[go: up one dir, main page]

CN109967384A - A sealing inspection device for automatic assembly line of throttle valve - Google Patents

A sealing inspection device for automatic assembly line of throttle valve Download PDF

Info

Publication number
CN109967384A
CN109967384A CN201910251395.5A CN201910251395A CN109967384A CN 109967384 A CN109967384 A CN 109967384A CN 201910251395 A CN201910251395 A CN 201910251395A CN 109967384 A CN109967384 A CN 109967384A
Authority
CN
China
Prior art keywords
valve body
throttle valve
twenty
plug
gas injection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910251395.5A
Other languages
Chinese (zh)
Inventor
林川波
蒋滨
许杰
林开峰
范海浪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Intel Pneumatic Technology Co Ltd
Original Assignee
Ningbo Intel Pneumatic Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Intel Pneumatic Technology Co Ltd filed Critical Ningbo Intel Pneumatic Technology Co Ltd
Priority to CN201910251395.5A priority Critical patent/CN109967384A/en
Publication of CN109967384A publication Critical patent/CN109967384A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B07SEPARATING SOLIDS FROM SOLIDS; SORTING
    • B07CPOSTAL SORTING; SORTING INDIVIDUAL ARTICLES, OR BULK MATERIAL FIT TO BE SORTED PIECE-MEAL, e.g. BY PICKING
    • B07C5/00Sorting according to a characteristic or feature of the articles or material being sorted, e.g. by control effected by devices which detect or measure such characteristic or feature; Sorting by manually actuated devices, e.g. switches
    • B07C5/02Measures preceding sorting, e.g. arranging articles in a stream orientating
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B07SEPARATING SOLIDS FROM SOLIDS; SORTING
    • B07CPOSTAL SORTING; SORTING INDIVIDUAL ARTICLES, OR BULK MATERIAL FIT TO BE SORTED PIECE-MEAL, e.g. BY PICKING
    • B07C5/00Sorting according to a characteristic or feature of the articles or material being sorted, e.g. by control effected by devices which detect or measure such characteristic or feature; Sorting by manually actuated devices, e.g. switches
    • B07C5/34Sorting according to other particular properties
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B07SEPARATING SOLIDS FROM SOLIDS; SORTING
    • B07CPOSTAL SORTING; SORTING INDIVIDUAL ARTICLES, OR BULK MATERIAL FIT TO BE SORTED PIECE-MEAL, e.g. BY PICKING
    • B07C5/00Sorting according to a characteristic or feature of the articles or material being sorted, e.g. by control effected by devices which detect or measure such characteristic or feature; Sorting by manually actuated devices, e.g. switches
    • B07C5/36Sorting apparatus characterised by the means used for distribution
    • B07C5/361Processing or control devices therefor, e.g. escort memory
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B07SEPARATING SOLIDS FROM SOLIDS; SORTING
    • B07CPOSTAL SORTING; SORTING INDIVIDUAL ARTICLES, OR BULK MATERIAL FIT TO BE SORTED PIECE-MEAL, e.g. BY PICKING
    • B07C5/00Sorting according to a characteristic or feature of the articles or material being sorted, e.g. by control effected by devices which detect or measure such characteristic or feature; Sorting by manually actuated devices, e.g. switches
    • B07C5/36Sorting apparatus characterised by the means used for distribution
    • B07C5/38Collecting or arranging articles in groups

Landscapes

  • Lift Valve (AREA)

Abstract

本发明涉及节流阀自动装配设备技术领域,具体地,涉及一种节流阀自动装配生产线的密封性检查装置,包括有控制器、阀体卸料机构、注气保压机构、气孔堵头、堵头相向移动机构和检测台,注气保压机构设置在检测台的上方,堵头相向移动机构的工作端向上延伸至检测台的上方并分别位于检测台的两侧,气孔堵头固定安装在堵头相向移动机构的工作端,气孔堵头与阀体设有气孔的侧面贴合,注气保压机构包括有注气杆和第二十二直线驱动装置,注气杆固定安装在第二十二直线驱动装置的工作端,第二十二直线驱动装置的输出方向竖直向下设置,该装置可以检测装配完成的节流阀是否气密性良好,并分开摆放合格与不合格的节流阀。

The invention relates to the technical field of automatic throttle valve assembly equipment, in particular to a sealing inspection device for an automatic throttle valve assembly production line, comprising a controller, a valve body unloading mechanism, a gas injection and pressure maintaining mechanism, and a gas hole plug. , The relative movement mechanism of the plug and the detection table, the gas injection and pressure keeping mechanism is arranged above the detection table, the working end of the relative movement mechanism of the plug extends upward to the top of the detection table and is located on both sides of the detection table, and the air hole plug is fixed. It is installed on the working end of the opposite movement mechanism of the plug. The air hole plug is attached to the side of the valve body with air holes. The air injection and pressure maintaining mechanism includes an air injection rod and a twenty-second linear drive device. The air injection rod is fixedly installed in the The working end of the twenty-second linear drive device and the output direction of the twenty-second linear drive device are set vertically downward. This device can detect whether the assembled throttle valve has good air tightness, and separate qualified and unacceptable ones. Qualified throttle valve.

Description

一种节流阀自动装配生产线的密封性检查装置A sealing inspection device for automatic assembly line of throttle valve

技术领域technical field

本发明涉及节流阀自动装配设备技术领域,具体地,涉及一种节流阀自动装配生产线的密封性检查装置。The invention relates to the technical field of automatic assembling equipment for throttle valves, in particular, to a device for checking the tightness of a throttle valve automatic assembling production line.

背景技术Background technique

节流阀是通过改变节流截面或节流长度以控制流体流量的阀门,将节流阀和单向阀并联则可组合成单向节流阀,节流阀和单向节流阀是简易的流量控制阀。The throttle valve is a valve that controls the fluid flow by changing the throttle section or the throttle length. The throttle valve and the one-way valve can be combined in parallel to form a one-way throttle valve. The throttle valve and the one-way throttle valve are simple and easy to use. flow control valve.

应用气动流量控制阀对气动执行元件进行调速,比用液压流量控制阀调速要困难、因气体具有压缩性。所以用气动流量控制阀调速应注重以下几点,以防产生爬行:It is more difficult to adjust the speed of pneumatic actuators with pneumatic flow control valves than with hydraulic flow control valves because of the compressibility of gas. Therefore, the following points should be paid attention to when adjusting the speed of the pneumatic flow control valve to prevent crawling:

1.管道上不能有漏气现象;1. There should be no air leakage on the pipeline;

2.气缸、活塞间的润滑状态要好;2. The lubrication state between the cylinder and the piston is better;

3.流量控制阀应尽量安装在气缸或气马达四周;3. The flow control valve should be installed around the cylinder or air motor as much as possible;

4.尽可能采用出口节流调速方式;4. The outlet throttling speed regulation method should be adopted as much as possible;

5.外加负载应当稳定。若外负载变化较大,应借助液压或机械装置(如气液联动)来补偿由于载荷变动造成的速度变化。5. The applied load should be stable. If the external load changes greatly, hydraulic or mechanical devices (such as gas-liquid linkage) should be used to compensate for the speed change caused by the load change.

目前,使用中的节流阀装配机,工序繁杂,操作不方便,细节上设计不合理,产品在装配过程中会出现损坏,既浪费人力,又浪费物力,不利于推广使用。At present, the throttle valve assembly machine in use has complicated procedures, inconvenient operation, unreasonable design in detail, and damage to the product during the assembly process, which wastes both manpower and material resources, which is not conducive to popularization and use.

中国专利CN204868077U公开了一种节流阀自动装配机,包括机架,所述机架上设有输送带,所述输送带上依次设有人工排料机构、上料机构一、加油机构、上料机构二、压入机构、锌套装配机构、按钮装配机构、检测机构、下料机构和触摸屏。Chinese patent CN204868077U discloses an automatic throttle valve assembly machine, including a frame, on which a conveyor belt is arranged, and a manual discharge mechanism, a feeding mechanism 1, a refueling mechanism, and an upper feeding mechanism are arranged on the conveyor belt in sequence. Feeding mechanism 2, press-in mechanism, zinc sleeve assembly mechanism, button assembly mechanism, detection mechanism, blanking mechanism and touch screen.

该专利公开的设备仅适用于由阀套、阀体、锌套等组成的简易节流阀,不适用于现有技术中的复杂节流阀。The device disclosed in this patent is only suitable for a simple throttle valve composed of a valve sleeve, a valve body, a zinc sleeve, etc., and is not suitable for a complex throttle valve in the prior art.

现有技术中的节流阀包括有阀体、阀杆、阀芯,其中阀体上套设有两个密封圈,阀杆上套设有一个密封圈,阀芯上也套设有一个密封圈,阀杆底端安装有锁紧螺母,阀体底端安装有调节螺丝,阀杆和阀芯都安装到阀体内部之后还需要将阀体锁扣铆合,并最终进行气密性检查。The throttle valve in the prior art includes a valve body, a valve stem and a valve core, wherein the valve body is sleeved with two sealing rings, the valve stem is sleeved with a sealing ring, and the valve core is also sleeved with a sealing ring. A lock nut is installed at the bottom end of the valve stem, and an adjusting screw is installed at the bottom end of the valve body. After the valve stem and the valve core are installed inside the valve body, the valve body lock must be riveted, and finally the air tightness inspection is carried out. .

针对现有技术中复杂的节流阀,需要一种自动装配生产线用于自动装配生产。For the complicated throttle valve in the prior art, an automatic assembly production line is required for automatic assembly production.

发明内容SUMMARY OF THE INVENTION

针对现有技术的不足,本发明提供一种节流阀自动装配生产线的密封性检查装置,该装置可以检测装配完成的节流阀是否气密性良好,并分开摆放合格与不合格的节流阀。In view of the deficiencies of the prior art, the present invention provides a device for checking the tightness of a throttle valve automatic assembly production line. The device can detect whether the assembled throttle valve has good air tightness, and separate qualified and unqualified throttles. flow valve.

本发明公开的一种节流阀自动装配生产线的密封性检查装置,包括有控制器、阀体卸料机构、注气保压机构、气孔堵头、堵头相向移动机构和检测台,阀体卸料机构、注气保压机构和堵头相向移动机构均与控制器电连接,注气保压机构设置在检测台的上方,堵头相向移动机构通过支架固定安装在检测台的下方,堵头相向移动机构的工作端向上延伸至检测台的上方并分别位于检测台的两侧,气孔堵头固定安装在堵头相向移动机构的工作端,气孔堵头与阀体设有气孔的侧面贴合,注气保压机构包括有注气杆和第二十二直线驱动装置,注气杆固定安装在第二十二直线驱动装置的工作端,第二十二直线驱动装置的输出方向竖直向下设置。The invention discloses a sealing inspection device for an automatic assembly production line of a throttle valve, comprising a controller, a valve body unloading mechanism, a gas injection and pressure maintaining mechanism, an air hole plug, a plug relative moving mechanism and a detection table, a valve body The unloading mechanism, the gas injection and pressure maintaining mechanism and the plug relative moving mechanism are all electrically connected to the controller. The gas injection and pressure maintaining mechanism is arranged above the detection table, and the plug relative movement mechanism is fixedly installed under the detection table through a bracket. The working end of the head-to-movement mechanism extends upward to the top of the test table and is located on both sides of the test table. The air hole plug is fixedly installed on the working end of the plug-to-move mechanism, and the air hole plug is attached to the side of the valve body with air holes. The gas injection and pressure maintaining mechanism includes a gas injection rod and a twenty-second linear drive device. The gas injection rod is fixedly installed on the working end of the twenty-second linear drive device, and the output direction of the twenty-second linear drive device is vertical. Set down.

优选地,注气保压机构还包括有气体压力传感器,气体压力传感器安装在注气杆内部,气体压力传感器与控制器电连接。Preferably, the gas injection and pressure maintaining mechanism further includes a gas pressure sensor, the gas pressure sensor is installed inside the gas injection rod, and the gas pressure sensor is electrically connected to the controller.

优选地,气孔堵头为弹性材料制作的方块形状,气孔堵头朝向阀体的一侧设置有与阀体圆周面紧密配合的半圆孔。Preferably, the air hole plug is in the shape of a square made of elastic material, and the side of the air hole plug facing the valve body is provided with a semicircular hole that closely fits with the circumferential surface of the valve body.

优选地,气孔堵头的顶端安装有朝向远离阀体的方向延伸的固定片,固定片为水平设置的平板形状,固定片上设置有两个竖直贯穿固定片的安装孔;堵头相向移动机构包括有开阔手指气缸和安装在开阔手指气缸工作端的夹爪,夹爪的工作端设置有与气孔堵头间隙配合的方槽和与两个安装孔一一对应的螺纹孔。Preferably, the top end of the air hole plug is installed with a fixing piece extending in a direction away from the valve body, the fixing piece is in the shape of a horizontally arranged flat plate, and two mounting holes vertically penetrating the fixing piece are arranged on the fixing piece; It includes an open-finger cylinder and a clamping claw installed on the working end of the open-finger cylinder. The working end of the clamping claw is provided with a square groove for clearance fit with the air hole plug and a threaded hole corresponding to the two installation holes one-to-one.

优选地,注气杆的内径大于阀体顶端圆环的外径,注气杆的底端安装有密封圈,该密封圈的内径小于阀体顶端圆环的内径。Preferably, the inner diameter of the gas injection rod is larger than the outer diameter of the top ring of the valve body, and a sealing ring is installed at the bottom end of the gas injection rod, and the inner diameter of the sealing ring is smaller than the inner diameter of the top ring of the valve body.

优选地,阀体卸料机构包括有机械手、带式传输机、码料盘和废料桶,码料盘放置在带式传输机的传输带上。Preferably, the valve body unloading mechanism includes a manipulator, a belt conveyor, a code tray and a waste bucket, and the code tray is placed on the conveyor belt of the belt conveyor.

优选地,码料盘上满布有用于装载阀体的盲孔。Preferably, the pallet is covered with blind holes for loading the valve body.

优选地,机械手包括有第四滑台、第二十三直线驱动装置、手指气缸和阀体夹爪,第四滑台通过支架骑跨在检测台和带式传输机之间,第二十三直线驱动装置固定安装在第四滑台的工作端,第二十三直线驱动装置的输出方向竖直向下设置,手指气缸固定安装在第二十三直线驱动装置的工作端,阀体夹爪固定安装在手指气缸的工作端。Preferably, the manipulator includes a fourth sliding table, a twenty-third linear drive device, a finger cylinder and a valve body gripper, and the fourth sliding table rides between the inspection table and the belt conveyor through a bracket, and the twenty-third The linear drive device is fixedly installed on the working end of the fourth sliding table, the output direction of the twenty-third linear drive device is set vertically downward, the finger cylinder is fixedly installed on the working end of the twenty-third linear drive device, and the valve body clamps Fixed installation on the working end of the finger cylinder.

优选地,阀体卸料机构还包括有固定安装在第二十三直线驱动装置固定端旁侧的第四传感器,第四传感器的工作方向竖直向下设置,机械手和第四传感器均与控制器电连接。Preferably, the valve body unloading mechanism further includes a fourth sensor fixedly installed on the side of the fixed end of the twenty-third linear drive device, the working direction of the fourth sensor is vertically downward, and both the manipulator and the fourth sensor are connected to the control electrical connection.

有益效果:Beneficial effects:

第二十二直线驱动装置驱动注气杆向下移动使得注气杆罩设在阀体的顶端,同时堵头相向移动机构驱动气孔堵头向着阀体的方向移动,使得气孔堵头从阀体两侧卡住阀体并堵住阀体设有气孔的部位,接着空压机通过注气杆向阀体中注入气体并保压一段时间;The twenty-second linear driving device drives the gas injection rod to move downward so that the gas injection rod cover is located at the top of the valve body, and at the same time, the plug relative moving mechanism drives the air hole plug to move in the direction of the valve body, so that the air hole plug is removed from the valve body. The valve body is stuck on both sides and the part of the valve body with the air hole is blocked, and then the air compressor injects gas into the valve body through the air injection rod and maintains the pressure for a period of time;

气体压力传感器检测气压,若气压低于标准值则发出信号给控制器,控制器发出信号给阀体卸料机构,卸料机械手将阀体放入废品箱;若阀体内气压达到合格的标准值,则控制器发出信号给阀体卸料机构,卸料机械手将节流阀放置到码料盘上。The gas pressure sensor detects the air pressure. If the air pressure is lower than the standard value, it will send a signal to the controller, and the controller will send a signal to the valve body unloading mechanism, and the unloading manipulator will put the valve body into the waste bin; , the controller sends a signal to the valve body unloading mechanism, and the unloading manipulator places the throttle valve on the pallet.

1.该装置可以检测装配完成的节流阀是否气密性良好;1. The device can detect whether the assembled throttle valve has good air tightness;

2.该装置可以分开摆放合格与不合格的节流阀。2. The device can separate qualified and unqualified throttle valves.

附图说明Description of drawings

此处所说明的附图用来提供对本申请的进一步理解,构成本申请的一部分,本申请的示意性实施例及其说明用于解释本申请,并不构成对本申请的不当限定。在附图中:The drawings described herein are used to provide further understanding of the present application and constitute a part of the present application. The schematic embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation of the present application. In the attached image:

图1为实施例的立体图;1 is a perspective view of an embodiment;

图2为实施例的俯视图;Figure 2 is a top view of the embodiment;

图3为实施例的工作台和阀体移料机构立体图一;3 is a perspective view 1 of the workbench and the valve body material moving mechanism of the embodiment;

图4为实施例的工作台和阀体移料机构立体图二;FIG. 4 is a perspective view 2 of the workbench and the valve body moving mechanism of the embodiment;

图5为实施例的气密性检查机构立体图;5 is a perspective view of the air tightness inspection mechanism of the embodiment;

图6为实施例的气密性检查机构部分结构立体分解图;6 is an exploded perspective view of the partial structure of the air tightness inspection mechanism of the embodiment;

附图标记说明:Description of reference numbers:

工作台1,阀体上料工位1a,阀体第一密封圈安装工位1b,阀体第二密封圈安装工位1c,阀杆安装工位1d,阀杆润滑工位1e,第一中转工位1f,锁紧螺母安装工位1g,阀芯安装工位1h,阀体锁扣铆合工位1j,第二中转工位1k,调节螺丝自动点胶安装工位1l,密封性检测工位1m,卸料工位1n,阀杆上料工位1o,阀杆密封圈安装工位1p,阀体移料机构2,阀体上料机构2a,第一机械爪移动机构2b,竖直活动板2b1,伸缩立柱2b2,第一直线驱动装置2b3,水平滑动板2b4,第一滑轨2b5,第二直线驱动装置2b6,第二机械爪移动机构2c,机械夹爪2d,阀体卸料机构2e,卸料机械手2e1,第四滑台2e11,第二十三直线驱动装置2e12,手指气缸2e13,阀体夹爪2e14,带式传输机2e2,码料盘2e3,废料桶2e4,第四传感器2e5,密封性检查机构10,注气保压机构10a,注气杆10a1,第二十二直线驱动装置10a2,气孔堵头10b,半圆孔10b1,固定片10b2,安装孔10b3,堵头相向移动机构10c,开阔手指气缸10c1,夹爪10c2,方槽10c3,螺纹孔10c4,检测台10d。Workbench 1, valve body feeding station 1a, valve body first sealing ring installation station 1b, valve body second sealing ring installation station 1c, valve stem installation station 1d, valve stem lubrication station 1e, first Transfer station 1f, lock nut installation station 1g, valve core installation station 1h, valve body lock riveting station 1j, second transfer station 1k, adjusting screw automatic dispensing installation station 1l, tightness detection Work station 1m, unloading station 1n, valve stem feeding station 1o, valve stem sealing ring installation station 1p, valve body moving mechanism 2, valve body feeding mechanism 2a, first mechanical claw moving mechanism 2b, vertical Straight movable plate 2b1, telescopic column 2b2, first linear drive device 2b3, horizontal sliding plate 2b4, first slide rail 2b5, second linear drive device 2b6, second mechanical claw moving mechanism 2c, mechanical gripper 2d, valve body Unloading mechanism 2e, unloading manipulator 2e1, fourth sliding table 2e11, twenty-third linear drive device 2e12, finger cylinder 2e13, valve body gripper 2e14, belt conveyor 2e2, code disc 2e3, waste bucket 2e4, The fourth sensor 2e5, the tightness inspection mechanism 10, the gas injection and pressure retention mechanism 10a, the gas injection rod 10a1, the twenty-second linear drive device 10a2, the air hole plug 10b, the semicircular hole 10b1, the fixing plate 10b2, the installation hole 10b3, the plug The head-to-movement mechanism 10c, the finger-opening cylinder 10c1, the clamping jaw 10c2, the square groove 10c3, the threaded hole 10c4, and the detection table 10d.

具体实施方式Detailed ways

以下将以图式揭露本发明的多个实施方式,为明确说明起见,许多实务上的细节将在以下叙述中一并说明。然而,应了解到,这些实务上的细节不应用以限制本发明。也就是说,在本发明的部分实施方式中,这些实务上的细节是非必要的。此外,为简化图式起见,一些习知惯用的结构与组件在图式中将以简单的示意的方式绘示之。Various embodiments of the present invention will be disclosed in the drawings below, and for the sake of clarity, many practical details will be described together in the following description. It should be understood, however, that these practical details should not be used to limit the invention. That is, in some embodiments of the invention, these practical details are unnecessary. In addition, for the purpose of simplifying the drawings, some well-known structures and components will be shown in a simple schematic manner in the drawings.

另外,在本发明中如涉及“第一”、“第二”等的描述仅用于描述目的,并非特别指称次序或顺位的意思,亦非用以限定本发明,其仅仅是为了区别以相同技术用语描述的组件或操作而已,而不能理解为指示或暗示其相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括至少一个该特征。另外,各个实施例之间的技术方案可以相互结合,但是必须是以本领域普通技术人员能够实现为基础,当技术方案的结合出现相互矛盾或无法实现时应当认为这种技术方案的结合不存在,也不在本发明要求的保护范围之内。In addition, descriptions such as “first”, “second”, etc. in the present invention are only for the purpose of description, and do not refer to the meaning of order or sequence, nor are they used to limit the present invention. The components or operations are described by the same technical terms, and should not be construed as indicating or implying their relative importance or implying the quantity of the indicated technical features. Thus, a feature delimited with "first", "second" may expressly or implicitly include at least one of that feature. In addition, the technical solutions between the various embodiments can be combined with each other, but must be based on the realization by those of ordinary skill in the art. When the combination of technical solutions is contradictory or cannot be realized, it should be considered that the combination of such technical solutions does not exist. , is not within the scope of protection required by the present invention.

参照图1至图6所示的一种节流阀自动装配生产线,包括有工作台1和固定安装在工作台1上的阀体移料机构2,工作台1上设置有从工作台1的一端到工作台1的另一端排成一条直线的十三个工位,该十三个工位分别为阀体上料工位1a、阀体第一密封圈安装工位1b、阀体第二密封圈安装工位1c、阀杆安装工位1d、阀杆润滑工位1e、第一中转工位1f、锁紧螺母安装工位1g、阀芯安装工位1h、阀体锁扣铆合工位1j、第二中转工位1k、调节螺丝自动点胶安装工位1l、密封性检测工位1m、卸料工位1n,其中阀杆安装工位1d的旁侧设置有阀杆上料工位1o和阀杆密封圈安装工位1p;Referring to Figures 1 to 6, an automatic throttle valve assembly production line includes a workbench 1 and a valve body moving mechanism 2 fixedly installed on the workbench 1. The workbench 1 is provided with a One end to the other end of the table 1 is lined up in a straight line with thirteen stations, the thirteen stations are the valve body feeding station 1a, the valve body first sealing ring installation station 1b, the valve body second Sealing ring installation station 1c, valve stem installation station 1d, valve stem lubricating station 1e, first transfer station 1f, lock nut installation station 1g, valve core installation station 1h, valve body lock riveting station Position 1j, second transfer station 1k, adjustment screw automatic dispensing and installation station 1l, tightness detection station 1m, unloading station 1n, among which the valve stem installation station 1d is provided with a valve stem loading worker. Position 1o and stem seal installation position 1p;

阀体上料工位1a、阀体第一密封圈安装工位1b、阀体第二密封圈安装工位1c、锁紧螺母安装工位1g、阀芯安装工位1h、调节螺丝自动点胶安装工位1l、阀杆上料工位1o、阀杆密封圈安装工位1p旁侧均设置有一个上料机构,阀体第一密封圈安装工位1b、阀体第二密封圈安装工位1c旁侧设置有阀体密封圈安装机构3,阀杆上料工位1o旁侧设置有阀杆上料机构4,阀杆密封圈安装工位1p旁侧设置有阀杆密封圈安装机构5,锁紧螺母安装工位1g旁侧设置有锁紧螺母安装机构6,阀芯安装工位1h旁侧设置有阀芯安装机构7,阀体锁扣铆合工位1j旁侧设置有阀体锁扣铆合机构8,调节螺丝自动点胶安装工位1l旁侧设置有调节螺丝自动点胶安装机构9,密封性检测工位1m旁侧设置有密封性检查机构10,工作台1上还设置有控制器,控制器与阀体移料机构2、阀体密封圈安装机构3、阀杆上料机构4、阀杆密封圈安装机构5、锁紧螺母安装机构6、阀芯安装机构7、阀体锁扣铆合机构8、调节螺丝自动点胶安装机构9、密封性检查机构10和上料机构均电连接;Valve body feeding station 1a, valve body first sealing ring installation station 1b, valve body second sealing ring installation station 1c, lock nut installation station 1g, valve core installation station 1h, adjusting screw automatic dispensing The installation station 1l, the valve stem feeding station 1o, and the valve stem sealing ring installation station 1p are all provided with a feeding mechanism on the side, the valve body first sealing ring installation station 1b, and the valve body second sealing ring installation station. The valve body sealing ring installation mechanism 3 is arranged beside the position 1c, the valve stem feeding mechanism 4 is arranged beside the valve stem feeding station 1o, and the valve stem sealing ring installation mechanism is arranged beside the valve stem sealing ring installation station 1p. 5. A locking nut installation mechanism 6 is arranged beside the locking nut installation station 1g, a valve core installation mechanism 7 is arranged beside the valve core installation station 1h, and a valve is arranged beside the valve body lock riveting station 1j. The body lock riveting mechanism 8, the adjustment screw automatic dispensing and installation station 1l is provided with an adjustment screw automatic dispensing and installation mechanism 9, and the sealing detection station 1m is provided with a sealing inspection mechanism 10 beside it. There is also a controller, the controller and the valve body moving mechanism 2, the valve body sealing ring installation mechanism 3, the valve stem feeding mechanism 4, the valve stem sealing ring installation mechanism 5, the locking nut installation mechanism 6, the valve core installation mechanism 7. The valve body locking and riveting mechanism 8, the adjusting screw automatic dispensing and installation mechanism 9, the sealing inspection mechanism 10 and the feeding mechanism are all electrically connected;

阀体移料机构2包括有阀体上料机构2a、第一机械爪移动机构2b、第二机械爪移动机构2c、机械夹爪2d和阀体卸料机构2e,前十二个工位上均设置有一个机械夹爪2d,多个机械夹爪2d等距离间隔排列成一条直线,第一机械爪移动机构2b与前六个机械夹爪2d固定连接,第二机械爪移动机构2c与后六个机械夹爪2d固定连接,第一机械爪移动机构2b和第二机械爪移动机构2c为相同结构,阀体上料机构2a设置在阀体上料工位1a旁侧,阀体卸料机构2e设置在卸料工位1n旁侧;The valve body moving mechanism 2 includes a valve body feeding mechanism 2a, a first mechanical claw moving mechanism 2b, a second mechanical claw moving mechanism 2c, a mechanical gripper 2d and a valve body unloading mechanism 2e. Each is provided with a mechanical gripper 2d, a plurality of mechanical grippers 2d are arranged in a straight line at equal intervals, the first mechanical gripper moving mechanism 2b is fixedly connected with the first six mechanical gripping jaws 2d, the second mechanical gripper The six mechanical jaws 2d are fixedly connected, the first mechanical jaw moving mechanism 2b and the second mechanical jaw moving mechanism 2c are of the same structure, the valve body feeding mechanism 2a is arranged beside the valve body feeding station 1a, and the valve body is unloaded. The mechanism 2e is arranged beside the unloading station 1n;

第一机械爪移动机构2b包括有竖直活动板2b1、伸缩立柱2b2、第一直线驱动装置2b3、水平滑动板2b4、第一滑轨2b5和第二直线驱动装置2b6,第一滑轨2b5和第二直线驱动装置2b6并排设置并且固定安装在工作台1上,水平滑动板2b4固定安装在第一滑轨2b5的工作端,第二直线驱动装置2b6的输出端与水平滑动板2b4固定连接,第一直线驱动装置2b3固定安装在水平滑动板2b4的中端并且第一直线驱动装置2b3的输出端竖直向上设置,伸缩立柱2b2固定安装在水平滑动板2b4的两端并且伸缩立柱2b2的伸缩方向竖直向上设置,竖直活动板2b1水平设置在水平滑动板2b4的上方,竖直活动板2b1的中端与第一直线驱动装置2b3的工作端固定连接,竖直活动板2b1的两端与伸缩立柱2b2的伸缩端固定连接,机械夹爪2d固定安装在竖直活动板2b1上。The first mechanical claw moving mechanism 2b includes a vertical movable plate 2b1, a telescopic column 2b2, a first linear driving device 2b3, a horizontal sliding plate 2b4, a first sliding rail 2b5 and a second linear driving device 2b6, the first sliding rail 2b5 The horizontal sliding plate 2b4 is fixedly installed on the working end of the first sliding rail 2b5, and the output end of the second linear driving device 2b6 is fixedly connected with the horizontal sliding plate 2b4. , the first linear drive device 2b3 is fixedly installed at the middle end of the horizontal sliding plate 2b4 and the output end of the first linear drive device 2b3 is vertically upward, the telescopic column 2b2 is fixedly installed at both ends of the horizontal sliding plate 2b4 and the telescopic column The telescopic direction of 2b2 is arranged vertically upward, the vertical movable plate 2b1 is arranged horizontally above the horizontal sliding plate 2b4, the middle end of the vertical movable plate 2b1 is fixedly connected with the working end of the first linear drive device 2b3, and the vertical movable plate Both ends of 2b1 are fixedly connected to the telescopic end of the telescopic column 2b2, and the mechanical gripper 2d is fixedly installed on the vertical movable plate 2b1.

第一直线驱动装置2b3和第二直线驱动装置2b6均为单轴气缸,第二直线驱动装置2b6驱动水平滑动板2b4在第一滑轨2b5上水平直线往复运动,第一直线驱动装置2b3驱动竖直活动板2b1竖直往复运动,伸缩立柱2b2为安装有导柱和导套的立柱,其中导柱与竖直活动板2b1底端固定连接,从而使得伸缩立柱2b2得以起到支撑竖直活动板2b1的重量和引导竖直活动板2b1移动方向的作用;The first linear drive device 2b3 and the second linear drive device 2b6 are both single-axis cylinders. The second linear drive device 2b6 drives the horizontal sliding plate 2b4 to reciprocate horizontally on the first slide rail 2b5. The first linear drive device 2b3 The vertical movable plate 2b1 is driven to reciprocate vertically, and the telescopic column 2b2 is a column installed with a guide column and a guide sleeve, wherein the guide column is fixedly connected to the bottom end of the vertical movable plate 2b1, so that the telescopic column 2b2 can support the vertical The weight of the movable plate 2b1 and the function of guiding the moving direction of the vertical movable plate 2b1;

阀体上料机构2a包括有机械手,上料时,上料机构源源不断地将阀体移动到阀体上料工位1a旁侧,然后通过阀体上料机构2a将阀体抓取并放置在阀体上料工位1a上;The valve body feeding mechanism 2a includes a manipulator. During feeding, the feeding mechanism continuously moves the valve body to the side of the valve body feeding station 1a, and then grabs and places the valve body through the valve body feeding mechanism 2a. On the valve body feeding station 1a;

随后,机械夹爪2d将阀体夹住,随后第一直线驱动装置2b3驱动竖直活动板2b1向上移动,使得机械夹爪2d将阀体夹起使其离开工位并悬空;接着第二直线驱动装置2b6驱动水平滑动板2b4带动竖直活动板2b1向旁侧移动,使得机械夹爪2d将阀体移动到下一个工位的上方,再通过第一直线驱动装置2b3驱动竖直活动板2b1向下移动并令机械夹爪2d松开,阀体自然落入到下一个工位的位置;通过第一机械爪移动机构2b和第二机械爪移动机构2c共同工作可以一次将多个阀体同时挪动到下一个工位;Subsequently, the mechanical gripper 2d clamps the valve body, and then the first linear drive device 2b3 drives the vertical movable plate 2b1 to move upward, so that the mechanical gripper 2d picks up the valve body to leave the working position and hangs; then the second The linear drive device 2b6 drives the horizontal sliding plate 2b4 to drive the vertical movable plate 2b1 to move sideways, so that the mechanical gripper 2d moves the valve body to the top of the next station, and then drives the vertical movement through the first linear drive device 2b3 The plate 2b1 moves down and releases the mechanical gripper 2d, and the valve body naturally falls to the position of the next station; The valve body moves to the next station at the same time;

阀体在控制器的控制下通过阀体移料机构2移动,同时依次通过阀体密封圈安装机构3、阀杆上料机构4、阀杆密封圈安装机构5、锁紧螺母安装机构6、阀芯安装机构7、阀体锁扣铆合机构8和调节螺丝自动点胶安装机构9的加工,再通过密封性检查机构10进行气密性检测,检测完成后通过阀体移料机构2移动到卸料工位1n的位置通过阀体卸料机构2e卸料。The valve body moves through the valve body moving mechanism 2 under the control of the controller, and at the same time passes through the valve body sealing ring mounting mechanism 3, the valve stem feeding mechanism 4, the valve stem sealing ring mounting mechanism 5, the locking nut mounting mechanism 6, The valve core installation mechanism 7, the valve body locking and riveting mechanism 8 and the adjusting screw automatic dispensing and installation mechanism 9 are processed, and then the air tightness detection is carried out by the sealing inspection mechanism 10. After the detection is completed, the valve body moving mechanism 2 is moved. To the position of the unloading station 1n, the material is unloaded through the valve body unloading mechanism 2e.

密封性检查装置包括有注气保压机构10a、气孔堵头10b、堵头相向移动机构10c和检测台10d,注气保压机构10a设置在检测台10d的上方,堵头相向移动机构10c通过支架固定安装在检测台10d的下方,堵头相向移动机构10c的工作端向上延伸至检测台10d的上方并分别位于检测台10d的两侧,气孔堵头10b固定安装在堵头相向移动机构10c的工作端,气孔堵头10b与阀体设有气孔的侧面贴合,注气保压机构10a包括有注气杆10a1和第二十二直线驱动装置10a2,注气杆10a1固定安装在第二十二直线驱动装置10a2的工作端,第二十二直线驱动装置10a2的输出方向竖直向下设置。The airtightness inspection device includes a gas injection and pressure maintaining mechanism 10a, a pore plug 10b, a plug relative moving mechanism 10c, and a detection table 10d. The bracket is fixedly installed below the test table 10d, the working end of the plug relative moving mechanism 10c extends upward to the top of the test table 10d and is located on both sides of the test table 10d, and the air hole plug 10b is fixedly installed on the plug relative moving mechanism 10c At the working end of the valve body, the air hole plug 10b is attached to the side of the valve body with the air hole. The air injection and pressure maintaining mechanism 10a includes an air injection rod 10a1 and a twenty-second linear drive device 10a2. The gas injection rod 10a1 is fixedly installed on the second The working ends of the twelve linear drive devices 10a2 and the output direction of the twenty-second linear drive device 10a2 are vertically downwardly arranged.

注气保压机构10a还包括有空压机,阀体放置在检测台10d上,第二十二直线驱动装置10a2为单轴单杆气缸,第二十二直线驱动装置10a2驱动注气杆10a1向下移动使得注气杆10a1罩设在阀体的顶端,同时堵头相向移动机构10c驱动气孔堵头10b向着阀体的方向移动,使得气孔堵头10b从阀体两侧卡住阀体并堵住阀体设有气孔的部位,接着空压机通过注气杆10a1向阀体中注入气体并保压一段时间。The gas injection and pressure maintaining mechanism 10a further includes an air compressor, the valve body is placed on the test table 10d, the twenty-second linear driving device 10a2 is a single-axis single-rod cylinder, and the twenty-second linear driving device 10a2 drives the gas injection rod 10a1 Moving downwards makes the gas injection rod 10a1 cover the top of the valve body, and at the same time, the plug relative moving mechanism 10c drives the air hole plug 10b to move toward the valve body, so that the air hole plug 10b clamps the valve body from both sides of the valve body and Block the part of the valve body with the air hole, and then the air compressor injects gas into the valve body through the air injection rod 10a1 and maintains the pressure for a period of time.

注气保压机构10a还包括有气体压力传感器,气体压力传感器安装在注气杆10a1内部,气体压力传感器与控制器电连接。The gas injection and pressure maintaining mechanism 10a further includes a gas pressure sensor, the gas pressure sensor is installed inside the gas injection rod 10a1, and the gas pressure sensor is electrically connected to the controller.

阀体内注入气体并保压的时候,由气体压力传感器检测气压,若气压低于标准值则发出信号给控制器,控制器发出信号给阀体卸料机构2e,阀体卸料机构2e将阀体放入废品箱。When the gas is injected into the valve body and the pressure is maintained, the gas pressure sensor detects the air pressure. If the air pressure is lower than the standard value, a signal is sent to the controller, and the controller sends a signal to the valve body unloading mechanism 2e. The valve body unloading mechanism 2e releases the valve. put the body in the waste bin.

气孔堵头10b为弹性材料制作的方块形状,气孔堵头10b朝向阀体的一侧设置有与阀体圆周面紧密配合的半圆孔10b1。The air hole plug 10b is a square shape made of elastic material, and the side of the air hole plug 10b facing the valve body is provided with a semicircular hole 10b1 that closely fits with the circumferential surface of the valve body.

堵头相向移动机构10c驱动气孔堵头10b相向移动,使得气孔堵头10b通过半圆孔10b1夹住阀体,通过气孔堵头10b的弹性结构使得半圆孔10b1的内壁得以将阀体侧面的通气孔紧紧地封堵住。The plug relative moving mechanism 10c drives the air hole plug 10b to move toward each other, so that the air hole plug 10b clamps the valve body through the semicircular hole 10b1, and the inner wall of the semicircular hole 10b1 can connect the vent hole on the side of the valve body through the elastic structure of the air hole plug 10b. Block tightly.

气孔堵头10b的顶端安装有朝向远离阀体的方向延伸的固定片10b2,固定片10b2为水平设置的平板形状,固定片10b2上设置有两个竖直贯穿固定片10b2的安装孔10b3;堵头相向移动机构10c包括有开阔手指气缸10c1和安装在开阔手指气缸10c1工作端的夹爪10c2,夹爪10c2的工作端设置有与气孔堵头10b间隙配合的方槽10c3和与两个安装孔10b3一一对应的螺纹孔10c4。The top end of the air hole plug 10b is installed with a fixing piece 10b2 extending in a direction away from the valve body. The fixing piece 10b2 is in the shape of a horizontally arranged flat plate. The head moving mechanism 10c includes an open finger cylinder 10c1 and a clamping jaw 10c2 installed on the working end of the open finger cylinder 10c1. The working end of the clamping jaw 10c2 is provided with a square groove 10c3 for clearance fit with the air hole plug 10b and two mounting holes 10b3. One-to-one corresponding threaded holes 10c4.

固定片10b2为刚性材料,气孔堵头10b与固定片10b2通过胶水固定连接,固定片10b2通过螺丝穿过安装孔10b3固定安装在螺纹孔10c4上,从而使得固定片10b2得以固定在方槽10c3中,气孔堵头10b可拆卸的设计使其用久后气密性不佳时可以更换。The fixing piece 10b2 is a rigid material, the air hole plug 10b and the fixing piece 10b2 are fixedly connected by glue, and the fixing piece 10b2 is fixedly installed on the threaded hole 10c4 through the mounting hole 10b3 by screws, so that the fixing piece 10b2 can be fixed in the square groove 10c3 , The detachable design of the air hole plug 10b makes it possible to replace it when the air tightness is not good after a long period of use.

注气杆10a1的内径大于阀体顶端圆环的外径,注气杆10a1的底端安装有密封圈,该密封圈的内径小于阀体顶端圆环的内径。The inner diameter of the gas injection rod 10a1 is larger than the outer diameter of the top ring of the valve body, and a sealing ring is installed at the bottom end of the gas injection rod 10a1, and the inner diameter of the sealing ring is smaller than the inner diameter of the top ring of the valve body.

当注气杆10a1套设在阀体顶端的圆环上时,注气杆10a1通过密封圈与阀体顶端线连接,从而确保阀体内保压时气体不会通过注气杆10a1和阀体之间的间隙逸散。When the gas injection rod 10a1 is sleeved on the ring at the top of the valve body, the gas injection rod 10a1 is connected with the top line of the valve body through the sealing ring, so as to ensure that the gas will not pass between the gas injection rod 10a1 and the valve body when the pressure is maintained in the valve body. The gap between them escapes.

工作原理:working principle:

阀体放置在检测台10d上,第二十二直线驱动装置10a2为单轴单杆气缸,第二十二直线驱动装置10a2驱动注气杆10a1向下移动使得注气杆10a1罩设在阀体的顶端,同时堵头相向移动机构10c驱动气孔堵头10b向着阀体的方向移动,使得气孔堵头10b从阀体两侧卡住阀体并堵住阀体设有气孔的部位,接着空压机通过注气杆10a1向阀体中注入气体并保压一段时间;The valve body is placed on the testing table 10d, the twenty-second linear driving device 10a2 is a single-axis single-rod cylinder, and the twenty-second linear driving device 10a2 drives the gas injection rod 10a1 to move downward so that the gas injection rod 10a1 is covered on the valve body. At the same time, the plug relative moving mechanism 10c drives the air hole plug 10b to move towards the direction of the valve body, so that the air hole plug 10b clamps the valve body from both sides of the valve body and blocks the part of the valve body with the air hole, and then the air pressure The machine injects gas into the valve body through the gas injection rod 10a1 and maintains the pressure for a period of time;

阀体内注入气体并保压的时候,由气体压力传感器检测气压,若气压低于标准值则发出信号给控制器,控制器发出信号给阀体卸料机构2e,阀体卸料机构2e将阀体放入废品箱。When the gas is injected into the valve body and the pressure is maintained, the gas pressure sensor detects the air pressure. If the air pressure is lower than the standard value, a signal is sent to the controller, and the controller sends a signal to the valve body unloading mechanism 2e. The valve body unloading mechanism 2e releases the valve. put the body in the waste bin.

上所述仅为本发明的实施方式而已,并不用于限制本发明。对于本领域技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原理的内所作的任何修改、等同替换、改进等,均应包括在本发明的权利要求范围之内。The above description is merely an embodiment of the present invention, and is not intended to limit the present invention. Various modifications and variations of the present invention are possible for those skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included within the scope of the claims of the present invention.

Claims (9)

1.一种节流阀自动装配生产线的密封性检查装置,其特征在于:包括有控制器、阀体卸料机构(2e)、注气保压机构(10a)、气孔堵头(10b)、堵头相向移动机构(10c)和检测台(10d),阀体卸料机构(2e0)、注气保压机构(10a)和堵头相向移动机构(10c)均与控制器电连接,注气保压机构(10a)设置在检测台(10d)的上方,堵头相向移动机构(10c)通过支架固定安装在检测台(10d)的下方,堵头相向移动机构(10c)的工作端向上延伸至检测台(10d)的上方并分别位于检测台(10d)的两侧,气孔堵头(10b)固定安装在堵头相向移动机构(10c)的工作端,气孔堵头(10b)与阀体设有气孔的侧面贴合,注气保压机构(10a)包括有注气杆(10a1)和第二十二直线驱动装置(10a2),注气杆(10a1)固定安装在第二十二直线驱动装置(10a2)的工作端,第二十二直线驱动装置(10a2)的输出方向竖直向下设置。1. A device for checking the tightness of a throttle valve automatic assembly production line, characterized in that it comprises a controller, a valve body unloading mechanism (2e), a gas injection and pressure maintaining mechanism (10a), a gas hole plug (10b), The plug relative moving mechanism (10c) and the detection table (10d), the valve body unloading mechanism (2e0), the gas injection and pressure maintaining mechanism (10a) and the plug relative moving mechanism (10c) are all electrically connected to the controller, and the gas injection The pressure maintaining mechanism (10a) is arranged above the detection table (10d), the plug relative moving mechanism (10c) is fixedly installed under the detection table (10d) through a bracket, and the working end of the plug relative moving mechanism (10c) extends upwards The air hole plug (10b) is fixedly installed on the working end of the plug relative moving mechanism (10c), and the air hole plug (10b) is connected to the valve body. The sides provided with air holes are fitted together, the air injection and pressure maintaining mechanism (10a) includes an air injection rod (10a1) and a twenty-second linear drive device (10a2), and the gas injection rod (10a1) is fixedly installed on the twenty-second linear At the working end of the driving device (10a2), the output direction of the twenty-second linear driving device (10a2) is arranged vertically downward. 2.根据权利要求1所述的一种节流阀自动装配生产线的密封性检查装置,其特征在于:注气保压机构(10a)还包括有气体压力传感器,气体压力传感器安装在注气杆(10a1)内部,气体压力传感器与控制器电连接。2. The tightness inspection device of a throttle valve automatic assembly production line according to claim 1, characterized in that: the gas injection and pressure maintaining mechanism (10a) further comprises a gas pressure sensor, and the gas pressure sensor is installed on the gas injection rod Inside (10a1), the gas pressure sensor is electrically connected to the controller. 3.根据权利要求1所述的一种节流阀自动装配生产线的密封性检查装置,其特征在于:气孔堵头(10b)为弹性材料制作的方块形状,气孔堵头(10b)朝向阀体的一侧设置有与阀体圆周面紧密配合的半圆孔(10b1)。3. The device for checking the tightness of a throttle valve automatic assembly production line according to claim 1, wherein the air hole plug (10b) is a square shape made of elastic material, and the air hole plug (10b) faces the valve body One side of the valve body is provided with a semicircular hole (10b1) which is closely matched with the circumferential surface of the valve body. 4.根据权利要求1所述的一种节流阀自动装配生产线的密封性检查装置,其特征在于:气孔堵头(10b)的顶端安装有朝向远离阀体的方向延伸的固定片(10b2),固定片(10b2)为水平设置的平板形状,固定片(10b2)上设置有两个竖直贯穿固定片(10b2)的安装孔(10b3);堵头相向移动机构(10c)包括有开阔手指气缸(10c1)和安装在开阔手指气缸(10c1)工作端的夹爪(10c2),夹爪(10c2)的工作端设置有与气孔堵头(10b)间隙配合的方槽(10c3)和与两个安装孔(10b3)一一对应的螺纹孔(10c4)。4. The device for checking the tightness of a throttle valve automatic assembly production line according to claim 1, wherein the top end of the air hole plug (10b) is installed with a fixing plate (10b2) extending in a direction away from the valve body , the fixing piece (10b2) is in the shape of a horizontally arranged flat plate, and the fixing piece (10b2) is provided with two mounting holes (10b3) vertically penetrating the fixing piece (10b2); The cylinder (10c1) and the clamping jaw (10c2) installed on the working end of the open finger cylinder (10c1), the working end of the clamping jaw (10c2) is provided with a square groove (10c3) for clearance fit with the air hole plug (10b) and two The mounting holes (10b3) correspond to the threaded holes (10c4) one by one. 5.根据权利要求1所述的一种节流阀自动装配生产线的密封性检查装置,其特征在于:注气杆(10a1)的内径大于阀体顶端圆环的外径,注气杆(10a1)的底端安装有密封圈,该密封圈的内径小于阀体顶端圆环的内径。5. The device for checking the tightness of a throttle valve automatic assembly production line according to claim 1, wherein the inner diameter of the gas injection rod (10a1) is larger than the outer diameter of the top ring of the valve body, and the gas injection rod (10a1) ) is installed with a sealing ring, and the inner diameter of the sealing ring is smaller than the inner diameter of the ring at the top of the valve body. 6.根据权利要求1所述的一种节流阀自动装配生产线的密封性检查装置,其特征在于:阀体卸料机构(2e)包括有机械手(2e1)、带式传输机(2e2)、码料盘(2e3)和废料桶(2e4),码料盘(2e3)放置在带式传输机(2e2)的传输带上。6. The device for checking the tightness of a throttle valve automatic assembly production line according to claim 1, wherein the valve body unloading mechanism (2e) comprises a manipulator (2e1), a belt conveyor (2e2), A code tray (2e3) and a waste bucket (2e4), the code tray (2e3) is placed on the conveyor belt of the belt conveyor (2e2). 7.根据权利要求6所述的一种节流阀自动装配生产线的密封性检查装置,其特征在于:码料盘(2e3)上满布有用于装载阀体的盲孔。7. The device for checking the tightness of an automatic throttle valve assembly production line according to claim 6, characterized in that: the code disc (2e3) is fully covered with blind holes for loading the valve body. 8.根据权利要求6所述的一种节流阀自动装配生产线的密封性检查装置,其特征在于:机械手(2e1)包括有第四滑台(2e11)、第二十三直线驱动装置(2e12)、手指气缸(2e13)和阀体夹爪(2e14),第四滑台(2e11)通过支架骑跨在检测台(10d)和带式传输机(2e2)之间,第二十三直线驱动装置(2e12)固定安装在第四滑台(2e11)的工作端,第二十三直线驱动装置(2e12)的输出方向竖直向下设置,手指气缸(2e13)固定安装在第二十三直线驱动装置(2e12)的工作端,阀体夹爪(2e14)固定安装在手指气缸(2e13)的工作端。8. The device for checking the tightness of an automatic throttle valve assembly production line according to claim 6, wherein the manipulator (2e1) comprises a fourth sliding table (2e11), a twenty-third linear drive device (2e12) ), the finger cylinder (2e13) and the valve body gripper (2e14), the fourth sliding table (2e11) rides between the inspection table (10d) and the belt conveyor (2e2) through the bracket, and the twenty-third linear drive The device (2e12) is fixedly installed on the working end of the fourth sliding table (2e11), the output direction of the twenty-third linear drive device (2e12) is set vertically downward, and the finger cylinder (2e13) is fixedly installed on the twenty-third linear The working end of the driving device (2e12) and the valve body gripper (2e14) are fixedly installed on the working end of the finger cylinder (2e13). 9.根据权利要求8所述的一种节流阀自动装配生产线的密封性检查装置,其特征在于:阀体卸料机构(2e)还包括有固定安装在第二十三直线驱动装置(2e12)固定端旁侧的第四传感器(2e5),第四传感器(2e5)的工作方向竖直向下设置,机械手(2e1)和第四传感器(2e5)均与控制器电连接。9. A device for checking the tightness of a throttle valve automatic assembly production line according to claim 8, characterized in that: the valve body unloading mechanism (2e) further comprises a ) a fourth sensor (2e5) beside the fixed end, the working direction of the fourth sensor (2e5) is arranged vertically downward, and both the manipulator (2e1) and the fourth sensor (2e5) are electrically connected to the controller.
CN201910251395.5A 2019-03-29 2019-03-29 A sealing inspection device for automatic assembly line of throttle valve Pending CN109967384A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910251395.5A CN109967384A (en) 2019-03-29 2019-03-29 A sealing inspection device for automatic assembly line of throttle valve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910251395.5A CN109967384A (en) 2019-03-29 2019-03-29 A sealing inspection device for automatic assembly line of throttle valve

Publications (1)

Publication Number Publication Date
CN109967384A true CN109967384A (en) 2019-07-05

Family

ID=67081716

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910251395.5A Pending CN109967384A (en) 2019-03-29 2019-03-29 A sealing inspection device for automatic assembly line of throttle valve

Country Status (1)

Country Link
CN (1) CN109967384A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110280447A (en) * 2019-03-29 2019-09-27 宁波英特灵气动科技有限公司 A kind of valve body adjusting screw automatically dropping glue mounting device of throttle valve assembling line
CN110420874A (en) * 2019-08-29 2019-11-08 宁波奉化胜雄机电科技有限公司 A kind of air pump solenoid valve integral test system
CN111112111A (en) * 2019-12-31 2020-05-08 上海宝嵩机器人有限公司 A kind of multi-station ball valve gas measuring equipment and its working method
CN111307013A (en) * 2020-03-17 2020-06-19 何小红 Multifunctional detection table for valve machining and use method
CN118641118A (en) * 2024-07-10 2024-09-13 苏州互感信息技术有限公司 A sensor processing and testing platform and its use method
CN119188283A (en) * 2024-10-31 2024-12-27 无锡荟川智能科技有限公司 Flat valve plate assembly equipment

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203643158U (en) * 2014-01-10 2014-06-11 九牧厨卫股份有限公司 Multi-ported valve gas testing equipment
CN105043690A (en) * 2015-08-31 2015-11-11 温州职业技术学院 Valve automatic detection equipment
CN205157142U (en) * 2015-11-03 2016-04-13 浙江中财管道科技股份有限公司 Pipe fitting self sealing nature test fixture
CN105738051A (en) * 2016-04-05 2016-07-06 苏州盟川自动化科技有限公司 Bellows airtightness detection device and detection method therefor
CN105817873A (en) * 2016-05-23 2016-08-03 宁波新邦工具有限公司 Nut mounting station of quick joint automatic assembly machine
CN205894548U (en) * 2016-05-13 2017-01-18 武汉华康世纪洁净室技术工程有限公司 Medical gas tightness access hole
CN206208464U (en) * 2016-10-27 2017-05-31 九牧厨卫股份有限公司 A kind of leak detecting device
CN106932156A (en) * 2017-03-21 2017-07-07 江苏嘉文医疗用品有限公司 A kind of disposable glove automatic detecting machine
CN207961902U (en) * 2018-03-25 2018-10-12 于子峰 Fixed pipeline leak stoppage device
CN108760188A (en) * 2018-07-17 2018-11-06 广东万家乐燃气具有限公司 A kind of automatic detection device and system
CN108971980A (en) * 2018-09-28 2018-12-11 苏州博鲁克机器人系统工程有限公司 Throttle valve copper piece assembles equipment
CN109516226A (en) * 2018-11-29 2019-03-26 天津龙创恒盛实业有限公司 Four axis robot blanking code-disc equipment
CN210434888U (en) * 2019-03-29 2020-05-01 宁波英特灵气动科技有限公司 Sealing performance inspection device of automatic throttle valve assembly production line

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203643158U (en) * 2014-01-10 2014-06-11 九牧厨卫股份有限公司 Multi-ported valve gas testing equipment
CN105043690A (en) * 2015-08-31 2015-11-11 温州职业技术学院 Valve automatic detection equipment
CN205157142U (en) * 2015-11-03 2016-04-13 浙江中财管道科技股份有限公司 Pipe fitting self sealing nature test fixture
CN105738051A (en) * 2016-04-05 2016-07-06 苏州盟川自动化科技有限公司 Bellows airtightness detection device and detection method therefor
CN205894548U (en) * 2016-05-13 2017-01-18 武汉华康世纪洁净室技术工程有限公司 Medical gas tightness access hole
CN105817873A (en) * 2016-05-23 2016-08-03 宁波新邦工具有限公司 Nut mounting station of quick joint automatic assembly machine
CN206208464U (en) * 2016-10-27 2017-05-31 九牧厨卫股份有限公司 A kind of leak detecting device
CN106932156A (en) * 2017-03-21 2017-07-07 江苏嘉文医疗用品有限公司 A kind of disposable glove automatic detecting machine
CN207961902U (en) * 2018-03-25 2018-10-12 于子峰 Fixed pipeline leak stoppage device
CN108760188A (en) * 2018-07-17 2018-11-06 广东万家乐燃气具有限公司 A kind of automatic detection device and system
CN108971980A (en) * 2018-09-28 2018-12-11 苏州博鲁克机器人系统工程有限公司 Throttle valve copper piece assembles equipment
CN109516226A (en) * 2018-11-29 2019-03-26 天津龙创恒盛实业有限公司 Four axis robot blanking code-disc equipment
CN210434888U (en) * 2019-03-29 2020-05-01 宁波英特灵气动科技有限公司 Sealing performance inspection device of automatic throttle valve assembly production line

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王烈准: "《自动化生产线拆装与调试 三菱FX3U机型》", 28 February 2018, 机械工业出版社, pages: 42 - 43 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110280447A (en) * 2019-03-29 2019-09-27 宁波英特灵气动科技有限公司 A kind of valve body adjusting screw automatically dropping glue mounting device of throttle valve assembling line
CN110280447B (en) * 2019-03-29 2024-04-16 宁波英特灵气动科技有限公司 Automatic dispensing and mounting device for valve body adjusting screw of throttle valve assembly production line
CN110420874A (en) * 2019-08-29 2019-11-08 宁波奉化胜雄机电科技有限公司 A kind of air pump solenoid valve integral test system
CN111112111A (en) * 2019-12-31 2020-05-08 上海宝嵩机器人有限公司 A kind of multi-station ball valve gas measuring equipment and its working method
CN111112111B (en) * 2019-12-31 2023-10-27 上海宝嵩机器人有限公司 A multi-station ball valve gas measuring equipment and its working method
CN111307013A (en) * 2020-03-17 2020-06-19 何小红 Multifunctional detection table for valve machining and use method
CN111307013B (en) * 2020-03-17 2021-08-31 宁波田湖阀门科技有限公司 Multifunctional detection table for valve machining and use method
CN118641118A (en) * 2024-07-10 2024-09-13 苏州互感信息技术有限公司 A sensor processing and testing platform and its use method
CN119188283A (en) * 2024-10-31 2024-12-27 无锡荟川智能科技有限公司 Flat valve plate assembly equipment
CN119188283B (en) * 2024-10-31 2025-11-28 无锡荟川智能科技有限公司 Flat valve plate assembling equipment

Similar Documents

Publication Publication Date Title
CN109967384A (en) A sealing inspection device for automatic assembly line of throttle valve
CN109940382B (en) Automatic assembly production line for throttle valve
CN210060379U (en) Automatic valve rod sealing ring mounting device of throttle valve assembly production line
CN210434888U (en) Sealing performance inspection device of automatic throttle valve assembly production line
CN107097054A (en) A kind of automatic automobile oxygen sensor component press mounting system and its operating method
CN105817873A (en) Nut mounting station of quick joint automatic assembly machine
CN210435681U (en) Automatic valve body sealing ring mounting device of throttle valve assembly production line
CN102530705A (en) Magnetic grabber
CN110774000A (en) Automatic Venturi Assembly Line
CN109822327A (en) A kind of press mounting for crankshaft oil seal detection device
CN110280995B (en) Valve body lock catch riveting device of throttle valve automatic assembly production line
CN210060381U (en) Automatic assembly production line for throttle valve
CN201852683U (en) Air-tightness test equipment
CN219853126U (en) Sealing washer and valve rod assembly devices
CN106684310A (en) Liquid injection equipment and method
CN111633670B (en) Sorting manipulator for linear output of formed mechanical parts
CN115383439A (en) Method and device for press mounting of air bag and cover plate of small curved bag type air spring
CN210435664U (en) Valve body lock catch riveting device of automatic throttle valve assembly production line
CN110280447B (en) Automatic dispensing and mounting device for valve body adjusting screw of throttle valve assembly production line
CN217111373U (en) Cooling tube leakproofness detects frock
CN214251396U (en) Gas valve detection device
CN217123042U (en) Mounting device of valve cap
CN115799105B (en) Semiconductor Equipment
CN205539222U (en) A nonmetal position sensor , antenna automatic positioning device and system for electro magnetic compatibility test
CN208026431U (en) Oil sump airtight detecting apparatus

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190705

RJ01 Rejection of invention patent application after publication