A kind of branch line piping lane tunnel interface section constructing method Download PDFInfo
- Publication number
- CN110005416A CN110005416A CN201910359444.7A CN201910359444A CN110005416A CN 110005416 A CN110005416 A CN 110005416A CN 201910359444 A CN201910359444 A CN 201910359444A CN 110005416 A CN110005416 A CN 110005416A
- Authority
- CN
- China
- Prior art keywords
- tunnel
- vertical shaft
- pilot
- piping lane
- branch line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 40
- 238000010276 construction Methods 0.000 claims abstract description 41
- 239000002689 soil Substances 0.000 claims description 18
- 238000010586 diagram Methods 0.000 claims description 17
- 238000009412 basement excavation Methods 0.000 claims description 14
- 230000011218 segmentation Effects 0.000 claims description 12
- 230000005641 tunneling Effects 0.000 claims description 11
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 8
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 6
- 239000004567 concrete Substances 0.000 claims description 4
- 239000000567 combustion gas Substances 0.000 claims description 3
- 229910052742 iron Inorganic materials 0.000 claims description 3
- 239000011378 shotcrete Substances 0.000 claims description 3
- 238000007569 slipcasting Methods 0.000 claims description 3
- 239000007921 spray Substances 0.000 claims description 3
- 238000004078 waterproofing Methods 0.000 claims description 3
- 239000011150 reinforced concrete Substances 0.000 claims description 2
- 238000005728 strengthening Methods 0.000 claims description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D5/00—Lining shafts; Linings therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D5/00—Lining shafts; Linings therefor
- E21D5/11—Lining shafts; Linings therefor with combinations of different materials, e.g. wood, metal, concrete
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mechanical Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Wood Science & Technology (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910359444.7A CN110005416B (en) | 2019-04-30 | 2019-04-30 | Construction method for branch pipe gallery tunnel interface section |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910359444.7A CN110005416B (en) | 2019-04-30 | 2019-04-30 | Construction method for branch pipe gallery tunnel interface section |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110005416A true CN110005416A (en) | 2019-07-12 |
CN110005416B CN110005416B (en) | 2020-08-11 |
Family
ID=67175263
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910359444.7A Active CN110005416B (en) | 2019-04-30 | 2019-04-30 | Construction method for branch pipe gallery tunnel interface section |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110005416B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111764911A (en) * | 2020-07-16 | 2020-10-13 | 北京市市政工程设计研究总院有限公司 | Construction method and construction structure of double-layer integrated pipe gallery joints with underground excavation up and down |
CN112963168A (en) * | 2021-01-29 | 2021-06-15 | 北京交通大学 | Construction method for bridgehead gate of disturbance sensitive stratum ultra-small clear distance large-section group tunnel |
CN114810098A (en) * | 2022-06-16 | 2022-07-29 | 北京市政路桥股份有限公司 | Multi-cabin pipe gallery underground excavation construction method |
CN117948151A (en) * | 2024-03-27 | 2024-04-30 | 北京城建道桥建设集团有限公司 | Safe and efficient excavation method for excavating multiple tunnels by taking vertical shaft as starting point |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4915542A (en) * | 1984-11-16 | 1990-04-10 | Fernando Gordun B | Process for waterproofing surfaces |
JP4024400B2 (en) * | 1998-09-28 | 2007-12-19 | 株式会社熊谷組 | Construction method of shaft in limited area |
CN105350631A (en) * | 2015-11-30 | 2016-02-24 | 广州市市政工程设计研究总院 | Folding plate type inflow vertical well system connected into deep tunnel drainage system |
CN106906843A (en) * | 2017-03-17 | 2017-06-30 | 中国建筑第八工程局有限公司 | Underground pipe gallery and its construction method |
CN108425678A (en) * | 2018-04-12 | 2018-08-21 | 中铁四局集团有限公司 | Construction method of large-section subway crossover tunnel |
-
2019
- 2019-04-30 CN CN201910359444.7A patent/CN110005416B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4915542A (en) * | 1984-11-16 | 1990-04-10 | Fernando Gordun B | Process for waterproofing surfaces |
JP4024400B2 (en) * | 1998-09-28 | 2007-12-19 | 株式会社熊谷組 | Construction method of shaft in limited area |
CN105350631A (en) * | 2015-11-30 | 2016-02-24 | 广州市市政工程设计研究总院 | Folding plate type inflow vertical well system connected into deep tunnel drainage system |
CN106906843A (en) * | 2017-03-17 | 2017-06-30 | 中国建筑第八工程局有限公司 | Underground pipe gallery and its construction method |
CN108425678A (en) * | 2018-04-12 | 2018-08-21 | 中铁四局集团有限公司 | Construction method of large-section subway crossover tunnel |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111764911A (en) * | 2020-07-16 | 2020-10-13 | 北京市市政工程设计研究总院有限公司 | Construction method and construction structure of double-layer integrated pipe gallery joints with underground excavation up and down |
CN112963168A (en) * | 2021-01-29 | 2021-06-15 | 北京交通大学 | Construction method for bridgehead gate of disturbance sensitive stratum ultra-small clear distance large-section group tunnel |
CN112963168B (en) * | 2021-01-29 | 2022-04-01 | 北京交通大学 | Construction method of matoumen in ultra-small clear distance and large-section group tunnel tunnels in disturbance-sensitive strata |
CN114810098A (en) * | 2022-06-16 | 2022-07-29 | 北京市政路桥股份有限公司 | Multi-cabin pipe gallery underground excavation construction method |
CN117948151A (en) * | 2024-03-27 | 2024-04-30 | 北京城建道桥建设集团有限公司 | Safe and efficient excavation method for excavating multiple tunnels by taking vertical shaft as starting point |
Also Published As
Publication number | Publication date |
---|---|
CN110005416B (en) | 2020-08-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108194102B (en) | The dismounting of limit section and safe stress check calculation construction method are invaded in Tunnel deformation | |
CN107762535B (en) | Cut-and-cover tunnel secretly does construction technology under complicated geological environment | |
CN110005416A (en) | A kind of branch line piping lane tunnel interface section constructing method | |
CN106907164A (en) | A kind of water-bed combination of mine shield tunnel docking structure form and its construction method | |
CN110173267A (en) | Building up station construction method is passed through in a kind of metro shield section | |
CN209444350U (en) | Shield launching wears existing shield tunnel barrel vault advanced support structure under being | |
CN108005664A (en) | A kind of hole pile construction method of platform structure | |
CN107218046A (en) | Mechanical assistance sealing Station structure and construction method in a kind of pilot tunnel | |
CN104653187B (en) | Method for excavating geological large-section tunnel with water-rich sand layer | |
CN104763435B (en) | Construction method of shallow-buried excavation type large cross section of tunnel in tail slag filling area | |
CN101864960A (en) | Carst region double-arch road tunnel construction method | |
CN110159298A (en) | A kind of first branch button arch construction method of Underground Subway Station | |
CN109404012A (en) | IV~VI grade of country rock is backbreak Tunnel method | |
CN110439571A (en) | Flat pilot tunnel leads to the adit construction method and transverse passage-way of main tunnel | |
CN108625879A (en) | Mountain Tunnels half-open and half-hidden structure and its construction method | |
CN109736827A (en) | Excavation method of high-pressure gas expansion-induced cracking in the connection channel of urban subway hard rock strata | |
CN207063982U (en) | Mechanical assistance sealing Station structure in a kind of pilot tunnel | |
CN102748040A (en) | Main structure for metro long-span station and pillar arching construction method thereof | |
CN104632227B (en) | Subway station excavation technology of single-layer beam arch structure | |
CN106049195A (en) | Method for strengthening subgrade basement of existing high speed railway line | |
CN104806251A (en) | Subsidiary inverted excavation construction method for urban subway station under complex environment | |
CN108952766A (en) | The construction method of Tunnel Passing karst location punishment | |
CN205805574U (en) | A kind of super-span pile foundation joist carrying arch tunnel recombination liner structure | |
CN108797620A (en) | A kind of OPT construction method of interlocking pile | |
CN108150219A (en) | The ground water drainage system and its construction method of a kind of separate type double-hole tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Jiang Linlin Inventor after: Wang Miao Inventor after: Liu Kai Inventor after: Yang Mingchao Inventor after: Zhitanyun Inventor after: Gao Biao Inventor after: Cluster rock Inventor after: Jiang Naiqian Inventor after: Zheng Zhibin Inventor after: Li Minggan Inventor after: Yan Chaotao Inventor after: Qiu Jing Inventor after: Wang Chenxiao Inventor before: Song Xiaoke Inventor before: Yang Lidong Inventor before: Sun Dalei Inventor before: Cluster Xu Inventor before: Lv Aihua Inventor before: Li Lei Inventor before: Liu Erhong Inventor before: Wang Haibo Inventor before: Meng Lingyong Inventor before: Hao Zaiguo |
|
CB03 | Change of inventor or designer information | ||
TR01 | Transfer of patent right |
Effective date of registration: 20211109 Address after: 100082, building 32, No. 3 North Main Street, Haidian District, Beijing, Xizhimen Patentee after: BEIJING GENERAL MUNICIPAL ENGINEERING DESIGN & RESEARCH INSTITUTE Co.,Ltd. Address before: 100026 Building 1, yard 5, Jingkai Xingwei West Road (Xingfeng section), Daxing District, Beijing Patentee before: BEIJING WAN XING BUILDING GROUP Co.,Ltd. |
|
TR01 | Transfer of patent right |