CN112609961B - Integral horizontal pull rod assembly in concrete wall formwork - Google Patents
Integral horizontal pull rod assembly in concrete wall formwork Download PDFInfo
- Publication number
- CN112609961B CN112609961B CN202011455437.6A CN202011455437A CN112609961B CN 112609961 B CN112609961 B CN 112609961B CN 202011455437 A CN202011455437 A CN 202011455437A CN 112609961 B CN112609961 B CN 112609961B
- Authority
- CN
- China
- Prior art keywords
- screw
- rod
- pad
- formwork
- assembled
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009415 formwork Methods 0.000 title claims abstract description 48
- 230000007246 mechanism Effects 0.000 claims abstract description 13
- 238000000034 method Methods 0.000 claims abstract description 9
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 6
- 239000010959 steel Substances 0.000 claims abstract description 6
- 230000002787 reinforcement Effects 0.000 claims description 5
- 239000013013 elastic material Substances 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 12
- 230000005540 biological transmission Effects 0.000 abstract description 4
- 229910000746 Structural steel Inorganic materials 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
- E04G11/08—Forms, which are completely dismantled after setting of the concrete and re-built for next pouring
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/005—Strips for covering joints between form sections, e.g. to avoid burring or spilling of laitance
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/06—Tying means; Spacers ; Devices for extracting or inserting wall ties
- E04G17/065—Tying means, the tensional elements of which are threaded to enable their fastening or tensioning
- E04G17/0655—Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/06—Tying means; Spacers ; Devices for extracting or inserting wall ties
- E04G17/065—Tying means, the tensional elements of which are threaded to enable their fastening or tensioning
- E04G17/0655—Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts
- E04G17/0658—Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts remaining completely or partially embedded in the cast material
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Description
技术领域technical field
本发明涉及建筑现浇混凝土施工技术领域,具体涉及一种砼墙支模中的整装水平拉杆组件。The invention relates to the technical field of cast-in-place concrete construction of buildings, in particular to a self-assembled horizontal tie rod assembly in a support formwork of a concrete wall.
背景技术Background technique
在现浇砼结构中,竖向构件(例如墙体、柱体、深梁等)的侧模板承受未凝砼的很大水平推力。为了解决支模问题,利用钢质水平杆来承当此水平力是较有效的方法。目前水平杆的构造方法众多,但总是顾此失彼,无法很好解决。看似水平杆只要能够与侧模结合,传力可靠,拆装操作方便就可以,实则不然。最好的设想是:它能将竖向构件中的两侧排钢筋在模内定位,达到排钢筋竖向的侧立位与模板内距离符合规范要求,并能满足墙体双排钢筋结构的拉结要求;又能与模板结合,并做到装拆方便,位置留设灵活;还要能在支模中满足水平拉结力要求,使其传力可靠;对有防水要求的墙体,还需要满足浇筑后的墙墙体满足止水要求。采用双头带有螺纹的水平杆,显然无法满足上述要求。因此,需要设计一种全新的水平拉杆组件。In the cast-in-place concrete structure, the side formwork of the vertical members (such as walls, columns, deep beams, etc.) bears a large horizontal thrust of the unconsolidated concrete. In order to solve the problem of formwork, it is more effective to use a steel horizontal rod to bear the horizontal force. At present, there are many construction methods for horizontal rods, but they always pay attention to one and the other, and cannot be solved well. It seems that as long as the horizontal rod can be combined with the side mold, the force transmission is reliable, and the disassembly and assembly operations are convenient, but this is not the case. The best idea is: it can locate the two rows of steel bars in the vertical member in the mold, so that the vertical side position of the row of steel bars and the distance in the template meet the requirements of the specification, and can meet the requirements of the double-row steel bar structure of the wall. It can also be combined with the formwork, and it is easy to assemble and disassemble, and the location is flexible; it must also be able to meet the horizontal tie force requirements in the formwork, so that the force transmission is reliable; for walls with waterproof requirements, It is also necessary to meet the water-stop requirements for the wall after pouring. The use of horizontal rods with threads at both ends obviously cannot meet the above requirements. Therefore, a completely new horizontal tie rod assembly needs to be designed.
发明内容SUMMARY OF THE INVENTION
鉴于上述现有技术的不足,本发明提供一种砼墙支模中的整装水平拉杆组件。本发明的整装水平拉杆组件既是支模中的一个水平拉结工具,又是墙体结构钢筋组成件,浇筑完成后能够方便拆模,除杆件留埋于墙体内,其它外侧零部件能拆除后再次复用。整装为的是不占用施工工时,解决以往穿模板拉结较难精准作业和易损坏模板的问题,使施工工艺更简便。In view of the above-mentioned deficiencies of the prior art, the present invention provides a self-assembled horizontal tie rod assembly in a concrete wall support formwork. The self-assembled horizontal tie rod assembly of the present invention is not only a horizontal tie tool in the formwork, but also a structural steel bar component of the wall body. After the pouring is completed, the formwork can be easily removed. Except for the rod parts that remain buried in the wall, other external components It can be reused after dismantling. The purpose of the whole installation is not to occupy the construction time, to solve the problems of difficult and accurate operation and easy damage to the formwork in the past, and to make the construction process easier.
本发明的技术方案在于:一种砼墙支模中的整装水平拉杆组件,包括用于预埋在砼内的杆件,所述杆件的两端部分别设置有外螺纹,形成螺纹连接段,所述螺纹连接段自内向外依次安装有弹性防水垫、内承力螺帽、墙筋定位拉钩、模头底垫和模头隔膜,所述螺纹连接段的外端部还与端头机构相连接,所述端头机构包括锥形模头、螺筒杆、螺筒杆定位套垫、附加垫、拼装跨孔垫和外螺帽,所述锥形模头的内端小而外端大,所述锥形模头内端与螺纹连接段的外端部相互螺接,所述螺筒杆水平连接在锥形模头的外端中部,所述螺筒杆定位套垫安装在螺筒杆中部,使用时,所述螺筒杆定位套垫夹在上下两块砼墙模板之间,用于垫隔上下两块砼墙模板并定位螺筒杆,所述螺筒杆的外端安装拼装跨孔垫和外螺帽,使得上下两块砼墙模板能够同时被锥形模头以及拼装跨孔垫和外螺帽所夹持固定。The technical scheme of the present invention is as follows: a self-assembled horizontal tie rod assembly in a concrete wall supporting formwork includes a rod for pre-embedding in the concrete, and the two ends of the rod are respectively provided with external threads to form a threaded connection The threaded connection section is sequentially installed with an elastic waterproof pad, an inner bearing nut, a wall rib positioning hook, a die bottom pad and a die diaphragm from the inside to the outside, and the outer end of the threaded connection section is also connected to the end The end mechanism includes a conical die head, a screw rod, a screw rod positioning sleeve, an additional pad, an assembled cross-hole gasket and an outer nut, and the inner end of the conical die is small and outward The end is large, the inner end of the conical die is screwed with the outer end of the threaded connection section, the screw rod is horizontally connected to the middle of the outer end of the conical die, and the screw rod positioning sleeve is installed on the In the middle of the screw rod, when in use, the screw rod positioning sleeve is clamped between the upper and lower concrete wall formwork, used to cushion the upper and lower two concrete wall formwork and locate the screw rod, the outer part of the screw rod. The assembled cross-hole gasket and outer nut are installed at the end, so that the upper and lower concrete wall formwork can be clamped and fixed by the conical die head and the assembled cross-hole gasket and outer nut at the same time.
优选地,所述弹性防水垫上的孔径略小于螺纹连接段的直径,使得穿套弹性防水垫时,它能紧抱在杆件上或杆件的螺纹连接段上。Preferably, the aperture on the elastic waterproof pad is slightly smaller than the diameter of the threaded connection section, so that when the elastic waterproof pad is put on, it can tightly hug the rod or the threaded connection section of the rod.
优选地,所述墙筋定位拉钩是指将一根拉结钢筋的一端热加工完成一个套环,套环内孔与杆件直径相匹配,使套环能够套置在杆件上,拉结钢筋余下的直线段在使用时与墙筋缠绕连接。Preferably, the wall rib positioning hook refers to thermally processing one end of a tie bar to complete a collar, and the inner hole of the collar matches the diameter of the rod, so that the collar can be sleeved on the rod, and the tie The remaining straight segments of the reinforcement are wrapped around the stud when in use.
优选地,所述模头底垫为扁平的硬质垫体。Preferably, the bottom pad of the die head is a flat hard pad body.
优选地,所述模头隔膜是由弹性材料制成的柔性盘状体,其内侧面与模头底垫相配合,其外侧面与锥形模头相配合,并能紧扣在锥形模头的内端头上。Preferably, the die diaphragm is a flexible disc-shaped body made of elastic material, the inner side of which is matched with the bottom pad of the die, and the outer side of which is matched with the conical die and can be tightly fastened to the conical die. on the inner end of the head.
优选地,所述拼装跨孔垫的上下部跨接在上下两块模板的水平肋沿上,所述拼装跨孔垫中部设置有通孔,所述通孔与螺筒杆匹配。Preferably, the upper and lower parts of the assembled cross-hole gasket are bridged on the horizontal rib edges of the upper and lower templates, and a through hole is provided in the middle of the assembled cross-hole gasket, and the through hole is matched with the screw rod.
优选地,所述拼装跨孔垫是由左右两半体经暗销拼装而成。Preferably, the assembled cross-hole gasket is assembled from left and right halves through dowels.
优选地,所述螺筒杆的末端设置有工作部,便于使用工具将其转动,所述螺筒杆靠近末端的位置上还设置有辅助工作部,以利辅助转动。Preferably, the end of the screw rod is provided with a working part, which is convenient to use a tool to rotate it, and an auxiliary working part is also set at the position of the screw rod close to the end to facilitate the auxiliary rotation.
优选地,所述锥形模头的内端小而外端大,所述锥形模头的大端面与连接在其上的螺筒杆轴线相互垂直,以便能与安装在螺筒杆外端的拼装跨孔垫共同形成用于夹持固定在模板缝道上紧固件。Preferably, the inner end of the conical die head is small and the outer end is large, and the large end face of the conical die head is perpendicular to the axis of the screw rod connected to it, so as to be able to be connected to the outer end of the screw rod. The assembled cross-hole pads together form a fastener for clamping and fixing on the formwork channel.
优选地,所述螺筒杆定位套垫的高度为模板缝道的高度,所述螺筒杆定位套垫中间设置有螺筒杆穿设定位孔,所述螺筒杆定位套垫的左右两侧分别设置有附接螺杆,经与附接螺杆匹配的活接螺筒再与附加垫螺接,所述附加垫的高度与螺筒杆定位套垫等同,且所述附加垫上设置有竖向连接孔,通过穿设在竖向连接孔上的连接螺栓与上下两块模板的水平肋沿相互连接。Preferably, the height of the screw rod positioning sleeve is the height of the template seam, the screw rod positioning sleeve is provided with a screw rod passing setting hole in the middle, and the left and right sides of the screw rod positioning sleeve are Attaching screws are respectively provided on both sides, and the additional pads are screwed together through the joint screw barrels matched with the attaching screws. To the connecting hole, it is connected with the horizontal rib edge of the upper and lower templates by connecting bolts pierced through the vertical connecting hole.
本发明的有益效果在于:本发明的整装水平拉杆组件既是支模中的一个水平拉结工具,又是墙体结构钢筋组成件,浇筑完成后能够方便拆模,除杆件留埋于墙体内,其它外侧零部件能拆除后再次复用。整装为的是不占用施工工时,解决以往穿模板拉结较难精准作业和易损坏模板的问题,使施工工艺更简便。The beneficial effects of the present invention are as follows: the self-assembled horizontal tie rod assembly of the present invention is not only a horizontal tie tool in the formwork, but also a structural steel bar component of the wall body. Inside the body, other external parts can be removed and reused. The purpose of the whole installation is not to occupy the construction time, to solve the problems of difficult and accurate operation and easy damage to the formwork in the past, and to make the construction process easier.
附图说明Description of drawings
图1为实施例中整装水平拉杆组件使用状态示意图。FIG. 1 is a schematic diagram of the use state of the self-assembled horizontal tie rod assembly in the embodiment.
图2为实施例中整装水平拉杆组件一端头的使用状态结构示意图。FIG. 2 is a schematic structural diagram of the use state of one end of the integrally assembled horizontal tie rod assembly in the embodiment.
图3为实施例中螺筒杆定位套垫与附加垫的主视结构示意图。FIG. 3 is a schematic front view of the structure of the screw cylinder rod positioning sleeve gasket and the additional gasket in the embodiment.
图4为实施例中拼装跨孔垫的主视结构示意图。FIG. 4 is a schematic front view of the structure of the assembled cross-hole gasket in the embodiment.
图中:1—杆件 1.1—弹性防水垫 1.2—内承力螺帽 1.3—墙筋定位拉钩 1.4—模头底垫 1.5—模头隔膜;In the picture: 1—rod 1.1—elastic waterproof pad 1.2—internal bearing nut 1.3—wall reinforcement positioning hook 1.4—die head pad 1.5—die head diaphragm;
2—端头机构 2.1—锥形模头 2.2—螺筒杆 2.3—螺筒杆定位套垫 2.31—附接螺杆 2.32—活接螺筒 2.4—附加垫 2.41—连接螺栓 2.5—拼装跨孔垫 2.51—暗销2.52—通孔 2.6—外螺帽 2.7—工作部 2.8—辅助工作部;2—End Head Mechanism 2.1—Conical Die Head 2.2—Screw Barrel Rod 2.3—Screw Barrel Rod Positioning Sleeve 2.31—Attaching Screw 2.32—Joint Screw Barrel 2.4—Additional Washer 2.41—Connecting Bolt 2.5—Assembled Cross-hole Washer 2.51 - Dowel 2.52 - Through hole 2.6 - Outer nut 2.7 - Working part 2.8 - Auxiliary working part;
3—模板 3.1—水平肋沿 4—模板缝道 5—封堵条。3—template 3.1—
具体实施方式Detailed ways
为详细说明本发明的技术内容、构造特征、所实现目的及效果,以下结合实施方式并配合附图详予说明。In order to describe the technical content, structural features, achieved objects and effects of the present invention in detail, the following detailed description is given in conjunction with the embodiments and the accompanying drawings.
如图1至图4所示,本发明的砼墙支模中的整装水平拉杆组件包括用于预埋在砼内的杆件1以及用于与模板缝道4相连的两个端头机构2。埋设于砼中的杆体1两端部还分别对应安装有弹性防水垫1.1、内承力螺帽1.2、墙筋定位拉钩1.3、模头底垫1.4和模头隔膜1.5,上述各项依次安装后尚余一部分螺纹连接段,其长度不少于螺结传力要求,并与端头机构2相螺结。所述模板缝道是指上下两块模板3竖向对拼时预留出的用于安装整装水平拉杆组件端头机构的缝道。施放整装水平拉杆组件时,将两个端头机构2与杆体1完整地组装成一个整体式的组件,然后装置于模板缝道4内,并采用封堵条5填充其余模板缝道4,然后旋紧外螺帽2.6,使上下两块模板3竖向对拼成整体。As shown in FIGS. 1 to 4 , the integral horizontal tie rod assembly in the concrete wall support formwork of the present invention includes a rod member 1 for pre-embedding in the concrete and two end mechanisms for connecting with the
具体地讲,所述砼墙支模中的整装水平拉杆组件包括用于预埋在砼内的杆件1,所述杆件的两端部分别设置有外螺纹,形成螺纹连接段,所述螺纹连接段自内向外依次安装有弹性防水垫1.1、内承力螺帽1.2、墙筋定位拉钩1.3、模头底垫1.4和模头隔膜1.5,所述螺纹连接段的外端部的尚余部分与端头机构2相连接。所述端头机构2包括锥形模头2.1、螺筒杆2.2、螺筒杆定位套垫2.3、附加垫2.4、拼装跨孔垫2.5和外螺帽2.6,所述锥形模头2.1的内端小而外端大,所述锥形模头2.1内端与螺纹连接段的外端部相互螺接,所述螺筒杆2.2水平连接在锥形模头2.1的外端中部,所述螺筒杆定位套垫2.3安装在螺筒杆2.2中部,使用时,所述螺筒杆定位套垫2.3夹在上下两块砼墙模板3之间,用于垫隔上下两块砼墙模板3并定位螺筒杆2.2,所述螺筒杆2.2的外端安装拼装跨孔垫2.5和外螺帽2.6,使得上下两块砼墙模板3能够同时被锥形模头以及拼装跨孔垫2.5和外螺帽2.6所夹持固定。Specifically, the self-assembled horizontal tie rod assembly in the concrete wall support formwork includes a rod member 1 for pre-embedding in the concrete, and the two ends of the rod member are respectively provided with external threads to form a threaded connection section. The threaded connection section is sequentially installed with an elastic waterproof pad 1.1, an inner bearing nut 1.2, a wall rib positioning hook 1.3, a die bottom pad 1.4 and a die diaphragm 1.5 from the inside to the outside. The remaining part is connected with the
所述螺纹连接段的直径必须满足模板及砼施工的水平推拉力要求,螺纹连接段的外螺纹与安装在其上的相应部件的内螺纹相互匹配,且其长度满足装配需要。The diameter of the threaded connection section must meet the horizontal push-pull force requirements of formwork and concrete construction, the external thread of the threaded connection section matches the internal thread of the corresponding component installed on it, and its length meets the assembly requirements.
所述弹性防水垫1.1指由弹性材料制成的垫体,所述弹性防水垫上的孔径略小于螺纹连接段的直径,使得穿套弹性防水垫时,它能紧抱在杆件上或杆件的螺纹连接段上。The elastic waterproof pad 1.1 refers to a pad body made of elastic material, and the aperture on the elastic waterproof pad is slightly smaller than the diameter of the threaded connection section, so that when the elastic waterproof pad is put on, it can tightly hug the rod or the rod. on the threaded connection section.
所述内承力螺帽1.2可以是普通螺帽,用于将其外侧的墙筋定位拉钩、模头底垫和模头隔膜等与锥形模头内端相互抵紧,达到承力需要。The inner bearing nut 1.2 can be an ordinary nut, which is used to press the outer wall rib positioning hook, the die head pad and the die head diaphragm, etc., against the inner end of the conical die head, so as to meet the bearing requirements.
所述墙筋定位拉钩1.3是指将一根拉结钢筋的一端热加工完成一个套环,套环内孔与杆件直径相匹配,使套环能够套置在杆件上,拉结钢筋余下的直线段在使用时与墙筋缠绕连接,缠绕长度满足实际施工需要。The wall rib positioning hook 1.3 refers to thermal processing of one end of a tie bar to complete a collar, the inner hole of the collar matches the diameter of the rod, so that the collar can be sleeved on the rod, and the rest of the tie bar remains. The straight line segment is wound and connected with the wall reinforcement when in use, and the winding length meets the actual construction needs.
所述模头底垫1.4为扁平的硬质垫体,其螺孔径与杆件1的螺纹连接段相匹配。The bottom pad 1.4 of the die head is a flat hard pad body, and the threaded hole diameter of which matches the threaded connection section of the rod member 1 .
所述模头隔膜1.5的材料有弹性,是柔性的盘状体,其内侧面与模头底垫相配合,其外侧面与锥形模头2.1相配合,并能紧扣在锥形模头2.1的内端头上。The material of the die head diaphragm 1.5 is elastic and is a flexible disc-shaped body. 2.1 on the inner end of the head.
所述锥形模头2.1的内端小而外端大,所述锥形模头2.1的大端面与连接在其上的螺筒杆2.2轴线相互垂直,以便能与安装在螺筒杆2.2外端的拼装跨孔垫2.5共同形成用于夹持固定在模板缝道4上紧固件。The inner end of the conical die head 2.1 is small and the outer end is large, and the large end face of the conical die head 2.1 is perpendicular to the axis of the screw rod 2.2 connected to it, so that it can be installed outside the screw rod 2.2. The assembled cross-hole pads 2.5 at the ends together form a fastener for clamping and fixing on the
所述螺筒杆2.2的各截面净承力面积不小于预埋在砼内的杆件的承力面积,以及满足抗剪、抗扭的要求,所述螺筒杆的外端部设拼装跨孔垫2.5,所述拼装跨孔垫2.5的上下部跨接在上下两块模板3的水平肋沿3.1上,所述拼装跨孔垫2.5中部设置有通孔2.52,所述通孔与螺筒杆2.2匹配。所述拼装跨孔垫2.5是由左右两半体经暗销2.51拼装而成,做到拼拆灵活方便。所述螺筒杆2.2的末端设置有工作部2.7,所述工作部可以是外六角凸起部,便于使用工具将其转动,所述螺筒杆靠近末端的位置上还设置有辅助工作部2.8,所述辅助工作部可以是便于工具穿过的通孔等,以利辅助转动。The net bearing area of each section of the screw rod 2.2 is not less than the bearing area of the rod embedded in the concrete, and meets the requirements of shear resistance and torsion resistance. The outer end of the screw rod is provided with an assembly span. Hole pad 2.5, the upper and lower parts of the assembled cross-hole pad 2.5 are bridged on the horizontal rib edge 3.1 of the upper and
所述螺筒杆定位套垫2.3的高度为模板缝道4的高度,所述螺筒杆定位套垫2.4中间设置有螺筒杆2.2穿设定位孔,所述螺筒杆定位套垫2.3的左右两侧分别设置有附接螺杆2.31,所述附接螺杆2.31是一节短螺杆,经与附接螺杆2.31匹配的活接螺筒2.32再与附加垫2.4螺接,所述附加垫2.4的高度与螺筒杆定位套垫2.3等同,且所述附加垫2.4的竖直方向设置有连接孔,通过穿设在连接孔上的连接螺栓2.41与上下两块模板3的水平肋沿3.1相互连接。The height of the screw rod positioning sleeve 2.3 is the height of the
本发明的整装水平拉杆组件既是支模中的一个水平拉结工具,又是墙体结构钢筋组成件,浇筑完成后能够方便拆模,除杆件留埋于墙体内,其它外侧零部件能拆除后再次复用。整装为的是不占用施工工时,解决以往穿模板拉结较难精准作业和易损坏模板的问题,使施工工艺更简便。The self-assembled horizontal tie rod assembly of the present invention is not only a horizontal tie tool in the formwork, but also a structural steel bar component of the wall body. After the pouring is completed, the formwork can be easily removed. Except for the rod parts that remain buried in the wall, other external components It can be reused after dismantling. The purpose of the whole installation is not to occupy the construction time, to solve the problems of difficult and accurate operation and easy damage to the formwork in the past, and to make the construction process easier.
以上所述仅为本发明的实施例,并非因此限制本发明的专利范围,凡是利用本发明说明书及附图内容所作的等效结构或等效流程变换,或直接或间接运用在其他相关的技术领域,均包括在本发明的专利保护范围内。The above descriptions are only the embodiments of the present invention, and are not intended to limit the scope of the present invention. Any equivalent structure or equivalent process transformation made by using the contents of the description and drawings of the present invention, or directly or indirectly applied to other related technologies field, are included in the scope of patent protection of the present invention.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011455437.6A CN112609961B (en) | 2020-12-13 | 2020-12-13 | Integral horizontal pull rod assembly in concrete wall formwork |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011455437.6A CN112609961B (en) | 2020-12-13 | 2020-12-13 | Integral horizontal pull rod assembly in concrete wall formwork |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112609961A CN112609961A (en) | 2021-04-06 |
CN112609961B true CN112609961B (en) | 2022-05-20 |
Family
ID=75233218
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011455437.6A Expired - Fee Related CN112609961B (en) | 2020-12-13 | 2020-12-13 | Integral horizontal pull rod assembly in concrete wall formwork |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112609961B (en) |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB922416A (en) * | 1959-08-27 | 1963-04-03 | Rapid Metal Developments Ltd | Nut assemblies for use with tie-rods or bolts |
US3168772A (en) * | 1963-10-10 | 1965-02-09 | Utah Construction & Mining Co | Form system for concrete construction |
DE1288779B (en) * | 1964-08-28 | 1969-02-06 | Klaiss Hans Dieter | Device for the mutual tensioning and spacing of two formwork walls placed opposite one another |
FI100903B (en) * | 1992-09-30 | 1998-03-13 | Gantan Beauty Kogyo Kk | Support device for use in the manufacture of a concrete wall and concrete wall construction |
DE202006005497U1 (en) * | 2006-04-03 | 2006-07-13 | Max Frank Gmbh & Co. Kg | Exposed concrete cone has solid conical ring of PVC around frusto conical cone section with seal fitted in groove around opening in cone and against shuttering wall |
CN101545319B (en) * | 2008-03-27 | 2011-07-20 | 中国二十冶集团有限公司 | Split bolt for concrete template and using method of same |
CN106223603B (en) * | 2016-10-10 | 2018-11-30 | 河南林艺塑料科技有限公司 | Efficiently one template |
CN108571167A (en) * | 2018-07-01 | 2018-09-25 | 西山煤电(集团)有限责任公司 | Template leakproof pull rod for concreting |
CN209723620U (en) * | 2019-03-18 | 2019-12-03 | 中国二十二冶集团有限公司 | A section template reinforcing bolt is poured after sandwich thermal insulation board precast facade |
CN110195513B (en) * | 2019-06-25 | 2024-05-07 | 中铁一局集团第四工程有限公司 | Water stop pull rod in subway construction and waterproof construction method |
-
2020
- 2020-12-13 CN CN202011455437.6A patent/CN112609961B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN112609961A (en) | 2021-04-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205382568U (en) | Pre -embedded sleeve connection structure who adds girder steel behind concrete column | |
CN211873851U (en) | Split bolt assembly, construction support system and cast-in-place self preservation temperature enclosure wall | |
CN109930688A (en) | A kind of assembled beam-column connecting node and its construction method | |
CN113668839A (en) | External scaffold wall connecting structure convenient for single-side installation and disassembly and construction method thereof | |
CN112609961B (en) | Integral horizontal pull rod assembly in concrete wall formwork | |
KR101332415B1 (en) | Maintain distance device of concrete mold | |
JP5004918B2 (en) | Formwork structure for decorative plate member | |
CN108547844B (en) | A segmented unilateral bolt fastener | |
KR100620253B1 (en) | Formwork panel for formwork installation and its manufacturing method | |
CN218714132U (en) | Cast-in-place shear wall connecting piece and shear wall | |
WO2019206192A1 (en) | Prefabricated column/beam and connection structure thereof and construction method thereof | |
JP5398598B2 (en) | Reinforcing brackets for concrete utility poles | |
CN212201241U (en) | Wall connecting piece for constructing external scaffold by utilizing shear wall through-wall screw eye drawknot | |
CN215167928U (en) | Detachable scaffold wall connecting system and wall connecting mechanism | |
KR200414930Y1 (en) | Formwork spacing | |
CN210032563U (en) | Outer frame wall connecting piece | |
CN115681620A (en) | An installation method of load-bearing embedded parts of comprehensive support | |
CN203547123U (en) | Supporting device for deformation joint template | |
CN112609960B (en) | Stacked formwork structure and construction method thereof | |
KR100771232B1 (en) | Die spacing | |
CN222686104U (en) | A fast-detachable and adjustable wall-connecting fixing device without pre-embedded parts | |
JPH04108923A (en) | Construction method for concrete retaining wall | |
CN221627617U (en) | Rotatable telescopic wall connecting piece | |
CN222909454U (en) | Telescopic five-section type water stop opposite-pulling screw rod | |
JP2010189867A (en) | Concrete form clamp fitting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220520 |