CN110593561B - Screw fixture for steel frame template - Google Patents
Screw fixture for steel frame template Download PDFInfo
- Publication number
- CN110593561B CN110593561B CN201910990903.1A CN201910990903A CN110593561B CN 110593561 B CN110593561 B CN 110593561B CN 201910990903 A CN201910990903 A CN 201910990903A CN 110593561 B CN110593561 B CN 110593561B
- Authority
- CN
- China
- Prior art keywords
- square tube
- clamping
- connecting end
- clamping part
- tube body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 14
- 239000010959 steel Substances 0.000 title claims abstract description 14
- 230000003014 reinforcing effect Effects 0.000 claims description 6
- 229910000838 Al alloy Inorganic materials 0.000 abstract description 7
- 238000000034 method Methods 0.000 description 11
- 238000009415 formwork Methods 0.000 description 7
- 238000009434 installation Methods 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 101001121408 Homo sapiens L-amino-acid oxidase Proteins 0.000 description 1
- 102100026388 L-amino-acid oxidase Human genes 0.000 description 1
- 101100012902 Saccharomyces cerevisiae (strain ATCC 204508 / S288c) FIG2 gene Proteins 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/001—Corner fastening or connecting means for forming or stiffening elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G17/00—Connecting or other auxiliary members for forms, falsework structures, or shutterings
- E04G17/06—Tying means; Spacers ; Devices for extracting or inserting wall ties
- E04G17/065—Tying means, the tensional elements of which are threaded to enable their fastening or tensioning
- E04G17/0655—Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts
- E04G17/0657—Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts fully recoverable
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mutual Connection Of Rods And Tubes (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
Description
技术领域Technical Field
本发明属于建筑模板快拆体系技术领域,尤其涉及一种钢框模板用螺杆式卡具。The invention belongs to the technical field of building template quick-disassembly system, and in particular relates to a screw-type clamp for a steel frame template.
背景技术Background technique
建筑模板是一种临时性支护结构,按设计要求制作,使混凝土结构、构件按规定的位置、几何尺寸成形,保持其正确位置,并承受建筑模板自重及作用在其上的外部荷载。Building formwork is a temporary supporting structure, manufactured according to design requirements, which allows concrete structures and components to be formed according to specified positions and geometric dimensions, maintain their correct positions, and bear the deadweight of the building formwork and external loads acting on it.
现浇混凝土结构工程施工用的建筑模板结构,主要由面板、支撑结构和连接配件三部分组成。面板是直接接触新浇混凝土的承力板;支撑结构则是支承面板、混凝土和施工荷载的临时结构,保证建筑模板结构牢固地组合,做到不变形、不破坏;连接配件是将面板与支撑结构连接成整体的配件。The building formwork structure used in cast-in-place concrete structure construction mainly consists of three parts: panel, support structure and connection accessories. The panel is the load-bearing plate that directly contacts the newly poured concrete; the support structure is a temporary structure that supports the panel, concrete and construction load, ensuring that the building formwork structure is firmly combined without deformation or damage; the connection accessories are accessories that connect the panel and the support structure into a whole.
传统的铝合金模板中,铝合金边框之间通常使用的连接配件是销片式卡具,然而销片式卡具在施工过程中由于振动等原因易松动,紧固性差,因此需要研发一种新型结构的、通用性更强的边框连接卡具。In traditional aluminum alloy formwork, the connection accessories commonly used between aluminum alloy frames are pin-type clamps. However, pin-type clamps are easy to loosen due to vibration and other reasons during construction, and have poor fastening. Therefore, it is necessary to develop a new structure and more universal frame connection clamp.
发明内容Summary of the invention
本发明的目的在于提供一种紧固性好、通用性强的钢框模板用螺杆式卡具。The purpose of the present invention is to provide a screw-type clamp for a steel frame formwork with good fastening performance and strong versatility.
为实现上述目的,本发明提供如下技术方案:一种钢框模板用螺杆式卡具包括连接方管,以及相对安装于连接方管两端的第一卡紧机构和第二卡紧机构;所述连接方管包括连接方管本体,连接方管本体的一端固定设置有紧固机构,连接方管本体的另一端相对的管壁上等间距开设有三组连接孔;所述第一卡紧机构包括方管状的第一连接端,第一连接端可套设于所述连接方管本体外,第一连接端相对的管壁上开设有一组与所述连接孔相配合的第一安装孔,第一连接端的底部固定设置有第一卡紧部,第一卡紧部的内侧向内弯曲为弧形,弧形的末端向内凸起形成第一凸缘;所述第二卡紧机构包括方管状第二连接端,第二连接端可套设于所述连接方管本体外,第二连接端的长度大于第一连接端,靠近第二连接端外端的相对管壁上开设有一组与所述连接孔相配合的第二安装孔,第二连接端的底部与第二安装孔对应的位置固定设置有第二卡紧部,第二卡紧部的内侧向内弯曲为弧形,弧形的末端向内凸起形成第二凸缘。To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a screw-type clamp for a steel frame formwork comprises a connecting square tube, and a first clamping mechanism and a second clamping mechanism relatively installed at two ends of the connecting square tube; the connecting square tube comprises a connecting square tube body, one end of the connecting square tube body is fixedly provided with a fastening mechanism, and the other end of the connecting square tube body is provided with three groups of connecting holes at equal intervals on the opposite tube wall; the first clamping mechanism comprises a square tube-shaped first connecting end, the first connecting end can be sleeved outside the connecting square tube body, a group of first mounting holes matching the connecting holes are provided on the tube wall opposite to the first connecting end, and the first mounting holes matching the connecting holes are provided on the first mounting holes matching the connecting holes. A first clamping portion is fixedly provided at the bottom of one connecting end, the inner side of the first clamping portion is bent inwardly into an arc shape, and the end of the arc protrudes inwardly to form a first flange; the second clamping mechanism includes a square tube-shaped second connecting end, the second connecting end can be sleeved on the outside of the connecting square tube body, the length of the second connecting end is greater than the first connecting end, and a group of second mounting holes matching the connecting holes are opened on the relative tube wall near the outer end of the second connecting end, and a second clamping portion is fixedly provided at the bottom of the second connecting end at a position corresponding to the second mounting hole, the inner side of the second clamping portion is bent inwardly into an arc shape, and the end of the arc protrudes inwardly to form a second flange.
优选的,所述第一卡紧部的外侧中部设置有第一卡块,所述第二卡紧部的外侧中部设置有第二卡块。Preferably, a first clamping block is provided at a middle portion of an outer side of the first clamping portion, and a second clamping block is provided at a middle portion of an outer side of the second clamping portion.
优选的,所述第一卡块和第二卡块的边缘为锯齿状结构。Preferably, the edges of the first card block and the second card block are serrated structures.
优选的,所述紧固机构包括固定设置于连接方管本体一端的紧固螺杆,紧固螺杆上配有相应的紧固螺帽。Preferably, the fastening mechanism comprises a fastening screw fixedly arranged at one end of the connected square tube body, and the fastening screw is provided with a corresponding fastening nut.
优选的,所述第一连接端与第一卡紧部的连接处设置有加强筋;所述第二连接端与第二卡紧部的连接处设置有加强筋。Preferably, a reinforcing rib is provided at a connection between the first connecting end and the first clamping portion; and a reinforcing rib is provided at a connection between the second connecting end and the second clamping portion.
优选的,所述紧固螺杆焊接于所述连接方管本体的一端内壁上。Preferably, the fastening screw is welded to the inner wall of one end of the connecting square tube body.
与现有技术相比,本发明的有益效果是:(1)本发明首先通过螺丝分别将连接方管与第一卡紧机构和第二卡紧机构进行预固定,然后调整卡具与边框的相对位置将边框卡紧后,再通过紧固螺杆和紧固螺帽从侧面进行进一步紧固完成固定连接过程,紧固性好,同时拆除也很方便;(2)本发明有两种安装方式,可同时实现对传统铝合金边框以及新型钢边框的固定连接,通用性高。Compared with the prior art, the beneficial effects of the present invention are: (1) the present invention first pre-fixes the connecting square tube to the first clamping mechanism and the second clamping mechanism respectively by screws, and then adjusts the relative position of the clamp and the frame to clamp the frame, and then further tightens it from the side by fastening screws and fastening nuts to complete the fixed connection process, with good fastening and convenient removal; (2) the present invention has two installation methods, which can simultaneously realize the fixed connection of traditional aluminum alloy frames and new steel frames, and has high versatility.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
图1为本发明的分解结构示意图;FIG1 is a schematic diagram of the exploded structure of the present invention;
图2为本发明使用状态的结构示意图;FIG2 is a schematic diagram of the structure of the present invention in use;
图3为本发明另一种使用状态的结构示意图。FIG. 3 is a schematic structural diagram of another use state of the present invention.
图中:1、连接方管本体;2、连接孔;3、紧固螺杆;4、第一连接端;5、第一安装孔;6、第一卡紧部;7、第一凸缘;8、第一卡块;9、第二连接端;10、第二安装孔;11、第二卡紧部;12、第二卡块;13、第二凸缘;14、紧固螺帽。In the figure: 1. connecting square tube body; 2. connecting hole; 3. fastening screw; 4. first connecting end; 5. first mounting hole; 6. first clamping part; 7. first flange; 8. first clamping block; 9. second connecting end; 10. second mounting hole; 11. second clamping part; 12. second clamping block; 13. second flange; 14. fastening nut.
具体实施方式Detailed ways
下面将结合附图描述本发明的一个优选实施例,对本发明一优选实施例中的技术方案进行清楚、完整地描述。A preferred embodiment of the present invention will be described below in conjunction with the accompanying drawings to clearly and completely describe the technical solution in a preferred embodiment of the present invention.
请参见图1,本发明包括连接方管,以及相对安装于连接方管两端的第一卡紧机构和第二卡紧机构。Please refer to FIG. 1 , the present invention includes a connecting square tube, and a first clamping mechanism and a second clamping mechanism installed at two ends of the connecting square tube.
所述连接方管包括连接方管本体1,连接方管本体1的一端固定设置有紧固机构,连接方管本体1的另一端相对的管壁上等间距开设有三组连接孔2。The connecting square tube comprises a connecting square tube body 1 , one end of which is fixedly provided with a fastening mechanism, and the other end of the connecting square tube body 1 is provided with three groups of connecting holes 2 at equal intervals on the opposite tube wall.
所述第一卡紧机构包括方管状的第一连接端4,第一连接端4可套设于所述连接方管本体1外,第一连接端4相对的管壁上开设有一组与所述连接孔2相配合的第一安装孔5,第一连接端4的底部固定设置有第一卡紧部6,第一卡紧部6的内侧向内弯曲为弧形,弧形的末端向内凸起形成第一凸缘7。The first clamping mechanism includes a square tube-shaped first connecting end 4, which can be sleeved on the outside of the connecting square tube body 1. A group of first mounting holes 5 matching the connecting hole 2 are opened on the tube wall opposite to the first connecting end 4. A first clamping portion 6 is fixedly arranged at the bottom of the first connecting end 4. The inner side of the first clamping portion 6 is bent inwardly into an arc shape, and the end of the arc protrudes inwardly to form a first flange 7.
所述第二卡紧机构包括方管状第二连接端9,第二连接端9可套设于所述连接方管本体1外,第二连接端9的长度大于第一连接端4,靠近第二连接端4外端的相对管壁上开设有一组与所述连接孔2相配合的第二安装孔10,第二连接端9的底部与第二安装孔10对应的位置固定设置有第二卡紧部11,第二卡紧部11的内侧向内弯曲为弧形,弧形的末端向内凸起形成第二凸缘13。The second clamping mechanism includes a square tube-shaped second connecting end 9, which can be sleeved on the outside of the connecting square tube body 1. The length of the second connecting end 9 is greater than the first connecting end 4. A group of second mounting holes 10 matching the connecting hole 2 are opened on the relative tube wall near the outer end of the second connecting end 4. A second clamping portion 11 is fixedly provided at the bottom of the second connecting end 9 at a position corresponding to the second mounting hole 10. The inner side of the second clamping portion 11 is bent inwardly into an arc shape, and the end of the arc protrudes inwardly to form a second flange 13.
本实施例中,所述第一卡紧部6的外侧中部设置有第一卡块8,所述第二卡紧部11的外侧中部设置有第二卡块12;所述第一卡块8和第二卡块12的边缘为锯齿状结构。In this embodiment, a first clamping block 8 is provided in the middle of the outer side of the first clamping portion 6, and a second clamping block 12 is provided in the middle of the outer side of the second clamping portion 11; the edges of the first clamping block 8 and the second clamping block 12 are serrated structures.
本实施例中,所述紧固机构包括固定设置于连接方管本体1一端的紧固螺杆3,紧固螺杆3上配有相应的紧固螺帽14。In this embodiment, the fastening mechanism includes a fastening screw 3 fixedly arranged at one end of the square tube body 1 , and a corresponding fastening nut 14 is provided on the fastening screw 3 .
本实施例中,所述第一连接端4与第一卡紧部6的连接处设置有加强筋;所述第二连接端9与第二卡紧部11的连接处设置有加强筋。In this embodiment, a reinforcing rib is provided at the connection between the first connecting end 4 and the first clamping portion 6 ; and a reinforcing rib is provided at the connection between the second connecting end 9 and the second clamping portion 11 .
本实施例中,所述紧固螺杆3焊接于所述连接方管本体1的一端内壁上。In this embodiment, the fastening screw 3 is welded to the inner wall of one end of the connecting square tube body 1 .
请参见图2,本发明的安装方法为:将第一连接端4和第二连接端9分别套设于连接方管本体1上进行预固定;然后将本卡具安装于一组相对设置的钢边框上,第一凸缘7和第二凸缘13分别卡入钢边框两侧的卡槽中,调整卡具使第一卡紧部6与第二卡紧部11将钢边框卡紧固定,然后通过在第一安装孔5、第二安装孔10和连接孔2内旋入螺丝进行固定,再通过紧固螺杆3和紧固螺帽14从侧面进行进一步紧固,完成固定连接过程。Please refer to Figure 2. The installation method of the present invention is: the first connecting end 4 and the second connecting end 9 are respectively sleeved on the connecting square tube body 1 for pre-fixation; then the clamp is installed on a group of relatively arranged steel frames, and the first flange 7 and the second flange 13 are respectively inserted into the clamping grooves on both sides of the steel frame. The clamp is adjusted so that the first clamping part 6 and the second clamping part 11 clamp and fix the steel frame, and then screwed into the first mounting hole 5, the second mounting hole 10 and the connecting hole 2 for fixing, and then further tightened from the side by the fastening screw 3 and the fastening nut 14 to complete the fixed connection process.
请参见图3,本发明还有另外一种使用方法,可用于传统的铝合金边框,与上述安装方法不同之处在于,将第一连接端4和第二连接端9反向套设于连接方管本体1上,即将卡具的第一卡块8与第二卡块12相对安装,第一卡紧部6与第二卡紧部11配合第一卡块8和第二卡块12边缘的锯齿状粗糙面将铝合金边框卡紧,紧固方式与上述方法相同。Please refer to Figure 3. There is another method of using the present invention, which can be used for traditional aluminum alloy frames. The difference from the above installation method is that the first connecting end 4 and the second connecting end 9 are reversely sleeved on the connecting square tube body 1, that is, the first clamping block 8 and the second clamping block 12 of the clamp are installed oppositely, and the first clamping portion 6 and the second clamping portion 11 cooperate with the serrated rough surfaces of the edges of the first clamping block 8 and the second clamping block 12 to clamp the aluminum alloy frame, and the fastening method is the same as the above method.
本发明首先通过螺丝分别将连接方管与第一卡紧机构和第二卡紧机构进行预固定,然后调整卡具与边框的相对位置将边框卡紧后,再通过紧固螺杆和紧固螺帽从侧面进行进一步紧固完成固定连接过程,紧固性好,同时拆除也很方便;本发明有两种安装方式,可同时实现对传统铝合金边框以及新型钢边框的固定连接,通用性高。The present invention firstly pre-fixes the connecting square tube to the first clamping mechanism and the second clamping mechanism respectively by means of screws, then adjusts the relative position of the clamp and the frame to clamp the frame, and then further tightens it from the side by means of a fastening screw and a fastening nut to complete the fixed connection process, with good fastening performance and convenient removal. The present invention has two installation methods, which can simultaneously realize the fixed connection of the traditional aluminum alloy frame and the new steel frame, and has high versatility.
尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910990903.1A CN110593561B (en) | 2019-10-18 | 2019-10-18 | Screw fixture for steel frame template |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910990903.1A CN110593561B (en) | 2019-10-18 | 2019-10-18 | Screw fixture for steel frame template |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110593561A CN110593561A (en) | 2019-12-20 |
CN110593561B true CN110593561B (en) | 2024-05-10 |
Family
ID=68850763
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910990903.1A Active CN110593561B (en) | 2019-10-18 | 2019-10-18 | Screw fixture for steel frame template |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110593561B (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3020742U (en) * | 1995-07-18 | 1996-02-06 | 義晴 内橋 | Formwork clamp |
JP2004360391A (en) * | 2003-06-06 | 2004-12-24 | Teruaki Nishioka | Connecting tool set, structure, and metallic pipe connecting method |
JP2008128297A (en) * | 2006-11-17 | 2008-06-05 | Osaka Rasenkan Kogyo Kk | Clamp for flange type pipe joint |
CN102031865A (en) * | 2010-12-03 | 2011-04-27 | 蓟县新兴模板技术服务部 | Steel frame template and assembly method thereof |
US8496421B1 (en) * | 2010-11-09 | 2013-07-30 | Christopher C. Burton | Ferrule lock nuts |
CN108166757A (en) * | 2018-03-14 | 2018-06-15 | 沭阳县福阳木业制品厂 | A kind of bindiny mechanism of building template |
KR20180065043A (en) * | 2016-12-06 | 2018-06-18 | 주식회사 정우비엔씨 | Reinforced Connection device and method |
CN208137431U (en) * | 2017-11-09 | 2018-11-23 | 天津市东文模架施工技术有限公司 | A kind of building template connector |
CN211229531U (en) * | 2019-10-18 | 2020-08-11 | 天津市东鑫新材料科技有限公司 | Screw type fixture for steel frame template |
-
2019
- 2019-10-18 CN CN201910990903.1A patent/CN110593561B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3020742U (en) * | 1995-07-18 | 1996-02-06 | 義晴 内橋 | Formwork clamp |
JP2004360391A (en) * | 2003-06-06 | 2004-12-24 | Teruaki Nishioka | Connecting tool set, structure, and metallic pipe connecting method |
JP2008128297A (en) * | 2006-11-17 | 2008-06-05 | Osaka Rasenkan Kogyo Kk | Clamp for flange type pipe joint |
US8496421B1 (en) * | 2010-11-09 | 2013-07-30 | Christopher C. Burton | Ferrule lock nuts |
CN102031865A (en) * | 2010-12-03 | 2011-04-27 | 蓟县新兴模板技术服务部 | Steel frame template and assembly method thereof |
KR20180065043A (en) * | 2016-12-06 | 2018-06-18 | 주식회사 정우비엔씨 | Reinforced Connection device and method |
CN208137431U (en) * | 2017-11-09 | 2018-11-23 | 天津市东文模架施工技术有限公司 | A kind of building template connector |
CN108166757A (en) * | 2018-03-14 | 2018-06-15 | 沭阳县福阳木业制品厂 | A kind of bindiny mechanism of building template |
CN211229531U (en) * | 2019-10-18 | 2020-08-11 | 天津市东鑫新材料科技有限公司 | Screw type fixture for steel frame template |
Also Published As
Publication number | Publication date |
---|---|
CN110593561A (en) | 2019-12-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110593561B (en) | Screw fixture for steel frame template | |
CN211229531U (en) | Screw type fixture for steel frame template | |
CN214756153U (en) | A photovoltaic bracket that is easy to fold and assemble | |
CN206888514U (en) | Sliding type opposite-pulling fastening beam formwork supporting bracket | |
CN218292765U (en) | Cross steel column and circular steel tube fixing clamp assembly | |
CN110593562A (en) | Steel frame shaping building template system | |
CN211923116U (en) | A pendant structure and precast concrete wall panel system | |
CN219158400U (en) | Fixed column hoop of concrete pouring template and template reinforcing device | |
CN110847011A (en) | Steel trestle bailey sheet fixing device and fixing method thereof | |
CN222456874U (en) | A photovoltaic U-shaped anchor bolt positioning and installation auxiliary frame | |
CN207405782U (en) | A kind of pre-buried connecting elements structure between connecting wall | |
CN220848339U (en) | Steel construction spandrel girder | |
CN221837962U (en) | Building templates reinforcing apparatus | |
CN221895576U (en) | A pouring device for bridge pier | |
CN206352393U (en) | A kind of reinforcement tools of side template | |
CN216641427U (en) | The Dragon Button Components of the Building Formwork Reinforcement System | |
CN222276168U (en) | A formwork device for building construction | |
CN220434231U (en) | Building templates supports fixture device | |
CN119254094B (en) | Solar panel installation device | |
CN221646380U (en) | Woodworking beam column template easy to install | |
CN221256171U (en) | Novel reinforcing structure for connecting diagonal bracing with template | |
CN214279399U (en) | Manual electric arc welding training frame | |
CN222491891U (en) | Vertical angle correction tool for reinforcing steel bars | |
CN219175464U (en) | Steel connection structure with multimode connection function | |
CN217299989U (en) | Steel structure building with support connection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20250310 Address after: Room 302, 3rd Floor, No. 22 Industrial Avenue, Chengbei New District, Longbo Town, Shuangpai County, Yongzhou City, Hunan Province, China 425299 Patentee after: Hunan Zehao New Material Technology Co.,Ltd. Country or region after: China Address before: 300000-1012 Huaying building, Central Avenue, pilot free trade zone (Airport Economic Zone), Binhai New Area, Tianjin Patentee before: TIANJIN DONGXIN NEW MATERIAL TECHNOLOGY CO.,LTD. Country or region before: China |