CN111827711A - A kind of emergency reinforcement device for broken pole of electric pole and using method - Google Patents
A kind of emergency reinforcement device for broken pole of electric pole and using method Download PDFInfo
- Publication number
- CN111827711A CN111827711A CN202010738639.5A CN202010738639A CN111827711A CN 111827711 A CN111827711 A CN 111827711A CN 202010738639 A CN202010738639 A CN 202010738639A CN 111827711 A CN111827711 A CN 111827711A
- Authority
- CN
- China
- Prior art keywords
- arc
- shaped clamping
- clamping plate
- pole
- broken
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
- E04G23/0225—Increasing or restoring the load-bearing capacity of building construction elements of circular building elements, e.g. by circular bracing
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
- E04H12/08—Structures made of specified materials of metal
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Materials Engineering (AREA)
- Wood Science & Technology (AREA)
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
本申请提供一种电杆断杆紧急补强装置及使用方法,涉及电力线路紧急抢修技术领域,包括第一弧形夹板、第二弧形夹板和紧固件组件,第一弧形夹板和第二弧形夹板通过紧固组件固定连接,第一弧形夹板和第二弧形夹板相连后围成与电杆相适应的圆柱形孔腔;第一弧形夹板和第二弧形夹板之间还设有锁紧组件。本申请提供的电杆断杆紧急补强装置,在电杆发生断杆,短时间内无法抢修的紧急情况下后,将两段断杆对接,然后在断裂处加装该装置,能够使断裂的电杆继续使用,极大的缩小了线路停电时间,能够在最短的时间内完成客户供电,最大限度保证配网供电可靠性。
The present application provides an emergency reinforcement device for broken poles and a method for using them, which relate to the technical field of emergency repair of power lines, including a first arc-shaped splint, a second arc-shaped splint and a fastener assembly, a first arc-shaped splint and a first arc-shaped splint The two arc-shaped splints are fixedly connected by fastening components, and the first arc-shaped splint and the second arc-shaped splint are connected to form a cylindrical cavity suitable for the pole; the space between the first arc-shaped splint and the second arc-shaped splint is There is also a locking assembly. The emergency reinforcement device for broken poles provided by the present application, in the emergency situation that the poles are broken and cannot be repaired in a short period of time, the two sections of broken poles are butted, and then the device is installed at the broken place, which can make the broken poles The continuous use of the poles, which greatly reduces the power outage time of the line, can complete the power supply for customers in the shortest time, and ensure the reliability of the power supply of the distribution network to the greatest extent.
Description
技术领域technical field
本申请涉及电力线路紧急抢修技术领域,具体涉及一种电杆断杆紧急补强装置及使用方法。The present application relates to the technical field of emergency repair of power lines, in particular to an emergency reinforcement device for broken poles and a method of using the same.
背景技术Background technique
近年来,一、二级用户对供电可靠性要求日益严格。供电企业为提升客户用电质量,投入到配网改造的资金越来越多,配网健康水平大幅度提升。随着社会的发展,各地基建改造工程越来越多,大量施工机械出现在了线路防护区附近。供电企业为防止出现线路外力破坏事件,造成配网障碍,积极组织人员开展了电力设施保护宣传工作,但因电杆被撞断造成配网障碍事件也时有发生。电杆断杆后,需要进行紧急抢修,新立电杆,抢修前后耗时长,无法在最短的时间内恢复供电,造成严重影响配网企业、居民正常的生产、生活用电和配网供电可靠性。In recent years, primary and secondary users have increasingly stringent requirements for power supply reliability. In order to improve the power quality of customers, power supply enterprises have invested more and more funds in the transformation of distribution network, and the health level of distribution network has been greatly improved. With the development of society, there are more and more infrastructure renovation projects in various places, and a large number of construction machines appear near the line protection area. In order to prevent the occurrence of external damage to the line and cause obstacles to the distribution network, the power supply company actively organized personnel to carry out the protection and publicity work of power facilities, but the incidents of distribution network obstacles caused by the breakdown of the poles also occurred from time to time. After the pole is broken, emergency repairs are required. The new poles take a long time before and after the repairs, and the power supply cannot be restored in the shortest time. sex.
发明内容SUMMARY OF THE INVENTION
针对现有技术中存在的问题,本申请提供一种电杆断杆紧急补强装置及使用方法,以达到能够使断裂的电杆继续使用,极大的缩小了线路停电时间,能够在最短的时间内完成客户供电,最大限度保证配网供电可靠性的有益效果。In view of the problems existing in the prior art, the present application provides an emergency reinforcement device for broken poles and a method of use, so as to enable the broken poles to continue to be used, greatly reduce the time of line power outages, and be able to Complete customer power supply within time, and maximize the beneficial effect of ensuring the reliability of distribution network power supply.
本申请提供一种电杆断杆紧急补强装置,包括第一弧形夹板、第二弧形夹板和紧固件组件,第一弧形夹板和第二弧形夹板通过紧固组件固定连接,第一弧形夹板和第二弧形夹板相连后围成与电杆相适应的圆柱形孔腔;第一弧形夹板和第二弧形夹板之间还设有锁紧组件。The present application provides an emergency reinforcement device for broken poles, comprising a first arc-shaped splint, a second arc-shaped splint and a fastener assembly, wherein the first arc-shaped splint and the second arc-shaped splint are fixedly connected by the fastening assembly, The first arc-shaped splint and the second arc-shaped splint are connected to form a cylindrical cavity suitable for the electric pole; a locking component is also arranged between the first arc-shaped splint and the second arc-shaped splint.
优选的,所述紧固组件包括第一紧固件和第二紧固件,所述第一弧形夹板的一侧与第二弧形夹板的一侧通过第一紧固件固定连接;所述第一弧形夹板的另一侧与第二弧形夹板的另一侧通过第二紧固件固定连接。Preferably, the fastening component includes a first fastener and a second fastener, and one side of the first arc-shaped splint and one side of the second arc-shaped splint are fixedly connected by the first fastener; The other side of the first arc-shaped splint is fixedly connected to the other side of the second arc-shaped splint by a second fastener.
优选的,所述第一弧形夹板的一侧设有第一连接板,第一弧形夹板的另一侧设有第二连接板;第二弧形夹板的一侧设有与第一连接板相匹配的第三连接板,第二弧形夹板的另一侧设有与第二连接板相匹配的第四连接板,第一紧固件穿过第一连接板和第三连接板;第二紧固件穿过第二连接板和第四连接板。Preferably, one side of the first arc-shaped clamping plate is provided with a first connecting plate, the other side of the first arc-shaped clamping plate is provided with a second connecting plate; one side of the second arc-shaped clamping plate is provided with a first connection plate a third connecting plate that matches the plates, the other side of the second arc-shaped splint is provided with a fourth connecting plate that matches the second connecting plate, and the first fastener passes through the first connecting plate and the third connecting plate; The second fastener passes through the second connecting plate and the fourth connecting plate.
优选的,所述第一连接板上设有第一安装孔,第三连接板上设有与第一安装孔相匹配的第一定位孔,第一紧固件依次穿过第一安装孔及第一定位孔,将第一弧形夹板与第二弧形夹板固定连接。Preferably, the first connecting plate is provided with a first mounting hole, the third connecting plate is provided with a first positioning hole matching the first mounting hole, and the first fastener passes through the first mounting hole and the first mounting hole in sequence. The first positioning hole fixes the first arc-shaped splint with the second arc-shaped splint.
优选的,所述第二连接板上设有第二安装孔,第四连接板上设有与第二安装孔相匹配的第二定位孔,第二紧固件依次穿过第二安装孔及第二定位孔,将第一弧形夹板与第二弧形夹板固定连接。Preferably, the second connecting plate is provided with a second mounting hole, the fourth connecting plate is provided with a second positioning hole matching the second mounting hole, and the second fastener passes through the second mounting hole and the second mounting hole in sequence. The second positioning hole fixes the first arc-shaped splint with the second arc-shaped splint.
优选的,所述第一紧固件和第二紧固件均采用锁紧螺栓。Preferably, both the first fastener and the second fastener are locking bolts.
优选的,所述第一连接板和第二连接板的数量均为多个,多个第一连接板和第二连接板均沿第一弧形夹板的长度方向间隔分布;所述第三连接板和第四连接板的数量均为多个,多个第三连接板和第四连接板均沿第二弧形夹板的长度方向间隔分布。Preferably, the number of the first connecting plate and the second connecting plate is multiple, and the first connecting plate and the second connecting plate are distributed at intervals along the length direction of the first arc-shaped splint; the third connecting plate The number of the plates and the fourth connecting plates are both multiple, and the multiple third connecting plates and the fourth connecting plates are distributed at intervals along the length direction of the second arc-shaped clamping plate.
优选的,所述第一安装孔和第二安装孔的数量均为多个,多个第一安装孔沿第一连接板的长度方向间隔分布;多个第二安装孔沿第二连接板的长度方向间隔分布。Preferably, the number of the first mounting holes and the second mounting holes are multiple, and the multiple first mounting holes are spaced along the length direction of the first connecting plate; the multiple second mounting holes are along the length of the first connecting plate. Lengthwise spaced distribution.
优选的,所述锁紧组件包括底座、扣座和锁扣,底座设置在第一弧形夹板上,扣座设置在第二弧形夹板上,锁扣的一端铰接在底座上,扣座上设有与锁扣另一端相适应的卡接槽。Preferably, the locking assembly includes a base, a buckle seat and a lock, the base is set on the first arc-shaped splint, the buckle base is set on the second arc-shaped splint, one end of the lock is hinged on the base, and the buckle is on the base. There is a snap-fit slot corresponding to the other end of the lock.
优选的,所述第一弧形夹板和第二弧形夹板采用金属材质。Preferably, the first arc-shaped splint and the second arc-shaped splint are made of metal.
本申请的有益效果在于:The beneficial effects of this application are:
本申请提供的电杆断杆紧急补强装置及使用方法,在电杆发生断杆,短时间内无法抢修的紧急情况下后,将两段断杆对接,然后在断裂处加装该装置,能够使断裂的电杆继续使用,极大的缩小了线路停电时间,能够在最短的时间内完成客户供电,最大限度保证配网供电可靠性。The emergency reinforcement device for broken poles provided by the present application and the method of use, in the emergency situation that the poles are broken and cannot be repaired in a short time, the two sections of broken poles are butted, and then the device is installed at the broken part, It can make the broken poles continue to be used, greatly reduce the power outage time of the line, and complete the power supply for customers in the shortest time, ensuring the reliability of the power supply of the distribution network to the greatest extent.
此外,本申请设计原理可靠,结构简单,具有非常广泛的应用前景。In addition, the design principle of the present application is reliable, the structure is simple, and has a very broad application prospect.
附图说明Description of drawings
为了更清楚地说明本申请实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,对于本领域普通技术人员而言,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the following briefly introduces the accompanying drawings that need to be used in the description of the embodiments or the prior art. In other words, other drawings can also be obtained based on these drawings without creative labor.
图1是本申请一个实施例中第一弧形夹板的结构示意图。FIG. 1 is a schematic structural diagram of a first arc-shaped splint in an embodiment of the present application.
图2是本申请一个实施例中第二弧形夹板的结构示意图。FIG. 2 is a schematic structural diagram of a second arc-shaped splint in an embodiment of the present application.
图3是本申请一个实施例中锁紧组件与第一弧形夹板和第二弧形夹板装配结构示意图。FIG. 3 is a schematic diagram of the assembly structure of the locking assembly, the first arc-shaped clamping plate and the second arc-shaped clamping plate in an embodiment of the present application.
图4是本申请一个实施例中锁紧组件的结构示意图。FIG. 4 is a schematic structural diagram of a locking assembly in an embodiment of the present application.
图5是本申请一个实施例中电杆断杆紧急补强装置的结构示意图。FIG. 5 is a schematic structural diagram of an emergency reinforcement device for broken poles in an embodiment of the present application.
图中,1、第一弧形夹板,2、第二弧形夹板,3、圆柱形孔腔,4、第一连接板,5、第二连接板,6、第三连接板,7、第四连接板,8、第一安装孔,9、第一定位孔,10、第二安装孔,11、第二定位孔,12、底座,13、扣座,14、锁扣,15、卡接槽。In the figure, 1, the first arc splint, 2, the second arc splint, 3, the cylindrical cavity, 4, the first connecting plate, 5, the second connecting plate, 6, the third connecting plate, 7, the first connecting plate Four connecting plates, 8, the first mounting hole, 9, the first positioning hole, 10, the second mounting hole, 11, the second positioning hole, 12, the base, 13, the buckle seat, 14, the locking buckle, 15, the snap connection groove.
具体实施方式Detailed ways
为了使本技术领域的人员更好地理解本申请中的技术方案,下面将结合本申请实施例中的附图,对本申请实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本申请一部分实施例,而不是全部的实施例。基于本申请中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都应当属于本申请保护的范围。In order to make those skilled in the art better understand the technical solutions in the present application, the technical solutions in the embodiments of the present application will be described clearly and completely below with reference to the accompanying drawings in the embodiments of the present application. Obviously, the described The embodiments are only a part of the embodiments of the present application, but not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those of ordinary skill in the art without creative work shall fall within the scope of protection of the present application.
下面对本申请中出现的关键术语进行解释。Key terms appearing in this application are explained below.
本申请提供的电杆断杆紧急补强装置,包括第一弧形夹板1、第二弧形夹板2和紧固件组件。The emergency reinforcement device for broken poles provided in this application includes a first arc-
所述第一弧形夹板1和第二弧形夹板2采用高强度金属材质制作而成。第一弧形夹板1和第二弧形夹板2通过紧固组件固定连接,第一弧形夹板1和第二弧形夹板2相连后围成与电杆相适应的圆柱形孔腔3。实际使用过程中中,断裂的电杆被放置在圆柱形孔腔内,圆柱形孔腔3的腔体侧壁贴近在电杆的外侧壁上。The first arc-
第一弧形夹板1和第二弧形夹板2之间还设有锁紧组件。所述锁紧组件包括底座12、扣座13和锁扣14,底座12设置在第一弧形夹板1上,具体的,底座12的底部为与第一弧形夹板1相匹配的弧形结构,底座通过焊接固定在第一弧形夹板1上。扣座13设置在第二弧形夹板2上,扣座13的底面为与第二弧形夹板2相匹配的弧形结构,扣座3可以通过粘结剂固定在第二弧形夹板2上。锁扣14的一端铰接在底座12上,扣座13上设有与锁扣14另一端相适应的卡接槽15。A locking assembly is also provided between the first arc-
所述紧固组件包括第一紧固件和第二紧固件,所述第一弧形夹板1上沿长度方向的一侧与第二弧形夹板2的一侧通过第一紧固件固定连接;所述第一弧形夹板1上沿长度方向的另一侧与第二弧形夹板2的另一侧通过第二紧固件固定连接。The fastening assembly includes a first fastener and a second fastener, and one side of the first arc-
具体的,如图1所示,所述第一弧形夹板1的一侧设有第一连接板4,第一弧形夹板1的另一侧设有第二连接板5,第一连接板4和第二连接板5均沿第一弧形夹板1的长度方向延伸。本实施例中,第一连接板4和第二连接板5均成梯形结构,在其他实施例中,第一连接板4和第二连接板5也可以采用其他形状。本实施例中,第一连接板4和第二连接板5与第一弧形夹板1通过焊接固定连接,在其他实施例中,第一连接板4和第二连接板5也可以与第一弧形夹板1采用一体成型设计。Specifically, as shown in FIG. 1 , one side of the first arc-
如图所示,第一弧形夹板1和第二弧形夹板2的结构相同。第二弧形夹板2的一侧设有与第一连接板4相匹配的第三连接板6,第二弧形夹板2的另一侧设有与第二连接板5相匹配的第四连接板7。第三连接板6和第四连接板7均沿第二弧形夹板2的长度方向延伸。本实施例中,第三连接板6和第四连接板7均成梯形结构,在其他实施例中,第三连接板6和第四连接板7也可以采用其他形状。本实施例中,第三连接板6和第四连接板7与第二弧形夹板2通过焊接固定连接,在其他实施例中,第三连接板6和第四连接板7也可以与第二弧形夹板2采用一体成型设计。As shown in the figure, the structures of the first arc-shaped
本实施例中,所述第一紧固件和第二紧固件均采用锁紧螺栓。第一紧固件依次穿过第一连接板4和第三连接板6;第二紧固件依次穿过第二连接板5和第四连接板7。In this embodiment, both the first fastener and the second fastener are locking bolts. The first fastener passes through the first connecting
所述第一连接板4上设有第一安装孔8,第三连接板6上设有与第一安装孔8相匹配的第一定位孔9,第一紧固件依次穿过第一安装孔8及第一定位孔9,将第一弧形夹板1与第二弧形夹板2固定连接。第一安装孔8和第一定位孔9均采用圆形孔,两者的孔径相同。The first connecting
所述第二连接板5上设有第二安装孔10,第四连接板7上设有与第二安装孔10相匹配的第二定位孔11,第二紧固件依次穿过第二安装孔10及第二定位孔11,将第一弧形夹板1与第二弧形夹板2固定连接。第二安装孔10和第二定位孔11均采用圆形孔,两者的孔径相同。The second connecting
为了提高第一弧形夹板1与第二弧形夹板2的连接紧固性,所述第一连接板4和第二连接板5的数量均为三个,三个第一连接板4和第二连接板5均沿第一弧形夹板1的长度方向间隔分布;所述第三连接板6和第四连接板7的数量均为三个,三个第三连接板6和第四连接板7均沿第二弧形夹板2的长度方向间隔分布。In order to improve the connection tightness of the first arc-shaped
为了进一步提高第一弧形夹板1与第二弧形夹板2的连接紧固性,所述第一安装孔8和第二安装孔10的数量均为多个,多个第一安装孔8沿第一连接板4的长度方向间隔分布;多个第二安装孔10沿第二连接板5的长度方向间隔分布。In order to further improve the connection tightness of the first arc-shaped
本申请还提供一种电杆断杆紧急补强装置的使用方法,包括以下步骤:The application also provides a method for using the emergency reinforcement device for broken poles, comprising the following steps:
步骤一:将两段断杆对接,将第一弧形夹板和第二弧形夹板卡接在电杆的断裂处,使得电杆位于第一弧形夹板和第二弧形夹板相连后围成与电杆相适应的圆柱形孔腔中;Step 1: Connect the two sections of broken rods, and clamp the first arc-shaped splint and the second arc-shaped splint at the break of the pole, so that the pole is located after the first arc-shaped splint and the second arc-shaped splint are connected. In the cylindrical cavity suitable for the pole;
步骤二:转动锁扣,可以将锁扣卡接到卡接槽中,从而实现第一弧形夹板与第二弧形夹板的初步固定;Step 2: Rotating the lock, the lock can be clamped into the clamping groove, so as to realize the preliminary fixation of the first arc-shaped splint and the second arc-shaped splint;
步骤三:将第一紧固件依次穿过第一安装孔及第一定位孔,将第一弧形夹板与第二弧形夹板固定连接;Step 3: Pass the first fastener through the first installation hole and the first positioning hole in sequence, and connect the first arc-shaped splint to the second arc-shaped splint;
步骤四:将第二紧固件依次穿过第二安装孔及第二定位孔,将第一弧形夹板与第二弧形夹板进一步固定连接,从而将整个电杆断杆紧急补强装置与断裂的电杆固定连接。Step 4: Pass the second fastener through the second installation hole and the second positioning hole in turn, and further connect the first arc-shaped splint with the second arc-shaped splint, so as to connect the entire broken pole emergency reinforcement device with the Broken pole fixed connection.
本实施例的实施方式为:The implementation of this embodiment is:
实际工作过程中,首先,将将两段断杆对接,然后在断裂处加装该装置,通过转动锁扣14,可以将锁扣14卡接到卡接槽15中,从而实现第一弧形夹板与第二弧形夹板的初步固定;然后,通过将第一紧固件依次穿过第一安装孔8及第一定位孔9,将第一弧形夹板1与第二弧形夹板2固定连接,再将第二紧固件依次穿过第二安装孔10及第二定位孔11,将第一弧形夹板1与第二弧形夹板2进一步固定连接,从而将整个电杆断杆紧急补强装置与断裂的电杆固定连接,本申请提供的电杆断杆紧急补强装置,能够使断裂的电杆继续使用,极大的缩小了线路停电时间,能够在最短的时间内完成客户供电,最大限度保证配网供电可靠性。In the actual working process, first, the two sections of broken rods will be butted together, and then the device will be installed at the break. Preliminary fixing of the splint and the second arc splint; then, by passing the first fastener through the
尽管通过参考附图并结合优选实施例的方式对本申请进行了详细描述,但本申请并不限于此。在不脱离本申请的精神和实质的前提下,本领域普通技术人员可以对本申请的实施例进行各种等效的修改或替换,而这些修改或替换都应在本申请的涵盖范围内/任何熟悉本技术领域的技术人员在本申请揭露的技术范围内,可轻易想到变化或替换,都应涵盖在本申请的保护范围之内。因此,本申请的保护范围应所述以权利要求的保护范围为准。Although the present application has been described in detail with reference to the accompanying drawings and in conjunction with the preferred embodiments, the present application is not limited thereto. Without departing from the spirit and essence of the present application, those of ordinary skill in the art can make various equivalent modifications or substitutions to the embodiments of the present application, and these modifications or substitutions should all fall within the scope of the present application/any Those skilled in the art can easily think of changes or substitutions within the technical scope disclosed in the present application, which should all be covered by the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010738639.5A CN111827711A (en) | 2020-07-28 | 2020-07-28 | A kind of emergency reinforcement device for broken pole of electric pole and using method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010738639.5A CN111827711A (en) | 2020-07-28 | 2020-07-28 | A kind of emergency reinforcement device for broken pole of electric pole and using method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN111827711A true CN111827711A (en) | 2020-10-27 |
Family
ID=72919149
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010738639.5A Pending CN111827711A (en) | 2020-07-28 | 2020-07-28 | A kind of emergency reinforcement device for broken pole of electric pole and using method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN111827711A (en) |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4543764A (en) * | 1980-10-07 | 1985-10-01 | Kozikowski Casimir P | Standing poles and method of repair thereof |
CN201236516Y (en) * | 2008-06-27 | 2009-05-13 | 江苏省电力公司连云港供电公司 | Broken rod connection device for power distribution line |
CN103276937A (en) * | 2013-05-17 | 2013-09-04 | 国家电网公司 | Temporary electric pole reinforcing device |
WO2015006496A1 (en) * | 2013-07-09 | 2015-01-15 | Huncovsky Jeffrey | Systems and methods for repairing utility poles |
CN105756409A (en) * | 2016-04-25 | 2016-07-13 | 盐城市昶桦户外用品股份有限公司 | Tent supporting rod protective sleeve |
CN107724703A (en) * | 2016-08-11 | 2018-02-23 | 国网山东省电力公司威海市文登区供电公司 | A kind of electric pole prosthetic device |
CN109179175A (en) * | 2018-11-13 | 2019-01-11 | 山东东山新驿煤矿有限公司 | A kind of coal mine friction type winder head rope cup rope is committed suicide by hanging device |
CN109881965A (en) * | 2019-03-29 | 2019-06-14 | 云南电网有限责任公司电力科学研究院 | Device and method for treating crack defect of cement pole |
CN110107142A (en) * | 2019-05-22 | 2019-08-09 | 国网山东省电力公司莱州市供电公司 | A kind of strutting of pole prior-warning device |
CN110593594A (en) * | 2019-08-07 | 2019-12-20 | 广东电网有限责任公司 | A broken electric pole protection frame |
CN211007746U (en) * | 2019-09-26 | 2020-07-14 | 广东电网有限责任公司 | Quick reinforcing apparatus of pole |
CN212866989U (en) * | 2020-07-28 | 2021-04-02 | 国网山东省电力公司寿光市供电公司 | Emergency reinforcing device for broken pole of electric pole |
-
2020
- 2020-07-28 CN CN202010738639.5A patent/CN111827711A/en active Pending
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4543764A (en) * | 1980-10-07 | 1985-10-01 | Kozikowski Casimir P | Standing poles and method of repair thereof |
CN201236516Y (en) * | 2008-06-27 | 2009-05-13 | 江苏省电力公司连云港供电公司 | Broken rod connection device for power distribution line |
CN103276937A (en) * | 2013-05-17 | 2013-09-04 | 国家电网公司 | Temporary electric pole reinforcing device |
WO2015006496A1 (en) * | 2013-07-09 | 2015-01-15 | Huncovsky Jeffrey | Systems and methods for repairing utility poles |
CN105756409A (en) * | 2016-04-25 | 2016-07-13 | 盐城市昶桦户外用品股份有限公司 | Tent supporting rod protective sleeve |
CN107724703A (en) * | 2016-08-11 | 2018-02-23 | 国网山东省电力公司威海市文登区供电公司 | A kind of electric pole prosthetic device |
CN109179175A (en) * | 2018-11-13 | 2019-01-11 | 山东东山新驿煤矿有限公司 | A kind of coal mine friction type winder head rope cup rope is committed suicide by hanging device |
CN109881965A (en) * | 2019-03-29 | 2019-06-14 | 云南电网有限责任公司电力科学研究院 | Device and method for treating crack defect of cement pole |
CN110107142A (en) * | 2019-05-22 | 2019-08-09 | 国网山东省电力公司莱州市供电公司 | A kind of strutting of pole prior-warning device |
CN110593594A (en) * | 2019-08-07 | 2019-12-20 | 广东电网有限责任公司 | A broken electric pole protection frame |
CN211007746U (en) * | 2019-09-26 | 2020-07-14 | 广东电网有限责任公司 | Quick reinforcing apparatus of pole |
CN212866989U (en) * | 2020-07-28 | 2021-04-02 | 国网山东省电力公司寿光市供电公司 | Emergency reinforcing device for broken pole of electric pole |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109209401A (en) | Shield tunnel inner circular support system and its construction method based on brace pre axial force | |
CN108442518B (en) | Beam-to-column joint of cross-connected beam-to-column joint with inclined outer ring plate | |
CN109695473A (en) | A kind of railway tunnel built-in groove channel fixing device and fixing means | |
CN111827711A (en) | A kind of emergency reinforcement device for broken pole of electric pole and using method | |
CN212866989U (en) | Emergency reinforcing device for broken pole of electric pole | |
CN208535389U (en) | A kind of pipeline quick closing joint for emergency repair | |
CN210517727U (en) | Power fitting for erecting cable line | |
CN211279058U (en) | Prefabricated assembled concrete structure fast-assembling sleeve built-in fitting | |
CN103662467A (en) | Splicing tank | |
CN209430907U (en) | A Municipal Pipeline Stable Connection Structure | |
CN214657957U (en) | Quick construction system of door frame wall | |
CN205908110U (en) | Guardrail and have station room of this guardrail | |
CN203979797U (en) | Substation equipment sign board deck | |
CN211086717U (en) | Novel butterfly-shaped leading-in optical cable | |
CN210529966U (en) | Super-huge steel structure connecting device | |
CN218117181U (en) | A connected node for outrigger installation | |
CN209040834U (en) | A kind of shield tunnel inner circular support system based on brace pre axial force | |
CN116122617B (en) | Hole reinforcing system and method for web plate hole reinforced concrete beam in reconstruction engineering | |
CN217177782U (en) | Municipal works pipeline installation mechanism | |
CN113205251A (en) | Comprehensive deepening design flow and process for core tube motor electric well pipeline of super high-rise building | |
CN220768956U (en) | Auxiliary device for repairing and reinforcing transmission tower | |
CN210074686U (en) | Swift cable protective sheath device | |
CN206545384U (en) | A kind of lateral template clamping of tool-type | |
CN208857841U (en) | A kind of spliced piping lane bottom plate for piping lane | |
CN110822210A (en) | Water supply and drainage pipeline assembled type blocking plate and construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20201027 |
|
RJ01 | Rejection of invention patent application after publication |