CN110644529A - Reverse-wrapping type slag building geotextile bag retaining wall, construction method and application - Google Patents
Reverse-wrapping type slag building geotextile bag retaining wall, construction method and application Download PDFInfo
- Publication number
- CN110644529A CN110644529A CN201910922564.3A CN201910922564A CN110644529A CN 110644529 A CN110644529 A CN 110644529A CN 201910922564 A CN201910922564 A CN 201910922564A CN 110644529 A CN110644529 A CN 110644529A
- Authority
- CN
- China
- Prior art keywords
- retaining wall
- geogrid
- section
- slope
- slag
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000002893 slag Substances 0.000 title claims abstract description 107
- 238000010276 construction Methods 0.000 title claims abstract description 70
- 239000004746 geotextile Substances 0.000 title claims description 35
- 230000002787 reinforcement Effects 0.000 claims abstract description 35
- 239000002689 soil Substances 0.000 claims description 92
- 238000013461 design Methods 0.000 claims description 14
- 230000002441 reversible effect Effects 0.000 claims description 7
- 238000000429 assembly Methods 0.000 claims description 2
- 230000000712 assembly Effects 0.000 claims description 2
- 238000004873 anchoring Methods 0.000 claims 2
- 230000000694 effects Effects 0.000 abstract description 30
- 238000004064 recycling Methods 0.000 abstract description 3
- 238000006073 displacement reaction Methods 0.000 description 103
- 238000012360 testing method Methods 0.000 description 59
- 238000010586 diagram Methods 0.000 description 32
- 238000000034 method Methods 0.000 description 21
- 239000000463 material Substances 0.000 description 13
- 239000002699 waste material Substances 0.000 description 11
- 230000009471 action Effects 0.000 description 10
- 238000004458 analytical method Methods 0.000 description 10
- 239000004567 concrete Substances 0.000 description 10
- 230000008569 process Effects 0.000 description 10
- 230000008859 change Effects 0.000 description 9
- 238000009826 distribution Methods 0.000 description 9
- 229910000831 Steel Inorganic materials 0.000 description 8
- 239000010959 steel Substances 0.000 description 8
- 239000011449 brick Substances 0.000 description 7
- 238000002474 experimental method Methods 0.000 description 7
- 230000005484 gravity Effects 0.000 description 6
- 230000002829 reductive effect Effects 0.000 description 6
- 238000011160 research Methods 0.000 description 6
- 239000004927 clay Substances 0.000 description 5
- 230000007423 decrease Effects 0.000 description 5
- 239000005341 toughened glass Substances 0.000 description 5
- 238000010835 comparative analysis Methods 0.000 description 4
- 238000005520 cutting process Methods 0.000 description 4
- 230000006378 damage Effects 0.000 description 4
- 230000003068 static effect Effects 0.000 description 4
- 238000005056 compaction Methods 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 239000002245 particle Substances 0.000 description 3
- -1 polypropylene Polymers 0.000 description 3
- 238000012546 transfer Methods 0.000 description 3
- 239000004698 Polyethylene Substances 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 2
- 230000003247 decreasing effect Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000003292 glue Substances 0.000 description 2
- 230000035699 permeability Effects 0.000 description 2
- 239000002985 plastic film Substances 0.000 description 2
- 229920006255 plastic film Polymers 0.000 description 2
- 229920000573 polyethylene Polymers 0.000 description 2
- 229920000642 polymer Polymers 0.000 description 2
- 230000008093 supporting effect Effects 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 239000004743 Polypropylene Substances 0.000 description 1
- 238000010521 absorption reaction Methods 0.000 description 1
- 230000003712 anti-aging effect Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000033228 biological regulation Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 230000000052 comparative effect Effects 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 239000000945 filler Substances 0.000 description 1
- 239000004519 grease Substances 0.000 description 1
- 238000000227 grinding Methods 0.000 description 1
- 229920001903 high density polyethylene Polymers 0.000 description 1
- 239000004700 high-density polyethylene Substances 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 230000000670 limiting effect Effects 0.000 description 1
- 230000001050 lubricating effect Effects 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
- 230000021715 photosynthesis, light harvesting Effects 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
- 229920003023 plastic Polymers 0.000 description 1
- 229920001155 polypropylene Polymers 0.000 description 1
- 229920001296 polysiloxane Polymers 0.000 description 1
- 229920000915 polyvinyl chloride Polymers 0.000 description 1
- 239000004800 polyvinyl chloride Substances 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 239000005060 rubber Substances 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 238000005476 soldering Methods 0.000 description 1
- 239000002910 solid waste Substances 0.000 description 1
- 229920001169 thermoplastic Polymers 0.000 description 1
- 239000004416 thermosoftening plastic Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0258—Retaining or protecting walls characterised by constructional features
- E02D29/0291—Retaining or protecting walls characterised by constructional features made up of filled, bag-like elements
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
- E02D29/0225—Retaining or protecting walls comprising retention means in the backfill
- E02D29/0241—Retaining or protecting walls comprising retention means in the backfill the retention means being reinforced earth elements
Landscapes
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
本发明公开了一种反包式建渣土工袋挡土墙、施工方法及应用,目的在于解决在加筋挡土墙的建造过程中,土工袋挡土墙能起到一定的加固效果,但土工袋之间是独立个体,缺乏连接性,在工程应用中的整体性差的问题;所述挡墙组件由加筋段、反包段、固定段依次相连而成。该反包式建渣土工袋挡土墙包括底层、设置在底层上的防护单元,所述防护单元由N个挡墙组件构成,且N≥1。本申请将土工袋、土工格栅以及建渣相结合,提出反包式建渣土工袋挡土墙结构,通过探究反包式建渣土工袋挡土墙的边坡加固效果,实现建渣的循环利用,提高了挡土墙的承载能力和整体性能,为反包式建渣土工袋挡土墙在实际工程中的应用提供了依据。
The invention discloses a reverse-packed construction slag geotechnical bag retaining wall, a construction method and an application, and the purpose is to solve the problem that the geotechnical bag retaining wall can play a certain reinforcement effect during the construction of the reinforced retaining wall. However, the geobags are independent individuals, lack connectivity, and have poor integrity in engineering applications; the retaining wall component is formed by sequentially connecting a reinforced section, a turn-up section, and a fixed section. The reverse-packed construction slag geobag retaining wall includes a bottom layer and a protection unit arranged on the bottom layer, and the protection unit is composed of N retaining wall components, and N≥1. This application combines geobags, geogrids and construction slag, and proposes a structure of a retaining wall with a reverse-packed construction slag geobag. The recycling of slag improves the bearing capacity and overall performance of the retaining wall, and provides a basis for the application of the reverse-packed slag geotechnical bag retaining wall in practical engineering.
Description
技术领域technical field
本发明涉及建渣回用领域,具体为一种反包式建渣土工袋挡土墙、施工方法及应用。 本申请基于建渣的特性,提供一种新的反包式建渣土工袋挡土墙,其具有较好的边坡加固 效果,对于实现建渣的资源化利用,具有重要的意义。The invention relates to the field of construction slag recycling, in particular to a reverse-packed construction slag geotechnical bag retaining wall, a construction method and an application. Based on the characteristics of the construction slag, the present application provides a new reverse-packed construction slag geotechnical bag retaining wall, which has a better slope reinforcement effect and is of great significance for realizing the resource utilization of the construction slag.
背景技术Background technique
在城镇化建设过程中,由于改建、扩建、拆除等活动中,会产生大量的建筑垃圾。其中,建筑垃圾主要由混凝土块、砖块、砂浆等固体废弃物组成。另一方面,随着我国城镇 化建设的高速发展,天然的建筑资源日益枯竭。若能对建渣进行回收利用,不仅可以解决 建渣带来的环境污染问题,还可以节约资源,具有极大的环保效益。In the process of urbanization construction, due to reconstruction, expansion, demolition and other activities, a large amount of construction waste will be generated. Among them, construction waste mainly consists of solid waste such as concrete blocks, bricks, and mortar. On the other hand, with the rapid development of urbanization in my country, natural building resources are increasingly depleted. If the building slag can be recycled, it can not only solve the environmental pollution problem caused by the building slag, but also save resources and have great environmental protection benefits.
目前,土工袋和土工格栅两种土工合成材料被大量应用于实际工程中。土工袋是利用 土工布缝制而成,再装填土、砂、碎石、建筑垃圾等经封口而成的袋装体。土工袋通过约 束土体的变形,从而达到加固的效果,已被广泛的应用于海口护岸、路基处理、边坡防护等工程中。格栅是一种由聚丙烯、聚氯乙烯等高分子聚合物经热塑或模压而成的二维网格状,或具有一定高度的三维立体网格屏栅,当用于土木工程建设时,称为土工格栅。土工 格栅是一种被广泛应用于加筋土结构的加筋材料,将其铺设在土体内能够起到约束土体的侧向变形、阻止滑移面的形成等作用。At present, two kinds of geosynthetic materials, geobags and geogrids, are widely used in practical projects. Geotextile bags are sewn from geotextiles and then filled with soil, sand, gravel, construction waste, etc. and sealed. Geobags can achieve the effect of reinforcement by constraining the deformation of soil, and have been widely used in Haikou revetment, roadbed treatment, slope protection and other projects. The grid is a two-dimensional grid made of polypropylene, polyvinyl chloride and other high molecular polymers by thermoplastic or molding, or a three-dimensional grid screen with a certain height. When used in civil engineering construction , called geogrid. Geogrid is a reinforced material that is widely used in reinforced soil structures. When it is laid in the soil, it can restrain the lateral deformation of the soil and prevent the formation of slip surfaces.
虽然在实际工程建设中,土工袋技术、土工格栅加筋技术已经较为成熟,但也存在一 些缺陷,难以满足工程需求。在加筋挡土墙的建设中,土工袋挡土墙能起到一定的加固效 果,但是土工袋加筋土结构的整体性能较差,易发生边坡倾覆性破坏或边坡整体向外移动 等破坏。Although in actual engineering construction, geobag technology and geogrid reinforcement technology have been relatively mature, there are also some defects, which are difficult to meet engineering needs. In the construction of the reinforced retaining wall, the geobag retaining wall can play a certain reinforcement effect, but the overall performance of the geobag reinforced soil structure is poor, and it is prone to the overturning damage of the slope or the overall outward movement of the slope. etc. Destruction.
为此,迫切需要一种新的装置和/或方法,以解决上述问题。Therefore, there is an urgent need for a new device and/or method to solve the above problems.
发明内容SUMMARY OF THE INVENTION
本发明的发明目的在于:针对在加筋挡土墙的建造过程中,土工袋挡土墙能起到一定 的加固效果,但土工袋之间是独立个体,缺乏连接性,在工程应用中的整体性差的问题, 提供一种反包式建渣土工袋挡土墙、施工方法及应用。本申请将土工袋、土工格栅以及建 渣相结合,提出反包式建渣土工袋挡土墙结构,通过探究反包式建渣土工袋挡土墙的边坡 加固效果,实现建渣的循环利用,提高了挡土墙的承载能力和整体性能,为反包式建渣土 工袋挡土墙在实际工程中的应用提供了依据。The purpose of the invention is as follows: in the construction process of the reinforced retaining wall, the geo-bag retaining wall can play a certain reinforcement effect, but the geo-bags are independent individuals and lack connectivity, which is very difficult in engineering applications. To solve the problem of poor integrity, the invention provides an anti-construction slag geotechnical bag retaining wall, a construction method and an application. The present application combines geobags, geogrids and construction slag, and proposes a structure of a retaining wall with a reverse-packed construction slag geobag. The recycling of slag improves the bearing capacity and overall performance of the retaining wall, and provides a basis for the application of the reverse bag type slag geotechnical bag retaining wall in practical engineering.
为了实现上述目的,本发明采用如下技术方案:In order to achieve the above object, the present invention adopts the following technical solutions:
一种反包式建渣土工袋挡土墙,包括底层、设置在底层上的防护单元,所述防护单元 由N个挡墙组件构成,且N≥1;A kind of anti-packing type construction slag geotechnical bag retaining wall, comprising a bottom layer and a protection unit arranged on the bottom layer, the protection unit is composed of N retaining wall components, and N≥1;
所述挡墙组件由加筋段、反包段、固定段依次相连而成;The retaining wall assembly is formed by connecting a reinforced section, a reverse wrapping section and a fixed section in sequence;
所述加筋段包括平铺的第一土工格栅、填筑土体,所述填筑土体位于第一土工格栅上;The reinforcement section includes a first geogrid laid flat and a filling soil body, and the filling soil body is located on the first geogrid;
所述反包段包括第二土工格栅、第二土工袋,所述第二土工袋为至少一个且叠加在一 起,所述第二土工格栅包覆在第二土工袋外侧并将第二土工袋连接为一体;The turn-up section includes a second geogrid and a second geobag, the second geobag is at least one and stacked together, the second geogrid is wrapped on the outside of the second geobag and the second geobag is Geo bags are connected as a whole;
所述固定段包括平铺的第三土工格栅、第三土工袋,所述第三土工袋为至少一个且沿 竖直方向依次叠加在一起,所述土工袋位于第三土工格栅上;The fixed section comprises a third geogrid and a third geobag that are laid flat, wherein the third geobag is at least one and is stacked together in sequence along the vertical direction, and the geobag is located on the third geogrid;
所述固定段远离加筋段的一侧相对竖直方向倾斜设置,所述固定段远离加筋段的一侧 侧面与水平面之间的夹角为2~75°;The side of the fixing section away from the reinforcement section is inclined relative to the vertical direction, and the angle between the side surface of the fixing section away from the reinforcement section and the horizontal plane is 2 to 75°;
所述第一土工格栅、第二土工格栅、第三土工格栅依次相连;The first geogrid, the second geogrid, and the third geogrid are connected in sequence;
所述第一土工袋、第二土工袋内分别填充建渣。The first geotechnical bag and the second geotechnical bag are respectively filled with building slag.
所述第一土工袋、第二土工袋内分别填充由混凝土块和砖块构成的建渣,所述混凝土 块与转块的质量为1:0.25~2。The first geotechnical bag and the second geotechnical bag are respectively filled with building slag composed of concrete blocks and bricks, and the mass of the concrete blocks and the rotating blocks is 1:0.25-2.
所述混凝土块与转块的质量为1:0.8~1.2。The mass of the concrete block and the rotating block is 1:0.8-1.2.
所述第一土工袋、第二土工袋内建渣的填充度为65~90%。The filling degree of the slag in the first geotechnical bag and the second geotechnical bag is 65-90%.
所述第一土工袋、第二土工袋内建渣的填充度为80%。The filling degree of the slag in the first geotechnical bag and the second geotechnical bag is 80%.
所述挡墙组件的高度为0.2~3.5m。The height of the retaining wall assembly is 0.2-3.5m.
所述固定段中,上下相邻两层第三土工袋交错排列。In the fixing section, two adjacent layers of third geotechnical bags are arranged in a staggered manner.
所述固定段远离加筋段的一侧侧面与水平面之间的夹角为15~35°。The angle between the side surface of the fixing section away from the reinforcement section and the horizontal plane is 15-35°.
所述挡墙组件远离加筋段的一侧呈下大上小状。The side of the retaining wall assembly away from the reinforced section is large at the bottom and small at the top.
所述第二土工袋叠加在一起并构成第二叠加体,所述第二土工格栅包裹在第二叠加体 的外表面上。The second geobags are stacked together to form a second stack, and the second geogrid is wrapped on the outer surface of the second stack.
所述固定段远离加筋段的一侧侧面的上端点位于固定段远离加筋段的一侧侧面的下端 点与反包段之间。The upper end point of the side face of the fixing section away from the reinforced section is located between the lower end point of the side face of the fixing section away from the reinforced section and the turn-up section.
所述防护单元由至少两个挡墙组件沿竖直方向叠加而成;The protection unit is formed by stacking at least two retaining wall assemblies in a vertical direction;
沿从下至上的方向,将挡墙组件依次记为第一个挡墙组件构、……第N个挡墙组件, 且N≥2;In the direction from bottom to top, the retaining wall components are recorded as the first retaining wall component structure, ... the Nth retaining wall component, and N≥2;
第一个挡墙组件的第一土工格栅平铺于底层上,第N个挡墙组件的第一土工格栅平铺 于第N-1个挡墙组件的填筑土体上;The first geogrid of the first retaining wall assembly is tiled on the bottom layer, and the first geogrid of the Nth retaining wall assembly is tiled on the filling soil of the N-1th retaining wall assembly;
所述防护单元上固定段的一侧呈下大上小状。One side of the upper fixed section of the protection unit is in the shape of a large bottom and a small top.
所述底层为土层或水泥层。The bottom layer is a soil layer or a cement layer.
所述第一土工格栅的长度为0.1~10m。The length of the first geogrid is 0.1-10m.
所述加筋段位于靠近坡体的一侧,所述固定段位于远离坡体的一侧。The reinforced section is located on the side close to the slope body, and the fixed section is located on the side away from the slope body.
所述反包段采用二至六层第二土工袋依次叠加而成;所述固定段采用二至六层第三土 工袋沿竖直方向叠加而成。The turn-up section is formed by stacking two to six layers of second geotextile bags in turn; the fixed section is formed by stacking two to six layers of third geotechnical bags in the vertical direction.
所述第一土工格栅、第二土工格栅、第三土工格栅采用一体成型。The first geogrid, the second geogrid and the third geogrid are integrally formed.
一种反包式建渣土工袋挡土墙的施工方法,包括如下步骤:A construction method for a reverse-packed construction slag geotechnical bag retaining wall, comprising the following steps:
(1)将待防护处的底层整理平整;(1) Arrange and level the bottom layer of the place to be protected;
(2)以整理平整的底层为基础,根据设计要求确定第一土工格栅、第二土工格栅、第 三土工格栅的长度,并选取相应长度的土工格栅平铺于基层表面;在第一土工格栅上填土 并形成填筑土体,构成加筋段;将第二土工袋叠加在一起并构成第二叠加体,并将第二土 工格栅包裹在第二叠加体的外表面,形成反包段;将第三土工袋沿竖直方向叠加在第三土 工格栅上,构成固定段;待加筋段、反包段、固定段构筑完成后,形成第一个挡墙组件;(2) Based on the leveled bottom layer, determine the lengths of the first geogrid, the second geogrid, and the third geogrid according to the design requirements, and select the corresponding length of the geogrid to spread on the surface of the base; Fill soil on the first geogrid to form a filled soil to form a reinforced section; stack the second geotechnical bags together to form a second stack, and wrap the second geogrid on the outside of the second stack The surface is formed into a turn-up section; the third geotextile is superimposed on the third geogrid in the vertical direction to form a fixed section; after the reinforced section, the turn-up section and the fixed section are constructed, the first retaining wall is formed components;
(3)在第一个挡墙组件的基础,以第一个挡墙组件的上表面为基础,重复步骤(2),形成第二个挡墙组件;如此反复,直至构成第N个挡墙组件。(3) On the basis of the first retaining wall assembly, using the upper surface of the first retaining wall assembly as the basis, repeat step (2) to form a second retaining wall assembly; repeat this until the Nth retaining wall is formed components.
所述步骤2中,将混凝土块和砖块用破碎机破碎、筛分后,按比例装入土工袋内,依据放置位置的不同,分为第二土工袋、第三土工袋。In the
所述步骤1,待防护处有泥土时,需根据需要,去除其上的泥土,并将去除泥土后的底 层整理平整。In the
所述步骤2中,沿从下至上的方向,上下相邻两层第三土工袋之间,下方的第三土工 袋远离加筋段的外缘位于上方的第三土工袋远离加筋段的外缘远离加筋段的方向上。In the
前述反包式建渣土工袋挡土墙的应用。The application of the above-mentioned anti-construction slag geotechnical bag retaining wall.
将前述反包式建渣土工袋挡土墙用于边坡防护中。The aforesaid turn-back type construction slag geobag retaining wall is used for slope protection.
挡土墙是指支承土体、防止土体滑坡或坍塌,以保持土体稳定的构造物;根据挡土墙 的结构形式分为:重力式挡土墙、锚定式挡土墙、薄壁式挡墙、加筋土挡土墙等。其中,重力式挡土墙指的是,依靠挡土墙自身重力抵抗土体侧压力,来维持土体边坡稳定的挡土墙。根据挡土墙的墙背坡度,重力式挡土墙分为仰斜、俯斜、直立三种类型;根据墙背型 式不同,重将力式挡土墙分为普通重力式挡墙、不带衡重台的折线墙背式重力挡墙和衡重 式挡墙。Retaining wall refers to a structure that supports soil, prevents landslide or collapse of soil, and maintains soil stability; according to the structural form of retaining wall, it is divided into: gravity retaining wall, anchored retaining wall, thin-walled retaining wall Retaining walls, reinforced earth retaining walls, etc. Among them, the gravity retaining wall refers to the retaining wall that relies on the retaining wall's own gravity to resist the lateral pressure of the soil mass to maintain the stability of the soil slope. According to the back slope of the retaining wall, the gravity retaining wall is divided into three types: inclined, inclined and upright; The polyline wall-backed gravity retaining wall and the counterweight retaining wall of the counterweight table.
而加筋土挡土墙是指,由填土、填土中布设的拉筋以及墙面板三部分组成的加筋土承 受土体侧压力的挡土墙。加筋土挡土墙是在土中加入土工格栅等筋材,加筋材料与土体之 间的产生摩擦作用,从而抵抗土体的侧向压力,抑制土体变形;同时,土体中的加筋材料 能把土体产生的侧压力削减在土体中,从而使挡土墙的边坡土体维持稳定。加筋土挡土墙 属于柔性支挡结构,对地基变形、边坡滑移的适应性大,其加筋挡土墙的建筑高度也可达 到很大。Reinforced soil retaining wall refers to a retaining wall with reinforced soil composed of three parts: fill, tie bars arranged in the fill and wall panels, which bear the lateral pressure of the soil body. Reinforced earth retaining wall is to add geogrid and other reinforcement materials to the soil, and the friction between the reinforcement material and the soil body can resist the lateral pressure of the soil body and restrain the deformation of the soil body. The reinforced material can reduce the lateral pressure generated by the soil in the soil, thereby maintaining the stability of the slope soil of the retaining wall. Reinforced earth retaining wall is a flexible retaining structure, which has great adaptability to foundation deformation and slope slippage, and the building height of its reinforced retaining wall can also be very large.
进一步,国内外学者对建渣开展了大量的研究,但主要是将废弃混凝土作为再生骨料 应用到钢筋混凝土结构工程和道路工程中,对以建渣为填充物的土工袋挡土墙的研究甚少, 鲜有其研究报道;国内外学者对反包式挡土墙进行了较为广泛的探索,但目前还未见到对 建渣土工袋以反包式连接的加筋挡土墙的相关研究。Further, scholars at home and abroad have carried out a lot of research on construction slag, but mainly apply waste concrete as recycled aggregate to reinforced concrete structural engineering and road engineering, and research on geotechnical bag retaining walls filled with construction slag. There are few research reports on it; domestic and foreign scholars have carried out extensive exploration on the turn-up retaining wall, but so far there is no research on the reinforced retaining wall connected by the turn-up type of construction slag geotechnical bags. Related research.
为此,本申请在现有挡土墙的基础上,提供一种以建渣为基础材料,将其作为土工袋 填料,由重力式挡土墙和加筋土挡土墙相结合的复合式挡土墙结构。同时,发明人通过控 制变量法,研究本申请对挡土墙边坡土体的加固效果;进一步,还研究第一土工格栅长度 对挡土墙边坡加固效果的影响,为本申请在边坡支护工程实践中的应用提供了有力参考。Therefore, based on the existing retaining wall, the present application provides a composite type that uses construction slag as a basic material and uses it as a geotechnical bag filler, which is a combination of a gravity retaining wall and a reinforced soil retaining wall. retaining wall structure. At the same time, the inventor studied the reinforcement effect of the application on the slope soil of the retaining wall through the control variable method; further, the influence of the length of the first geogrid on the reinforcement effect of the retaining wall slope was also studied. The application in the practice of slope support engineering provides a powerful reference.
本申请中,以建渣为原料,将其应用于土工袋边坡支护工程中,有利于减少建筑业对 自然资源的需求和依赖。同时,建渣量大、易得,且近乎零成本,有利于降低挡土墙的建造成本。另外,本申请的建渣土工袋无须进行养护,能够提高施工速度,缩短施工周期, 具有较好的效果。In the present application, the construction slag is used as a raw material, and it is applied to the geobag side slope support project, which is beneficial to reduce the demand and dependence of the construction industry on natural resources. At the same time, the amount of slag is large, easy to obtain, and nearly zero cost, which is conducive to reducing the construction cost of the retaining wall. In addition, the construction slag geotechnical bag of the present application does not need to be maintained, can improve the construction speed, shorten the construction period, and has a good effect.
本申请中,将建筑垃圾中的废弃混凝土块、砖块等用破碎机破碎后,经筛分、按比例 装入土工袋中,形成土工袋,依据作用、位置的不同,分为第二土工袋、第三土工袋。本申请中,土工格栅和土工袋均为柔性材料,土工格栅能够有效地约束土体的侧向位移,增强土体的承载能力;而第二土工袋、第三土工袋不仅具有一定的透水性,且具有一定的变形能力。该结构中,通过加筋段、反包段、固定段的相互作用,能够有效抑制仅采用第三 土工袋时,土工袋之间的相互错动滑移;同时,第二土工袋、第三土工袋在承受压力的作 用下,通过土工袋产生的张力约束袋内的建渣,从而使具土工袋有较高的抗压强度,起到 加固的目的;同时,第二土工袋与第二土工格栅反包相结合,将多个第二土工袋通过第二 土工格栅连为一体,出具有较高的抗压强度外,还具有较好的减震消能及防冻胀特性;进 一步,第三土工格栅与第三土工袋相结合,除能有效避免土工袋内的建渣在自重和外力作 用时下陷外,土工格栅与土体、土工袋与土体之间具有摩擦作用,及土工格栅的网格结构 能对土体产生嵌锁、咬合作用,从而限制土体的侧向变形和极大程度提高土体的承载能力,从而达到加固边坡的作用;而第三土工袋的错位叠加能对土体形成坡面防护,而土工格栅与土体之间的产生的摩擦、嵌锁等的约束作用,能有效保证挡土墙边坡土体的稳定性,形成坡体防护。In this application, after the waste concrete blocks, bricks, etc. in the construction waste are crushed by a crusher, they are screened and put into a geotechnical bag according to the proportion to form a geotechnical bag. bags, third geo bags. In this application, both the geogrid and the geobag are flexible materials, and the geogrid can effectively restrain the lateral displacement of the soil and enhance the bearing capacity of the soil; the second and third geobags not only have certain It is water permeable and has a certain deformation ability. In this structure, through the interaction of the reinforcement section, the turn-up section and the fixed section, the mutual displacement and slippage between the geotextile bags when only the third geotechnical bag is used can be effectively suppressed; at the same time, the second geotechnical bag, the third Under the action of pressure, the slag in the bag is restrained by the tension generated by the geobag, so that the geobag has a higher compressive strength and serves the purpose of reinforcement; at the same time, the second geobag is connected with the second The geogrid is combined with the reverse bag, and a plurality of second geotechnical bags are connected into one through the second geogrid, which not only has high compressive strength, but also has good shock absorption and energy dissipation and anti-frost heave characteristics; further , The combination of the third geogrid and the third geobag, in addition to effectively preventing the construction slag in the geobag from sinking under the action of its own weight and external force, has friction between the geogrid and the soil, between the geobag and the soil , and the grid structure of the geogrid can produce interlocking and occlusal effects on the soil, thereby limiting the lateral deformation of the soil and greatly improving the bearing capacity of the soil, thereby achieving the effect of reinforcing the slope; and the third The dislocation superposition of the geobag can form slope protection for the soil, and the friction and interlocking between the geogrid and the soil can effectively ensure the stability of the soil on the slope of the retaining wall. Slope protection.
综上所述,本申请利用建渣建造反包式建渣土工袋挡土墙,能有效实现建渣的资源化 利用;同时,以建渣作为土工袋填充物,采用加筋段、反包段、固定段构成挡墙组件,从而形成有效的坡体防护。为了验证本申请的效果,发明人通过模型试验,对比了天然土坡、土工袋挡土墙、本申请反包式建渣土工袋挡土墙三种不同工况下的边坡加固效果。实验结果表明:本申请的反包式建渣土工袋挡土墙可增强挡土墙后土体的承载能力,能有效抑制挡土墙坡顶的沉降变形;反包式建渣土工袋挡土墙结构可增强挡土墙的整体性能,能有效抑制挡土墙墙面的侧向变形。此外,在相同条件下第一土工格栅的长度越长,反包式建渣土工袋挡土墙结构边坡加固效果越明显。可见,本申请能够起到有效的边坡加固防护效果,且制作简单、造价便宜、绿色环保、透水性好、取材方便、造价低,尤其适用于海口护岸、 围堰防护、护坡等实际工程中,能够满足实际工程应用的需要,具有重要的使用价值和显 著的社会意义。To sum up, in the present application, the construction slag is used to build a reverse-packed construction slag geotechnical bag retaining wall, which can effectively realize the resource utilization of the construction slag; The package section and the fixed section constitute a retaining wall component, thereby forming an effective slope protection. In order to verify the effect of the present application, the inventor compared the slope reinforcement effect under three different working conditions: natural soil slope, geo-bag retaining wall, and the present application's turn-back construction slag geo-bag retaining wall through model tests. The experimental results show that the retaining wall with the reverse-packed construction slag geotextile bag of the present application can enhance the bearing capacity of the soil behind the retaining wall, and can effectively restrain the settlement deformation of the slope top of the retaining wall; The retaining wall structure can enhance the overall performance of the retaining wall and can effectively restrain the lateral deformation of the retaining wall surface. In addition, under the same conditions, the longer the length of the first geogrid is, the more obvious the reinforcement effect of the slope of the retaining wall structure is. It can be seen that the present application can play an effective slope reinforcement and protection effect, and is simple in manufacture, cheap in cost, green and environmentally friendly, good in water permeability, convenient in material acquisition, and low in cost, and is especially suitable for practical projects such as seaport revetment, cofferdam protection, and slope protection. , can meet the needs of practical engineering applications, has important use value and significant social significance.
附图说明Description of drawings
本发明将通过例子并参照附图的方式说明,其中:The invention will be described by way of example and with reference to the accompanying drawings, in which:
图1为实施例1中模型槽示意图。FIG. 1 is a schematic diagram of a model groove in Example 1. FIG.
图2为基础试验模型设计图。Figure 2 shows the design of the basic experimental model.
图3为不同第一土工格栅长度的模型设计图。Figure 3 is a model design diagram of different lengths of the first geogrid.
图4为模型加载装置图。Figure 4 is a diagram of a model loading device.
图5为百分表布设图。Figure 5 shows the layout of the dial indicator.
图6为土压力盒布设图。Figure 6 shows the layout of the earth pressure cell.
图7为剖面布设图。Figure 7 is a cross-sectional layout diagram.
图8为应变片布设图。Figure 8 shows the layout of the strain gauges.
图9为第一土工格栅铺设及第二土工格栅反包图。Fig. 9 is the first geogrid laying and the second geogrid reverse wrapping diagram.
图10为实施例1中第三土工袋的安放示意图。FIG. 10 is a schematic diagram of the placement of the third geobag in Example 1. FIG.
图11为荷载传递杆图。Figure 11 is a diagram of the load transfer bar.
图12为天然土坡(工况1)试验图。Figure 12 is a test diagram of a natural soil slope (Condition 1).
图13为建渣土工袋挡土墙(工况2)试验图。Figure 13 is the test diagram of the retaining wall with the construction slag geotechnical bag (Condition 2).
图14为0.9m第一土工格栅长度反包式建渣土工袋挡土墙(工况3)试验图。Figure 14 is the test diagram of the 0.9m first geogrid length turn-up slag geobag retaining wall (Condition 3).
图15为工况1、2、3的坡顶荷载与坡顶沉降关系图。Figure 15 shows the relationship between the load on the top of the slope and the settlement on the top of the slope for working
图16为工况1的墙面水平位移与挡土墙高度关系图。Figure 16 is a diagram showing the relationship between the horizontal displacement of the wall surface and the height of the retaining wall in working
图17为工况2的边坡墙面中间和边上的水平位移沿挡土墙高度的变化规律图。Figure 17 is a graph showing the variation rule of the horizontal displacement along the height of the retaining wall in the middle and on the edge of the slope wall in working
图18为工况3的边坡墙面中间和边上的水平位移沿挡土墙高度的变化规律图。Figure 18 is a graph showing the variation rule of the horizontal displacement along the height of the retaining wall in the middle and on the edge of the slope wall in working
图19为建渣土工袋挡土墙(工况2)和0.9m第一土工格栅长度的反包式建渣土工袋挡 土墙(工况3)的墙后侧向土压力分布曲线图。Figure 19 shows the lateral earth pressure distribution behind the wall of the slag geobag retaining wall (Condition 2) and the 0.9m first geogrid length of the turn-back type slag geobag retaining wall (Condition 3) Graph.
图20为工况4、5的试验结果图。FIG. 20 is a graph of the test results of working
图21为工况3、4、5的坡顶荷载与坡顶沉降关系图。Figure 21 shows the relationship between the load on the top of the slope and the settlement on the top of the slope for working
图22为工况4、5的墙面水平位移与挡土墙高度关系图。Figure 22 shows the relationship between the horizontal displacement of the wall surface and the height of the retaining wall in working
图23为工况3、4、5挡土墙的墙后侧向土压力分布图。Figure 23 is the distribution diagram of the lateral earth pressure behind the retaining wall in working
图24为工况4的土工格栅应变曲线图。FIG. 24 is the geogrid strain curve of working
图25为工况3的土工格栅应变曲线图。FIG. 25 is the geogrid strain curve of working
图26为工况5的土工格栅应变曲线图。FIG. 26 is the geogrid strain curve of working
具体实施方式Detailed ways
本说明书中公开的所有特征,或公开的所有方法或过程中的步骤,除了互相排斥的特 征和/或步骤以外,均可以以任何方式组合。All features disclosed in this specification, or all disclosed steps in a method or process, may be combined in any way except mutually exclusive features and/or steps.
本说明书中公开的任一特征,除非特别叙述,均可被其他等效或具有类似目的的替代 特征加以替换。即,除非特别叙述,每个特征只是一系列等效或类似特征中的一个例子而 已。Any feature disclosed in this specification, unless expressly stated otherwise, may be replaced by other equivalent or alternative features serving a similar purpose. That is, unless expressly stated otherwise, each feature is but one example of a series of equivalent or similar features.
实施例1Example 1
(一)试验测试(1) Test test
为了验证本申请的效果,本实施例设置两组模型对比试验,研究反包式建渣土工袋挡 土墙的边坡加固效果,以及第一土工格栅的长度比对本申请反包式建渣土工袋挡土墙边坡 加固的影响。其中,通过天然土坡、建渣土工袋挡土墙、反包式建渣土工袋挡土墙的模型 对比试验,在挡土墙坡顶的顶部施加均布荷载,观察挡土墙在均布荷载作用下的变形和力 学反应,从而确定反包式建渣土工袋挡土墙的边坡加固效果。采用控制变量法开展一组不 同第一土工格栅长度的模型比试验,在挡土墙坡顶的顶部施加均布荷载,通过观察和测量 挡土墙的坡顶荷载、墙面水平位移、坡顶沉降位移、侧向土压力以及土工格栅应变等的大 小和变化规律,拟探究第一土工格栅长度对反包式建渣土工袋挡土墙加固效果的影响。In order to verify the effect of the present application, two sets of model comparison tests are set up in this example to study the slope reinforcement effect of the reverse-packed slag geobag retaining wall, and the length ratio of the first geogrid to the reverse-packed construction of the present application. Influence of soil bag retaining wall slope reinforcement. Among them, through the model comparison test of natural soil slope, construction slag geo-bag retaining wall, and reverse-packed construction slag geo-bag retaining wall, a uniform load was applied to the top of the slope top of the retaining wall. The deformation and mechanical response under the uniform load are determined to determine the slope reinforcement effect of the reverse-packed slag geotechnical bag retaining wall. A set of model ratio tests with different lengths of the first geogrid were carried out by using the control variable method, and a uniform load was applied to the top of the slope top of the retaining wall. The magnitude and change law of top settlement displacement, lateral earth pressure and geogrid strain, etc., it is proposed to explore the influence of the length of the first geogrid on the reinforcement effect of the back-packed slag geobag retaining wall.
1模型设计与制作1 Model design and production
1.1试验原型及模型参数1.1 Test prototype and model parameters
本实施例反包式建渣土工袋挡土墙的原型设计是粉质粘土边坡。为真实反映原始边坡 的实际受力和变形情况,试验模型应与结构原型相似,遵循相似定理,使其满足材料相似、 荷载相似、几何相似等。为试验和研究需要,将模型槽根据实际尺寸按1:4进行试验,并以 此作为试验结构的模型。The prototype design of the reverse-packed slag geobag retaining wall in this embodiment is a silty clay slope. In order to truly reflect the actual stress and deformation of the original slope, the test model should be similar to the structural prototype and follow the similarity theorem, so that it satisfies material similarity, load similarity, and geometric similarity. For testing and research needs, the model tank is tested at 1:4 according to the actual size, and it is used as the model of the test structure.
1.2模型槽设计1.2 Model slot design
根据挡土墙的结构原型与试验模型的相似比为1∶4,试验的模型槽也按照相似比1∶4进 行制作。模型槽的尺寸大小为:长×宽×高=2.43×1.06×1.60m,模型槽材料采用12号工 字钢和14号工字钢焊接而成,模型槽框架的三面用相同的角钢进行加固处理。模型槽挡板 材料侧边两面使用木板,正面由2.43×1.60m的钢化玻璃代替,方便观察加载过程中挡土墙 的破坏变化,见图1所示。According to the similarity ratio between the structural prototype of the retaining wall and the test model is 1:4, the model groove of the test is also made according to the similarity ratio of 1:4. The size of the model groove is: length × width × height = 2.43 × 1.06 × 1.60m, the model groove material is welded with No. 12 I-beam and No. 14 I-beam, and the three sides of the model groove frame are reinforced with the same angle steel deal with. Model groove baffle The two sides of the material are wooden boards, and the front is replaced by 2.43×1.60m tempered glass, which is convenient to observe the damage change of the retaining wall during the loading process, as shown in Figure 1.
1.3模型设计1.3 Model Design
本试验挡土墙的坡比为1:0.5,土坡高度为1.5m,挡土墙长度为1m,挡土墙支护宽度 为0.37m的条件下,统一在挡土墙模型的顶部紧挨着建渣土工袋处施加0.9m×0.5m的均布 荷载,研究反包式建渣土工袋挡土墙的边坡支护效果。In this test, the slope ratio of the retaining wall is 1:0.5, the height of the soil slope is 1.5m, the length of the retaining wall is 1m, and the supporting width of the retaining wall is 0.37m. A uniform load of 0.9m×0.5m is applied to the site where the construction slag geotextile bag is placed, and the slope support effect of the retaining wall with the reverse-packed construction slag geotechnical bag is studied.
本试验的二组对比模型试验设计图:The design diagram of the two groups of comparative model experiments in this experiment:
(1)基础实验:在坡比为1:0.5时,研究天然土坡(简称工况1)、建渣土工袋挡土墙(简称工况2)、第一土工格栅长度为0.9m的反包式建渣土工袋挡土墙(简称工况3);三 种不同工况下挡土墙的模型设计图,见图2所示。图2中,a、b、c依次对应工况1、工况 2、工况3。(1) Basic experiment: When the slope ratio is 1:0.5, the natural soil slope (referred to as working condition 1), the retaining wall of the slag geotechnical bag (referred to as working condition 2), and the length of the first geogrid are 0.9m. Figure 2 shows the model design drawings of the retaining wall under three different working conditions. In Figure 2, a, b, and c correspond to working
(2)在相同坡比1:0.5情况下,研究本申请中,第一土工格栅长度不同对反包式建渣 土工袋挡土墙边坡加固效果的影响,即为:第一土工格栅长度0.5m(简称工况4,如图3a所示)、第一土工格栅长度0.9m(简称工况3,如图3b所示)、第一土工格栅长度1.3m(简 称工况5,如图3c所示)。反包式建渣土工袋挡土墙第一土工格栅长度不同工况下的模型设 计图,见图3所示。(2) In the case of the same slope ratio of 1:0.5, the influence of the different lengths of the first geogrid on the slope reinforcement effect of the reverse-packed slag geobag retaining wall in the present application is studied, namely: the first geogrid The length of the grid is 0.5m (referred to as working
1.4试验材料1.4 Test materials
(1)坡体材料(1) Slope material
挡土墙的墙后土体采用的是四川地区常见的粉质粘土,其物理力学指标按照《土木实 验规程》(SL237—1999)进行土工实验测得,边坡土体物理力学指标,见下表1所示。The soil behind the retaining wall is silty clay common in Sichuan, and its physical and mechanical indexes are measured by geotechnical experiments in accordance with the "Civil Experiment Regulations" (SL237-1999). The physical and mechanical indexes of the slope soil are shown below. shown in Table 1.
表1边坡土体物理力学指标Table 1 Slope soil physical and mechanical indicators
(2)建渣土工袋(2) Construction waste geotechnical bag
土工袋原尺寸为440mm×815mm,按照几何相似比1:4对土工袋进行缩尺,因此模型试 验用土工袋尺寸为110mm×204mm。本次模型试验采用的土工袋为绿色环保的高聚物绿色 编织袋。其极限抗拉强度不小于30kN/m,断裂伸长率≤30%;土工布网孔尺寸按照设计要 求。主要技术指标要求,见表2所示。The original size of the geotechnical bag is 440mm×815mm, and the geotechnical bag is scaled according to the geometric similarity ratio of 1:4, so the size of the geotechnical bag used in the model test is 110mm×204mm. The geotextile bag used in this model test is a green high-polymer green woven bag that is environmentally friendly. The ultimate tensile strength is not less than 30kN/m, and the elongation at break is less than or equal to 30%; the mesh size of the geotextile is in accordance with the design requirements. The main technical index requirements are shown in Table 2.
表2土工布主要技术指标Table 2 Main technical indicators of geotextiles
根据前期试验结果,将建渣作为土工袋填充物时,废弃混凝土块和废弃砖块含量各为 50%时建渣土工袋的强度最佳。因此,本次试验建渣土工袋的填充物为50%的混凝土块和 50%的砖块。按照几何相似比1:4对废弃混凝土块和废弃砖块的粒径进行缩尺,缩尺后的集 料各粒径含量不变。According to the previous test results, when the construction slag is used as the filling of the geotextile bag, the strength of the construction slag geotechnical bag is the best when the content of waste concrete blocks and waste bricks is 50%. Therefore, the filling of the slag geotextile bag in this experiment is 50% concrete blocks and 50% bricks. According to the geometric similarity ratio of 1:4, the particle sizes of the waste concrete blocks and the waste bricks are scaled down, and the content of each particle size of the aggregates after the scale down remains unchanged.
利用颚式破碎机对建渣进行破碎,然后在进行粒径筛分,按照建渣土工袋的填充度80% 对土工袋进行装袋。The construction slag is crushed by a jaw crusher, and then the particle size is screened, and the geotechnical bag is bagged according to the filling degree of the construction slag geotechnical bag is 80%.
(4)土工格栅(4) Geogrid
本次试验采用的土工格栅为高密度聚乙烯双向拉伸塑料土工格栅,聚乙烯双向拉伸土 工格栅具有强度大、蠕变小、承载力强、抗腐蚀、防老化、摩擦系数大等优点。其主要性能参数要求,见表3所示。The geogrid used in this test is a high-density polyethylene biaxially stretched plastic geogrid. The polyethylene biaxially stretched geogrid has high strength, low creep, strong bearing capacity, corrosion resistance, anti-aging, and large friction coefficient. Etc. Its main performance parameter requirements are shown in Table 3.
表3土工格栅性能参数Table 3 Geogrid performance parameters
2加载装置2 loading device
模型试验是采用1:4相似比例进行试验,按照相似定理,模型不仅要满足相似比,还 应要满足荷载相似的条件。因此,按照相似比换算的荷载值较小,本次试验采用较为方便 实施的杠杆加载,杠杆加载系统是由杠杆、砝码、配重、砝码盘、铰接点以及荷载传递杆组成。The model test is carried out with a 1:4 similarity ratio. According to the similarity theorem, the model should not only meet the similarity ratio, but also meet the conditions of similar loads. Therefore, the load value converted according to the similarity ratio is small. This test adopts the lever loading which is more convenient to implement. The lever loading system is composed of levers, weights, counterweights, weight plates, hinge points and load transmission rods.
加载区域为土工袋墙后的边坡顶面,为防止在加载过程中加载板中间凹陷两边翘起, 使受力均匀分布,则设置两块加载钢板。其尺寸为0.9m×0.5m×10mm、0.3m×0.3m×20mm(长×宽×厚)。防止加载时加载砝码过重,导致加载装置侧翻,在加载装置侧边用钢条连接成网条,方便堆积重物,同时将加载装置侧边使用膨胀螺栓将其固定在地中。本申请试验采用杠杆加载的方法是在平衡杠杆自重(配重为杠杆加载装置自重)时进行加载,杠杆比例为1:7,如图4所示。The loading area is the top surface of the slope behind the geobag wall. In order to prevent the two sides of the depression in the middle of the loading plate from lifting up during the loading process, so that the force is evenly distributed, two loading steel plates are set. Its dimensions are 0.9m×0.5m×10mm, 0.3m×0.3m×20mm (length×width×thickness). To prevent the loading weight from being too heavy during loading, causing the loading device to roll over, connect the side of the loading device with steel bars to form a mesh, which is convenient for stacking heavy objects, and at the same time use expansion bolts on the side of the loading device to fix it in the ground. The method of lever loading used in this application test is to load when balancing the dead weight of the lever (the counterweight is the dead weight of the lever loading device), and the lever ratio is 1:7, as shown in Figure 4.
对挡土墙坡顶进行分级加载作用,直至加载荷载板形成均布荷载,每10分钟测定一次 数据,其中包括观测和记录坡顶的沉降位移以及挡土墙坡面的水平位移,直至数据稳定再 进行下一级加载。Load the top of the retaining wall in stages until the loading plate forms a uniform load, and measure the data every 10 minutes, including observing and recording the settlement displacement of the top of the slope and the horizontal displacement of the slope of the retaining wall until the data is stable Then proceed to the next level of loading.
3测试内容及测试元件布设3 Test content and test component layout
本次模型试验中,测试的内容有:挡土墙的坡顶破坏荷载、坡顶沉降位移、墙面水平 位移、侧向土压力的大小及变化情况。In this model test, the test contents include: the failure load of the slope top of the retaining wall, the settlement displacement of the slope top, the horizontal displacement of the wall surface, and the magnitude and change of the lateral earth pressure.
3.1坡顶极限荷载3.1 Ultimate load at the top of the slope
坡顶破坏荷载,是指在试验过程中挡土墙坡顶使用杠杆施加均布荷载,当施加的均布 荷载基本不变或有所减小而坡顶沉降迅速增大,坡体产生明显贯通性裂缝,坡体发生破坏 时的坡顶均布荷载称为坡顶破坏荷载。The failure load at the top of the slope refers to the use of levers to apply a uniform load on the top of the retaining wall during the test. When the applied uniform load is basically unchanged or reduced, the settlement of the top of the slope increases rapidly, and the slope is obviously connected. The uniform load on the top of the slope when the slope is damaged is called the failure load on the top of the slope.
3.2坡顶沉降位移3.2 Settlement displacement of slope top
挡土墙的坡顶沉降位移,是指在挡土墙坡顶均布荷载的作用下,挡土墙坡顶的竖向沉 降变形的大小。在挡土墙坡顶加载区域的荷载板上布设百分表(50mm)读取坡顶的竖向沉 降位移。The settlement displacement of the top of the retaining wall refers to the vertical settlement and deformation of the top of the retaining wall under the action of uniformly distributed loads on the top of the retaining wall. A dial indicator (50mm) is arranged on the load plate in the loading area of the top of the retaining wall to read the vertical settlement displacement of the top of the slope.
3.3墙面水平位移3.3 Horizontal displacement of the wall
挡土墙边坡的水平位移,是指在挡土墙坡顶施加均布荷载的作用下,土体被压实后由 于模型槽三面侧边的约束,使挡土墙边坡土体整体向外移动,从而使挡土墙边坡发生水平 位移。挡土墙边坡土体的水平位移由布设的百分表(50mm和30mm量程)读取。共需要10只百分表,水平方向沿高度布设5排百分表,每排2个用以测量不同边坡高度的水平位移,布设位置见图5所示;其中,图5(a)为百分表示意图,图5(b)为百分表布设实景 图。The horizontal displacement of the retaining wall slope means that under the action of uniformly distributed load applied to the top of the retaining wall slope, after the soil is compacted, due to the constraints of the three sides of the model groove, the overall direction of the retaining wall slope soil is move out, so that the slope of the retaining wall is displaced horizontally. The horizontal displacement of the soil mass on the slope of the retaining wall is read by the dial indicator (50mm and 30mm range). A total of 10 dial indicators are required, and five rows of dial indicators are arranged along the height in the horizontal direction, and each row is used to measure the horizontal displacement of different slope heights. The layout positions are shown in Figure 5; among them, Figure 5(a) is Schematic diagram of the dial indicator, Figure 5(b) is the actual layout of the dial indicator.
3.4侧向土压力3.4 Lateral earth pressure
侧向土压力,是指在挡土墙坡顶施加均布荷载的作用下,土体产生向外的土压力。本 次试验测量的侧向土压力,是在边坡土体边缘10cm处埋设微型应变式土压力盒,连接静态 电阻应变仪测得应变值,经率定参数换算求得。土压力计算公式:Ρ=με*K式中:Ρ为压力值(k Pa),με为应变量,K为率定系数。Lateral earth pressure refers to the outward earth pressure generated by the soil mass under the action of uniformly distributed loads on the top of the retaining wall. The lateral earth pressure measured in this test is obtained by burying a micro-strain earth pressure cell at 10 cm from the edge of the slope soil, and connecting the static resistance strain gauge to measure the strain value, which is converted by the calibration parameters. Earth pressure calculation formula: Ρ=με*K In the formula: P is the pressure value (k Pa), με is the strain variable, and K is the rate coefficient.
为减少实验的误差,在土压力盒布设的位置铺设一层细的粉质黏土。在埋设土压力盒 的时候,需要将土压力盒竖直埋放,测量挡土墙相应位置的侧向土压力。本次试验共需要 12只100kPa的土压力盒,布设位置见图6所示,剖面布设图,见图7所示。In order to reduce the experimental error, a layer of fine silty clay was laid on the location where the earth pressure cell was laid. When burying the earth pressure box, it is necessary to bury the earth pressure box vertically, and measure the lateral earth pressure at the corresponding position of the retaining wall. A total of 12 earth pressure cells of 100kPa are required for this test. The layout position is shown in Figure 6, and the section layout is shown in Figure 7.
3.5土工格栅应变测试3.5 Geogrid strain test
土工格栅的应变,指在挡土墙坡顶施加均布荷载的作用下,土工格栅局部发生相应的 变形。试验土工格栅的应变,是在沿第一土工格栅长度方向上布设应变片,连接静态电阻 应变仪测得应变值。本次模型试验是在挡土墙高度的60cm、90cm处的土工格栅加筋段沿 第一土工格栅长度方向中间部位等间距布设5个应变片。应变片的布设图,见图8所示。The strain of the geogrid refers to the local deformation of the geogrid under the action of a uniform load applied to the top of the retaining wall slope. To test the strain of the geogrid, the strain gauge is arranged along the length of the first geogrid, and the strain value is measured by connecting the static resistance strain gauge. In this model test, five strain gauges were arranged at equal intervals along the middle part of the length of the first geogrid in the reinforced section of the geogrid at the height of 60cm and 90cm of the retaining wall. The layout of the strain gauge is shown in Figure 8.
本实施例中,应变片的粘贴和接线步骤如下:In this embodiment, the steps of pasting and wiring the strain gauge are as follows:
(1)在裁剪好的土工格栅上,在需粘贴应变片相应的位置做好标记;(1) On the cut geogrid, mark the corresponding position where the strain gauge needs to be pasted;
(2)将砂纸成45°多次来回打磨标记处的土工格栅,使应变片更好固定在土工格栅上;(2) Grinding the geogrid at the mark with the sandpaper at 45° for several times, so that the strain gauge can be better fixed on the geogrid;
(3)用502胶水粘贴应变片时,用一块聚乙烯塑料薄膜覆盖在应变片上按压赶走502 胶水中的气泡,使土工格栅与应变片更好的贴合,保证土工格栅的受力情况能够较好的传 送给应力片检测;(3) When pasting the strain gauge with 502 glue, cover the strain gauge with a piece of polyethylene plastic film and press it to drive away the air bubbles in the 502 glue, so that the geogrid and the strain gauge can fit better and ensure the force of the geogrid The situation can be better transmitted to the stress gauge inspection;
(4)将应变片贴好后,用万能表检查应变片是否有破碎,贴合是否满足要求;(4) After attaching the strain gauge, use a multimeter to check whether the strain gauge is broken and whether the fit meets the requirements;
(5)待应变片粘贴牢固后,将应变片接线后需再用万用表检查是否为通路,同时在电 线末端贴上所在测点名称的标签。(5) After the strain gage is firmly attached, use a multimeter to check whether it is a path after connecting the strain gage, and attach a label with the name of the measuring point to the end of the wire.
4模型试验过程4 Model test process
4.1模型槽搭设4.1 Model slot erection
为观测试验过程中挡土墙坡体的变形与破坏变化情况,将模型槽一侧设有透明的钢化 玻璃。钢化玻璃虽抗压强度高,但易碎;因此在搭设模型槽时用橡胶贴合工字钢与钢化玻 璃的接触面,使钢化玻璃受力均匀。为减小模型槽侧壁对挡土墙模型试验的影响,应将挡 土墙侧壁清洗干净,涂抹一层润滑硅脂,再贴一层塑料薄膜。In order to observe the deformation and damage changes of the retaining wall slope during the test, a transparent tempered glass was installed on one side of the model groove. Although tempered glass has high compressive strength, it is fragile; therefore, when setting up the model groove, use rubber to fit the contact surface between the I-beam and the tempered glass, so that the tempered glass is evenly stressed. In order to reduce the influence of the sidewall of the model groove on the model test of the retaining wall, the sidewall of the retaining wall should be cleaned, smeared with a layer of lubricating silicone grease, and then pasted with a layer of plastic film.
4.2挡土墙模型制作4.2 Model making of retaining wall
按照模型试验的设计方案,根据土工格栅的第一土工格栅长度、反包段和固定段的长 度,确定土工格栅的裁剪长度,根据模型的宽度确定土工格栅的裁剪宽度,在试验开始前, 将土工格栅裁剪成相应尺寸,并将应变片粘贴和接线在相应布设的部位。三种不同第一土 工格栅长度的土工格栅裁剪长度,见表4所示。According to the design scheme of the model test, the cutting length of the geogrid is determined according to the length of the first geogrid, the length of the turn-up section and the fixed section of the geogrid, and the cutting width of the geogrid is determined according to the width of the model. Before starting, cut the geogrid to the corresponding size, and paste and wire the strain gauge in the corresponding layout. The cutting lengths of geogrids with three different first geogrid lengths are shown in Table 4.
表4不同第一土工格栅长度的土工格栅裁剪长度Table 4 Geogrid cutting lengths with different first geogrid lengths
制作过程如下。The production process is as follows.
(1)首先,模型槽的底部需铺设厚度为0.1m的夯实土体(即本申请的底层),将其作为模型试验的垫层。(1) First, a rammed soil body with a thickness of 0.1 m (that is, the bottom layer of the present application) needs to be laid at the bottom of the model groove, which is used as the cushion for the model test.
(2)铺设土工格栅和建渣土工袋:将土工格栅铺设在填土中,将反包段和固定段的土 工格栅长度预留出来,保证土工格栅的加筋(即本申请中的第一土工格栅)长度;土工格栅必须按水平铺设,且与墙面垂直。将建渣土工袋安放在挡土墙土体坡面的位置(上下两层土工袋交错布置),垒起30cm高度的建渣土工袋;再将预留的反包段土工格栅(即本申 请的的第二土工格栅)包裹住垒起的建渣土工袋(即本申请中的第二土工袋),再用U型钉 将固定段的土工格栅(即本申请的第三土工格栅)锚固到夯实的土体中;在第一土工格栅 上填土并形成填筑土体,构成加筋段;最后,将第三土工袋沿竖直方向叠加在第三土工格 栅上,构成固定段。土工格栅铺设见图9所示(其中,图9(a)为第一土工格栅铺设图, 图9(b)为第二土工格栅反包图),第三土工袋的安放见图10所示(其中,图10a为俯视 图,图10b为主视图)。(2) Laying geogrids and construction slag geotextiles: Lay the geogrids in the filling, and reserve the length of the geogrids in the turn-up section and the fixed section to ensure the reinforcement of the geogrids (that is, the The length of the first geogrid in the application); the geogrid must be laid horizontally and perpendicular to the wall. Place the construction slag geotechnical bag on the slope of the retaining wall soil (the upper and lower layers of geotechnical bags are staggered), and build a 30cm-high construction slag geotechnical bag; That is, the second geogrid of this application) wraps the built-up slag geotechnical bag (that is, the second geotechnical bag in this application), and then uses U-shaped nails to fix the geogrid of the fixed section (that is, the geotechnical bag of this application). The third geogrid) is anchored into the rammed soil; the soil is filled on the first geogrid to form a filled soil to form a reinforced section; finally, the third geobag is vertically superimposed on the third geogrid On the geogrid, a fixed section is formed. The laying of the geogrid is shown in Fig. 9 (wherein, Fig. 9(a) is the laying diagram of the first geogrid, and Fig. 9(b) is the reverse wrapping diagram of the second geogrid), and the placement of the third geogrid is shown in Fig. 10 (wherein, FIG. 10a is a top view, and FIG. 10b is a front view).
(3)填土和夯实:本次模型试验的挡土墙高1.5m,采用分层回填、分层夯实土体的方 法进行填土和夯实。为使土体的密度均匀且达到1.5g/cm3,试验按每层15cm的土体厚度进 行分层填压,共进行十次填土和夯实。(3) Filling and compaction: The retaining wall in this model test is 1.5m high, and the method of layered backfill and layered compacted soil is used for filling and compaction. In order to make the density of the soil uniform and reach 1.5g/cm 3 , the test was carried out in layers with a thickness of 15 cm for each layer of soil, and a total of ten times of filling and tamping were performed.
按照设计和规范要求,以及已知试验所用粉质粘土的密度,计算每层回填所需粉质粘 土的重量。在分层回填时按照每层所需回填土的重量进行回填,然后再夯实到相应高度。 当夯实到上一层挡墙组件的底标高时,铺设上一层挡墙组件。在夯实土体时,先从土工格 栅尾端进行,填土需要充分压实使回填土的压实度达到相应的高度。同时,在填充土体和 铺设土工格栅的过程中,还需按照土压力盒布设图在土体的相应位置中布设土压力盒。Calculate the weight of silty clay required for each layer of backfill according to the design and specification requirements and the known density of the silty clay used in the test. When backfilling in layers, backfill is carried out according to the weight of the required backfill soil for each layer, and then compacted to the corresponding height. When tamped to the bottom level of the upper layer of retaining wall components, lay the upper layer of retaining wall components. When compacting the soil, start from the end of the geogrid first, and the backfill needs to be fully compacted so that the compaction degree of the backfill reaches the corresponding height. At the same time, in the process of filling the soil and laying the geogrid, it is also necessary to arrange the earth pressure cells in the corresponding positions of the soil according to the earth pressure cell layout diagram.
4.3加载板安装4.3 Loading board installation
在反包式建渣土工袋挡土墙模型制作完成后,为使挡土墙受力均匀,需将挡土墙坡顶 的土体夯实平整。将0.9m×0.5m的加载钢板放置于紧靠着坡顶建渣土工袋挡土墙后的边坡 顶面,通过传力杆组合连接,外部采用杠杆加载装置施加均布荷载。After the model of the retaining wall with the anti-construction slag geobag is completed, in order to make the retaining wall evenly stressed, the soil at the top of the retaining wall needs to be compacted and leveled. A 0.9m×0.5m loaded steel plate is placed on the top surface of the slope behind the retaining wall of the slag geotechnical bag close to the top of the slope, connected by a combination of dowel rods, and a lever loading device is used externally to apply a uniform load.
一般传统的荷载板和杠杆加载装置衔接传力设置为固接,但当坡体发生沉降,杠杆向 下转动倾斜,使得杠杆对挡土墙坡顶施加的力不再是竖直向下。而本文对杠杆加载系统采 用球形铰接的方式连接杠杆和荷载传递杆,荷载传递杆上焊接一个直径为30mm的钢珠, 再将钢珠的上半部分嵌入薄壁圆桶的凹槽内,将凹槽与一块厚20mm的钢板焊接好后固定 在杠杆上,从而保证杠杆施加的力垂直向下,如图11所示。Generally, the connection force transmission between the traditional load plate and the lever loading device is set to be fixed, but when the slope body settles, the lever rotates downward and tilts, so that the force exerted by the lever on the slope top of the retaining wall is no longer vertically downward. In this paper, the lever loading system uses spherical hinges to connect the lever and the load transfer rod. A steel ball with a diameter of 30mm is welded on the load transfer rod, and then the upper half of the steel ball is embedded in the groove of the thin-walled barrel, and the groove is connected with a piece of steel ball. The steel plate with a thickness of 20mm is welded and fixed on the lever, so as to ensure that the force exerted by the lever is vertically downward, as shown in Figure 11.
4.4测量仪器连接4.4 Measuring instrument connection
应变片测量部位固定于土工格栅受拉处,应变片与导线的连接通过电焊锡焊连接,全 部固定完毕后,使用万用表检测应变片是否正常工作,电阻显示120Ω即表示正常。应变片 采用1/4桥法接应变仪,其中红线接+Eg端,黑线接Vi``端。每一单元接一个温度补偿片, 温度补偿片的红线接+Eg端,黑线接Comp端。The measuring part of the strain gauge is fixed at the tensile place of the geogrid, and the connection between the strain gauge and the wire is connected by electric soldering. After all fixing is completed, use a multimeter to check whether the strain gauge is working normally, and the resistance shows 120Ω, which means it is normal. The strain gauge is connected to the strain gauge by the 1/4 bridge method, in which the red wire is connected to the +Eg terminal, and the black wire is connected to the Vi`` terminal. Each unit is connected to a temperature compensation film, the red wire of the temperature compensation film is connected to the +Eg terminal, and the black wire is connected to the Comp terminal.
土压力盒由于自带温度补偿,所以本次试验采用全桥法连接TST3826F-L静态电阻应变 仪,其中红线接+Eg端,白线接Vi+端,黑线接-Eg端,白线接Vi-端。在连接应变仪之前,需要用万用表检测土压力盒是否正常工作,电阻显示350Ω即表示正常。Because the earth pressure cell has its own temperature compensation, the full bridge method is used to connect the TST3826F -L static resistance strain gauge in this test. Vi - end. Before connecting the strain gauge, it is necessary to use a multimeter to check whether the earth pressure cell is working properly. The resistance display of 350Ω means it is normal.
4.5测试4.5 Testing
进入TST3826F-L静态电阻应变仪的测试系统,根据土压力盒以及应变的相应参数,调 节每个测点通道参数。设定应变片连接方式为1/4桥带补偿,电阻值为120Ω;设定土压力 盒连接方式为全桥,电阻值350Ω。首先平衡系统,再进行清零,新建相应的文本文件,然 后开始试验。Enter the test system of the TST3826F-L static resistance strain gauge, and adjust the channel parameters of each measuring point according to the corresponding parameters of the earth pressure cell and strain. The connection mode of the strain gauge is set to 1/4 bridge with compensation, and the resistance value is 120Ω; the connection mode of the earth pressure cell is set to be full bridge, and the resistance value is 350Ω. First balance the system, then clear it, create a corresponding text file, and then start the test.
通过杠杆进行分级加载。每加载一级,观测坡顶竖向沉降位移和坡体水平位移变化, 每间隔10分钟读取百分表和土压力盒以及土工格栅应变的读数,数据稳定后进行下一级加 载,直到挡土墙破坏时试验结束。Staged loading via levers. For each loading level, observe the vertical settlement displacement of the top of the slope and the change of the horizontal displacement of the slope body, and read the dial indicator, the earth pressure cell and the strain reading of the geogrid every 10 minutes. After the data is stable, proceed to the next level of loading until the The test ends when the retaining wall fails.
(二)模型试验数据处理与结果分析(2) Model test data processing and result analysis
5基础实验支护效果对比分析5. Comparative analysis of supporting effect of basic experiments
5.1坡顶沉降位移分析5.1 Analysis of settlement and displacement of slope top
天然土坡(工况1),在坡顶竖直向下的均布荷载的作用下,当荷载加载到14.28kPa时, 天然土坡坡面发生倾覆性破坏,坡顶最终沉降位移为21.47mm。天然土坡加载前后的试验 照片,见图12所示。其中,图12(a)为加载前的试验图,图12(b)为加载后的试验图。Natural soil slope (Condition 1), under the action of the uniformly distributed load vertically downward from the top of the slope, when the load is loaded to 14.28kPa, the natural soil slope surface is overturned, and the final settlement displacement of the top of the slope is 21.47mm . Figure 12 shows the test photos of the natural soil slope before and after loading. Among them, Fig. 12(a) is a test diagram before loading, and Fig. 12(b) is a test diagram after loading.
建渣土工袋挡土墙(工况2),开始加载阶段,在坡顶竖直向下的均布荷载作用下,土体 逐渐被压实,坡顶沉降位移较大;随着荷载的增大,由于土体已被压实,坡顶沉降位移增 加幅度减小。在加载到28.56kPa时,建渣土工袋挡土墙坡顶的最终沉降位移为39.23mm。建渣土工袋挡土墙加载前后的试验照片,见图13所示。其中,图13(a)为加载前的试验 图,图13(b)为加载后的试验图。At the beginning of the loading stage, the soil is gradually compacted and the settlement displacement of the top of the slope is relatively large under the action of the uniformly distributed load vertically downward from the top of the slope. Increase, because the soil has been compacted, the increase in the settlement displacement of the top of the slope decreases. When loaded to 28.56kPa, the final settlement displacement of the top of the retaining wall with the slag geotextile bag is 39.23mm. Figure 13 shows the test photos of the retaining wall before and after the construction slag geobag retaining wall is loaded. Among them, Fig. 13(a) is the test picture before loading, and Fig. 13(b) is the test picture after loading.
第一土工格栅长度0.9m的反包式建渣土工袋挡土墙(工况3),在加载过程中挡土墙的 坡顶沉降位移与建渣土工袋挡土墙的加载结果相似。坡顶破坏荷载为44.43kPa时,挡土墙 的坡顶沉降位移为47.59mm,如图3所示;其中,图13(a)为加载前的试验图,图13(b)为加载后的沉降变形图。The first geogrid length is 0.9m for the reverse-packed slag geobag retaining wall (Condition 3), the settlement displacement of the top of the retaining wall during the loading process and the loading result of the slag geobag retaining wall resemblance. When the failure load at the top of the slope is 44.43kPa, the settlement displacement of the top of the retaining wall is 47.59mm, as shown in Figure 3; among them, Figure 13(a) is the test picture before loading, and Figure 13(b) is after loading. Subsidence deformation diagram.
三种不同工况下(工况1、工况2、工况3)挡土墙的坡顶均布荷载与坡顶沉降位移的关系图,如图15所示。从图15可以得出:在加载初始阶段,土体逐渐在荷载的作用下被 压实,三种不同工况下的坡顶沉降位移均变化较大;随着坡顶均布荷载的不断增大,但土 体已经密实,挡土墙的坡顶沉降位移变化幅度减小。与天然土坡和建渣土工袋挡土墙相比,反包式建渣土工袋挡土墙结构坡顶承受的均布荷载增大;且在相同均布荷载的作用下,坡顶沉降位移减小。Figure 15 shows the relationship between the uniformly distributed load on the top of the retaining wall and the settlement displacement of the top of the retaining wall under three different working conditions (
5.2墙面水平位移分析5.2 Analysis of the horizontal displacement of the wall
天然土坡(工况1)的边坡墙面中间和边上的水平位移沿挡土墙高度的变化规律,如图 16所示。其中,图16(a)为工况1墙面中间水平位移图,图16(b)为工况1墙面边上水 平位移图。在坡顶均布荷载的作用下,由于天然土坡的边坡坡面无任何加固措施,随着坡 顶均布荷载的不断增大,天然土坡坡面的水平位移随着挡土墙高度方向呈现先增大后减小的变化规律。The variation law of the horizontal displacement along the height of the retaining wall along the middle and edge of the slope wall of the natural soil slope (Condition 1) is shown in Figure 16. Among them, Fig. 16(a) is the horizontal displacement diagram in the middle of the wall in working
建渣土工袋挡土墙(工况2)的边坡墙面中间和边上的水平位移沿挡土墙高度的变化规 律,如图17所示。其中,图17(a)为工况2墙面中间水平位移图,图17(b)为工况2 墙面边上水平位移图。开始加载阶段,由于建渣土工袋对土体边坡的约束,挡土墙面的水 平位移较小。随着坡顶均布荷载的不断增大,由建渣土工袋堆砌而成的挡土墙的整体墙面 水平位移逐渐增大。Figure 17 shows the variation law of the horizontal displacement along the height of the retaining wall along the middle and edge of the slope wall of the slag geobag retaining wall (Condition 2). Among them, Fig. 17(a) is the horizontal displacement diagram in the middle of the wall in working
建渣土工袋挡土墙的墙面水平位移呈鼓型分布,随挡土墙的高度先增大后减小的变化 规律,其中墙面最大的水平位移出现在挡土墙1/2~2/3处。由于模型槽侧壁对其挡土墙有一 定的约束作用,从而使挡土墙墙面边上的水平位移比墙面中间的水平位移有一定的减小, 但也呈现相似的规律分布。The horizontal displacement of the wall surface of the slag geotechnical bag retaining wall is distributed in a drum shape, and it first increases and then decreases with the height of the retaining wall. 2/3. Since the sidewall of the model groove has a certain restraint effect on its retaining wall, the horizontal displacement on the edge of the retaining wall is somewhat smaller than the horizontal displacement in the middle of the wall, but it also presents a similar regular distribution.
第一土工格栅长度为0.9m的反包式建渣土工袋挡土墙(工况3)的边坡墙面中间和边 上的水平位移沿挡土墙高度的变化规律,如图18所示。其中,图18(a)为工况3墙面中 间水平位移图,图18(b)为工况3墙面边上水平位移图。开始加载阶段,反包式建渣土工 袋挡土墙在土工格栅建渣土工袋的加固作用下,土工袋对土体边坡的约束以及土工格栅对 土体有一定的嵌锁和咬合作用,从而使得反包式建渣土工袋挡土墙的墙面水平位移较小; 随着坡顶均布荷载的不断增大,其挡土墙的整体墙面水平位移才逐渐增大。第一土工格栅 长度为0.9m的反包式建渣土工袋挡土墙的墙面水平位移变化规律也呈鼓型分布,与建渣土工大挡土墙的变化规律相似。The variation law of the horizontal displacement along the height of the retaining wall in the middle and on the edge of the side slope wall of the 0.9m-long reverse-packed slag geobag retaining wall (Condition 3), as shown in Figure 18 shown. Among them, Fig. 18(a) is the horizontal displacement diagram in the middle of the wall in working
5.3侧向土压力分析5.3 Lateral earth pressure analysis
图19为建渣土工袋挡土墙(工况2)和0.9m第一土工格栅长度的反包式建渣土工袋挡 土墙(工况3)的墙后侧向土压力分布曲线图。由图可知,挡土墙的墙后侧向土压力并非呈 三角形分布,且在墙高约1/3~2/3处的侧向土压力最大;由于模型槽侧壁的约束作用,而位 于挡土墙边上的侧向土压力相对减小。结合挡土墙的墙面水平位移分析,同一挡土墙高度 处产生的最大侧向土压力处与墙面最大水平位移处均出现在挡土墙的墙高约1/3~2/3处;侧 向土压力越大的地方,其挡土墙的墙面水平位移越大。Figure 19 shows the lateral earth pressure distribution behind the wall of the slag geobag retaining wall (Condition 2) and the 0.9m first geogrid length of the turn-back type slag geobag retaining wall (Condition 3) Graph. It can be seen from the figure that the lateral earth pressure behind the retaining wall is not triangularly distributed, and the lateral earth pressure is the largest at about 1/3 to 2/3 of the wall height; The lateral earth pressure on the edge of the retaining wall is relatively reduced. Combined with the analysis of the horizontal displacement of the retaining wall, the maximum lateral earth pressure generated at the same height of the retaining wall and the maximum horizontal displacement of the wall both appear at about 1/3 to 2/3 of the retaining wall height. ; The greater the lateral earth pressure, the greater the horizontal displacement of the retaining wall.
为更好地分析工况1、2、3挡土墙边坡的加固效果,将三种不同工况下坡顶承受的均 布荷载以及同一均布荷载(12.7kPa)下挡土墙的坡顶沉降位移、墙面最大水平位移整理于 表中,如表5所示。In order to better analyze the reinforcement effect of the retaining wall slope in working
表5工况1、2、3挡土墙边坡对比分析Table 5 Comparative analysis of retaining wall slopes in working
由表5可知:It can be seen from Table 5 that:
(1)对比工况1~3,工况1的坡顶破坏荷载为14.28kPa,工况2的坡顶破坏荷载为28.56kPa,工况3的坡顶破坏荷载为44.43kPa;工况3的坡顶破坏荷载比工况1提高了211.1%,比工况2提高了55.6%。(1) Comparing working
(2)在坡顶均布荷载为12.7kPa时,工况1的坡顶沉降位移为18.87mm,工况2的坡顶沉降位移为16.94mm,工况3的坡顶沉降位移为13.37mm;工况3的坡顶沉降位移比工 况1减小了29.15%,比工况2减小了21.07%。(2) When the uniformly distributed load on the slope top is 12.7kPa, the settlement displacement of the slope top in working
(3)在坡顶均布荷载为12.7kPa时,工况1的墙面最大水平位移为9.36mm,工况2 的墙面最大水平位移为3.56mm,工况3的墙面最大水平位移为2.36mm;工况3的墙面最 大水平位移比工况1减小了74.79%,比工况2减小了33.71%。(3) When the uniformly distributed load on the slope top is 12.7kPa, the maximum horizontal displacement of the wall in working
6不同第一土工格栅长度的边坡支护效果对比分析6 Comparative analysis of slope support effects with different first geogrid lengths
6.1坡顶沉降位移分析6.1 Analysis of settlement and displacement of slope top
第一土工格栅长度0.5m的反包式建渣土工袋挡土墙(工况4),在加载过程中挡土墙的 坡顶破坏荷载为31.73kPa时,挡土墙的坡顶沉降位移为43.77mm。第一土工格栅长度1.3m 的反包式建渣土工袋挡土墙(工况5),在加载过程中挡土墙的坡顶破坏荷载为50.77kPa时, 挡土墙的坡顶沉降位移为49.85mm。工况4、5的试验结果照片,见图20所示。其中,图 20(a)为工况4的坡顶裂缝图,图20(b)为工况4的坡体裂缝图,图20(c)为工况5 的坡顶沉降变形图,图20(d)为工况5的坡体裂缝图。When the first geogrid length is 0.5m for the slag-retaining geobag retaining wall (Condition 4), when the top failure load of the retaining wall is 31.73kPa during the loading process, the top of the retaining wall settles The displacement is 43.77mm. The first geogrid length is 1.3m for the reverse-packed slag geobag retaining wall (Condition 5), when the top failure load of the retaining wall is 50.77kPa during the loading process, the top of the retaining wall settles The displacement is 49.85mm. The photos of the test results of working
三种不同第一土工格栅长度0.5m、0.9m、1.3m挡土墙(工况4、工况3、工况5)的坡顶均布荷载与坡顶沉降位移的关系图,如图21所示。从图21可以得出:反包式建渣土工 袋挡土墙的第一土工格栅长度越长,挡土墙的坡顶极限荷载越大。在相同的坡顶荷载作用下,第一土工格栅长度越长的挡土墙,其坡顶沉降位移越小;三种不同第一土工格栅长度的反包式建渣土工袋挡土墙,第一土工格栅长度为0.5m的挡土墙坡顶沉降位移变化较大,但第一土工格栅长度为0.9m和第一土工格栅长度为1.3m的挡土墙坡顶沉降位移变化相似。The relationship between the uniform load on the top of the slope and the settlement displacement of the top of the slope for three different first geogrid lengths of 0.5m, 0.9m, and 1.3m for retaining walls (
三种不同第一土工格栅长度0.5m、0.9m、1.3m挡土墙(工况4、工况3、工况5)的坡顶均布荷载与坡顶沉降位移的关系图,如图21所示。从图21可以得出:反包式建渣土工 袋挡土墙的第一土工格栅长度越长,挡土墙的坡顶极限荷载越大。在相同的坡顶荷载作用下,第一土工格栅长度越长的挡土墙,其坡顶沉降位移越小;三种不同第一土工格栅长度的反包式建渣土工袋挡土墙,第一土工格栅长度为0.5m的挡土墙坡顶沉降位移变化较大,但第一土工格栅长度为0.9m和第一土工格栅长度为1.3m的挡土墙坡顶沉降位移变化相似。The relationship between the uniform load on the top of the slope and the settlement displacement of the top of the slope for three different first geogrid lengths of 0.5m, 0.9m, and 1.3m for retaining walls (
6.2墙面水平位移分析6.2 Analysis of the horizontal displacement of the wall
工况4、5的边坡墙面中间和边上的水平位移沿挡土墙高度的变化规律,如图22所示。 图22(a)为工况4墙面中间的水平位移图,图22(b)为工况4墙面边上的水平位移图,Figure 22 shows the variation law of the horizontal displacement along the height of the retaining wall in the middle and on the edge of the slope wall in working
图22(c)为工况5墙面中间的水平位移图,图22(d)为工况5墙面边上的水平位移图。 由图可知,不同第一土工格栅长度的反包式建渣土工袋挡土墙的墙面水平位移变化规律一 致,随挡土墙高度先增大后减小,曲线均呈鼓型分布,挡土墙的墙面最大水平位移处约在 挡土墙高1/3~2/3处。由于模型槽侧壁对挡土墙有一定的约束作用,所以图中挡土墙边上的 水平位移相对减小,但也呈现相似的变化规律。在相同均布荷载的作用下,第一土工格栅 长度越长,反包式建渣土工袋挡土墙的墙面水平位移越小。Figure 22(c) is the horizontal displacement diagram in the middle of the wall in working
6.3侧向土压力分析6.3 Lateral earth pressure analysis
图23为不同第一土工格栅长度的反包式建渣土工袋挡土墙的墙后侧向土压力分布图。 从图中可知,反包式建渣土工袋挡土墙的墙厚侧向土压力随挡土墙高度先增加,在距墙高50cm处的侧向土压力最大,后随着挡土墙的高度逐渐减小。结合反包式建渣土工袋挡土墙 的墙面水平位移分析,同一挡土墙高度处产生相同的墙面水平位移,则土工格栅第一土工 格栅长度越长,其对应的墙后侧向土压力越大。Fig. 23 is a distribution diagram of the lateral earth pressure behind the wall of the reverse-packed slag geobag retaining wall with different lengths of the first geogrid. It can be seen from the figure that the lateral earth pressure of the wall thickness of the reverse-packed slag geobag retaining wall first increases with the height of the retaining wall, and the lateral earth pressure is the largest at a height of 50cm from the wall, and then increases with the height of the retaining wall. height gradually decreases. Combined with the analysis of the horizontal displacement of the wall surface of the retaining wall with the reverse-packed slag geotextile, the same horizontal displacement of the wall surface occurs at the same height of the retaining wall, and the longer the length of the first geogrid, the corresponding The greater the rear lateral earth pressure.
6.4土工格栅应变分析6.4 Geogrid strain analysis
在模型试验中,总共分两层测定反包式加筋挡土墙中土工格栅的应变;在试验过程中 记录每级荷载作用下土工格栅应变的大小,从而观察和分析挡土墙内部土工格栅应变的变 化情况。In the model test, the strain of the geogrid in the turn-back reinforced retaining wall was measured in two layers; the strain of the geogrid under each level of load was recorded during the test, so as to observe and analyze the interior of the retaining wall Variation of geogrid strain.
图24为第一土工格栅长度为0.5m的反包式建渣土工袋挡土墙(工况4)的土工格栅应 变随荷载变化的曲线图。其中,图24(a)为工况4的第一层测点应变图,图24(b)为工 况4的第二层测点应变图。由图可知,两层土工格栅应变的大致规律是随着坡顶均布荷载 的增加而增大的,但每个测定土工格栅应变的变化规律不尽相同。由于加筋长度较短,挡 土墙的坡体侧向位移较大,而1-10测点均位于加载板下方以及挡土墙边坡位置处,因此每 个测点的应变变化相差不大。其中,当坡顶均布荷载达到31.73kPa时,第一层测点中的应 变值最大的为1号测点1252.73με,第二层测点中的应变值最大的为6号测点1356.87με。Figure 24 is a graph showing the variation of the geogrid strain with the load of the first geogrid length of 0.5m for the turn-up slag geobag retaining wall (Condition 4). Among them, Fig. 24(a) is the strain map of the first layer measuring point of working
图25为第一土工格栅长度为0.9m的反包式建渣土工袋挡土墙(工况3)的土工格栅应 变随荷载变化的曲线图。其中,图25(a)为工况3的第一层测点应变图,图25(b)为工 况3的第二层测点应变图。由图可知,工况3中位于加载板的下方2、3、6、7、8号测点 的应变值随荷载增大变化更为明显。其中,当坡顶均布荷载达到44.43kPa时,第一层测点 中的应变值最大的为2号测点1812.47με,第二层测点中的应变值最大的为8号测点 2169.87με。Figure 25 is a graph showing the variation of the geogrid strain with the load of the first geogrid length of 0.9m for the turn-up slag geobag retaining wall (Condition 3). Among them, Fig. 25(a) is the strain map of the first layer measuring point of working
图26为加筋长度为1.3m的反包式建渣土工袋挡土墙(工况5)的土工格栅应变随荷载 变化的曲线图。其中,图26(a)为工况5的第一层测点应变图,图26(b)为工况5的第 二层测点应变图。由图可知,工况5中位于加载板的下方及边缘的3、4、8、9号测点应变 值随荷载增大变化更为明显,而在挡土墙土体内部且距离加载板较远的1、2、6号测点应 变值随荷载增大变化小。其中,当坡顶均布荷载达到50.77kPa时,第一层测点中的应变值 最大的为4号测点2536.25με,第二层测点中的应变值最大的为8号测点2921.64με。Fig. 26 is a graph showing the variation of geogrid strain with load for a 1.3m reinforced slag-backed geobag retaining wall (Condition 5). Among them, Fig. 26(a) is the strain map of the first layer measuring point in working
综合图24、图25、图26对不同第一土工格栅长度的反包式建渣土工袋挡土墙的土工 格栅应变进行分析,位于加载板区域下方及边缘的测点随荷载的不断增大,土工格栅应变 的幅度越大;而土体内部距离加载板较远、靠近挡土墙墙面的测点应变值随荷载的不断增 大,土工格栅应变的较小。在相同的坡顶均布荷载作用下,第一土工格栅长度越长的挡土 墙,其对应测点的土工格栅应变相对减小。Figure 24, Figure 25, and Figure 26 are combined to analyze the geogrid strain of the reverse-packed slag geobag retaining wall with different lengths of the first geogrid. The strain value of the geogrid increases with increasing load; while the strain value of the measuring point inside the soil body which is far from the loading plate and close to the retaining wall surface increases with the load, and the strain of the geogrid is smaller. Under the same uniform load on the top of the slope, the longer the length of the first geogrid is, the geogrid strain corresponding to the measuring point decreases relatively.
为更好地分析不同第一土工格栅长度对挡土墙边坡加固效果的影响,将工况3、4、5 坡顶承受破坏荷载以及同一均布荷载(31.73kPa,为工况4的坡顶极限破坏荷载)下挡土墙 的坡顶沉降位移、墙面最大水平位移、土工格栅的最大应变值整理于表中,如表6所示。In order to better analyze the influence of different lengths of the first geogrid on the reinforcement effect of the retaining wall slope, the slope tops of working
表6工况3、4、5挡土墙边坡对比分析Table 6 Comparative analysis of retaining wall slopes in working
由表6可知:It can be seen from Table 6 that:
(1)对比工况3~5,工况4的坡顶破坏荷载为31.73kPa,工况3的坡顶破坏荷载为44.43kPa,工况5的坡顶破坏荷载为50.77kPa;工况5的坡顶破坏荷载比工况4提高了60%,比工况3提高了14.27%。(1) Comparing working
(2)在坡顶均布荷载为31.73kPa时,工况4的坡顶沉降位移为43.77mm,工况3的 坡顶沉降位移为36.58mm,工况5的坡顶沉降位移为32.76mm;工况5的坡顶沉降位移比 工况4减小了25.1%,比工况3减小了10.44%。(2) When the uniformly distributed load on the slope top is 31.73kPa, the settlement displacement of the slope top in working
(3)在坡顶均布荷载为31.73kPa时,工况4的墙面最大水平位移为16.87mm,工况3的墙面最大水平位移为14.21mm,工况5的墙面最大水平位移为9.87mm;工况5的墙面最 大水平位移比工况4减小了42.03%,比工况3减小了31.18%。(3) When the uniformly distributed load on the slope top is 31.73kPa, the maximum horizontal displacement of the wall in working
(4)在坡顶均布荷载为31.73kPa时,工况4的土工格栅最大应变为1356.87,工况3的土工格栅最大应变为1125.89,工况5的土工格栅最大应变为987.56;工况5的土工格 栅最大应变比工况4减小了27.22%,比工况3减小了12.87%。(4) When the uniformly distributed load on the slope top is 31.73kPa, the maximum strain of the geogrid under working
7基于上述实验数据,能够知道。7 can be known based on the above-mentioned experimental data.
(1)反包式建渣土工袋挡土墙与天然土坡、建渣土工袋挡土墙相比,坡顶破坏荷载分 别提高了211.1%、55.6%。反包式建渣土工袋挡土墙坡顶的破坏荷载明显增大,且在相同均 布荷载作用下坡顶沉降位移明显减小。因此,反包式建渣土工袋挡土墙的边坡加固效果为 明显。(1) Compared with the natural soil slope and the construction slag geobag retaining wall, the failure load of the top of the slope is increased by 211.1% and 55.6% respectively. The failure load of the top of the slope top of the reverse-packed slag geobag retaining wall increases significantly, and the settlement displacement of the top of the slope decreases significantly under the same uniform load. Therefore, the slope reinforcement effect of the reverse-packed slag geobag retaining wall is obvious.
(2)反包式建渣土工袋挡土墙的墙面水平位移呈鼓型分布,与建渣土工袋挡土墙的墙 面水平位移分布规律相似。在相同均布荷载作用下,工况3的墙面最大水平位移比工况1 减小了34.56%,比工况2减小了18.64%;反包式建渣土工袋挡土墙的墙面水平位移小于天 然土坡、建渣土工袋挡土墙的墙面水平位移。这表明,反包式建渣土工袋挡土墙结构的整 体性能较好,能有效的抑制挡土墙墙面的侧向变形。(2) The horizontal displacement of the wall surface of the reverse-packed slag geobag retaining wall is distributed in a drum shape, which is similar to the distribution law of the horizontal displacement of the wall surface of the slag geobag retaining wall. Under the same uniform load, the maximum horizontal displacement of the wall in
(3)反包式建渣土工袋挡土墙的墙后侧向土压力并非呈三角形分布,呈鼓型分布,在 墙高约1/3~2/3处的侧向土压力最大;由于模型槽侧壁的约束作用,而位于挡土墙边上的侧 向土压力相对减小。(3) The lateral earth pressure behind the wall of the back-packed slag geobag retaining wall is not a triangular distribution, but a drum-shaped distribution, and the lateral earth pressure is the largest at about 1/3 to 2/3 of the wall height; Due to the constraint of the sidewall of the model groove, the lateral earth pressure on the edge of the retaining wall is relatively reduced.
(4)第一土工格栅越长,反包式建渣土工袋挡土墙的坡顶破坏荷载越大;在相同均布 荷载作用下,第一土工格栅越长,其坡顶沉降位移越小,挡土墙的墙面水平位移也越小,土工格栅的应变值也相应减小。因此,反包式建渣土工袋挡土墙的第一土工格栅越长其边坡加固效果越明显。(4) The longer the first geogrid is, the greater the failure load of the top of the slope of the turn-up slag geobag retaining wall; under the same uniform load, the longer the first geogrid, the settlement of the top of the slope is The smaller the displacement, the smaller the horizontal displacement of the retaining wall, and the smaller the strain value of the geogrid. Therefore, the longer the first geogrid of the turn-up slag geobag retaining wall is, the more obvious the slope reinforcement effect is.
本发明并不局限于前述的具体实施方式。本发明扩展到任何在本说明书中披露的新特 征或任何新的组合,以及披露的任一新的方法或过程的步骤或任何新的组合。The present invention is not limited to the foregoing specific embodiments. The present invention extends to any new features or any new combination disclosed in this specification, as well as any new method or process steps or any new combination disclosed.
Claims (10)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910899235 | 2019-09-23 | ||
CN2019108992351 | 2019-09-23 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110644529A true CN110644529A (en) | 2020-01-03 |
Family
ID=69011650
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910922564.3A Pending CN110644529A (en) | 2019-09-23 | 2019-09-27 | Reverse-wrapping type slag building geotextile bag retaining wall, construction method and application |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110644529A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113152536A (en) * | 2021-02-26 | 2021-07-23 | 中国建筑股份有限公司 | Method for testing and predicting reinforced retaining wall |
CN117449344A (en) * | 2023-11-02 | 2024-01-26 | 深圳市市政工程总公司 | A kind of earthquake-absorbing and energy-consuming reinforced soil retaining wall and its assembled construction method |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07166551A (en) * | 1993-12-13 | 1995-06-27 | Oyo Kikaku:Kk | Reinforcing method for fill |
KR20000053761A (en) * | 2000-04-03 | 2000-09-05 | 강수용 | Green concrete retaining wall and method for constructing the same |
US6494009B1 (en) * | 2001-08-30 | 2002-12-17 | Soo-Yong Kang | Green concrete retaining wall and method for constructing the same |
KR100752152B1 (en) * | 2006-12-29 | 2007-08-27 | 김광호 | Construction method of greening retaining wall |
CN201534975U (en) * | 2009-03-27 | 2010-07-28 | 朱海龙 | Slope protection body with ribbed and core-wrapped structure |
KR20100125892A (en) * | 2009-05-22 | 2010-12-01 | 이병철 | Retaining wall structure and construction method of retaining wall structure |
CN201991016U (en) * | 2011-01-21 | 2011-09-28 | 徐江宁 | Grid reverse-covering tension type biological retaining wall |
CN202347533U (en) * | 2011-11-15 | 2012-07-25 | 湖南科鑫电力设计有限公司 | Geogrid reinforced retaining wall device |
CN210946878U (en) * | 2019-09-23 | 2020-07-07 | 西南科技大学城市学院 | Reverse-wrapping type retaining wall with slag building geotextile bags |
-
2019
- 2019-09-27 CN CN201910922564.3A patent/CN110644529A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07166551A (en) * | 1993-12-13 | 1995-06-27 | Oyo Kikaku:Kk | Reinforcing method for fill |
KR20000053761A (en) * | 2000-04-03 | 2000-09-05 | 강수용 | Green concrete retaining wall and method for constructing the same |
US6494009B1 (en) * | 2001-08-30 | 2002-12-17 | Soo-Yong Kang | Green concrete retaining wall and method for constructing the same |
KR100752152B1 (en) * | 2006-12-29 | 2007-08-27 | 김광호 | Construction method of greening retaining wall |
CN201534975U (en) * | 2009-03-27 | 2010-07-28 | 朱海龙 | Slope protection body with ribbed and core-wrapped structure |
KR20100125892A (en) * | 2009-05-22 | 2010-12-01 | 이병철 | Retaining wall structure and construction method of retaining wall structure |
CN201991016U (en) * | 2011-01-21 | 2011-09-28 | 徐江宁 | Grid reverse-covering tension type biological retaining wall |
CN202347533U (en) * | 2011-11-15 | 2012-07-25 | 湖南科鑫电力设计有限公司 | Geogrid reinforced retaining wall device |
CN210946878U (en) * | 2019-09-23 | 2020-07-07 | 西南科技大学城市学院 | Reverse-wrapping type retaining wall with slag building geotextile bags |
Non-Patent Citations (1)
Title |
---|
文华;邹娇丽;程谦恭;张敏;顾成壮;: "建渣土工袋挡土墙室内模型试验", 西南交通大学学报, no. 06, 31 December 2016 (2016-12-31), pages 1087 - 1097 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113152536A (en) * | 2021-02-26 | 2021-07-23 | 中国建筑股份有限公司 | Method for testing and predicting reinforced retaining wall |
CN113152536B (en) * | 2021-02-26 | 2022-09-27 | 中国建筑股份有限公司 | Method for testing and predicting reinforced retaining wall |
CN117449344A (en) * | 2023-11-02 | 2024-01-26 | 深圳市市政工程总公司 | A kind of earthquake-absorbing and energy-consuming reinforced soil retaining wall and its assembled construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Sireesh et al. | Bearing capacity of circular footing on geocell–sand mattress overlying clay bed with void | |
Hegde et al. | Experimental and numerical studies on protection of buried pipelines and underground utilities using geocells | |
Yadu et al. | Effect of the length of geogrid layers in the bearing capacity ratio of geogrid reinforced granular fill-soft subgrade soil system | |
Miao et al. | Benefits of geosynthetic reinforcement in widening of embankments subjected to foundation differential settlement | |
Hegde et al. | Protection of buried pipelines using a combination of geocell and geogrid reinforcement: experimental studies | |
CN113378261A (en) | Calculation method for ultimate bearing capacity of large-area high-strength pile-up foundation | |
CN110846965A (en) | Geocell reinforcement and roadbed widening method based on conductive polymer | |
Rahmaninezhad et al. | Stress distributions and pullout responses of extensible and inextensible reinforcement in soil using different normal loading methods | |
CN110644529A (en) | Reverse-wrapping type slag building geotextile bag retaining wall, construction method and application | |
CN210946878U (en) | Reverse-wrapping type retaining wall with slag building geotextile bags | |
CN115492172B (en) | Device and method for testing influence of traffic load on pile-net composite foundation power | |
Banerjee et al. | Experimental and 3-D finite element analyses on geocell-reinforced embankments | |
Abu-Farsakh et al. | Use of reinforced soil foundation (RSF) to support shallow foundation. | |
Bian et al. | An experimental study on a culvert buried in granular soil subjected to vehicle loads | |
Shinoda et al. | Increasing the stiffness of mechanically reinforced backfill by preloading and prestressing | |
CN113378406A (en) | Multilayer geocell reinforced non-sticky soil circular foundation settlement prediction method | |
CN111441331A (en) | A kind of high water content clay dynamic compaction replacement filling foundation and its construction method | |
Haddad et al. | Evaluation of Recycled Materials as Aggregate of End Bearing Stone Columns: a Comparative Study | |
CN109653240B (en) | Urban residual mud and slag mound in ecological restoration project and its construction method | |
Cheng et al. | Field testing of geosynthetic-reinforced and column-supported earth platforms constructed on soft soil | |
Akpinar et al. | Pavement subgrade stabilization with lime and cellular confinement system | |
CN210066778U (en) | A micro-pile rigid connection structure with both anti-slope and production road | |
Fattah et al. | An experimental analysis of embankment on stone columns | |
Han et al. | Establishing a design procedure for buried steel-reinforced high-density polyethylene pipes: a field study. | |
Roy et al. | Influence of footing interference on bearing capacity improvement for geogrid-reinforced sand bed underlain by soft clay |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |