CN109816349A - A kind of test verification management platform - Google Patents

A kind of test verification management platform Download PDF

Info

Publication number
CN109816349A
CN109816349A CN201910087297.2A CN201910087297A CN109816349A CN 109816349 A CN109816349 A CN 109816349A CN 201910087297 A CN201910087297 A CN 201910087297A CN 109816349 A CN109816349 A CN 109816349A
Authority
CN
China
Prior art keywords
project
test
data
cloud
internet cloud
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910087297.2A
Other languages
Chinese (zh)
Inventor
凌宇翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Huayuan Chuangxing Computer Service Co Ltd
Original Assignee
Guangzhou Huayuan Chuangxing Computer Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Huayuan Chuangxing Computer Service Co Ltd filed Critical Guangzhou Huayuan Chuangxing Computer Service Co Ltd
Priority to CN201910087297.2A priority Critical patent/CN109816349A/en
Publication of CN109816349A publication Critical patent/CN109816349A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention provides a kind of test verification management platform, internet cloud is using internet cloud as server loading side, using cloud server as application server, the external high speed cloud disk of carry is stored for file, use file backup function, using relevant database as database server, data storage uses high speed cloud disk, use the data backup and high-availability arrangement of relevant database itself, platform client is used to record the project information obtained, it is recorded and stored in internet cloud by platform client, the relevant project information of project that internet cloud end receiving platform client is sent, and the project information that will acquire is stored into database server, internet cloud is used to receive the project management instruction of Project Manager's transmission, it is instructed according to project management, it is corresponding to what is stored in database server Project information is managed.It can allow each regulatory authorities that can comprehensively grasp current project information.

Description

A kind of test verification management platform
Technical field
The present invention relates to technical field of performance test more particularly to a kind of test verification management platforms.
Background technique
Traditional test project management mode is that artificial management project is implemented under line.After information is collected by market department, Manual arranging Project data gives project implementation team, offline to record project information and send work situation.At the scene, test team carries papery Material reaches scene and carries out test construction, to prevent data insufficient or data modification, also needs to carry computer and printer.Record manually Unirecord test result, review trial, feedback progress summarize with problem manually.Implement to terminate and then carry all test knots Fruit returns to general headquarters, unified to carry out experts' evaluation and Technical Review, after evaluation terminates, rearranges, summarizes typesetting manually and formed Test report.
With the development of social construction, requirement of the people to equipment management is increasingly stringenter, and equipment is after coming into operation In the process usually require regularly checked, tested and safeguarded, in order to guarantee going on smoothly for project, need to above-mentioned crowd Too many levels carries out unified management.
However, each administrative department can not grasp the related letter of current project currently during to management comprehensively It ceases, the management between each administrative department disperses very much, close efficient work linking can not be carried out, to reduce project The efficiency of management affects the normal implementation of project.
In summary as can be seen that how to ensure that each administrative department can comprehensively grasp current project information, to mention The efficiency of management of high project is current urgent problem to be solved.
Summary of the invention
Allow each regulatory authorities that can comprehensively grasp current project letter the object of the invention is that providing one kind The test verification management platform of breath.
The technical solution adopted by the present invention to solve the technical problems is:
A kind of test verification management platform, including internet cloud peace platform client, internet cloud are made using internet cloud For server loading side, unify firewall using internet cloud, using cloud server as application server, the external height of carry Fast cloud disk is stored for file, and using file backup function, using RDS database as database server, data storage makes With high speed cloud disk, using the data backup and high-availability arrangement of RDS database itself, platform client include pc client with Mobile client,
Platform client, for record obtain project information, be recorded and stored in internet cloud by platform client, The relevant project information of project that internet cloud end receiving platform client is sent, and the project information that will acquire is stored to number According in the server of library,
Internet cloud instructs, to database for receiving the project management instruction of Project Manager's transmission according to project management The corresponding project information stored in server is managed,
Platform base document data base is built between platform client and internet cloud, system architecture realizes system-based Data management and project management, by realizing the control of project general headquarters to project management.
Include: between the platform client and internet cloud as a preferred technical solution,
Basic data module: it for being manually entered basic data or importing basic data database in batches, is managed collectively and deposits Store up the basic data of basic data database;
Project verification information module: it is used for typing project information, testing requirement is efficiently arranged, is quickly selected from basic data database It selects basic data, and the basic data group of selection is unified into a contents of a project, the testing scheme template of system Auto-matching complexity, Test form, facility information and testing standard, support detail modifications, supplement and adjustment, and project data is uploaded in internet cloud End saves, and consults for related personnel;
Material data recording module: for recording inventory's administrative situation, available material information is managed, checks and borrows for project;
Test plan module: for formulating test plan online, arranging project process and implementing the time, all testers are synchronous Test job executes test assignment according to plan, it is long-range realize project send work with send work synchronous.
Test information module: for field conduct can off-line operation, data locally save, automatic or manual obtain project letter Breath;
Test result module: for recording test data, record personnel easily record test data, and support is manually entered result Description, can carry out result typing and data consultation under no network environment, and according to backstage established standards, it is current to judge automatically prompt Testing result reminds related personnel to carry out repetition measurement and modification, the electronic signature or scene that test result automatic marking backstage saves Signature, all test results equally support backstage typing, can modify history and missing result supplement, automatic or manual is same after networking Step passback test result, general headquarters and sundry item member can be synchronized to existing test result, report testing progress, and can be at any time It carries out result audit and the data review of module, experts' evaluation and Technical Review is completed, Real-time Feedback review comment, guidance is now Field personnel check and correct, and are examined by remarks, short message or mail are reminded in many ways;
Test report module: for generating and saving test result, test report is automatically generated, and cloud saves all test knots Fruit, all affected members can consult at any time, after the completion of test, integrate catalogue and test result automatically by setting self-defined structure, Whole test contents, unified typesetting and format are exported, test report is exported.
The beneficial effects of the present invention are:
The test verification management platform can allow each regulatory authorities that can comprehensively grasp current project information.To test Verifying system sex work is effectively planned and is managed.Main pass through combines existing technology, from two side of the end pc and mobile terminal Face is started with, and is standardized to the management of the process and equipment of test and management.Detection engineer and administrator can lead to The manual operations that this platform reduces them to greatest extent is crossed, and the secondary operation for test data, mining analysis provide item Part.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 is a kind of test verification management platform application schematic diagram disclosed by the invention.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings and specific examples, so that those skilled in the art can be more The good understanding present invention can be simultaneously practiced, but illustrated embodiment is not as a limitation of the invention.
A kind of test verification management platform, including internet cloud peace platform client, internet cloud use internet Cloud unifies firewall as server loading side, using internet cloud, using cloud server as application server, outside carry It sets high speed cloud disk to store for file, using file backup function, using RDS database as database server, data are deposited Storage uses high speed cloud disk, and using the data backup and high-availability arrangement of RDS database itself, platform client includes PC client End and mobile client,
Platform client, for record obtain project information, be recorded and stored in internet cloud by platform client, The relevant project information of project that internet cloud end receiving platform client is sent, and the project information that will acquire is stored to number According in the server of library,
Internet cloud instructs, to database for receiving the project management instruction of Project Manager's transmission according to project management The corresponding project information stored in server is managed,
Platform base database is built between platform client and internet cloud, system architecture realizes system-based data Management and project management.By including implement team's project management, the project implementation, project query to project management, project is realized General headquarters' control, including test plan management, report arrange output, system setting function.
Include: between the platform client and internet cloud as a preferred technical solution,
Basic data module: it for being manually entered basic data or importing basic data database in batches, is managed collectively and deposits The basic data of basic data database is stored up, basic data includes testing scheme, test data, subsystem, equipment, test table It is single, facility information, testing standard, instrument resource, load, inventory, backstage account and authority module etc.;
Project verification information module: it is used for typing project information, testing requirement is efficiently arranged, is quickly selected from basic data database It selects basic data, and the basic data group of selection is unified into a contents of a project, the testing scheme template of system Auto-matching complexity, Test form, facility information and testing standard, support detail modifications, supplement and adjustment, and project data is uploaded in internet cloud End saves, and project data includes customer information, requirement objective, the reference that project overview and client provide, handbook of such as constructing, The documentations such as plan view upload, and consult for related personnel;
Material data recording module: for recording inventory's administrative situation, management available material information is checked and is borrowed for project, Including equipment data, test form, testing standard and specification etc.;
Test plan module: for formulating test plan online, arranging project process and implementing the time, all testers are synchronous Test job executes test assignment according to plan, it is long-range realize project send work with send work synchronous.
Test information module: for field conduct can off-line operation, data locally save, automatic or manual obtain project letter Breath;
Test result module: for recording test data, record personnel easily record test data, and support is manually entered result Description, can carry out result typing and data consultation under no network environment, and according to backstage established standards, it is current to judge automatically prompt Testing result reminds related personnel to carry out repetition measurement and modification, the electronic signature or scene that test result automatic marking backstage saves Signature, all test results equally support backstage typing, can modify history and missing result supplement, automatic or manual is same after networking Step passback test result, general headquarters and sundry item member can be synchronized to existing test result, report testing progress, and can be at any time It carries out result audit and the data review of module, experts' evaluation and Technical Review is completed, Real-time Feedback review comment, guidance is now Field personnel check and correct, and are examined by remarks, short message or mail are reminded in many ways;
Test report module: for generating and saving test result, test report is automatically generated, and cloud saves all test knots Fruit, all affected members can consult at any time, after the completion of test, integrate catalogue and test result automatically by setting self-defined structure, Whole test contents, unified typesetting and format are exported, test report is exported.
The test verification management platform, is generally used for data center, information system rooms, power computer room, big data cloud The Performance Testing Technology of the projects such as service platform, cloud data center, IDC project, evaluation and test computer room service, technology detection service, wind Danger evaluation and test assessment, system installation and debugging, system testing, operation and maintenance, validation test, integration test service, third party detect clothes Business, third-party testing service, the verifying of third party's check and evaluation, single system and joint verification service, commission detection certification, certification clothes Business, monitoring Identification Service, the test service for checking credentials, the on-the-spot test service for checking credentials, the fictitious load test service for checking credentials, band carry test verifying Equal fields.
Following content is one embodiment of this test verification management platform,
After landing platform client, main interface points three pieces show ongoing project respectively, the project that has terminated, recycle bin." into Project in row " shows the project name of ongoing project, client, duration progress, testing progress, the item number being related to, just Begin to show three records modified recently, all ongoing projects can be checked by clicking " checking whole ".Every record provides detailed Feelings are checked, are deleted, completing operation.Details are checked, check the details of the project.The project is then moved to recycle bin by deletion, The project is then moved to the project terminated by completion." project terminated " show the project name of project terminated, client, Deadline, the item number being related to, initial presentation terminate recently three records, clicking " checking whole " and can checking has terminated Project.Details are checked, test result is checked, reopen operation for every record offer.Details are checked, check the detailed of the project Details condition, and modification editor is provided.Test result, which is checked, then enters test result figure.It reopens, which is moved to " into Project in row "." recycle bin " shows project name, client, the erasing time, the item number being related to of deleted project, just Begin to show three records deleted recently, the project in recycle bin can be checked by clicking " checking whole ".Every record offer recovery, Delete operation, recovery then move to the project " ongoing project ", delete then by all related datas of the project from system Middle deletion.
Select main interface side menu bar " member's framework " enter the page, show project leader's information (including Name, position), project engineer's information (including name, position), personnel's transition information.Wherein project engineer point is electrical, empty It adjusts, intelligent three pieces of displayings.Personnel's transition information shows that the variation time, changing content, (to be confirmed, change people, becomes change reason More content) etc..Show project engineer's record, including name, job information.Electrical, air-conditioning, intelligent three options are provided, Control project engineer's record display of relevant speciality.Following point repeats to be confirmed.The item of main attack profession control relevant speciality Mesh engineer's record display provides whole, air-conditioning, electrical, four options of intelligence.Answering before the project engineer selected Select frame that can tick.Function of search is provided, search name includes the record of keyword.
Select main interface side menu bar " test process " enter the page, show project reconnaissance trip, preliminary examination, Single system verifying, comprehensive verification four-stage Percent Complete, including each stage air-conditioning, electrical, intelligentized completion feelings Condition, check box ticks before the part of completion, and shows the date of completion.The work plan of displaying project, including date, air-conditioning Detection content, electrical detection content, intellectualized detection content.Show that the test assignment in selected stage records, including testDate, The information such as test macro, tester, test content, unit of fit, test load, remarks, the setting that system of being subject to saves.It mentions For button is arranged, setting need to specifically show field.Each stage provide button control stage test assignment record gathering and Expansion operation.Addition button is provided, for adding the test assignment in the stage.General is provided and selects button, selects the stage full for general The test assignment of sufficient specified conditions.The Percent Complete in the stage is shown simultaneously, and test assignment number is completed, general assignment number, surveys It tries Start Date (taking the date value that testDate is earliest in the stage all test assignments), the target date, (stage, there are also appoint Business does not complete then as sky, otherwise takes the date value of testDate the latest in the stage all test assignments).Test assignment is provided Said system, tester, the handsome choosing setting of test Start Date, wherein system, tester are by the way of combobox to user Selection.Show that the stage meets general and the test assignment of condition is selected to record simultaneously.The stage according to selected by front adds toward the stage Test assignment provides test macro, the tester, test Start Date, test target date, test content, cooperation of the task The operation of the information inputs such as unit, test load.
The above embodiment of the present invention is not limiting the scope of the present invention, and embodiments of the present invention are not limited to This, all this kind above content according to the present invention is not departing from this according to the ordinary technical knowledge and customary means of this field Modification, replacement or change under the premise of inventing above-mentioned basic fundamental thought, to other diversified forms that above structure of the present invention is made More, it should all fall within the scope and spirit of the invention.

Claims (2)

1. a kind of test verification management platform, it is characterised in that: including internet cloud peace platform client, internet cloud is adopted It uses internet cloud as server loading side, unifies firewall using internet cloud, using cloud server as application service Device, the external high speed cloud disk of carry is stored for file, using file backup function, using RDS database as database service Device, data storage use high speed cloud disk, use the data backup and high-availability arrangement of RDS database itself, platform client Comprising pc client and mobile client,
Platform client, for record obtain project information, be recorded and stored in internet cloud by platform client, The relevant project information of project that internet cloud end receiving platform client is sent, and the project information that will acquire is stored to number According in the server of library,
Internet cloud instructs, to database for receiving the project management instruction of Project Manager's transmission according to project management The corresponding project information stored in server is managed,
Platform base document data base is built between platform client and internet cloud, system architecture realizes system-based Data management and project management, by realizing the control of project general headquarters to project management.
2. a kind of test verification management platform according to claim 1, it is characterised in that: the platform client and interconnection It nets between cloud and includes:
Basic data module: it for being manually entered basic data or importing basic data database in batches, is managed collectively and deposits Store up the basic data of basic data database;
Project verification information module: it is used for typing project information, testing requirement is efficiently arranged, is quickly selected from basic data database It selects basic data, and the basic data group of selection is unified into a contents of a project, the testing scheme template of system Auto-matching complexity, Test form, facility information and testing standard, support detail modifications, supplement and adjustment, and project data is uploaded in internet cloud End saves, and consults for related personnel;
Material data recording module: for recording inventory's administrative situation, available material information is managed, checks and borrows for project;
Test plan module: for formulating test plan online, arranging project process and implementing the time, all testers are synchronous Test job executes test assignment according to plan, it is long-range realize project send work with send work synchronous;
Test information module: for field conduct can off-line operation, data locally save, automatic or manual obtain project information;
Test result module: for recording test data, record personnel easily record test data, and support is manually entered result Description, can carry out result typing and data consultation under no network environment, and according to backstage established standards, it is current to judge automatically prompt Testing result reminds related personnel to carry out repetition measurement and modification, the electronic signature or scene that test result automatic marking backstage saves Signature, all test results equally support backstage typing, can modify history and missing result supplement, automatic or manual is same after networking Step passback test result, general headquarters and sundry item member can be synchronized to existing test result, report testing progress, and can be at any time It carries out result audit and the data review of module, experts' evaluation and Technical Review is completed, Real-time Feedback review comment, guidance is now Field personnel check and correct, and are examined by remarks, short message or mail are reminded in many ways;
Test report module: for generating and saving test result, test report is automatically generated, and cloud saves all test knots Fruit, all affected members can consult at any time, after the completion of test, integrate catalogue and test result automatically by setting self-defined structure, Whole test contents, unified typesetting and format are exported, test report is exported.
CN201910087297.2A 2019-01-29 2019-01-29 A kind of test verification management platform Pending CN109816349A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910087297.2A CN109816349A (en) 2019-01-29 2019-01-29 A kind of test verification management platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910087297.2A CN109816349A (en) 2019-01-29 2019-01-29 A kind of test verification management platform

Publications (1)

Publication Number Publication Date
CN109816349A true CN109816349A (en) 2019-05-28

Family

ID=66605704

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910087297.2A Pending CN109816349A (en) 2019-01-29 2019-01-29 A kind of test verification management platform

Country Status (1)

Country Link
CN (1) CN109816349A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110610305A (en) * 2019-08-29 2019-12-24 广州华源创兴计算机服务有限公司 Data center full life cycle integrated service dispatching master control system
CN111274775A (en) * 2020-01-20 2020-06-12 清华大学 Watershed water environment model verification system
CN112611586A (en) * 2020-12-05 2021-04-06 广州华源创兴计算机服务有限公司 Method and system for testing and verifying liquid cooling system of data machine room
CN114079655A (en) * 2020-08-03 2022-02-22 中检赛辰技术服务有限公司 Intelligent equipment internet data cross-boundary test verification method
CN114756280A (en) * 2022-03-17 2022-07-15 智芯造(上海)信息技术有限公司 Efficient, dynamic and platform factory intelligent hardware automatic production testing framework and implementation method
CN117313856A (en) * 2023-11-29 2023-12-29 浙江季丰电子科技有限公司 Reliability test planning system and method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102521697A (en) * 2011-12-13 2012-06-27 广东电网公司信息中心 Power grid informatization evaluating lab management system
CN105117824A (en) * 2015-07-31 2015-12-02 成都亿信标准认证集团有限公司 Cloud service system used for project management
CN107566520A (en) * 2017-09-27 2018-01-09 合肥博力生产力促进中心有限公司 A kind of business data information management system based on cloud management platform

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102521697A (en) * 2011-12-13 2012-06-27 广东电网公司信息中心 Power grid informatization evaluating lab management system
CN105117824A (en) * 2015-07-31 2015-12-02 成都亿信标准认证集团有限公司 Cloud service system used for project management
CN107566520A (en) * 2017-09-27 2018-01-09 合肥博力生产力促进中心有限公司 A kind of business data information management system based on cloud management platform

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110610305A (en) * 2019-08-29 2019-12-24 广州华源创兴计算机服务有限公司 Data center full life cycle integrated service dispatching master control system
CN111274775A (en) * 2020-01-20 2020-06-12 清华大学 Watershed water environment model verification system
CN111274775B (en) * 2020-01-20 2021-10-08 清华大学 Watershed Water Environment Model Verification System
CN114079655A (en) * 2020-08-03 2022-02-22 中检赛辰技术服务有限公司 Intelligent equipment internet data cross-boundary test verification method
CN112611586A (en) * 2020-12-05 2021-04-06 广州华源创兴计算机服务有限公司 Method and system for testing and verifying liquid cooling system of data machine room
CN112611586B (en) * 2020-12-05 2021-07-23 广州华源创兴计算机服务有限公司 Method and system for testing and verifying liquid cooling system of data machine room
CN114756280A (en) * 2022-03-17 2022-07-15 智芯造(上海)信息技术有限公司 Efficient, dynamic and platform factory intelligent hardware automatic production testing framework and implementation method
CN117313856A (en) * 2023-11-29 2023-12-29 浙江季丰电子科技有限公司 Reliability test planning system and method
CN117313856B (en) * 2023-11-29 2024-03-05 浙江季丰电子科技有限公司 Reliability test planning system and method

Similar Documents

Publication Publication Date Title
CN109816349A (en) A kind of test verification management platform
CN102571396B (en) Communication network system and routing inspection subsystem and routing inspection method of communication equipment
CN102005065B (en) Handheld inspection device of maintenance and operation system for equipment and method thereof
CN105989443A (en) Intelligent-mobile-terminal-based communication line inspection system
CN111612646A (en) A networked intelligent secondary operation and maintenance system
CN117422434A (en) Wisdom fortune dimension dispatch platform
CN110647567A (en) Auxiliary decision-making system for power outage planning based on terminal data fusion
CN106934507A (en) A kind of new cruising inspection system and method for oil field petrochemical field
CN110689259A (en) Power system statistic digital detection management system
CN115017484A (en) Access control method and device
CN109214535A (en) A kind of equipment routing inspection system and method based on offline terminal
CN108776278A (en) A kind of the configuration type relay protection test system and method for topological correlation
CN113778903A (en) Method and system for generating test case of power distribution terminal and storage medium
US20100191568A1 (en) Apparatus and method for managing task information of a plant
JP5989194B1 (en) Test management system and program
CN116991678A (en) Intelligent operation and maintenance system of data center
CN113129469A (en) Inspection monitoring method and system and computer readable storage medium
CN104899799A (en) Project management system
CN113947377B (en) Laboratory management system
CN111464350B (en) Method and system for managing heterogeneous brand network equipment
CN109299016A (en) Assessment document structure tree method, system and terminal device
CN118037268A (en) Equipment point detection method, device, equipment and storage medium
CN105718602A (en) Cloud system for work safety standardization of rural hydropower station
CN116757678A (en) Analysis management system based on atmosphere super observation station equipment
CN115907615A (en) Power test equipment storehouse management system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190528

RJ01 Rejection of invention patent application after publication