CN109652879A - The double drawing-off spinning apparatus of single ingot and its Yarn spinning method - Google Patents
The double drawing-off spinning apparatus of single ingot and its Yarn spinning method Download PDFInfo
- Publication number
- CN109652879A CN109652879A CN201910061146.XA CN201910061146A CN109652879A CN 109652879 A CN109652879 A CN 109652879A CN 201910061146 A CN201910061146 A CN 201910061146A CN 109652879 A CN109652879 A CN 109652879A
- Authority
- CN
- China
- Prior art keywords
- roller
- drafting
- sleeve
- draft
- rubber roller
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 60
- 238000009987 spinning Methods 0.000 title claims abstract description 54
- 230000008569 process Effects 0.000 claims abstract description 47
- 230000005540 biological transmission Effects 0.000 claims abstract description 25
- 238000003825 pressing Methods 0.000 claims abstract description 14
- 239000000835 fiber Substances 0.000 claims description 56
- 238000004804 winding Methods 0.000 claims description 22
- 239000000463 material Substances 0.000 claims description 14
- 239000007787 solid Substances 0.000 claims description 10
- 230000009471 action Effects 0.000 claims description 6
- 230000003993 interaction Effects 0.000 claims description 6
- 229910000831 Steel Inorganic materials 0.000 claims description 3
- 239000010959 steel Substances 0.000 claims description 3
- 238000009434 installation Methods 0.000 claims description 2
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims 4
- 229910052742 iron Inorganic materials 0.000 claims 2
- 230000015572 biosynthetic process Effects 0.000 claims 1
- 239000003292 glue Substances 0.000 description 107
- 230000010354 integration Effects 0.000 description 20
- 230000000694 effects Effects 0.000 description 11
- 239000004753 textile Substances 0.000 description 10
- 238000005538 encapsulation Methods 0.000 description 7
- 239000004744 fabric Substances 0.000 description 6
- 238000003780 insertion Methods 0.000 description 5
- 230000037431 insertion Effects 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 4
- 230000007246 mechanism Effects 0.000 description 4
- 150000001875 compounds Chemical class 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 239000000203 mixture Substances 0.000 description 3
- 230000002146 bilateral effect Effects 0.000 description 2
- 230000000717 retained effect Effects 0.000 description 2
- TVEXGJYMHHTVKP-UHFFFAOYSA-N 6-oxabicyclo[3.2.1]oct-3-en-7-one Chemical compound C1C2C(=O)OC1C=CC2 TVEXGJYMHHTVKP-UHFFFAOYSA-N 0.000 description 1
- 229920000742 Cotton Polymers 0.000 description 1
- 238000004026 adhesive bonding Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000001035 drying Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000009950 felting Methods 0.000 description 1
- 239000002657 fibrous material Substances 0.000 description 1
- 238000010409 ironing Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
- 238000012827 research and development Methods 0.000 description 1
- 230000033764 rhythmic process Effects 0.000 description 1
- 238000007378 ring spinning Methods 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 238000005406 washing Methods 0.000 description 1
- 210000002268 wool Anatomy 0.000 description 1
Classifications
-
- D—TEXTILES; PAPER
- D02—YARNS; MECHANICAL FINISHING OF YARNS OR ROPES; WARPING OR BEAMING
- D02G—CRIMPING OR CURLING FIBRES, FILAMENTS, THREADS, OR YARNS; YARNS OR THREADS
- D02G3/00—Yarns or threads, e.g. fancy yarns; Processes or apparatus for the production thereof, not otherwise provided for
-
- D—TEXTILES; PAPER
- D01—NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
- D01H—SPINNING OR TWISTING
- D01H5/00—Drafting machines or arrangements ; Threading of roving into drafting machine
- D01H5/18—Drafting machines or arrangements without fallers or like pinned bars
- D01H5/22—Drafting machines or arrangements without fallers or like pinned bars in which fibres are controlled by rollers only
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Textile Engineering (AREA)
- Spinning Or Twisting Of Yarns (AREA)
Abstract
The invention discloses the double drawing-off spinning apparatus of single ingot and its Yarn spinning methods, before, the right end of bottom roll axis is respectively by first afterwards, second motor drives, middle bottom roller set includes a left side, right roller set, and left roller set is fixedly connected with roller shaft, right roller set is crossed bearing with roller shaft and is connect, and it is driven by belt by transmission shaft, rear roller axis is driven with middle bottom roller axis by first gear group, transmission shaft is driven with front lower roller shaft by second gear group, first rove and the second rove are after first break draft roller is to pressing feeding successively respectively through left back, the drawing-off in right first break draft area, then again through left front, right front draft zone drawing-off obtains first, with the second yarn, to realize the first of feeding, second rove is not the same under identical total draft multiple, drafting process in first break draft area under Pullin performances, realize the double roving for feeding same spindle position Drafting process according to the different needs improves resultant yarn comprehensive quality to optimize spinning process.
Description
Technical field
The invention belongs to textile technology fields, are related to a kind of new ring spinning technology, the specially double drawing-off spinning of single ingot
Device and its Yarn spinning method.
Background technique
With the continuous advance in epoch, requirement of the people for garment material is continuously improved, and textile clothing industry is at present
One follow the fashion, the epoch of diversification and high-quality.Therefore, the development of textile raw material, textile technology also proposed new
It is required that.Among these, textile high-quality, high performance and its production and processing cleans the master for having become Modern Textile Industry
Developing direction is wanted, and improves the effective way of product specification and added value.With the raising and work of modern life level
The quickening of rhythm, the high conformality and easy care performance of textile have become the important attribute of high quality fabric and clothes and significantly mark
Will.But there is also many problems, such as cotton fabric dress easily to play fold, washing in terms of conformality for difference Fiber Materials fabric at present
Drying rear poor flatness needs ironing, and wool fabric is machine-washed, and easy felting, fabric rivel conformality are poor, and it is conformal that chemical & blended fabric wears easy arch camber
Deng.Conformality is inadequate, conformal effect is unstable, existing conformal technique environmental protection index many realistic problems such as not up to standard difficult to control
As the serious obstruction of textile high-quality, demand of the modern society people to high-quality dressing has not been adapted to.Research and development are high
Conformal textile key technology of preparing simultaneously realizes that its industrial application is to promote China's textile quality and competitiveness in the international market
Important channel and industry common recognition.
Compound fasciated yarn is a kind of yarn of mutually compound using different fibers and production structure, can be passed through in spinning
The control of yarn texture and performance is realized to the control of fiber compound structure, thus the production of the yarn needed for realizing.But mesh
It is preceding since spinning process is limited, cause resultant yarn comprehensive quality lower.
Summary of the invention
The technical issues of solution: for overcome the deficiencies in the prior art, by using under in bilateral symmetry
The rubber roller set of the roller set and middle upper glue roller of roller, the first rove and the second rove for realizing feeding are in identical total draft multiple
Under different forward and backward draft areas in drafting process under Pullin performances, then realize feed the double roving of same spindle position according to
The different drafting process needed improve resultant yarn comprehensive quality to optimize spinning process, and the present invention provides the double drawing-offs of single ingot to spin
Yarn feeding device and its Yarn spinning method.
Technical solution: the double drawing-off spinning apparatus of single ingot, described device includes drafting system, and drafting system includes first break draft sieve
It draws to, middle drawing rollers to, front traction roller pair, first break draft roller is to including rear bottom roll and rear upper glue roller, middle drawing rollers
To including middle bottom roller and middle upper glue roller, front traction roller to including preceding bottom roll and preceding upper glue roller, rear bottom roll, in lower sieve
It draws, preceding bottom roll includes roller shaft, the roller shaft integrated solid of the rear bottom roll of all spindle positions of spinning frame front truck table top
It connects calmly, the roller shaft integration of the middle bottom roller of all spindle positions is fixedly connected, the roller shaft one of the preceding bottom roll of all spindle positions
Body is fixedly connected, and the roller shaft integration of the rear bottom roll of all spindle positions of spinning frame rear car table top is fixedly connected, owns
The roller shaft integration of the middle bottom roller of spindle position, which is fixedly connected, the roller shaft integration of the preceding bottom roll of all spindle positions is fixed connects
It connects, roller shaft exterior circumference is equipped with roller set;The roller set of middle bottom roller is divided into left roller set and right roller set, left roller set
Integrated with roller shaft to be fixedly connected, right roller set is slidably connected with roller shaft by the first intermediate bearing, a left side for right roller set
End is fixedly connected with band moving sleeve, is covered on the roller shaft between the left roller set and right roller set of middle bottom roller with moving sleeve,
Right end with moving sleeve is fixedly connected with the left end that right roller covers, and is retained between the left end with moving sleeve and the right end of left roller set
Spacing, band moving sleeve are connect by belt with transmission shaft driven;The transmission shaft one of one all spindle position of spinning frame front truck table top
Change connection, the transmission shaft integration connection of all spindle positions of spinning frame rear car table top, the left end of transmission shaft and right end lead to respectively
It crosses bearing to be fastened on the vehicle frame of spinning frame, the right end of the roller shaft of preceding bottom roll is driven by first motor to be rotated, and is passed
The right end of the roller shaft of the right end of moving axis and preceding bottom roll is sequentially connected by the first connection gear group, the roller shaft of rear bottom roll
Right end rotation is driven by the second motor, the right end of the roller shaft of middle bottom roller and it is rear before bottom roll roller shaft right end it is logical
Cross the transmission connection of the second connection gear group;Upper glue roller, middle upper glue roller, preceding upper glue roller include rubber roller afterwards;After one spinning frame
Ride face, the adjacent spindle position of a spindle position of front truck table top and right side constitute a spindle position group, two ingots of a spindle position group
The rubber roller integration of rear upper glue roller on position connects, the rubber roller integration of middle upper glue roller connects, the rubber roller of preceding upper glue roller
Integration connection, the rear upper glue roller of each spindle position, middle upper glue roller, preceding upper glue roller rubber roller exterior circumference make-up be cased with glue
The rubber roller set of roller set, rear upper glue roller is consistent with the length that the roller of rear bottom roll covers and left and right ends are aligned, the glue of rear upper glue roller
Roller set is connect with the rubber roller of rear upper glue roller by the second intermediate bearing, the roller set of the rubber roller set and preceding bottom roll of preceding upper glue roller
Length it is consistent and left and right ends are aligned, the rubber roller set of preceding upper glue roller and the rubber roller of preceding upper glue roller are connected by third intermediate bearing
It connects, the rubber roller set of middle upper glue roller is divided into left rubber roller set and right rubber roller set, left sieve of left the rubber roller set and middle bottom roller of middle upper glue roller
The length helped pull a cart is consistent and left and right ends are aligned, and the right rubber roller set of middle upper glue roller is consistent with the length that the right roller of middle bottom roller covers
And left and right ends are aligned, the left rubber roller of middle upper glue roller set is connect with the rubber roller of middle upper glue roller by the 4th intermediate bearing, on
The right rubber roller set of rubber roller is connect with the rubber roller of middle upper glue roller by the 5th intermediate bearing;One spindle position group, two spindle positions it is rear on
Rubber roller, middle upper glue roller, preceding upper glue roller rubber roller set between rubber roller successively from back to front be embedded in the rear embedding of pressure-applying unit
Enter to grab, it is middle insertion grab, it is preceding insertion grab in, thus realize after the peace of upper glue roller, middle upper glue roller, preceding upper glue roller on pressure-applying unit
Dress, the rear portion of pressure-applying unit are fixed on the ride face of spinning frame by fixing axle, and pressure-applying unit is rotated along fixing axle, are being turned
Upper glue roller, middle upper glue roller, the pushing of preceding upper glue roller under a certain pressure after being realized during dynamic.
Preferably, the roller shaft is solid cylindrical structure.
Preferably, roller shaft is identical as the material that roller covers, and is irony or steel.
Preferably, left roller set is identical with the length that right roller covers, and there are gaps therebetween.
Preferably, the material with moving sleeve is identical as the material that right roller covers, and is the cylinder of both ends open with moving sleeve
Hollow structure.
Preferably, transmission shaft is solid cylindrical structure.
Preferably, rubber roller is irony material, and is solid cylindrical structure.
Preferably, rubber roller set is rubber material.
The Yarn spinning method of the double drawing-off spinning apparatus of any description above single ingot, in use, pressure-applying unit is under force
It is rotated along fixing axle, so that the pushing of pressure-applying unit is realized, so that the rubber roller set of the rear upper glue roller of each spindle position is with after
The roller of bottom roll covers close face contact, the left rubber roller set of middle upper glue roller and right rubber roller cover respectively with the left roller of middle bottom roller
Close face contact between set, right roller set is closely pressed between the rubber roller set of preceding upper glue roller and the roller set of preceding bottom roll and is crimped
Touching, the roller shaft rotation of bottom roll, then drives be fixedly connected integrated with the roller shaft of preceding bottom roll before first motor drives
The roller of preceding bottom roll cover and rotate synchronously, the rotation of the roller of preceding bottom roll set then drives close with the roller of preceding bottom roll set
The rubber roller of the preceding upper glue roller of face contact, which covers, to be rotated synchronously, and the roller shaft rotation of preceding bottom roll then passes through the first connection gear group
Transmission shaft rotation is driven, transmission shaft rotation then drives the right roller of middle bottom roller to cover rotation, the right side of middle bottom roller by belt
The rotation of roller set, which then drives, covers synchronous turn of the right rubber roller set of middle upper glue roller of close face contact with the right roller of middle bottom roller
It is dynamic, the middle right side that the right rubber roller set with right roller set and middle upper glue roller by middle bottom roller forms is being led by front traction roller at this time
It stretches and forms right front draft zone between roller pair, the drafting multiple of right front draft zone is fixed and is equal to the number of teeth of the first connection gear group
Than;The roller shaft rotation of bottom roll, then drives be fixedly connected integrated with the roller shaft of rear bottom roll after second motor drives
The roller of rear bottom roll cover and rotate synchronously, the rotation of the roller of rear bottom roll set then drives close with the roller of rear bottom roll set
The rubber roller of the rear upper glue roller of face contact, which covers, to be rotated synchronously, and the roller shaft rotation of rear bottom roll then passes through the second connection gear group
The roller shaft rotation of middle bottom roller is driven, the roller shaft rotation of middle bottom roller then drives integrated with the roller shaft of middle bottom roller
The left roller for the middle bottom roller being fixedly connected covers rotation, and the left roller set rotation of middle bottom roller then drives the left side with middle bottom roller
The left rubber roller set that roller covers the middle upper glue roller of close face contact rotates synchronously, at this time by first break draft roller to sieve lower in
Left back draft area is formed between left drawing rollers pair in the left rubber roller set composition of the left roller set drawn and middle upper glue roller, it is left back to lead
The drafting multiple for stretching area fix and be equal to the second connection gear group gear ratio, meanwhile, by first break draft roller to under
The right roller of roller covers and the right rubber roller of middle upper glue roller covers and forms right first break draft area in composition between right drawing rollers pair, after right
The drafting multiple of draft area is equal to first break draft roller to the total draft multiple between front traction roller pair divided by right front draft zone
Drafting multiple, by front traction roller to forming with left roller set and the left rubber roller set of middle upper glue roller by middle bottom roller in
Form left front draft area between left drawing rollers pair, the drafting multiple of left front draft area be equal to first break draft roller to and front draft sieve
Draw the total draft multiple between divided by the drafting multiple of left back draft area;Feeding loudspeaker is added at the rear portion of first break draft roller pair
Mouth device, feeding bell mouth arrangement includes left horn mouth and right horn mouth, passes through connection between left horn mouth and right horn mouth
Cross bar is fixedly connected, and retains spacing between the two, and the first rove feeds drafting system by left horn mouth, and the second rove is by right loudspeaker
Mouth feeds drafting system, and the first rove of feeding between the roller set of rear bottom roll and the rubber roller set of rear upper glue roller then by pressing
Pressure feeding is then pressed between the left roller set of middle bottom roller and the left rubber roller of middle upper glue roller set and is exported, first during this
Rove is acted on obtaining the first fibre bundle by the drawing-off of left back draft area, then the first fibre bundle by preceding bottom roll roller set with
Output is pressed between the rubber roller set of preceding upper glue roller, the first fibre bundle is acted on obtaining the by the drawing-off of left front draft area during this
One ribbon, the second rove of feeding are then fed by pressing between the roller set of rear bottom roll and the rubber roller set of rear upper glue roller,
Then pressed and exported between the right roller set of middle bottom roller and the right rubber roller of middle upper glue roller set, during this second rove by
The drawing-off in right first break draft area acts on obtaining the second fibre bundle, and the second fibre bundle is by the glue of the roller set and preceding upper glue roller of preceding bottom roll
Output is pressed between roller set, the second fibre bundle is acted on obtaining the second ribbon by the drawing-off of right front draft zone during this, from
And the total draft multiple for realizing that the first rove of feeding and the second rove are subject in drafting system is identical;First ribbon and
Two ribbons are constantly exported in the case where the rotation of front traction roller pair drives, and the first ribbon and second through drafting system output are fine
Dimension item interacts resultant yarn under the action of twisting the twist, according to the property of the first ribbon of output and the second ribbon, when
When the orientation for twisting the twist is that Z is twisted, the mechanism of interaction resultant yarn at this time includes four kinds, the first is positioned at left side
The second ribbon for being located at right side is wrapped up resultant yarn by the first ribbon, and the two respectively carries out twisting effect in encapsulation process;
It is for second that the first ribbon positioned at left side is twisted first, is then located at the second ribbon looping resultant yarn on right side again, and
The two respectively carries out twisting effect simultaneously in encapsulation process;The third is positioned at first ribbon in left side and positioned at right side
The second ribbon directly and close mutually winding resultant yarn, and be during the winding process the first ribbon positioned at left side by right side
Second ribbon gradually looping, and the two respectively while carrying out twisting effect during mutual winding;4th kind is position
The first ribbon in left side and the respectively preliminary twisting first of the second ribbon positioned at right side, then mutually wind resultant yarn again,
It and is during the winding process the first ribbon through tentatively twisting positioned at left side by second fiber through tentatively twisting on right side
Item gradually looping;When the orientation for twisting the twist is that S is twisted, the mechanism of interaction resultant yarn at this time is including four kinds, first
Kind is that the second ribbon positioned at right side will wrap up resultant yarn positioned at second ribbon in left side, and the two is respective in encapsulation process
Carry out twisting effect;It is for second that the second ribbon positioned at right side is twisted first, is then located at first fiber in left side again
Looping resultant yarn, and the two respectively carries out twisting effect simultaneously in encapsulation process;The third is the first fibre positioned at left side
It ties up item and the second ribbon positioned at right side directly and closes mutually winding resultant yarn, and during the winding process for positioned at the second of right side
Ribbon is by first ribbon in left side gradually looping, and the two respectively while carrying out twisting work during mutual winding
With;4th kind is respectively twisted first positioned at first ribbon in left side and the second ribbon positioned at right side, then again mutually
Resultant yarn is wound, and during the winding process tentatively to be twisted in left side positioned at second ribbon through tentatively twisting on right side
Firstth ribbon gradually looping.
Preferably, the drafting multiple for the front draft zone being subject to and the drafting multiple in first break draft area are same or different, it is preceding,
Pullin performances in first break draft area are different, including three kinds of situations, the first situation is the gear ratio and the of the first connection gear group
The product of the gear ratio of two connection gear groups is equal to first break draft roller to the total draft multiple between front traction roller pair, also
It is that the drafting multiple of left back draft area and the product of drafting multiple of right front draft zone are equal to total draft multiple, at this time the first rove
The drafting multiple for the left back draft area being subject in first break draft area is equal to the right first break draft that the second rove is subject in first break draft area
The drafting multiple in area, the drafting multiple for the left front draft area that the first rove is subject in front draft zone are equal to the second rove and lead preceding
Stretch the drafting multiple for the right front draft zone being subject in area, that is, total drafting multiple phase that the first rove and the second rove are subject to
Together, and the drafting multiple of the drafting multiple of front draft zone and first break draft area that is subject to is also identical, to realize the first rove and the
Two rove are in drafting system by identical drafting process;Second situation be the first connection gear group gear ratio with
The product of the gear ratio of second connection gear group is less than first break draft roller to the total draft multiple between front traction roller pair,
It is exactly that the drafting multiple of left back draft area and the product of drafting multiple of right front draft zone are less than total draft multiple, first is thick at this time
It is led behind the right side that the drafting multiple for the left back draft area that yarn is subject in first break draft area is subject in first break draft area less than the second rove
The drafting multiple in area is stretched, the drafting multiple for the left front draft area that the first rove is subject in front draft zone is greater than the second rove preceding
The drafting multiple for the right front draft zone being subject in draft area, that is, total drafting multiple that the first rove and the second rove are subject to
It is identical, but the drafting multiple in the drafting multiple for the front draft zone being subject to and first break draft area is different, to realize the first rove and the
Two rove are in drafting system by different drafting process;The third situation is the gear ratio and second of the first connection gear group
The product of the gear ratio of connection gear group is greater than first break draft roller to the total draft multiple between front traction roller pair, that is,
The product of the drafting multiple of the drafting multiple of left back draft area and right front draft zone is greater than total draft multiple, and the first rove exists at this time
The drafting multiple for the left back draft area being subject in first break draft area is greater than the right first break draft area that the second rove is subject in first break draft area
Drafting multiple, the drafting multiple for the left front draft area that the first rove is subject in front draft zone is less than the second rove in front draft
The drafting multiple for the right front draft zone being subject in area, that is, total drafting multiple phase that the first rove and the second rove are subject to
Together, but the drafting multiple of the drafting multiple of front draft zone and first break draft area that is subject to is different, to realize the first rove and second
Rove is in drafting system by different drafting process.
The utility model has the advantages that the double drawing-off spinning apparatus of single ingot of the present invention and its Yarn spinning method, which use, has bilateral symmetry
Middle bottom roller roller set and middle upper glue roller rubber roller set, realize that the first rove of feeding and the second rove are always led identical
The drafting process in the different forward and backward draft areas under multiple under Pullin performances is stretched, then realizes and feeds the double thick of same spindle position
Yarn drafting process according to the different needs improves resultant yarn comprehensive quality to optimize spinning process.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the double drawing-off spinning apparatus of single ingot of the present invention;
Wherein, 1 is rear bottom roll, and 2 be rear upper glue roller, and 3 be middle bottom roller, and 4 be middle upper glue roller, and 5 be preceding bottom roll, and 6 are
Preceding upper glue roller, 7 be roller shaft, and 8 be roller set, and 9 be rubber roller set, and 10 be rubber roller, and 11 be left rubber roller set, and 12 be right rubber roller set,
13 be left roller set, and 14 be right roller set, and 15 be the first intermediate bearing, and 16 be belt, and 17 be transmission shaft, and 18 be first motor,
19 be the first connection gear group, 20 second connection gear groups, 21 be the second motor, 22 be the first rove, 23 be the second rove, 24
For band moving sleeve.
Specific embodiment
Following embodiment further illustrates the contents of the present invention, but should not be construed as limiting the invention.Without departing substantially from
In the case where spirit of that invention and essence, to modification made by the method for the present invention, step or condition and replaces, belong to the present invention
Range.Unless otherwise specified, the conventional means that technological means used in embodiment is well known to those skilled in the art.
Embodiment 1
As shown in Figure 1, the double drawing-off spinning apparatus of single ingot, described device includes drafting system, and drafting system includes first break draft
Roller is to, middle drawing rollers to, front traction roller pair, and first break draft roller is to including rear bottom roll 1 and rear upper glue roller 2, middle drawing-off
Roller is to including middle bottom roller 3 and middle upper glue roller 4, and front traction roller is to including preceding bottom roll 5 and preceding upper glue roller 6, rear bottom roll
1, middle bottom roller 3, preceding bottom roll 5 include roller shaft 7, sieve of the rear bottom roll 1 of all spindle positions of spinning frame front truck table top
7 integration of pulling shaft is fixedly connected, 7 integration of roller shaft of the middle bottom roller 3 of all spindle positions is fixedly connected, all spindle positions it is front lower
7 integration of roller shaft of roller 5 is fixedly connected, the roller shaft 7 one of the rear bottom roll 1 of all spindle positions of spinning frame rear car table top
Body is fixedly connected, 7 integration of roller shaft of the middle bottom roller 3 of all spindle positions is fixedly connected, the preceding bottom roll 5 of all spindle positions
7 integration of roller shaft is fixedly connected, and 7 exterior circumference of roller shaft is equipped with roller set 8;It is left sieve that the roller of middle bottom roller 3, which covers 8 points,
It helps pull a cart 13 and right roller set 14, left roller set 13 is integrated with roller shaft 7 to be fixedly connected, and right roller covers 14 and passes through with roller shaft 7
First intermediate bearing 15 is slidably connected, and the left end of right roller set 14 is fixedly connected with band moving sleeve 24, and 24 sets of moving sleeve of band is in
On roller shaft 7 between the left roller set 13 and right roller set 14 of bottom roll 3, the right end with moving sleeve 24 and right roller cover 14
Left end is fixedly connected, and spacing is retained between the left end with moving sleeve 24 and the right end of left roller set 13, and band moving sleeve 24 passes through skin
Band 16 and transmission shaft 17 are sequentially connected;The 17 integration connection of transmission shaft of one all spindle position of spinning frame front truck table top is one thin
The 17 integration connection of transmission shaft of all spindle positions of yarn machine rear car table top, the left end of transmission shaft 17 passes through bearing with right end respectively and connects
It is fixed on the vehicle frame of spinning frame, the right end of the roller shaft 7 of preceding bottom roll 5 drives rotation, transmission shaft 17 by first motor 18
Right end and preceding bottom roll 5 roller shaft 7 right end by the first connection gear group 19 transmission connection, the roller of rear bottom roll 1
The right end of axis 7 passes through the second motor 21 and drives rotation, the roller shaft 7 of the right end of the roller shaft 7 of middle bottom roller 3 and rear preceding bottom roll
Right end pass through the second connection gear group 20 be sequentially connected;Upper glue roller 2, middle upper glue roller 4, preceding upper glue roller 6 include rubber roller afterwards
10;One spinning frame rear car table top, the adjacent spindle position of a spindle position of front truck table top and right side constitute a spindle position group, and one
The 10 integration connection of rubber roller of rear upper glue roller 2 in two spindle positions of a spindle position group, 10 integration of rubber roller of middle upper glue roller 4 connect
It connects, the 10 integration connection of the rubber roller of preceding upper glue roller 6, in the rear upper glue roller 2 of each spindle position, middle upper glue roller 4, preceding upper glue roller 6
The exterior circumference make-up of rubber roller 10 is cased with rubber roller set 9, the length of the roller set 8 of the rubber roller set 9 and rear bottom roll 1 of rear upper glue roller 2
Degree is consistent and left and right ends are aligned, and the rubber roller set 9 and the rubber roller 10 of rear upper glue roller 2 of rear upper glue roller 2 pass through the second intermediate bearing
The rubber roller set 9 of connection, preceding upper glue roller 6 is consistent with the length of the roller of preceding bottom roll 5 set 8 and left and right ends are aligned, preceding upper glue roller 6
Rubber roller set 9 connect with the rubber roller 10 of preceding upper glue roller 6 by third intermediate bearing, 9 points of the rubber roller set of middle upper glue roller 4 is left glue
Roller set 11 and right rubber roller set 12, the left rubber roller set 11 and the length of the left roller of middle bottom roller 3 set 13 of middle upper glue roller 4 are consistent and left
Right both ends alignment, the right rubber roller of middle upper glue roller 4 cover 12 and left and right ends pair consistent with the length of the right roller of middle bottom roller 3 set 14
Together, the left rubber roller set 11 of middle upper glue roller 4 is connect with the rubber roller 10 of middle upper glue roller 4 by the 4th intermediate bearing, middle upper glue roller 4
Right rubber roller set 12 is connect with the rubber roller 10 of middle upper glue roller 4 by the 5th intermediate bearing;One spindle position group, two spindle positions it is rear on
Rubber roller 2, middle upper glue roller 4, preceding upper glue roller 6 rubber roller set 9 between rubber roller 10 successively from back to front be embedded in pressure-applying unit
Rear insertion grab, it is middle insertion grab, it is preceding insertion grab in, thus realize after upper glue roller 2, middle upper glue roller 4, preceding upper glue roller 6 in pressurization group
The rear portion of installation on part, pressure-applying unit is fixed on the ride face of spinning frame by fixing axle, and pressure-applying unit is along fixing axle
Rotation, upper glue roller 2, middle upper glue roller 4, the pushing of preceding upper glue roller 6 under a certain pressure after realizing during rotation.
The roller shaft 7 is solid cylindrical structure.
Roller shaft 7 is identical as the material of roller set 8, and is irony or steel.
Left roller set 13 is identical with the length of right roller set 14, and there are gaps therebetween.
Material with moving sleeve 24 is identical as the material of right roller set 14, is the cylindrical empty of both ends open with moving sleeve 24
Core structure.
Transmission shaft 17 is solid cylindrical structure.
Rubber roller 10 is irony material, and is solid cylindrical structure.
Rubber roller set 9 is rubber material.
The Yarn spinning method of the double drawing-off spinning apparatus of any description above single ingot, in use, pressure-applying unit is under force
Rotated along fixing axle, to realize the pushing of pressure-applying unit so that the rubber roller set 9 of the rear upper glue roller 2 of each spindle position with
The roller of bottom roll 1 covers 8 close face contacts afterwards, and the left rubber roller set 11 and right rubber roller set 12 of middle upper glue roller 4 descend sieve in respectively
3 left roller set 13, right roller is drawn to cover close face contact between 14, sieve of the rubber roller set 9 and preceding bottom roll 5 of preceding upper glue roller 6
It helps pull a cart close face contact between 8, the roller shaft 7 of bottom roll 5 rotates before first motor 18 drives, and then drives and preceding bottom roll
The roller set 8 for the preceding bottom roll 5 that 57 integration of roller shaft is fixedly connected rotates synchronously, 8 rotation of the roller of preceding bottom roll 5 set after
And the rubber roller set 9 for the preceding upper glue roller 6 for covering 8 close face contacts with the roller of preceding bottom roll 5 is driven to rotate synchronously, preceding bottom roll 5
Roller shaft 7 rotation then by the first connection gear group 19 drive transmission shaft 17 rotate, transmission shaft 17 rotation then passes through skin
14 rotation of right roller set of 14 rotation of right roller set for driving middle bottom roller 3 with 16, middle bottom roller 3 then drives and middle bottom roller
The right rubber roller set 14 that 3 right roller covers the middle upper glue roller 4 of 14 close face contacts rotates synchronously, at this time by front traction roller pair
And by the right roller of middle bottom roller 3 cover 14 and middle upper glue roller 4 right rubber roller set 12 form in formed between right drawing rollers pair
The drafting multiple of right front draft zone, right front draft zone is fixed and is equal to the gear ratio of the first connection gear group 19;Second motor 21
The roller shaft 7 of bottom roll 1 rotates after drive, then drives rear lower sieve being fixedly connected integrated with the roller shaft 7 of rear bottom roll 1
1 roller set 8 is drawn to rotate synchronously, 8 rotation of roller set of rear bottom roll 1 then drives closely presses with the roller of rear bottom roll 1 set 8
The rubber roller set 9 of the rear upper glue roller 2 of press contacts rotates synchronously, and the rotation of roller shaft 7 of rear bottom roll 1 then passes through the second connection gear
Group 20 drives the roller shaft 7 of middle bottom roller 3 to rotate, and the rotation of roller shaft 7 of middle bottom roller 3 then drives sieve with middle bottom roller 3
13 rotation of left roller set for the middle bottom roller 3 that 7 integration of pulling shaft is fixedly connected, 13 rotation of left roller set of middle bottom roller 3 is then
It drives the left rubber roller set 11 for the middle upper glue roller 4 for covering 13 close face contacts with the left roller of middle bottom roller 3 to rotate synchronously, exists at this time
By first break draft roller to left roller set 13 and the left rubber roller of middle upper glue roller 4 set 11 by middle bottom roller 3 form in left drawing-off
Left back draft area is formed between roller pair, the drafting multiple of left back draft area is fixed and is equal to the number of teeth of the second connection gear group 20
Than, meanwhile, it is formed covering 12 to the right rubber roller with right roller set 14 and middle upper glue roller 4 by middle bottom roller 3 by first break draft roller
In form right first break draft area between right drawing rollers pair, the drafting multiple in right first break draft area be equal to first break draft roller to preceding lead
Stretch the total draft multiple between roller pair divided by the drafting multiple of right front draft zone, by front traction roller to by middle bottom roller
Left front draft area is formed between left drawing rollers pair in 3 left roller set 13 and 11 composition of left rubber roller set of middle upper glue roller 4, it is left
The drafting multiple of front draft zone is equal to first break draft roller to the total draft multiple between front traction roller pair divided by left back drawing-off
The drafting multiple in area;Feeding bell mouth arrangement is added at the rear portion of first break draft roller pair, feeding bell mouth arrangement includes left loudspeaker
Mouth and right horn mouth are fixedly connected by connecting cross bar between left horn mouth and right horn mouth, and retain spacing between the two,
First rove 22 by left horn mouth feed drafting system, the second rove 23 by right horn mouth feed drafting system, the first of feeding
Rove 22, which then is covered to press between 8 and the rubber roller set 9 of rear upper glue roller 2 by the roller of rear bottom roll 1, to be fed, then by middle bottom roller
It presses and exports between 3 left roller set 13 and the left rubber roller set 11 of middle upper glue roller 4, the first rove 22 is led by left back during this
The drawing-off for stretching area acts on obtaining the first fibre bundle, and then the first fibre bundle is by the roller set 8 and preceding upper glue roller 6 of preceding bottom roll 5
Output is pressed between rubber roller set 9, the first fibre bundle is acted on obtaining the first ribbon by the drawing-off of left front draft area during this,
Second rove 23 of feeding, which then is covered to press between 8 and the rubber roller set 9 of rear upper glue roller 2 by the roller of rear bottom roll 1, to be fed, then
It is covered to press between 14 and the right rubber roller set 12 of middle upper glue roller 4 by the right roller of middle bottom roller 3 and export, the second rove 23 during this
Drawing-off by right first break draft area acts on obtaining the second fibre bundle, and the second fibre bundle is by the roller set 8 of preceding bottom roll 5 and preceding gluing
Output is pressed between the rubber roller set 9 of roller 6, the second fibre bundle is acted on obtaining the second fibre by the drawing-off of right front draft zone during this
Item is tieed up, so that the total draft multiple for realizing that the first rove 22 of feeding and the second rove 23 are subject in drafting system is identical;The
One ribbon and the second ribbon are constantly exported in the case where the rotation of front traction roller pair drives, and first through drafting system output is fine
Dimension item and the second ribbon interact resultant yarn under the action of twisting the twist, according to the first ribbon and the second fiber of output
The property of item, when the orientation for twisting the twist is that Z is twisted, the mechanism of interaction resultant yarn at this time includes four kinds, the first
Be positioned at left side the first ribbon will be located at right side the second ribbon package resultant yarn, and the two in encapsulation process respectively into
Row twisting effect;It is for second that the first ribbon positioned at left side is twisted first, is then located at second ribbon on right side again
Looping resultant yarn, and the two respectively carries out twisting effect simultaneously in encapsulation process;The third is the first fiber positioned at left side
Item and the second ribbon positioned at right side directly and close mutually winding resultant yarn, and during the winding process for positioned at the first fine of left side
Item is tieed up by second ribbon on right side gradually looping, and the two respectively while carrying out twisting work during mutual winding
With;4th kind is the respectively preliminary twisting first of the first ribbon positioned at left side and the second ribbon positioned at right side, then again
Mutual winding resultant yarn, and be during the winding process the adding through preliminary by right side positioned at first ribbon through tentatively twisting in left side
The the second ribbon gradually looping twisted;When the orientation for twisting the twist is that S is twisted, the mechanism packet of interaction resultant yarn at this time
Four kinds are included, the first is will to be located at the second ribbon package resultant yarn in left side positioned at second ribbon on right side, and the two is being wrapped
Twisting effect is respectively carried out during wrapping up in;It is for second that the second ribbon positioned at right side is twisted first, is then located at a left side again
First ribbon looping resultant yarn of side, and the two respectively carries out twisting effect simultaneously in encapsulation process;The third is to be located at
First ribbon in left side and positioned at right side the second ribbon directly and close mutually winding resultant yarn, and during the winding process be position
In right side the second ribbon by first ribbon in left side gradually looping, and the two during mutual winding respectively together
Shi Jinhang twisting effect;4th kind is that the first ribbon positioned at left side and the second ribbon positioned at right side respectively add first
It twists, then mutual winding resultant yarn again, and is during the winding process the second ribbon through tentatively twisting positioned at right side by left side
The gradually looping of the firstth ribbon through tentatively twisting.
But the drafting multiple for the front draft zone being subject to and the drafting multiple in first break draft area are same or different, lead forward and backward
The Pullin performances stretched in area are different, including three kinds of situations, the first situation are the gear ratios and second of the first connection gear group 19
The product of the gear ratio of connection gear group 20 is equal to first break draft roller to the total draft multiple between front traction roller pair, also
It is that the drafting multiple of left back draft area and the product of drafting multiple of right front draft zone are equal to total draft multiple, at this time the first rove
After the drafting multiple of the 22 left back draft areas being subject in first break draft area is equal to the right side that the second rove 23 is subject in first break draft area
The drafting multiple of the drafting multiple of draft area, the left front draft area that the first rove 22 is subject in front draft zone is equal to the second rove
The drafting multiple of the 23 right front draft zones being subject in front draft zone, that is, the first rove 22 and the second rove 23 be subject to it is total
Drafting multiple it is identical, and the drafting multiple for the front draft zone being subject to and the drafting multiple in first break draft area are also identical, to realize
First rove 22 and the second rove 23 are in drafting system by identical drafting process;Second situation is the first connection
The product of the gear ratio of gear set 19 and the gear ratio of the second connection gear group 20 be less than first break draft roller to and front traction roller
Total draft multiple between, that is, the product of drafting multiple of drafting multiple and right front draft zone of left back draft area are less than
Total draft multiple, the drafting multiple for the left back draft area that the first rove 22 is subject in first break draft area at this time is less than the second rove 23
The drafting multiple in the right first break draft area being subject in first break draft area, the left front draft area that the first rove 22 is subject in front draft zone
Drafting multiple be greater than the drafting multiple of right front draft zone that the second rove 23 is subject in front draft zone, that is, the first rove
22 total drafting multiples for being subject to the second rove 23 are identical, but the drafting multiple for the front draft zone being subject to and first break draft area are led
Multiple difference is stretched, to realize the first rove 22 and the second rove 23 in drafting system by different drafting process;Third
Kind of situation is the product of the gear ratio of the first connection gear group 19 and the gear ratio of the second connection gear group 20 greater than first break draft sieve
It draws to the total draft multiple between front traction roller pair, that is, the drafting multiple of left back draft area and leading for right front draft zone
The product for stretching multiple is greater than total draft multiple, the drawing-off times for the left back draft area that the first rove 22 is subject in first break draft area at this time
Number is greater than the drafting multiple in the right first break draft area that the second rove 23 is subject in first break draft area, and the first rove 22 is in front draft zone
Drawing-off times of the drafting multiple for the left front draft area being subject to less than the right front draft zone that the second rove 23 is subject in front draft zone
Number, that is, total drafting multiple that the first rove 22 and the second rove 23 are subject to are identical, but the drawing-off for the front draft zone being subject to
Multiple is different with the drafting multiple in first break draft area, to realize the first rove 22 and the second rove 23 in drafting system by not
Same drafting process.
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910061146.XA CN109652879B (en) | 2019-01-23 | 2019-01-23 | Single-spindle double-draft spinning device and spinning method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910061146.XA CN109652879B (en) | 2019-01-23 | 2019-01-23 | Single-spindle double-draft spinning device and spinning method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109652879A true CN109652879A (en) | 2019-04-19 |
CN109652879B CN109652879B (en) | 2021-07-06 |
Family
ID=66120548
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910061146.XA Active CN109652879B (en) | 2019-01-23 | 2019-01-23 | Single-spindle double-draft spinning device and spinning method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109652879B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH03220330A (en) * | 1990-01-24 | 1991-09-27 | Toray Eng Co Ltd | Sliver for doubling, and preparation thereof |
CN103556320A (en) * | 2013-07-18 | 2014-02-05 | 嘉兴学院 | Blending and color mixing device and method based on three-roving coupling drafting twisting system |
CN104762714A (en) * | 2015-03-27 | 2015-07-08 | 江南大学 | Yarn method and device for implementing color mixing of double-color roving through asynchronous/synchronous two-stage drafting |
CN105821532A (en) * | 2016-04-19 | 2016-08-03 | 江南大学 | Segment color yarn spinning device and segment color yarn spinning method |
CN109234864A (en) * | 2018-10-08 | 2019-01-18 | 合肥经新纺织科技有限公司 | A kind of double twist yarn synchronous production devices and production method |
-
2019
- 2019-01-23 CN CN201910061146.XA patent/CN109652879B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH03220330A (en) * | 1990-01-24 | 1991-09-27 | Toray Eng Co Ltd | Sliver for doubling, and preparation thereof |
CN103556320A (en) * | 2013-07-18 | 2014-02-05 | 嘉兴学院 | Blending and color mixing device and method based on three-roving coupling drafting twisting system |
CN104762714A (en) * | 2015-03-27 | 2015-07-08 | 江南大学 | Yarn method and device for implementing color mixing of double-color roving through asynchronous/synchronous two-stage drafting |
CN105821532A (en) * | 2016-04-19 | 2016-08-03 | 江南大学 | Segment color yarn spinning device and segment color yarn spinning method |
CN109234864A (en) * | 2018-10-08 | 2019-01-18 | 合肥经新纺织科技有限公司 | A kind of double twist yarn synchronous production devices and production method |
Also Published As
Publication number | Publication date |
---|---|
CN109652879B (en) | 2021-07-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108179507B (en) | A kind of upper and lower double drafting shape-preserving pure spinning siro yarn and its production device and method | |
CN109594167B (en) | Double-filament core-spun yarn production device and production method thereof | |
CN203080159U (en) | One-step double-coated covering silk machine | |
CN109097884A (en) | A kind of production method for matching the high-elastic yarn of network | |
CN105624872B (en) | A kind of section coloured yarn spinning apparatus and Yarn spinning method | |
CN108930078A (en) | The soft clean Pure Yarn process units of one kind and production method | |
CN103276485A (en) | Multi-color embedding type section colorful spinning method, and device and product thereof | |
CN107190393A (en) | High-elastic double-core yarn production device and production method | |
CN106544770A (en) | A kind of three rove pair drawing-off fancy yarn process units and production method | |
CN109234864A (en) | A kind of double twist yarn synchronous production devices and production method | |
CN206127532U (en) | Double -contracting twines hollow ingot novelty apparatus for producing | |
CN109706560A (en) | Control spinning apparatus and Yarn spinning method are gathered in a kind of double drawing-offs | |
CN109680381B (en) | Double-filament interlaced core-spun yarn production device and production method | |
CN109137178A (en) | A kind of three primary colors fiber secondary colour Spinning process device and production method | |
CN109898204B (en) | Production device and production method of composite functional yarn | |
CN109652879A (en) | The double drawing-off spinning apparatus of single ingot and its Yarn spinning method | |
CN109881310B (en) | A kind of pure spinning conformal yarn production device and production method | |
CN109837631B (en) | Composite wrapping yarn production device and production process thereof | |
CN109554796A (en) | A kind of composite core-spun yarn process units and production method | |
CN109554786A (en) | A kind of double drawing-offs control spinning apparatus and Yarn spinning method | |
CN109778355A (en) | Twisted composite core-spun yarn production device and production method thereof | |
CN109554795A (en) | One kind is pure to spin conformal covering yarn process units and production method | |
CN110067051A (en) | A kind of double drawing-off Siro-spinning devices and Yarn spinning method | |
CN109837616A (en) | Spinning apparatus and its Yarn spinning method with double transmission drawing-off controls | |
CN109576853A (en) | A kind of function covering yarn process units and production method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |