CN110697315A - A system and method for rapid transportation of sand and gravel - Google Patents
A system and method for rapid transportation of sand and gravel Download PDFInfo
- Publication number
- CN110697315A CN110697315A CN201911137198.7A CN201911137198A CN110697315A CN 110697315 A CN110697315 A CN 110697315A CN 201911137198 A CN201911137198 A CN 201911137198A CN 110697315 A CN110697315 A CN 110697315A
- Authority
- CN
- China
- Prior art keywords
- area
- transportation
- buffer area
- sand
- rapid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G11/00—Chutes
- B65G11/02—Chutes of straight form
- B65G11/026—Chutes of straight form for bulk
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G11/00—Chutes
- B65G11/20—Auxiliary devices, e.g. for deflecting, controlling speed of, or agitating articles or solids
- B65G11/206—Auxiliary devices, e.g. for deflecting, controlling speed of, or agitating articles or solids for bulk
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G65/00—Loading or unloading
- B65G65/30—Methods or devices for filling or emptying bunkers, hoppers, tanks, or like containers, of interest apart from their use in particular chemical or physical processes or their application in particular machines, e.g. not covered by a single other subclass
- B65G65/32—Filling devices
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G65/00—Loading or unloading
- B65G65/30—Methods or devices for filling or emptying bunkers, hoppers, tanks, or like containers, of interest apart from their use in particular chemical or physical processes or their application in particular machines, e.g. not covered by a single other subclass
- B65G65/34—Emptying devices
- B65G65/40—Devices for emptying otherwise than from the top
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G2201/00—Indexing codes relating to handling devices, e.g. conveyors, characterised by the type of product or load being conveyed or handled
- B65G2201/04—Bulk
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Preparation Of Clay, And Manufacture Of Mixtures Containing Clay Or Cement (AREA)
Abstract
本发明提出了一种砂石料快速运输系统及方法,解决了现有技术中砂石料的运输成本高且运输速度低,影响掘进工程的问题;包括传送机构,设置在使用地,并一端与物料堆放地相邻设置;物料缓冲区,通过输料道与外部连通;且输料道包括进料口和出料口,进料口与传送机构的另一端相邻设置;用于获取物料缓冲区的物料并进行存储的储料机构,一端与暂存区连通;另一端置于运输区内;本发明提出的砂石料快速运输系统及方法无需使用高强度的缓冲装置等,进而能够在降低运输成本的同时,不影响掘进工程的进度。
The invention proposes a system and method for rapid transportation of sand and gravel materials, which solves the problems of high transportation cost and low transportation speed of sand and gravel materials in the prior art, which affect the excavation project. The stacking area is set adjacent to each other; the material buffer zone is communicated with the outside through the feeding channel; and the feeding channel includes a feeding port and a feeding port, and the feeding port is set adjacent to the other end of the conveying mechanism; it is used to obtain the material buffer zone A material storage mechanism for storing and storing materials, one end is connected to the temporary storage area; the other end is placed in the transportation area; the system and method for rapid transportation of sand and gravel materials proposed by the present invention do not need to use high-strength buffer devices, etc., thereby reducing transportation costs. At the same time, it does not affect the progress of the excavation project.
Description
技术领域technical field
本发明涉及矿下物料运输领域,特别是指一种砂石料快速运输系统及方法。The invention relates to the field of underground material transportation, in particular to a system and method for rapid transportation of sand and gravel materials.
背景技术Background technique
矿区根据地质的不同可以包括软岩结构的矿区,其中,巷道掘进支护方式常采用锚网喷支护和反底拱喷浆支护组合的方式进行;矿区中平均每天的掘进和准备硐室进尺约为30~40m,巷道每米进尺需要喷砼1.5~2.9m3,需要使用的砂石料非常巨大;The mining area can include the mining area with soft rock structure according to the different geology. Among them, the roadway excavation support is usually carried out by the combination of bolt mesh shotcrete support and reverse bottom arch shotcrete support; the average daily excavation and preparation chamber in the mining area is carried out. The footage is about 30-40m, and each meter of the roadway requires 1.5-2.9m 3 of shotcrete, and the sand and gravel materials to be used are very huge;
现有技术中,砂石料运输方式为井上装车后,通过电机车运至井口,通过副井下放,电机车运至轨道石门,在分布到各施工地点;而此种运输方式中需要多次换装,且运输路线长,此过程中造成了人力成本增加、占用运输车辆等问题;另外,通过上述方式进行运输,增加了运输成本的同时还存在许多安全隐患。当掘进速度加快时,采用罐笼提升与矿车配合的运输方式运输能力有限,使运料速度跟不上施工需求,导致掘进施工受影响,造成了掘进工程不能满足回采接续要求。In the prior art, sand and gravel materials are transported to the wellhead by electric locomotive after being loaded on the well, lowered through the auxiliary shaft, and transported by electric locomotive to the track Shimen, and then distributed to various construction sites; and this transportation method requires many times. In addition, the transportation in the above-mentioned way increases the transportation cost and also has many hidden safety hazards. When the excavation speed is accelerated, the transportation capacity of using cage lifting and mining trucks is limited, so that the material transportation speed cannot keep up with the construction demand, which affects the excavation construction, resulting in the excavation project not meeting the requirements of mining and continuation.
发明内容SUMMARY OF THE INVENTION
本发明提出一种砂石料快速运输系统及方法,解决了现有技术中砂石料的运输成本高且运输速度低,影响掘进工程的问题。The invention proposes a system and method for rapid transportation of sand and gravel, which solves the problems of high transportation cost and low transportation speed of sand and gravel in the prior art, which affect the excavation project.
本发明的技术方案是这样实现的:The technical scheme of the present invention is realized as follows:
一种砂石料快速运输系统及方法,包括:A system and method for rapid transportation of sand and gravel, comprising:
传送机构,设置在使用地,并一端与物料堆放地相邻设置;The conveying mechanism is set at the place of use, and one end is set adjacent to the place where the materials are stacked;
物料缓冲区,通过输料道与外部连通;且输料道包括进料口和出料口,进料口与传送机构的另一端相邻设置;The material buffer zone is communicated with the outside through the feeding channel; and the feeding channel includes a feeding port and a feeding port, and the feeding port is arranged adjacent to the other end of the conveying mechanism;
用于获取物料缓冲区的物料并进行存储的储料机构,一端与暂存区连通;另一端置于运输区内。A storage mechanism used to obtain and store materials in the material buffer zone, one end is connected to the temporary storage area; the other end is placed in the transportation area.
作为进一步的技术方案,还包括:监控装置,设置在暂存区内。As a further technical solution, it also includes: a monitoring device, which is arranged in the temporary storage area.
作为进一步的技术方案,储料机构包括:As a further technical solution, the storage mechanism includes:
储料仓,一端与暂存区连通;The storage bin, one end is connected with the temporary storage area;
出料机,与储料仓另一端连通,且置于运输区内。The discharging machine is connected with the other end of the storage bin and is placed in the transport area.
优选的,出料机为给煤机。Preferably, the discharge machine is a coal feeder.
优选的,储料仓临近出料机的一端为锥形结构。Preferably, one end of the storage bin adjacent to the discharging machine has a conical structure.
优选的,出料口轴心距离储料机构临近出料口边缘的距离为1.5m。Preferably, the distance between the axis of the discharge port and the material storage mechanism adjacent to the edge of the discharge port is 1.5m.
优选的,输料道为输料管道。Preferably, the conveying channel is a conveying pipeline.
优选的,输料道为钻孔设备开设的通道。Preferably, the material conveying channel is a channel opened by the drilling equipment.
本发明还公开一种使用述砂石料快速运输系统的方法包括如下步骤:The invention also discloses a method for using the sand and gravel material rapid transportation system, comprising the following steps:
S1、以施工地为水平面向水平面以下设置输料道,并使输料道与置于施工地的传送机构相邻设置;S1. The construction site is set horizontally below the horizontal plane, and the conveying channel is set adjacent to the conveying mechanism placed on the construction site;
S2、在水平面以下开设物料缓冲区,且通过S1步骤形成的输料道与物料缓冲区连通;S2, set up a material buffer zone below the horizontal plane, and communicate with the material buffer zone through the conveying channel formed in step S1;
S3、在运输区与物料缓冲区之间设置储料机构,使储料机构连通物料缓冲区和运输区;以使物料依次经过输料道和物料缓冲区后,进入到储料机构。S3. Set up a material storage mechanism between the transportation area and the material buffer area, so that the material storage mechanism is connected to the material buffer area and the transportation area; so that the material enters the material storage mechanism after passing through the material conveying channel and the material buffer area in sequence.
作为进一步的技术方案,S2步骤包括:As a further technical solution, step S2 includes:
在水平面以下开设物料缓冲区,且在物料缓冲区中设置一平台和操作空间;并使S1步骤形成的输料道与物料缓冲区连通,令输料道置于平台上方。A material buffer zone is set up below the horizontal plane, and a platform and an operation space are set up in the material buffer zone; the feeding channel formed in step S1 is connected with the material buffer zone, and the feeding channel is placed above the platform.
本发明技术方案通过传送机构对物料堆放地的物料进行输送,使物料被输送到输料道进料口的位置,并通过输料道对物料进行传送,使物料进入到暂存区,而随着进入到暂存区物料量的增加,暂存区的物料会逐渐的进入到储料机构,通过储料机构对物料进行存储,而当需要使用时,储料机构内部的物料排出,使物料排放到运输区的车辆上,实现物料的运输,本发明的技术方案,充分利用了物料的自然堆积以及受冲击的蠕变性,与现有技术相比无需使用高强度的缓冲装置等,进而能够在降低运输成本的同时,不影响掘进工程的进度。The technical scheme of the present invention conveys the material in the material stacking place through the conveying mechanism, so that the material is conveyed to the position of the feeding port of the material conveying channel, and the material is conveyed through the material conveying channel, so that the material enters the temporary storage area, and the material enters the temporary storage area. As the amount of materials entering the temporary storage area increases, the materials in the temporary storage area will gradually enter the storage mechanism, and the materials will be stored through the storage mechanism. It is discharged to the vehicle in the transportation area to realize the transportation of materials. The technical solution of the present invention makes full use of the natural accumulation of materials and the creep under impact, and does not need to use high-strength buffer devices, etc. It can reduce the transportation cost without affecting the progress of the excavation project.
附图说明Description of drawings
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to explain the embodiments of the present invention or the technical solutions in the prior art more clearly, the following briefly introduces the accompanying drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description are only These are some embodiments of the present invention. For those of ordinary skill in the art, other drawings can also be obtained according to these drawings without creative efforts.
图1为本发明一种砂石料快速运输系统及方法的结构示意图。FIG. 1 is a schematic structural diagram of a system and method for rapid transportation of sand and gravel materials according to the present invention.
图中:In the picture:
1-传送机构;2-物料缓冲区;3-输料道;31-进料孔;32-出料口;4-储料机构;41-储料仓;42-出料机;5-运输区;6-监控装置。1-conveying mechanism; 2-material buffer zone; 3-feeding channel; 31-feeding hole; 32-feeding port; 4-material storage mechanism; 41-storage bin; 42-feeder; 5-transportation area; 6-monitoring device.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, but not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.
如图1所示,本发明提出的一种砂石料快速运输系统及方法,包括:As shown in Figure 1, a system and method for rapid transportation of sand and gravel materials proposed by the present invention include:
传送机构1设置在使用地,并一端与物料堆放地相邻设置;本发明中,传送机构1优选为传送带,可以通过操作人员或者使用操作设备等将物料(砂石料)置于传送带上,通过传送带进行物料的运输;The
物料缓冲区2通过输料道3与外部连通;且输料道3包括进料口和出料口32,进料口与传送机构1的另一端相邻设置;当传送机构1将物料进行传输后到达传送机构1的末端,在物料自身重力的作用下,物料进入到输料道3;并伴随自身重力,穿过无聊到下落到物料缓冲区2,本发明中,输料道3为输料管道;还可以输料道3为钻孔设备开设的通道;具体的根据实际情况而定,本发明对此不再进行限定;The
如图1所示,当物料穿过输料道3后到达物料缓冲区2,由于物料缓冲区2中设置有一平台供自输料道3下落后暂存使用,因此,通过输料道3的物料或落在物料暂存去的平台上,由于物料不断的落下,使得平台上的物料逐渐增多,当平台上的物料达到一定量后,由于平台与出料机42构临近设置,因此当平台长的物料量产出平台承载范围时,超出的物料则会流入到出料机42构中;且,本发明中,优选的,出料口32轴心距离储料机构4临近出料口32边缘的距离为1.5m;这样使得平台形成一定的空间,用于物料的暂存;且当超过空间的承受范围后,物料会进入到储料机构4;As shown in Figure 1, when the material passes through the
在此环境中,能够充分利用了物料的自然堆积以及受冲击的蠕变性;即当物料通过输料道3后下落到物料缓冲区2时,由于平台的设置,可以缓冲下落物料的冲击力,并由于物料逐渐的增多,使得落入出料机42构的物料能够低于下落速度进入到出料机42构,且由于平台上的物料逐渐增多,同样可以通过平台上已有的物料对持续下落的物料进行缓冲;In this environment, the natural accumulation of materials and the impact creep can be fully utilized; that is, when the materials fall to the
储料机构4一端与暂存区连通;另一端置于运输区5内;通过获取物料缓冲区2的物料并进行存储;在本发明中,根据实际的情况,可以对物料进行计量,而储料机构4中存储的物料量一般会超过一天的使用量;其中,One end of the
储料机构4包括储料仓41和出料机42,该储料仓41一端与暂存区连通;出料机42与储料仓41另一端连通,且置于运输区5内;即自平台上落入的物料进入到储料仓41中,通过储料仓41进行存储;并根据需要通过出料装置将储料仓41内的物料排出;本发明中,优选的,出料机42为给煤机;具体的,可以选取定量给煤机,这样可以对运输区5内的车辆定量的排放;进而实现定量的运输;The
另外,本发明中,储料仓41临近出料机42的一端为锥形结构;这样进入到储料仓41内的物料可以在自身重力下始终想出料端口汇集,提高出料机42的出料效果;In addition, in the present invention, the end of the
本发明中,为更好的获知工作状态,本发明中,优选的设置有监控装置6,该监控装置6设置在暂存区内;本发明中,优选的监控装置6为摄像头,通过摄像头始终监控暂存区的环境,具体的监控输料道3的出料情况已经平台上的堆料情况;进而可以根据监控的情况进行相应的处理。In the present invention, in order to better know the working state, in the present invention, a
本发明还公开一种使用述砂石料快速运输系统的方法包括如下步骤:The invention also discloses a method for using the sand and gravel material rapid transportation system, comprising the following steps:
以施工地为水平面向水平面以下设置输料道,并使输料道与置于施工地的传送机构相邻设置;本发明中,输料道可以通过钻孔设备开设的通道,也可以在开设的通道后置入熟料管道,该输料管道可以为PVC管等;With the construction site as the horizontal face below the horizontal plane, the material conveying channel is set up, and the material conveying channel is set adjacent to the conveying mechanism placed on the construction site; The clinker pipeline is placed after the channel of the pipeline, and the material conveying pipeline can be a PVC pipe, etc.;
在水平面以下开设物料缓冲区,且形成的输料道与物料缓冲区连通;在本发明中,可以根据需要进行相应的调整,如先进行输料道的开设,再进行物料暂存空间的设置,或者先进行物料暂存空间的设置再进行输料道的开设,具体根据实际工况进行调整;务必保证在开设后使输料道和物料缓冲区连通;以使物料通过输料道传输后能够进入到物料缓冲区;具体的,在水平面以下开设物料缓冲区,且在物料缓冲区中设置一平台和操作空间;并使S1步骤形成的输料道与物料缓冲区连通,令输料道置于平台上方;这样能够保证通过出料道进入到物料缓冲区后,可以通过平台暂存;A material buffer area is set up below the horizontal plane, and the formed conveying channel is connected to the material buffer area; in the present invention, corresponding adjustments can be made as needed, such as opening the conveying channel first, and then setting the material temporary storage space , or first set the material temporary storage space and then open the conveying channel, and adjust it according to the actual working conditions; it must be ensured that the conveying channel and the material buffer area are connected after opening; It can enter the material buffer area; specifically, a material buffer area is set up below the horizontal plane, and a platform and an operation space are set in the material buffer area; It is placed above the platform; this can ensure that after entering the material buffer through the discharge channel, it can be temporarily stored through the platform;
另外,需要在运输区与物料缓冲区之间设置储料机构,使储料机构连通物料缓冲区和运输区;以使物料依次经过输料道和物料缓冲区后,进入到储料机构;In addition, a material storage mechanism needs to be set up between the transportation area and the material buffer area, so that the material storage mechanism is connected to the material buffer area and the transportation area; so that the material enters the material storage mechanism after passing through the material conveying channel and the material buffer area in sequence;
这样,当物料进入后先落在物料缓存区的平台上,通过平台缓冲物料的冲击,而随着平台上物料量的增加,物料会达到平台的边缘,在平台边缘处滑落到储料机构内,通过储料机构进行存储,进而避免了通过输料道进入的物料直接对储料机构的冲击。In this way, when the material enters, it first falls on the platform of the material buffer area, and the impact of the material is buffered by the platform. With the increase of the amount of material on the platform, the material will reach the edge of the platform and slide into the storage mechanism at the edge of the platform. , The material is stored through the material storage mechanism, thereby avoiding the direct impact of the material entering through the conveying channel on the material storage mechanism.
以上仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention. within.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911137198.7A CN110697315A (en) | 2019-11-19 | 2019-11-19 | A system and method for rapid transportation of sand and gravel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911137198.7A CN110697315A (en) | 2019-11-19 | 2019-11-19 | A system and method for rapid transportation of sand and gravel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110697315A true CN110697315A (en) | 2020-01-17 |
Family
ID=69207339
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911137198.7A Pending CN110697315A (en) | 2019-11-19 | 2019-11-19 | A system and method for rapid transportation of sand and gravel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110697315A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112010055A (en) * | 2020-10-09 | 2020-12-01 | 内蒙古上海庙矿业有限责任公司 | Mining sand and stone material conveying system |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1465514A (en) * | 2002-07-04 | 2004-01-07 | 河南神火煤电股份有限公司 | Composite breaking-resistant vertical storehouse |
CN204588015U (en) * | 2015-04-23 | 2015-08-26 | 中国水利水电第十四工程局有限公司 | A kind of guide piece for the switching of load-transfer device material |
CN110155741A (en) * | 2019-06-21 | 2019-08-23 | 山东威斯特矿山工程科技股份有限公司 | A kind of horizontal warehousing system and control method |
CN211711743U (en) * | 2019-11-19 | 2020-10-20 | 内蒙古上海庙矿业有限责任公司 | Rapid sand and stone material transportation system |
-
2019
- 2019-11-19 CN CN201911137198.7A patent/CN110697315A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1465514A (en) * | 2002-07-04 | 2004-01-07 | 河南神火煤电股份有限公司 | Composite breaking-resistant vertical storehouse |
CN204588015U (en) * | 2015-04-23 | 2015-08-26 | 中国水利水电第十四工程局有限公司 | A kind of guide piece for the switching of load-transfer device material |
CN110155741A (en) * | 2019-06-21 | 2019-08-23 | 山东威斯特矿山工程科技股份有限公司 | A kind of horizontal warehousing system and control method |
CN211711743U (en) * | 2019-11-19 | 2020-10-20 | 内蒙古上海庙矿业有限责任公司 | Rapid sand and stone material transportation system |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112010055A (en) * | 2020-10-09 | 2020-12-01 | 内蒙古上海庙矿业有限责任公司 | Mining sand and stone material conveying system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104533429B (en) | Double-roadway combined rapid tunneling gangue discharge system and method | |
CN112814732B (en) | Waste stone and tailing mixed slurry preparation and pumping filling device | |
US4103972A (en) | Open pit mine | |
CN101528572A (en) | Air cushion conveying, stacking and taking equipment and method thereof | |
CN102753460A (en) | Active solids supply system and method for supplying solids | |
US20130118862A1 (en) | Pivoting Conveyor System | |
CN102889097A (en) | System for feeding coal mine solid filling material | |
CN111322073A (en) | A combined mine development system based on vertical shaft and tape inclined shaft | |
CN105736045A (en) | Bag type filling system and filling method for controlling water inrush from gob floor | |
CN103603680A (en) | One-well two-bin type quick conveying method for deep tunnel guniting and concreting materials | |
CN110697315A (en) | A system and method for rapid transportation of sand and gravel | |
CN114109485B (en) | Ore discharge and crushing system next to the unloading station underground | |
CN106608510B (en) | A kind of two-way conveying equipment and its application method | |
CN105565130A (en) | Coal mine vertical shaft combined hoisting system | |
CN211711743U (en) | Rapid sand and stone material transportation system | |
CN116427998A (en) | System and method for filling waste rock stope in metal mine in internal circulation mode | |
CN203667459U (en) | Concrete aggregate belt conveying and sorting device | |
CN216617574U (en) | Ore chute and crushing system of underground adjacent unloading station | |
CN111396120A (en) | Chute crushing transportation system | |
CN104948223B (en) | Down-hole gob-side roadway filling system and method | |
CN212200449U (en) | Piling and discharging system for dry-discharged tailings of strip mine stope | |
CN210477364U (en) | System for manufacturing coal bunker concrete in mining area | |
CN204162262U (en) | A kind of coal mine shaft lining mixed lifting system | |
CN113250695B (en) | Layered filling mining method and mine filling system | |
Schröder | Economical and technological aspects of Bucket Wheel Excavator and Crusher/Conveyor systems |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |