CN206085314U - Prefabricated component flexible production line - Google Patents
Prefabricated component flexible production line Download PDFInfo
- Publication number
- CN206085314U CN206085314U CN201621158299.4U CN201621158299U CN206085314U CN 206085314 U CN206085314 U CN 206085314U CN 201621158299 U CN201621158299 U CN 201621158299U CN 206085314 U CN206085314 U CN 206085314U
- Authority
- CN
- China
- Prior art keywords
- station
- autonomous working
- working area
- prefabricated components
- production line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 65
- 238000003860 storage Methods 0.000 claims description 19
- 239000002994 raw material Substances 0.000 claims description 13
- 238000012423 maintenance Methods 0.000 claims description 9
- 239000000463 material Substances 0.000 claims description 8
- 238000005266 casting Methods 0.000 claims description 6
- 238000011010 flushing procedure Methods 0.000 claims description 4
- 230000001815 facial effect Effects 0.000 abstract 1
- 230000002349 favourable effect Effects 0.000 abstract 1
- 238000000034 method Methods 0.000 description 21
- 230000008569 process Effects 0.000 description 10
- 238000005516 engineering process Methods 0.000 description 4
- 238000009434 installation Methods 0.000 description 3
- 230000008439 repair process Effects 0.000 description 3
- 238000005507 spraying Methods 0.000 description 3
- 241001669679 Eleotris Species 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 2
- 230000001680 brushing effect Effects 0.000 description 2
- 239000003795 chemical substances by application Substances 0.000 description 2
- 238000004140 cleaning Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 125000004122 cyclic group Chemical group 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 210000003195 fascia Anatomy 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 238000010408 sweeping Methods 0.000 description 2
- 230000007306 turnover Effects 0.000 description 2
- 238000010792 warming Methods 0.000 description 2
- 230000004888 barrier function Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 230000009467 reduction Effects 0.000 description 1
- 239000002893 slag Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 241000894007 species Species 0.000 description 1
- 238000005406 washing Methods 0.000 description 1
Landscapes
- Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)
Abstract
The utility model provides a prefabricated component flexible production line for the prefabricated component of shape is predetermine through the production of mould platform, the first autonomous working district and the second autonomous working district that include parallel arrangement on the horizontal direction to and parallel arrangement in the traffic zone between first autonomous working district and the second autonomous working district, first autonomous working district and second autonomous working district all organize including a plurality of stations that can correspond prefabricated component difference flow charts, and adjacent station is organized and is arranged side by side, the traffic zone include with first autonomous working district and second autonomous working district in all stations organize adjacent transportation tracks to and can follow the conveyer that facial make -up mould unloading platform was organized to the station, the conveyer is mobilizable to be set up on the transportation track. The utility model discloses a prefabricated component flexible production line has higher production efficiency to simple structure, saving cost and area are favorable to extensive popularization and application.
Description
Technical field
This utility model belongs to construction timber production equipment technical field, more particularly to a kind of prefabricated components flexible production
Line.
Background technology
At present, the country produces the prefabricated structure of assembled architecture using the circular line of horizontal cyclic pipeline mode mostly
Part, circular line is the closed circulation pattern produced by beat, including following station:Manually installed station, pour station, pre-
Maintenance station, maintenance station and handling station.
Specifically, first die station is completed to clear up, sprayed and mounting process in manually installed station;Then production line is by die station
It is sent to and pours station, touched in die cavity by side of the material distributing machine by concreting in die station, and is vibrated by vibration platen
Make concrete be evenly distributed, complete to pour, Vibration Technology;Then die station is conveyed to precuring station, complete manually to catch up with flat, precuring
The technique such as shield and plucking of wiping one's face;Then die station and prefabricated components placed on it are conveyed to station is conserved, to the component in die station
Conserved;Component is met after design strength, and die station and the component in die station are delivered to into handling station is carried out at form removal
Reason, the component after form removal is transported to stockyard by finished product transport vehicle, and the die station after form removal is transported to manually installed station and carries out
Come back to after hand sweeping, spraying and mounting process pour that station carries out next round pour work.
However, in circular line, die station is sequentially through the corresponding station of each operation, it is impossible to avoid because of each station used time
The phenomenon of difference and " fast etc. slow " of generation;On the other hand, if certain station hinder for some reason need suspend when, whole production line is necessary
Stop simultaneously, just can continue to run with until failure stations relieve failure, easily appearance " work holdup " phenomenon, thus circular line
Production efficiency it is relatively low.
Chinese invention patent CN105437364A discloses a kind of wallboard flexible production line, and the production line is solid including one group
Surely arrange and be contained with die station station support, station support side arrange the walking track parallel to station support group,
In the mould car of setting on track of walking, in the equipment along station support group back and forth movement of station support group upper lifting,
The processing of wallboard prefabricated component is carried out in die station, station support group top is provided with day rail and moves simultaneously for each equipment
Workpiece to needing processing carries out operation;Technical scheme disclosed in the utility model is by arranging the equipment that can be moved
Realize the processing that each operation is completed on each station, it is to avoid the time loss that operation is waited in prior art.But
Need the extra movable stand and the day rail for installing above-mentioned movable stand for arranging and being used for installing above-mentioned equipment.The opposing party
Face, if station is more, inevitably arranges many set equipments, movable stand and day rail, increased cost and occupation of land face
Product, is unfavorable for being widely popularized.
In sum, a kind of simple structure, low cost, floor space how to be provided few and with pre- compared with high efficiency
Component production line processed becomes the technical barrier that those skilled in the art are badly in need of solving.
Utility model content
This utility model is for the larger skill of above-mentioned prefabricated components production line low production efficiency, high cost and floor space
Art problem, proposes a kind of simple structure, cost-effective and floor space and has flexible compared with the prefabricated components of high efficiency raw
Producing line.
In order to achieve the above object, the technical solution adopted in the utility model is:A kind of prefabricated components flexible production line, uses
In the prefabricated components that preset shape is produced by die station, including the first autonomous working Qu He being arranged in parallel in the horizontal direction
Two autonomous working areas, and the traffic zone between the first autonomous working area and the second autonomous working area that is arranged in parallel, first is only
Vertical working area and the second autonomous working area include the multiple station groups that can correspond to prefabricated components different work operation, adjacent work
Hyte is arranged side by side;Traffic zone includes the transport adjacent with all station groups in the first autonomous working area and the second autonomous working area
Track, and the conveying arrangement of die station can be loaded and unloaded from station group, conveying arrangement is movably arranged on conveying track.
Preferably, conveying track includes first track close with the first autonomous working area, and with the second independent work
Make the second close track of area, the first track and the second parallel track are arranged;Each station group includes multiple stations, each work
Position is mutually perpendicular to conveying track.
Preferably, being disposed with artificial secondary installing station group, artificial inside the first autonomous working area from left to right
Once mounting station group and Rigger hyte;It is disposed with from left to right inside second autonomous working area and pours station group, pre-
Maintainer hyte and curing kilns group.
Preferably, conveying arrangement include can in artificial once mounting station group, artificial secondary installing station group, pour work
The center transport cars of die station are transmitted between hyte, precuring station group, and can be in precuring station group, curing kilns group and handling
The stacking machine of die station is transmitted between station group.
Preferably, pouring station group, also to include that the material distributing machine and can carrying out that can carry out casting concrete operation is vibrated close
Real concrete carries out the vibration platen of operation.
Preferably, precuring station group includes stretchable maintenance canopy, maintenance canopy bottom is embedded with jet chimney.
Preferably, further including storage area, storage area includes die station storage area, component working area and raw material storing
Area, wherein, die station storage area is located at the right side in the second autonomous working area, and component working area is located at the right side in the first autonomous working area
Side, raw material storing area is located at the lower section in the first autonomous working area, and is arranged in parallel with the first autonomous working area.
Preferably, component working area includes prefabricated components can be completed to rinse the flushing platform of operation.
Preferably, further including channel region, channel region includes being located at the first autonomous working area and raw material storage area
Between first passage, the second channel above the second autonomous working area, and be connected to first passage and second channel
The third channel of right-hand member.
Preferably, further including that controllable conveying arrangement transmits the central control room of route.
Compared with prior art, the advantage and good effect of the prefabricated components flexible production line that this utility model is provided exists
In:
1st, prefabricated components flexible production line of the present utility model be provided with the first autonomous working area, the second autonomous working area and
Traffic zone, by multiple different station groups in the first autonomous working area, the second autonomous working area the phase of prefabricated components production is completed
Answer procedures, and by the conveying track and conveying arrangement of traffic zone by die station and prefabricated components placed on it in different works
Transmit between the corresponding station group of sequence, therefore, the more station of indivedual man-hours requirements will not take the time of whole production line;And
And, because the station in individual station group breaks down the normal operation for also not interfering with remaining station or remaining station group, have
Beneficial to the production efficiency for significantly improving whole production line.
2nd, compared to traditional circular line, flexible production line of the present utility model only needs to additionally arrange conveying track
And center transport cars are capable of achieving die station and prefabricated components placed on it are transmitted between the corresponding station of each operation, favorably
In reduces cost and reduction floor space, and it is adapted to the popularization and application in large, medium and small workshop.
3rd, wallboard class can only be produced relative to the flexible production line mentioned in traditional circular line and prior art
Standard prefabricated components, the flexible production line of the application not only can produce the standard prefabricated components of wallboard class, can also batch life
All kinds of special-shaped prefabricated components such as balcony, stair, sleeper are produced, wide variety is produced.
Description of the drawings
Fig. 1 is the horizontal layout schematic diagram of this utility model prefabricated components flexible production line.
Above in each figure:11st, the first autonomous working area;111st, artificial once mounting station group;112nd, artificial secondary installing
Station group;113rd, Rigger hyte;12nd, the second autonomous working area;121st, station group is poured;1211st, material distributing machine;1212nd, vibrate
Platform;122nd, precuring station group;123rd, curing kilns group;2nd, traffic zone;21st, conveying track;211st, the first track;212nd, second
Track;221st, center transport cars;222nd, stacking machine;3rd, storage area;31st, die station storage area;32nd, component working area;321st, rinse
Platform;33rd, raw material storage area;4th, central control room;5th, channel region;51st, first passage;52nd, second channel;53rd, threeway
Road.
Specific embodiment
Below, this utility model is specifically described by exemplary embodiment.It should be appreciated, however, that not having
In the case of being further discussed below, the element, structure and features in an embodiment can also be advantageously incorporated into other enforcements
In mode.
In description of the present utility model, it should be noted that term "left", "right", " on ", D score " level " etc. indicates
Orientation or position relationship be based on the position relationship shown in accompanying drawing 1, be for only for ease of description this utility model and simplification retouch
State, rather than indicate or imply indication device or element must have specific orientation, with specific azimuth configuration and operation,
Therefore it is not intended that to restriction of the present utility model.Additionally, term " first ", " second " are only used for describing purpose, and can not
It is interpreted as indicating or implying relative importance.
Referring to Fig. 1, Fig. 1 is the horizontal layout schematic diagram of this utility model prefabricated components flexible production line.As shown in figure 1,
This utility model provides a kind of prefabricated components flexible production line, for producing the prefabricated components of preset shape, bag by die station
The the first autonomous working area 11 and the second autonomous working area 12 being arranged in parallel in the horizontal direction is included, and is arranged in parallel in first
Traffic zone 2 between autonomous working area 12 of autonomous working area 11 and second, the first autonomous working area 11 and the second autonomous working area
12 include the multiple station groups that can correspond to prefabricated components different work operation, and adjacent stations group is arranged side by side, and traffic zone 2 includes
The conveying track 21 adjacent with all station groups in the first autonomous working area 11 and the second autonomous working area 12, and can be from station
The conveying arrangement of die station is loaded and unloaded in group, conveying arrangement is movably arranged on conveying track 21.
Prefabricated components flexible production line of the present utility model is by the first autonomous working area 11 of arrangement, the second autonomous working area
12 and traffic zone 2, complete prefabricated components by multiple different station groups in the first autonomous working area 11, the second autonomous working area 12
The corresponding procedures of production, and platform and placed on it prefabricated will be touched by the conveying track 21 and conveying arrangement of traffic zone 2
Component is sequentially sent to the corresponding station group of operation, therefore, the more station of indivedual man-hours requirements will not take whole piece life
The time of producing line;Also, because the station in individual station group breaking down remaining station or remaining the station group of also do not interfere with
Normal operation, be conducive to significantly improving the production efficiency of whole production line.
Wherein, the preset shape of above-mentioned prefabricated components includes the wallboard class of standard, and balcony, stair, the sleeper of abnormity
Deng so as to meet the requirement of various construction, flexible production line of the present utility model production wide variety being made, with stronger
The conformability of prefabricated components species change.
With continued reference to Fig. 1, conveying track 21 includes two the first tracks 211 being parallel to each other and the second track 212, first
Track 211 is close with the first autonomous working area 11, and the second track 212 is close with the second autonomous working area 12;Each station group is equal
Including multiple stations, the multiple stations in each station group are arranged side by side and perpendicular with conveying track 21.Specifically, each work
Position includes the continuously arranged base of two rows, and the roller being installed on base, and roller can be along in being fixed on base
Heart axle rotates.Conveying arrangement is arranged on conveying track 21, it is possible to along the first track 211 and the second track 212 in difference
Move between working group.Conveying arrangement is provided with the driving wheel that can provide power, can drive die station and be placed in die station it is pre-
Component processed slides on conveying arrangement from station or slides on station from conveying arrangement, so as to realize in different station
The function of die station and prefabricated components is transmitted between the station of group.
Especially illustrate, the distance of the first autonomous working area 11 and the first conveying track 211, and second works independently
The distance of the conveying track 212 of area 12 and second, meets the requirement that conveying arrangement loads and unloads die station, you can so that the drive on conveying arrangement
Driving wheel realizes that die station and prefabricated components placed on it will be driven to load to conveying arrangement from corresponding station, while also may be used
So that the driving wheel on conveying arrangement is realized to drive die station and prefabricated components placed on it that phase is offloaded to from conveying arrangement
On the station answered.
Further show in Fig. 1, the first track 211, the second track 212 and the first autonomous working area 11 and second are only
Vertical working area 12 is all parallel to each other and equal length, is conducive to improving conveying arrangement transmission and loads and unloads die station and placed on it pre-
The work efficiency of component processed.Wherein, the first autonomous working area 11 is disposed with from left to right artificial secondary installing station group
112nd, artificial once mounting station group 111 and Rigger hyte 113, the second autonomous working area 12 is disposed with from left to right pours
Build station group 121, precuring station group 122 and curing kilns group 123.
Traffic zone 2 from Fig. 1 it is known that conveying arrangement includes center transport cars 221 and stacking machine 222, wherein, in
Centre transport vehicle 221 can in artificial once mounting station group 111, artificial secondary installing station group 112, pour station group 121, precuring
Die station and prefabricated components are transmitted between nurse's hyte 122, stacking machine 222 can be in precuring station 122, curing kilns 123 and handling
Station group 113 transmits die station and prefabricated components, meanwhile, stacking machine 222 can be with the vertical height of adjustment work platform, can be by mould
The platform and prefabricated components pile successively in curing kilns, also can successively take the die station and prefabricated components in curing kilns from curing kilns
Under.
The first autonomous working area 11 in referring to Fig. 1, positioned at the artificial secondary installing work of the left end of the first autonomous working area 11
Hyte 112 can complete the installation exercise of the secondary workpiece material of die station;Artificial once mounting station group 111 is located at artificial secondary peace
The right side of dress work group 112, can complete the operations such as hand sweeping, spraying and the related embedded part of installation;Rigger hyte 113 is located at first
The right-hand member in autonomous working area 11, can complete to tear open side touch, turnover panel and lifting job.
The second autonomous working area 12 in referring to Fig. 1, positioned at the left end of the second autonomous working area 12 pour station group 121 can
Casting concrete operation in the die cavity to the side mould model in die station is completed, also includes carrying out casting concrete work to pouring station
The material distributing machine 1211 of industry, material distributing machine 1211 can simultaneously pour two stations, be conducive to improving work efficiency, pour station group 121
Each station bottom be fixed with can be to pouring concrete carry out the vibration platen 1212 of vibration compacting operation, it is right to realize
The vibration compacting that the concrete prefabricated element for completing enters is poured, so that prefabricated components reach performance requirement;Precuring station group
122 are located at the right side for pouring station 121, can complete manually to catch up with flat, precuring, wipe one's face and plucking operation, wrap in each station
The desk-top stretchable precuring canopy of stent is included, under precuring canopy jet chimney is embedded with, can provide full for precuring canopy
The temperature and humidity that sufficient precuring is required;Each station positioned at the curing kilns group 123 of the right-hand member of the second autonomous working area 12 is arranged
There are curing kilns, curing kilns are multiple structure, and curing kilns group 123 can simultaneously complete the maintenance work of multigroup prefabricated components.
Illustrate as one embodiment, illustrate as one embodiment, artificial secondary installing station group 112 can
Including 6 stations;Artificial once mounting station group 111 may include 7 stations;Rigger hyte 113 may include two stations;Pour
Building station group 121 may include two stations;Precuring station group 122 may include 9 stations;Curing kilns group 123 may include 6 works
Position, curing kilns can be 6 Rotating fields, and curing kilns group 123 can simultaneously complete the maintenance work of 36 groups of prefabricated components;According to different operations
Station group the station number that includes of the production corresponding station group of duration rational, make flexible production line reach highest production
Efficiency.Curing time can be set to 8 hours, under the whole work efficiency for not affecting the whole flexible production line of concrete, further
Ensure that prefabricated components have good strength character.
Further, flexible production line also includes storage area 3, and storage area 3 includes die station storage area 31, component working area 32
With raw material storing area 33, wherein, die station storage area 31 be located at the second autonomous working area 12 right side, the dimension to die station can be completed
Repair and store;Component working area 32 is located at the right side in the first autonomous working area 11, can complete the prefabricated components to there is little damage
Be rinsed before handling, repairing work, it is temporary after complete lifting job again;Raw material storing area 33 works independently positioned at first
The lower section in area 11, and be arranged in parallel with the first autonomous working area 11, touch for opposite side, the original such as bar-mat reinforcement, embedded part and warming plate
Material is deposited.Component working area 32 includes prefabricated components can be completed to rinse the flushing platform 321 of operation.
Illustrate as one embodiment, the big I of above-mentioned flushing platform 321 is 3m*4m, to ensure to carry out simultaneously
The washing and cleaning operation of multiple prefabricated components, improves the production efficiency of flexible production line, also, rinses the space that platform has abundance,
Prefabricated components can be reached and rinse more thorough effect.
For the ease of the side in raw material storage area 33 is touched, the raw material such as bar-mat reinforcement, embedded part and warming plate is transported to respectively
Station needed for individual, while for convenience associated transportation work is carried out between each station group and between each station, this
The flexible production line of utility model further includes channel region 5, including positioned at the first autonomous working area 111 and raw material storage area
First passage 51 between 33, positioned at the second channel 52 of the top of the second autonomous working area 12, and is connected to first passage 51
With the third channel 53 of the right-hand member of second channel 52.First passage 51 and second channel 52 respectively with the first autonomous working area 11,
Two autonomous working areas 12 are parallel with traffic zone 2, and third channel 53 is perpendicular with first passage 51 and second channel 52 respectively.
Illustrate as one embodiment, the width of above-mentioned channel region 5 can be 3 meters so that channel region 5 there can be abundance
Space transmission raw material transport vehicle traveling.
There is practicality in order to above-mentioned flexible production line is better described, with reference to pre- using the flexible production line production
The process of component processed is further illustrated.
The process of flexible production line production prefabricated components of the present utility model is as follows:
First labor cleaning is carried out to the residual concrete slag on die station surface in artificial once mounting station group 111, made
Die station surface is neatly clean, completes to clean technique;Then releasing agent is sprayed on die station surface, makes die station surface form one layer
Releasing agent oil film, smoothly form removal, completes spraying coating process after being easy to;Finally carry out side film, reinforced mesh and sleeve, electrical box etc.
The installation first of related embedded part, completes mounting process.
After the completion of mounting process, die station and side placed on it are touched by center transport cars 221 and related embedded part is from artificial
Once mounting station group 111 is transported to station group 121 is poured, according to the concrete amount of prefabricated components, to die station top Mo Mo
Casting concrete operation is carried out in the die cavity of type and completes casting craft;It is after the completion of pouring that concrete vibrating is closely knit, complete to vibrate
Technique.
If the prefabricated components of production are Side fascia, using center transport cars 221 by die station and relevant group placed on it
Part is transported to artificial secondary installing station group 112 from station group 121 is poured, and completes and the phase in artificial once mounting station group 111
Same mounting process.After the completion of secondary installing, then by die station and associated component placed on it from artificial secondary installing station group
112 return to transport back and pour station group 121, carry out it is secondary pour, Vibration Technology.
After concrete vibrating is closely knit, die station and prefabricated components placed on it are transported to precuring by center transport cars 221
Station group 122, according to the technological requirement of wallboard class prefabricated components, to the surface of wallboard flat operation is manually caught up with;Catch up with flat technique
After the completion of, precuring canopy is closed, by controlling the temperature in precuring canopy, concrete initial set speed is improved, complete precuring nurse
Skill;After the completion of precuring technique, according to the technological requirement of wallboard class prefabricated components, internal, Side fascia class prefabricated components table is completed
The brushing process on wipe one's face technique or/and the prefabricated components surface to superimposed sheet class in face.The setting time of above-mentioned precuring technique
For 1 hour.
Complete to wipe one's face or/and brushing process after, stacking machine 222 is by die station and prefabricated components placed on it from precuring nurse
Hyte 122 is sent to curing kilns group 123, and is stored in curing kilns and carries out steam curing.The time of above-mentioned maintaining process is 8 hours.
After maintenance terminates, die station and prefabricated components placed on it are stored in into handling station 113 by stacking machine 222, by mould
The moulds such as the Bian Mo on platform are removed, and carry out tearing side mold technique open;Complete to tear open after the mold technique of side, the die station for being loaded with prefabricated components is overturn
Certain angle so that prefabricated components easily can vertically be sling by lifting appliance, complete turnover panel operation;Finally set using lifting
It is standby by prefabricated components handling entrucking.
There is little damage or dirty if reaching the prefabricated components of handling station 113, can be by prefabricated components from die station
First move to component working area 32 to be rinsed component, repair, will complete to rinse, the prefabricated components of repair technology are temporarily stored in component
Working area 32, it is follow-up directly from component working area 32 by prefabricated components handling entrucking.
After the completion of entrucking, prefabricated components are transported to component stockyard;And component be extracted after die station Jing center transport cars
221 transport again to artificial once mounting station group 111 production for carrying out subsequent cycle.
In order to realize the orderly control to whole flexible production line, flexible production line of the present utility model also includes controllable
Conveying arrangement transmits the control system of route and whole production line cyclic production, the centrally located control room of manipulation end of control system
In computer in 4, the end of control system is located on the station of conveying arrangement and each station group, and manipulation end and end are by letter
Breath module is interconnected, it is possible to select to implement manipulation end artificial control or computer control, to realize whole production
The orderly function of line.Central control room 4 is located at the right side of traffic zone 2, and positioned at die station storage area 31 and component working area 32 it
Between.
Claims (10)
1. a kind of prefabricated components flexible production line, for producing the prefabricated components of preset shape by die station, is included in level side
The first autonomous working area (11) being arranged in parallel upwards and the second autonomous working area (12), and be arranged in parallel in the first independent work
Make the traffic zone (2) between area (11) and the second autonomous working area (12), it is characterised in that the first autonomous working area (11) and
Two autonomous working areas (12) include the multiple station groups that can correspond to prefabricated components different work operation, and adjacent stations group is side by side
Arrangement;Traffic zone (2) includes adjacent with all station groups in the first autonomous working area (11) and the second autonomous working area (12)
Conveying track (21), and the conveying arrangement of die station can be loaded and unloaded from station group, conveying arrangement is movably arranged at transport rail
On road (21).
2. prefabricated components flexible production line according to claim 1, it is characterised in that:Conveying track (21) includes and first
Close the first track (211) in autonomous working area (11), and second track close with the second autonomous working area (12)
(212), the first track (211) be arranged in parallel with the second track (212);Each station group includes multiple stations, each station
It is mutually perpendicular to conveying track (21).
3. prefabricated components flexible production line according to claim 1, it is characterised in that:First autonomous working area (11) is from a left side
Artificial secondary installing station group (112), artificial once mounting station group (111) and Rigger hyte are disposed with to the right side
(113);Second autonomous working area (12) be disposed with from left to right pour station group (121), precuring station group (122) and
Curing kilns group (123).
4. prefabricated components flexible production line according to claim 3, it is characterised in that:Conveying arrangement includes can be artificial one
Secondary erector's hyte (111), artificial secondary installing station group (112), pour station group (121), precuring station group (122) it
Between transmit the center transport cars (221) of die station, and can be in precuring station group (122), curing kilns group (123) and handling station
The stacking machine (222) of die station is transmitted between group (113).
5. prefabricated components flexible production line according to claim 3, it is characterised in that:Pouring station group (121) also includes
The material distributing machine (1211) of casting concrete operation can be carried out and vibration compacting concrete can be carried out to carry out the vibration platen of operation
(1212)。
6. prefabricated components flexible production line according to claim 3, it is characterised in that:Precuring station group (122) includes
Stretchable maintenance canopy, maintenance canopy bottom is embedded with jet chimney.
7. prefabricated components flexible production line according to claim 1, it is characterised in that:Storage area (3) is further included, is stored up
Area (3) is deposited including die station storage area (31), component working area (32) and raw material storing area (33), wherein, die station storage area
(31) positioned at the right side in the second autonomous working area (12), component working area (32) positioned at the right side in the first autonomous working area (11),
Raw material storing area (33) is arranged in parallel positioned at the lower section in the first autonomous working area (11) with the first autonomous working area (11).
8. prefabricated components flexible production line according to claim 7, it is characterised in that:Component working area (32) is including can be right
Prefabricated components complete the flushing platform (321) for rinsing operation.
9. prefabricated components flexible production line according to claim 7, it is characterised in that further include channel region (5), leads to
Road area (5) includes being located at first passage (51) between the first autonomous working area (11) and raw material storage area (33), positioned at the
Second channel (52) above two autonomous working areas (12), and it is connected to first passage (51) and second channel (52) right-hand member
Third channel (53).
10. the prefabricated components flexible production line according to any one of claim 1-9, it is characterised in that further include
Controllable conveying arrangement transmits the central control room (4) of route.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621158299.4U CN206085314U (en) | 2016-10-25 | 2016-10-25 | Prefabricated component flexible production line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621158299.4U CN206085314U (en) | 2016-10-25 | 2016-10-25 | Prefabricated component flexible production line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206085314U true CN206085314U (en) | 2017-04-12 |
Family
ID=58484577
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621158299.4U Active CN206085314U (en) | 2016-10-25 | 2016-10-25 | Prefabricated component flexible production line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206085314U (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107363982A (en) * | 2017-09-20 | 2017-11-21 | 北京星航机电装备有限公司 | A kind of concrete prefabricated board assembly line pours traveling automatic control system and control method |
CN107740611A (en) * | 2017-11-23 | 2018-02-27 | 河北雪龙机械制造有限公司 | A kind of twin spans two-wire production system of assembling type buildings material |
CN108340479A (en) * | 2018-01-24 | 2018-07-31 | 有利华建筑预制件(深圳)有限公司 | Continuous-flow type storage concrete curing system |
CN108481543A (en) * | 2018-04-27 | 2018-09-04 | 有利华建筑预制件(深圳)有限公司 | Precast stair production line |
CN109129872A (en) * | 2018-10-15 | 2019-01-04 | 六安远大住宅工业有限公司 | Line is deposited in a kind of production of prefabricated components |
CN110434979A (en) * | 2019-06-24 | 2019-11-12 | 江苏元大建筑科技有限公司 | Three-dimensional expansible bidirectional flexible PC component production technology |
CN110815534A (en) * | 2019-09-27 | 2020-02-21 | 江苏元大建筑科技有限公司 | PC component production line |
CN112140322A (en) * | 2020-09-07 | 2020-12-29 | 中民筑友智能装备科技有限公司 | Novel flexible prefabricated component production line |
CN115446592A (en) * | 2022-09-26 | 2022-12-09 | 惠州市和宏电线电缆有限公司 | A multifunctional production line and its assembly method |
-
2016
- 2016-10-25 CN CN201621158299.4U patent/CN206085314U/en active Active
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107363982A (en) * | 2017-09-20 | 2017-11-21 | 北京星航机电装备有限公司 | A kind of concrete prefabricated board assembly line pours traveling automatic control system and control method |
CN107363982B (en) * | 2017-09-20 | 2019-07-02 | 北京星航机电装备有限公司 | A kind of concrete prefabricated board assembly line pours traveling automatic control system and control method |
CN107740611A (en) * | 2017-11-23 | 2018-02-27 | 河北雪龙机械制造有限公司 | A kind of twin spans two-wire production system of assembling type buildings material |
CN107740611B (en) * | 2017-11-23 | 2023-08-29 | 河北雪龙机械制造有限公司 | Double-span double-line production system for assembled building materials |
CN108340479A (en) * | 2018-01-24 | 2018-07-31 | 有利华建筑预制件(深圳)有限公司 | Continuous-flow type storage concrete curing system |
CN108481543A (en) * | 2018-04-27 | 2018-09-04 | 有利华建筑预制件(深圳)有限公司 | Precast stair production line |
CN109129872A (en) * | 2018-10-15 | 2019-01-04 | 六安远大住宅工业有限公司 | Line is deposited in a kind of production of prefabricated components |
CN109129872B (en) * | 2018-10-15 | 2023-08-22 | 六安远大住宅工业有限公司 | Prefabricated component production line |
CN110434979A (en) * | 2019-06-24 | 2019-11-12 | 江苏元大建筑科技有限公司 | Three-dimensional expansible bidirectional flexible PC component production technology |
CN110815534A (en) * | 2019-09-27 | 2020-02-21 | 江苏元大建筑科技有限公司 | PC component production line |
CN112140322A (en) * | 2020-09-07 | 2020-12-29 | 中民筑友智能装备科技有限公司 | Novel flexible prefabricated component production line |
CN115446592A (en) * | 2022-09-26 | 2022-12-09 | 惠州市和宏电线电缆有限公司 | A multifunctional production line and its assembly method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206085314U (en) | Prefabricated component flexible production line | |
CN104723449B (en) | A kind of automatic assembly line of building industrialization concrete prefabricated element | |
CN108890850B (en) | Intelligent production line and production process capable of producing various standard PC components | |
CN104626348B (en) | Prefabricated components production line | |
CN103128847B (en) | Double-block type sleeper production line and production process thereof | |
WO2020232744A1 (en) | Prefabricated component production line having temporary storage function | |
CN109203215A (en) | Concrete prefabricated element production line | |
CN109352815A (en) | Line is deposited in a kind of prefabricated components production line and the production with the prefabricated components production line | |
WO2020232745A1 (en) | Prefabricated component production line with bench formwork temporary storage unit | |
CN208068545U (en) | A kind of three-dimensional production system of prefabricated component | |
FI124656B (en) | Process and manufacturing plant for casting concrete products | |
CN103029212A (en) | Production process of automatic assembly line in factory for pre-fabricating and assembling wall panel of integral shear wall structure | |
CN207888889U (en) | Prefabricated components integrated production line | |
CN109291229B (en) | Modularized mobile multilayer stacking steam curing PC component production system and production method | |
CN110877405A (en) | Prefabricated component production line | |
CN204382485U (en) | Prefabricated components production system | |
CN110936487A (en) | Novel prefabricated part production system | |
CN104493965A (en) | Precast concrete curing and distribution device, production system and production method | |
CN110355866B (en) | Parallel PC component production system | |
CN104589476A (en) | Precuring bin, production line containing precuring bin and control method of production line | |
CN109129872A (en) | Line is deposited in a kind of production of prefabricated components | |
CN209699477U (en) | A kind of component production line | |
CN209491931U (en) | Line is deposited in a kind of production of prefabricated components | |
CN110027083A (en) | The production technology and production equipment of concrete tabular component | |
CN109249528A (en) | A kind of automatic production line of fixed production precast concrete |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |