部和楼板叠合层混凝土。Step 5: The floor slab is hoisted, and the steel bars reserved for the floor slab go deep into the upper part of the ring beam, bind with the steel bars reserved on the upper part of the ring beam, and pour the superimposed layer concrete of the upper part of the ring beam and the floor slab as a whole.
进一步,所述地圈梁上突出的榫为圆柱体,且榫的直径小于轻墙中孔洞的直径;所述地圈梁设置凹槽,所述凹槽宽度大于轻墙厚度。Further, the tenon protruding on the ground ring beam is a cylinder, and the diameter of the tenon is smaller than the diameter of the hole in the light wall; the ground ring beam is provided with a groove, and the width of the groove is greater than the thickness of the light wall.
进一步,与圈梁上的榫对应的轻墙孔洞上设置有堵头,避免砂浆掉落空洞中,造成填缝不密实。Further, plugs are provided on the holes of the light wall corresponding to the tenons on the ring beams, so as to prevent the mortar from falling into the holes and causing the joints not to be compacted.
进一步,所述轻墙在板厚度方向两侧均配置未张拉的钢绞线,所述钢绞线用于增强墙板的延性,避免墙板的地震时发生脆性破坏。Further, untensioned steel strands are arranged on both sides of the light wall in the thickness direction of the board, and the steel strands are used to enhance the ductility of the wallboard and avoid brittle failure of the wallboard during an earthquake.
进一步,在浇筑混凝土前应有足够的间歇时间,对构造柱、圈梁、墙体的垂直度进行校正,校正后保证砂浆填满榫卯缝隙,且有足够强度后再进行混凝土浇筑。Further, there should be enough intermittent time before pouring concrete, and the verticality of structural columns, ring beams, and walls should be corrected. After correction, ensure that the mortar fills the tenon and tenon joints and has sufficient strength before concrete pouring.
本发明至少包括以下有益效果:The present invention includes at least the following beneficial effects:
(1)农村房屋的建筑工业化程度显著提高;(1) The degree of construction industrialization of rural houses has been significantly improved;
(2)传承了优秀的古代建筑技术;榫卯连接作为我国古代木结构巧妙的构件连接技术,引入到了钢筋混凝土结构的连接节点中,在低层建筑中发挥重要的作用,增强了构件之间共同工作的能力。(2) Inherited excellent ancient building technology; tenon-and-mortise joint, as an ingenious component connection technology of ancient wooden structures in my country, was introduced into the connection nodes of reinforced concrete structures, played an important role in low-rise buildings, and enhanced the commonality between components. ability to work.
(3)提高了农村建筑砌墙的效率,用轻墙作为承重墙体,利用小型吊车即可快速完成墙体安装。(3) The efficiency of building walls in rural buildings is improved. Light walls are used as load-bearing walls, and small cranes can be used to quickly complete wall installation.
附图说明Description of drawings
图1为L型墙体角部构造柱上端的结构示意图;Fig. 1 is the structural schematic diagram of the upper end of the L-shaped wall corner structural column;
图2为圈梁左端的结构示意图;Fig. 2 is the structural representation of the left end of the ring beam;
图3为圈梁下部的结构示意图;Fig. 3 is the structural representation of the lower part of the ring beam;
图4为轻墙的结构示意图;Fig. 4 is the structural schematic diagram of light wall;
图5为一字型墙体中部构造柱的结构示意图;Fig. 5 is the structural schematic diagram of the structural column in the middle of the in-line wall;
图6为L字型墙体角部构造柱的结构示意图;6 is a schematic structural diagram of an L-shaped wall corner structural column;
图7为T字型墙体相交处构造柱的结构示意图;Fig. 7 is the structural schematic diagram of the structural column at the intersection of the T-shaped wall;
图8为十字型墙体相交处构造柱的结构示意图。FIG. 8 is a schematic structural diagram of a structural column at the intersection of a cross-shaped wall.
具体实施方式Detailed ways
下面结合附图对本发明作进一步的说明。The present invention will be further described below in conjunction with the accompanying drawings.
本发明是一种榫卯连接装配式轻墙农房及施工方法,该农房包括构造柱、圈梁和轻墙,且均具有榫卯结构,能够相互进行榫卯插接连接。本发明提出的榫卯连接,虽没有木结构的榫卯结构复杂,但起到了初步连接构件的作用,可以起到减少支撑和脚手架的使用。The invention relates to a mortise-and-mortise connection assembled light-wall farmhouse and a construction method. The farmhouse comprises a structural column, a ring beam and a light wall, all of which have a tenon-and-mortise structure and can be connected by tenon-and-mortise joints. Although the tenon-and-mortise joint proposed by the present invention is not as complicated as the tenon-and-mortise joint of a wooden structure, it acts as a preliminary connecting member and can reduce the use of supports and scaffolding.
一种榫卯连接装配式轻墙农房,包括构造柱、圈梁和轻墙;所述构造柱上设有榫卯结构,能够与同样具有榫卯结构的圈梁和轻墙插入配合。根据所述构造柱的安装位置不同,包括一字型墙体中部构造柱、L型墙体角部构造柱、T字形墙体相交处构造柱和十字型墙体相交处构造柱。A tenon-and-mortise-connected assembled light-wall farmhouse includes a structural column, a ring beam and a light wall; the structural column is provided with a tenon-and-mortise structure, which can be inserted and matched with the ring beam and the light wall which also have the tenon-and-mortise structure. According to the different installation positions of the structural columns, the structural columns in the middle of the in-line wall, the corners of the L-shaped wall, the intersection of the T-shaped walls and the intersection of the cross-shaped walls are included.
如图1至图3所示,L型墙体角部构造柱的两个相邻的侧面有突出的榫3,用于与轻墙9的卯11相连接。构造柱与圈梁7相连的部位,在构造柱上设有卯1,能够与圈梁7两侧突出的长方体榫6连接;所述构造柱下部设有孔洞10,上部设有突出的钢筋2,实现上下层构造柱的插筋灌浆连接。图1中榫3只有构造柱高度的一半,也可做成与圈梁等高或圈梁高度的3/4,需要与构造柱上部卯1的尺寸相配合。该设置方式能够在施工中可以减少脚手架的使用,使圈梁7两端突出的榫6放入构造柱凹陷的卯1中即可实现临时固定。在圈梁下部局部设置突出的圆柱形榫8,用于插入轻墙9的孔洞10中,增强整体性。为增强节点的承载能力与抗震性能,圈梁7中的榫6、8的内部有钢筋,且该钢筋为圈梁内部钢筋的延伸。As shown in FIG. 1 to FIG. 3 , two adjacent sides of the L-shaped wall corner structural column have protruding
在榫卯的缝隙中嵌入砂浆或在预制圈梁两端的榫上预先抹上砂浆,再将榫放入卯中,等砂浆凝结硬化后,即可形成构造柱与圈梁的可靠连接。砂浆应随拌随用,其一方面可以起到抵消构件制作误差的作用,另一方面可以起到填充榫卯之间空隙、增强榫卯连接承载能力的作用。Embed the mortar in the gap of the tenon and mortise or put the mortar on the tenon at both ends of the prefabricated ring beam, and then put the tenon into the mortise. The mortar should be used with mixing. On the one hand, it can offset the manufacturing error of the components, and on the other hand, it can fill the gap between the tenon and tenon joints and enhance the bearing capacity of the tenon and tenon joints.
图1仅给出了一种构造柱做法,一字型墙体、T型墙体和十字型墙体的构造柱与此构造柱类似,只是榫卯的数量和位置不同。Figure 1 only shows a method of structural columns. The structural columns of the in-line wall, T-shaped wall and cross-shaped wall are similar to this structural column, but the number and position of the tenon and mortise are different.
如图4所示,本发明中的轻墙9采用混凝土板,且上下两端并排开有若干孔洞10,用于与圈梁7插接;与构造柱13相邻的轻墙9两侧为卯11,所述构造柱与轻墙9之间通过榫卯连接;相邻块轻墙9中一侧为榫12,一侧为卯11,相邻两块轻墙之间通过榫卯连接。使用空心墙板作为轻墙墙体,表观密度较小,具有一定的保温隔热性能,且施工效率更高,可以减少工期、降低造价。As shown in FIG. 4 , the
一种榫卯连接装配式轻墙农房的施工方法,包括以下步骤:A construction method for a tenon-and-mortise connected assembled light-wall farm house, comprising the following steps:
步骤一:预制混凝土构造柱、圈梁和轻墙;根据构造柱所在不同部位,分别预制与轻墙等厚的一字型墙体中部构造柱、L型墙体角部构造柱、T字形墙体相交处构造柱和十字型墙体相交处构造柱;在预制圈梁上部预留裸露钢筋,或设置钢筋桁架,混凝土表面拉毛。Step 1: Prefabricated concrete structural columns, ring beams and light walls; according to the different positions of the structural columns, prefabricate the central structural columns of the in-line wall, the corner structural columns of the L-shaped wall, and the T-shaped wall with the same thickness as the light wall. The structural column at the intersection of the body and the cross-shaped wall should be constructed; the exposed steel bars are reserved on the upper part of the prefabricated ring beam, or the steel bar trusses are set, and the concrete surface is roughened.
步骤二:现浇地圈梁;根据农房的产地大小和规模,设置合理的功能分区与房间布置,现浇地圈梁;在有构造柱的部位,地圈梁预留突出的钢筋,插入构造柱下部的孔洞中并进行灌浆;在轻墙对应的地圈梁部位,有一个或两个突出的圆柱体的榫和用于安装轻墙的凹槽,且榫的直径小于轻墙中孔洞的直径,凹槽宽度大于轻墙厚度,用于将轻墙安装在凹槽中,并将地圈梁上的榫插入到轻墙的空洞中。Step 2: cast-in-situ ground ring beam; according to the size and scale of the farm house, set up reasonable functional partitions and room layout, cast-in-situ ground ring beam; in the position with structural columns, the ground ring beam reserves the protruding steel bars, inserted into the ground ring beam The holes in the lower part of the structural columns are grouted; in the corresponding ground ring beams of the light wall, there are one or two protruding cylindrical tenons and grooves for installing the light wall, and the diameter of the tenon is smaller than that of the hole in the light wall The diameter of the groove is larger than the thickness of the light wall, which is used to install the light wall in the groove and insert the tenon on the ground ring beam into the cavity of the light wall.
步骤三:安装构造柱与轻墙;安装前在地圈梁上抹上砂浆;一块一块安装相邻的墙板,安装时在突出的榫上均匀抹上砂浆,实现和卯的紧密结合;再安装构造柱。Step 3: Install the structural column and the light wall; apply mortar on the ground ring beam before installation; install the adjacent wall panels one by one, and apply mortar evenly on the protruding tenons during installation to achieve close integration with the Mao; Install the structural column.
步骤四:安装圈梁;在圈梁两端和下部突出的榫上抹上砂浆,将圈梁下部突出的榫插入轻墙上的孔洞中,两侧的榫插入构造柱的卯中。Step 4: Install the ring beam; put mortar on the protruding tenons at both ends and the lower part of the ring beam, insert the tenons protruding from the lower part of the ring beam into the holes on the light wall, and insert the tenons on both sides into the sockets of the structural columns.
步骤五:吊装楼板,楼板预留钢筋深入到圈梁上部,和圈梁上部预留的钢筋进行绑扎,整体浇筑圈梁上部和楼板叠合层混凝土。Step 5: The floor slab is hoisted, and the steel bars reserved for the floor slab go deep into the upper part of the ring beam, bind with the steel bars reserved on the upper part of the ring beam, and pour the superimposed layer concrete of the upper part of the ring beam and the floor slab as a whole.
在步骤二中,与圈梁上的榫对应的轻墙孔洞上设置有堵头,避免砂浆掉落空洞中,造成填缝不密实。In
在步骤三中,轻墙在板厚度方向两侧均配置未张拉的钢绞线,所述钢绞线用于增强墙板的延性,避免墙板的地震时发生脆性破坏。In
在步骤五中,在浇筑混凝土前应有足够的间歇时间,对构造柱、圈梁、墙体的垂直度等进行校正,校正后保证砂浆填满榫卯缝隙,且有足够强度后再进行混凝土浇筑。In step 5, there should be enough intermittent time before pouring concrete, and the verticality of structural columns, ring beams, walls, etc. should be corrected. After correction, ensure that the mortar fills the mortise and tenon gaps and has sufficient strength before concrete. pouring.
上述施工工艺中,步骤一中的一字型墙体中部构造柱13俯视图如图5所示,L型墙体角部构造柱俯视图如图6所示,T型墙体相交处构造柱俯视图如图7所示,十字型墙体相交处构造柱如图8所示,榫卯之间用砂浆14嵌缝。In the above construction process, the top view of the in-line
将榫卯连接应用于装配式混凝土结构,传承了古代优秀的建筑技术、增强建筑的整体性和抗震性能;榫卯连接与砂浆等胶结材料共用,增强节点的承载能力。本发明中的圈梁、构造柱、轻墙等重量均不大,使用吨位较小的吊车即可完成吊运、安装,适用于农村住宅场地较小的情况。使农房建设更加高效,质量提升,造价持平或降低;装配式建筑在农村地区得到推广;建筑工业化得到深入发展。The tenon-and-mortise joint is applied to the prefabricated concrete structure, which inherits the ancient excellent construction technology and enhances the integrity and seismic performance of the building; the tenon-and-mortise joint is shared with cementing materials such as mortar to enhance the bearing capacity of the joint. The ring beams, structural columns, light walls, etc. in the present invention are not heavy, and can be hoisted and installed by using a crane with a small tonnage, which is suitable for small rural residential sites. Make the construction of farm houses more efficient, improve the quality, and keep the same or reduce the cost; prefabricated buildings are promoted in rural areas; the industrialization of construction is further developed.
以上所述仅为本发明的优选实施例,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明的技术方案前提下,还可做出若干修改或等同替代,例如构件之间通过键槽、不同形式的榫卯连接,均视为本发明的保护范畴。The above are only preferred embodiments of the present invention. It should be pointed out that for those skilled in the art, some modifications or equivalent substitutions can be made without departing from the technical solution of the present invention. The keyway and tenon-and-mortise connection between them are all regarded as the protection scope of the present invention.
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011413529.8A CN112663998B (en) | 2020-12-07 | 2020-12-07 | Mortise-tenon joint assembly type light wall farm house and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011413529.8A CN112663998B (en) | 2020-12-07 | 2020-12-07 | Mortise-tenon joint assembly type light wall farm house and construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112663998A CN112663998A (en) | 2021-04-16 |
CN112663998B true CN112663998B (en) | 2022-05-17 |
Family
ID=75401253
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011413529.8A Active CN112663998B (en) | 2020-12-07 | 2020-12-07 | Mortise-tenon joint assembly type light wall farm house and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112663998B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115928874B (en) * | 2023-02-03 | 2024-09-24 | 河南省第二建设集团有限公司 | Full-prefabricated assembly type structural system based on prefabricated hollow slab and construction method thereof |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005068841A (en) * | 2003-08-26 | 2005-03-17 | Hajime Furuta | Connecting structure of column material and wall material in wooden structure |
CN201883573U (en) * | 2010-08-08 | 2011-06-29 | 路石科 | Combined type wall structure |
CN105155734B (en) * | 2015-08-19 | 2017-05-10 | 太原理工大学 | Mortise and tenon connection assembled self-insulation and heat insulation hollow shear wall system and its hoisting method |
CN205576959U (en) * | 2016-04-26 | 2016-09-14 | 杭州鲁创屋建材科技有限公司 | Light -duty pottery glass siding wall and basic assembly component |
CN110130496B (en) * | 2019-05-29 | 2020-09-08 | 石家庄铁道大学 | Beam column mortise-tenon joint type node structure |
-
2020
- 2020-12-07 CN CN202011413529.8A patent/CN112663998B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN112663998A (en) | 2021-04-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108824818B (en) | Construction method of assembled concrete filled steel tube frame-shear wall structure system | |
CN106149880B (en) | Assembly room with new structural system | |
CN103924710B (en) | Low layer assembled combined wall house Plate Welding node structure | |
CN103993679B (en) | Low layer assembling combined wall house bolt connection node structure | |
WO2007134519A1 (en) | A concrete load-bearing wall with compound heat-insulating layer | |
CN111549950A (en) | Light-weight prefabricated steel structure composite floor and its implementation method | |
CN104110096B (en) | The construction method in the wall building part of Prefabricated building plate and formation and building room and building room | |
CN103061517A (en) | Novel sub-structure modular prefabricated assembly node type frame structure assembly method | |
CN106522633A (en) | Assembly type cold-formed thin-walled steel truss support lateral force resistant system | |
CN106760038A (en) | A kind of T-shaped precast concrete shear wall and its dry construction connection method | |
CN112663998B (en) | Mortise-tenon joint assembly type light wall farm house and construction method | |
CN203096926U (en) | Novel substructure module type prefabricated assembled frame structure | |
CN103993672A (en) | Tenon type connecting joint structure of low-rise fabricated composite wall house | |
CN110424370A (en) | The linear type connecting node and L shape connecting node of prefabricated post and prefabricated panel | |
CN111809729B (en) | A dry connection node for assembled concrete beams and columns | |
CN114278004A (en) | Low-layer assembled profiled steel sheet light-concrete composite wallboard, connecting structure and construction method | |
CN214531068U (en) | Assembled steel structure house | |
CN205329970U (en) | Precast concrete wallboard and wall panel structure system of dark frame in area of structure thereof | |
CN108571065A (en) | The assembled steel tendon concrete frame structure of connector is connected to based on steel plate | |
CN111980226A (en) | Full-assembly mortise-tenon connection multi-cavity steel plate combined shear wall and construction method thereof | |
CN218024833U (en) | Prefabricated elevator shaft | |
CN114658141B (en) | T-shaped constructional column and independent foundation connection structure of assembled composite wallboard and manufacturing method | |
CN207110035U (en) | Assembled steel tendon concrete frame structure based on steel plate connection joint | |
CN209975803U (en) | An ecological composite wall structure | |
CN107401214A (en) | A kind of installation method of assembled architecture |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |