[go: up one dir, main page]

CN206545384U - A kind of lateral template clamping of tool-type - Google Patents

A kind of lateral template clamping of tool-type Download PDF

Info

Publication number
CN206545384U
CN206545384U CN201720250138.6U CN201720250138U CN206545384U CN 206545384 U CN206545384 U CN 206545384U CN 201720250138 U CN201720250138 U CN 201720250138U CN 206545384 U CN206545384 U CN 206545384U
Authority
CN
China
Prior art keywords
fastener
lateral
composite beam
tool
sidewise restraint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720250138.6U
Other languages
Chinese (zh)
Inventor
张意
罗庆志
苏义庭
冯庆敏
段文川
徐子静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing University
Chongqing Construction Engineering Group Co Ltd
Chongqing Construction Residential Engineering Co Ltd
Original Assignee
Chongqing University
Chongqing Construction Engineering Group Co Ltd
Chongqing Construction Residential Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing University, Chongqing Construction Engineering Group Co Ltd, Chongqing Construction Residential Engineering Co Ltd filed Critical Chongqing University
Priority to CN201720250138.6U priority Critical patent/CN206545384U/en
Application granted granted Critical
Publication of CN206545384U publication Critical patent/CN206545384U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

本实用新型提供了一种工具式侧向模板卡具,包括现浇层、叠合板和叠合梁,所述叠合板连接所述叠合梁,所述叠合梁与所述叠合板之间还浇筑所述现浇层,其特征在于:还包括侧向约束扣件、主背楞、次背楞和约束所述现浇层的模板,所述叠合梁内预埋PVC套管,所述侧向约束扣件被穿过所述PVC套管的一螺栓杆锁紧,所述侧向约束扣件依次连接所述主背楞和次背楞并最终通过所述次背楞支所述模板。本实用新型在浇筑时,所述将PVC套管预埋到相应的叠合梁中,并设计了对应的工具式侧向模板卡具,施工简便,可重复利用,使得叠合梁板的侧向支模能快速进行。

The utility model provides a tool-type lateral formwork fixture, which comprises a cast-in-place layer, a laminated plate and a laminated beam, the laminated plate is connected to the laminated beam, and the gap between the laminated beam and the laminated plate The cast-in-place layer is also poured, which is characterized in that: it also includes lateral restraint fasteners, main back corrugations, secondary back corrugations, and a template for constraining the cast-in-place layer, and the PVC casing is pre-embedded in the composite beam. The lateral restraint fastener is locked by a bolt rod passing through the PVC sleeve, and the lateral restraint fastener is sequentially connected to the main back flute and the secondary back flute and finally passes through the secondary back flute. template. When the utility model is pouring, the PVC casing is pre-embedded in the corresponding composite beam, and the corresponding tool-type lateral formwork fixture is designed. The construction is simple and reusable, so that the side of the composite beam slab Formwork can be carried out quickly.

Description

一种工具式侧向模板卡具A tool-type lateral formwork fixture

技术领域technical field

本实用新型涉及一种卡具,具体涉及一种工具式侧向模板卡具。The utility model relates to a fixture, in particular to a tool-type lateral formwork fixture.

背景技术Background technique

当前,由于劳动力开始出现短缺以及对环境保护日益重视等原因,我国建筑业正处于转型升级过程中。为落实“节能、降耗、减排、环保”的基本国策,国内众多的建筑企业都在积极适应新常态,学习新知识,争取在我国装配式建筑领域作出应有的贡献。然而,装配式混凝土结构的进一步推广应用也面临着瓶颈,主要表现在装配式混凝土结构的主要构件是在工厂预制并运输到施工现场安装,与传统现浇式结构相比,对施工工艺的精细要求更高,但目前的施工人员专业素质整体不高,缺乏装配式混凝土结构的技术经验积累和总结,对装配式结构的工艺流程和操作要点缺乏全面、细致的理解和掌握,造成施工效率低下,施工误差偏大,甚至出现施工错误。At present, due to the shortage of labor force and the increasing emphasis on environmental protection, my country's construction industry is in the process of transformation and upgrading. In order to implement the basic national policy of "energy saving, consumption reduction, emission reduction, and environmental protection", many domestic construction companies are actively adapting to the new normal, learning new knowledge, and striving to make due contributions in the field of prefabricated buildings in my country. However, the further popularization and application of prefabricated concrete structures is also facing bottlenecks, mainly manifested in the fact that the main components of prefabricated concrete structures are prefabricated in factories and transported to the construction site for installation. The requirements are higher, but the overall professional quality of the current construction personnel is not high, the lack of accumulation and summary of technical experience in prefabricated concrete structures, and the lack of comprehensive and detailed understanding and mastery of the process flow and operating points of prefabricated structures, resulting in low construction efficiency , The construction error is too large, and even construction errors occur.

叠合结构是是一种先在构件厂制作好预应力混凝土叠合式构件,再在工程现场安装后与现浇混凝土叠合而成的新型整体超静定结构。而常规的叠合梁板结构的侧模支撑方法与常规的现浇结构相同,采用打孔加对拉螺栓或钉钉子的方法固定侧向模板,需要在叠合构件上打孔,加对拉螺栓,而且直接在木模板上穿孔和钉钉子会降低模板的循环利用次数,无法体现装配式结构的优点。The superimposed structure is a new type of overall statically indeterminate structure that is made of prestressed concrete superimposed components in the component factory, and then superimposed with cast-in-place concrete after installation on the project site. The side formwork support method of the conventional composite beam-slab structure is the same as that of the conventional cast-in-place structure. The side formwork is fixed by drilling holes and cross-tensioning bolts or nails. Bolts, and directly perforating and nailing the wooden formwork will reduce the number of recycling of the formwork, and cannot reflect the advantages of the prefabricated structure.

实用新型内容Utility model content

本实用新型要解决的问题是针对现有技术中所存在的上述不足而提供一种工具式侧向模板卡具使得叠合梁板的侧向支模能快速进行。The problem to be solved by the utility model is to provide a tool-type lateral formwork fixture for the above-mentioned deficiencies in the prior art, so that the lateral formwork of the laminated beam and slab can be quickly carried out.

为实现上述目的,本实用新型采用了如下的技术方案:一种工具式侧向模板卡具,包括现浇层、叠合板和叠合梁,所述叠合板连接所述叠合梁,所述叠合梁与所述叠合板之间还浇筑所述现浇层,其特征在于:还包括侧向约束扣件、主背楞、次背楞和约束所述现浇层的模板,所述叠合梁内预埋PVC套管,所述侧向约束扣件被穿过所述PVC套管的一螺栓杆锁紧,所述侧向约束扣件依次连接所述主背楞和次背楞并最终通过所述次背楞支所述模板。In order to achieve the above purpose, the utility model adopts the following technical solution: a tool-type lateral formwork fixture, including a cast-in-place layer, a laminated plate and a laminated beam, the laminated plate is connected to the laminated beam, the The cast-in-place layer is also poured between the composite beam and the composite slab, which is characterized in that it also includes lateral restraint fasteners, main back corrugations, secondary back corrugations and templates for constraining the cast-in-place layer. A PVC sleeve is pre-embedded in the composite beam, and the lateral restraint fastener is locked by a bolt rod passing through the PVC sleeve, and the lateral restraint fastener is sequentially connected to the main back flute and the secondary back flute Finally pass the formwork through the secondary back studs.

进一步,所述侧向约束扣件上设有多个竖向条形孔,所述条形孔与所述PVC套管相对应,穿过所述PVC套管的螺栓杆其中一端穿过所述条形孔被螺母锁紧,另外一端直接被螺母锁住。Further, the lateral restraint fastener is provided with a plurality of vertical strip-shaped holes, the strip-shaped holes correspond to the PVC sleeve, and one end of the bolt rod passing through the PVC sleeve passes through the The strip hole is locked by the nut, and the other end is directly locked by the nut.

进一步,所述侧向约束扣件为Z形约束扣件,所述侧向约束扣件其中一端与所述叠合梁相对应,所述侧向约束扣件的另外一端与所述现浇层相对应,与所述现浇层相对应的所述侧向约束扣件一端设有第一卡槽,所述主背楞面向所述侧向约束扣件上设有与所述第一卡槽相配合的第一凸起,所述主背楞背向所述侧向约束扣件方向设有第二卡槽,所述次背楞上设有与所述第二卡槽相配合的第二凸起。Further, the lateral restraint fastener is a Z-shaped restraint fastener, one end of the lateral restraint fastener corresponds to the composite beam, and the other end of the lateral restraint fastener corresponds to the cast-in-place layer Correspondingly, one end of the lateral constraining fastener corresponding to the cast-in-place layer is provided with a first card slot, and the main back flute is provided with the first card groove on the lateral constraining fastener. The matching first protrusion, the main back flute is provided with a second card slot facing away from the side restraint fastener, and the secondary back flute is provided with a second card slot matching the second card slot. raised.

进一步,所述次背楞上设有第三卡槽,所述模板上设有与所述第三卡槽相配合的第三凸起。Further, the secondary back flute is provided with a third card slot, and the template is provided with a third protrusion matching the third card slot.

相比于现有技术,本实用新型具有如下有益效果:本实用新型在所述叠合梁上方构建所述叠合板,并在所述叠合板和所述叠合梁之间浇筑所述现浇层,浇筑所述现浇层时,通过在所述叠合梁内预埋PVC套管,然后在所述PVC套管中穿入一螺栓杆,螺栓杆的一端扭有螺母套上,螺栓杆的另外一端穿过所述侧向约束扣件然后把所述侧向约束构件锁在所述叠合梁上面,所述侧向约束构件配有穿孔与预埋PVC套管相对应方便螺栓杆穿出,当所述侧向约束构件被固定好后,在所述侧向约束扣件依次连接所述主背楞和次背楞并最终通过所述次背楞支所述模板,通过所述主背楞和次背楞将侧向的模板固定好位置,以防止所述模板背侧向的挤压力挤出,当模板支好后再浇筑所述现浇层,所述次背楞用来连接所述模板,所述主背楞用来调节所述模板伸出所述叠合梁端部的长度,当所述现浇层超出所述叠合梁端部的距离为A时,此时所述侧向约束构件面向所述现浇层的面到所述叠合梁的垂直距离就为A加所述主背楞、次背楞以及模板的厚度,使用时,可以快速的支出模板,加快了施工速度,在浇筑时,所述将PVC套管预埋到相应的叠合梁中,并设计了对应的工具式侧向模板卡具,施工简便,可重复利用,使得叠合梁板的侧向支模能快速进行。Compared with the prior art, the utility model has the following beneficial effects: the utility model constructs the composite slab above the composite beam, and pours the cast-in-place layer, when pouring the cast-in-place layer, pre-embed PVC sleeves in the composite beam, and then penetrate a bolt rod into the PVC sleeve, one end of the bolt rod is twisted with a nut sleeve, and the bolt rod pass the other end of the lateral restraint fastener and then lock the lateral restraint member on the composite beam. The lateral restraint member is equipped with perforations corresponding to the pre-embedded PVC sleeves to facilitate the penetration of bolt rods. After the lateral constraining member is fixed, the lateral constraining fasteners sequentially connect the main back flute and the secondary back flute and finally support the formwork through the secondary back flute, and pass through the main back flute The back flute and the secondary back flute fix the lateral formwork in a good position to prevent the back and side extrusion of the formwork. After the formwork is supported, the cast-in-place layer is poured. The secondary back flute is used for Connect the template, and the main back flute is used to adjust the length of the template protruding from the end of the composite beam. When the distance of the cast-in-place layer beyond the end of the composite beam is A, at this time The vertical distance from the side of the lateral constraining member facing the cast-in-place layer to the composite beam is A plus the thickness of the main back flute, secondary back flute and formwork. When in use, the formwork can be quickly paid out. The construction speed is accelerated. During pouring, the PVC casing is pre-embedded into the corresponding composite beam, and the corresponding tool-type lateral formwork fixture is designed. The construction is simple and reusable, making the composite beam slab The lateral formwork can be carried out quickly.

本实用新型的其它优点、目标和特征将部分通过下面的说明体现,部分还将通过对本实用新型的研究和实践而为本领域的技术人员所理解。Other advantages, objectives and features of the utility model will partly be embodied through the following description, and partly will be understood by those skilled in the art through the research and practice of the utility model.

附图说明Description of drawings

图1为本实用新型一种工具式侧向模板卡具结构示意图。Fig. 1 is a schematic structural diagram of a tool-type lateral formwork fixture of the present invention.

图2为本实用新型模板与次背楞连接出断面图。Fig. 2 is a sectional view of the connection between the formwork of the present invention and the secondary back corrugation.

图3为本实用新型侧向约束扣件、主背楞和次背楞之间连接处的截面图。Fig. 3 is a cross-sectional view of the connection between the lateral restraint fastener, the main back corrugated and the secondary back corrugated in the present invention.

具体实施方式detailed description

为了使本实用新型实现的技术手段、创作特征、达成目的与作用更加清楚及易于了解,下面结合附图和具体实施方式对本实用新型作进一步阐述:In order to make the technical means, creative features, purpose and effect of the utility model realized clearer and easier to understand, the utility model will be further elaborated below in conjunction with the accompanying drawings and specific implementation methods:

本实用新型提出了一种工具式侧向模板卡具,包括现浇层1、叠合板2和叠合梁3,所述叠合板2连接所述叠合梁3,所述叠合梁3与所述叠合板2之间还浇筑所述现浇层1,其特征在于:还包括侧向约束扣件4、主背楞5、次背楞6和约束所述现浇层1的模板7,所述叠合梁3内预埋PVC套管31,所述侧向约束扣件4被穿过所述PVC套管31的一螺栓杆锁紧,所述侧向约束扣件4依次连接所述主背楞5和次背楞6并最终通过所述次背楞6支所述模板7。The utility model proposes a tool-type lateral formwork fixture, which includes a cast-in-place layer 1, a laminated plate 2 and a laminated beam 3, the laminated plate 2 is connected to the laminated beam 3, and the laminated beam 3 is connected to the laminated beam 3. The cast-in-place layer 1 is also poured between the laminated plates 2, which is characterized in that it also includes lateral restraint fasteners 4, main back flute 5, secondary back flute 6 and template 7 for constraining the cast-in-place layer 1, A PVC sleeve 31 is pre-embedded in the composite beam 3, and the lateral restraint fastener 4 is locked by a bolt rod passing through the PVC sleeve 31, and the lateral restraint fastener 4 is sequentially connected to the The main back flute 5 and the secondary back flute 6 finally support the template 7 through the secondary back flute 6 .

本实用新型在所述叠合梁上方构建所述叠合板,并在所述叠合板和所述叠合梁之间浇筑所述现浇层,浇筑所述现浇层时,通过在所述叠合梁内预埋PVC套管,然后在所述PVC套管中穿入一螺栓杆,螺栓杆的一端扭有螺母套上,螺栓杆的另外一端穿过所述侧向约束扣件然后把所述侧向约束构件锁在所述叠合梁上面,所述侧向约束构件配有穿孔与预埋PVC套管相对应方便螺栓杆穿出,当所述侧向约束构件被固定好后,在所述侧向约束扣件依次连接所述主背楞和次背楞并最终通过所述次背楞支所述模板,通过所述主背楞和次背楞将侧向的模板固定好位置,以防止所述模板背侧向的挤压力挤出,当模板支好后再浇筑所述现浇层,所述次背楞用来连接所述模板,所述主背楞用来调节所述模板伸出所述叠合梁端部的长度,当所述现浇层超出所述叠合梁端部的距离为A时,此时所述侧向约束构件面向所述现浇层的面到所述叠合梁的垂直距离就为A加所述主背楞、次背楞以及模板的厚度,使用时,可以快速的支出模板,加快了施工速度,在浇筑时,所述将PVC套管预埋到相应的叠合梁中,并设计了对应的工具式侧向模板卡具,施工简便,可重复利用,使得叠合梁板的侧向支模能快速进行。The utility model builds the composite slab above the composite beam, and pours the cast-in-place layer between the composite slab and the composite beam. When pouring the cast-in-place layer, the Pre-embed a PVC casing in the composite beam, and then penetrate a bolt rod into the PVC casing, one end of the bolt rod is twisted with a nut, and the other end of the bolt rod passes through the lateral restraint fastener The lateral restraint member is locked on the laminated beam, and the lateral restraint member is equipped with perforations corresponding to the embedded PVC casing to facilitate the bolt rod to pass through. After the lateral restraint member is fixed, the The lateral restraint fasteners are sequentially connected to the main back flute and the secondary back flute and finally support the formwork through the secondary back flute, and the lateral formwork is fixed in position through the main back flute and the secondary back flute, In order to prevent the extruding force from the back and side of the formwork, the cast-in-place layer is poured after the formwork is supported, the secondary back flute is used to connect the formwork, and the main back flute is used to adjust the The length of the formwork protruding from the end of the composite beam, when the distance of the cast-in-place layer beyond the end of the composite beam is A, at this time the side of the lateral restraint member facing the cast-in-place layer reaches The vertical distance of the composite beam is A plus the thickness of the main back flute, the secondary back flute and the formwork. When in use, the formwork can be quickly paid out, which speeds up the construction. When pouring, the PVC casing It is pre-embedded into the corresponding composite beam, and the corresponding tool-type lateral formwork fixture is designed, which is easy to construct and can be reused, so that the lateral formwork of the composite beam and slab can be quickly carried out.

作为具体实施例,装配式竖向构件也适合与所述一种工具式侧向模板卡具连接。As a specific embodiment, the assembled vertical member is also suitable for being connected with the one tool-type lateral formwork fixture.

作为具体实施例,所述侧向约束扣件4上设有多个竖向条形孔41,所述条形孔41与所述PVC套管31相对应,穿过所述PVC套管31的螺栓杆其中一端穿过所述条形孔41被螺母锁紧,另外一端直接被螺母锁住,所述条形孔41由于是条形状,所以可以调节所述侧向约束扣件4的竖直位置,根据实际需求,先定位再锁所述侧向约束扣件4。As a specific embodiment, the lateral constraint fastener 4 is provided with a plurality of vertical strip-shaped holes 41, the strip-shaped holes 41 correspond to the PVC casing 31, and pass through the PVC casing 31. One end of the bolt rod passes through the bar-shaped hole 41 and is locked by a nut, and the other end is directly locked by a nut. Since the bar-shaped hole 41 is in the shape of a bar, the vertical direction of the lateral constraint fastener 4 can be adjusted. Position, according to actual needs, first locate and then lock the lateral restraint fastener 4 .

作为具体实施例,所述侧向约束扣件4为两两互相垂直的Z形约束扣件,所述侧向约束扣件4其中一端与所述叠合梁3相对应,安装所述Z形约束扣件时,所述Z形约束扣件的中间端的上表面与所述叠合梁3的上表面齐平,所述侧向约束扣件4的另外一端与所述现浇层1相对应,与所述现浇层1相对应的所述侧向约束扣件4一端设有第一卡槽42,所述主背楞5面向所述侧向约束扣件4上设有与所述第一卡槽42相配合的第一凸起51,所述主背楞5背向所述侧向约束扣件4方向设有第二卡槽52,所述次背楞6上设有与所述第二卡槽52相配合的第二凸起62,所述第一凸起51插入所述第一卡槽42把所述主背楞5连接在所述侧向约束扣件4上,把所述第二凸起62插入所述第二卡槽52内把所述次背楞6连接在所述主背楞5上。As a specific embodiment, the lateral restraint fasteners 4 are Z-shaped restraint fasteners perpendicular to each other, one end of the lateral restraint fasteners 4 corresponds to the composite beam 3, and the Z-shaped restraint fasteners are installed. When restraining the fastener, the upper surface of the middle end of the Z-shaped restraining fastener is flush with the upper surface of the composite beam 3, and the other end of the lateral restraining fastener 4 corresponds to the cast-in-place layer 1 One end of the lateral constraining fastener 4 corresponding to the cast-in-place layer 1 is provided with a first slot 42, and the main back flute 5 faces the lateral constraining fastener 4 and is provided with the first groove 42. A first protrusion 51 matched with a slot 42, the main back flute 5 is provided with a second slot 52 facing away from the lateral constraint fastener 4, and the secondary back flute 6 is provided with a The second protrusion 62 matched with the second card slot 52, the first protrusion 51 is inserted into the first card slot 42 to connect the main back flute 5 to the lateral restraint fastener 4, and the The second protrusion 62 is inserted into the second card slot 52 to connect the secondary back flute 6 to the main back flute 5 .

作为具体实施例,所述次背楞6上设有第三卡槽61,所述模板7上设有与所述第三卡槽61相配合的第三凸起,把所述第三凸起插入所述第三卡槽61内把所述模板7连接在所述次背楞6上。As a specific embodiment, the second back flute 6 is provided with a third card slot 61, and the template 7 is provided with a third protrusion matching the third card slot 61, and the third protrusion Insert into the third card slot 61 to connect the template 7 to the secondary back flute 6 .

作为具体实施例,所述一种工具式侧向模板卡具还包括垫板8,所述垫板8上设有穿孔9,螺栓杆穿过所述竖向条形孔41然后穿过所述垫板8上的所述穿孔9并最终通过螺母锁住,通过所述垫板8使所述侧向约束扣件4更加牢固的被锁住。As a specific embodiment, the tool-type lateral formwork clamp also includes a backing plate 8, and a perforation 9 is provided on the backing plate 8, and the bolt rod passes through the vertical strip hole 41 and then passes through the The perforation 9 on the backing plate 8 is finally locked by a nut, and the lateral restraint fastener 4 is locked more firmly through the backing plate 8 .

最后说明的是,以上实施例仅用以说明本实用新型的技术方案而非限制,尽管参照较佳实施例对本实用新型进行了详细说明,本领域的普通技术人员应当理解,可以对本实用新型的技术方案进行修改或者等同替换,而不脱离本实用新型技术方案的宗旨和范围,其均应涵盖在本实用新型的权利要求范围当中。Finally, it is noted that the above embodiments are only used to illustrate the technical solutions of the present utility model without limitation. Although the utility model has been described in detail with reference to the preferred embodiments, those of ordinary skill in the art should understand that the utility model can be Modifications or equivalent replacements of the technical solutions without departing from the purpose and scope of the technical solutions of the utility model shall be covered by the claims of the utility model.

Claims (4)

1. a kind of lateral template clamping of tool-type, including in-situ layer (1), superimposed sheet (2) and composite beam (3), the superimposed sheet (2) The composite beam (3) is connected, the in-situ layer (1), its feature are also poured between the composite beam (3) and the superimposed sheet (2) It is:Also include sidewise restraint fastener (4), main back cord (5), secondary back cord (6) and the template (7) of the constraint in-situ layer (1), institute Pre-buried PVC sleeve pipes (31) in composite beam (3) are stated, the sidewise restraint fastener (4) is through a bolt of the PVC sleeve pipes (31) Rod locking, the sidewise restraint fastener (4) is sequentially connected the main back cord (5) and time back cord (6) and eventually through the described back of the body Stupefied (6) Zhi Suoshu templates (7).
2. the lateral template clamping of a kind of tool-type according to claim 1, it is characterised in that:The sidewise restraint fastener (4) Multiple vertical bar holes (41) are provided with, the bar hole (41) is corresponding with the PVC sleeve pipes (31), through PVC sets The shank of bolt wherein one end for managing (31) passes through the bar hole (41) by nut check, and other end is directly pinned by nut.
3. the lateral template clamping of a kind of tool-type according to claim 1, it is characterised in that:The sidewise restraint fastener (4) For Z-shaped constraint fastener, the sidewise restraint fastener (4) wherein one end is corresponding with the composite beam (3), the sidewise restraint button The other end of part (4) is corresponding with the in-situ layer (1), the sidewise restraint fastener corresponding with the in-situ layer (1) (4) one end is provided with the first neck (42), and the main back cord (5) is provided with and described first towards the sidewise restraint fastener (4) First raised (51) that neck (42) is engaged, dorsad sidewise restraint fastener (4) direction is provided with second to the main back cord (5) Neck (52), described back cord (6) is provided with second raised (62) being engaged with second neck (52).
4. the lateral template clamping of a kind of tool-type according to claim 1, it is characterised in that:Described time back cord (6) is provided with 3rd neck (61), it is raised that the template (7) is provided with the 3rd be engaged with the 3rd neck (61).
CN201720250138.6U 2017-03-15 2017-03-15 A kind of lateral template clamping of tool-type Expired - Fee Related CN206545384U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720250138.6U CN206545384U (en) 2017-03-15 2017-03-15 A kind of lateral template clamping of tool-type

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720250138.6U CN206545384U (en) 2017-03-15 2017-03-15 A kind of lateral template clamping of tool-type

Publications (1)

Publication Number Publication Date
CN206545384U true CN206545384U (en) 2017-10-10

Family

ID=59994670

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720250138.6U Expired - Fee Related CN206545384U (en) 2017-03-15 2017-03-15 A kind of lateral template clamping of tool-type

Country Status (1)

Country Link
CN (1) CN206545384U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113202222A (en) * 2021-05-08 2021-08-03 重庆大学 Construction method for assembled type superposed beam slab

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113202222A (en) * 2021-05-08 2021-08-03 重庆大学 Construction method for assembled type superposed beam slab

Similar Documents

Publication Publication Date Title
CN212026786U (en) Fastener device suitable for detachable steel bar truss building carrier plate
CN110284704A (en) A kind of Assembled Building board post poured band formwork edge joint structure and its construction method
CN105507429A (en) Structure and construction method of aperture steel plate shear keys
CN104695708A (en) Construction method for expansion joint formwork in narrow space of outer wall of high-rise building
CN102561679A (en) Fabricated floor decking sheet, fastener and construction method of cast-in-situ concrete floor slabs
CN205955261U (en) Prestressed wire rope curved scissors reinforcing concrete T roof beam
CN208072706U (en) A kind of connection structure of the prefabricated steel shear wall horizontal joint of slip installation
CN205025099U (en) Shaped building structure fillet template support system
CN206545384U (en) A kind of lateral template clamping of tool-type
CN109518857B (en) A kind of two-way laminated board side seam connection structure and laminated board construction method
CN206070796U (en) A kind of vertical attachment means of prefabricated assembled shear wall slab
CN212000639U (en) Template splice structure
CN209227594U (en) A kind of aluminum wood gang form applied to pipe gallery construction
CN205476065U (en) Full assembled steel - precast concrete floor combination beam
CN204551172U (en) A kind of prefabricated road surface of assembled steel reinforced concrete hollow
CN204676890U (en) A kind of portable through-flooring pipeline preformed hole sleeve pipe
CN208792806U (en) A kind of floor of steel structure transformation node
CN214575601U (en) Outer scaffold is wall spare even
CN211498425U (en) Novel joint structure of folded steel web and concrete bottom plate
CN214220265U (en) Novel slurry leakage prevention superposed secondary beam suitable for assembly type frame concrete building
CN211037815U (en) Square column mould fossil fragments reinforcing system structure
CN204225326U (en) Lower edge muscle snap-fitted formula floor support plate
CN211499784U (en) Pouring module device after secondary hole opening of floor slab
CN208586628U (en) A kind of detachable open caisson reserved holes of pipes mouth template structure
CN112814364A (en) External scaffold wall connecting piece and using method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171010

Termination date: 20210315

CF01 Termination of patent right due to non-payment of annual fee