CN110053151A - A kind of prefabricated components production line with temporary function - Google Patents

A kind of prefabricated components production line with temporary function Download PDF

Info

Publication number
CN110053151A
CN110053151A CN201910434087.6A CN201910434087A CN110053151A CN 110053151 A CN110053151 A CN 110053151A CN 201910434087 A CN201910434087 A CN 201910434087A CN 110053151 A CN110053151 A CN 110053151A
Authority
CN
China
Prior art keywords
assembly line
station
line
temporary storage
production
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910434087.6A
Other languages
Chinese (zh)
Inventor
张剑
谢忠全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Broad Homes Industrial Group Co Ltd
Original Assignee
Changsha Broad Homes Industrial Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha Broad Homes Industrial Group Co Ltd filed Critical Changsha Broad Homes Industrial Group Co Ltd
Priority to CN201910434087.6A priority Critical patent/CN110053151A/en
Priority to PCT/CN2019/089768 priority patent/WO2020232744A1/en
Publication of CN110053151A publication Critical patent/CN110053151A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B15/00General arrangement or layout of plant ; Industrial outlines or plant installations

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)
  • General Factory Administration (AREA)

Abstract

本发明公开了一种具有暂存功能的预制构件生产线,其包括第一流水线、第二流水线、第三流水线、第四流水线和台摸暂存单元,第一、第二流水线上分别设置有布料工位、脱模工位,第一流水线的两端分别与养护窑和台摸暂存单元衔接,第二流水线的一端与养护窑衔接,另一端与第三流水线的一端衔接;第三、第四流水线上用于设置清模工位、装模工位和布筋工位;第四流水线的一端与台摸暂存单元衔接,另一端与第三流水线的另一端通过台模摆渡机构进行衔接;台摸暂存单元用于暂时存放经过布筋操作之后台模。本发明提高了生产线的适应能力,即便是同时生产不同类型或尺寸的预制构件,也便于保证生产线的生产节拍,有利于安排生产计划。

The invention discloses a prefabricated component production line with a temporary storage function, which comprises a first assembly line, a second assembly line, a third assembly line, a fourth assembly line and a temporary storage unit. Work station and demoulding station, both ends of the first assembly line are connected with the curing kiln and the temporary storage unit respectively, one end of the second assembly line is connected with the curing kiln, and the other end is connected with one end of the third assembly line; The fourth assembly line is used to set the mold clearing station, the mold loading station and the reinforcement station; one end of the fourth assembly line is connected with the temporary storage unit of the table, and the other end is connected with the other end of the third assembly line through the table mold ferry mechanism; The table touch temporary storage unit is used to temporarily store the table mold after the reinforcement operation. The invention improves the adaptability of the production line, even if the prefabricated components of different types or sizes are produced at the same time, it is convenient to ensure the production rhythm of the production line and facilitate the arrangement of production plans.

Description

一种具有暂存功能的预制构件生产线A prefabricated component production line with temporary storage function

技术领域technical field

本发明涉及一种具有暂存功能的预制构件生产线,属于预制构件生产技术领域。The invention relates to a prefabricated component production line with a temporary storage function, belonging to the technical field of prefabricated component production.

背景技术Background technique

预制构件的流水线生产方式的特点是台模/钢台车(也就是工作平台)随着工艺顺序通过生产线的传送系统流动至每个工序对应的工位;每一个工位的操作人员和具体工作相对固定,例如,台模清理、挡边模具安装、预埋件预埋、钢筋摆放布置、混凝土浇筑、振捣等操作在固定位置由相对固定的人和设备来操作。这种生产工艺形式可降低劳动强度、提高生产效率,节省人工,因此目前国内预制构件生产企业对于预制外墙板和内墙板多采用流水线生产方式进行生产。The feature of the assembly line production method of prefabricated components is that the table mold/steel trolley (that is, the working platform) flows to the corresponding station of each process through the conveying system of the production line with the process sequence; the operator and specific work of each station Relatively fixed, for example, table mold cleaning, sidewall mold installation, pre-embedded parts, reinforcement arrangement, concrete pouring, vibrating and other operations are operated by relatively fixed people and equipment in fixed positions. This type of production process can reduce labor intensity, improve production efficiency, and save labor. Therefore, domestic prefabricated component manufacturers currently use assembly line production for prefabricated exterior wall panels and interior wall panels.

现有预制构件的生产工艺流程一般包括:清洁模具、喷油划线、安装模具、布置钢筋/预埋件、浇筑振捣混凝土、刮平混凝土、预养护、磨平、养护窑养护、脱模、吊装等等。The production process of existing prefabricated components generally includes: cleaning molds, spraying and marking, installing molds, arranging steel bars/embedded parts, pouring vibrating concrete, leveling concrete, pre-curing, grinding, curing kiln curing, demoulding , hoisting, etc.

这些工序中,浇筑振捣混凝土、刮平混凝土、预养护、磨平、养护窑养护、脱模、吊装工位的操作(处理)时间节拍大致固定,不会因预制构件的形式、尺寸等因素产生较大的变化。但是安装模具和布置钢筋/预埋件工位的操作时间则会受到预制构件的形式、尺寸的不同而差异巨大,尤其是对于具体施工项目个性化定制的定制件,其非常规的外形往往将延长安装模具和布置钢筋/预埋件工位的操作时间。如图1所示,现有技术中的比较典型的预制构件生产线的生产工序为:完成全部生产流程的预制构件在脱模工位进行脱模(拆除挡边模具),然后对预制构件进行吊装,预制构件转移至成品库中,留下来的台模沿着第一流水线转移,依次进行清模、装模、钢筋布置、预埋件预埋操作,在这些操作过程中,可以将台模从第一流水线通过台摸摆渡机构转移到第二流水线上,完成以上操作后台模进入布料工位进行混凝土浇筑并振捣,再进行一些浇筑后处理之后进入养护窑中进行养护,养护后的台模来到脱模工位,完成一次生产循环。In these processes, the time rhythm of the operation (processing) of the pouring and vibrating concrete, leveling concrete, pre-curing, grinding, curing kiln curing, demoulding, and hoisting stations is roughly fixed, and will not be affected by the form, size and other factors of the prefabricated components. produce larger changes. However, the operation time of installing molds and arranging steel bars/embedded parts will vary greatly depending on the form and size of prefabricated components. Especially for customized parts customized for specific construction projects, their unconventional shapes often Extended operating time for installing molds and arranging rebar/embedded parts. As shown in Figure 1, the production process of a typical prefabricated component production line in the prior art is: the prefabricated component that has completed the entire production process is demolded at the demolding station (removal of the sidewall mold), and then the prefabricated component is hoisted. , the prefabricated components are transferred to the finished product warehouse, and the remaining table molds are transferred along the first assembly line, and the mold cleaning, mold loading, reinforcement arrangement, and pre-embedded parts are carried out in turn. During these operations, the table mold can be removed from The first assembly line is transferred to the second assembly line through the table-frying mechanism. After the above operations are completed, the background mold enters the placing station for concrete pouring and vibrating. After some post-casting treatment, it enters the curing kiln for curing. The cured table mold Come to the demolding station to complete a production cycle.

现有的生产线如果只是生产单一的预制构件产品,大致能够保证每一个生产工序的处于可控状态,能够按照24小时平均生产多少数量的预制构件进行生产计划安排,生产节拍不易被打乱。但是当需要同时生产不同类型的预制构件时,尤其是个性化的定制件时,由于安装模具和布置钢筋/预埋件工位的操作时间难以协调到一致,比如个性化的定制件在安装模具时需要比常规预制构件的装模时间多出几倍,这将导致个性化的定制件后续的常规预制构件生产节拍被打乱,过慢节拍工位使生产线出现拥堵,降低了生产线产能。If the existing production line only produces a single prefabricated component product, it can roughly ensure that each production process is in a controllable state, and the production plan can be arranged according to the average number of prefabricated components produced in 24 hours, and the production rhythm is not easily disrupted. However, when different types of prefabricated components need to be produced at the same time, especially personalized customized parts, it is difficult to coordinate the operation time of installing molds and arranging steel bars/embedded parts. For example, personalized customized parts are installed in molds. It takes several times more time than conventional prefabricated components, which will lead to the disruption of the subsequent conventional prefabricated components production cycle of personalized customized parts, and the production line will be congested and reduce the production line capacity if the production line is too slow.

发明内容SUMMARY OF THE INVENTION

为了克服现有技术中存在的问题,本发明提供一种具有暂存功能的预制构件生产线,具体技术方案如下。In order to overcome the problems existing in the prior art, the present invention provides a prefabricated component production line with a temporary storage function, and the specific technical scheme is as follows.

一种具有暂存功能的预制构件生产线,其特征在于,包括第一流水线、第二流水线、第三流水线、第四流水线、台模摆渡机构、养护窑和台摸暂存单元,所述第一流水线上设置有布料工位,所述第二流水线上设置有脱模工位,所述第一流水线的两端分别与所述养护窑和所述台摸暂存单元衔接,所述第二流水线的一端与所述养护窑衔接,另一端与所述第三流水线的一端衔接;所述第三流水线上设置有清模工位、装模工位和布筋工位中的至少一种,所述第四流水线上设置有清模工位、装模工位和布筋工位中的至少一种;所述第四流水线的一端与所述台摸暂存单元衔接,另一端与所述第三流水线的另一端通过所述台模摆渡机构进行衔接;所述台摸暂存单元用于暂时存放经过布筋操作之后台模。A prefabricated component production line with a temporary storage function is characterized in that it includes a first assembly line, a second assembly line, a third assembly line, a fourth assembly line, a table mold ferry mechanism, a curing kiln and a table mold temporary storage unit, the first assembly line A distributing station is arranged on the assembly line, a demoulding station is arranged on the second assembly line, and both ends of the first assembly line are respectively connected with the curing kiln and the temporary storage unit, and the second assembly line One end is connected with the curing kiln, and the other end is connected with one end of the third assembly line; the third assembly line is provided with at least one of a mold cleaning station, a mold loading station and a reinforcement station. The fourth assembly line is provided with at least one of a mold clearing station, a mold loading station and a reinforcement station; one end of the fourth assembly line is connected with the stage touch temporary storage unit, and the other end is connected with the third assembly line The other end of the mold is connected by the table mold ferry mechanism; the table mold temporary storage unit is used to temporarily store the table mold after the reinforcement operation.

本申请的上述技术方案相比于现有技术增加了台摸暂存单元,使得预制构件的生产循环过程以台模暂存单元为界限可以大致分为两个区域,即生产节拍不固定区和生产节拍固定区。具体生产过程大致为:用于生产预制构件的台模在第三流水线、第四流水线上依次进行台模清理、挡边模具安装、钢筋布置,预埋件放置等操作后,从第四流水线上转移到台模暂存单元中进行暂存;由于预制构件的类型以及尺寸的不同,上述操作针对不同的预制构件在时间上存在较大的差异,因此,从清理台模到完成钢筋布置、预埋件预埋所需要的时间可以认为是不确定的,即生产线的这部分区域的生产节拍是不定的。台模暂存单元中的台模可以按照一定的时间节拍(比如15分钟)转运出一个台模到第一流水线上,第一流水线上的台模在布料工位进行混凝土浇筑和振捣操作,然后经过抹平、磨平、静养、拉毛等后处理工序之后进入养护窑中进行养护,养护后台模及其预制构件转移到第二流水线上,在第二流水线上完成挡边模具拆除和脱模操作,用于生产预制构件的台模在第二流水线的脱模工位处进行脱模处理后(预制构件吊离台模)转移到第三流水线上,完成一个生产循环;第一流水线、养护窑和第二流水线上的操作时间几乎不受预制构件类型和尺寸的限制,各种类型和尺寸的预制构件都可以按照设定的时间间隔在第一流水线和第二流水线上进行生产,即第一流水线、养护窑和第二流水线形成的区域可以称为生产节拍固定区。台摸暂存单元用于累计存储一定量的台模,可以保证24h不间断地为第一流水线提供台模,这样就可以保证在第二流水线的脱模工位处按照设定的节拍(时间间隔)下线预制构件成品,完全不受不断变化的预制构件类型和尺寸的影响,使得生产节拍不固定的操作工序全部位于台模暂存单元的上游,在这种情况下只需要加大生产节拍不固定区的生产能力,保证台摸暂存单元中具有足够的台模即可连续不断地进行预制构件生产。台模暂存单元起到了“缓存蓄水”的作用,生产线的适应能力大大提高,生产不同类型的定制化预制构件也不会导致生产线堵塞或者效率降低。Compared with the prior art, the above-mentioned technical solution of the present application adds a mold temporary storage unit, so that the production cycle process of the prefabricated component can be roughly divided into two areas with the mold temporary storage unit as the limit, namely, the production cycle is not fixed area and Production takt fixed area. The specific production process is roughly as follows: after the table molds used to produce prefabricated components are cleaned on the third assembly line and the fourth assembly line in turn, after the operation of the mold cleaning, the installation of the sidewall molds, the arrangement of the steel bars, and the placement of the embedded parts, the fourth assembly line is completed. Transfer to the table form temporary storage unit for temporary storage; due to the different types and sizes of prefabricated components, the above operations have great differences in time for different prefabricated components. The time required for the pre-embedding of the embedded parts can be considered as uncertain, that is, the production tact in this part of the production line is uncertain. The table mold in the table mold temporary storage unit can transfer a table mold to the first assembly line according to a certain time rhythm (for example, 15 minutes). Then, after troweling, grinding, resting, roughening and other post-processing procedures, it enters the curing kiln for curing, and the curing background mold and its prefabricated components are transferred to the second assembly line, and the sidewall mold removal and demoulding are completed on the second assembly line. Operation, the table mold used to produce the prefabricated component is demolded at the demolding station of the second assembly line (the prefabricated component is lifted off the table mold) and transferred to the third assembly line to complete a production cycle; the first assembly line, maintenance The operation time of the kiln and the second assembly line is almost not limited by the type and size of prefabricated components, and prefabricated components of various types and sizes can be produced on the first assembly line and the second assembly line according to the set time interval, that is, the first assembly line and the second assembly line. The area formed by the first line, the curing kiln and the second line can be called the production takt fixed area. The table pattern temporary storage unit is used to accumulatively store a certain amount of table molds, which can ensure that the table molds are provided for the first assembly line uninterruptedly for 24 hours, so as to ensure that the demolding station of the second assembly line is in accordance with the set tempo (time). Interval) off-line prefabricated components are completely unaffected by the ever-changing types and sizes of prefabricated components, so that the operation processes with unfixed production rhythms are all located upstream of the table mold temporary storage unit. In this case, it is only necessary to increase production. The production capacity in the variable rhythm area ensures that there are enough table molds in the temporary storage unit for prefabricated components to be continuously produced. The temporary storage unit of the table mold plays the role of "buffering and storing water", and the adaptability of the production line is greatly improved, and the production of different types of customized prefabricated components will not cause the production line to block or reduce efficiency.

进一步地,所述第一流水线和所述第二流水线平行设置;所述第三流水线和所述第四流水线平行设置。这样有利于减小生产线的占地面积。Further, the first pipeline and the second pipeline are arranged in parallel; the third pipeline and the fourth pipeline are arranged in parallel. This helps to reduce the footprint of the production line.

进一步地,所述台摸暂存单元包括有升降移动装置和若干个用于容纳台模的容纳空间。Further, the table mold temporary storage unit includes a lifting and moving device and a plurality of accommodating spaces for accommodating the table mold.

进一步地,所述第三流水线平行并列设置有两条以上,全部所述第三流水线的两端通过台模摆渡机构进行衔接;所述第四流水线平行并列设置有两条以上,全部所述第四流水线的两端通过台模摆渡机构进行衔接。这样能够增加清模工位、装模工位和布筋工位的数量,多个第三流水线和多个第四流水线上的台模可以相互转移,提升了生产节拍不固定区的生产能力,保证台模暂存单元中始终有足够多的台模。如此设置,可以减少生产线上三班倒的人员数量,清模工位、装模工位和布筋工位需要的大量工作人员可只在白天工作,即白天下班时就能够保证台模暂存单元中有足够生产线夜晚生产所需要的台模数量,夜晚台模暂存单元中的台模源源不断地按照固定节拍转移至第一流水线上,这样夜晚只需要在第一流水线、第二流水线安排少量的工作人员即可实现生产线的24小时不间断生产,而且不需要所有岗位的工作人员都进行三班倒。Further, more than two of the third assembly lines are arranged in parallel, and the two ends of all the third assembly lines are connected by a table die ferry mechanism; the fourth assembly line is arranged in parallel with more than two, and all of the third assembly lines are arranged in parallel and juxtaposed. The two ends of the four-pipeline are connected by a table die ferry mechanism. In this way, the number of mold cleaning stations, mold loading stations and reinforcement stations can be increased, and the table molds of multiple third and fourth assembly lines can be transferred to each other, which improves the production capacity in areas where the production rhythm is not fixed. There are always enough tables in the table staging unit. This setting can reduce the number of personnel in three shifts on the production line, and a large number of workers required for the mold cleaning station, the mold installation station and the reinforcement station can only work during the day, that is, the table mold temporary storage unit can be guaranteed when off work during the day. There are enough table molds required for night production of the production line, and the table molds in the table mold temporary storage unit are continuously transferred to the first assembly line according to a fixed rhythm, so that only a small amount needs to be arranged in the first assembly line and the second assembly line at night. 24-hour uninterrupted production of the production line can be achieved with only 100 staff members, and there is no need for staff in all positions to work three shifts.

进一步地,所述第三流水线和所述第四流水线均设置有两条以上,且所述第三流水线和所述第四流水线间隔设置,一条所述第三流水线和一条所述第四流水线组成一组,一组内的所述第三流水线和所述第四流水线远离所述台摸暂存单元的一端通过所述台摸暂存单元进行衔接。这样能够增加清模工位、装模工位和布筋工位的数量,多个第三流水线和多个第四流水线上的台模可以相互转移,提升了生产节拍不固定区的生产能力,保证台模暂存单元中始终有足够多的台模。如此设置,可以将部分组的第三流水线和第四流水线专门用来生产复杂、异形或定制化预制构件,即便其在这个阶段生产效率低下也不会阻塞整个生产线或者降低整个生产线的产出效率。Further, the third assembly line and the fourth assembly line are both provided with two or more, and the third assembly line and the fourth assembly line are arranged at intervals, and a third assembly line and a fourth assembly line are formed. In one group, one end of the third pipeline and the fourth pipeline in a group that is far away from the stage-mode temporary storage unit is connected through the stage-mode temporary storage unit. In this way, the number of mold cleaning stations, mold loading stations and reinforcement stations can be increased, and the table molds of multiple third and fourth assembly lines can be transferred to each other, which improves the production capacity in areas where the production rhythm is not fixed. There are always enough tables in the table staging unit. In this way, part of the third assembly line and the fourth assembly line can be dedicated to the production of complex, special-shaped or customized prefabricated components, even if the production efficiency at this stage is low, it will not block the entire production line or reduce the output efficiency of the entire production line .

进一步地,所述第一流水线上依次设置有布料工位、刮平工位和后处理工位。布料工位是用来浇筑混凝土、振捣混凝土的;刮平工位用来将混凝土预制构件表面刮平;后处理工位包括磨平、静养、拉毛等入养护窑前的处理工位。Further, the first assembly line is sequentially provided with a fabricating station, a leveling station and a post-processing station. The distribution station is used to pour concrete and vibrate the concrete; the leveling station is used to level the surface of the concrete prefabricated components; the post-processing station includes grinding, resting, and roughing before entering the curing kiln

进一步地,所述第二流水线上依次设置有拆模工位和脱模工位。在拆模工位进行挡边模具拆除,在脱模工位将预制构件产品吊离台模。Further, the second assembly line is provided with a demolding station and a demolding station in sequence. The sidewall mold is removed at the demoulding station, and the prefabricated product is lifted off the table mold at the demolding station.

进一步地,所述第二流水线和/或所述第三流水线直接进行衔接,且所述第二流水线和/或所述第三流水线下穿所述台摸暂存单元。或者,所述第二流水线和所述第三流水线通过所述台摸暂存单元的升降移动装置进行衔接。第二流水线和第三流水线分别与台模暂存单元衔接,可以使得在夜晚生产时,在第二流水线上完成脱模处理的台模自动转移到台摸暂存单元中暂存,待第二天第三流水线的工作人员上班后,在将台模暂存单元中的空台模转移至第三流水线上进行处理。Further, the second assembly line and/or the third assembly line are directly connected, and the second assembly line and/or the third assembly line pass through the stage-mode temporary storage unit. Alternatively, the second assembly line and the third assembly line are connected by a lifting and moving device of the stage-mode temporary storage unit. The second assembly line and the third assembly line are respectively connected to the table mold temporary storage unit, so that during night production, the table mold that has completed the demoulding process on the second assembly line is automatically transferred to the table mold temporary storage unit for temporary storage. After the staff of the third assembly line goes to work, they transfer the empty table molds in the table mold temporary storage unit to the third assembly line for processing.

本发明相比于现有技术具有以下有益效果。Compared with the prior art, the present invention has the following beneficial effects.

1、提高了生产线的适应能力,即便是同时生产不同类型或尺寸的预制构件,也能够保证生产线不发生阻塞,确保生产效率。1. Improve the adaptability of the production line. Even if different types or sizes of prefabricated components are produced at the same time, it can ensure that the production line does not block and ensure production efficiency.

2、保证了生产线的成品生产的节拍一致性,便于安排生产计划。2. It ensures the rhythm consistency of the finished product production of the production line, which is convenient for arranging the production plan.

3、在生产线24小时不间断生产的情况下,可以在晚间解放部分工位的劳动力,减少三班倒的工作人员数量,降低了劳动强度。3. Under the condition of 24-hour uninterrupted production of the production line, the labor force of some workstations can be liberated at night, the number of three-shift workers is reduced, and the labor intensity is reduced.

4、通过台模暂存单元的运转、存储,将不同生产节拍的工序实现相同标准的生产节拍,避免较长生产工序工位拥堵较短的生产工序工位,解决了定制化产品生产节拍不均衡的问题。4. Through the operation and storage of the temporary storage unit of the table mold, the same standard production rhythm can be achieved for the processes of different production takt, which avoids the congestion of the longer production process stations and the shorter production process stations, and solves the problem of the customized product production rhythm. balance issue.

附图说明Description of drawings

图1是本发明实施例1的预制构件生产线示意图;Fig. 1 is the schematic diagram of the prefabricated component production line of embodiment 1 of the present invention;

图2是本发明实施例1的预制构件生产线示意图;Fig. 2 is the schematic diagram of the prefabricated component production line of Embodiment 1 of the present invention;

图3是本发明实施例1的预制构件生产线示意图。FIG. 3 is a schematic diagram of a production line for prefabricated components according to Example 1 of the present invention.

图中:第一流水线1、第二流水线2、第三流水线3、第四流水线4、台模摆渡机构5、养护窑6、台摸暂存单元7、升降移动装置71、布料工位8、脱模工位9。In the figure: the first assembly line 1, the second assembly line 2, the third assembly line 3, the fourth assembly line 4, the table mold ferry mechanism 5, the curing kiln 6, the table touch temporary storage unit 7, the lifting and moving device 71, the distribution station 8, Demoulding station 9.

具体实施方式Detailed ways

下面结合附图对本发明作进一步详细描述。The present invention will be described in further detail below with reference to the accompanying drawings.

实施例1Example 1

参见图1,一种具有暂存功能的预制构件生产线,其特征在于,包括第一流水线1、第二流水线2、第三流水线3、第四流水线4、台模摆渡机构5、养护窑6和台摸暂存单元7,所述第一流水线1上设置有布料工位8,所述第二流水线2上设置有脱模工位9,所述第一流水线1的两端分别与所述养护窑6和所述台摸暂存单元7衔接,所述第二流水线2的一端与所述养护窑6衔接,另一端与所述第三流水线3的一端衔接;所述第三流水线3上设置有清模工位、装模工位和布筋工位中的至少一种,所述第四流水线4上设置有清模工位、装模工位和布筋工位中的至少一种;所述第四流水线4的一端与所述台摸暂存单元7衔接,另一端与所述第三流水线3的另一端通过所述台模摆渡机构5进行衔接;所述台摸暂存单元7用于暂时存放经过布筋操作之后台模。Referring to FIG. 1, a prefabricated component production line with a temporary storage function is characterized in that it includes a first assembly line 1, a second assembly line 2, a third assembly line 3, a fourth assembly line 4, a table die ferry mechanism 5, a curing kiln 6 and The table touches the temporary storage unit 7, the first assembly line 1 is provided with a cloth distribution station 8, the second assembly line 2 is provided with a demoulding station 9, and the two ends of the first assembly line 1 are respectively connected with the maintenance The kiln 6 is connected with the temporary storage unit 7, one end of the second assembly line 2 is connected with the curing kiln 6, and the other end is connected with one end of the third assembly line 3; the third assembly line 3 is provided with There is at least one of a mold-clearing station, a mold-installing station, and a reinforcement station, and the fourth assembly line 4 is provided with at least one of a mold-clearing station, a mold-installing station, and a reinforcement station; the One end of the fourth assembly line 4 is connected with the stage pattern temporary storage unit 7, and the other end is connected with the other end of the third assembly line 3 through the stage mold ferry mechanism 5; the stage pattern temporary storage unit 7 is used for Temporarily store the table mold after the reinforcement operation.

流水线主要包括两列相互平行的输送导向机构,如两列滚轮,驱动电机可驱动该滚轮转动,当用于生产预制构件的台模(钢台车)放置在流水线上,在滚轮的驱动下台模可以沿着流水线移动。需要说明的是:台模在流水线上的驱动不限于滚轮驱动,驱动机构也可以采用液压顶进或链轮拖拉方式传动,定时定距离移动台模,移动节奏时间根据生产工艺时间计算,根据每种构件生产工艺决定每个工位执行工序时间,自动运行。The assembly line mainly includes two rows of parallel conveying guide mechanisms, such as two rows of rollers. The drive motor can drive the rollers to rotate. When the table mold (steel trolley) used to produce prefabricated components is placed on the assembly line, the table mold is driven by the rollers. Can move along the pipeline. It should be noted that the driving of the table mold on the assembly line is not limited to roller drive, and the driving mechanism can also be driven by hydraulic jacking or sprocket dragging, and the table mold can be moved at a fixed distance at a fixed distance. The moving rhythm time is calculated according to the production process time, according to each The production process of these components determines the time for each station to execute the process, and it runs automatically.

台模摆渡机构5是为了将相邻流水线上的台模进行相互转移的机构。台模摆渡机构可采用吊装机构或者摆渡小车,摆渡小车设置在摆渡导轨上。The table transfer mechanism 5 is a mechanism for transferring table molds on adjacent assembly lines to each other. The ferry mechanism of the table mold can be a hoisting mechanism or a ferry trolley, and the ferry trolley is arranged on the ferry guide rail.

用于生产预制构件的台模在第三流水线3、第四流水线4上依次进行台模清理、挡边模具安装、钢筋布置,预埋件放置等操作后,从第四流水线4上转移到台模暂存单元7中进行暂存;由于预制构件的类型以及尺寸的不同,上述操作针对不同的预制构件在时间上存在较大的差异,因此,从清理台模到完成钢筋布置、预埋件预埋所需要的时间可以认为是不确定的,即生产线的这部分区域的生产节拍是不定的。台模暂存单元7中的台模可以按照一定的时间节拍(比如15分钟)转运出一个台模到第一流水线1上,第一流水线1上的台模在布料工位8进行混凝土浇筑和振捣操作,然后经过抹平、磨平、静养、拉毛等后处理工序之后进入养护窑6中进行养护,养护后台模及其预制构件转移到第二流水线2上,在第二流水线2上完成挡边模具拆除和脱模操作,用于生产预制构件的台模在第二流水线2的脱模工位处进行脱模处理后(预制构件吊离台模)转移到第三流水线3上,完成一个生产循环;第一流水线、养护窑和第二流水线上的操作时间几乎不受预制构件类型和尺寸的限制,各种类型和尺寸的预制构件都可以按照设定的时间间隔在第一流水线和第二流水线上进行生产,即第一流水线、养护窑和第二流水线形成的区域可以称为生产节拍固定区。台摸暂存单元用于累计存储一定量的台模,可以保证24h不间断地为第一流水线提供台模,这样就可以保证在第二流水线的脱模工位处按照设定的节拍(时间间隔)下线预制构件成品,完全不受不断变化的预制构件类型和尺寸的影响,使得生产节拍不固定的操作工序全部位于台模暂存单元的上游,在这种情况下只需要加大生产节拍不固定区的生产能力,保证台摸暂存单元中具有足够的台模即可连续不断地进行预制构件生产。台模暂存单元起到了“缓存蓄水”的作用,生产线的适应能力大大提高,生产不同类型的定制化预制构件也不会导致生产线堵塞或者效率降低。The table molds used for the production of prefabricated components are sequentially carried out on the third assembly line 3 and the fourth assembly line 4, after the table mold cleaning, sidewall mold installation, reinforcement arrangement, and embedded parts placement, etc., are transferred from the fourth assembly line 4 to the table. Temporary storage is performed in the mold temporary storage unit 7; due to the different types and sizes of prefabricated components, the above operations have great differences in time for different prefabricated components. The time required for pre-embedding can be considered to be indeterminate, that is, the production tact in this part of the production line is indeterminate. The table mold in the table mold temporary storage unit 7 can transfer a table mold to the first assembly line 1 according to a certain time rhythm (for example, 15 minutes). Vibration operation, and then enter the curing kiln 6 after post-processing procedures such as troweling, grinding, resting, and brushing for curing. The curing background mold and its prefabricated components are transferred to the second assembly line 2, and completed on the second assembly line 2 The sidewall mold removal and demolding operations, the table mold used for producing the prefabricated component is demolded at the demolding station of the second assembly line 2 (the prefabricated component is lifted off the table mold) and transferred to the third assembly line 3, complete One production cycle; the operation time of the first assembly line, curing kiln and second assembly line is almost not limited by the type and size of prefabricated components, and prefabricated components of various types and sizes can be used in the first assembly line and the second assembly line according to the set time interval. Production is performed on the second assembly line, that is, the area formed by the first assembly line, the curing kiln and the second assembly line may be referred to as a fixed production takt area. The table pattern temporary storage unit is used to accumulatively store a certain amount of table molds, which can ensure that the table molds are provided for the first assembly line uninterruptedly for 24 hours, so as to ensure that the demolding station of the second assembly line is in accordance with the set tempo (time). Interval) off-line prefabricated components are completely unaffected by the ever-changing types and sizes of prefabricated components, so that the operation processes with unfixed production rhythms are all located upstream of the table mold temporary storage unit. In this case, it is only necessary to increase production. The production capacity in the variable rhythm area ensures that there are enough table molds in the temporary storage unit for prefabricated components to be continuously produced. The temporary storage unit of the table mold plays the role of "buffering and storing water", and the adaptability of the production line is greatly improved, and the production of different types of customized prefabricated components will not cause the production line to block or reduce efficiency.

第一流水线1和第二流水线2平行设置;第三流水线3和第四流水线4平行设置。这样有利于减小生产线的占地面积,使得生产线比较紧凑,也便于多条生产线并列设置。The first pipeline 1 and the second pipeline 2 are arranged in parallel; the third pipeline 3 and the fourth pipeline 4 are arranged in parallel. In this way, the floor space of the production line is reduced, the production line is compact, and the parallel arrangement of multiple production lines is facilitated.

台摸暂存单元7包括有升降移动装置71和若干个用于容纳台模的容纳空间。例如台摸暂存单元可以采用专利文献(比如公开号为:CN109264276A、CN109159272A、CN109176855A、CN204136208U、CN203236582U、CN208697677U的专利文献)中公开的养护装置(养护窑),作为台摸暂存单元可以不需要设置加热、保湿装置,升降移动装置能够将台模转移至容纳空腔中,并在需要进行下一步工序时,能够从该容纳空间中向生产线的下游进行转移,升降移动装置是本领域养护窑中的常规装置,其可以带动台模进行三个方向(横向、纵向和竖直方向)上的移动。当然,台摸暂存单元也可以直接采用现有的养护窑。台摸暂存单元保证了第一流水线上能够按照既定的生产节拍进行生产。The table mold temporary storage unit 7 includes a lifting and moving device 71 and several accommodating spaces for accommodating table molds. For example, the temporary storage unit of the stage model can use the curing device (curing kiln) disclosed in the patent documents (for example, the publication numbers are: CN109264276A, CN109159272A, CN109176855A, CN204136208U, CN203236582U, CN208697677U), and it does not need to be used as the temporary storage unit of the stage model. A heating and moisturizing device is provided, and the lifting and moving device can transfer the table mold to the accommodating cavity, and when the next step needs to be performed, it can be transferred from the accommodating space to the downstream of the production line. The lifting and moving device is a curing kiln in the field. A conventional device in , which can drive the table mold to move in three directions (transverse, longitudinal and vertical). Of course, the temporary storage unit can also directly use the existing curing kiln. The temporary storage unit ensures that the first assembly line can produce according to the established production rhythm.

第一流水线1上依次设置有布料工位8、刮平工位和后处理工位。布料工位是用来浇筑混凝土、振捣混凝土的;刮平工位用来将混凝土预制构件表面刮平;后处理工位包括磨平、静养、拉毛等入养护窑前的处理工位。The first assembly line 1 is sequentially provided with a cloth-distributing station 8, a leveling station and a post-processing station. The distribution station is used to pour concrete and vibrate the concrete; the leveling station is used to level the surface of the concrete prefabricated components; the post-processing station includes grinding, resting, and roughing before entering the curing kiln

第二流水线2上依次设置有拆模工位和脱模工位9。在拆模工位进行挡边模具拆除,在脱模工位将预制构件产品吊离台模。The second assembly line 2 is provided with a demolding station and a demolding station 9 in sequence. The sidewall mold is removed at the demoulding station, and the prefabricated product is lifted off the table mold at the demolding station.

第二流水线2和/或所述第三流水线3直接进行衔接,且所述第二流水线2和/或所述第三流水线3下穿所述台摸暂存单元7。或者,所述第二流水线2和所述第三流水线3通过所述台摸暂存单元7的升降移动装置71进行衔接。第二流水线和第三流水线分别与台模暂存单元衔接,可以使得在夜晚生产时,在第二流水线上完成脱模处理的台模自动转移到台摸暂存单元中暂存,待第二天第三流水线的工作人员上班后,在将台模暂存单元中的空台模转移至第三流水线上进行处理。需要说明的是,第二流水线2和所述第三流水线3直接进行衔接时,可以位于所述台模暂存单元7的的侧面,而不是必须位于台模暂存单元7的下方。The second assembly line 2 and/or the third assembly line 3 are directly connected, and the second assembly line 2 and/or the third assembly line 3 pass through the stage-mode temporary storage unit 7 . Alternatively, the second assembly line 2 and the third assembly line 3 are connected through the lifting and moving device 71 of the stage-mode temporary storage unit 7 . The second assembly line and the third assembly line are respectively connected to the table mold temporary storage unit, so that during night production, the table mold that has completed the demoulding process on the second assembly line is automatically transferred to the table mold temporary storage unit for temporary storage. After the staff of the third assembly line goes to work, they transfer the empty table molds in the table mold temporary storage unit to the third assembly line for processing. It should be noted that, when the second assembly line 2 and the third assembly line 3 are directly connected, they may be located on the side of the table mold temporary storage unit 7 , but not necessarily below the table mold temporary storage unit 7 .

实施例2Example 2

参见图2,在其他结构与实施例1相同的基础上,所述第三流水线3平行并列设置有两条以上,全部所述第三流水线3的两端通过台模摆渡机构5进行衔接;第四流水线4平行并列设置有两条以上,全部所述第四流水线4的两端通过台模摆渡机构进行衔接。这样能够增加清模工位、装模工位和布筋工位的数量,多个第三流水线和多个第四流水线上的台模可以相互转移,提升了生产节拍不固定区的生产能力,保证台模暂存单元中始终有足够多的台模。如此设置,可以减少生产线上三班倒的人员数量,清模工位、装模工位和布筋工位需要的大量工作人员可只在白天工作,即白天下班时就能够保证台模暂存单元中有足够生产线夜晚生产所需要的台模数量,夜晚台模暂存单元中的台模源源不断地按照固定节拍转移至第一流水线上,这样夜晚只需要在第一流水线、第二流水线安排少量的工作人员即可实现生产线的24小时不间断生产,而且不需要所有岗位的工作人员都进行三班倒。Referring to FIG. 2 , on the basis of the other structures being the same as those in Embodiment 1, there are more than two parallel and juxtaposed third assembly lines 3 , and both ends of all the third assembly lines 3 are connected by the table die ferry mechanism 5 ; Two or more of the fourth assembly lines 4 are arranged in parallel and juxtaposed, and both ends of all the fourth assembly lines 4 are connected by a table die ferry mechanism. In this way, the number of mold cleaning stations, mold loading stations and reinforcement stations can be increased, and the table molds of multiple third and fourth assembly lines can be transferred to each other, which improves the production capacity in areas where the production rhythm is not fixed. There are always enough tables in the table staging unit. This setting can reduce the number of personnel in three shifts on the production line, and a large number of workers required for the mold cleaning station, the mold installation station and the reinforcement station can only work during the day, that is, the table mold temporary storage unit can be guaranteed when off work during the day. There are enough table molds required for night production of the production line, and the table molds in the table mold temporary storage unit are continuously transferred to the first assembly line according to a fixed rhythm, so that only a small amount needs to be arranged in the first assembly line and the second assembly line at night. 24-hour uninterrupted production of the production line can be achieved with only 100 staff members, and there is no need for staff in all positions to work three shifts.

实施例3Example 3

参见图3,在其他结构与实施例1相同的基础上,所述第三流水线3和所述第四流水线4均设置有两条以上,且所述第三流水线3和所述第四流水线4间隔设置,一条所述第三流水线3和一条所述第四流水线4组成一组,一组内的所述第三流水线和所述第四流水线远离所述台摸暂存单元的一端通过所述台摸暂存单元进行衔接。这样能够增加清模工位、装模工位和布筋工位的数量,多个第三流水线和多个第四流水线上的台模可以相互转移,提升了生产节拍不固定区的生产能力,保证台模暂存单元中始终有足够多的台模。如此设置,可以将部分组的第三流水线和第四流水线专门用来生产复杂、异形或定制化预制构件,即便其在这个阶段生产效率低下也不会阻塞整个生产线或者降低整个生产线的产出效率。Referring to FIG. 3 , on the basis that other structures are the same as those in Embodiment 1, there are more than two of the third pipeline 3 and the fourth pipeline 4 , and the third pipeline 3 and the fourth pipeline 4 spaced, one of the third pipeline 3 and one of the fourth pipeline 4 form a group, and the third pipeline and the fourth pipeline in a group pass through the The platform touches the temporary storage unit for connection. In this way, the number of mold cleaning stations, mold loading stations and reinforcement stations can be increased, and the table molds of multiple third and fourth assembly lines can be transferred to each other, which improves the production capacity in areas where the production rhythm is not fixed. There are always enough tables in the table staging unit. In this way, part of the third assembly line and the fourth assembly line can be dedicated to the production of complex, special-shaped or customized prefabricated components, even if the production efficiency at this stage is low, it will not block the entire production line or reduce the output efficiency of the entire production line .

上面结合附图对本发明的实施例进行了描述,在不冲突的情况下,本发明中的实施例及实施例中的特征可以相互组合。本发明并不局限于上述的具体实施方式,上述的具体实施方式仅仅是示意性的,而不是局限性的,本领域的普通技术人员在本发明的启示下,在不脱离本发明宗旨和权利要求所保护的范围情况下,还可做出很多形式,这些均属于本发明的保护范围之内。The embodiments of the present invention are described above with reference to the accompanying drawings, and the embodiments of the present invention and the features of the embodiments may be combined with each other without conflict. The present invention is not limited to the above-mentioned specific embodiments, and the above-mentioned specific embodiments are only illustrative rather than limiting. Those of ordinary skill in the art, under the inspiration of the present invention, do not deviate from the purpose and rights of the present invention. In the case of the claimed protection scope, many forms can also be made, which all fall within the protection scope of the present invention.

Claims (9)

1. a kind of prefabricated components production line with temporary function, which is characterized in that including the first assembly line, the second assembly line, Third assembly line, the 4th assembly line, platform mould ferry-boat mechanism, curing kilns and platform touch temporary storage location, are arranged on first assembly line Have cloth station, be provided with demoulding station on second assembly line, the both ends of first assembly line respectively with the maintenance Kiln and described touch temporary storage location linking, and one end of second assembly line is connected with the curing kilns, the other end and described the One end of three assembly lines is connected;It is provided on the third assembly line in clear die worker position, die-filling station and cloth muscle station at least One kind being provided at least one of clear die worker position, die-filling station and cloth muscle station on the 4th assembly line;4th stream One end of waterline is touched temporary storage location with described and is connected, and the other end of the other end and the third assembly line is put by described mould Mechanism is crossed to be connected;Described is touched temporary storage location for temporary backstage mould of the storage Jing Guo cloth muscle operation.
2. a kind of prefabricated components production line with temporary function according to claim 1, which is characterized in that described first Assembly line and second assembly line are arranged in parallel;The third assembly line and the 4th assembly line are arranged in parallel.
3. a kind of prefabricated components production line with temporary function according to claim 1, which is characterized in that described is touched Temporary storage location includes lifting and moving device and several are used to accommodate the accommodation space of platform mould.
4. a kind of prefabricated components production line with temporary function according to claim 1, which is characterized in that the third Assembly line parallel side-by-side is provided with two or more, and all the both ends of the third assembly line are held in the mouth by platform mould ferry-boat mechanism It connects;The 4th assembly line parallel side-by-side is provided with two articles or more, and all the both ends of the 4th assembly line are ferried by platform mould Mechanism is connected.
5. a kind of prefabricated components production line with temporary function according to claim 1, which is characterized in that the third Assembly line and the 4th assembly line are provided with two articles or more, and the third assembly line and the 4th assembly line interval are set It sets, one article of third assembly line and one article of the 4th assembly line form the third assembly line and institute in one group, one group It states one end that the 4th assembly line touches temporary storage location far from described and touches temporary storage location by described and be connected.
6. a kind of prefabricated components production line with temporary function according to claim 1, which is characterized in that described first It is disposed with cloth station on assembly line, strikes off station and post-processing station.
7. a kind of prefabricated components production line with temporary function according to claim 1, which is characterized in that described second Demoulding station and demoulding station are disposed on assembly line.
8. a kind of prefabricated components production line with temporary function according to claim 1, which is characterized in that described second Assembly line and/or the third assembly line are directly connected, and are worn under second assembly line and/or the third assembly line Described is touched temporary storage location.
9. a kind of prefabricated components production line with temporary function according to claim 1, which is characterized in that described second The lifting and moving device that assembly line and the third assembly line touch temporary storage location by described is connected.
CN201910434087.6A 2019-05-23 2019-05-23 A kind of prefabricated components production line with temporary function Pending CN110053151A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201910434087.6A CN110053151A (en) 2019-05-23 2019-05-23 A kind of prefabricated components production line with temporary function
PCT/CN2019/089768 WO2020232744A1 (en) 2019-05-23 2019-06-03 Prefabricated component production line having temporary storage function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910434087.6A CN110053151A (en) 2019-05-23 2019-05-23 A kind of prefabricated components production line with temporary function

Publications (1)

Publication Number Publication Date
CN110053151A true CN110053151A (en) 2019-07-26

Family

ID=67324186

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910434087.6A Pending CN110053151A (en) 2019-05-23 2019-05-23 A kind of prefabricated components production line with temporary function

Country Status (2)

Country Link
CN (1) CN110053151A (en)
WO (1) WO2020232744A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110303590A (en) * 2019-08-01 2019-10-08 郴州远大住宅工业有限公司 A kind of prefabricated components production line
CN114919052A (en) * 2022-05-19 2022-08-19 岳阳远大住宅工业有限公司 Prefabricated part production line
CN115291030A (en) * 2022-06-13 2022-11-04 群沃电子科技(苏州)有限公司 Test method of test assembly line

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109291229B (en) * 2018-11-30 2024-01-23 湖北宇辉智能科技有限公司 Modularized mobile multilayer stacking steam curing PC component production system and production method
CN112622005A (en) * 2020-12-10 2021-04-09 北京好运达智创科技有限公司 Precast box girder beam surface smoothing and galling device
CN113400449B (en) * 2021-07-30 2025-01-10 湖南新鼎住宅工业有限公司 Intelligent precast concrete component self-vibrating steel table formwork and production line
CN113580359A (en) * 2021-09-08 2021-11-02 苏州绿建住工科技有限公司 Automatic production line for laminated floor slabs
CN114789505A (en) * 2021-11-19 2022-07-26 江苏众为智能科技有限公司 Compact type small mold table full-automatic laminated slab production line
CN114800835B (en) * 2022-04-29 2023-06-13 中铁三局集团第二工程有限公司 Automatic production system for reinforced concrete prefabricated cover plates
CN115890850A (en) * 2022-10-10 2023-04-04 北京日佳柏莱窗业有限公司 Wood window processing assembly line
CN116872336A (en) * 2023-08-18 2023-10-13 西安交通大学 An integrated device and method for smoothing and roughening concrete precast parts
CN116890384B (en) * 2023-09-11 2024-01-23 中铁九局集团第三建设有限公司 Vibrating floating platform

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203236582U (en) * 2013-03-21 2013-10-16 长沙远大住宅工业有限公司 Three-dimensional curing kiln
WO2018036186A1 (en) * 2016-08-23 2018-03-01 中铁二十三局集团轨道交通工程有限公司 Automatic pre-tensioned prestress concrete slab manufacturing technique utilized in assembly line
CN109352815A (en) * 2018-11-21 2019-02-19 长沙远大住宅工业(江苏)有限公司 Line is deposited in a kind of prefabricated components production line and the production with the prefabricated components production line
CN109732768A (en) * 2019-02-27 2019-05-10 中清大装配式建筑有限公司 Building prefabricated components forming production line and production technology with central dispatch system
CN210282705U (en) * 2019-05-23 2020-04-10 长沙远大住宅工业集团股份有限公司 A prefabricated component production line with temporary storage function

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FI916098A0 (en) * 1991-12-23 1991-12-23 Acotec Oy FOERFARANDE FOER TILLVERKNING AV BETONGELEMENT OCH APPARATUR FOER TILLAEMPNING AV FOERFARANDET.
CN109203211B (en) * 2018-10-12 2024-01-12 广州建筑产业研究院有限公司 Assembly line for component compatible production
CN109227921A (en) * 2018-10-15 2019-01-18 远大住宅工业(杭州)有限公司 A kind of prefabricated components production line
CN109333800A (en) * 2018-11-21 2019-02-15 远大住宅工业(天津)有限公司 A prefabricated component production line
CN109732767A (en) * 2019-02-27 2019-05-10 中清大装配式建筑有限公司 Multipurpose assembled architecture prefabricated components forming production line and its production technology

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203236582U (en) * 2013-03-21 2013-10-16 长沙远大住宅工业有限公司 Three-dimensional curing kiln
WO2018036186A1 (en) * 2016-08-23 2018-03-01 中铁二十三局集团轨道交通工程有限公司 Automatic pre-tensioned prestress concrete slab manufacturing technique utilized in assembly line
CN109352815A (en) * 2018-11-21 2019-02-19 长沙远大住宅工业(江苏)有限公司 Line is deposited in a kind of prefabricated components production line and the production with the prefabricated components production line
CN109732768A (en) * 2019-02-27 2019-05-10 中清大装配式建筑有限公司 Building prefabricated components forming production line and production technology with central dispatch system
CN210282705U (en) * 2019-05-23 2020-04-10 长沙远大住宅工业集团股份有限公司 A prefabricated component production line with temporary storage function

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
尹静等: "《Flexsim物流仿真与系统优化》", 31 January 2018, 冶金工业出版社, pages: 172 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110303590A (en) * 2019-08-01 2019-10-08 郴州远大住宅工业有限公司 A kind of prefabricated components production line
CN110303590B (en) * 2019-08-01 2024-10-22 郴州远大住宅工业有限公司 Prefabricated component production line
CN114919052A (en) * 2022-05-19 2022-08-19 岳阳远大住宅工业有限公司 Prefabricated part production line
CN115291030A (en) * 2022-06-13 2022-11-04 群沃电子科技(苏州)有限公司 Test method of test assembly line

Also Published As

Publication number Publication date
WO2020232744A1 (en) 2020-11-26

Similar Documents

Publication Publication Date Title
CN110053151A (en) A kind of prefabricated components production line with temporary function
CN110076897A (en) A kind of prefabricated components production line with platform mould temporary storage location
CN206085314U (en) Prefabricated component flexible production line
CN103128847B (en) Double-block type sleeper production line and production process thereof
CN109352815B (en) Prefabricated component production line and production line with same
CN108058266A (en) Prefabricated components integrated production line
CN111186011B (en) Automatic assembly line arrangement structure for factory prefabrication of laminated plate beams and production method
CN111975974A (en) A double-circulation production line for prefabricated building components and its production process
CN211492145U (en) Automatic production line for Reactive Powder Concrete (RPC) prefabricated parts
CN212498269U (en) Double-circulation production line for prefabricated components of fabricated building
CN207480877U (en) A kind of subway segment production line using multilayer steam curing kiln
CN110936487A (en) Novel prefabricated part production system
CN109129872A (en) Line is deposited in a kind of production of prefabricated components
CN109203211B (en) Assembly line for component compatible production
CN209491931U (en) Line is deposited in a kind of production of prefabricated components
CN104669430B (en) PC wallboard production systems
CN109483717A (en) A kind of component production line
CN210282705U (en) A prefabricated component production line with temporary storage function
CN210910546U (en) Prefabricated component production line
CN113001741A (en) Prefabricated component production line
CN210282704U (en) Prefabricated part production line with bench formwork temporary storage unit
CN218227163U (en) Double-skin wall production line
CN209319993U (en) Centrifugal concrete pile production line
CN209491933U (en) A kind of prefabricated components production line
CN216803909U (en) Prefabricated component production line

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190726