CN110805289A - Plug-in unloading platform and construction method - Google Patents
Plug-in unloading platform and construction method Download PDFInfo
- Publication number
- CN110805289A CN110805289A CN201911124843.1A CN201911124843A CN110805289A CN 110805289 A CN110805289 A CN 110805289A CN 201911124843 A CN201911124843 A CN 201911124843A CN 110805289 A CN110805289 A CN 110805289A
- Authority
- CN
- China
- Prior art keywords
- cantilever beam
- plug
- baffle
- platform
- cantilever
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/166—Landings, receiving platforms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
Description
技术领域technical field
本发明涉及建筑施工领域,具体为一种插接式卸料平台及施工方法。The invention relates to the field of building construction, in particular to a plug-in unloading platform and a construction method.
背景技术Background technique
在高层及超高层施工过程中,卸料平台是施工现场常搭设各种临时性的操作台和操作架,一般用于材料的周转。卸料平台分为移动式卸料平台、落地式卸料平台、悬挑式卸料平台多种。其中悬挑式卸料平台以槽钢或工字钢作为悬挑梁,悬挑梁一端使用锚固件与建筑混凝土结构锚固,悬挑梁另一端伸出建筑物外,然后在伸出部分上铺木板或钢板平台板,用于接收或者转出材料,与塔吊接驳,以及人员的站立;周转平台板周围可设置围栏等防护,保证施工人员安全,卸料平台悬挑处上方设置钢丝绳拉锚,提高悬挑梁的承载重量,以及提高悬挑梁的安全系数。In the process of high-rise and super-high-rise construction, the unloading platform is a variety of temporary operating platforms and operating frames that are often set up on the construction site, which are generally used for material turnover. The unloading platform is divided into mobile unloading platform, floor-standing unloading platform, and cantilever unloading platform. Among them, the cantilevered unloading platform uses channel steel or I-beam as the cantilever beam, one end of the cantilever beam is anchored with the building concrete structure, and the other end of the cantilever beam protrudes out of the building, and then the protruding part is covered. The wooden or steel plate platform is used to receive or transfer materials, connect with tower cranes, and stand for personnel; fences and other protections can be set around the turnover platform to ensure the safety of construction workers, and wire rope anchors are set above the overhang of the unloading platform , improve the bearing weight of the cantilever beam, and improve the safety factor of the cantilever beam.
通常,卸料平台主要由悬挑梁主梁、垂直方向架设在主梁上方的次梁,次梁上方放置铺板,四周固定钢管制成的围护栏杆;其中次梁采用焊接或者螺栓紧固在主梁上,铺板也是主要通过螺栓紧固件紧固在次梁上,围护栏杆利用连接板也是通过螺栓连接的方式与铺板或次梁连接。传统的卸料平台螺栓或焊接连接方式,使得卸料平台在组装的时候需要耗费一定的人工成本,组装速度慢,且卸料平台焊接之后,成为整体框架后无法轻易分解,不方便运输,不利于将卸料平台重复利用。Usually, the unloading platform is mainly composed of the main beam of the cantilever beam, the secondary beam erected above the main beam in the vertical direction, the plank is placed above the secondary beam, and the fence made of steel pipes is fixed around it; the secondary beam is welded or bolted. On the main beam, the deck is mainly fastened to the secondary beam by bolt fasteners, and the fence rail is also connected with the deck or the secondary beam by means of bolt connection using the connecting plate. The traditional bolt or welding connection method of the unloading platform makes the assembly of the unloading platform cost a certain amount of labor, and the assembly speed is slow, and after the unloading platform is welded, it cannot be easily disassembled after becoming an integral frame, which is inconvenient for transportation and inconvenient. It is beneficial to reuse the unloading platform.
发明内容SUMMARY OF THE INVENTION
本发明提供一种插接式卸料平台及施工方法;该卸料平台各部件之间通过插接连接,免去紧固螺栓或者焊接的繁琐工序,提高了卸料平台的组装效率,且结构牢固可靠;其部件均可轻易拆卸,将部件拆散后装车带到下一个施工地点重复使用,提高了材料利用率,节省施工成本。The invention provides a plug-in unloading platform and a construction method; the components of the unloading platform are connected by plug-in connection, eliminating the cumbersome process of tightening bolts or welding, improving the assembling efficiency of the unloading platform, and the structure It is firm and reliable; its components can be easily disassembled, and the parts can be disassembled and transported to the next construction site for reuse, which improves the utilization rate of materials and saves construction costs.
为了实现上述本发明目的,采用的技术方案为:In order to realize the above-mentioned purpose of the present invention, the technical scheme adopted is:
插接式卸料平台,两根悬挑梁平行放置,伸出建筑物外的部分形成悬挑端,悬挑梁的悬挑端上放置若干铺板,铺板两侧设置卡槽,卡槽与悬挑梁的外形匹配,并嵌扣在悬挑梁的上方,铺板的前端部上还固定挡板,铺板的两侧还固定侧板。卡槽的设置,可以将铺板稳固的固定在悬挑梁上,将铺板左右方向的移动限定,悬挑梁将铺板和铺板上的货物和人稳固承载;铺板可以在悬挑梁承受范围内和长度内任意增加数量进行拼接,灵活设置。Plug-in unloading platform, two cantilever beams are placed in parallel, the part extending out of the building forms a cantilever end, a number of planks are placed on the cantilever end of the cantilever beam, and card grooves are set on both sides of the plank, the card groove and the cantilever end. The shape of the cantilever beam is matched, and is embedded and buckled above the cantilever beam, a baffle plate is also fixed on the front end of the plank, and side plates are also fixed on both sides of the plank. The setting of the slot can firmly fix the slab on the cantilever beam, limit the movement of the slab in the left and right directions, and the cantilever beam can stably carry the slab and the goods and people on the slab; the slab can be within the bearing range of the cantilever beam. Arbitrarily increase the number within the length for splicing, flexible setting.
所述铺板两外侧设置若干套管,悬挑梁两外侧相应位置设置若干悬挑梁插杆,悬挑梁插杆在安装状态时插入相应的套管中进行固定;悬挑梁插杆可以通过焊接在垫板上,垫板再跟悬挑梁焊接,增大焊接面积,通过插杆和套管的相互插接作用,将铺板的前后移动也进行限制,因此,就将铺板牢牢固定在悬挑梁上;在插杆的端部位置,设置销孔,将销钉插入拧紧,即可防止插杆从套管中脱出,保证卸料平台的施工安全。A number of sleeves are arranged on the two outer sides of the plank, and a number of cantilever beam insertion rods are arranged at corresponding positions on the two outer sides of the cantilever beam. Welded on the backing plate, the backing plate is then welded with the cantilever beam to increase the welding area, and the back and forth movement of the board is also restricted through the mutual insertion of the insertion rod and the sleeve. Therefore, the board is firmly fixed on the On the cantilever beam; at the end of the insertion rod, set a pin hole, and insert and tighten the pin to prevent the insertion rod from falling out of the casing and ensure the construction safety of the unloading platform.
所述铺板的前端下部固定设置延伸板,延伸板上设置方形插孔,挡板底部的相应位置设置方形插块,在安装状态时,方形插块插入方形插孔进行固定;挡板所起的作用是防止东西和物品从平台端部掉下,方形插块插入到铺板上的方形插孔后,将挡板与铺板进行固定,在方形插块穿出方形插孔的部分,设置若干销孔,将销钉插入拧紧,即可防止方形插块脱出,保证设备安全;另一方面,每一块铺板设置的延伸板都可以与前一块铺板的地面相接触,进而将若干块铺板形成一个连接的整体平面,使平台刚性更好,更不容易发生铺板凹陷变形等现象。An extension plate is fixedly arranged at the lower part of the front end of the plank, a square socket is arranged on the extension plate, and a square insert block is arranged at the corresponding position at the bottom of the baffle plate. In the installation state, the square insert block is inserted into the square hole for fixing; The function is to prevent things and items from falling from the end of the platform. After the square insert is inserted into the square jack on the deck, the baffle is fixed with the deck, and a number of pin holes are set at the part where the square insert goes out of the square jack. , inserting and tightening the pins can prevent the square inserts from coming out and ensure the safety of the equipment; on the other hand, the extension plates set on each plank can be in contact with the ground of the previous plank, and then several planks are formed into a connected whole. The flat surface makes the platform more rigid and less prone to the phenomenon of slab concave deformation.
所述挡板的两侧特定位置设置挡板插杆,挡板插杆插入到相应的铺板上的套管中进行固定,两侧的插杆将挡板两端与铺板固定,使挡板稳定性更好,防止挡板掉落。The baffle insertion rods are arranged at specific positions on both sides of the baffle, and the baffle insertion rods are inserted into the casings on the corresponding decking boards for fixing, and the insertion rods on both sides fix both ends of the baffles with the decking boards to stabilize the baffles Better performance and prevent the baffle from falling.
所述侧板的外侧特定位置设置若干侧板插杆,在安装状态时,侧板插杆插入到相应的铺板上的套管中进行固定;一般侧板上有2个以上的插杆,能保证侧板与铺板之间的紧密连接;在插杆的端部位置,设置销孔,将销钉插入拧紧,即可防止插杆从套管中脱出,保证侧板不会从铺板上脱出。A number of side plate insert rods are arranged at specific positions on the outer side of the side plate. In the installation state, the side plate insert rods are inserted into the sleeves on the corresponding decking boards for fixing; generally, there are more than 2 insert rods on the side plate, which can To ensure the tight connection between the side plate and the deck; at the end of the insertion rod, set a pin hole, and insert and tighten the pin to prevent the insertion rod from coming out of the casing and ensure that the side plate will not come out of the deck.
所述铺板下底面焊接若干支撑梁,支撑梁方向与悬挑梁方向垂直;或是支撑梁也可焊接在铺板上平面,两端延伸至两侧卡槽,可以进一步加强卡槽的刚度。Several support beams are welded on the bottom surface of the deck, and the direction of the support beam is perpendicular to the direction of the cantilever beam; or the support beam can also be welded on the plane of the deck, and both ends extend to the two sides of the slot, which can further strengthen the stiffness of the slot.
所述挡板和侧板也可是由钢管焊接而成的栏杆,板式结构或栏杆结构都同属于防护结构,可根据现场要求进行更改和选用。The baffle plate and the side plate can also be railings welded by steel pipes, and both the plate structure and the railing structure belong to the protective structure, and can be modified and selected according to the requirements of the site.
所述挡板上设置铰链,挡板上部沿铰链旋转下翻,当有较长的杆件从卸料平台上进入,就需要将挡板上部翻下,方便长杆件直接从卸料平台挡板缺口处穿入建筑窗洞之中。A hinge is arranged on the baffle, and the upper part of the baffle rotates and turns down along the hinge. When a long rod enters from the unloading platform, the upper part of the baffle needs to be turned down, so that the long rod can be blocked directly from the unloading platform. The plate gap penetrates into the building window hole.
插接式卸料平台,其施工方法包括如下步骤:The construction method of the plug-in unloading platform includes the following steps:
将卸料平台的铺板、挡板和侧板在地面上进行组装;Assemble the decking, baffles and side panels of the unloading platform on the ground;
将卸料平台的悬挑梁吊到指定建筑上指定楼层,放置好与预埋锚固件进行固定,固定拉锚钢丝绳;Hoist the cantilever beam of the unloading platform to the designated floor on the designated building, place it with the embedded anchor for fixing, and fix the anchor wire rope;
将步骤A所组装好的平台吊至悬挑梁悬挑端,定位安装后,拉紧拉锚钢丝绳,即完成卸料平台的安装;Lift the platform assembled in step A to the cantilever end of the cantilever beam, and after positioning and installation, tighten the anchor wire rope to complete the installation of the unloading platform;
当施工完成,按照步骤A-C的相反顺序,拆卸卸料平台,转运至下一个施工地点进行使用。When the construction is completed, in the reverse order of steps A-C, disassemble the unloading platform and transfer it to the next construction site for use.
本发明相对于现有技术所具有的实质性特点和进步是:The substantial features and progress that the present invention has relative to the prior art are:
1、本发明卸料平台整体结构可拆散成若干小件装配,操作简便,在短时间内即可完成拆装,节省人工,提高施工效率。1. The overall structure of the unloading platform of the present invention can be disassembled into several small parts for assembly, which is easy to operate, and can be disassembled and assembled in a short time, saving labor and improving construction efficiency.
2、本发明卸料平台结构稳定可靠,通过若干插杆和套管的使用,将铺板、挡板和侧板整体连接在一起,并与悬挑梁紧密固定,提高施工的安全系数。2. The structure of the unloading platform of the present invention is stable and reliable. Through the use of several insert rods and casings, the decking board, the baffle plate and the side board are integrally connected together, and are tightly fixed with the cantilever beam to improve the safety factor of construction.
3、本发明卸料平台长度可根据需要,铺板和侧板的数量可进行任意拼接调整,灵活多样。3. The length of the unloading platform of the present invention can be adjusted according to the needs, and the number of planks and side plates can be adjusted arbitrarily, which is flexible and diverse.
附图说明Description of drawings
图1为悬挑梁、铺板、挡板和侧板结合示意图;Figure 1 is a schematic diagram of the combination of a cantilever beam, a plank, a baffle plate and a side plate;
图2为本发明悬挑梁结构示意图;Fig. 2 is the structural schematic diagram of the cantilever beam of the present invention;
图3为本发明铺板结构示意图;3 is a schematic diagram of a plank structure of the present invention;
图4为本发明挡板结构示意图;Figure 4 is a schematic diagram of the structure of the baffle plate of the present invention;
图5为本发明侧板结构示意图;Fig. 5 is the structural schematic diagram of the side plate of the present invention;
图6为悬挑梁和铺板结合示意图;6 is a schematic diagram of the combination of a cantilever beam and a plank;
图7为悬挑梁、铺板和挡板结合示意图;Figure 7 is a schematic diagram of the combination of cantilever beams, planks and baffles;
图中的标注序号为:1、悬挑梁;11、悬挑梁插杆;2、铺板;21、套管;22、卡槽;23、延伸板;24、方形插孔;3、挡板;31、挡板插杆;32、方形插块;33、铰链;4、侧板;41、侧板插杆。The serial numbers marked in the figure are: 1, cantilever beam; 11, cantilever beam insert rod; 2, plank; 21, casing; 22, card slot; 23, extension plate; 24, square socket; 3, baffle ; 31, baffle insert rod; 32, square insert block; 33, hinge; 4, side plate; 41, side plate insert rod.
具体实施方式Detailed ways
实施例1Example 1
结合本发明附图1-7对本发明做进一步详细说明;The present invention is further described in detail with reference to accompanying drawings 1-7 of the present invention;
插接式卸料平台,其特征在于:两根悬挑梁1平行放置,伸出建筑物外的部分形成悬挑端,悬挑梁1的悬挑端上放置若干铺板2,铺板2两侧设置卡槽22,卡槽22与悬挑梁1的外形匹配,并嵌扣在悬挑梁1的上方,铺板2的前端部上还固定挡板3,铺板2的两侧还固定侧板4。The plug-in unloading platform is characterized in that: two
所述铺板2两外侧设置若干套管21,悬挑梁1两外侧相应位置设置若干悬挑梁插杆11,悬挑梁插杆11在安装状态时插入相应的套管21中进行固定。
所述铺板2的前端下部固定设置延伸板23,延伸板23上设置方形插孔24,挡板3底部的相应位置设置方形插块32,在安装状态时,方形插块32插入方形插孔24进行固定。An
所述挡板3的两侧特定位置设置挡板插杆31,挡板插杆31插入到相应的铺板2上的套管21中进行固定。The baffle insertion rods 31 are provided at specific positions on both sides of the baffle 3 , and the baffle insertion rods 31 are inserted into the
所述侧板4的外侧特定位置设置侧板插杆41,在安装状态时,侧板插杆41插入到相应的铺板2上的套管21中进行固定。A side board insertion rod 41 is provided at a specific position on the outer side of the side board 4 . In the installation state, the side board insertion rod 41 is inserted into the
所述铺板2下底面焊接若干支撑梁。Several support beams are welded on the bottom surface of the
所述挡板3和侧板4也可是由钢管焊接而成的栏杆。The baffle 3 and the side plate 4 can also be railings welded from steel pipes.
所述挡板3上设置铰链33,挡板3上部沿铰链33旋转下翻。A hinge 33 is provided on the baffle 3 , and the upper part of the baffle 3 rotates and turns down along the hinge 33 .
插接式卸料平台,其施工方法包括如下步骤:The construction method of the plug-in unloading platform includes the following steps:
A、将卸料平台的铺板、挡板和侧板在地面上进行组装;A. Assemble the decking, baffles and side panels of the unloading platform on the ground;
B、 将卸料平台的悬挑梁吊到指定建筑上指定楼层,放置好与预埋锚固件进行固定,固定拉锚钢丝绳;B. Lift the cantilever beam of the unloading platform to the designated floor of the designated building, place it and fix it with the embedded anchor, and fix the anchor wire rope;
C、 将步骤A所组装好的平台吊至悬挑梁悬挑端,定位安装后,拉紧拉锚钢丝绳,即完成卸料平台的安装;C. Hang the platform assembled in step A to the cantilever end of the cantilever beam, and after positioning and installation, tighten the anchor wire rope to complete the installation of the unloading platform;
当施工完成,按照步骤A-C的相反顺序,拆卸卸料平台,转运至下一个施工地点进行使用。When the construction is completed, in the reverse order of steps A-C, disassemble the unloading platform and transfer it to the next construction site for use.
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911124843.1A CN110805289A (en) | 2019-11-18 | 2019-11-18 | Plug-in unloading platform and construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911124843.1A CN110805289A (en) | 2019-11-18 | 2019-11-18 | Plug-in unloading platform and construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110805289A true CN110805289A (en) | 2020-02-18 |
Family
ID=69490220
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911124843.1A Pending CN110805289A (en) | 2019-11-18 | 2019-11-18 | Plug-in unloading platform and construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110805289A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111764660A (en) * | 2020-06-29 | 2020-10-13 | 中科盛博建设集团有限公司 | Assembled platform of unloading |
CN111997380A (en) * | 2020-08-13 | 2020-11-27 | 中煤第三建设(集团)有限责任公司 | Assembled discharging platform for high-rise building construction and construction method thereof |
CN112779986A (en) * | 2020-12-30 | 2021-05-11 | 浙江新曙光建设有限公司 | Cantilever frame structure and mounting method thereof |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH03151466A (en) * | 1989-09-20 | 1991-06-27 | John Clement Preston | Landing platform and overhead protector in construction site |
CN203846778U (en) * | 2013-12-14 | 2014-09-24 | 重庆陶家都市工业园开发建设有限公司 | Rear supporting structure of cantilever beam |
CN206233531U (en) * | 2016-11-15 | 2017-06-09 | 中国建筑第八工程局有限公司 | Door-type scaffold and the attachment means for the door-type scaffold |
CN206667757U (en) * | 2017-04-06 | 2017-11-24 | 中机国能电力工程有限公司 | A kind of building template supporting construction |
CN206815861U (en) * | 2017-05-10 | 2017-12-29 | 山西四建集团有限公司 | Assembled outfeed platforms |
CN208122340U (en) * | 2018-03-28 | 2018-11-20 | 中国建筑第二工程局有限公司 | Detachable and recyclable discharging platform |
CN208564009U (en) * | 2018-07-19 | 2019-03-01 | 国强建设集团有限公司 | A kind of overhanging unloading platform |
CN209353747U (en) * | 2018-12-17 | 2019-09-06 | 浙江省三建建设集团有限公司 | A kind of assembled discharging platform |
CN209637243U (en) * | 2019-01-18 | 2019-11-15 | 中建七局(上海)有限公司 | One kind being used for construction assembled discharging platform |
-
2019
- 2019-11-18 CN CN201911124843.1A patent/CN110805289A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH03151466A (en) * | 1989-09-20 | 1991-06-27 | John Clement Preston | Landing platform and overhead protector in construction site |
CN203846778U (en) * | 2013-12-14 | 2014-09-24 | 重庆陶家都市工业园开发建设有限公司 | Rear supporting structure of cantilever beam |
CN206233531U (en) * | 2016-11-15 | 2017-06-09 | 中国建筑第八工程局有限公司 | Door-type scaffold and the attachment means for the door-type scaffold |
CN206667757U (en) * | 2017-04-06 | 2017-11-24 | 中机国能电力工程有限公司 | A kind of building template supporting construction |
CN206815861U (en) * | 2017-05-10 | 2017-12-29 | 山西四建集团有限公司 | Assembled outfeed platforms |
CN208122340U (en) * | 2018-03-28 | 2018-11-20 | 中国建筑第二工程局有限公司 | Detachable and recyclable discharging platform |
CN208564009U (en) * | 2018-07-19 | 2019-03-01 | 国强建设集团有限公司 | A kind of overhanging unloading platform |
CN209353747U (en) * | 2018-12-17 | 2019-09-06 | 浙江省三建建设集团有限公司 | A kind of assembled discharging platform |
CN209637243U (en) * | 2019-01-18 | 2019-11-15 | 中建七局(上海)有限公司 | One kind being used for construction assembled discharging platform |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111764660A (en) * | 2020-06-29 | 2020-10-13 | 中科盛博建设集团有限公司 | Assembled platform of unloading |
CN111997380A (en) * | 2020-08-13 | 2020-11-27 | 中煤第三建设(集团)有限责任公司 | Assembled discharging platform for high-rise building construction and construction method thereof |
CN112779986A (en) * | 2020-12-30 | 2021-05-11 | 浙江新曙光建设有限公司 | Cantilever frame structure and mounting method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20210180341A1 (en) | Scaffolding | |
US9861190B2 (en) | Wood gang form and method for constructing concrete building using same | |
CN110805289A (en) | Plug-in unloading platform and construction method | |
JP2010065378A (en) | Hanging scaffold and method for erecting the same | |
CN213268827U (en) | Operating platform is decorated to suspension type socket joint type under large-span high altitude steel construction vestibule | |
KR101076562B1 (en) | Support Structure of Slab Formwork | |
CN104775606A (en) | Operation platform for prefabricated assembled residential building wall plate construction and construction method thereof | |
CN114197325A (en) | Pier shaft construction safety protection platform | |
CN107816209B (en) | The large-scale Roof Truss construction technology of installation is lifted across outer two sides | |
CN112302320A (en) | Modular assembled scaffolding module, system and construction method for building column | |
CN110306784A (en) | A kind of aluminum tunnel modular system and its operating method | |
CN216713867U (en) | Fixed bolster of prefabricated wallboard and contain braced system of this support | |
CN212406038U (en) | Lower hanging construction platform module of high-altitude large-cantilever steel roof truss | |
CN213597442U (en) | Elevator shaft template operation platform that encorbelments | |
CN115162171A (en) | Sectional installation method and installation system for suspension bridge steel pull rod anchoring system | |
CN211173029U (en) | A liftable platform structure for chimney reinforcement construction | |
CN216949403U (en) | Mounting structure of overlong double-support-arm cantilever scaffold for special-shaped profile building | |
KR200298061Y1 (en) | divided supporter structure for supporting a mould for forming a concrete united wall | |
JP3287816B2 (en) | Building interior stairs | |
CN216157149U (en) | Aluminum alloy formwork support system of coincide floor | |
CN115162823B (en) | Assembling method of pinnacle steel member | |
CN211949507U (en) | Removable channel | |
CN218493202U (en) | Suspension type packway | |
CN218264949U (en) | Concrete cantilever member support system | |
CN220319075U (en) | Guy rope hanging basket assembling platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20200218 |
|