CN110593561A - A kind of screw clamp for steel frame formwork - Google Patents

A kind of screw clamp for steel frame formwork Download PDF

Info

Publication number
CN110593561A
CN110593561A CN201910990903.1A CN201910990903A CN110593561A CN 110593561 A CN110593561 A CN 110593561A CN 201910990903 A CN201910990903 A CN 201910990903A CN 110593561 A CN110593561 A CN 110593561A
Authority
CN
China
Prior art keywords
clamping
square
steel frame
clamping part
connecting end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910990903.1A
Other languages
Chinese (zh)
Other versions
CN110593561B (en
Inventor
钱卫东
姜磊
庞娇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Zehao New Material Technology Co.,Ltd.
Original Assignee
Tianjin Dongxin New Material Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Dongxin New Material Technology Co ltd filed Critical Tianjin Dongxin New Material Technology Co ltd
Priority to CN201910990903.1A priority Critical patent/CN110593561B/en
Publication of CN110593561A publication Critical patent/CN110593561A/en
Application granted granted Critical
Publication of CN110593561B publication Critical patent/CN110593561B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/001Corner fastening or connecting means for forming or stiffening elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings
    • E04G17/06Tying means; Spacers ; Devices for extracting or inserting wall ties
    • E04G17/065Tying means, the tensional elements of which are threaded to enable their fastening or tensioning
    • E04G17/0655Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts
    • E04G17/0657Tying means, the tensional elements of which are threaded to enable their fastening or tensioning the element consisting of several parts fully recoverable

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

本发明公开了一种钢框模板用螺杆式卡具,包括连接方管,以及相对安装于连接方管两端的第一卡紧机构和第二卡紧机构;所述连接方管包括连接方管本体,连接方管本体的一端固定设置有紧固机构,连接方管本体的另一端相对的管壁上等间距开设有三组连接孔;所述第一卡紧机构包括方管状的第一连接端,第一安装孔,第一卡紧部,第一卡紧部的内侧向内弯曲为弧形,弧形的末端向内凸起形成第一凸缘;所述第二卡紧机构包括方管状第二连接端,第二安装孔,第二卡紧部,第二卡紧部的内侧向内弯曲为弧形,弧形的末端向内凸起形成第二凸缘。本发明通用性高,通过两种安装方式可实现对传统铝合金边框以及新型钢边框的固定连接。

The invention discloses a screw-type clamp for a steel frame template, comprising a connecting square tube, and a first clamping mechanism and a second clamping mechanism relatively installed at two ends of the connecting square tube; the connecting square tube comprises a connecting square tube body, one end of the connecting square tube body is fixedly provided with a fastening mechanism, and three groups of connecting holes are evenly spaced on the tube wall opposite to the other end of the connecting square tube body; the first clamping mechanism comprises a square tube-shaped first connecting end, a first mounting hole, a first clamping part, the inner side of the first clamping part is bent inwardly into an arc, and the end of the arc is protruded inwardly to form a first flange; the second clamping mechanism comprises a square tube-shaped second connecting end, a second mounting hole, a second clamping part, the inner side of the second clamping part is bent inwardly into an arc, and the end of the arc is protruded inwardly to form a second flange. The invention has high versatility and can realize fixed connection of traditional aluminum alloy frames and new steel frames through two installation methods.

Description

一种钢框模板用螺杆式卡具A kind of screw clamp for steel frame formwork

技术领域technical field

本发明属于建筑模板快拆体系技术领域,尤其涉及一种钢框模板用螺杆式卡具。The invention belongs to the technical field of building formwork quick release systems, and in particular relates to a screw-type fixture for steel frame formwork.

背景技术Background technique

建筑模板是一种临时性支护结构,按设计要求制作,使混凝土结构、构件按规定的位置、几何尺寸成形,保持其正确位置,并承受建筑模板自重及作用在其上的外部荷载。The building formwork is a temporary support structure, which is manufactured according to the design requirements, so that the concrete structure and components are formed according to the specified position and geometric size, maintain their correct position, and bear the self-weight of the building formwork and the external load acting on it.

现浇混凝土结构工程施工用的建筑模板结构,主要由面板、支撑结构和连接配件三部分组成。面板是直接接触新浇混凝土的承力板;支撑结构则是支承面板、混凝土和施工荷载的临时结构,保证建筑模板结构牢固地组合,做到不变形、不破坏;连接配件是将面板与支撑结构连接成整体的配件。The building formwork structure used in the construction of cast-in-place concrete structures is mainly composed of three parts: panels, supporting structures and connecting accessories. The panel is the load-bearing slab that directly contacts the newly poured concrete; the support structure is a temporary structure that supports the panel, concrete and construction loads, ensuring that the building formwork structure is firmly combined without deformation or damage; Fittings that connect structures into a whole.

传统的铝合金模板中,铝合金边框之间通常使用的连接配件是销片式卡具,然而销片式卡具在施工过程中由于振动等原因易松动,紧固性差,因此需要研发一种新型结构的、通用性更强的边框连接卡具。In the traditional aluminum alloy formwork, the connection accessories usually used between the aluminum alloy frames are pin-type clamps. However, due to vibration and other reasons during the construction process, the pin-type clamps are easy to loosen and have poor fastening performance. Therefore, it is necessary to develop a A frame connection fixture with a new structure and stronger versatility.

发明内容Contents of the invention

本发明的目的在于提供一种紧固性好、通用性强的钢框模板用螺杆式卡具。The object of the present invention is to provide a screw-type fixture for steel frame templates with good fastening performance and high versatility.

为实现上述目的,本发明提供如下技术方案:一种钢框模板用螺杆式卡具包括连接方管,以及相对安装于连接方管两端的第一卡紧机构和第二卡紧机构;所述连接方管包括连接方管本体,连接方管本体的一端固定设置有紧固机构,连接方管本体的另一端相对的管壁上等间距开设有三组连接孔;所述第一卡紧机构包括方管状的第一连接端,第一连接端可套设于所述连接方管本体外,第一连接端相对的管壁上开设有一组与所述连接孔相配合的第一安装孔,第一连接端的底部固定设置有第一卡紧部,第一卡紧部的内侧向内弯曲为弧形,弧形的末端向内凸起形成第一凸缘;所述第二卡紧机构包括方管状第二连接端,第二连接端可套设于所述连接方管本体外,第二连接端的长度大于第一连接端,靠近第二连接端外端的相对管壁上开设有一组与所述连接孔相配合的第二安装孔,第二连接端的底部与第二安装孔对应的位置固定设置有第二卡紧部,第二卡紧部的内侧向内弯曲为弧形,弧形的末端向内凸起形成第二凸缘。In order to achieve the above object, the present invention provides the following technical solutions: a screw-type clamp for steel frame formwork includes a connecting square tube, and a first clamping mechanism and a second clamping mechanism installed relatively at both ends of the connecting square tube; Connecting the square pipe includes connecting the square pipe body, one end connecting the square pipe body is fixedly provided with a fastening mechanism, and the opposite end of the square pipe body is connected with three groups of connecting holes at equal intervals on the pipe wall; the first clamping mechanism includes A square tubular first connecting end, the first connecting end can be sleeved outside the connecting square tube body, and a set of first mounting holes matching the connecting holes are opened on the pipe wall opposite the first connecting end. The bottom of a connecting end is fixedly provided with a first clamping part, the inner side of the first clamping part is curved inwardly into an arc, and the end of the arc protrudes inward to form a first flange; the second clamping mechanism includes a square Tubular second connection end, the second connection end can be sleeved outside the connecting square pipe body, the length of the second connection end is greater than the first connection end, and a group of pipes with the said pipe wall is opened near the outer end of the second connection end. The second installation hole matched with the connection hole, the bottom of the second connection end and the position corresponding to the second installation hole are fixedly provided with a second clamping part, the inner side of the second clamping part is curved inward into an arc, and the end of the arc is Projecting inwardly forms a second flange.

优选的,所述第一卡紧部的外侧中部设置有第一卡块,所述第二卡紧部的外侧中部设置有第二卡块。Preferably, a first locking block is provided at the outer middle part of the first clamping part, and a second locking block is provided at the outer middle part of the second clamping part.

优选的,所述第一卡块和第二卡块的边缘为锯齿状结构。Preferably, the edges of the first clamping block and the second clamping block are in a zigzag structure.

优选的,所述紧固机构包括固定设置于连接方管本体一端的紧固螺杆,紧固螺杆上配有相应的紧固螺帽。Preferably, the fastening mechanism includes a fastening screw fixedly arranged at one end of the connecting square pipe body, and the fastening screw is equipped with a corresponding fastening nut.

优选的,所述第一连接端与第一卡紧部的连接处设置有加强筋;所述第二连接端与第二卡紧部的连接处设置有加强筋。Preferably, a reinforcing rib is provided at the connection between the first connection end and the first clamping part; a reinforcing rib is provided at the connection between the second connection end and the second clamping part.

优选的,所述紧固螺杆焊接于所述连接方管本体的一端内壁上。Preferably, the fastening screw is welded on the inner wall of one end of the connecting square pipe body.

与现有技术相比,本发明的有益效果是:(1)本发明首先通过螺丝分别将连接方管与第一卡紧机构和第二卡紧机构进行预固定,然后调整卡具与边框的相对位置将边框卡紧后,再通过紧固螺杆和紧固螺帽从侧面进行进一步紧固完成固定连接过程,紧固性好,同时拆除也很方便;(2)本发明有两种安装方式,可同时实现对传统铝合金边框以及新型钢边框的固定连接,通用性高。Compared with the prior art, the beneficial effects of the present invention are: (1) the present invention first pre-fixes the connecting square tube with the first clamping mechanism and the second clamping mechanism respectively by screws, and then adjusts the clamping fixture and the frame. After clamping the frame at the relative position, further fastening from the side by the fastening screw and the fastening nut completes the fixed connection process, the fastening is good, and it is also very convenient to dismantle; (2) the present invention has two installation methods , can realize the fixed connection of the traditional aluminum alloy frame and the new steel frame at the same time, and has high versatility.

附图说明Description of drawings

图1为本发明的分解结构示意图;Fig. 1 is a schematic diagram of an exploded structure of the present invention;

图2为本发明使用状态的结构示意图;Fig. 2 is a schematic structural view of the present invention in use;

图3为本发明另一种使用状态的结构示意图。Fig. 3 is a structural schematic diagram of another usage state of the present invention.

图中:1、连接方管本体;2、连接孔;3、紧固螺杆;4、第一连接端;5、第一安装孔;6、第一卡紧部;7、第一凸缘;8、第一卡块;9、第二连接端;10、第二安装孔;11、第二卡紧部;12、第二卡块;13、第二凸缘;14、紧固螺帽。In the figure: 1. connecting square pipe body; 2. connecting hole; 3. fastening screw; 4. first connecting end; 5. first mounting hole; 6. first clamping part; 7. first flange; 8. The first clamping block; 9. The second connecting end; 10. The second mounting hole; 11. The second clamping part; 12. The second clamping block; 13. The second flange; 14. The fastening nut.

具体实施方式Detailed ways

下面将结合附图描述本发明的一个优选实施例,对本发明一优选实施例中的技术方案进行清楚、完整地描述。A preferred embodiment of the present invention will be described below in conjunction with the accompanying drawings, and the technical solution in a preferred embodiment of the present invention will be clearly and completely described.

请参见图1,本发明包括连接方管,以及相对安装于连接方管两端的第一卡紧机构和第二卡紧机构。Please refer to FIG. 1 , the present invention includes a connecting square pipe, and a first clamping mechanism and a second clamping mechanism installed oppositely at both ends of the connecting square pipe.

所述连接方管包括连接方管本体1,连接方管本体1的一端固定设置有紧固机构,连接方管本体1的另一端相对的管壁上等间距开设有三组连接孔2。The connecting square pipe includes connecting square pipe body 1, one end of connecting square pipe body 1 is fixedly provided with a fastening mechanism, and the opposite end of connecting square pipe body 1 is provided with three groups of connecting holes 2 at equal intervals on the pipe wall.

所述第一卡紧机构包括方管状的第一连接端4,第一连接端4可套设于所述连接方管本体1外,第一连接端4相对的管壁上开设有一组与所述连接孔2相配合的第一安装孔5,第一连接端4的底部固定设置有第一卡紧部6,第一卡紧部6的内侧向内弯曲为弧形,弧形的末端向内凸起形成第一凸缘7。The first clamping mechanism includes a square tubular first connecting end 4, the first connecting end 4 can be sleeved outside the connecting square tube body 1, and a set of pipes corresponding to the first connecting end 4 is provided on the wall opposite to the first connecting end 4. The first mounting hole 5 matched with the above connecting hole 2, the bottom of the first connecting end 4 is fixedly provided with a first clamping part 6, the inner side of the first clamping part 6 is curved inward to form an arc, and the end of the arc is curved toward the The inner protrusion forms the first flange 7 .

所述第二卡紧机构包括方管状第二连接端9,第二连接端9可套设于所述连接方管本体1外,第二连接端9的长度大于第一连接端4,靠近第二连接端4外端的相对管壁上开设有一组与所述连接孔2相配合的第二安装孔10,第二连接端9的底部与第二安装孔10对应的位置固定设置有第二卡紧部11,第二卡紧部11的内侧向内弯曲为弧形,弧形的末端向内凸起形成第二凸缘13。The second clamping mechanism includes a square tubular second connecting end 9, which can be sleeved outside the connecting square tube body 1, the length of the second connecting end 9 is greater than that of the first connecting end 4, and is close to the second connecting end 9. A group of second installation holes 10 matching the connection holes 2 are provided on the opposite pipe wall at the outer end of the two connection ends 4, and a second clip is fixedly arranged at the bottom of the second connection end 9 corresponding to the second installation holes 10. The inner side of the tightening part 11 and the second clamping part 11 are bent inward to form an arc, and the end of the arc protrudes inward to form a second flange 13 .

本实施例中,所述第一卡紧部6的外侧中部设置有第一卡块8,所述第二卡紧部11的外侧中部设置有第二卡块12;所述第一卡块8和第二卡块12的边缘为锯齿状结构。In this embodiment, a first clamping block 8 is provided at the outer middle part of the first clamping part 6, and a second clamping block 12 is provided at the outer middle part of the second clamping part 11; the first clamping block 8 And the edge of the second block 12 is a sawtooth structure.

本实施例中,所述紧固机构包括固定设置于连接方管本体1一端的紧固螺杆3,紧固螺杆3上配有相应的紧固螺帽14。In this embodiment, the fastening mechanism includes a fastening screw 3 fixedly arranged at one end connected to the square pipe body 1 , and a corresponding fastening nut 14 is provided on the fastening screw 3 .

本实施例中,所述第一连接端4与第一卡紧部6的连接处设置有加强筋;所述第二连接端9与第二卡紧部11的连接处设置有加强筋。In this embodiment, reinforcing ribs are provided at the connection between the first connecting end 4 and the first clamping portion 6 ; reinforcing ribs are provided at the connecting position between the second connecting end 9 and the second clamping portion 11 .

本实施例中,所述紧固螺杆3焊接于所述连接方管本体1的一端内壁上。In this embodiment, the fastening screw 3 is welded on the inner wall of one end of the connecting square pipe body 1 .

请参见图2,本发明的安装方法为:将第一连接端4和第二连接端9分别套设于连接方管本体1上进行预固定;然后将本卡具安装于一组相对设置的钢边框上,第一凸缘7和第二凸缘13分别卡入钢边框两侧的卡槽中,调整卡具使第一卡紧部6与第二卡紧部11将钢边框卡紧固定,然后通过在第一安装孔5、第二安装孔10和连接孔2内旋入螺丝进行固定,再通过紧固螺杆3和紧固螺帽14从侧面进行进一步紧固,完成固定连接过程。Please refer to Fig. 2, the installation method of the present invention is: the first connecting end 4 and the second connecting end 9 are respectively sleeved on the connecting square pipe body 1 for pre-fixing; On the steel frame, the first flange 7 and the second flange 13 are respectively snapped into the slots on both sides of the steel frame, and the fixture is adjusted so that the first clamping part 6 and the second clamping part 11 clamp and fix the steel frame , and then fixed by screwing screws in the first mounting hole 5, the second mounting hole 10 and the connecting hole 2, and then further tightening from the side by the fastening screw 3 and the fastening nut 14 to complete the fixed connection process.

请参见图3,本发明还有另外一种使用方法,可用于传统的铝合金边框,与上述安装方法不同之处在于,将第一连接端4和第二连接端9反向套设于连接方管本体1上,即将卡具的第一卡块8与第二卡块12相对安装,第一卡紧部6与第二卡紧部11配合第一卡块8和第二卡块12边缘的锯齿状粗糙面将铝合金边框卡紧,紧固方式与上述方法相同。Please refer to Fig. 3, the present invention has another usage method, which can be used for the traditional aluminum alloy frame. The difference from the above-mentioned installation method is that the first connection end 4 and the second connection end 9 are reversely sleeved on the connection On the square pipe body 1, the first clamping block 8 and the second clamping block 12 of the fixture are installed oppositely, and the first clamping part 6 and the second clamping part 11 cooperate with the edges of the first clamping block 8 and the second clamping block 12 The serrated rough surface of the aluminum alloy frame is fastened, and the fastening method is the same as the above method.

本发明首先通过螺丝分别将连接方管与第一卡紧机构和第二卡紧机构进行预固定,然后调整卡具与边框的相对位置将边框卡紧后,再通过紧固螺杆和紧固螺帽从侧面进行进一步紧固完成固定连接过程,紧固性好,同时拆除也很方便;本发明有两种安装方式,可同时实现对传统铝合金边框以及新型钢边框的固定连接,通用性高。The present invention first pre-fixes the connecting square tube with the first clamping mechanism and the second clamping mechanism respectively by screws, then adjusts the relative position of the fixture and the frame to clamp the frame, and then tightens the frame through the fastening screw and the fastening screw. The cap is further fastened from the side to complete the fixed connection process, which has good fastness and is also very convenient to remove; the invention has two installation methods, which can realize the fixed connection of the traditional aluminum alloy frame and the new steel frame at the same time, and has high versatility .

尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those skilled in the art can understand that various changes, modifications and substitutions can be made to these embodiments without departing from the principle and spirit of the present invention. and modifications, the scope of the invention is defined by the appended claims and their equivalents.

Claims (6)

1. The utility model provides a screw fixture for steel frame template which characterized in that: the clamping device comprises a connecting square pipe, a first clamping mechanism and a second clamping mechanism, wherein the first clamping mechanism and the second clamping mechanism are oppositely arranged at two ends of the connecting square pipe;
the connecting square pipe comprises a connecting square pipe body (1), a fastening mechanism is fixedly arranged at one end of the connecting square pipe body (1), and three groups of connecting holes (2) are formed in the pipe wall opposite to the other end of the connecting square pipe body (1) at equal intervals;
the first clamping mechanism comprises a first connecting end (4) in a square tube shape, the first connecting end (4) can be sleeved outside the connecting square tube body (1), a group of first mounting holes (5) matched with the connecting holes (2) are formed in the tube wall opposite to the first connecting end (4), a first clamping part (6) is fixedly arranged at the bottom of the first connecting end (4), the inner side of the first clamping part (6) is inwards bent to be in an arc shape, and the tail end of the arc shape inwards protrudes to form a first flange (7);
the second clamping mechanism comprises a square-tube-shaped second connecting end (9), the second connecting end (9) can be sleeved outside the square connecting pipe body (1), the length of the second connecting end (9) is larger than that of the first connecting end (4), a group of second mounting holes (10) matched with the connecting holes (2) are formed in the opposite pipe wall close to the outer end of the second connecting end (4), a second clamping portion (11) is fixedly arranged at the position, corresponding to the second mounting holes (10), of the bottom of the second connecting end (9), the inner side of the second clamping portion (11) is bent inwards to form an arc shape, and the arc-shaped tail end protrudes inwards to form a second flange (13).
2. The screw type fixture for the steel frame template according to claim 1, characterized in that: the outer middle part of the first clamping part (6) is provided with a first clamping block (8), and the outer middle part of the second clamping part (11) is provided with a second clamping block (12).
3. The screw type fixture for the steel frame template according to claim 2, characterized in that: the edges of the first fixture block (8) and the second fixture block (12) are of sawtooth structures.
4. The screw type fixture for the steel frame template according to claim 1, characterized in that: the fastening mechanism comprises a fastening screw rod (3) fixedly arranged at one end of the square connecting pipe body (1), and a corresponding fastening nut (14) is arranged on the fastening screw rod (3).
5. The screw type fixture for the steel frame template according to claim 1, characterized in that: a reinforcing rib is arranged at the joint of the first connecting end (4) and the first clamping part (6); and a reinforcing rib is arranged at the joint of the second connecting end (9) and the second clamping part (11).
6. The screw type fixture for the steel frame template according to claim 1, characterized in that: the fastening screw rod (3) is welded on the inner wall of one end of the square connecting pipe body (1).
CN201910990903.1A 2019-10-18 2019-10-18 Screw fixture for steel frame template Active CN110593561B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910990903.1A CN110593561B (en) 2019-10-18 2019-10-18 Screw fixture for steel frame template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910990903.1A CN110593561B (en) 2019-10-18 2019-10-18 Screw fixture for steel frame template

Publications (2)

Publication Number Publication Date
CN110593561A true CN110593561A (en) 2019-12-20
CN110593561B CN110593561B (en) 2024-05-10

Family

ID=68850763

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910990903.1A Active CN110593561B (en) 2019-10-18 2019-10-18 Screw fixture for steel frame template

Country Status (1)

Country Link
CN (1) CN110593561B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3020742U (en) * 1995-07-18 1996-02-06 義晴 内橋 Formwork clamp
JP2004360391A (en) * 2003-06-06 2004-12-24 Teruaki Nishioka Connecting tool set, structure, and metallic pipe connecting method
JP2008128297A (en) * 2006-11-17 2008-06-05 Osaka Rasenkan Kogyo Kk Clamp for flange type pipe joint
CN102031865A (en) * 2010-12-03 2011-04-27 蓟县新兴模板技术服务部 Steel frame template and assembly method thereof
US8496421B1 (en) * 2010-11-09 2013-07-30 Christopher C. Burton Ferrule lock nuts
CN108166757A (en) * 2018-03-14 2018-06-15 沭阳县福阳木业制品厂 A kind of bindiny mechanism of building template
KR20180065043A (en) * 2016-12-06 2018-06-18 주식회사 정우비엔씨 Reinforced Connection device and method
CN208137431U (en) * 2017-11-09 2018-11-23 天津市东文模架施工技术有限公司 A kind of building template connector
CN211229531U (en) * 2019-10-18 2020-08-11 天津市东鑫新材料科技有限公司 Screw type fixture for steel frame template

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3020742U (en) * 1995-07-18 1996-02-06 義晴 内橋 Formwork clamp
JP2004360391A (en) * 2003-06-06 2004-12-24 Teruaki Nishioka Connecting tool set, structure, and metallic pipe connecting method
JP2008128297A (en) * 2006-11-17 2008-06-05 Osaka Rasenkan Kogyo Kk Clamp for flange type pipe joint
US8496421B1 (en) * 2010-11-09 2013-07-30 Christopher C. Burton Ferrule lock nuts
CN102031865A (en) * 2010-12-03 2011-04-27 蓟县新兴模板技术服务部 Steel frame template and assembly method thereof
KR20180065043A (en) * 2016-12-06 2018-06-18 주식회사 정우비엔씨 Reinforced Connection device and method
CN208137431U (en) * 2017-11-09 2018-11-23 天津市东文模架施工技术有限公司 A kind of building template connector
CN108166757A (en) * 2018-03-14 2018-06-15 沭阳县福阳木业制品厂 A kind of bindiny mechanism of building template
CN211229531U (en) * 2019-10-18 2020-08-11 天津市东鑫新材料科技有限公司 Screw type fixture for steel frame template

Also Published As

Publication number Publication date
CN110593561B (en) 2024-05-10

Similar Documents

Publication Publication Date Title
CN103075407A (en) Bracing type single-edge bolt fastener
CN203531385U (en) Mold for plugging gap between reserved hole and pipeline
CN111472461B (en) Steel pipe concrete column steel reinforced concrete beam ring beam node formwork reinforcement and method
CN209195907U (en) Unilateral bolt
CN214756153U (en) A photovoltaic bracket that is easy to fold and assemble
CN110593561A (en) A kind of screw clamp for steel frame formwork
CN211229531U (en) Screw type fixture for steel frame template
CN206888514U (en) Sliding type opposite-pulling fastening beam formwork supporting bracket
CN111894156A (en) External wall thermal insulation connection structure and wall body
CN113605694A (en) Method for reinforcing short-limb shear wall template
CN112012351A (en) Prefabricated wall panel dry connection joint with double connection of beam top and beam bottom
CN110593562A (en) Steel frame shaping building template system
CN207277389U (en) A kind of end template structure of deformation joint
CN216380589U (en) Aluminum alloy template screw system is equipped with stupefied fastener only
CN212927143U (en) Self-adaptive template supporting device
CN211949613U (en) Aluminum alloy building template clamping member
CN209398928U (en) A pump tube attached to the wall fixing bracket
CN221703118U (en) Novel conversion fastener of integral steel pipe
CN114033176B (en) A single-rib fastening device for aluminum alloy formwork screw system
CN119254094B (en) Solar panel installation device
CN221742968U (en) A detachable installation mechanism for an octagonal tube
CN220945058U (en) Lateral wall stull device
CN222375995U (en) External corner template reinforcing apparatus
CN216108608U (en) Embedded part fixing and combining device
JPS5836948Y2 (en) antenna pole support

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20250310

Address after: Room 302, 3rd Floor, No. 22 Industrial Avenue, Chengbei New District, Longbo Town, Shuangpai County, Yongzhou City, Hunan Province, China 425299

Patentee after: Hunan Zehao New Material Technology Co.,Ltd.

Country or region after: China

Address before: 300000-1012 Huaying building, Central Avenue, pilot free trade zone (Airport Economic Zone), Binhai New Area, Tianjin

Patentee before: TIANJIN DONGXIN NEW MATERIAL TECHNOLOGY CO.,LTD.

Country or region before: China