[go: up one dir, main page]

CN110057741A - A kind of unrestrained well seepage tests model equipment in water-bearing layer bottom - Google Patents

A kind of unrestrained well seepage tests model equipment in water-bearing layer bottom Download PDF

Info

Publication number
CN110057741A
CN110057741A CN201910357325.8A CN201910357325A CN110057741A CN 110057741 A CN110057741 A CN 110057741A CN 201910357325 A CN201910357325 A CN 201910357325A CN 110057741 A CN110057741 A CN 110057741A
Authority
CN
China
Prior art keywords
water
pipe
seepage
well
drainage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910357325.8A
Other languages
Chinese (zh)
Other versions
CN110057741B (en
Inventor
王文学
李洋
董金玉
姜彤
刘海宁
何志磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China University of Water Resources and Electric Power
Original Assignee
North China University of Water Resources and Electric Power
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China University of Water Resources and Electric Power filed Critical North China University of Water Resources and Electric Power
Priority to CN201910357325.8A priority Critical patent/CN110057741B/en
Publication of CN110057741A publication Critical patent/CN110057741A/en
Application granted granted Critical
Publication of CN110057741B publication Critical patent/CN110057741B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N15/00Investigating characteristics of particles; Investigating permeability, pore-volume or surface-area of porous materials
    • G01N15/08Investigating permeability, pore-volume, or surface area of porous materials
    • G01N15/0806Details, e.g. sample holders, mounting samples for testing
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N15/00Investigating characteristics of particles; Investigating permeability, pore-volume or surface-area of porous materials
    • G01N15/08Investigating permeability, pore-volume, or surface area of porous materials
    • G01N15/082Investigating permeability by forcing a fluid through a sample
    • G01N15/0826Investigating permeability by forcing a fluid through a sample and measuring fluid flow rate, i.e. permeation rate or pressure change

Landscapes

  • Chemical & Material Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Biochemistry (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Dispersion Chemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Fluid Mechanics (AREA)
  • Sewage (AREA)

Abstract

The present invention discloses a kind of unrestrained well seepage tests model equipment in water-bearing layer bottom, including sector, the seepage flow sandbox body of hollow only upper end opening, sand body is filled in seepage flow sandbox body, water level monitoring system is provided in seepage flow sandbox body, seepage flow sandbox body includes front side board, back side panel and circular arc outer panel, seepage flow sandbox body edge is provided with pressure stabilizing tank along its circular arc outer panel, the different inlet and outlet of at least two groups height are provided on circular arc outer panel, several permeable holes are offered on circular arc interior plate, fan-shaped unrestrained well is provided in seepage flow sandbox body close to its center location, unrestrained well bottom is provided with the unrestrained mouth of a river, saturation water inlet is provided in the seepage flow sand tank floor, the unrestrained mouth of a river, it is saturated water inlet, inlet and outlet are connected separately with water supply circulatory system.Compared with prior art, the present invention has the characteristics that structure is simple, strong applicability, economy, realizes the research to the unrestrained well seepage flow characteristics in water-bearing layer bottom.

Description

一种含水层底部疏放水井渗流试验模型装置A model device for seepage test of drainage wells at the bottom of aquifers

技术领域technical field

本发明属于含水层底部疏放水井渗流技术领域,具体涉及一种含水层底部疏放水井渗流试验模型装置。The invention belongs to the technical field of seepage in a drainage well at the bottom of an aquifer, in particular to a model device for a seepage test of a drainage well at the bottom of an aquifer.

背景技术Background technique

深入地面以下开发利用地下空间及能源资源是21世纪人类工程活动的主要课题,我国是世界隧道和地下工程最多、发展最快、水文地质及结构形式最复杂的国家,复杂的水文地质条件对地下工程施工带来诸多困难。地下工程施工扰动围岩体形成不同程度的扰动裂隙,其贯穿联通是形成突水、涌砂、突泥等灾害的重要通道,对工程与生命财产安全构成严重威胁。The development and utilization of underground space and energy resources below the ground is the main subject of human engineering activities in the 21st century. my country is the country with the most tunnels and underground projects, the fastest development, and the most complex hydrogeological and structural forms in the world. The construction of the project brought many difficulties. Underground engineering construction disturbs the surrounding rock mass to form disturbed fissures of varying degrees, and its penetration is an important channel for the formation of water inrush, sand gushing, mud inrush and other disasters, posing a serious threat to the safety of engineering and life and property.

超前探测并对含水层(体)进行疏水降压是解决水体下工程施工发生突水溃砂灾害的有效手段。对于深部地下工程施工,地面施工钻孔进行抽排水降压,钻进深度往往要800m以上,时间长、费用高,在地下空间向上施工仰斜孔(钻进长度通常小于100m)对含水层(体)进行疏水降压更为经济、合理。Detecting and depressurizing aquifers (bodies) in advance is an effective means to solve the water inrush and sand inrush disasters in engineering construction under water bodies. For deep underground engineering construction, the ground construction holes are pumped, drained and depressurized. The drilling depth is often more than 800m, which takes a long time and costs a lot. The upward construction of inclined holes in the underground space (the drilling length is usually less than 100m) is very important for aquifers ( It is more economical and reasonable to conduct hydrophobic depressurization.

仰斜疏放水孔由含水层底部进入含水层,含水层体内水流依靠渗流梯度及自重向下渗流,这与传统意义上地面的抽排水井渗流规律不同。传统的适用于地面的抽排水井渗流规律的Dipuit-Thiem公式已不再适合计算疏放水井的渗流规律。在疏放水井渗流特征方面,疏放水井的井径、井长及疏放水井底开闭对疏放水渗流特征有着显著影响,进而影响地下工作面进行疏水降压时疏放水井的布设方案;然而,目前还没有适用于研究疏放水井渗流特征的模型及方法。The oblique drainage hole enters the aquifer from the bottom of the aquifer, and the water flow in the aquifer depends on the seepage gradient and its own weight to flow downward, which is different from the seepage law of the ground pumping and drainage wells in the traditional sense. The traditional Dipuit-Thiem formula, which is suitable for the seepage law of the ground pumping and drainage wells, is no longer suitable for calculating the seepage law of the drainage wells. In terms of the seepage characteristics of the drainage well, the diameter and length of the drainage well and the opening and closing of the drainage well bottom have a significant impact on the seepage characteristics of the drainage water, which in turn affects the layout plan of the drainage well when the underground working face is drained and depressurized; However, there are no models and methods suitable for studying the seepage characteristics of drainage wells.

发明内容SUMMARY OF THE INVENTION

为解决传统的适用于地面的抽排水井渗流规律的Dipuit-Thiem公式已不再适合计算疏放水井的渗流规律的问题,本发明提供一种含水层底部疏放水井渗流试验模型装置,具有结构简单、适用性强、经济节约的特点,实现对含水层底部疏放水井渗流特征的研究,能有效的揭示动静储量水对疏放水井非稳定渗流阶段的定量补给特征,揭示含水层底部疏放水井井长、井径以及含水层的厚度、孔隙水压力等因素对非完整疏放水井渗流特征的影响关系,为采用含水层底部疏放水试验测试含水层水文地质参数的方法并推导相关理论公式等方面提供物理模型研究基础。In order to solve the problem that the traditional Dipuit-Thiem formula, which is suitable for the seepage law of the ground pumping and drainage wells, is no longer suitable for calculating the seepage law of the drainage wells, the present invention provides a seepage test model device for the drainage wells at the bottom of the aquifer, which has a structure. The characteristics of simplicity, strong applicability, and economical economy can realize the study of the seepage characteristics of the drainage wells at the bottom of the aquifer, and can effectively reveal the quantitative replenishment characteristics of the dynamic and static water reserves to the unsteady seepage stage of the drainage wells, and reveal the drainage wells at the bottom of the aquifer. The relationship between the well length, well diameter, thickness of aquifer, pore water pressure and other factors on the seepage characteristics of incomplete drainage wells, in order to test the hydrogeological parameters of the aquifer by using the drainage test at the bottom of the aquifer and deduce the relevant theoretical formulas and other aspects to provide the basis for physical model research.

本发明的目的是以下述方式实现的:The purpose of this invention is to realize in the following way:

一种含水层底部疏放水井渗流试验模型装置,包括扇形、空心的仅上端开口的渗流砂箱体,渗流砂箱体内填充有砂体,渗流砂箱体内设置有水位监测系统,渗流砂箱体包括前侧板、后侧板和圆弧外侧板,渗流砂箱体边缘沿其圆弧外侧板设置有稳压槽,稳压槽的圆弧外侧板上设置有至少两组高度不同的进水口和出水口,稳压槽的圆弧内侧板上开设有若干透水孔,渗流砂箱体内靠近其圆心位置设置有扇形的疏放水井,疏放水井底部设置有疏放水口,所述渗流砂箱体底面上设置有饱和进水口,所述疏放水口、饱和进水口、进水口和出水口分别连接有供水循环系统。A seepage test model device for a drainage well at the bottom of an aquifer, comprising a fan-shaped, hollow seepage sand box with only the upper end open, the seepage sand box is filled with sand, a water level monitoring system is arranged in the seepage sand box, and the seepage sand box is It includes a front side plate, a rear side plate and a circular arc outer plate. The edge of the seepage sand box is provided with a pressure stabilization groove along its arc outer plate, and at least two groups of water inlets with different heights are arranged on the circular arc outer plate of the pressure stabilization tank. and water outlet, a number of permeable holes are opened on the inner side plate of the arc of the pressure stabilization tank, a fan-shaped drainage well is arranged in the seepage sand box near the center of the circle, and a drainage hole is arranged at the bottom of the drainage well. A saturated water inlet is arranged on the bottom surface of the body, and a water supply circulation system is respectively connected to the dredging water inlet, the saturated water inlet, the water inlet and the water outlet.

所述疏放水井包括井管,井管壁上开设有透水孔,所述前侧板和后侧板内侧壁上靠近渗流砂箱体圆心位置分别设置有疏放水井插槽,所述井管插在疏放水井插槽内从而卡接在渗流砂箱体上,所述疏放水井顶部放置有井盖;所述井管为多段子管组成,子管的弧形长度与井管的弧形长度一致。The drainage well includes a well pipe, and a water permeable hole is formed on the wall of the well pipe, and a drainage well slot is respectively provided on the inner side wall of the front side plate and the rear side plate near the center of the seepage sand box. It is inserted into the slot of the drainage well so as to be clamped on the seepage sand box, and a well cover is placed on the top of the drainage well; same length.

所述井管底部设有用于支撑井管的水平的拆卸插板,所述渗流砂箱体底部靠近其圆心位置开设有拆卸插槽,拆卸插板的一端通过插在拆卸插槽内固定在渗流砂箱体上,所述疏放水口设置在拆卸插板上,井管与井盖、前侧板、后侧板、拆卸插板形成扇形的疏放水井,所述拆卸插板的整体尺寸大于所需研究的最大疏放水井的横截面尺寸。The bottom of the well pipe is provided with a horizontal dismounting insert plate for supporting the well pipe, a dismounting slot is opened at the bottom of the seepage sand box near the center of the circle, and one end of the dismounting insert plate is fixed on the seepage by being inserted into the dismounting slot. On the sand box body, the drainage port is arranged on the dismantling insert, the well pipe and the well cover, the front side plate, the rear side plate, and the dismounting insert form a fan-shaped draining well, and the overall size of the dismantling insert is larger than that of the dismantling insert. The cross-sectional dimension of the largest evacuation well to be studied.

所述前侧板和后侧板内侧壁上靠近渗流砂箱体圆心位置均设置有砂体保护板插槽,砂体保护板插槽位于疏放水井插槽远离圆心位置的一侧,砂体保护板插槽内卡接有砂体保护板,所述砂体保护板到渗流砂箱体圆心位置之间的距离大于所需研究最大疏放水井的半径。A sand body protection plate slot is arranged on the inner side wall of the front side plate and the rear side plate near the center of the seepage sand box. The sand body protection plate slot is located on the side of the drainage well slot away from the center of the circle. A sand body protection plate is clamped in the protection plate slot, and the distance between the sand body protection plate and the center of the seepage sand box is greater than the radius of the largest drainage well to be studied.

所述渗流砂箱体上部设置有活动密封盖,活动密封盖的外轮廓尺寸与渗流砂箱体内轮廓尺寸一致,活动密封盖边缘粘结有橡胶密封条;所述渗流砂箱体底面上安装有车轮。The upper part of the seepage sand box is provided with a movable sealing cover, the outer contour size of the movable sealing cover is consistent with the inner contour size of the seepage sand box, and the edge of the movable sealing cover is bonded with a rubber sealing strip; the bottom surface of the seepage sand box is installed with a wheel.

所述水位监测系统包括水位监测管集成板和若干水位监测管,水位监测管集成板外侧设置有用于实时同步监测水位监测管水位变化的数码相机,水位监测管集成板固定在前侧板外侧面上,水位监测管根据水位监测点布设情况分层埋设在渗流砂箱体内,水位监测管的水位探测端位于预设的水位监测点上,另一端穿过前侧板集成在水位监测管集成板上。The water level monitoring system includes a water level monitoring tube integrated board and a plurality of water level monitoring tubes. A digital camera for real-time synchronous monitoring of the water level change of the water level monitoring tube is arranged on the outside of the water level monitoring tube integrated board, and the water level monitoring tube integrated board is fixed on the outer side of the front side plate. The water level monitoring pipe is embedded in the seepage sand box in layers according to the layout of the water level monitoring points. superior.

所述水位监测管集成板包括集成板本体,集成板本体上间隔设置有竖直的中空管,中空管上沿竖直方向标有刻度,中空管的数量等于或大于水位监测管的数量,水位监测管的另一端与中空管的底部相连通。The water level monitoring tube integrated board includes an integrated board body, and vertical hollow tubes are arranged at intervals on the integrated board body, the hollow tubes are marked with scales along the vertical direction, and the number of the hollow tubes is equal to or greater than that of the water level monitoring tubes. quantity, the other end of the water level monitoring pipe is communicated with the bottom of the hollow pipe.

所述供水循环系统包括供水箱、中转箱和集水箱,供水箱连接有集水箱排水管,集水箱排水管连接有集水箱抽水泵,集水箱抽水泵连接有集水箱抽水管,集水箱抽水管连接集水箱,所述供水箱还连接有中转箱排水管,中转箱排水管连接有中转箱抽水泵,中转箱抽水泵连接有中转箱抽水管,中转箱抽水管连接中转箱;The water supply circulation system includes a water supply tank, a transfer tank and a water collection tank. The water supply tank is connected with a water collection tank drainage pipe, the water collection tank drainage pipe is connected with a collection tank pumping pump, and the collection tank pumping pump is connected with a collection tank pumping pipe, and the collecting tank pumping pipe The water collecting tank is connected, the water supply tank is also connected with a transfer box drainage pipe, the transfer box drainage pipe is connected with a transfer box pumping pump, the transfer box pumping pump is connected with a transfer box pumping pipe, and the transfer box pumping pipe is connected with the transfer box;

供水箱连接有供水管和饱和水管,供水管与进水口相连通,供水管上安装有供水阀门,所述饱和水管与饱和进水口相连通,饱和水管上安装有饱和阀门;所述中转箱连接有出水口水管,出水口水管与出水口相连通;所述集水箱连接有放水管,放水管与疏放水口相连通,放水管上安装有疏放水阀门。The water supply tank is connected with a water supply pipe and a saturated water pipe, the water supply pipe is connected with the water inlet, a water supply valve is installed on the water supply pipe, the saturated water pipe is connected with the saturated water inlet, and a saturated valve is installed on the saturated water pipe; the transfer box is connected There is a water outlet pipe, and the water outlet water pipe is connected with the water outlet; the water collecting tank is connected with a water discharge pipe, the water discharge pipe is connected with the drainage water outlet, and a water drainage valve is installed on the water discharge pipe.

所述供水循环系统上设置有水量监测系统,水量监测系统由供水口流量计、出水口流量计、疏水口流量计、数据采集装置及电脑组成,供水口流量计、出水口流量计、疏水口流量计分别连接数据采集装置,数据采集装置连接电脑,供水口流量计安装在供水管上,出水口流量计安装在出水口水管上,疏水口流量计安装在放水管上。The water supply circulation system is provided with a water quantity monitoring system. The water quantity monitoring system consists of a water supply outlet flowmeter, a water outlet flowmeter, a drain outlet flowmeter, a data acquisition device and a computer. The flowmeters are respectively connected to the data acquisition device, the data acquisition device is connected to the computer, the water supply outlet flowmeter is installed on the water supply pipe, the water outlet flowmeter is installed on the water outlet water pipe, and the drain outlet flowmeter is installed on the water discharge pipe.

所述疏放水井插槽沿前侧板、后侧板的径向分别间隔设置。The drainage well slots are respectively arranged at intervals along the radial direction of the front side plate and the rear side plate.

相对于现有技术,本发明的优点如下:Compared with the prior art, the advantages of the present invention are as follows:

1.首次设计了含水层底部疏放水井渗流试验模型装置,弥补含水层底部疏放水试验研究装置的空白;1. For the first time, a model device for the seepage test of the drainage well at the bottom of the aquifer is designed to make up for the blank of the experimental research device for the drainage of water at the bottom of the aquifer;

2.本发明的试验模型装置中渗流砂箱体横截面、疏放水井横截面均为扇形,节省了试验装置材料、试验砂体及试验时间;2. In the test model device of the present invention, the cross section of the seepage sand box and the cross section of the drainage well are fan-shaped, which saves the material of the test device, the test sand body and the test time;

3.可用于研究不同井径、井长的疏放水井的渗流特征;通过设置砂体保护板及拆卸插板,疏放水井的井管采用分节设计,便于更换井管,且井管更换过程中不扰动砂体保护板后侧的固结砂体,提高了渗流砂体渗流参数的稳定性及试验结果的准确性;3. It can be used to study the seepage characteristics of drainage wells with different well diameters and well lengths; by setting the sand body protection plate and removing the insert plate, the well pipe of the drainage well adopts a segmented design, which is easy to replace the well pipe, and the well pipe is replaced During the process, the consolidated sand body on the back side of the sand body protection plate is not disturbed, which improves the stability of the seepage parameters of the seepage sand body and the accuracy of the test results;

4.采用循环供水系统,节约水资源;在渗流砂箱体上的稳压槽进水口、出水口及疏放水口均安装流量计,能同步准确监测疏放水井非稳定渗流阶段静储量补给及动储量补给的定量关系;4. The circulating water supply system is adopted to save water resources; flow meters are installed at the water inlet, water outlet and drainage outlet of the pressure stabilization tank on the seepage sand box, which can synchronously and accurately monitor the static reserve replenishment and discharge of the drainage well in the unstable seepage stage. Quantitative relationship of dynamic reserve replenishment;

5.本发明的试验模型装置可用于研究井长、井径以及含水层的厚度、孔隙水压力等因素对非完整疏放水井渗流特征的影响关系,为建立深部含水层底部疏放水井渗流模型及理论计算方程、界定深部含水层底部疏放水井极限井长、给出采用疏放水试验测试含水层水文地质参数的方法并推导相关理论公式等方面提供了物理模型研究基础。5. The experimental model device of the present invention can be used to study the influence relationship of factors such as well length, well diameter, thickness of aquifer, pore water pressure, etc. on the seepage characteristics of incomplete drainage wells, in order to establish a seepage model of drainage wells at the bottom of deep aquifers. and theoretical calculation equations, defining the limit well length of the drainage well at the bottom of the deep aquifer, giving the method of testing the hydrogeological parameters of the aquifer by the drainage test, and deriving the relevant theoretical formulas, which provide the basis for the research of the physical model.

附图说明Description of drawings

图1是本发明渗流试验模型装置整体图。Figure 1 is an overall view of the seepage test model device of the present invention.

图2是图1中渗流砂箱体的俯视图。FIG. 2 is a top view of the seepage sand box in FIG. 1 .

图3是井管的结构示意图。Figure 3 is a schematic diagram of the structure of the well pipe.

图4是井盖的结构示意图。Figure 4 is a schematic diagram of the structure of the manhole cover.

图5是拆卸插板的结构示意图。FIG. 5 is a schematic structural diagram of disassembling the plug-in board.

图6是砂体保护板的结构示意图。Figure 6 is a schematic structural diagram of a sand body protection plate.

图中:1-渗流砂箱体;2-井盖;3-井管;4-疏放水口;5-拆卸插槽;6-拆卸插板;7-砂体保护板;8-疏放水井插槽;9-砂体保护板插槽;10-活动密封盖;11-车轮;12-稳压槽;13-进水口;14-出水口;15-出水口流量计;16-出水口水管;17-饱和水管;18-供水口流量计;19-供水阀门;20-饱和阀门;21-供水箱;22-中转箱排水管;23-中转箱抽水泵;24-中转箱抽水管;25-供水管;26-集水箱排水管;27-数码相机;28-疏放水阀门;29-疏水口流量计;30-放水管;31-集水箱抽水管;32-集水箱抽水泵;33-集水箱;34-饱和进水口;35-水位监测管集成板;36-中转箱;37-供水箱供水口;38-供水箱饱和进水口;39-圆弧内侧板;40-圆弧外侧板;41-后侧板;42-前侧板;43-中空管;44-采集装置;45-电脑;46-水位监测点;47-水位监测管。In the figure: 1-seepage sand box; 2-well cover; 3-well pipe; 4-draining water outlet; 5-removal slot; 6-removal insert plate; 7-sand body protection plate; Slot; 9-sand protection plate slot; 10-movable sealing cover; 11-wheel; 12-pressure tank; 13-water inlet; 14-water outlet; 15-water outlet flowmeter; 16-water outlet pipe; 17-saturated water pipe; 18-flow meter of water supply port; 19-water supply valve; 20-saturated valve; 21-water supply tank; 22-transfer box drain pipe; 23-transfer box pump; Water supply pipe; 26-water collection tank drain pipe; 27-digital camera; 28-drain water valve; 29-water drainage port flowmeter; 30-water discharge pipe; 31-collection tank suction pipe; 32-collection tank suction pump; 33-collection Water tank; 34-saturated water inlet; 35-water level monitoring tube integrated board; 36-transfer box; 37-water supply tank water inlet; 38-water supply tank saturated water inlet; 39-arc inner plate; 40-arc outer plate; 41-rear side board; 42-front side board; 43-hollow pipe; 44-collection device; 45-computer; 46-water level monitoring point; 47-water level monitoring pipe.

具体实施方式Detailed ways

如图1-6所示,一种含水层底部疏放水井渗流试验模型装置,包括扇形、空心的仅上端开口的渗流砂箱体1,渗流砂箱体1内填充有砂体,也可以填充其他各类需要的材料,渗流砂箱体1内设置有水位监测系统,渗流砂箱体1包括前侧板42、后侧板41和圆弧外侧板40,渗流砂箱体1边缘沿其圆弧外侧板40设置有稳压槽12,稳压槽12的圆弧外侧板40上设置有至少两组高度不同的进水口13和出水口14,此处图1中进水口13和出水口14一共为四组,可用于设置不同高度边界水头,稳压槽12的圆弧内侧板39上开设有若干透水孔(图中未示出),渗流砂箱体1内靠近其圆心位置设置有扇形的疏放水井,疏放水井底部设置有疏放水口4,用于疏放渗流入疏放水井内的水流,所述渗流砂箱体1底面上设置有饱和进水口34,所述疏放水口4、饱和进水口34、进水口13和出水口14分别连接有供水循环系统。上述稳压槽12由内侧板和外侧板组成。上述饱和进水口34为两个,均匀分布于渗流砂箱体1的底板中间部位,两个饱和进水口34并联与供水循环系统连接。As shown in Figure 1-6, a model device for the seepage test of the drainage well at the bottom of the aquifer includes a fan-shaped, hollow seepage sand box 1 with only the upper end open. The seepage sand box 1 is filled with sand bodies, or can be filled with sand bodies. For other materials required, the seepage sand box 1 is provided with a water level monitoring system. The seepage sand box 1 includes a front side plate 42, a rear side plate 41 and a circular arc outer plate 40. The seepage sand box 1 has an edge along its circle. The arc outer plate 40 is provided with a pressure-stabilizing groove 12, and at least two groups of water inlets 13 and water outlets 14 with different heights are arranged on the circular arc outer plate 40 of the pressure-stabilizing groove 12. Here, the water inlet 13 and the water outlet 14 in FIG. 1 There are four groups in total, which can be used to set boundary water heads of different heights. A number of permeable holes (not shown in the figure) are opened on the circular arc inner plate 39 of the pressure stabilization tank 12. The seepage sand box 1 is provided with a fan shape near the center of the circle. The bottom of the drainage well is provided with a drainage water port 4 for dredging the water flow that seeps into the drainage well, and the bottom surface of the seepage sand box 1 is provided with a saturated water inlet 34. , The saturated water inlet 34, the water inlet 13 and the water outlet 14 are respectively connected with a water supply circulation system. The above-mentioned pressure stabilization tank 12 is composed of an inner plate and an outer plate. There are two saturated water inlets 34, which are evenly distributed in the middle of the bottom plate of the seepage sand box 1, and the two saturated water inlets 34 are connected in parallel with the water supply circulation system.

优选地,所述疏放水井包括井管3,井管3壁上开设有高密度透水孔,如图3所示,所述前侧板42和后侧板41内侧壁上靠近渗流砂箱体1圆心位置分别设置有疏放水井插槽8,所述井管3插在疏放水井插槽8内从而卡接在渗流砂箱体1上,所述疏放水井顶部放置有井盖2,井盖2可以根据试验需要,为透水性井盖或非透水性井盖。透水性的井盖2上有高密度透水孔,井管3和透水井盖2外侧均包裹有不锈钢高密度细丝过滤网,以防止细颗粒砂颗粒流入井管3内侧。疏放水井插槽8为U型,便于安装或拆卸井管3。Preferably, the drainage well includes a well pipe 3, and high-density water permeable holes are opened on the wall of the well pipe 3. As shown in FIG. 3, the inner side walls of the front side plate 42 and the rear side plate 41 are close to the seepage sand box. 1. The position of the center of the circle is respectively provided with a drainage well slot 8, the well pipe 3 is inserted in the drainage well slot 8 so as to be clamped on the seepage sand box 1, and a well cover 2 is placed on the top of the drainage well. 2 According to the needs of the test, it can be a permeable well cover or a non-permeable well cover. The water-permeable manhole cover 2 has high-density water-permeable holes, and the outer side of the well pipe 3 and the water-permeable well cover 2 is wrapped with a stainless steel high-density fine wire filter screen to prevent fine-grained sand particles from flowing into the inside of the well pipe 3 . The drainage well slot 8 is U-shaped, which is convenient to install or remove the well pipe 3 .

为了便于拆卸、更换井管3,所述井管3底部设有用于支撑井管3的水平的拆卸插板6,所述渗流砂箱体1底部靠近其圆心位置开设有拆卸插槽5,拆卸插板6的一端通过插在拆卸插槽5内固定在渗流砂箱体1上,所述疏放水口4设置在拆卸插板6上,井管3与井盖2、前侧板42、后侧板41、拆卸插板6形成扇形的疏放水井,所述拆卸插板6的尺寸稍大于所需研究的最大疏放水井的横截面尺寸,以适应于不同井径的井管3。安装时,井管3直接放置于拆卸插板6上。In order to facilitate the disassembly and replacement of the well pipe 3, the bottom of the well pipe 3 is provided with a horizontal disassembly insert 6 for supporting the well pipe 3, and the bottom of the seepage sand box 1 is provided with a disassembly slot 5 near the center of the circle. One end of the plug board 6 is fixed on the seepage sand box body 1 by being inserted into the dismantling slot 5, the drainage water port 4 is arranged on the disassembly plug board 6, the well pipe 3 and the well cover 2, the front side plate 42, the back side The plate 41 and the dismantling insert plate 6 form a fan-shaped drainage well. The size of the dismounting insert plate 6 is slightly larger than the cross-sectional dimension of the largest drainage well to be studied, so as to be suitable for well pipes 3 of different well diameters. During installation, the well pipe 3 is directly placed on the dismantling insert 6 .

上述拆卸插板6结构如图5、图1、图2所示,拆卸插板6的一端沿渗流砂箱体1向外伸出,其伸出端为拉环(图中未标出),使得拆卸井管3时,只需通过拉环向外拉出拆卸插板6,井管3会由于自重逐渐下落,从而分节拆掉即可。上述拆卸插槽5为开口向左(即图2所示的左侧)的U型槽,其U型槽的开口深度以能与井管3相配合固定住拆卸插板6处于水平状态为宜。The structure of the above-mentioned dismantling insert 6 is shown in Figures 5, 1 and 2. One end of the dismantling insert 6 extends outward along the seepage sand box 1, and its protruding end is a pull ring (not marked in the figure), Therefore, when the well pipe 3 is disassembled, it is only necessary to pull out the dismantling insert plate 6 through the pull ring, and the well pipe 3 will gradually fall down due to its own weight, so that it can be dismantled in sections. The above-mentioned dismantling slot 5 is a U-shaped slot with an opening to the left (that is, the left side as shown in Figure 2), and the opening depth of the U-shaped slot is suitable to be able to cooperate with the well pipe 3 to fix the dismantling insert plate 6 in a horizontal state. .

为了使更换井管3时仅扰动小部分渗流砂体,所述前侧板42和后侧板41内侧壁上靠近渗流砂箱体1圆心位置均设置有砂体保护板插槽9,砂体保护板插槽9位于疏放水井插槽8远离圆心位置的一侧,砂体保护板插槽9内卡接有砂体保护板7,所述砂体保护板7到渗流砂箱体1圆心位置之间的距离大于所需研究最大疏放水井的半径,此处为稍大于。更换井管3时,仅扰动砂体保护板7内侧的渗流砂体,砂体保护板7外侧的渗流砂体不受影响。砂体保护板7结构如图6所示,为不锈钢格栅,整体强度高,高度可根据需要定制,其外侧包裹不锈钢高密度细丝过滤网,防止拆卸井管3时,细颗粒砂体流出。In order to disturb only a small part of the seepage sand body when the well pipe 3 is replaced, the sand body protection plate slot 9 is provided on the inner side walls of the front side plate 42 and the rear side plate 41 near the center of the seepage sand box 1. The protection plate slot 9 is located on the side of the drainage well slot 8 away from the center of the circle, and a sand body protection plate 7 is clamped in the sand body protection plate slot 9. The sand body protection plate 7 reaches the center of the seepage sand box 1. The distance between locations is greater than the radius of the largest evacuation well to be studied, which is slightly greater here. When the well pipe 3 is replaced, only the seepage sand body inside the sand body protection plate 7 is disturbed, and the seepage sand body outside the sand body protection plate 7 is not affected. The structure of the sand body protection plate 7 is shown in Figure 6. It is a stainless steel grid with high overall strength and can be customized according to needs. .

为了便于调节井长且便于拆卸,所述井管3为多段子管组成,子管的弧形长度与井管3的弧形长度一致,如图3所示。In order to facilitate adjustment of the well length and facilitate disassembly, the well pipe 3 is composed of multiple sub-pipes, and the arc length of the sub-pipes is consistent with the arc length of the well pipe 3, as shown in FIG. 3 .

为了便于调节井径进而研究井径对渗流的影响,所述疏放水井插槽8沿前侧板42、后侧板41的径向分别间隔设置。In order to adjust the well diameter and study the influence of the well diameter on seepage, the drainage well slots 8 are respectively arranged at intervals along the radial direction of the front side plate 42 and the rear side plate 41 .

优选地,所述渗流砂箱体1上部设置有活动密封盖10,活动密封盖10的外轮廓尺寸与渗流砂箱体1内轮廓尺寸一致,活动密封盖10边缘粘结有橡胶密封条(图中未画出);所述渗流砂箱体1底面上安装有车轮11。活动密封盖10能渗流砂箱体1内上下调节并固定于预设高度。Preferably, the upper part of the seepage sand box body 1 is provided with a movable sealing cover 10, the outer contour size of the movable sealing cover 10 is consistent with the inner outline size of the seepage sand box body 1, and the edge of the movable sealing cover 10 is bonded with a rubber sealing strip (Fig. (not shown in the figure); wheels 11 are installed on the bottom surface of the seepage sand box body 1 . The movable sealing cover 10 can be adjusted up and down in the seepage sand box body 1 and fixed at a preset height.

进一步地,所述水位监测系统包括水位监测管集成板35和若干水位监测管47,水位监测管集成板35外侧设置有用于实时同步监测水位监测管47水位变化的数码相机27,水位监测管集成板35固定在前侧板42外侧面上,水位监测管47根据水位监测点布设情况分层埋设在渗流砂箱体1内,水位监测管47的水位探测端位于预设的水位监测点上,另一端穿过前侧板42集成在水位监测管集成板35上。数码相机27通过水位监测管集成板35来实时同步监测各水位监测管47的水头变化。Further, the water level monitoring system includes a water level monitoring tube integrated board 35 and several water level monitoring tubes 47. The outside of the water level monitoring tube integrated board 35 is provided with a digital camera 27 for synchronously monitoring the water level change of the water level monitoring tube 47 in real time. The water level monitoring tube integrates The plate 35 is fixed on the outer surface of the front side plate 42, the water level monitoring pipe 47 is embedded in the seepage sand box 1 in layers according to the layout of the water level monitoring points, and the water level detection end of the water level monitoring pipe 47 is located on the preset water level monitoring point, The other end is integrated on the water level monitoring tube integrated plate 35 through the front side plate 42 . The digital camera 27 monitors the change of the water head of each water level monitoring tube 47 synchronously in real time through the water level monitoring tube integrated board 35 .

更进一步地,所述水位监测管集成板35包括集成板本体(图中未标出),集成板本体上间隔设置有竖直的中空管43,中空管43上沿竖直方向标有刻度,中空管43的数量等于或大于水位监测管47的数量,水位监测管47的另一端与中空管43的底部相连通。可通过中空管43内的水位来监测渗流砂箱体1内的水位变化。Further, the water level monitoring tube integrated plate 35 includes an integrated plate body (not shown in the figure), and vertical hollow tubes 43 are arranged on the integrated plate body at intervals, and the hollow tubes 43 are marked along the vertical direction. Scale, the number of hollow pipes 43 is equal to or greater than the number of water level monitoring pipes 47 , and the other end of the water level monitoring pipes 47 is communicated with the bottom of the hollow pipes 43 . The change of the water level in the seepage sand box 1 can be monitored by the water level in the hollow tube 43 .

进一步地,所述供水循环系统包括供水箱21、中转箱36和集水箱33,供水箱21连接有集水箱排水管26,集水箱排水管26连接有集水箱抽水泵32,集水箱抽水泵32连接有集水箱抽水管31,集水箱抽水管31连接集水箱33,所述供水箱21还连接有中转箱排水管22,中转箱排水管22连接有中转箱抽水泵23,中转箱抽水泵23连接有中转箱抽水管24,中转箱抽水管24连接中转箱36;Further, the water supply circulation system includes a water supply tank 21, a transfer tank 36 and a water collection tank 33. The water supply tank 21 is connected with a water collection tank drain pipe 26, and the water collection tank drain pipe 26 is connected with a collection tank pumping pump 32, and the collection tank pumping pump 32. The water collection tank suction pipe 31 is connected, the water collection tank suction pipe 31 is connected to the water collection tank 33, the water supply tank 21 is also connected with a transfer tank drain pipe 22, and the transfer tank drain pipe 22 is connected with a transfer tank pumping pump 23, and the transfer tank pumping pump 23 The transfer box water pipe 24 is connected, and the transfer box water pipe 24 is connected to the transfer box 36;

供水箱21连接有供水管25和饱和水管17,供水管25与进水口13相连通,供水管25上安装有供水阀门19,所述饱和水管17与饱和进水口34相连通,饱和水管17上安装有饱和阀门20;所述中转箱36连接有出水口水管16,出水口水管16与出水口14相连通;所述集水箱33连接有放水管30,放水管30与疏放水口4相连通,放水管30上安装有疏放水阀门28。上述供水箱21上设置有用于与供水管25连接的供水箱供水口37,还设置有用于与饱和水管17连接的供水箱饱和进水口38。The water supply tank 21 is connected with a water supply pipe 25 and a saturated water pipe 17. The water supply pipe 25 is communicated with the water inlet 13. A water supply valve 19 is installed on the water supply pipe 25. The saturated water pipe 17 is communicated with the saturated water inlet 34. A saturation valve 20 is installed; the transfer box 36 is connected with a water outlet pipe 16, and the water outlet water pipe 16 is connected with the water outlet 14; , the drain pipe 30 is installed with a drain valve 28 . The water supply tank 21 is provided with a water supply tank water supply port 37 for connecting with the water supply pipe 25 , and a water supply tank saturated water inlet 38 for connecting with the saturated water pipe 17 .

上述供水循环系统中供水箱21分两条通道与渗流砂箱体1连接,一条通过供水管25与渗流砂箱体1中稳压槽12的进水口13相连通,另一条通过饱和水管17与渗流砂箱体1的饱和口34相连通;其中供水箱21补给稳压槽12的水分两路循环汇集至供水箱21,其中一路经渗流砂箱体1的稳压槽12的出水口14通过放水管16与中转箱36连接,中转箱36通过中转箱36的中转箱抽水管24与中转箱抽水泵23、中转箱排水管22与供水箱21相连,形成渗流循环;另一路经渗流砂箱体1的疏放水口4通过放水管30与集水箱33连接,集水箱33通过集水箱抽水管31、集水箱抽水泵32、集水箱排水管26与供水箱21相连,形成渗流循环。In the above water supply circulation system, the water supply tank 21 is connected to the seepage sand box 1 through two channels, one is connected to the water inlet 13 of the pressure stabilization tank 12 in the seepage sand box 1 through the water supply pipe 25, and the other is connected to the seepage sand box 1 through the saturated water pipe 17. The saturated port 34 of the seepage sand box 1 is connected to each other; wherein the water supplied by the water supply tank 21 to the pressure stabilization tank 12 is circulated and collected to the water supply tank 21 in two ways, and one of them passes through the water outlet 14 of the pressure stabilization tank 12 of the seepage sand box 1. The water discharge pipe 16 is connected with the transfer box 36, and the transfer box 36 is connected with the transfer box pump 23 through the transfer box water pump 24 of the transfer box 36, and the transfer box drain pipe 22 is connected with the water supply tank 21 to form a seepage circulation; the other way through the seepage sand box The drainage port 4 of the body 1 is connected to the water collection tank 33 through the water discharge pipe 30, and the water collection tank 33 is connected to the water supply tank 21 through the water collection tank suction pipe 31, the water collection tank suction pump 32, and the water collection tank drainage pipe 26 to form a seepage circulation.

为了便于对水量进行监测及研究,所述供水循环系统上设置有水量监测系统,水量监测系统由供水口流量计18、出水口流量计15、疏水口流量计29、数据采集装置44及电脑45组成,供水口流量计18、出水口流量计15、疏水口流量计29分别连接数据采集装置44,数据采集装置44连接电脑45,数据采集装置44将数据传输至电脑45,供水口流量计18安装在供水管25上,出水口流量计15安装在出水口水管16上,疏水口流量计29安装在放水管30上。上述数据采集装置44为现有技术,在此不再赘述。In order to facilitate the monitoring and research of the water volume, the water supply circulation system is provided with a water volume monitoring system, and the water volume monitoring system consists of a water supply flowmeter 18 , a water outlet flowmeter 15 , a drain flowmeter 29 , a data acquisition device 44 and a computer 45 The water supply port flowmeter 18, the water outlet flowmeter 15, and the drain port flowmeter 29 are respectively connected to the data acquisition device 44, the data acquisition device 44 is connected to the computer 45, the data acquisition device 44 transmits data to the computer 45, and the water supply port flowmeter 18 Installed on the water supply pipe 25 , the water outlet flowmeter 15 is installed on the water outlet water pipe 16 , and the drain outlet flowmeter 29 is installed on the water discharge pipe 30 . The above-mentioned data collection device 44 is in the prior art, and details are not described herein again.

其中,所述的水量监测系统中供水口流量计18监测供水箱21渗流试验时的总供水量Q ,出水口流量计15监测稳压槽12稳压过程中流出水量Q ,放水口流量计29用于监测疏放水试验时渗流砂箱体1的疏放水量Q ,疏放水试验过程中稳压槽12对渗流砂箱体1的动态补给Q =Q -Q ,非稳定渗流阶段,疏放水量Q 包括动态补给Q 及静储量补给Q Q =Q -Q =Q -Q +Q ,该装置的流量监测系统可以实时监测非稳定渗流阶段的动静储量补给量;Wherein, in the described water quantity monitoring system, the water supply outlet flowmeter 18 monitors the total water supply quantity Q supply during the seepage test of the water supply tank 21, the water outlet flowmeter 15 monitors the outflow water quantity Q out of the pressure stabilization tank 12 during the pressure stabilization process, and the water outlet flow rate The meter 29 is used to monitor the drainage water quantity Q of the seepage sand box 1 during the drainage test. During the drainage test, the dynamic supply of the pressure stabilization tank 12 to the seepage sand box 1 is Q dynamic = Q supply - Q output , unstable In the seepage stage, the drainage water volume Q release includes dynamic supply Q dynamic and static reserve supply Q static , Q static = Q release - Q dynamic = Q release - Q supply + Q output , the flow monitoring system of the device can monitor the unsteady seepage in real time. The amount of dynamic and static reserve replenishment in the stage;

所述含水层底部疏放水井渗流试验模型装置的试验方法,包括以下步骤:The test method for the seepage test model device of the drainage well at the bottom of the aquifer includes the following steps:

(一)含水层底部疏放水井渗流试验模型装置的安装:(1) Installation of the seepage test model device for the drainage well at the bottom of the aquifer:

如图1所示,将供水循环系统与渗流砂箱体1连接,将井管3包裹不锈钢细丝网分节通过疏放水井插槽8与渗流砂箱体1卡接,将井盖2放置于井管3上,将砂体保护板7包裹不锈钢过滤网通过砂体保护板插槽9与渗流砂箱体1卡接;As shown in Figure 1, the water supply circulation system is connected to the seepage sand box 1, the well pipe 3 is wrapped with stainless steel fine wire mesh, and the well pipe 3 is clipped to the seepage sand box 1 through the dredging well slot 8, and the well cover 2 is placed on the On the well pipe 3, the sand body protection plate 7 is wrapped with a stainless steel filter screen, and the sand body protection plate slot 9 is clamped to the seepage sand box 1;

(二)水位监测系统安装及砂体填充:(2) Installation of water level monitoring system and sand filling:

将水位监测管集成板35固装在渗流砂箱体1的前侧板42上,将水位监测管47的水位探测端分别用不锈钢过滤网包裹好,防止细砂颗粒进入,将底层的水位监测管47的水位探测端放置于渗流砂箱体1内预设的水位监测点,即沿着渗流砂箱体1底板角的平分线布设的水位监测点46,如图2所示,然后填充筛选冲洗过的砂体,在充填砂体时保持水位监测管47的位置不动,充填完第一层砂体后,埋设第二层水位监测管47并再次充填砂体,重复上述步骤至预定渗流砂体厚度,所有水位监测管47的另一端穿过前侧板42均与水位监测管集成板35相连;Fix the water level monitoring tube integrated plate 35 on the front side plate 42 of the seepage sand box 1, and wrap the water level detection ends of the water level monitoring tube 47 with stainless steel filters to prevent the entry of fine sand particles, and monitor the water level of the bottom layer. The water level detection end of the pipe 47 is placed at the preset water level monitoring point in the seepage sand box 1, that is, the water level monitoring point 46 arranged along the bisector of the bottom plate corner of the seepage sand box 1, as shown in FIG. For the washed sand body, keep the position of the water level monitoring pipe 47 unchanged when filling the sand body. After filling the first layer of sand body, bury the second layer of water level monitoring pipe 47 and fill the sand body again, and repeat the above steps until the predetermined seepage flow. The thickness of the sand body, the other ends of all the water level monitoring pipes 47 are connected to the water level monitoring pipe integrated plate 35 through the front side plate 42;

对于承压含水层试验,砂体充填完成后,盖好活动密封盖10并封堵稳压槽12内侧壁上位于活动密封盖10以上的透水孔,对于非承压含水层则不需要加盖活动密封盖10;For the confined aquifer test, after the sand body filling is completed, cover the movable sealing cover 10 and block the permeable holes located above the movable sealing cover 10 on the inner side wall of the pressure stabilization tank 12. For the unconfined aquifer, it is not necessary to add a cover Movable sealing cover 10;

(三)砂体饱和固结过程:(3) Sand body saturation consolidation process:

首次开始试验时,将供水箱21放置高于渗流砂箱体1一定距离的位置,关闭供水阀门19、饱和阀门20、疏放水阀门28,利用外接水源对供水箱21充水直至集水箱33内水满足渗流循环总用水量,或者根据需要后期对集水箱再次通过外接水源补给水量,打开饱和阀门20,水从渗流砂箱体1底部饱和进水口34进入,逐渐充填砂体以使砂体内空气逐渐向上排出,接着外接水源继续对供水箱21供水,观察供水箱21的水位并调整外接水源的供水量,以保持集水箱33的水位在1/2至3/4集水箱高度位置;通过水位监测管集成板35观察渗流砂箱体1内水位,达到预定水位时,关闭饱和阀门20,打开疏放水阀门28和供水阀门19,当集水箱33的水量至集水箱容量的1/2时,关闭外接水源,打开集水箱抽水泵32,同时观察中转箱36水位,当中转箱36水位超过1/2容量时,打开中转箱抽水泵23,维持该渗流状态60分钟以上,使稳定渗流区砂体内空气充分排出;关闭疏放水阀门28、供水阀门19、集水箱抽水泵32及中转箱抽水泵23,同时打开饱和阀门20,再次饱和至预定水位,关闭饱和阀门20,打开疏放水阀门28、供水阀门19、集水箱抽水泵32及中转箱抽水泵23,维持渗流状态60分钟以上;When starting the test for the first time, place the water supply tank 21 at a certain distance higher than the seepage sand box 1, close the water supply valve 19, the saturation valve 20, and the drain water valve 28, and use an external water source to fill the water supply tank 21 with water until it reaches the water collection tank 33. The water meets the total water consumption of the seepage circulation, or the water collection tank is replenished by the external water source again later as needed, and the saturation valve 20 is opened, and the water enters from the saturated water inlet 34 at the bottom of the seepage sand box 1, and gradually fills the sand body to make the air in the sand body. Gradually discharge upward, and then the external water source continues to supply water to the water supply tank 21, observe the water level of the water supply tank 21 and adjust the water supply volume of the external water source to keep the water level of the water collection tank 33 at 1/2 to 3/4 of the height of the water collection tank; through the water level The monitoring tube integrated board 35 observes the water level in the seepage sand box 1. When the water level reaches the predetermined water level, the saturation valve 20 is closed, and the drainage valve 28 and the water supply valve 19 are opened. Turn off the external water source, turn on the water collection tank pump 32, and observe the water level of the transfer tank 36. When the water level of the transfer tank 36 exceeds 1/2 of the capacity, turn on the transfer tank pump 23 and maintain the seepage state for more than 60 minutes to stabilize the sand in the seepage zone. The air in the body is fully discharged; close the drain valve 28, the water supply valve 19, the water collection tank pump 32 and the transfer tank pump 23, open the saturation valve 20 at the same time, and re-saturate to the predetermined water level, close the saturation valve 20, and open the drain valve 28, The water supply valve 19, the water collection tank pump 32 and the transfer tank pump 23 maintain the seepage state for more than 60 minutes;

重复上述饱和过程4-5次,使渗流砂箱体1的砂体内空气充分排出,砂体完成密实固结,以使砂体渗透性参数均一稳定,此时,关闭疏放水阀门28、饱和阀门20、集水箱抽水泵32,打开供水阀门19、中转箱抽水泵23,保持稳压槽12内的边界水位稳定;Repeat the above saturation process 4-5 times to fully discharge the air in the sand body of the seepage sand box 1, and complete the compaction and consolidation of the sand body, so as to make the permeability parameters of the sand body uniform and stable. At this time, close the drainage valve 28 and the saturation valve. 20. The water collection tank water pump 32, open the water supply valve 19, the transfer box water pump 23, and keep the boundary water level in the pressure stabilization tank 12 stable;

(四)疏放水渗流过程:(4) The seepage process of dredging water:

检查各水位监测管47内有无气泡,各水位监测点位置有无异常,检查并确保供水阀门19处于打开状态、饱和阀门20处于关闭状态,保持稳压槽12内的边界水位稳定,放置好数码相机27,数码相机27开始记录水位监测管集成板35上的水位,供水口流量计18、出水口流量计15及疏水口流量计29开始采集数据,打开疏放水阀门28、集水箱抽水泵32,保持供水循环系统循环供水,当疏水口流量计29处的水量稳定、水位监测管集成板35上显示的各水位监测管47的水位稳定时,关闭疏放水阀门28,监测渗流砂箱体1内各水位监测点的水位恢复过程及边界补给水量,至各水位监测点的水位完全恢复时,关闭供水阀门19、中转箱抽水泵23、数码相机27、各流量计及流量计数据采集装置44,停止试验;Check whether there are air bubbles in each water level monitoring pipe 47, and whether the position of each water level monitoring point is abnormal, check and ensure that the water supply valve 19 is open, the saturation valve 20 is closed, and the boundary water level in the pressure stabilization tank 12 is kept stable and placed. The digital camera 27, the digital camera 27 starts to record the water level on the water level monitoring tube integrated board 35, the water supply port flowmeter 18, the water outlet flowmeter 15 and the drain port flowmeter 29 start to collect data, open the drain water valve 28, and the water collection tank pumping pump 32. Keep the water supply circulating system circulating water supply. When the water volume at the drain outlet flowmeter 29 is stable and the water level of each water level monitoring tube 47 displayed on the water level monitoring tube integrated board 35 is stable, close the drainage water valve 28 and monitor the seepage sand box. The water level recovery process of each water level monitoring point in 1 and the boundary replenishment water volume, when the water level of each water level monitoring point is fully recovered, close the water supply valve 19, the transfer box pump 23, the digital camera 27, each flowmeter and the flowmeter data acquisition device 44. Stop the test;

(五)更换渗流井管(5) Replacing the seepage well pipe

检查并确保供水阀门19、饱和阀门20处于关闭状态,打开疏放水阀门28及集水箱抽水泵32,疏放渗流砂箱体1内的水,当疏放水口4处只有少量或基本没有水流渗出时,关闭集水箱抽水泵32,在拆卸插板6下方放一大口径容器,拔出拆卸插板6,砂体保护板7内侧的砂体将流入容器内,分节取下渗流井管3及井盖2,清理砂体保护板7内侧的残留砂体;插入拆卸插板6,分节安装新的渗流井管3及井盖2,将砂体保护板7内侧流出砂体再次填充至新的井管3及井盖2周围空间,填充砂体过程中分层铺设好砂体保护板7内侧的水位监测管47,至充填量与砂体保护板7外侧砂体持平时,新的井管更换结束;Check and make sure that the water supply valve 19 and the saturation valve 20 are closed, open the drain valve 28 and the water collection tank pump 32, and drain the water in the seepage sand box 1. When there is only a small amount of or almost no water seepage at the drain port 4 When it comes out, turn off the water collection tank pump 32, put a large-diameter container under the dismantling insert plate 6, pull out the dismantling insert plate 6, the sand body inside the sand body protection plate 7 will flow into the container, and the seepage well pipe is removed in sections. 3 and manhole cover 2, clean the residual sand body inside the sand body protection plate 7; insert and remove the insert plate 6, install new seepage well pipes 3 and manhole cover 2 in sections, and refill the sand body flowing out from the inner side of the sand body protection plate 7 to the new one. In the space around the well pipe 3 and the well cover 2, the water level monitoring pipe 47 on the inner side of the sand body protection plate 7 is laid in layers in the process of filling the sand body until the filling amount is equal to the sand body outside the sand body protection plate 7. the replacement is over;

(六)再次饱和砂体(6) Re-saturated sand bodies

更换新的井管后,再次饱和砂体时,采用步骤(三)的饱和方法对渗流砂体进行再次饱和,重复饱和砂体2-3次,饱和结束后检查各水位监测管47的水位有无异常;After replacing the new well pipe, when the sand body is saturated again, use the saturation method of step (3) to re-saturate the seepage sand body, and repeat the saturation of the sand body 2-3 times. No abnormality;

(七)重复渗流试验(7) Repeated seepage test

更换新的井管后,可按照步骤(四)的方法进行渗流试验,渗流试验结束后,继续按照步骤(五)的方法更换井管,然后按照步骤(六)再次饱和砂体,按顺序重复步骤(五)、步骤(六)及步骤(四)开展若干组渗流试验。After replacing the new well pipe, the seepage test can be carried out according to the method of step (4). After the seepage test, continue to replace the well pipe according to the method of step (5), and then re-saturate the sand body according to step (6), and repeat in sequence. Step (5), step (6) and step (4) carry out several groups of seepage tests.

以上所述的仅是本发明的优选实施方式,应当指出,对于本领域的技术人员来说,在不脱离本发明整体构思前提下,还可以作出若干改变和改进,这些也应该视为本发明的保护范围,这些都不会影响本发明实施的效果和专利的实用性。The above are only the preferred embodiments of the present invention. It should be pointed out that for those skilled in the art, some changes and improvements can be made without departing from the overall concept of the present invention, and these should also be regarded as the present invention. the scope of protection, these will not affect the effect of the implementation of the present invention and the practicability of the patent.

Claims (10)

1.一种含水层底部疏放水井渗流试验模型装置,其特征在于:包括扇形、空心的仅上端开口的渗流砂箱体(1),渗流砂箱体(1)内填充有砂体,渗流砂箱体(1)内设置有水位监测系统,渗流砂箱体(1)包括前侧板(42)、后侧板(41)和圆弧外侧板(40),渗流砂箱体(1)边缘沿其圆弧外侧板(40)设置有稳压槽(12),稳压槽(12)的圆弧外侧板(40)上设置有至少两组高度不同的进水口(13)和出水口(14),稳压槽(12)的圆弧内侧板(39)上开设有若干透水孔,渗流砂箱体(1)内靠近其圆心位置设置有扇形的疏放水井,疏放水井底部设置有疏放水口(4),所述渗流砂箱体(1)底面上设置有饱和进水口(34),所述疏放水口(4)、饱和进水口(34)、进水口(13)和出水口(14)分别连接有供水循环系统。1. A seepage test model device for a drainage well at the bottom of an aquifer, characterized in that: it comprises a fan-shaped, hollow seepage sand box (1) with only an upper end opening, and the seepage sand box (1) is filled with sand bodies, and seepage flow. The sand box body (1) is provided with a water level monitoring system. The seepage sand box body (1) includes a front side plate (42), a rear side plate (41) and an arc outer side plate (40). The seepage sand box body (1) The edge is provided with a pressure stabilization groove (12) along its circular arc outer plate (40), and at least two groups of water inlets (13) and water outlets with different heights are arranged on the circular arc outer plate (40) of the pressure stabilization groove (12). (14), a number of permeable holes are opened on the arc inner plate (39) of the pressure stabilization tank (12), and a fan-shaped drainage well is arranged in the seepage sand box (1) near the center of the circle, and the bottom of the drainage well is provided with There is a drainage water port (4), and a saturated water inlet (34) is provided on the bottom surface of the seepage sand box (1), the drainage water inlet (4), the saturated water inlet (34), the water inlet (13) and the The water outlets (14) are respectively connected with a water supply circulation system. 2.如权利要求1所述的含水层底部疏放水井渗流试验模型装置,其特征在于:所述疏放水井包括井管(3),井管(3)壁上开设有透水孔,所述前侧板(42)和后侧板(41)内侧壁上靠近渗流砂箱体(1)圆心位置分别设置有疏放水井插槽(8),所述井管(3)插在疏放水井插槽(8)内从而卡接在渗流砂箱体(1)上,所述疏放水井顶部放置有井盖(2);所述井管(3)为多段子管组成,子管的弧形长度与井管(3)的弧形长度一致。2 . The seepage test model device for a drainage well at the bottom of an aquifer according to claim 1 , wherein the drainage well comprises a well pipe (3), and the wall of the well pipe (3) is provided with permeable holes, and the A drainage well slot (8) is respectively provided on the inner side walls of the front side plate (42) and the rear side plate (41) near the center of the seepage sand box (1), and the well pipe (3) is inserted into the drainage well. The slot (8) is clamped on the seepage sand box (1), and a well cover (2) is placed on the top of the drainage well; the well pipe (3) is composed of multiple sub-pipes, and the arc-shaped The length is consistent with the arc length of the well pipe (3). 3.如权利要求2所述的含水层底部疏放水井渗流试验模型装置,其特征在于:所述井管(3)底部设有用于支撑井管(3)的水平的拆卸插板(6),所述渗流砂箱体(1)底部靠近其圆心位置开设有拆卸插槽(5),拆卸插板(6)的一端通过插在拆卸插槽(5)内固定在渗流砂箱体(1)上,所述疏放水口(4)设置在拆卸插板(6)上,井管(3)与井盖(2)、前侧板(42)、后侧板(41)、拆卸插板(6)形成扇形的疏放水井,所述拆卸插板(6)的整体尺寸大于所需研究的最大疏放水井的横截面尺寸。3. The seepage test model device for drainage wells at the bottom of the aquifer according to claim 2, characterized in that: the bottom of the well pipe (3) is provided with a horizontal dismantling plate (6) for supporting the well pipe (3). , the bottom of the seepage sand box (1) is provided with a disassembly slot (5) near the center of the circle, and one end of the disassembly insert plate (6) is fixed on the seepage sand box (1) by inserting it into the disassembly slot (5). ), the drainage port (4) is arranged on the dismantling insert plate (6), the well pipe (3) and the manhole cover (2), the front side plate (42), the rear side plate (41), the dismantling insert plate ( 6) A fan-shaped drainage well is formed, and the overall size of the dismantling insert (6) is larger than the cross-sectional dimension of the largest drainage well to be studied. 4.如权利要求1或2所述的含水层底部疏放水井渗流试验模型装置,其特征在于:所述前侧板(42)和后侧板(41)内侧壁上靠近渗流砂箱体(1)圆心位置均设置有砂体保护板插槽(9),砂体保护板插槽(9)位于疏放水井插槽(8)远离圆心位置的一侧,砂体保护板插槽(9)内卡接有砂体保护板(7),所述砂体保护板(7)到渗流砂箱体(1)圆心位置之间的距离大于所需研究最大疏放水井的半径。4. The seepage test model device for drainage wells at the bottom of aquifers according to claim 1 or 2, characterized in that: the inner side walls of the front side plate (42) and the rear side plate (41) are close to the seepage sand box ( 1) There are sand body protection plate slots (9) at the center of the circle, the sand body protection plate slots (9) are located on the side of the drainage well slot (8) away from the center of the circle, and the sand body protection plate slots (9) ) is clamped with a sand body protection plate (7), and the distance between the sand body protection plate (7) and the center of the seepage sand box (1) is greater than the radius of the largest drainage well to be studied. 5.如权利要求1所述的含水层底部疏放水井渗流试验模型装置,其特征在于:所述渗流砂箱体(1)上部设置有活动密封盖(10),活动密封盖(10)的外轮廓尺寸与渗流砂箱体(1)内轮廓尺寸一致,活动密封盖(10)边缘粘结有橡胶密封条;所述渗流砂箱体(1)底面上安装有车轮(11)。5 . The seepage test model device for drainage wells at the bottom of the aquifer according to claim 1 , wherein a movable sealing cover ( 10 ) is provided on the upper part of the seepage sand box ( 1 ). The size of the outer contour is consistent with the size of the inner contour of the seepage sand box (1), and the edge of the movable sealing cover (10) is bonded with a rubber sealing strip; a wheel (11) is installed on the bottom surface of the seepage sand box (1). 6.如权利要求1所述的含水层底部疏放水井渗流试验模型装置,其特征在于:所述水位监测系统包括水位监测管集成板(35)和若干水位监测管(47),水位监测管集成板(35)外侧设置有用于实时同步监测水位监测管(47)水位变化的数码相机(27),水位监测管集成板(35)固定在前侧板(42)外侧面上,水位监测管(47)根据水位监测点布设情况分层埋设在渗流砂箱体(1)内,水位监测管(47)的水位探测端位于预设的水位监测点上,另一端穿过前侧板(42)集成在水位监测管集成板(35)上。6. The seepage test model device for drainage wells at the bottom of aquifers according to claim 1, wherein the water level monitoring system comprises a water level monitoring tube integrated board (35) and several water level monitoring tubes (47). The outside of the integrated board (35) is provided with a digital camera (27) for synchronously monitoring the water level change of the water level monitoring pipe (47) in real time. (47) According to the layout of the water level monitoring points, it is buried in layers in the seepage sand box (1). ) integrated on the water level monitoring tube integrated board (35). 7.如权利要求6所述的含水层底部疏放水井渗流试验模型装置,其特征在于:所述水位监测管集成板(35)包括集成板本体,集成板本体上间隔设置有竖直的中空管(43),中空管(43)上沿竖直方向标有刻度,中空管(43)的数量等于或大于水位监测管(47)的数量,水位监测管(47)的另一端与中空管(43)的底部相连通。7 . The seepage test model device for drainage wells at the bottom of aquifers according to claim 6 , wherein the water level monitoring tube integrated plate ( 35 ) comprises an integrated plate body, and vertical intermediate plates are arranged on the integrated plate body at intervals. 8 . Empty pipe (43), the hollow pipe (43) is marked with a scale along the vertical direction, the number of the hollow pipe (43) is equal to or greater than the number of the water level monitoring pipe (47), the other end of the water level monitoring pipe (47) It communicates with the bottom of the hollow tube (43). 8.如权利要求1所述的含水层底部疏放水井渗流试验模型装置,其特征在于:所述供水循环系统包括供水箱(21)、中转箱(36)和集水箱(33),供水箱(21)连接有集水箱排水管(26),集水箱排水管(26)连接有集水箱抽水泵(32),集水箱抽水泵(32)连接有集水箱抽水管(31),集水箱抽水管(31)连接集水箱(33),所述供水箱(21)还连接有中转箱排水管(22),中转箱排水管(22)连接有中转箱抽水泵(23),中转箱抽水泵(23)连接有中转箱抽水管(24),中转箱抽水管(24)连接中转箱(36);8. The seepage test model device for drainage wells at the bottom of aquifers according to claim 1, wherein the water supply circulation system comprises a water supply tank (21), a transfer tank (36) and a water collection tank (33), and the water supply tank (21) is connected with the collecting tank drain pipe (26), the collecting tank drain pipe (26) is connected with the collecting tank pumping pump (32), and the collecting tank pumping pump (32) is connected with the collecting tank pumping pipe (31), the collecting tank pumping The water pipe (31) is connected to the water collecting tank (33), the water supply tank (21) is also connected with a transfer tank drain pipe (22), and the transfer tank drain pipe (22) is connected with a transfer tank pumping pump (23), and the transfer tank pumping pump (23) A transfer box water pumping pipe (24) is connected, and the transfer box water pumping pipe (24) is connected to the transfer box (36); 供水箱(21)连接有供水管(25)和饱和水管(17),供水管(25)与进水口(13)相连通,供水管(25)上安装有供水阀门(19),所述饱和水管(17)与饱和进水口(34)相连通,饱和水管(17)上安装有饱和阀门(20);所述中转箱(36)连接有出水口水管(16),出水口水管(16)与出水口(14)相连通;所述集水箱(33)连接有放水管(30),放水管(30)与疏放水口(4)相连通,放水管(30)上安装有疏放水阀门(28)。The water supply tank (21) is connected with a water supply pipe (25) and a saturated water pipe (17), the water supply pipe (25) is communicated with the water inlet (13), and a water supply valve (19) is installed on the water supply pipe (25). The water pipe (17) is communicated with the saturated water inlet (34), and a saturated valve (20) is installed on the saturated water pipe (17); the transfer box (36) is connected with a water outlet water pipe (16), and a water outlet water pipe (16) communicated with the water outlet (14); the water collecting tank (33) is connected with a water discharge pipe (30), the water discharge pipe (30) is communicated with the water discharge port (4), and a water discharge valve is installed on the water discharge pipe (30). (28). 9.如权利要求7所述的含水层底部疏放水井渗流试验模型装置,其特征在于:所述供水循环系统上设置有水量监测系统,水量监测系统由供水口流量计(18)、出水口流量计(15)、疏水口流量计(29)、数据采集装置(44)及电脑(45)组成,供水口流量计(18)、出水口流量计(15)、疏水口流量计(29)分别连接数据采集装置(44),数据采集装置(44)连接电脑(45),供水口流量计(18)安装在供水管(25)上,出水口流量计(15)安装在出水口水管(16)上,疏水口流量计(29)安装在放水管(30)上。9. The seepage test model device for drainage wells at the bottom of the aquifer according to claim 7, characterized in that: the water supply circulation system is provided with a water quantity monitoring system, and the water quantity monitoring system consists of a water supply outlet flowmeter (18), a water outlet The flowmeter (15), the drain flowmeter (29), the data acquisition device (44) and the computer (45) are composed of the water supply flowmeter (18), the water outlet flowmeter (15), and the drain flowmeter (29) The data acquisition device (44) is respectively connected, the data acquisition device (44) is connected to the computer (45), the water supply outlet flowmeter (18) is installed on the water supply pipe (25), and the water outlet flowmeter (15) is installed on the water outlet water pipe ( 16), the drain port flowmeter (29) is installed on the drain pipe (30). 10.如权利要求3所述的含水层底部疏放水井渗流试验模型装置,其特征在于:所述疏放水井插槽(8)沿前侧板(42)、后侧板(41)的径向分别间隔设置。10. The model device for the seepage test of the drainage well at the bottom of the aquifer according to claim 3, characterized in that: the drainage well slot (8) is along the diameter of the front side plate (42) and the rear side plate (41) To separate interval settings.
CN201910357325.8A 2019-04-29 2019-04-29 Experimental model device of aquifer bottom drainage well seepage flow Active CN110057741B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910357325.8A CN110057741B (en) 2019-04-29 2019-04-29 Experimental model device of aquifer bottom drainage well seepage flow

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910357325.8A CN110057741B (en) 2019-04-29 2019-04-29 Experimental model device of aquifer bottom drainage well seepage flow

Publications (2)

Publication Number Publication Date
CN110057741A true CN110057741A (en) 2019-07-26
CN110057741B CN110057741B (en) 2021-09-21

Family

ID=67321578

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910357325.8A Active CN110057741B (en) 2019-04-29 2019-04-29 Experimental model device of aquifer bottom drainage well seepage flow

Country Status (1)

Country Link
CN (1) CN110057741B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113777005A (en) * 2021-08-26 2021-12-10 华北水利水电大学 Intermittent automatic suction seepage test device and method for drainage hole or well
CN117907194A (en) * 2024-03-15 2024-04-19 兴化市建设工程质量检测有限公司 Concrete water permeability detection device

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4392497A (en) * 1980-12-02 1983-07-12 Ghaussy Rahmat U Erythrocyte sedimentation rate apparatus and method
CN101110175A (en) * 2007-08-28 2008-01-23 成都理工大学 Geological environment simulation experiment device
CN202194686U (en) * 2011-08-03 2012-04-18 中铁十二局集团第四工程有限公司 Well-point dewatering device at bottom of tunnel
CN203149978U (en) * 2013-03-21 2013-08-21 安徽理工大学 Bearing-phreatic fully penetrating well flow experiment device
CN104264700A (en) * 2014-10-09 2015-01-07 安徽华力建设集团有限公司 Seepage prevention construction method for light-weight precipitation well point post-cast strip of underground construction
CN104318843A (en) * 2014-11-18 2015-01-28 成都理工大学 Pressure-bearing well water injection test device
US20150160091A1 (en) * 2013-03-11 2015-06-11 Nanjing Emperodam Co., Ltd. Three-dimensional flow velocity vector, energy and mass gauge
CN204613068U (en) * 2015-04-23 2015-09-02 北京市园林科学研究院 A kind of soil solution drainage arrangement
WO2016085447A1 (en) * 2014-11-24 2016-06-02 Halliburton Energy Services, Inc. Backscattering spectrometry for determining a concentration of solids in a solids-laden fluid
CN105756103A (en) * 2016-03-08 2016-07-13 同济大学 Transparent soil test method for simulating groundwater seepage of drawdown and confined aquifer of foundation pit
CN105910975A (en) * 2016-06-25 2016-08-31 西安科技大学 Snow-melting infiltration simulation system and unsaturated infiltration coefficient determination method
CN108843300A (en) * 2018-06-25 2018-11-20 中国石油天然气股份有限公司 Method and device for determining type of main flow channel in complex porous medium
CN108986624A (en) * 2018-08-20 2018-12-11 成都理工大学 Saturating type cap rock is collapsed to because of experimental provision under upper resistance
CN109612538A (en) * 2019-01-08 2019-04-12 山东大学 A kind of test method of drainage volume of concealed pipe

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4392497A (en) * 1980-12-02 1983-07-12 Ghaussy Rahmat U Erythrocyte sedimentation rate apparatus and method
CN101110175A (en) * 2007-08-28 2008-01-23 成都理工大学 Geological environment simulation experiment device
CN202194686U (en) * 2011-08-03 2012-04-18 中铁十二局集团第四工程有限公司 Well-point dewatering device at bottom of tunnel
US20150160091A1 (en) * 2013-03-11 2015-06-11 Nanjing Emperodam Co., Ltd. Three-dimensional flow velocity vector, energy and mass gauge
CN203149978U (en) * 2013-03-21 2013-08-21 安徽理工大学 Bearing-phreatic fully penetrating well flow experiment device
CN104264700A (en) * 2014-10-09 2015-01-07 安徽华力建设集团有限公司 Seepage prevention construction method for light-weight precipitation well point post-cast strip of underground construction
CN104318843A (en) * 2014-11-18 2015-01-28 成都理工大学 Pressure-bearing well water injection test device
WO2016085447A1 (en) * 2014-11-24 2016-06-02 Halliburton Energy Services, Inc. Backscattering spectrometry for determining a concentration of solids in a solids-laden fluid
CN204613068U (en) * 2015-04-23 2015-09-02 北京市园林科学研究院 A kind of soil solution drainage arrangement
CN105756103A (en) * 2016-03-08 2016-07-13 同济大学 Transparent soil test method for simulating groundwater seepage of drawdown and confined aquifer of foundation pit
CN105910975A (en) * 2016-06-25 2016-08-31 西安科技大学 Snow-melting infiltration simulation system and unsaturated infiltration coefficient determination method
CN108843300A (en) * 2018-06-25 2018-11-20 中国石油天然气股份有限公司 Method and device for determining type of main flow channel in complex porous medium
CN108986624A (en) * 2018-08-20 2018-12-11 成都理工大学 Saturating type cap rock is collapsed to because of experimental provision under upper resistance
CN109612538A (en) * 2019-01-08 2019-04-12 山东大学 A kind of test method of drainage volume of concealed pipe

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
EDWARDS, KB 等: "MODELING PUMPING TESTS IN WEATHERED GLACIAL TILL", 《JOURNAL OF HYDROLOGY》 *
杨解: "井流模拟试验", 《水文地质工程地质》 *
汪星晨 等: "单孔稳定流抽水试验渗透系数分析", 《河北工程大学学报(自然科学版)》 *
王文学 等: "某矿第四系底部含水层降水井群优化布置", 《煤田地质与勘探》 *
顾建平 等: "《建筑施工技术》", 31 January 1999, 河海大学出版社 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113777005A (en) * 2021-08-26 2021-12-10 华北水利水电大学 Intermittent automatic suction seepage test device and method for drainage hole or well
CN113777005B (en) * 2021-08-26 2023-11-14 华北水利水电大学 Intermittent automatic suction seepage test device and method for drainage hole or well
CN117907194A (en) * 2024-03-15 2024-04-19 兴化市建设工程质量检测有限公司 Concrete water permeability detection device
CN117907194B (en) * 2024-03-15 2024-05-14 兴化市建设工程质量检测有限公司 Concrete water permeability detection device

Also Published As

Publication number Publication date
CN110057741B (en) 2021-09-21

Similar Documents

Publication Publication Date Title
CN104880334B (en) Construction and operation phase seepage field of tunnel model assay systems and its test method
CN103940718B (en) A kind of on-the-spot permeability experimental facility of discrete material
CN110047368A (en) Fill solution cavity deposition experimental rig integrated with the prominent mud catastrophe of tunnel batch-type gushing water and method
CN109959598A (en) A seepage test method for drainage wells at the bottom of aquifers
CN107238482B (en) Experimental device system for evolution process of karst collapse column in North China Coalfield
CN203811515U (en) A Field Permeation Experimental Device for Bulk Materials
CN102128775B (en) Detachable constant head permeability tester
CN114486683B (en) A test device for simulating pumping in foundation pits and recharging groundwater outside foundation pits
CN102608289A (en) Test simulation device for confined aquifer
CN104865371A (en) Experiment device and method for consolidation of soft foundation under vacuum condition
CN110057741A (en) A kind of unrestrained well seepage tests model equipment in water-bearing layer bottom
JP3768208B2 (en) Reduction model of groundwater level lowering method
CN108872042A (en) Sand level, vertical infiltration coefficient simultaneous determination apparatus and its test method
CN109060624B (en) Method for researching seepage-discharging effect of seepage-discharging pipe and seepage device
CN115479869A (en) Test device and method for evaluating grouting performance effect under running water condition under simulation of multiple working conditions
CN112834375B (en) A soil-rock water tank scouring test device considering seepage
CN108196019B (en) A three-dimensional injection-production device for testing the water quality index of the back-injection water in the groundwater sealed cave reservoir
CN202486127U (en) Confined Aquifer Test Simulator
CN108169419A (en) It is a kind of to test device and the experimental method that water seal cave depot reinjected water influences cave depot
CN111986549A (en) Indoor model test device and method for studying the deformation mechanism of hydrodynamic landslide
CN109868833B (en) Control Method of Precipitation in Deep Foundation Pit with Binary Structure
CN207586097U (en) A kind of road surface water-permeable brick permeability coefficient tester
CN204679292U (en) Construction and operation phase seepage field of tunnel model assay systems
CN212483052U (en) A kind of filling body permeate water quality detection and sampling device
CN209296530U (en) A kind of suspension type water-stop curtain flow model in porous media pilot system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant